FY 18 Adopted CIP Book - Long Beach, California
Transcript of FY 18 Adopted CIP Book - Long Beach, California
FISCAL YEAR 2018 ADOPTED BUDGETCAPITAL IMPROVEMENT PROGRAM BUDGET
2018 LB BUDGET COVERS 6-19-17.indd 5 6/19/17 10:43 AM
FY18 Capital Improvement Program
Table of Contents
Guide to the CIP ................................................................................................ 1
Strategic Investments ..............................................................................................5
Section Summaries. .......................................................................................... 9
Measure A ............................................................................................. 21
Airport ............................................................................................. 23
Beaches and Marinas ..................................................................... 29
Mobility .................................................................................... 39
Parks and Recreation ................................................................. 57
Public Facilities .......................................................................... 73
Utilities ........................................................................................ 85
Harbor ............................................................................................. 93
Grant Funding ....................................................................................... 95
Index ........................................................................................................... 97
Glossary ................................................................................................ 99
i
Guide to the Capital Improvement Program (CIP)
Capital Program Overview
FY 18 Adopted CIP 1 City of Long Beach - Public Works
City of Long Beach- Public WorksFY 18 Adopted CIP
Guide to the Capital Improvement Program (CIP)
Capital Improvement Planning Process
The Public Works Department was responsible for developing and implementing the Fiscal Year 2018 (FY 18) CIP. Public Works, in conjunction with other Departments, reviewed the City’s capital needs and prioritized project submittals based on established criteria:
• The ability of the project to meet health, safety and legal concerns and mandates
• The value of the project to prolong the life of City assets or avoid/minimize future repair costs
• The benefit the project will provide the community in support of the goals articulated in the Strategic Plan
• The potential for the project to generate savings or increase productivity • The extent to which the project will secure future funds through program planning
or grant eligibility
The Financial Management Department provided the revenue projections to determine the type and amount of resources available to finance proposed capital projects. Specifically, Financial Management monitors fiscal trends at both the local and state levels. Analyses of property, sales, and user tax revenues and County, State and Federal information contribute to their economic forecast.
This Document
The CIP identifies the proposed budget for each program that will receive funding in FY 18, including estimated revenues for FY 19 and FY 20. The CIP’s multi-year character is reflected in the historical summaries to show the fiscal activity for each program.
Carryover Balances
The Financial Summaries and individual Program pages include an FY 18 Budget Balance column. These budget balance amounts may be currently planned for projects in the design stage, pending contract award, or committed to an approved contract. Therefore, estimated budget balance amounts are not necessarily available for new projects. Please note that carryover balances are based on November 14, 2017 data and calculated totals may reflect rounding.
Operating and Maintenance Costs/Operating Budget Impacts
One of the many issues evaluated through the CIP process is the impact new infrastructure projects and assets may have on departmental operating budgets. As capital improvement projects are considered by the City Council, the operating and maintenance (O & M) costs for these facilities should be estimated so that the City Manager and City Council can assess whether adequate budget is available to operate and maintain these facilities after construction.
2
City of Long Beach- Public WorksFY 18 Adopted CIP
Guide to the Capital Improvement Program (CIP)
(continued)
Although some additional costs may be absorbed within a department’s existing budget, future resources often will be required in the Proposed Budget for the operational expenses associated with capital projects. As part of the Capital Improvement Program Budget process, the Public Works Department coordinated with the Financial Management Department and end user department staff to describe and quantify any anticipated O & M costs associated with each new capital project.
O & M costs are addressed at the outset of the process and if needed included in proposed adjustments to the operating budgets as part of the Annual Budget Process. As a result, Management and the City Council are able to prioritize these additional costs, along with other budget requests, based on available funding.
Implementation Criteria
O & M costs are not applied to upgrades and renovations (e.g., major street maintenance projects) since they actually tend to lower long-term maintenance costs.
Calculating FY 18 Operating and Maintenance Costs
The Public Works Department assists client departments to qualify potential costs.
• FTE (Full Time Equivalent) impacts • Utility (water, sewer, refuse, electrical and gas) costs in a facility • Maintenance, including HVAC, plumbing, electrical and
structural repairs, landscaping services • Custodial services • New operating equipment/supplies • Technology annual replacement contribution
3
Fiscal Year 2018 Capital Improvement Program (New Funding)
Funding Summary
Total New Capital for FY 18 - $96,363,961
2.1% 0.5%
8.9%
8.4%
6.5%
27.3%1.6%
2.7%
22.5%
13.9%
4.2%
Airport Capital ‐ $2,000,000 Civic Center Capital ‐ $500,000
General Capital Projects ‐ $10,015,000 Gas Fund ‐ $8,050,000
Gasoline Tax Street Improvement ‐ $6,264,943 Measure A ‐ $26,311,739
Tidelands Operations ‐ $1,500,000 Queen Mary ‐ $2,589,000
Transportation ‐ $21,671,000 Water Fund ‐ $13,416,279
Sewer Fund ‐ $4,046,000
CY 18 Adopted CIP 4 City of Long Beach - Public Works
Strategic InvestmentsAdopted Capital Projects
Provided below is a summary of adopted capital improvement projects for FY 18. These projects are funded through a variety of sources. Additional detail can be found in the FY 18 program pages.
Airport $2,000,000
Title Status Estimated Cost
AIRPORT TERMINAL AREA IMPROVEMENT
The Long Beach Airport's historic terminal building is heavily used on a daily basis, requiring regular major maintenance, repairs and improvements. Repairs and improvements as needed.
$1,000,000
AIRPORT PAVEMENT REHABILITATION
Repairs and improvements necessary to comply with Part 139 Certification requirements. Improvements are emergency repairs and unforeseen maintenance on utility, pavement, crack sealing, and slurry sealing, signage, lighting replacement, paving.
$1,000,000
Beaches and Marinas $1,100,000
Title Status Estimated Cost
BEACH PARKING LOTS REHABILITATION
Upgrades and additions made to existing parking lot. Repaving, grading for better drainage and striping of parking lot.
$500,000
ALAMITOS BAY AREA IMPROVEMENTS
Demolition and installation of a replacement lifeguard station. $200,000
TIDELANDS CRITICAL FACILITY REPAIRS
Design and construct safety repairs at locations to be determined. $400,000
Mobility $47,736,182
Title Status Estimated Cost
PROP A TRANSIT IMPROVEMENTS
Primarily bus stop improvements at various locations and recreational transit.
$1,371,000
CITYWIDE LED LIGHTING Replace conventional high pressure sodium (HPS) lights with light emitting diodes (LEDs) to extend the useful life and reduce energy costs.
$210,500
MAJOR AND SECONDARY HIGHWAY (ARTERIAL)
Reconstruction and resurfacing of City streets to extend useful life, provide incidental curb, gutter and sidewalk improvements, construct curb ramps and bus pads, and replace pavement markings.
$18,527,624
BRIDGE REHABILITATION AND SEISMIC RETROFIT
Perform bridge deck repairs listed in the County of Los Angeles condition survey dated January 2012.
$300,000
RESIDENTIAL STREET PROGRAM
Repair residential street and alleys through pavement sealing, asphalt overlays, and full reconstruction.
$12,107,058
ALLEYS Ongoing repair and/or replacement of existing alleys identified in the Alley Pavement Management Plan.
$1,800,000
CITYWIDE SLURRY SEAL PROGRAM
Repair residential streets through pavement sealing and slurry sealing.
$2,670,000
ADA RESPONSE PROGRAM Construct and/or improve verified requests for rights‐of‐way access and investigate new requests when received.
$500,000
FY 18 Adopted CIP 5 City of Long Beach - Strategic Investments
Strategic InvestmentsAdopted Capital Projects
(CONTINUED)
Continue Mobility
StatusTitle
SIDEWALKS/CURB RAMPS Construct sidewalk curb ramp improvements. $5,700,000
SUSTAINABLE TRANSPORTATION IMPROVEMENT
Design, construct and implement projects and programs to enhance the safety and viability of bicycle and pedestrian routes.
$3,250,000
CITYWIDE STRIPING & SIGNAGE PROGRAM
Install and replace street name signs and traffic control signs at various locations, as needed, throughout the city.
$50,000
NEIGHBORHOOD TRAFFIC MITIGATION
Provide enhancements and improvements to safety, mobility and active transportation to City neighborhoods.
$250,000
TRAFFIC & PEDESTRIAN SIGNALS
Construct pedestrian related safety improvements and high priority traffic signal improvement projects.
$1,000,000
Parks & Recreation $7,127,500
Title Status Estimated Cost
PARK BIKE PATH REPLACEMENT
Repair and/or replacement of existing bike paths, facilities, signage, and striping of park bike paths.
$100,000
PARK FACILITY REROOFING Reroof Park Facilities as needed to prevent damage to structures, equipment and inventory citywide.
$292,000
RANCHO LOS ALAMITOS Perform improvements in a manner that is consistent with preserving the historical character of the Rancho.
$500,000
RANCHO LOS CERRITOS Repair and maintenance upgrades to extend the useful life of Rancho Los Cerritos.
$500,000
PARK ACQUISITION & DEVELOPMENT
Acquisition of park land and development of new parks throughout the City.
$4,648,000
GAME FIELD UPGRADES Repair and maintain to prolong the life of game field infrastructure and reduce future expenses related to heavy usage.
$480,000
IRRIGATION SYSTEM REPLACEMENT
Upgrade and replace park irrigation systems. $357,500
RECREATION BUILDING REHABILITATION
Rehabilitate existing buildings to enhance the functional use. $250,000
Public Facilities $11,038,000
Title Status Estimated Cost
CONVENTION CENTER COMPLEX IMPROVEMENTS
Ongoing improvements include the Terrace Plaza fountain upgrades, Terrace Plaza Sound & Lighting upgrades and general facility improvements: painting, flooring and other building upgrades.
$1,400,000
CIVIC CENTER COMPLEX IMPROVEMENTS
Improvements to maintain each facility in a reliable and efficient operating condition
$500,000
FY 18 Adopted CIP 6 City of Long Beach - Strategic Investments
Strategic InvestmentsAdopted Capital Projects
(CONTINUED)
Continue Public Facilities
StatusTitle
CITYWIDE REROOFING Replace City buildings roofs as needed to prevent damage to structures, equipment and protect and preseve inventory.
$250,000
GENERAL CITY BUILDING REFURBISHMENT
Refurbish City buildings to minimize structural deficiencies and extend the facility useful life.
$5,974,000
FIRE FACILITIES MODERNIZATION
Upgrades to provide gender separation for restrooms and the conversion of common sleeping dorms to private sleeping quarters in order to provide privacy for the workforce.
$125,000
FACILITY ASSESSMENTS Compile a comprehensive facility listing and identify facilities to be assessed in the City’s Facility Condition Assessment Study.
$200,000
QUEEN MARY PROJECTS Historic preservation and capital improvements to the Queen Mary. $2,589,000
Utilities $27,362,279
Title Status Estimated Cost
GAS AND OIL PROGRAM Installation of an Advanced Metering Infrastructure system (AMI) and repair and improvement to the City’s gas pipeline infrastructure.
$8,050,000
STORM DRAIN PUMP STATION REPAIR & CERTIFICATION
Repair and upgrade storm water pumps at various locations in accordance with AQMD regulations.
$1,550,000
STORM DRAIN SYSTEM & WATER QUALITY IMPROVEMENT
Repair storm water catch basins and storm water mainline pipes. Construct storm drain enhancements.
$300,000
SEWER FUND Upgrades and improvements to the City’s sewer infrastructure. $4,046,000
WATER FUND Upgrades and improvements to the City’s potable and reclaimed water infrastructure.
$13,416,279
FY 18 Adopted CIP 7 City of Long Beach - Strategic Investments
8
Section Summaries The purpose of the CIP is to provide a comprehensive Infrastructure Investment Program to plan, design, construct, maintain, and repair City facilities and infrastructure. The size, age and diverse infrastructure of the City require significant consideration to determine the best investments to make now, in order to realize the most cost effective returns in the future. The CIP also serves as a financial tool to set aside funds for the wide variety of capital projects as well as a planning tool to ensure capital projects are consistent with the City’s General plan.
How this Document is Organized
The economic vitality and quality of life in the community is enhanced through CIP projects. Capital improvements require a major initial investment, a significant and continuing financial commitment for maintenance and, eventually, replacement. The following pages provide a summary of each section with a dollar amount that represents adopted new funding for FY 18.
Airport
Beaches and Marinas
Harbor
Mobility
Public Facilities
Parks
Utilities
FY 18 Adopted CIP 9 City of Long Beach - Section Summaries
Program Section Overviews
Airport Long Beach Airport (LGB) serves over 3 million passengers each year and offers a variety of services to air carriers, commercial and general aviation users, as well as the traveling public. Funding for Airport Capital Improvement Projects is derived from several sources including: Federal Aviation Administration (FAA), Airport Improvement Program grants (AIP); Passenger Facility Charges (PFC); Customer Facility Charges (CFC); Airport fees; and bond sale proceeds. The focus of the Airport Capital Improvement Program is to continue improving the safety, security, and operations of the Airport to meet the mandates of the FAA and Transportation Security Administration.
In FY 17, LGB completed security improvements to the airfield perimeter. The improvements included the removal of several thousand feet of deteriorating and/or inadequate perimeter fence, installation of intrusion detection systems, access control systems, and security network infrastructure improvements. Also, completed in FY 17 were improvements to the Lot A parking structure. The Lot A project consisted of demolition of the existing single elevator and staircase tower; installation of a new two-cab elevator and outdoor staircase; new exit driveway; new attendant booth; new ramps, curbs, gutters and islands; and new LED lighting. FY 18 funds have been approved for miscellaneous Terminal Area
Improvements and Airfield Pavement Rehabilitation. Planned projects in FY 18 include selected priorities of the Terminal Area Improvements Phase II. The Terminal Improvements Phase II consists of a new ticketing lobby, TSA In-Line Checked Baggage Screening Facility, baggage claim, Rental Car Facility, and a Ground Transportation Center.
FY 18 Adopted CIP 10 City of Long Beach - Section Summaries
Beaches and Marinas
Two assets that make Long Beach unique are its beaches and marinas. These City operated and maintained resources provide recreational enjoyment to both residents and visitors. In FY 17, the City completed the Colorado Lagoon Restoration Phase 2B, and continues to work on the Seaside Way Pedestrian Bridge at the Convention Center, which will be substantially complete by the end of FY 17. These new improvements are more efficient and environmentally friendly than they were in their previous condition.
In FY 17, the City also initiated the Colorado Lagoon Open Channel Project, which is anticipated to be completed in FY18. Construction began in FY 18 for the following projects: Leeway Sailing Center Pier Rebuild, Rainbow Harbor Commercial Sewage EVAC System Replacement, Belmont Pool/Granada Parking Lot Improvements, Rainbow Harbor Aquarium Plaza Wave Fountain repairs, and installation of the new Bayshore Lifeguard Station. The Marinas, Beaches & Waterways budget includes a total of $1.1 million in new funding for FY 18. This funding includes the completion of the Belmont Pool/Granada Parking Lot paving and improvements, the new Bayshore Lifeguard Station, and the Tidelands Critical Facility Repairs. Most Tidelands Capital Improvement Projects are subject to State Lands Commission approval.
FY 18 Adopted CIP 11 City of Long Beach - Section Summaries
Mobility
Preserving our neighborhoods is a key element in the Long Beach Strategic Plan. The Mobility section contains programs designed to meet the increased needs for mobility resulting from economic growth, utilizing a combination of different funding sources. These funds include Proposition A & C, Gas Tax Street Improvement Capital, Transportation Improvement Fees, and Federal, County grants and two new funding sources, Los Angeles County Measure M and the State Road Maintenance and Rehabilitation Act funds.
Mobility improvements include street repair, street and intersection widening, traffic signal system expansion and upgrades, transit improvements, replacement parking, neighborhood traffic management, and bike lanes.
This section also includes programs that monitor and evaluate traffic congestion throughout the City and respond with projects to relieve congestion or enhance traffic safety. The Street Rehabilitation program is designed to help meet that goal. The program delivers improvements including reconstructing and resurfacing major, secondary, and residential streets; upgrading accessibility of curb ramps to comply with current American Disabilities Act (ADA) regulations; replacing of street signs; repairing neighborhood sidewalks, curbs, and gutters; and rehabilitating bridges to repair deficiencies identified by the annual bridge inspection report. Public Works continues to update the Pavement Management System biannually and uses the information to prioritize the streets in need of resurfacing or reconstruction.
