    Variation Orders and Time Extensions

    Variations in the actual construction are inevitable. There will always be a

    time where in changes has to be made in the project so as to accommodate the need of the

    client. These include changes in the scope of work, addition, substitution and omission of

    any part of the job, and alteration of the materials to be used.

    In Suntrust Parkview Project, to file a variation order, their first process is

    to submit a e!uest for Information " #larification $%I& %orm to the owner,

    '()*+- #P*TI/. 0ou can see in this form to whom the letter is

    addressed, the date the form was made, the subject for clarification, the reference

    clarification, and the details of !uestion or clarification. It also indicates here the

    ultimatum for the reply for the purpose that the issue will be acknowledged as soon as

    possible for accelerated solution. The form will be given back to the general contractor

    with the reply from the owner of what will be done.

    /e1t will be the filling up of the Purchase rder %orm to get the materials

    from the suppliers to start the variation order. This will only be accomplished if the

    variation order is for additional construction, like putting up a canopy, planting a new

    column, etc.

    In the sample %I %orm below, '(#, the general contractor, asks if the

    specification of the canopy at main entrance will follow the original plan that is precast

    concrete canopy or if they will adopt the material"detail used at Tower 2 which is made of

    angle bar framing and aluminum composite cladding. . The owner3s response was to use

    the design of canopy at tower 2. They have also included a key plan for the approved

    solution.

  • 8/11/2019 (G) Variation Orders and Time Extensions

    2/5

    Sample e!uest for Information " #larification $%I& %orm

  • 8/11/2019 (G) Variation Orders and Time Extensions

    3/5

    Purchase rder %rom of the Sample %I %orm

  • 8/11/2019 (G) Variation Orders and Time Extensions

    4/5

    *ttached approved design of the canopy at main entrance

    *ctual constructed variation order on the site.

  • 8/11/2019 (G) Variation Orders and Time Extensions

    5/5

    4. TI'( (5T(/SI/S

    In case that the change order is to eliminate something, there is no need

    for the Purchase rder. nly in architectural aspect of the plan can only the plan be

    altered in removing something from consideration. In most cases, variation orders re!uest

    for time e1tension. This re!uest is asked in a form of letter sent to the owner indicating

    the reason of the time e1tension. It also shows in the letter the planned start of the project

    and its completion date. This is sent to the owner by the Project 'anager of the general

    contractor.

    Time (1tensions