Variation Orders and Time Extensions
Variations in the actual construction are inevitable. There will always be a
time where in changes has to be made in the project so as to accommodate the need of the
client. These include changes in the scope of work, addition, substitution and omission of
any part of the job, and alteration of the materials to be used.
In Suntrust Parkview Project, to file a variation order, their first process is
to submit a e!uest for Information " #larification $%I& %orm to the owner,
'()*+- #P*TI/. 0ou can see in this form to whom the letter is
addressed, the date the form was made, the subject for clarification, the reference
clarification, and the details of !uestion or clarification. It also indicates here the
ultimatum for the reply for the purpose that the issue will be acknowledged as soon as
possible for accelerated solution. The form will be given back to the general contractor
with the reply from the owner of what will be done.
/e1t will be the filling up of the Purchase rder %orm to get the materials
from the suppliers to start the variation order. This will only be accomplished if the
variation order is for additional construction, like putting up a canopy, planting a new
column, etc.
In the sample %I %orm below, '(#, the general contractor, asks if the
specification of the canopy at main entrance will follow the original plan that is precast
concrete canopy or if they will adopt the material"detail used at Tower 2 which is made of
angle bar framing and aluminum composite cladding. . The owner3s response was to use
the design of canopy at tower 2. They have also included a key plan for the approved
solution.
-
8/11/2019 (G) Variation Orders and Time Extensions
2/5
Sample e!uest for Information " #larification $%I& %orm
-
8/11/2019 (G) Variation Orders and Time Extensions
3/5
Purchase rder %rom of the Sample %I %orm
-
8/11/2019 (G) Variation Orders and Time Extensions
4/5
*ttached approved design of the canopy at main entrance
*ctual constructed variation order on the site.
-
8/11/2019 (G) Variation Orders and Time Extensions
5/5
4. TI'( (5T(/SI/S
In case that the change order is to eliminate something, there is no need
for the Purchase rder. nly in architectural aspect of the plan can only the plan be
altered in removing something from consideration. In most cases, variation orders re!uest
for time e1tension. This re!uest is asked in a form of letter sent to the owner indicating
the reason of the time e1tension. It also shows in the letter the planned start of the project
and its completion date. This is sent to the owner by the Project 'anager of the general
contractor.
Time (1tensions