There are several factors that are taken into consideration when the City evaluates the selection of streets, such as surface conditions, utility work (pipeline construction), future developments in the area, and potential conflicts with other projects. The goal and objective is to rehabilitate a roadway when it is in “good” condition versus delaying repairs to a state in which the street is in a “poor” condition, significantly increasing the costs of repairs.
FY 18 Adopted CIP 12 City of Long Beach - Section Summaries
In FY 17, 15 lane miles of arterial streets were replaced, 15 miles if sidewalks were repaired and 6.5 lane miles of bike lanes were added.
The Mobility budget includes $47.7 million in new funding for FY 18, of which $33.6 million has been budgeted for street rehabilitation. Measure A funds total $14 million, of which $2.7 million is for residential street repair, $6.9 million for arterial street improvements, $1.8 million for alley improvements Citywide and $2.6 million for slurry improvements.
In addition to Measure A funding, street rehabilitation also receives local and state funding totaling $27.5 million for major and secondary streets, residential street repair, sidewalks, bridge rehabilitation and related improvements provided in the FY 18 Capital Budget. The remaining $6.1 million in new funding is proposed for sustainable transportation improvements, Citywide signage, traffic mitigation, and traffic & pedestrian signal improvements. Of this amount, $50,000 in Measure A funds have been budgeted to replace the City’s aging traffic signs and $210,500 has been budgeted to upgrade the City’s street lights to LEDs.
FY 18 Adopted CIP 13 City of Long Beach - Section Summaries
Parks and Recreation Long Beach’s 170 parks and open spaces are fundamental to the fabric of the Long Beach community, and are a cornerstone of the City’s livability initiatives. Long Beach Parks generate property value and tax revenue, increase community health and reduce environmental impacts and costs.
Parks contribute to the economic vitality of Long Beach, as proximity to Long Beach parks increases property value, thereby increasing property tax revenue. Long Beach Parks are a good value compared with the amount residents would pay to use equivalent private facilities. Long Beach Parks host festivals, concerts and athletics events that draw visitors bringing tourism revenue to local restaurants, hotels, and stores, boosting the local economy.
Parks provide space for exercise and respite, and exposure to green space is associated with better physical and mental health. The environmental benefits of Long Beach Parks save residents money through reduced air pollution, greenhouse gas emissions, and storm water management costs. Long Beach Parks are essential to crime reduction efforts and reduce juvenile crime by providing places for children to learn, play and be involved in positive activity. Parks also deliver multi-generational programs and activities for Long Beach’s four-legged residents.
Many of Long Beach’s 170 parks and open spaces face aging infrastructure, and there is a constant and significant effort to rehabilitate existing park assets. Long deferred critical repairs have resulted in necessary capital projects to rehabilitate various park sites. In FY 17, the first year of Measure A funding provided for facility improvements at MacArthur, MLK, and Pan American Parks;
improvements to Animal Care Services, and the historic Rancho Los Alamitos site. Also in FY17, newly-developed parks included Gumbiner Park, the Drake/Chavez Greenbelt, and Molina Park.
FY 18 Adopted CIP 14 City of Long Beach - Section Summaries
Public Facilities The City of Long Beach owns hundreds of facilities throughout the City contributing to provide residents with public services, recreation, places to learn, and public safety. A few of the popular facilities include the Civic Center comprised of City Hall, Fire Station 1, Police Headquarters and the Main Library, the Department of Health and Human Services, neighborhood branch libraries, and Public Works operations. Long deferred critical repairs are required to sustain the integrity of the City’s various facilities. During FY 17, repairs were completed at the Fleet Services and Environmental Services Bureau facilities included roofing, painting, and on-site water line and skylight repairs. Construction of the new Michelle Obama Library and a new liquefied natural gas filling station was completed along with roof repairs at four Health and Human Services Buildings, HVAC repairs at the Emergency Operations Center, and remodel and repair work at multiple Police Department, Fire Department, and Library locations.
In FY 18, $11.3 million is approved for Public Facilities. Of that amount, $4.1 million is proposed from Measure A funding for general building refurbishment, fire facilities modernization, the convention center and an update to the facility assessment study. The remaining $7.2 million is for Queen Mary and energy efficient upgrades at Civic Center improvements to keep the facility operational until the new city hall and main library are complete.
FY 18 Adopted CIP 15 City of Long Beach - Section Summaries
Harbor The Harbor Department (Port) continues to implement a long-term capital improvement program designed to provide Port tenants with safe and secure, state-of-the-art facilities capable of accommodating international trade and secure regional economic benefits in a sustainable manner that ensures economic vitality, ecological health, and community integrity.
The Port’s $3 billion investment in capital projects over the next decade will stimulate the economy by creating thousands of direct construction jobs along with indirect service and commercial opportunities. In FY 17, the Port is forecasting to spend $267 million on the Gerald Desmond Bridge as construction is well underway, with all work scheduled to be completed in 2018. FY 18 will also see the Port invest approximately $90 million in its Middle Harbor Redevelopment Project. When the project is complete, the Middle Harbor Terminal will accommodate the newest 20,000+ Twenty-Foot Equivalent Unit (TEU) container ship and be the greenest major container terminal in North America due to its extensive use of on dock rail and cold ironing infrastructure.
Port Security will continue to be a high priority, with the Department investing nearly $19 million in capital projects, including $15 million for fire station upgrades and one new fire boat.
FY 18 Adopted CIP 16 City of Long Beach - Section Summaries
Utilities The new Utilities section is comprised of three services to Long Beach residents. These are Long Beach Gas and Oil, Long Beach Water and Stormwater/Environmental Compliance. Long Beach Gas and Oil Department Long Beach Gas & Oil (LBGO) oversees 1,900 miles of natural gas pipeline. A key Department objective is the safe delivery of natural gas to its 147,000 businesses and households. All operations are conducted in strict compliance with U.S. Department of
Transportation’s (DOT) pipeline safety regulations, CFR 49 part 190-199. LBGO is engaged in a long-term pipeline infrastructure replacement program focusing on pipelines identified in its Distribution Integrity Management Plan. During the past five years, over 56 miles of distribution pipeline and approximately 5,500 service pipelines have been replaced, improving system integrity.
As part of the Department’s commitment to provide affordable and safe natural gas, LBGO has taken a system-wide approach in reviewing the backbone of the gas distribution system for potential upgrades to increase reliability of gas delivery. LBGO is also in the process of establishing a consistent pressure standard throughout the system to ensure the long-term ability to meet customer demand and has installed or replaced twelve district regulator stations in the past five years. The integrated approach to pressure-consistency, and replacement of aging infrastructure will improve reliability and allow for more efficient operations. In addition, LBGO will continue to work closely with the Public Works Department to coordinate gas projects with street improvement projects.
FY 18 Adopted CIP 17 City of Long Beach - Section Summaries
Stormwater/Environmental Compliance
The Stormwater/Environmental Compliance Division is responsible for maintaining the City’s 300 miles of storm drains and sewer pipeline, pump stations and monitoring stormwater quality within Long Beach. Water quality compliance is handled through the City’s National Pollutant Discharge Eliminate System (NPDES) permit. In 2016, an assessment of the City’s 23 pump stations was completed and identified over $35 million in repairs and upgrades.
In FY 18, $1.85 million is for Stormwater/Environmental Compliance. Of this amount, $1.55 million is from Measure A funding for storm drain repair and certification. The remaining $300,000 is to install full capture trash inserts to comply with a State-wide environmental mandate.
Long Beach Water Department
Planned capital improvements to the City’s water and sewer system encompass a wide range of projects. The Water Department will continue replacing aging infrastructure that is approaching the end of their useful life including, but not limited to; water pipelines, valves and meters. The Department will coordinate pipeline projects with the Measure A Street Rehabilitation projects. In addition, the Department is continuing with its well and water tank rehabilitation projects. The Sewer CIP budget reflects a sustained level of investment in infrastructure, as the Department follows a programmatic CIP based on an updated Sewer Master Plan.
FY 18 Adopted CIP 18 City of Long Beach - Section Summaries
Guide to the CIP Program Page
Program Icon: Each Program Section is denoted by an icon displayed at the upper left of the program page.
Airport
Beaches and Marinas
Harbor
Mobility
Public Facilities
Parks
Utilities
Program Title: This summarizes the description of the Program. The City’s diverse programs range from Traffic and Pedestrian Signals to Rainbow Lagoon to Park Bike Path Replacement to Citywide Residential Street Repair.
Program Number: The reference number used to identify the specific CIP.
Program Budget for FY 18: The beginning balance plus new funding for FY 18 Budget, the funding Source shows the different funds making up the total project budget.
FY 18 and Future Years Totals: The total amount of new funding that will be allocated to the program in the current and future fiscal years.
FY 18 Adopted CIP 19 City of Long Beach - Section Summaries
FY 18 Adopted CIP City of Long Beach ‐ Mobility
Program NumberProgram TitleProgram Icon
Budget Breakdown by Funding Source
FY 18 and Estimated Future Years Totals
SAMPLE PROGRAM PAGE
PROP A TRANSIT IMPROVEMENTS PW4230
Mobility
Project Description Primary bus stop improvements at various locations and recreational transit.
Estimated Operating Repair and maintenance to prolong the life of bus stops.
and Maintenance
Project Timeline Design: October 2017 ‐ January 2018.
Construction: February 2108 ‐ September 2018.
Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665
Funding SourcesFunding Source Begining Balance FY 18 FY 19 FY 20 3 Year Total
PROP A $2,089,697 $1,371,000 $1,371,000 $1,371,000 $6,202,697
TRAFFIC MITIGATION PROGRAM $4 $0 $0 $0 $4
Total $2,089,701 $1,371,000 $1,371,000 $1,371,000 $6,202,701
20
Measure A
Year 2 Infrastructure Project Map
FY 18 Adopted CIP 21 City of Long Beach - Measure A
Measure A Funding
Year Two Infrastructure Project List
Mobility 14,333,239$
Arterial Street Improvements 6,902,739
Residential Street Repair (Slurry) 2,670,000
Curbs & Sidewalks 2,700,000
Alley Improvements 1,800,000
Smart Street Light Technology 210,500
Traffic Signage Replacement 50,000
Public Facilities 4,049,000$
Facility Assessment 200,000
Convention Center 1,000,000
Police Academy Building 900,000
Fire Station 7 Improvements 120,000
Fire Station 10 Improvements 125,000
Fire Station 17 Improvements 35,000
Fire Training Center Improvements 325,000
Emergency Operations Center 290,000
Harte Library Branch Improvements 40,000
Bach Library Branch Improvements 67,000
Mark Twain Library Branch Improvements 47,000
Library Roof Improvements 250,000
Health Department Building Improvements 650,000
Parks & Recreation 6,379,500$
Houghton Park Community Center 4,000,000
Rancho Los Alamitos Improvements 500,000
Rancho Los Cerritos Improvements 500,000
Citywide Park Irrigation Improvements 357,500
4th Street Senior Center Improvements 250,000
Stearns Park Community Center Roof Repair 292,000
Veterans Field Turf Improvements 160,000
Hudson Field Turf Improvements 160,000
Admiral Kidd Field Turf Improvements 160,000
Utilities 1,550,000$
Stormwater Protection 1,550,000
Total 26,311,739$
FY 18 Adopted CIP City of Long Beach ‐ Measure A22
Fiscal Year 2018 Capital Improvement Program
FY18 Adopted CIP City of Long Beach – Airport
Airport
23
Begining Balan
ce
Total Funding
FY 18
FY 19
FY 20
Fund
Airport Funding
$12,041
$0
$0
$0
$12,041
AIRPORT 2009 BONDS
$20,119,944
$2,000,000
$2,000,000
$2,000,000
$26,119,943
AIRPORT CAPITAL
$14,377,391
$0
$0
$0
$14,377,391
AIRPORT CUSTOMER
FACILITY CHARGE
Total
$34,509,376
$2,000,000
$2,000,000
$2,000,000
$40,509,375
FY 18 Adopted CIP 24 City of Long Beach - Airport
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Airport
Program
Snapshot
$1,224,020
$1,000,000
$1,000,000
$1,000,000
$4,224,020
AP1030
AIRPORT TERMINAL AREA
IMPROVEM
ENT
$111,426
$0
$0
$0
$111,426
AP1035
AIRPORT TERMINAL DEV
ELOPMEN
T
$2,453,560
$1,000,000
$1,000,000
$1,000,000
$5,453,560
AP1070
AIRPORT PAVEM
ENT REH
ABILITATION
$17,249,306
$0
$0
$0
$17,249,306
AP1072
RUNWAY 7R‐25L REH
ABILITATION
$572
$0
$0
$0
$572
AP1073
RUNWAY 7L‐25R REH
ABILITATION
$632,274
$0
$0
$0
$632,274
AP1130
AIRPORT SECURITY ACCESS CONTR
OL (FAA)
$75,732
$0
$0
$0
$75,732
AP1160
RUNWAY INCURSION PREV
ENTION
$3,516,683
$0
$0
$0
$3,516,683
AP1170
AIRPORT TERMINAL AREA
TRAFFIC IM
PR
$208,354
$0
$0
$0
$208,354
AP1210
AIRPORT PARKING STR
UCTU
RE
$84,303
$0
$0
$0
$84,303
AP1220
AIRPORT SA
FETY AND SEC
URITY
$8,953,145
$0
$0
$0
$8,953,145
AP1270
REN
TAL CAR FACILITY
Total
$34,509,376
$2,000,000
$2,000,000
$2,000,000
$40,509,376
FY 18 Adopted CIP 25 City of Long Beach - Airport
AIRPORT TERMINAL AREA IMPROVEMENT
Airport
AP1030
Project Description The Long Beach Airport's historic terminal building is heavily used on a daily basis. This high usage leads to unforseen repairs and consists of emergency repair to non‐scheduled equipment replacement. The new passenger concourse will require similar as‐needed repairs as the facility ages. The critical need is for the Airport to have the ability to keep the facility operational. The Terminal Improvements Phase II consists of a new ticketing lobby, TSA In‐Line Checked Baggage Screening Facility, baggage claim, Rental Car Facility and a Ground Transportation Center.
Estimated Operating and Maintenance
Terminal upgrades are intended to prolong the life of the new infrastructure and ensure the terminal is modernized, efficient and accessible for future use.
Project Timeline Design: October 2017 – March 2018.Construction: April 2018 – September 2018.
Department Contact Airport ‐ Fred Pena ‐ (562) 570‐2630
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 AIRPORT CAPITAL $1,224,020 $1,000,000 $1,000,000 $1,000,000 $4,224,020
Total $1,224,020 $1,000,000 $1,000,000 $1,000,000 $4,224,020
FY 18 Adopted CIP 26 City of Long Beach - Airport
AIRPORT PAVEMENT REHABILITATION
Airport
AP1070
Project Description Rehabilitation of municipal airport pavement on an as‐needed basis. Repairs and improvements necessary to comply with Part 139 Certification requirements. Improvements include emergency repairs and unforseen maintenace on utility, pavement, crack sealing and slurry sealing, signage, lighting replacement, pavement marking modifications.
Estimated Operating and Maintenance
Repair and maintenance intended to prolong the life of the airport pavement and reduce future infrastructure expenses while increasing the safety of the pavement.
Project Timeline Design and Construction on a continuous basis.
Department Contact Airport ‐ Fred Pena ‐ (562) 570‐2630
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 AIRPORT CAPITAL $721,567 $1,000,000 $1,000,000 $1,000,000 $3,721,567
AIRPORT CUSTOMER FACILITY CHARGE $1,733,150 $0 $0 $0 $1,733,150
Total $2,454,718 $1,000,000 $1,000,000 $1,000,000 $5,454,718
FY 18 Adopted CIP 27 City of Long Beach - Airport
28
Fiscal Year 2018 Capital Improvement Program
FY18 Adopted CIP City of Long Beach – Beaches & Marinas
Beaches & Marinas
29
Begining Balan
ce
Total Funding
FY 18
FY 19
FY 20
Fund
Beaches and M
arinas Funding
($5,868)
$0
$0
$0
($5,868)
GEN
ERAL CAPITAL
$4,599,095
$0
$0
$0
$4,599,095
MARINA CAPITAL
$0
$0
$0
$600,000
$600,000
MEA
SURE A
($11)
$0
$0
$0
($11)
RDA
$92,540,846
$1,100,000
$0
$0
$93,640,845
TIDELANDS
Total
$97,134,062
$1,100,000
$0
$600,000
$98,834,061
FY 18 Adopted CIP 30 City of Long Beach - Beaches & Marinas
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Beaches and M
arinas
Program
Snapshot
($5,879)
$0
$0
$0
($5,879)
PR8100
WETLANDS
$35,294
$0
$0
$0
$35,294
PR8190
FUEL FACILITIES
$6,621
$0
$0
$0
$6,621
PR8230
BEA
CH RESTR
OOM REPLACEM
ENT
$4,313,814
$0
$0
$0
$4,313,814
PR8340
SHORELINE DOWNTO
WN M
ARINA REH
ABILITATION
$1,065,567
$0
$0
$0
$1,065,567
PR8360
RAINBOW HARBOR
$93,408
$0
$0
$100,000
$193,408
PW8000
COLO
RADO LAGOON
($2,184)
$0
$0
$0
($2,184)
PW8020
TRASH
SYSTEMS
$246,723
$0
$0
$0
$246,723
PW8040
MARINE STADIUM AREA
IMPRVMNTS
$13,497,987
$0
$0
$0
$13,497,987
PW8110
SEAWALL M
AINTENANCE AND REPAIR
$200,521
$0
$0
$0
$200,521
PW8120
BEA
CH STA
IRWAY REPL
$448,184
$0
$0
$0
$448,184
PW8150
LIFEGUARD FACILITIES AND TOWER
S
$56,686,672
$0
$0
$500,000
$57,186,672
PW8170
BELMONT POOL AND PIER IM
PROVEM
ENTS
$6,948,077
$0
$0
$0
$6,948,077
PW8230
BEA
CH RESTR
OOM REH
ABILITATION
$578,397
$0
$0
$0
$578,397
PW8240
MARINA DOCK AND DEC
KING
$194,685
$0
$0
$0
$194,685
PW8260
BLU
FF EROSION CONTR
OL
$428,359
$0
$0
$0
$428,359
PW8290
BEA
CH M
AINTENANCE YA
RD IM
PROVEM
ENTS
$51,416
$0
$0
$0
$51,416
PW8300
BEA
CH M
ASTER
PLAN
$1,914,629
$500,000
$0
$0
$2,414,629
PW8310
BEA
CH PARKING LOTS REH
ABILITATION
$1,750,000
$0
$0
$0
$1,750,000
PW8320
BEA
CH PLAYG
ROUNDS
$828,989
$0
$0
$0
$828,989
PW8330
RAINBOW LAGOON
$2,439,698
$0
$0
$0
$2,439,698
PW8360
RAINBOW HARBOR
FY 18 Adopted CIP 31 City of Long Beach - Beaches & Marinas
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Beaches and M
arinas
Program
Snapshot
$2,684,119
$200,000
$0
$0
$2,884,119
PW8380
ALAMITOS BAY AREA
IMPROVEM
ENTS
$1,462,101
$0
$0
$0
$1,462,101
PW8390
BREA
KWATER STU
DY
$1,235,621
$400,000
$0
$0
$1,635,621
PW8400
TIDELANDS CRITICAL FA
CILITY REPAIRS
$31,242
$0
$0
$0
$31,242
PW8410
TIDELANDS AREA
ROADWAYS
Total
$97,134,062
$1,100,000
$0
$600,000
$98,834,062
FY 18 Adopted CIP 32 City of Long Beach - Beaches & Marinas
COLORADO LAGOON
Beaches and Marinas
PW8000
Project Description Repair and rehabilitate the playground area, irrigation systems and fencing at the Colorado Lagoon.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of the Colorado Lagoon and reduce future infrastructure expenses.
Project Timeline Design: October 2017 ‐ December 2017.Construction: January 2018 ‐ April 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 MEASURE A $0 $0 $0 $100,000 $100,000
TIDELANDS $93,408 $0 $0 $0 $93,408
Total $93,408 $0 $0 $100,000 $193,408
FY 18 Adopted CIP 33 City of Long Beach - Beaches & Marinas
BELMONT POOL AND PIER IMPROVEMENTS
Beaches and Marinas
PW8170
Project Description Provide funding for development and completion of the Belmont Pool.
Estimated Operating and Maintenance
Normal operating and maintenance costs will be determined at project completion.
Project Timeline TBD.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 MEASURE A $0 $0 $0 $500,000 $500,000
TIDELANDS $56,686,672 $0 $0 $0 $56,686,672
Total $56,686,672 $0 $0 $500,000 $57,186,672
FY 18 Adopted CIP 34 City of Long Beach - Beaches & Marinas
BEACH PARKING LOTS REHABILITATION
Beaches and Marinas
PW8310
Project Description Repaving and grading for better drainage and striping of parking lots. New gate arm for the boat launch ramp and new electric vehicle charging stations. Upgrades to be made at: • Belmont Pool Parking Lot • Granada Beach Parking Lot
Estimated Operating and Maintenance
The parking lot will not be expanded, so there are no additional operating and maintenance impacts are anticipated.
Project Timeline Design: January 2017 ‐ September 2017. Construction: October 2017‐ December 2017.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 TIDELANDS $1,914,629 $500,000 $0 $0 $2,414,629
Total $1,914,629 $500,000 $0 $0 $2,414,629
FY 18 Adopted CIP 35 City of Long Beach - Beaches & Marinas
ALAMITOS BAY AREA IMPROVEMENTS
Beaches and Marinas
PW8380
Project Description Demolition and installation of a replacement lifeguard station. Demolition of the old facility and purchase of a prefabricated building to be installed on the beach between 54th Place and Ocean Blvd.
Estimated Operating and Maintenance
The proposed facility will be replacing an existing lifeguard structure operated and maintained by Long Beach Lifeguards. No additional operating and maintenance impacts are anticipated.
Project Timeline Installation to be completed by May 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 TIDELANDS $2,684,119 $200,000 $0 $0 $2,884,119
Total $2,684,119 $200,000 $0 $0 $2,884,119
FY 18 Adopted CIP 36 City of Long Beach - Beaches & Marinas
TIDELANDS CRITICAL FACILITY REPAIRS
Beaches and Marinas
PW8400
Project Description Funding for project contingencies to address unforeseen expense for existing projects. Design and construct safety repairs at locations to be determined.
Estimated Operating and Maintenance
Funds used to keep existing project facilities and improvements in good working condition, as well as for emergency repairs due to unforeseen circumstances.
Project Timeline Design and Construction on a continuous as‐needed basis.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 TIDELANDS $1,235,621 $400,000 $0 $0 $1,635,621
Total $1,235,621 $400,000 $0 $0 $1,635,621
FY 18 Adopted CIP 37 City of Long Beach - Beaches & Marinas
38
Fiscal Year 2018 Capital Improvement Program
Mobility
FY 18 Adopted CIP 39 City of Long Beach - Mobility
Begining Balan
ce
Total Funding
FY 18
FY 19
FY 20
Fund
Mobility Funding
$1,219,201
$450,000
$500,000
$500,000
$2,669,201
AB 2766 AIR QUALITY
$966,551
$0
$0
$0
$966,551
AB32
$1,710,196
$0
$0
$0
$1,710,195
CAPITAL PROJECTS ‐ LEG
ISLATIVE
$411,165
$0
$0
$0
$411,165
CMNTY FACILITIES DIST 2007‐2(BLM
NT SH
R)
$6,545,616
$768,195
$500,000
$500,000
$8,313,810
COMMUNITY DEV
BLO
CK GRANT
$12,353,162
$3,224,885
$2,950,000
$2,950,000
$21,478,047
GAS TA
X
$6,003,128
$2,798,805
$2,798,805
$2,798,805
$14,399,542
GEN
ERAL CAPITAL
$1,537,490
$0
$0
$0
$1,537,490
LOCAL AGEN
CY 02 BONDS SP ASSESSM
ENT
$5,991,021
$1,500,000
$1,500,000
$1,500,000
$10,491,021
MAP 21
$4,169,614
$14,333,239
$10,067,168
$14,200,689
$42,770,710
MEA
SURE A
$0
$6,700,000
$6,700,000
$6,700,000
$20,100,000
MEA
SURE M LA COUNTY
$1,723,587
$5,900,000
$4,640,000
$4,500,000
$16,763,586
MEA
SURE R
($254)
$0
$0
$0
($254)
PROP 1B
$3,211,135
$2,421,000
$2,371,000
$2,371,000
$10,374,134
PROP A
$11,072,569
$6,200,000
$6,200,000
$6,200,000
$29,672,568
PROP C
$0
$2,740,058
$8,000,000
$8,000,000
$18,740,058
STATE RMRA LOCAL RETURN
$404,085
$0
$0
$0
$404,085
TIDELANDS
$1,312,225
$500,000
$400,000
$400,000
$2,612,224
TRAFFIC M
ITIGATION PROGRAM
($1,100)
$200,000
$200,000
$200,000
$598,900
TRANSPORTA
TION DEV
ACT
$406,410
$0
$0
$0
$406,409
UPLAND OIL CAPITAL PROJECTS
Total
$59,035,800
$47,736,182
$46,826,973
$50,820,494
$204,419,442
FY 18 Adopted CIP 40 City of Long Beach - Mobility
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Mobility
Program
Snapshot
$2,089,701
$1,371,000
$1,371,000
$1,371,000
$6,202,701
PW4230
PROP A TRANSIT IM
PROVEM
ENTS
$16,882
$0
$0
$0
$16,882
PW5030
SPEC
IAL PROBLEM LOCATIONS
$2,198,371
$210,500
$139,500
$0
$2,548,371
PW5050
CITYW
IDE LED LIGHTING
$29,058,708
$18,527,624
$12,650,000
$16,250,689
$76,487,021
PW5062
MAJOR AND SEC
ONDARY HIGHWAY (ARTERIAL)
$2,199,616
$300,000
$450,000
$300,000
$3,249,616
PW5080
BRIDGE REH
ABILITATION AND SEISM
IC RETROFIT
$527,825
$0
$0
$0
$527,825
PW5090
SHOEM
AKER
BRIDGE
$9,657
$0
$0
$0
$9,657
PW5130
NEIGHBORHOOD TRAFFIC M
ITIGATION
$3,686,600
$12,107,058
$18,797,000
$18,467,000
$53,057,658
PW5151
RESIDEN
TIAL STREET PROGRAM
$160,799
$0
$0
$0
$160,799
PW5220
MED
IAN LANDSCAPE REN
OVATION
$379,756
$1,800,000
$1,800,000
$1,800,000
$5,779,756
PW5244
ALLEYS
$801,946
$0
$0
$0
$801,946
PW5245
PARKING LOTS
$387,804
$0
$0
$0
$387,804
PW5250
CITYW
IDE INFRASTRUCTU
RE IM
PROVEM
ENTS
($428,878)
$2,670,000
$0
$0
$2,241,122
PW5390
CITYW
IDE SLURRY SEAL PROGRAM
$364,712
$500,000
$500,000
$500,000
$1,864,712
PW5450
ADA RESPONSE PROGRAM
$1,601,679
$5,700,000
$7,579,473
$8,731,805
$23,612,957
PW5500
SIDEW
ALKS/CURB RAMPS
$6,262,720
$3,250,000
$2,390,000
$2,250,000
$14,152,720
PWT010
SUSTAINABLE TRANSPORTA
TION IM
PROVEM
ENT
$71
$0
$0
$0
$71
PWT030
SPEC
IAL PROBLEM LOCATIONS
$917,237
$50,000
$0
$0
$967,237
PWT110
CITYW
IDE STRIPING & SIGNAGE PROGRAM
$444,739
$250,000
$250,000
$250,000
$1,194,739
PWT130
NEIGHBORHOOD TRAFFIC M
ITIGATION
$2,701,653
$0
$0
$0
$2,701,653
PWT170
TRAFFIC M
ITIGATION PROGRAM
$4,722,396
$1,000,000
$900,000
$900,000
$7,522,396
PWT190
TRAFFIC & PED
ESTR
IAN SIGNALS
FY 18 Adopted CIP 41 City of Long Beach - Mobility
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Mobility
Program
Snapshot
$149,124
$0
$0
$0
$149,124
PWT260
MAJOR CORRIDOR ENHANCEM
ENT PROGRAM
$278,390
$0
$0
$0
$278,390
PWT280
LIGHT RAIL TRANSIT RELATED IM
PROVEM
ENTS
$9,997
$0
$0
$0
$9,997
PWT300
PARKING M
ITIGATION
$235,601
$0
$0
$0
$235,601
PWT360
ADAPTIVE TR
AFFIC M
ANAGEM
ENT SYSTEM
$258,691
$0
$0
$0
$258,691
PWT380
TRAFFIC OPER
ATIONS
Total
$59,035,799
$47,736,182
$46,826,973
$50,820,494
$204,419,448
FY 18 Adopted CIP 42 City of Long Beach - Mobility
PROP A TRANSIT IMPROVEMENTS
Mobility
PW4230
Project Description Primarily bus stop improvements at various locations and recreational transit.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of bus stops.
Project Timeline Design: October 2017 ‐ January 2018. Construction: February 2108 ‐ September 2018.
Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 PROP A $2,089,697 $1,371,000 $1,371,000 $1,371,000 $6,202,697
TRAFFIC MITIGATION PROGRAM $4 $0 $0 $0 $4
Total $2,089,701 $1,371,000 $1,371,000 $1,371,000 $6,202,701
FY 18 Adopted CIP 43 City of Long Beach - Mobility
CITYWIDE LED LIGHTING
Mobility
PW5050
Project Description Replace conventional high pressure sodium (HPS) lights with light emitting diodes (LEDs) to extend the useful life and reduce energy costs.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of lighting infrastructure and reduce energy costs.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 AB32 $966,551 $0 $0 $0 $966,551
CAPITAL PROJECTS ‐ LEGISLATIVE $67,797 $0 $0 $0 $67,797
GAS TAX $1,884 $0 $0 $0 $1,884
GENERAL CAPITAL $1,059,459 $0 $0 $0 $1,059,459
MEASURE A $3,894 $210,500 $139,500 $0 $353,894
TIDELANDS $98,784 $0 $0 $0 $98,784
Total $2,198,371 $210,500 $139,500 $0 $2,548,371
FY 18 Adopted CIP 44 City of Long Beach - Mobility
MAJOR AND SECONDARY HIGHWAY (ARTERIAL)
Mobility
PW5062
Project Description Reconstruction and resurfacing of City streets to extend useful life, provide incidental curb, gutter and sidewalk improvements, construct curb ramps and bus pads, and replace pavement markings.
• Mar n Luther King Jr Ave between E 7th St ‐ E 8th St • W Anaheim St between Oregon Ave ‐ Pacific Ave • E 3rd St between Alamitos Ave ‐ Junipero Ave • E Ocean Blvd between Long Beach Blvd ‐ Atlan c Ave • Queensway Drive between Underpass ‐ Harbor Plaza • Obispo Ave between E 10th St ‐ PCH north end • Redondo Ave between Wilton St ‐ PCH north end • Clark Ave between E Carson St ‐ Harvey Way • E Willow St between San Vincente Av‐Studebaker Rd • Palo Verde Ave between Barrios St ‐ Wardlow Rd • Atlan c Ave between E 10t St ‐ E Anaheim St • E Anaheim St between Atlan c Ave ‐ Alamitos Ave • Magnolia Av between W 31st St ‐ Wardlow Rd • W Willow St between Golden Ave ‐ Magnolia Ave • E Market St between Atlan c Ave ‐ Orange Ave • South St between Atlan c Ave ‐ Walnut Ave • Long Beach Blvd between Victoria St ‐ Neece St • Orange Ave between E 70th St ‐ East 72nd St • Palo Verde Ave between Spring St ‐ Wardlow Rd • Orange Ave between 64th St ‐ E Artesia Blvd • Del Amo Blvd between WCL – Long Beach Blvd
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of arterial streets and reduce future infrastrucure expenses.
Project Timeline Design: October 2017 ‐ January 2018.Construction: February 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 AB 2766 AIR QUALITY $6,500 $0 $0 $0 $6,500
GAS TAX $6,226,424 $924,885 $650,000 $650,000 $8,451,309
GENERAL CAPITAL $1,091,348 $0 $0 $0 $1,091,348
LOCAL AGENCY 02 BONDS SP ASSESSM $1,537,490 $0 $0 $0 $1,537,490
MAP 21 $4,750,063 $1,500,000 $1,500,000 $1,500,000 $9,250,063
MEASURE A $4,335,683 $6,902,739 $1,300,000 $4,900,689 $17,439,111
MEASURE M LA COUNTY $0 $2,000,000 $2,000,000 $2,000,000 $6,000,000
MEASURE R $69,931 $0 $0 $0 $69,931
PROP A $0 $1,000,000 $1,000,000 $1,000,000 $3,000,000
PROP C $10,703,515 $6,200,000 $6,200,000 $6,200,000 $29,303,515
TRANSPORTATION DEV ACT $338,174 $0 $0 $0 $338,174
UPLAND OIL CAPITAL PROJECTS $816 $0 $0 $0 $816
Total $29,059,944 $18,527,624 $12,650,000 $16,250,689 $76,488,257
FY 18 Adopted CIP 45 City of Long Beach - Mobility
BRIDGE REHABILITATION AND SEISMIC RETROFIT
Mobility
PW5080
Project Description In conjunction with the County of Los Angeles and Caltrans, inspect, repair, upgrade, and retrofit City of Long Beach owned bridges. Perform bridge deck repairs
listed in the County of Los Angeles condi on survey dated January 2012.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of bridges and reduce future infrastructure expenses related to infrastructure degradation and heavy vehicular usage.
Project Timeline Ongoing design and construction in FY 18.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $13,725 $0 $0 $0 $13,725
GAS TAX $2,181,785 $300,000 $300,000 $300,000 $3,081,785
MEASURE A $4,106 $0 $150,000 $0 $154,106
Total $2,199,616 $300,000 $450,000 $300,000 $3,249,616
FY 18 Adopted CIP 46 City of Long Beach - Mobility
RESIDENTIAL STREET PROGRAM
Mobility
PW5151
Project Description Repair residential street and alleys through pavement sealing, asphalt overlays, and full reconstruction. Repair work to also include replacement of damaged curbs, gutters, drive approaches, installation of access ramps
and replacement signage.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of residential streets and reduce future infrastructure expenses related to normal erosion, root damage and vehicular usage.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $883,348 $0 $0 $0 $883,348
COMMUNITY DEV BLOCK GRANT $111,339 $0 $0 $0 $111,339
GAS TAX $361,681 $0 $0 $0 $361,681
GENERAL CAPITAL $1,066,643 $567,000 $567,000 $567,000 $2,767,643
MEASURE A $0 $0 $1,830,000 $1,500,000 $3,330,000
MEASURE M LA COUNTY $0 $3,900,000 $3,900,000 $3,900,000 $11,700,000
MEASURE R $1,016,277 $4,900,000 $4,500,000 $4,500,000 $14,916,277
STATE RMRA LOCAL RETURN $0 $2,740,058 $8,000,000 $8,000,000 $18,740,058
UPLAND OIL CAPITAL PROJECTS $247,312 $0 $0 $0 $247,312
Total $3,686,600 $12,107,058 $18,797,000 $18,467,000 $53,057,658
FY 18 Adopted CIP 47 City of Long Beach - Mobility
ALLEYS
Mobility
PW5244
Project Description Repair residential alleys through pavement sealing, asphalt overlays, and full reconstruction.
Estimated Operating and Maintenance
Repair and maintenance to upgrade and prolong the life of alleys and reduce future infrastructure expenses related to normal erosion and vehicle use.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $59,094 $0 $0 $0 $59,094
COMMUNITY DEV BLOCK GRANT $35,527 $0 $0 $0 $35,527
MEASURE A $285,135 $1,800,000 $1,800,000 $1,800,000 $5,685,135
Total $379,756 $1,800,000 $1,800,000 $1,800,000 $5,779,756
FY 18 Adopted CIP 48 City of Long Beach - Mobility
CITYWIDE SLURRY SEAL PROGRAM
Mobility
PW5390
Project Description Repair residential streets through pavement sealing and slurry sealing. Repair work to also include patching the street pavement and installation of traffic striping and marking.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of asphalt streets and reduce future infrastructure expenses related to vehicular usage.
Project Timeline Design: October 2017 ‐ January 2018. Construction: April 2018‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 GAS TAX $75,399 $0 $0 $0 $75,399
GENERAL CAPITAL $4,927 $0 $0 $0 $4,927
MEASURE A ($509,204) $2,670,000 $0 $0 $2,160,796
Total ($428,878) $2,670,000 $0 $0 $2,241,122
FY 18 Adopted CIP 49 City of Long Beach - Mobility
ADA RESPONSE PROGRAM
Mobility
PW5450
Project Description Construct access ramps and sidewalks on public rights of way based on verified requests.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of residential sidewalks and reduce future infrastructure expenses related to normal erosion, root damage and heavy pedestrian usage in compliance with ADA specifications.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $3,000 $0 $0 $0 $3,000
GAS TAX $356,198 $500,000 $500,000 $500,000 $1,856,198
GENERAL CAPITAL $6,272 $0 $0 $0 $6,272
Total $365,470 $500,000 $500,000 $500,000 $1,865,470
FY 18 Adopted CIP 50 City of Long Beach - Mobility
SIDEWALKS/CURB RAMPS
Mobility
PW5500
Project Description Construct curb ramp improvements for compliance with ADA specifications.
Estimated Operating and Maintenance
Repair and maintenance to upgrade curb ramps and reduce future infrastructure expenses related to heavy pedestrian usage in compliance with ADA specifications.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 COMMUNITY DEV BLOCK GRANT $768,195 $768,195 $500,000 $500,000 $2,536,390
GENERAL CAPITAL $833,484 $2,231,805 $2,231,805 $2,231,805 $7,528,899
MEASURE A $0 $2,700,000 $4,847,668 $6,000,000 $13,547,668
Total $1,601,679 $5,700,000 $7,579,473 $8,731,805 $23,612,957
FY 18 Adopted CIP 51 City of Long Beach - Mobility
SUSTAINABLE TRANSPORTATION IMPROVEMENT
Mobility
PWT010
Project Description • Citywide 8‐80 Connections• Design, construct, implement projects and programs to enhance the safety and viability of bicycle and pedestrian routes• Grant Matching Funds• Liveability Initiatives• PCH Ride
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of bike corridors and reduce future infrastructure expenses.
Project Timeline Design: October 2017– February 2018. Bid & Award: March 2018 – August 2018. Construction: September 2018 – February 2019.
Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 AB 2766 AIR QUALITY $1,162,701 $450,000 $500,000 $500,000 $2,612,701
GAS TAX $318,158 $750,000 $750,000 $750,000 $2,568,158
GENERAL CAPITAL $333,058 $0 $0 $0 $333,058
MAP 21 $587,862 $0 $0 $0 $587,862
MEASURE M LA COUNTY $0 $800,000 $800,000 $800,000 $2,400,000
MEASURE R $159,956 $1,000,000 $140,000 $0 $1,299,956
PROP A $325,856 $50,000 $0 $0 $375,856
PROP C $46,674 $0 $0 $0 $46,674
TIDELANDS $305,301 $0 $0 $0 $305,301
TRAFFIC MITIGATION PROGRAM $203,237 $0 $0 $0 $203,237
TRANSPORTATION DEV ACT $2,820,171 $200,000 $200,000 $200,000 $3,420,171
Total $6,262,974 $3,250,000 $2,390,000 $2,250,000 $14,152,974
FY 18 Adopted CIP 52 City of Long Beach - Mobility
CITYWIDE STRIPING & SIGNAGE PROGRAM
Mobility
PWT110
Project Description Install and replace street name signs and traffic control signs at various locations, as‐needed, throughout the City.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of signs and striped streets.
Project Timeline Signs are to be installed as‐needed, throughout the fiscal year.
Department Contact Public Works ‐ Public Service ‐ Mike Sickles ‐ (562) 570‐3263
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $5,244 $0 $0 $0 $5,244
GENERAL CAPITAL $884,362 $0 $0 $0 $884,362
MEASURE A $50,000 $50,000 $0 $0 $100,000
MEASURE R $18,000 $0 $0 $0 $18,000
UPLAND OIL CAPITAL PROJECTS $20,324 $0 $0 $0 $20,324
Total $977,929 $50,000 $0 $0 $1,027,929
FY 18 Adopted CIP 53 City of Long Beach - Mobility
NEIGHBORHOOD TRAFFIC MITIGATION
Mobility
PWT130
Project Description Enhancements and improvement projects to safety, mobility and active transportation of City neighborhoods.
Estimated Operating and Maintenance
Repair and maintenance to allow a broader range of traffic calming devices to be studied and potentially installed. Any new devices installed will require maintenance over their lifetime.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $79,456 $0 $0 $0 $79,456
COMMUNITY DEV BLOCK GRANT $160,235 $0 $0 $0 $160,235
GAS TAX $116,293 $250,000 $250,000 $250,000 $866,293
GENERAL CAPITAL $21,000 $0 $0 $0 $21,000
PROP A $81,862 $0 $0 $0 $81,862
Total $458,847 $250,000 $250,000 $250,000 $1,208,847
FY 18 Adopted CIP 54 City of Long Beach - Mobility
TRAFFIC & PEDESTRIAN SIGNALS
Mobility
PWT190
Project Description Construct pedestrian related safety improvements and high priority traffic signal safety improvement projects to address accident prone intersections and safety concerns. Implement Countdown Pedestrian Indications intersections flashing beacons at crosswalks, lighting at crosswalks, and crosswalk signals.
Estimated Operating and Maintenance
Repair and maintenance intended to prolong the life of traffic control infrastructures and reduce future infrastructure expenses.
Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $184,285 $0 $0 $0 $184,285
GAS TAX $2,704,829 $500,000 $500,000 $500,000 $4,204,829
GENERAL CAPITAL $15,000 $0 $0 $0 $15,000
MAP 21 $3,269 $0 $0 $0 $3,269
MEASURE R $450,000 $0 $0 $0 $450,000
PROP C $148,348 $0 $0 $0 $148,348
TRAFFIC MITIGATION PROGRAM $469,941 $500,000 $400,000 $400,000 $1,769,941
TRANSPORTATION DEV ACT $746,725 $0 $0 $0 $746,725
Total $4,722,396 $1,000,000 $900,000 $900,000 $7,522,396
FY 18 Adopted CIP 55 City of Long Beach - Mobility
56
Fiscal Year 2018 Capital Improvement Program
Parks & Recreation
FY 18 Adopted CIP 57 City of Long Beach - Parks & Recreation
Begining Balan
ce
Total Funding
FY 18
FY 19
FY 20
Fund
Parks & Recreation Funding
($16,543)
$0
$0
$0
($16,543)
AB32
$1,224,157
$0
$0
$0
$1,224,156
CAPITAL PROJECTS ‐ LEG
ISLATIVE
$4,972,002
$0
$0
$0
$4,972,001
COMMUNITY DEV
BLO
CK GRANT
$2
$0
$0
$0
$2
GAS TA
X
$6,912,411
$148,000
$2,500,000
$0
$9,560,414
GEN
ERAL CAPITAL
$4,497,585
$6,379,500
$4,169,000
$357,500
$15,403,586
MEA
SURE A
$19
$0
$0
$0
$19
OPEN
SPACE BONDS
$122,719
$500,000
$0
$0
$622,719
PARK IM
PACT FEES
($165)
$100,000
$100,000
$100,000
$299,835
TRANSPORTA
TION DEV
ACT
$99,480
$0
$0
$0
$99,479
UPLAND OIL CAPITAL PROJECTS
Total
$17,811,666
$7,127,500
$6,769,000
$457,500
$32,165,668
FY 18 Adoptep CIP 58 City of Long Beach - Parks & Recreation
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Parks & Recreation
Program
Snapshot
($441)
$0
$0
$0
($441)
PR3100
MLK POOL
$506
$0
$0
$0
$506
PR3180
MATC
HING FUNDS
$369,000
$0
$0
$0
$369,000
PR3225
MED
IAN LANDSCAPE REV
OVATION
$25,469
$0
$0
$0
$25,469
PR3320
LOS ANGELES RIVER
STU
DIES & IM
PROVEM
ENTS
$21,618
$0
$0
$0
$21,618
PR3330
DEV
ELOPMEN
T FEE STUDIES
($107)
$0
$0
$0
($107)
PR3360
DEFOREST PARK
$0
$100,000
$100,000
$100,000
$300,000
PW3010
PARK BIKE PATH
REPLACEM
ENT
$245,951
$292,000
$0
$0
$537,951
PW3020
PARK FACILITY RER
OOFING
$12,501
$0
$200,000
$0
$212,501
PW3040
GAME COURT REH
ABILITATION
$498,665
$500,000
$0
$0
$998,665
PW3050
RANCHO LOS ALAMITOS
$497,110
$500,000
$0
$0
$997,110
PW3060
RANCHO LOS CER
RITOS
$4,043,059
$4,648,000
$2,500,000
$0
$11,191,059
PW3070
PARK ACQUISITION & DEV
ELOPMEN
T
$4,117
$0
$0
$0
$4,117
PW3090
PARKING LOT UPGRADE
$898,579
$0
$0
$0
$898,579
PW3110
PARK IN
FRASTRUCTU
RE
$281,265
$0
$0
$0
$281,265
PW3120
PARK AMEN
ITIES
$67,457
$0
$495,000
$0
$562,457
PW3130
TREE
TRIM
MING ‐ PARKS
$68,750
$0
$0
$0
$68,750
PW3140
PARK LAKE AER
ATION
$284,878
$0
$0
$0
$284,878
PW3150
BIXBY PARK REH
ABILITATION
$14,987
$0
$0
$0
$14,987
PW3160
FENCING AND RAILING REH
AB
$1,380,980
$480,000
$0
$0
$1,860,980
PW3170
GAME FIELD UPGRADES
$2,176,570
$0
$0
$0
$2,176,570
PW3190
PLAY EQ
UIPMEN
T REPLACEM
ENT(GP)
FY 18 Adoptep CIP 59 City of Long Beach - Parks & Recreation
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Parks & Recreation
Program
Snapshot
($17,417)
$0
$0
$0
($17,417)
PW3200
REC
REA
TION PARK REH
AB
$4,258,468
$357,500
$0
$357,500
$4,973,468
PW3220
IRRIGATION SYSTEM REPLACEM
ENT
$107,521
$0
$0
$0
$107,521
PW3230
PARK SEC
URITY LIGHTING
$647,186
$250,000
$0
$0
$897,186
PW3240
REC
REA
TION BUILDING REH
ABILITATION
$463,503
$0
$1,620,000
$0
$2,083,503
PW3250
RESTR
OOM REH
ABILITATION
$18,359
$0
$0
$0
$18,359
PW3260
SIDEW
ALK HAZA
RD ABATEMEN
T
$859,428
$0
$1,854,000
$0
$2,713,428
PW3300
EL DORADO PARK REH
ABILITATION
$11,487
$0
$0
$0
$11,487
PW3310
OPEN
SPACE/REC
. STR
ATEGIC PLAN
$572,214
$0
$0
$0
$572,214
PW3320
LOS ANGELES RIVER
STU
DIES & IM
PROVEM
ENTS
Total
$17,811,666
$7,127,500
$6,769,000
$457,500
$32,165,666
FY 18 Adoptep CIP 60 City of Long Beach - Parks & Recreation
PARK BIKE PATH REPLACEMENT
Parks & Recreation
PW3010
Project Description On‐going repair and/or replacement of existing bike paths, facilities, signage, and striping of park bike paths. Ongoing repair and replacement of bike path paving and striping at:• Channel View Park• El Dorado Regional Park (including parkconnections to the San Gabriel River BikePath)• Heartwell Park, including off‐siteconnection to the San Gabriel River BikePath• PW right‐of‐way off‐street bike pathbetween Martin Luther King, Jr. Avenueand Orange Avenue• Recreation Park• 6th Street off‐site connection to the LARiver Bike Path
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of bike paths and reduce future infrastructure expenses.
Project Timeline Design: October 2017. Construction: November 2017 – October 2018.
Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 TRANSPORTATION DEV ACT $0 $100,000 $100,000 $100,000 $300,000
Total $0 $100,000 $100,000 $100,000 $300,000
FY 18 Adopted CIP 61 City of Long Beach - Parks & Recreation
PARK FACILITY REROOFING
Parks & Recreation
PW3020
Project Description Reroof park facilities to prevent damage to structures, equipment and inventory, citywide. Improvements will be made to the following facility: • Stearns Park Community Center
Estimated Operating and Maintenance
Improvements to increase the longevity of City‐owned assets and decrease ongoing maintenance costs.
Project Timeline Design: November 2017. Construction: December 2017 – October 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $30,760 $0 $0 $0 $30,760
COMMUNITY DEV BLOCK GRANT $192,042 $0 $0 $0 $192,042
GENERAL CAPITAL $16,441 $0 $0 $0 $16,441
MEASURE A $6,709 $292,000 $0 $0 $298,709
Total $245,951 $292,000 $0 $0 $537,951
FY 18 Adopted CIP 62 City of Long Beach - Parks & Recreation
GAME COURT REHABILITATION
Parks & Recreation
PW3040
Project Description Repair and construction of sports courts at the following locations:• Silverado Park• Los Cerritos Park
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of game courts and reduce future infrastructure expenses.
Project Timeline Design: October 2017 ‐ July 2018.Construction: August 2018.
Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $12,501 $0 $0 $0 $12,501
MEASURE A $0 $0 $200,000 $0 $200,000
Total $12,501 $0 $200,000 $0 $212,501
FY 18 Adopted CIP 63 City of Long Beach - Parks & Recreation
RANCHO LOS ALAMITOS
Parks & Recreation
PW3050
Project Description Perform improvements in a manner that isconsistent with preserving the historical character of the Rancho.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of the Rancho through seismic retrofit and reduce future infrastructure expenses.
Project Timeline Design: October 2017 – July 2018. Construction: August 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 GENERAL CAPITAL $1,595 $0 $0 $0 $1,595
MEASURE A $497,071 $500,000 $0 $0 $997,071
Total $498,665 $500,000 $0 $0 $998,665
FY 18 Adopted CIP 64 City of Long Beach - Parks & Recreation
RANCHO LOS CERRITOS
Parks & Recreation
PW3060
Project Description Repair and maintenance upgrades to extend the useful life of Rancho Los Cerritos. Work to be initiated in FY 18:• Driveway / parking lot upgrades• Furnace replacement• Irrigation and turf replacement• Termite treatment
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of the Rancho and reduce future infrastructure expenses.
Project Timeline Design: October 2017. Construction: November 2017 – October 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 MEASURE A $497,110 $500,000 $0 $0 $997,110
Total $497,110 $500,000 $0 $0 $997,110
FY 18 Adopted CIP 65 City of Long Beach - Parks & Recreation
PARK ACQUISITION & DEVELOPMENT
Parks & Recreation
PW3070
Project Description Acquisition of park land and development of parks throughout the City. Improvements to include the following locations: • Davenport Park• Houghton Park• Willow Springs Park
Estimated Operating and Maintenance
Development of parks creates open spaces, recreation areas, increases property values and supports the health of Long Beach's neighborhoods.
Project Timeline Design: October 2017. Construction: November 2017 – October 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $45,106 $0 $0 $0 $45,106
COMMUNITY DEV BLOCK GRANT $1,801,400 $0 $0 $0 $1,801,400
GAS TAX $2 $0 $0 $0 $2
GENERAL CAPITAL $2,143,403 $148,000 $2,500,000 $0 $4,791,403
MEASURE A ($3,458) $4,000,000 $0 $0 $3,996,542
OPEN SPACE BONDS $19 $0 $0 $0 $19
PARK IMPACT FEES $1,101 $500,000 $0 $0 $501,101
UPLAND OIL CAPITAL PROJECTS $55,485 $0 $0 $0 $55,485
Total $4,043,059 $4,648,000 $2,500,000 $0 $11,191,059
FY 18 Adopted CIP 66 City of Long Beach - Parks & Recreation
TREE TRIMMING ‐ PARKS
Parks & Recreation
PW3130
Project Description Investment into the City’s Urban Forest to include:• Tree Trimming• Tree Planting
Estimated Operating and Maintenance
Trimming to prolong the life of the urban forest.
Project Timeline Continuous.
Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $63,938 $0 $0 $0 $63,938
MEASURE A $3,519 $0 $495,000 $0 $498,519
Total $67,457 $0 $495,000 $0 $562,457
FY 18 Adopted CIP 67 City of Long Beach - Parks & Recreation
GAME FIELD UPGRADES
Parks & Recreation
PW3170
Project Description Restoration and rehabilitation of game fields. Improvements include the following locations: • Admiral Kidd Field Turf Improvements• Hudson Field Turf Improvements• Veterans Field Turf Improvements
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of game field infrastructure and reduce future expenses related to heavy usage.
Project Timeline Design: October 2017. Construction: November 2017 – October 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 COMMUNITY DEV BLOCK GRANT $600,000 $0 $0 $0 $600,000
GENERAL CAPITAL $780,980 $0 $0 $0 $780,980
MEASURE A $0 $480,000 $0 $0 $480,000
Total $1,380,980 $480,000 $0 $0 $1,860,980
FY 18 Adopted CIP 68 City of Long Beach - Parks & Recreation
IRRIGATION SYSTEM REPLACEMENT
Parks & Recreation
PW3220
Project Description Upgrade and replacement of park irrigationsystems to conserve water and properly maintainlandscaping.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of irrigation infrastructure and reduce future infrastructure expenses related to leaks and aging pipes.
Project Timeline Implementation: October 2017 – September 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $1,926 $0 $0 $0 $1,926
COMMUNITY DEV BLOCK GRANT $944,000 $0 $0 $0 $944,000
GENERAL CAPITAL $2,577,416 $0 $0 $0 $2,577,416
MEASURE A $735,126 $357,500 $0 $357,500 $1,450,126
Total $4,258,468 $357,500 $0 $357,500 $4,973,468
FY 18 Adopted CIP 69 City of Long Beach - Parks & Recreation
RECREATION BUILDING REHABILITATION
Parks & Recreation
PW3240
Project Description Rehabilitate existing buildings to enhance thefunctional use and maximise operatingefficiencies. Work to be initiated in FY 18:• 4th Street Street Senior Center
Estimated Operating and Maintenance
Repair and maintenance to prolong the recreation buildings and reduce ongoing infrastructure expenses due to increased park usage.
Project Timeline Design: October 2017 – March 2018.Construction: April 2018 – September 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $196,841 $0 $0 $0 $196,841
GENERAL CAPITAL $3,420 $0 $0 $0 $3,420
MEASURE A $346,047 $250,000 $0 $0 $596,047
PARK IMPACT FEES $100,000 $0 $0 $0 $100,000
TRANSPORTATION DEV ACT $879 $0 $0 $0 $879
Total $647,186 $250,000 $0 $0 $897,186
FY 18 Adopted CIP 70 City of Long Beach - Parks & Recreation
RESTROOM REHABILITATION
Parks & Recreation
PW3250
Project Description Repair and construction of restrooms at the following locations:• Drake Park• El Dorado Regional Park• MacArthur Park
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of restrooms and reduce future infrastructure expenses.
Project Timeline Design: October 2017 ‐ July 2018.Construction: August 2018.
Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $40,048 $0 $0 $0 $40,048
COMMUNITY DEV BLOCK GRANT $250,000 $0 $0 $0 $250,000
GENERAL CAPITAL $4,798 $0 $0 $0 $4,798
MEASURE A $168,658 $0 $1,620,000 $0 $1,788,658
Total $463,503 $0 $1,620,000 $0 $2,083,503
FY 18 Adopted CIP 71 City of Long Beach - Parks & Recreation
EL DORADO PARK REHABILITATION
Parks & Recreation
PW3300
Project Description Repair and rehabilite facilities at the City's largest park.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of El Dorado Park and reduce future infrastructure expenses.
Project Timeline Design: October 2017 ‐ July 2018.Construction: August 2018.
Department Contact Park & Recreations ‐ Meredith Reynolds ‐ (562) 570‐3165
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $47,413 $0 $0 $0 $47,413
COMMUNITY DEV BLOCK GRANT $299,805 $0 $0 $0 $299,805
GENERAL CAPITAL $512,210 $0 $0 $0 $512,210
MEASURE A $0 $0 $1,854,000 $0 $1,854,000
Total $859,428 $0 $1,854,000 $0 $2,713,428
FY 18 Adopted CIP 72 City of Long Beach - Parks & Recreation
Fiscal Year 2018 Capital Improvement Program
Public Facilities
FY 18 Adopted CIP 73 City of Long Beach - Public Facilities
Begining Balan
ce
Total Funding
FY 18
FY 19
FY 20
Fund
Public Facilities Funding
$0
$2,500,000
$0
$0
$2,500,000
AB32
$32,000
$0
$0
$0
$32,000
AIRPORT CAPITAL
$1,974,207
$0
$0
$0
$1,974,209
CAPITAL PROJECTS ‐ LEG
ISLATIVE
$2,115,278
$500,000
$0
$0
$2,615,277
CIVIC CEN
TER
$56,485
$0
$0
$0
$56,485
COMMUNITY DEV
BLO
CK GRANT
$1,658,023
$0
$0
$0
$1,658,022
FLEET CAPITAL
$3,713,226
$1,000,000
$0
$0
$4,713,228
GEN
ERAL CAPITAL
$1,766,950
$4,049,000
$3,390,000
$0
$9,205,950
MEA
SURE A
($8,323)
$0
$0
$0
($8,322)
MEA
SURE R
($3,000)
$0
$0
$0
($3,000)
PROP A
$9,502
$0
$0
$0
$9,502
PROP C
($81,208)
$2,589,000
$0
$0
$2,507,792
QUEEN M
ARY
$2,024,131
$400,000
$0
$0
$2,424,131
TIDELANDS
$17,378
$0
$0
$0
$17,378
TIDELANDS CAPITAL GRANTS
($6,450)
$0
$0
$0
($6,450)
UPLAND OIL CAPITAL PROJECTS
Total
$13,268,199
$11,038,000
$3,390,000
$0
$27,696,202
FY 18 Adoptex CIP 74 City of Long Beach - Public Facilities
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Public Facilities
Program
Snapshot
$32,000
$0
$0
$0
$32,000
PW1050
UNDER
GROUND FUEL TANK
$2,051,468
$1,400,000
$0
$0
$3,451,468
PW2040
CONVEN
TION CEN
TER COMPLEX IM
PROVEM
ENTS
$126,268
$0
$0
$0
$126,268
PW4070
ANIM
AL CONTR
OL SH
ELTER
$2,046,388
$500,000
$0
$0
$2,546,388
PW4100
CIVIC CEN
TER COMPLEX IM
PROVEM
ENTS
$210,908
$0
$0
$0
$210,908
PW4110
CIVIC CEN
TER COMPLEX REFURBISHMEN
T
$18,694
$250,000
$250,000
$0
$518,694
PW4140
CITYW
IDE RER
OOFING
($409)
$0
$0
$0
($409)
PW4150
CITYW
IDE TR
EE TRIM
MING
$1,827,074
$0
$0
$0
$1,827,074
PW4160
COOPER
ATIVE INFRASTRUCTU
RE IM
PROVEM
ENTS
$38,398
$0
$0
$0
$38,398
PW4174
FACILITY REPAIRS
$1,179
$0
$0
$0
$1,179
PW4200
DOWNTO
WN BIKE STATION DEM
O PROJ
$1,418,241
$5,974,000
$3,140,000
$0
$10,532,241
PW4240
GEN
ERAL CITY BUILDING REFURBISHMEN
T
$27,187
$0
$0
$0
$27,187
PW4260
PUBLIC SAFETY BUILDING
$111,760
$0
$0
$0
$111,760
PW4280
TEMPLE/W
ILLO
W FACILITIES
$14,329
$0
$0
$0
$14,329
PW4301
NORTH
BRANCH LIBRARY
$1,095,993
$0
$0
$0
$1,095,993
PW4320
REG
IONAL FU
EL STO
RAGE
$257,882
$0
$0
$0
$257,882
PW4322
CNG FUELING STA
TIONS
$411,021
$125,000
$0
$0
$536,021
PW4370
FIRE FA
CILITIES MODER
NIZATION
$1,082,220
$0
$0
$0
$1,082,220
PW4420
CITY PLACE PARKING GARAGE
$0
$200,000
$0
$0
$200,000
PW4450
FACILITY ASSESSM
ENTS
$2,422,200
$0
$0
$0
$2,422,200
PW4490
MEN
TAL HEA
LTH AMER
ICA FACILITY
$159,603
$0
$0
$0
$159,603
PW4500
SCHROED
ER HALL EAST POLICE STATION
FY 18 Adopted CIP 75 City of Long Beach - Public Facilities
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Public Facilities
Program
Snapshot
($3,000)
$0
$0
$0
($3,000)
PW5340
CITYW
IDE PED
ESTR
IAN SAFETY ENHNCMNT PROG
($81,208)
$2,589,000
$0
$0
$2,507,792
PW6200
QUEEN M
ARY PROJECTS
Total
$13,268,198
$11,038,000
$3,390,000
$0
$27,696,198
FY 18 Adopted CIP 76 City of Long Beach - Public Facilities
CONVENTION CENTER COMPLEX IMPROVEMENTS
Public Facilities
PW2040
Project Description The Convention Center’s Capital Improvements will provide facility upgrades to address infrastructure needs and to enhance the competitive position of the Center.Work to be initiated in FY 18:
• Terrace Plaza Fountain upgrades • Terrace Plaza Sound & Ligh ng Upgrades • General pain ng, flooring and other building upgrades
Estimated Operating and Maintenance
These Capital Improvements increase the longevity of the City‐owned asset, decrease maintenance costs, and improve the marketability of the Center. The Center provides an incredible amenity for the local community and regional visitors, and is an important economic driver for the City.
Project Timeline Design and Permitting: October 2017. Construction: November 2017 – October 2018.
Department Contact Economic Development ‐ Johnny Vallejo ‐ (562) 570‐6792
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 MEASURE A $0 $1,000,000 $0 $0 $1,000,000
TIDELANDS $2,039,686 $400,000 $0 $0 $2,439,686
TIDELANDS CAPITAL GRANTS $17,378 $0 $0 $0 $17,378
Total $2,057,063 $1,400,000 $0 $0 $3,457,063
FY 18 Adopted CIP 77 City of Long Beach - Public Facilities
CIVIC CENTER COMPLEX IMPROVEMENTS
Public Facilities
PW4100
Project Description The Civic Center Complex facility requires improvements to maintain each facility in a reliable and efficient operating condition. A majority of these projects will be initiated based on operational needs in conjunction with the new city hall and main library. Public Safety Building retrofits include LED lighting and maintenance on boilers.
Estimated Operating and Maintenance
Repair and maintenance to city hall, main library and surrounding complex to reduce ongoing infrastructure expenses while the new city hall and main library are under construction.
Project Timeline Design: September 2017 – October 2017. Construction: November 2017 – October 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CIVIC CENTER $2,056,347 $500,000 $0 $0 $2,556,347
Total $2,056,347 $500,000 $0 $0 $2,556,347
FY 18 Adopted CIP 78 City of Long Beach - Public Facilities
CITYWIDE REROOFING
Public Facilities
PW4140
Project Description Replace City building roofs to prevent damage to structures, equipment, and protect and preseve inventory. Roof replacement can extend the lifespan of buildings, facilities, and substructures around the City including parks establishments and community centers.Work to be initiated in FY 18:
• Fire Sta ons • Neighborhood Branch Libraries
Estimated Operating and Maintenance
These Capital Improvements increase the longevity of City‐owned assets and decrease maintenance costs.
Project Timeline Design: October 2017.Construction: November 2017 – October 2018,
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CIVIC CENTER $5,237 $0 $0 $0 $5,237
GENERAL CAPITAL $13,457 $0 $0 $0 $13,457
MEASURE A $0 $250,000 $250,000 $0 $500,000
Total $18,694 $250,000 $250,000 $0 $518,694
FY 18 Adopted CIP 79 City of Long Beach - Public Facilities
GENERAL CITY BUILDING REFURBISHMENT
Public Facilities
PW4240
Project Description Refurbish City buildings to minimize structural deficiencies and extend the facility useful life.Work to be initiated in FY 18:• Bach, Twain, and Bret Harte Libraries
• Emergency Opera ons Center • Energy Efficient Upgrades
• Fire Stations 7 and 17• Fire Station Training Center
• Health Department Facili es • Police Academy
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of municipal buildings and reduce ongoing infrastructure expenses.
Project Timeline Design: October 2017 – March 2018. Construction: April 2018 – September 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $22,084 $0 $0 $0 $22,084
COMMUNITY DEV BLOCK GRANT $56,485 $2,500,000 $0 $0 $2,556,485
GENERAL CAPITAL $766,546 $1,000,000 $0 $0 $1,766,546
MEASURE A $573,126 $2,474,000 $3,140,000 $0 $6,187,126
Total $1,418,241 $5,974,000 $3,140,000 $0 $10,532,241
FY 18 Adopted CIP 80 City of Long Beach - Public Facilities
FIRE FACILITIES MODERNIZATION
Public Facilities
PW4370
Project Description Modernize fire department facilities at Fire Stations throughout the City. Upgrades include providing gender separation for restrooms and the conversion of common sleeping dorms to private sleeping quarters in order to provide privacy for the workforce.Work to be initiated in FY 18:
• Fire Sta on 9
Estimated Operating and Maintenance
Upgrade and maintenance to prolong the life of municipal fire facilities and reduce ongoing infrastructure expenses.
Project Timeline Construction: October 2017 – September 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 GENERAL CAPITAL $299,447 $0 $0 $0 $299,447
MEASURE A $112,875 $125,000 $0 $0 $237,875
Total $412,322 $125,000 $0 $0 $537,322
FY 18 Adopted CIP 81 City of Long Beach - Public Facilities
FACILITY ASSESSMENTS
Public Facilities
PW4450
Project Description Develop list of all City‐owned buildings and facilities and complete an independent Facility Condition Assessment. This will include comprehensive building evaluations (structural, mechanical, electrical, plumbing, and energy and water conservation) for City facilities, identifying corrective work needed, and developing budget estimates and projected schedules for the completion of all recommended and preventative maintenance work.
Estimated Operating and Maintenance
Maintenance of a comprehensive facility deficiency listing will be essential to identifying future rehabilitation work and minimize maintenance costs.
Project Timeline Assessment: December 2017 ‐ December 2018.Construction: August 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 MEASURE A $0 $200,000 $0 $0 $200,000
Total $0 $200,000 $0 $0 $200,000
FY 18 Adopted CIP 82 City of Long Beach - Public Facilities
QUEEN MARY PROJECTS
Public Facilities
PW6200
Project Description The Queen Mary requires historic preservationand capital improvements to properly maintain the structure and its historically significant elements. Projects will be initiated based on operational needs, identified capital deficiencies and ongoing survey/studies.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of the ship and reduce future infrastructure expenses related to passenger usage.
Project Timeline Design: October 2017 – March 2018. Construction: March 2018 – September 2018.
Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 QUEEN MARY ($81,208) $2,589,000 $0 $0 $2,507,792
Total ($81,208) $2,589,000 $0 $0 $2,507,792
FY 18 Adopted CIP 83 City of Long Beach - Public Facilities
84
Fiscal Year 2018 Capital Improvement Program
Utilities
FY 18 Adopted CIP 85 City of Long Beach - Utilities
Begining Balan
ce
Total Funding
FY 18
FY 19
FY 20
Fund
Utilities Funding
$5,046
$0
$0
$0
$5,046
CAPITAL PROJECTS ‐ LEG
ISLATIVE
$27,127,543
$0
$0
$0
$27,127,543
COMMUNITY DEV
BLO
CK GRANT
$0
$500,000
$500,000
$500,000
$1,500,000
FACITILITY WORK
$0
$250,000
$250,000
$250,000
$750,000
GAS CONTR
OL/CATH
ODIC PROTECTION
$0
$25,000
$25,000
$25,000
$75,000
GAS METER
REPLACEM
ENT
$1,285,260
$300,000
$300,000
$300,000
$2,185,260
GAS TA
X
$4,686,727
$0
$300,000
$300,000
$5,286,727
GEN
ERAL CAPITAL
$0
$6,175,000
$6,175,000
$6,175,000
$18,525,000
MAIN PIPELINE REPLACEM
ENT
$0
$1,550,000
$3,450,000
$0
$5,000,000
MEA
SURE A
$0
$1,100,000
$1,100,000
$1,100,000
$3,300,000
SERVICE PIPELINE REPLACEM
ENT
$0
$4,046,000
$0
$0
$4,046,000
SEWER
FUND
$163,092
$0
$0
$0
$163,092
TIDELANDS
$0
$13,416,279
$0
$0
$13,416,279
WATER FUND
Total
$33,267,668
$27,362,279
$12,100,000
$8,650,000
$81,379,947
FY 18 Adopted CIP 86 City of Long Beach - Utilities
Beg Balan
ce
Total Funding
FY 18
FY 19
FY 20
Project
Project Title
Utilities
Program
Snapshot
$0
$8,050,000
$8,050,000
$8,050,000
$24,150,000
LBGO
GAS AND OIL PROGRAM
$100,000
$0
$0
$0
$100,000
PW7010
STORMWATER/U
RBAN RUNOFF M
GMT
$208,685
$1,550,000
$3,750,000
$300,000
$5,808,685
PW7020
STORM DRAIN PUMP STA
TION REPAIR & CER
TIFICATION
$81,474
$0
$0
$0
$81,474
PW7030
STORM DRAIN REFURB‐TELEM
ETRY
$6,909,119
$300,000
$300,000
$300,000
$7,809,119
PW7060
STORM DRAIN SYSTEM & W
ATER QUALITY IM
PROVEM
EN
$25,968,391
$0
$0
$0
$25,968,391
PW7090
LB‐M
UST W
ATER TREA
TMEN
T FA
CILITY
$0
$4,046,000
$0
$0
$4,046,000
SEWER
SEWER
FUND
$0
$13,416,279
$0
$0
$13,416,279
WATER
WATER FUND
Total
$33,267,668
$27,362,279
$12,100,000
$8,650,000
$81,379,947
FY 18 Adopted CIP 87 City of Long Beach - Utilities
STORM DRAIN PUMP STATION REPAIR & CERTIFICATION
Utilities
PW7020
Project Description Repair and upgrade storm water pumps at various locations in accordance with AQMD regulations. Initiate and construct improvements at pump stations that are idntified in the 2015 Pump Station Assessment Study.
Estimated Operating and Maintenance
Repair and maintenance to prolong the life of storm drain pumps and reduce future infrastructure expenses related to normal degradation.
Project Timeline Design: October 2017 ‐ January 2018 Construction: January 2018 ‐ September 2018.
Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 CAPITAL PROJECTS ‐ LEGISLATIVE $5,046 $0 $0 $0 $5,046
GENERAL CAPITAL $89,767 $0 $300,000 $300,000 $689,767
MEASURE A $0 $1,550,000 $3,450,000 $0 $5,000,000
TIDELANDS $115,956 $0 $0 $0 $115,956
Total $210,770 $1,550,000 $3,750,000 $300,000 $5,810,770
FY 18 Adopted CIP 88 City of Long Beach - Utilities
STORM DRAIN SYSTEM & WATER QUALITY IMPROVEMENT
Utilities
PW7060
Project Description Repair storm water catch basins and storm water mainline pipes. Construct storm drain enhancements. Conduct water quality improvements along Queensway Bay, San Pedro Bay, Alamitos Bay, and Los Cerritos Channel. Required monitoring modeling and implementation actions associated with Total Maximum Daily Loads (TMDL) as mandated by the State and Federal agencies. Improvements include construction of bioswales, low flow diversions and Structural Best Management Practices (BMP) for trash, metal and bacteria.
Estimated Operating and Maintenance
Repair and maintenance to modernize storm drain catch basins and mainline pipes to reduce future infrastructure expenses related to normal degradation and heavy usage.
Project Timeline Design: October 2017 ‐ March 2018. Construction: April 2018 ‐ April 2019.
Department Contact Public Works ‐ Stormwater ‐ Alvin Papa ‐ (562) 570‐6386
Funding SourcesFunding Source Beg Balance 3 Year Total FY 18 FY 19 FY 20 COMMUNITY DEV BLOCK GRANT $1,568,710 $0 $0 $0 $1,568,710
GAS TAX $1,287,345 $300,000 $300,000 $300,000 $2,187,345
GENERAL CAPITAL $4,005,927 $0 $0 $0 $4,005,927
TIDELANDS $47,136 $0 $0 $0 $47,136
Total $6,909,119 $300,000 $300,000 $300,000 $7,809,119
FY 18 Adopted CIP 89 City of Long Beach - Utilities
Proje
ctDe
scrip
tion
Budg
etFY
2017
Budg
etFY
2018
Budg
etFY
2019
Budg
etFY
2020
Budg
etFY
2021
Budg
etFY
2022
Five-
Year
Total
GOMN
Main
Pipe
line R
eplac
emen
t 6,4
75,00
0
6,175
,000
6,1
75,00
0
6,175
,000
6,1
75,00
0
6,175
,000
30
,875,0
00
GO
SVSe
rvice
Pipe
line R
eplac
emen
t1,7
75,00
0
1,100
,000
1,1
00,00
0
1,100
,000
1,1
00,00
0
1,100
,000
5,5
00,00
0
GO
RMGa
s Mete
r Rep
lacem
ent
1,050
,000
25
,000
25,00
0
25
,000
25,00
0
25
,000
125,0
00
GOBF
Facil
ity W
ork
500,0
00
500,0
00
500,0
00
500,0
00
500,0
00
500,0
00
2,500
,000
GOCP
Gas C
ontro
l/Cath
odic
Prote
ction
250,0
00
250,0
00
250,0
00
250,0
00
250,0
00
250,0
00
1,250
,000
GOMB
Billa
ble P
ipelin
e Wor
k2,0
00,00
0
2,000
,000
50
0,000
50
0,000
50
0,000
50
0,000
4,0
00,00
0
Subto
tal12
,050,0
00
10
,050,0
00
8,5
50,00
0
8,550
,000
8,5
50,00
0
8,550
,000
44
,250,0
00
Le
ss B
illable
Pipe
line W
ork
(2,00
0,000
)
(2
,000,0
00)
(500
,000)
(5
00,00
0)
(500
,000)
(5
00,00
0)
(4,00
0,000
)
Ne
t CIP
Bud
get
10,05
0,000
8,050
,000
8,0
50,00
0
8,050
,000
8,0
50,00
0
8,050
,000
40
,250,0
00
Note:
Gas M
eter R
eplac
emen
t bud
get is
redu
ced t
o $25
K in
FY20
18.
LBGO
antic
ipates
AMI
mete
r insta
llatio
n will
be co
mplet
ed in
FY2
017.
FY 20
18 -
FY 20
22 C
apita
l Impr
ovem
ent P
rogr
amLo
ng B
each
Gas
& O
il
LBGO
is co
mplet
ing th
e ins
tallat
ion of
an A
dvan
ced M
eterin
g Infr
astru
cture
syste
m (A
MI).
Initia
l fun
ding p
rovid
ed by
a sp
ecial
fee t
o the
rate
paye
r with
addit
ional
fundin
g fro
m a l
ease
-to-o
wn
finan
cing p
rogr
am. D
ebt s
ervic
e will
be co
vere
d with
savin
gs fr
om ex
isting
mete
r rea
ding c
ontra
ct.
AMI c
ost is
not in
clude
d in t
he nu
mber
s pro
vided
.
90
FY
17
FY
18
FY
16
FY
17
Est
imat
edN
ewP
ota
ble
Wat
erA
ctu
als
Bu
dg
et E
xpen
dit
ure
s B
ud
get
Wat
er C
IP b
y In
-Hou
se W
orkf
orce
2,26
7,87
8
2,
850,
000
2,85
0,00
0
2,85
0,00
0
P
ipel
ine
Sys
tem
Impr
ovem
ents
4,30
7,10
3
2,
817,
300
2,46
4,30
0
2,37
9,70
0
R
eser
voir/
Trea
tmen
t Pla
nt Im
prov
emen
ts2,
092,
307
1,70
6,00
0
2,
065,
700
2,
945,
100
Wat
er S
uppl
y P
roje
cts
1,71
5,03
3
3,
894,
500
4,02
3,80
0
3,30
5,60
0
Fa
cilit
y Im
prov
emen
ts65
1,69
9
520,
000
60
3,00
0
1,
135,
879
Dev
elop
er R
eim
burs
ed69
3,85
8
-
65
0,00
0
-
Inte
rest
Exp
ense
Cap
italiz
ed58
7,28
0
800,
000
80
0,00
0
80
0,00
0
Oth
er41
4,47
7
-
-
-
T
ota
l Po
tab
le12
,729
,634
12,5
87,8
00
13
,456
,800
13,4
16,2
79
Rec
laim
ed W
ater
Sys
tem
Exp
ansi
on63
,679
-
-
-
T
ota
l Rec
laim
ed63
,679
-
-
-
To
tal W
ater
Fu
nd
12,7
93,3
13
12
,587
,800
13,4
56,8
00
13
,416
,279
Se
wer S
ewer
Pip
elin
e Im
prov
emen
ts87
6,96
0
2,06
1,90
0
2,
883,
300
2,
422,
800
Sew
er L
ift S
tatio
ns2,
640,
804
1,66
7,50
0
76
4,70
0
1,
573,
200
Faci
lity
Impr
ovem
ents
-
15
,000
18,5
00
-
Inte
rest
Exp
ense
Cap
italiz
ed12
5,41
4
50,0
00
50
,000
50,0
00
O
ther
167,
133
-
-
-
To
tal S
ewer
Fu
nd
3,81
0,31
1
3,
794,
400
3,71
6,50
0
4,04
6,00
0
Gra
nd
To
tal
16,6
03,6
24$
16
,382
,200
$
17,1
73,3
00$
17
,462
,279
$
Not
e: T
his
is o
nly
a su
mm
ary
of th
e de
partm
ent's
pro
ject
s.
Fis
cal
Yea
r 20
18 C
apit
al I
mp
rove
men
t P
rog
ram
Su
mm
ary
of
Lo
ng
Bea
ch W
ater
Dep
artm
ent
Pro
ject
s
91
92
Pro
ject
Ince
pti
on
Fo
reca
stT
hro
ug
hF
Y 1
7A
do
pte
dat
FY
16
Est
imat
ed
FY
18
Co
mp
leti
on
Act
ual
sE
xpen
dit
ure
sB
ud
get
Ter
min
al P
roje
cts
Pie
rs D
/E/F
(Mid
dle
Har
bor)
$1,4
99,0
00$9
73,9
43$7
0,02
7$9
1,83
4T
ota
l Ter
min
al P
roje
cts
$1,4
99,0
00$9
73,9
43$7
0,02
7$9
1,83
4
New
Fir
e S
tati
on
s/F
ire
Bo
ats/
Po
rt S
afet
y an
d S
ecu
rity
Pro
ject
sN
ew F
ire S
tatio
ns /
Fire
Boa
ts /
Sec
urity
Pro
ject
s$1
86,8
45$7
2,08
2$1
3,41
4$1
3,22
1 T
ota
l Po
rt-w
ide
Sec
uri
ty &
Saf
ety
Pro
ject
s$1
86,8
45$7
2,08
2$1
3,41
4$1
3,22
1
Str
eets
, Bri
dg
es, &
Rai
lway
sG
eral
d D
esm
ond
Brid
ge R
epla
cem
ent
$1,4
15,4
92$8
73,3
67$1
91,0
86$2
14,9
87R
ail P
roje
cts
$1,0
09,7
09$1
30,1
58$2
8,80
9$1
3,03
4T
ota
l Str
eets
, Bri
dg
es, &
Rai
lway
s$2
,425
,201
$1,0
03,5
25$2
19,8
95$2
28,0
21
Mis
cella
neo
us
Env
ironm
enta
l Pro
ject
sN
/A [1
]N
/A [1
]$1
,992
$14,
406
Eng
inee
ring
Mis
cella
neou
s P
roje
cts
$502
,482
$87,
460
$41,
013
$56,
729
Por
t Inf
rast
ruct
ure
(Stre
ets,
Wat
er, S
torm
Wat
er, S
ewer
)$1
72,6
89$1
1,73
0$1
9,51
9$4
8,16
4In
form
atio
n Te
chno
logy
Pro
ject
sN
/A [1
]N
/A [1
]$2
,920
$4,1
65Fu
rnitu
re, F
ixtu
res,
and
Equ
ipm
ent [
2]N
/A [1
]N
/A [1
]$1
,575
$1,5
53T
ota
l Mis
cella
neo
us
Pro
ject
s$6
75,1
71$9
9,19
0$6
7,01
9$1
25,0
17
To
tal C
apit
al P
roje
cts
$4,7
86,2
17$2
,148
,740
$370
,355
$458
,093
*All
proj
ects
sta
ted
in m
illio
ns.
[1] O
nly
proj
ects
with
FY
201
7 es
timat
ed e
xpen
ditu
res
or a
n FY
201
8 bu
dget
ed a
mou
nt a
re s
how
n ab
ove.
[2] F
urni
ture
, Fix
ture
s, a
nd E
quip
men
t cat
egor
y is
par
t of H
arbo
r Dep
t's N
on-P
erso
nal B
udge
t and
is n
ot tr
acke
d cu
mul
ativ
ely
for a
ll ye
ars
Fis
cal Y
ear
2018
Cap
ital
Imp
rove
men
t P
rog
ram
Su
mm
ary
of
Har
bo
r D
epar
tmen
t P
roje
cts1
93
94
Pro
ject
Nam
eG
ran
t N
ame
Aw
ard
Am
ou
nt
14th
Str
eet P
ark
Exp
ansi
onLA
Cou
nty
Bon
ds D
iscr
etio
nary
Fun
ds20
0,00
0$
A
rter
ial S
tree
t Im
prov
emen
tsS
AF
ET
EA
-LU
899,
806
$
Bea
ch S
tree
ts M
idto
wn
Met
ro O
pen
Cyc
le B
each
Str
eets
190,
000
$
City
of B
ellfl
ower
Tra
ffic
Sig
nal I
nsta
llatio
n P
artn
ersh
ip25
,655
$
E
l Dor
ado
Duc
k P
ond
Rep
air
LA C
ount
y B
onds
Dis
cret
iona
ry F
unds
300,
000
$
El D
orad
o R
egio
nal P
ark
Res
troo
m R
ehab
ilita
tion
LA C
ount
y B
onds
Dis
cret
iona
ry F
unds
250,
000
$
Hou
ghto
n P
ark
AD
A Im
prov
emen
tsLA
Cou
nty
Bon
ds D
iscr
etio
nary
Fun
ds30
0,00
0$
I-
605
Sou
ndw
all
Met
ro25
0,00
0$
LE
D C
onve
rsio
n A
B-3
2 -
Cap
and
Tra
de F
unds
1,13
6,54
0$
Red
Car
Gre
enw
ay R
OW
Sou
thLA
Cou
nty
Bon
ds D
iscr
etio
nary
Fun
ds81
,000
$
S
easi
de P
art A
rtifi
cial
Tur
fC
omm
unity
Dev
elop
men
t Blo
ck G
rant
250,
000
$
Sea
side
Par
t Art
ifici
al T
urf
Sta
te P
arks
Pro
p 40
You
th S
occe
r60
0,00
0$
S
tear
ns P
ark
Com
mun
ity C
ente
r R
oof R
epai
rLA
Cou
nty
Bon
ds D
iscr
etio
nary
Fun
ds20
0,00
0$
S
tear
ns P
arn
Irrig
atio
n U
pgra
des
LA C
ount
y B
onds
Dis
cret
iona
ry F
unds
944,
000
$
Will
ow s
prin
gsP
ropo
sitio
n 84
924,
000
$
Wrig
ley
Gre
en B
elt D
evel
opm
ent
LA C
ount
y B
onds
Dis
cret
iona
ry F
unds
325,
000
$
To
tal
6,87
6,00
1$
Fis
cal Y
ear
2018
Cap
ital I
mpr
ovem
ent P
rogr
amG
rant
Fun
ding
Not
Iden
tifie
d in
CIP
Boo
k
Ple
ase
note
this
pag
e re
pres
ents
gra
nts
that
are
app
ropr
iate
d 10
/1/1
6 -
9/30
/17
and
not c
onsi
dere
d ne
w m
oney
(no
t app
ropr
iate
d du
ring
the
annu
al b
udge
t pre
para
tion
proc
ess)
.
FY
17 M
id-Y
ear
App
ropr
iate
d P
roje
cts
FY 18 Adopted CIP 95 City of Long Beach - Grant Funded Projects
Fis
cal Y
ear
2018
Cap
ital I
mpr
ovem
ent P
rogr
amG
rant
Fun
ding
Not
Iden
tifie
d in
CIP
Boo
k
FY
17 M
id-Y
ear
App
ropr
iate
d P
roje
cts
Pro
ject
Nam
eG
ran
tor
Ag
ency
Po
ten
tial
Aw
ard
Dat
eG
ran
t A
mo
un
tE
l Dor
ado
Duc
k P
ond
Res
tora
tion
San
A
ugus
t20
161,
754,
000
$
P
E R
OW
Sou
th
CA
Sta
te P
arks
/LW
CF
Aug
ust
2016
450,
000
$
Ana
heim
Cor
ridor
Saf
ety
Impr
ovem
ents
Cal
tran
sD
ecem
ber
2016
2,00
0,00
0$
Los
Coy
otes
Dia
gona
l Sig
nal I
mpr
ovem
ents
Cal
tran
sD
ecem
ber
2016
1,50
0,00
0$
Con
tinen
tal C
ross
wal
k U
pgra
des
Cal
tran
sD
ecem
ber
2016
250,
000
$
Ped
estr
ian
Cou
ntdo
wn
Sig
nal U
pgra
des
Cal
tran
sD
ecem
ber
2016
250,
000
$
Run
way
7R
-25L
FA
AS
epte
mbe
r20
1712
,881
,879
$
D
elta
Ave
nue
Bik
e B
oule
vard
Sta
te A
TP
Dec
embe
r20
181,
075,
105
$
C
ityw
ide
8-80
Con
nect
ions
Sta
te A
TP
Dec
embe
r20
186,
754,
000
$
A
ther
ton
Brid
ge a
nd C
ampu
s C
onne
ctio
nsS
tate
AT
PD
ecem
ber
2018
3,03
1,00
0$
Pro
ject
Nam
eG
ran
tor
Ag
ency
Po
ten
tial
Aw
ard
Dat
eG
ran
t A
mo
un
tA
rtes
ia G
reat
Bou
leva
rdM
etro
Sep
tem
ber
2020
6,00
0,00
0$
Gre
at 7
th S
tree
t Con
nect
ions
Met
roS
epte
mbe
r20
205,
200,
000
$
M
id-C
ity S
igna
l Coo
rdin
atio
nM
etro
Sep
tem
ber
2020
1,91
8,00
0$
Par
k or
Rid
eM
etro
Sep
tem
ber
2020
794,
000
$
15th
Str
eet B
icyc
le B
oule
vard
Met
roJu
ly
2018
1,00
0,00
0$
Long
Bea
ch B
lvd
Ped
estr
ian
Impr
ovem
ents
Met
roJa
nuar
y20
191,
700,
000
$
M
arke
t Str
eet P
edes
tria
n S
tree
tsca
peM
etro
Janu
ary
2020
3,20
0,00
0$
Par
king
Gui
danc
e &
Way
findi
ng S
yste
ms
Met
roO
ctob
er20
1790
0,00
0$
S
anta
Fe
Ave
nue
Syn
chro
niza
tion
Enh
ance
me
Met
roJa
nuar
y20
202,
000,
000
$
E
nhan
ced
Ped
estr
ian
Cro
ssin
gs (
HS
IP)
Met
roO
ctob
er20
1725
0,00
0$
W
illow
Str
eets
cape
Impr
ovem
ents
Met
roJa
nuar
y 20
182,
100,
000
$
T
ota
l55
,007
,984
$
Pot
entia
l Pro
ject
s to
be
fund
ed b
y G
rant
s
FY 18 Adopted CIP 96 City of Long Beach - Grant Funded Projects
Page Program Program Name
26 AP1030 Airport Terminal Area Improvement
27 AP1070 Airport Pavement Rehabilitation
90 GOBF Facility Work
90 GOCP Gas Control And Cathodic Protection
90 GOMB Billable Pipeline Work
90 GOMN Main Pipeline Replacement
90 GORM Gas Meter Replacement
90 GORSV Service Pipeline Replacement
77 PW2040 Convention Center Complex Refurb
61 PW3010 Park Bike Path Replacement
62 PW3020 Park Facility Reroofing
63 PW3040 Game Court Rehabilitation
64 PW3050 Rancho Los Alamitos
65 PW3060 Rancho Los Cerritos
66 PW3070 Park Acquisition & Development
67 PW3130 Tree Trimming ‐ Parks
68 PW3170 Game Field Upgrades
69 PW3220 Irrigation System Replacement
70 PW3240 Recreation Building Rehabilitation
71 PW3250 Restroom Rehabilitation
72 PW3300 El Dorado Park Rehabilitation
78 PW4100 Civic Center Complex Improvements
79 PW4140 Citywide Reroofing
43 PW4230 Prop A Transit Improvements
80 PW4240 General City Building Refurbishment
81 PW4370 Fire Facilities Modernization
82 PW4450 Facility Assessments
44 PW5050 Citywide Led Lighting
45 PW5062 Major And Secondary Highway (Arterial)
46 PW5080 Bridge Rehabilitation And Seismic Retrofit
47 PW5151 Residential Street Program
48 PW5244 Alleys
49 PW5390 Citywide Slurry Seal Program
50 PW5450 Ada Response Program
51 PW5500 Sidewalks/Curb Ramps
83 PW6200 Queen Mary Projects
88 PW7020 Storm Drain Pump Station Repair & Certification
89 PW7060 Storm Drain System & Water Quality Impro
33 PW8000 Colorado Lagoon
34 PW8170 Belmont Pool And Pier Improvements
35 PW8310 Beach Parking Lots Rehabilitation
36 PW8380 Alamitos Bay Area Improvements
Fiscal Year 2018 Capital Improvement Program
Index ‐ Numerical
FY 18 Adopted CIP 97 City of Long Beach - Index
Page Program Program Name
Fiscal Year 2018 Capital Improvement Program
Index ‐ Numerical
37 PW8400 Tidelands Critical Facility Repairs
52 PWT010 Sustainable Transportation Improvement
53 PWT110 Citywide Striping & Signage Program
54 PWT130 Neighborhood Traffic Mitigation
55 PWT190 Traffic & Pedestrian Signals
FY 18 Adopted CIP 98 City of Long Beach - Index
Fiscal Year 2018 Capital Improvement Program
Glossary AB2766 (Air Quality): This funding source was enacted to support programs that reduce air pollution from motor vehicles. Funds are collected by the Department of Motor Vehicle (DMV) and subvened to the South Coast Air Quality Management District (AQMD) for disbursement. The City receives these funds to implement programs and measures that reduce air pollution from motor vehicles mandated by the requirements of federal and state Clean Air Acts and the Air Quality Management Plan (AQMP). AB2928 (Traffic Congestion Relief): The State Assembly Bill that established legislation for the Traffic Congestion Relief Fund in the State Treasury for allocation of street and road funds to cities and counties for maintenance and reconstruction. This funding source was replaced in 2002 by the Transportation Congestion Improvement Act. See State Proposition 42. Americans with Disabilities Act of 1990 (ADA): A Federal law enacted to provide for the protection of individuals with disabilities. This protection ranges from prohibitions against discrimination in employment to specific requirements for modifications of public facilities and transportation systems. Airport Area Assessment District: The assessment district formed for the purpose of constructing upgrades in the airport area to improve traffic flow. The upgrades include street widening, grade separation, dedicated turn lanes, traffic signals, and signage. See Assessment District. Airport Capital: A sub-fund of the Airport Fund. The non-grant portion of the Airport Fund capital expenditures. See Airport Fund. Airport COPS: Certificates of Participation issued by the Long Beach Airport to fund capital improvements. See Certificates of Participation. Airport Fund: The fund designation used to account for revenues and expenditures applicable to the operation and maintenance of the Long Beach Airport and its leaseholds. The major revenue sources consist of revenues related to airport operations leases and grants. The Airport Fund is an Enterprise Fund. See Enterprise Fund. Airport Customer Facility Charges: A fee charged by car rental agencies on each rental transaction and passed on to the Airport to expend on a car
rental facility or transportation system between the rental facility and the terminal. Airport Passenger Facility Charges: The amount added to the passenger airline ticket to provide a funding source for airport improvements. Appropriation: An authorization granted by the City Council that permits officials to make expenditures and incur obligations for specific purposes. Assessment District: A separate local government entity formed to provide specific local public services. Assessment districts can be established to provide a single service such as sewage treatment or to provide multiple services such as police and fire protection, parks and recreation facilities, and water distribution systems. Property owners within the assessment district’s boundary pay into the district in direct proportion to the benefits or services they receive. Beginning Balance: Unspent funds carried over from prior fiscal years that become part of the FY 18 appropriation. Bond: A method of financing long-term debt, issued by a government or private corporation, which bears interest. Budget: A plan of anticipated expenditures and revenue for a certain period. California Energy Commission: California’s primary energy policy and planning agency. Caltrans: The State of California Department of Transportation. Caltrans administers both U.S. Department of Transportation grants and its own grants for improvements to streets and highways. Caltrans Construction Cooperative Grant: A grant issued by Caltrans for the City of Long Beach to provide various services in connection with the State’s Interstate 710 construction project. Capital: Assets that add to the long-term net worth of the City. Capital Improvement: Construction or major repair of City-owned buildings and infrastructure which helps meet health, safety, and legal concerns and mandates, prolongs the life of City assets or avoids or minimizes future repair costs, benefits the community and supports goals articulated in the City
FY 18 Adopted CIP 99 City of Long Beach
of Long Beach Strategic Plan, has potential to generate operating savings or increase productivity, and is consistent with the City’s General Plan. Certificates of Participation (COPS): Interest-bearing debt instruments sold to investors by a non-profit agency to finance construction. The agency then leases the facility and uses the revenues to repay the debt. CFD No. 5 Bond: See Community Facilities District (CFD) No. 5 Bond. CFO: Chief Financial Officer. CIP Category: A group of similar programs organized into a major section of the CIP budget document. Civic Center 1997A Bond: A bond issued in 1997 by the Long Beach Finance Authority to fund various capital improvement projects in the Civic Center Complex. Civic Center Capital: A sub-fund of the Civic Center Fund. The non-bond portion of the Civic Center Fund capital expenditures. The major ongoing revenue source to the Fund is rental payments from the departments occupying the facilities. Civic Center Fund: The fund designation used to account for revenues and expenditures applicable to the operation and maintenance of the City Hall Complex and the Main Library Complex. The major ongoing revenue source to the Fund is rental payments from the departments occupying the facilities. Coastal Conservancy Grant: State bond proceeds used to provide grant that protect coastal or ocean resources from development, natural or economic conditions. Established in 1976, the California Coastal Conservancy is funded largely by State bonds. Community Development Block Grant (CDBG): Federal entitlement funds (based on various criteria) received by the City of Long Beach from the U.S. Department of Housing and Urban Development (HUD) for the purpose of benefiting low and moderate-income areas and disabled residents. Community Facilities District (CFD) No. 5 Bond: The 2000 Special Tax Bonds issued to finance the acquisition and construction of certain street and other public improvements for the Long Beach Towne Center.
Construction Support: Engineering work during the construction process, which ensures that projects are constructed in accordance with design parameters and specifications. Primary construction engineering functions include construction, inspection, laboratory services, field surveys, and design plan updates or interpretation. Contract Award Process: Procurement preparation for Council award and all pertinent contract documentation prior to the initiation of construction. Debt Service: The principal and interest payment on borrowed money according to a predetermined schedule. Department of Boating and Waterways (DBAW): A State agency that provides grants and loans for improvements in the Tidelands areas of the City. Design: The process of identifying project options, developing a project scope, conducting feasibility analyses, and creating plans, specifications, and estimates for a capital improvement. Primary design engineering functions include drafting, design, development of specifications, and traffic engineering. Economic Development Administration (EDA): Created by Congress pursuant to the Public Works and Economic Development Act of 1965 to generate new jobs, retain existing jobs, and stimulate industrial and commercial growth in economically distressed areas of the United States. Edison Grant: A grant received from Edison International under the LED Traffic Signal Rebate Program to provide for more energy efficient traffic signals. Environmental Enhancement and Mitigation Program (EEMP) Grant: Annually, the EEMP offers grants for projects to mitigate the environmental impacts caused by new or modified state transportation facilities. These grants are offered to local, state, and federal governmental agencies. The EEMP was established in 1989. El Dorado Regional Park Development Grant: A National Park Service federal grant administered by the State Department of Parks and Recreation to upgrade the El Dorado Park campsites. Enterprise Fund: The fund designation used to account for City operations that are financed and operated in a manner similar to private business enterprises. The intent of the City in using this type of fund is to determine that the costs (expenses, including depreciation) of providing these services to the general public on a continuing basis are financed
FY 18 Adopted CIP 100 City of Long Beach
or recovered primarily through user charges. The City’s Enterprise Funds include Airport, Development Services, Gas, Refuse/ Recycling, Sewer, Towing, Water, and SERRF. Environmental Protection Agency (EPA) Grant: Federal funds used to address environmental issues for pre-approved projects. FAA: Federal Aviation Administration. FAA AIP Program Grant: An Airport Improvement Program (AIP) grant from the FAA to construct capital improvements for pre-approved projects at the Long Beach Airport. FEMA: Federal Emergency Management Agency. Provides funds, services, hiring, and post-disaster assistance for response and recovery in the event of natural disasters. FEMA HMGP: The FEMA Hazard Mitigation Grant Program. The Governor’s Office of Emergency Services (OES) administers this program in California. Fiscal Year (FY): A designated time frame which identifies the beginning and ending dates for recording an entity’s financial transactions. The fiscal year for the City of Long Beach is from October 1 through September 30. Fleet Capital: A sub-fund of the Fleet Fund. It is comprised of the non-grant and non-bond portion of the Fleet Fund capital expenditures. See Fleet Fund. Fleet Fund: The fund designation used to account for revenues and expenditures applicable to the City’s operation, maintenance, and timely replacement of the City’s fleet of vehicles and equipment. There are two major sources of ongoing revenue for the Fund, Fleet Services charges to the City departments and land rental payments. Fund: An accounting entity with a self-balancing set of accounts recording financial resources and transactions for specific activities. Fund Type: A classification term used to group funding sources into specific categories of government functions or services. Funding Source: The specific source of appropriated funds.
FY 18 New Budget: The new allocation of monies that is part of the FY 18 budget appropriation. Gas Capital: A sub-fund of the Gas Fund. This is the non-grant portion of the Gas Fund capital expenditures. See Gas Fund. Gas Fund: The fund designation used to account for revenues and expenditures applicable to activities associated with the transmission and distribution of natural gas to the City’s users. The Gas Fund is an Enterprise Fund. See Enterprise Fund. Gasoline Tax Street Improvement Capital: A sub-fund of the Gasoline Tax Street Improvement Fund. This is the non-grant portion of the Gasoline Tax Street Improvement Fund. Gasoline Tax Street Improvement Fund: The fund designation used to account for revenues and expenditures of gasoline tax funds apportioned under the State Streets and Highways Code, as well as other sources dedicated to transportation improvements. Expenditures may be made for any street-related purpose on the City’s system of streets, including maintenance. In addition to the gasoline tax revenue from the State of California, other transportation-related revenue sources include funding from the Federal Transportation Equity Act for the Twenty-First Century (TEA-21) and the State Traffic Congestion Relief Fund and State Proposition 42 (AB2928). General Capital Projects Fund: The fund designation used to account for the all-years Capital Improvement Program with multiple funding sources, including the General Fund that pays for the City’s general projects. General Fund: The fund designation used to account for financial resources applicable to the general governmental operations of the City of Long Beach. The largest sources of revenue for the General Fund are property taxes, sales taxes, utility user’s taxes, and motor vehicle license fees. Grants: Disbursement of assets from another government agency or entity to be expended for a pre-approved purpose, activity, or facility. Highways-Through-Cities Grant (HTC): A Los Angeles County financial aid program to assist Cities with their major and secondary highway rehabilitation projects. This is a discretionary program based on each Supervisor’s decision regarding which projects to assist in the cities within their district. Financing is provided by each County Supervisor District’s Road Construction program allocation of State gas tax funding.
FY 18 Adopted CIP 101 City of Long Beach
HBRR: Highway Bridge Rehabilitation and Replacement Program. See TEA-21 HBRR. Health Fund: The fund designation used to account for revenues and expenditures applicable to the support of the operations of the Department of Health and Human Services. HVAC: Heating, ventilation, and air conditioning. Internal Service Fund: The fund designation used to account for the finance of goods and services provided by one City department to another on a cost-reimbursement basis, e.g., computer services, fleet services, etc., including depreciation. ISTEA: Intermodal Surface Transportation Efficiency Act (of 1991). The Transportation Equity Act for the Twenty-First Century (TEA-21) superseded this funding source in 1998. The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) superseded TEA-21 in 2005. The Moving Ahead for Progress in the 21st (MAP-21) Century Act supercedes SAFETY-LU in 2012. LED: Light Emitting Diode. A component of an electronic display. Long Beach and Los Angeles Harbor Contributions: Monies received from the Long Beach and Los Angeles Harbors to fund various street improvements to improve the traffic flow out of the Long Beach and Los Angeles harbor areas. Los Angeles County Grant: Grants issued by the County of Los Angeles to the City of Long Beach to fund various capital improvement projects. MAP-21: The authorized bill that governed United States federal surface transportation spending. The bill was signed into law by President Bush on August 10, 2005 and expired on September 30, 2009 but Congress renewed its funding formulas ten times after its expiration date, until replacing the bill with Moving Ahead for Progress in the 21st (MAP-21) Century Act in 2012. The $286.4 billion measure contained a host of provisions and earmarks intended to improve and maintain the surface transportation infrastructure in the United States, including interstate highway system, transit systems around the country, bicycling and pedestrian facilities, and freight rail operations. Marina Capital: A sub-fund of the Marina Fund. The non-grant and non-loan portion of the Marina Fund capital expenditures. See Marina Fund. Marina Fund: The fund designation used to account for the revenues and expenditures
applicable to the operation, maintenance, and development of the City’s marinas in the Tidelands area. Measure A: In June 2016, Long Beach voters approved Measure A, a Transaction and Use Tax. The Measure added a transactions and use (sales) tax on the sale and/or use of all tangible personal property sold at retail in the City for a 10 year period. Measure D: In November 2010, Long Beach voters approved Measure D, a City Charter amendment that removed control of oil properties and all oil operations in the Port of Long Beach from the Long Beach Board of Harbor Commissioners, giving the authority instead to the Long Beach City Council. Measure D transfers 5% of the port's gross earnings to Tidelands Operating Fund. Measure R: A ballot measure proposed by the Los Angeles County that was passed in 2008. This increases the county sales tax by one half-cent to fund transportation projects. Collection of Measure R sales tax revenue commenced on July 1, 2009. MTA Grant: State and Federal funding awarded to the City of Long Beach through the Metropolitan Transportation Authority (MTA) “Call for Projects”. Non-Point Source Pollution (NPS): Water pollution which originates from many different sources rather than one specific, identifiable source. NPS occurs when rainfall, irrigation waters, and water habits (washing cars/pets) create a flow over land and impervious surfaces and are deposited into the receiving waters via the storm drain system. Park Impact Fees: Fees collected on new residential development to mitigate impact on Parks, Recreation and Marine facilities for the purpose of assuring that the park land and recreational facility standards established by the City of Long Beach are met with respect to the additional needs created by such development. Program: A specific undertaking for the delivery of a capital improvement including procurement, construction or installation of facilities or related equipment. Proposition A: A source of funding from the Los Angeles County sales tax of one-half cent used exclusively to construct, improve, and maintain mass transit services and facilities. See Transportation Fund. Proposition 1B (Transportation Bond): Funding derived from Budget Bill: SB78 and Trailer Bill: SB88 and implemented as “The Highway Safety, Traffic
FY 18 Adopted CIP 102 City of Long Beach
Reduction, Air Quality, and Port Security Bond Act of 2006” passed by the voters in November 2006. This authorized the state to sell approximately $20 billion of general obligation bonds to fund transportation projects to relieve congestion, improve the movement of goods, improve air quality, and enhance the safety and security of the transportation system. Proposition C: A source of funding from the Los Angeles County sales tax of one-half cent used to construct, improve, and maintain mass transit services and facilities. This funding also provides an expanded list of eligible project expenditures including: congestion management programs, bikeways and bike lanes, street improvements supporting public transit service, and pavement management system projects. See Transportation Fund. Proposition C MTA Grant: See MTA Grant. Proposition 42: See State Proposition 42. Public Safety Facilities Capital Improvements Lease Revenue Bond: The 2002 bond issued by the Long Beach Finance Authority to finance public safety facility capital improvement projects. Rainbow Harbor Area Fund: The fund designation used to account for revenues and expenditures applicable to the operation, maintenance, and development of the City’s Rainbow Harbor area. Rainbow Harbor Capital: A sub-fund of the Rainbow Harbor Area Fund. The non-grant and non-loan portion of the Rainbow Harbor Area Fund capital expenditures. Safe Routes to School Program: Administered by Caltrans, this 2003 program provides state and federal funds for projects that protect the safety of children traveling to and from school. Projects were developed through collaboration with the Long Beach Unified School District. SERRF Refunding 03 Bonds: The 2003 refunding bonds for the finance of the construction of the Southeast Resource Recovery Facility (SERRF). Sewer Capital: A sub-fund of the Sewer Fund. The non-grant portion of the Sewer Fund capital expenditures. See Sewer Fund. Sewer Fund: The fund designation used to account for revenues and expenditures applicable to the operation, maintenance, and replacement of the City’s sewer system in a cost effective manner. The major sources of revenue include a water usage charge based on water that will enter the sewer
system and a service charge based on the size of the customer’s water meter. The Sewer Fund is an Enterprise Fund. Skylinks Golf Course 03 Bonds: The 2003 bond issued by the Long Beach Finance Authority to finance improvements to the Skylinks Golf Course. South Coast Air Quality Management District (SCAQMD): Agency responsible for preparation of the state implementation plan (SIP) applicable within its boundaries, adoption of control regulations for stationary sources, and implementation of indirect source and transportation control measures. State Bond Act of 1988: The 1988 bond issued by the State of California to fund various parks and recreation projects. State Grant – California Endowment Fund: State funding awarded to the City of Long Beach to establish a Latino Diabetes Prevention and Management Program. State Grant – Energy Commission: Funding authorized by Assembly Bill 970 and administered by the California Energy Commission (CEC). These funds were used to purchase and install light-emitting diode (LED) traffic signals and battery back up systems. State Grant – Public Libraries: Funding for new library facilities provided under the California Reading and Literacy Improvement and Public Library Construction and Renovation Bond Act of 2000. State Implementation Plan (SIP): The 1970 Clean Air Act requires each state to develop a state implementation plan to attain National Ambient Air Quality Standards (NAAQS) by the applicable attainment deadlines. SIPs must be approved by the Federal Environmental Protection Agency. State Library Bond: California Reading and Literacy Improvement and Public Library Construction and Renovation Bond Act of 2000 (Proposition 14). The bond proceeds are designated for site acquisition, new building construction, remodeling, renovation, and upgrading electrical and telecommunications systems.\ State Proposition 12 Bond: Funding derived from Assembly Bill 18 and Senate Bill 1147 and implemented as the Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Act of 2000. The program includes entitlement (funding for cities based on population) and competitive grants for improvement of park land and facilities.
FY 18 Adopted CIP 103 City of Long Beach
State Proposition 13 (Costa-Machado Water Act of 2000) - Coastal Non-point Source Program: A source of funding from the State Water Resources Control Board (SWRCB) for the Los Angeles River and Colorado Lagoon California Beaches Initiative projects. State Proposition 40 Bond: Funding derived from the California Clean Water, Clean Air, Safe Neighborhood Parks, and Coastal Protection Act of 2002. Proposition 40 provides both entitlement and competitive grant programs to California cities for improvement of community recreation areas. State Proposition 40 Water Board Grant: Funding derived from the SWRCB from the Clean Beaches Initiative. This grant was obtained for the remediation of the Colorado Lagoon. State Proposition 42: Funding derived from Assembly Bill 2928 and implemented as State Transportation Congestion Improvement Act, passed in 2002. This requires sales and user taxes on motor fuels to be used for public transportation, city and county road repairs and improvements, and state highway improvements. State Proposition 46 Jobs Housing Balance Incentive Grant: The Housing and Emergency Shelter Trust Fund Act of 2002. This authorized the award of a one-time $25 million grant for cities and counties meeting the terms and conditions of the program for the 2001 calendar year. The City obtained this grant as part of the matching fund requirement for the MacArthur Park Branch Library project. State Transportation Improvement Grant: Federal funds from the Department of Transportation given to the State of California for major transportation projects. This funding has been used primarily for Citywide street repair and improvements. State Water Bond 2000: Funding derived from the Safe Drinking Water, Clean Water, Watershed Protection, and Flood Protection Act of 2000. The funds are administered by the SWRCB for non-point source pollution control, watershed management plan development and implementation, wastewater recycling, and the protection of various targeted watersheds. TDA-SB821: Transportation Development Act funding from sales tax receipts as specified in the California Streets and Highways Code. The TDA SB-821 is the Senate Bill that established legislation for the Transportation Development Act.
Transportation Equity Act for the Twenty-First Century (TEA-21): Enacted on June 9, 1998, this federal legislation authorizes the Federal surface transportation programs for highways, highway safety, and transit. TEA-21 provides states with the flexibility to set their own transportation priorities and to explore creative financing mechanisms within certain guidelines. TEA-21 supersedes the 1991 ISTEA program. TEA-21 HBRR: Highway Bridge Replacement and Rehabilitation funds used specifically for bridges within the city limits. See TEA-21. TEA-21 MTA Grant: See MTA Grant. Temple/Willow Bond: Bonds issued by the City to fund the construction of the new Fleet and Towing facility located on the corner of Temple Avenue and Willow Street. Tidelands Operations Capital: A sub-fund of the Tidelands Operations Fund. The non-grant and loan portion of the Tidelands Operations Fund capital expenditures. See Tidelands Operations Fund. Tidelands Operations Fund: The fund designation used to account for revenues and expenditures applicable to the operations, maintenance, and development of the convention center and beaches in the Tidelands area. Traffic Mitigation Program: The goal of the Program is to relieve arterial congestion, accommodate planned growth, and implement specific programs including street widening, left turn pockets, parking prohibition, off-street replacement parking, and traffic signal synchronization. The City receives the monies from the payment of Transportation Improvement Fees. The Traffic Mitigation Program monies are appropriated in the Capital Projects Fund. Transactions and Use Tax (Measure A): Additional sales tax added for transactions on the sale of all tangible personal property sold at retail in the City for a 10 year period starting in January of 2017. Transportation Development Act: The Transportation Development Act TDA SB-821 of 1971, law provides funding to be allocated to transit and non-transit related purposes that comply with regional transportation plans. Funding comes from sales tax receipts as specified in the California Streets and Highways Code. Transportation Fund: The fund designation which accounts for revenues and expenditures applicable to the City’s share of an additional one and a half
FY 18 Adopted CIP 104 City of Long Beach
percent sales tax. The tax is collected by the County of Los Angeles to finance transportation projects: Propositions A, 1B, C and Measure R. Transportation Improvement Fees: Fees collected from land developers to mitigate cumulative traffic impacts. Sometimes referred to as Transportation Development Fees. See Traffic Mitigation Program. TSM-State Grant: Traffic System Management funds administered by the California Department of Transportation (Caltrans) for traffic-related improvements. Receipt of the grant funds is contingent upon Caltrans’ approval of the proposed projects. Upland Oil Revenue Fund: An oil fund used to account for proceeds from oil operations north of the mean high tide in Long Beach, oil fields of working interest of Signal Hill east and west, Recreation Park on the north side of 7th Street and Marine Stadium. Revenues are used to spur investment opportunities in one-time capital improvements, budget requirements, and essential needs. The Upland Oil fund will allow for important contributions to public safety, infrastructure, libraries, parks, recreation, and technology. Urban Area Security Initiative (UASI): A grant awarded by the U.S. Department of Homeland Security to the City of Long Beach to fund planning, equipment, training, and personnel costs associated with the protection of critical infrastructure in and around the Long Beach Urban Area. Water Fund: The fund designation used to account for revenues and expenditures used to meet the water needs of the citizens of Long Beach with a dependable supply of high-quality water at a reasonable cost. The major sources of revenue include a volumetric charge for water used by customers and a service charge based on the size of the customer’s water meter. The Water Fund is an Enterprise Fund. See Enterprise Fund. West Long Beach Business Park Assessment District: The assessment district established to fund various street improvements in the West Long Beach area. See Assessment District.
FY 18 Adopted CIP 105 City of Long Beach