FY 18 Adopted CIP Book - Long Beach, California

109
FISCAL YEAR 2018 ADOPTED BUDGET CAPITAL IMPROVEMENT PROGRAM BUDGET 2018 LB BUDGET COVERS 6-19-17.indd 5 6/19/17 10:43 AM

Transcript of FY 18 Adopted CIP Book - Long Beach, California

Page 1: FY 18 Adopted CIP Book - Long Beach, California

FISCAL YEAR 2018 ADOPTED BUDGETCAPITAL IMPROVEMENT PROGRAM BUDGET

2018 LB BUDGET COVERS 6-19-17.indd 5 6/19/17 10:43 AM

Page 2: FY 18 Adopted CIP Book - Long Beach, California

FY18 Capital Improvement Program

Table of Contents

Guide to the CIP ................................................................................................ 1

Strategic Investments ..............................................................................................5

Section Summaries. .......................................................................................... 9

Measure A ............................................................................................. 21

Airport ............................................................................................. 23

Beaches and Marinas ..................................................................... 29

Mobility .................................................................................... 39

Parks and Recreation ................................................................. 57

Public Facilities .......................................................................... 73

Utilities ........................................................................................ 85

Harbor ............................................................................................. 93

Grant Funding ....................................................................................... 95

Index ........................................................................................................... 97

Glossary ................................................................................................ 99

i

Page 3: FY 18 Adopted CIP Book - Long Beach, California
Page 4: FY 18 Adopted CIP Book - Long Beach, California

Guide to the Capital Improvement Program (CIP)

Capital Program Overview

FY 18 Adopted CIP 1 City of Long Beach - Public Works

Page 5: FY 18 Adopted CIP Book - Long Beach, California

City of Long Beach- Public WorksFY 18 Adopted CIP  

Guide to the Capital Improvement Program (CIP)

Capital Improvement Planning Process

The Public Works Department was responsible for developing and implementing the Fiscal Year 2018 (FY 18) CIP. Public Works, in conjunction with other Departments, reviewed the City’s capital needs and prioritized project submittals based on established criteria:

• The ability of the project to meet health, safety and legal concerns and mandates

• The value of the project to prolong the life of City assets or avoid/minimize future repair costs

• The benefit the project will provide the community in support of the goals articulated in the Strategic Plan

• The potential for the project to generate savings or increase productivity • The extent to which the project will secure future funds through program planning

or grant eligibility

The Financial Management Department provided the revenue projections to determine the type and amount of resources available to finance proposed capital projects. Specifically, Financial Management monitors fiscal trends at both the local and state levels. Analyses of property, sales, and user tax revenues and County, State and Federal information contribute to their economic forecast.

This Document

The CIP identifies the proposed budget for each program that will receive funding in FY 18, including estimated revenues for FY 19 and FY 20. The CIP’s multi-year character is reflected in the historical summaries to show the fiscal activity for each program.

Carryover Balances

The Financial Summaries and individual Program pages include an FY 18 Budget Balance column. These budget balance amounts may be currently planned for projects in the design stage, pending contract award, or committed to an approved contract. Therefore, estimated budget balance amounts are not necessarily available for new projects. Please note that carryover balances are based on November 14, 2017 data and calculated totals may reflect rounding.

Operating and Maintenance Costs/Operating Budget Impacts

One of the many issues evaluated through the CIP process is the impact new infrastructure projects and assets may have on departmental operating budgets. As capital improvement projects are considered by the City Council, the operating and maintenance (O & M) costs for these facilities should be estimated so that the City Manager and City Council can assess whether adequate budget is available to operate and maintain these facilities after construction.

2

Page 6: FY 18 Adopted CIP Book - Long Beach, California

City of Long Beach- Public WorksFY 18 Adopted CIP  

Guide to the Capital Improvement Program (CIP)

(continued)

Although some additional costs may be absorbed within a department’s existing budget, future resources often will be required in the Proposed Budget for the operational expenses associated with capital projects. As part of the Capital Improvement Program Budget process, the Public Works Department coordinated with the Financial Management Department and end user department staff to describe and quantify any anticipated O & M costs associated with each new capital project.

O & M costs are addressed at the outset of the process and if needed included in proposed adjustments to the operating budgets as part of the Annual Budget Process. As a result, Management and the City Council are able to prioritize these additional costs, along with other budget requests, based on available funding.

Implementation Criteria

O & M costs are not applied to upgrades and renovations (e.g., major street maintenance projects) since they actually tend to lower long-term maintenance costs.

Calculating FY 18 Operating and Maintenance Costs

The Public Works Department assists client departments to qualify potential costs.

• FTE (Full Time Equivalent) impacts • Utility (water, sewer, refuse, electrical and gas) costs in a facility • Maintenance, including HVAC, plumbing, electrical and

structural repairs, landscaping services • Custodial services • New operating equipment/supplies • Technology annual replacement contribution

3

Page 7: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program (New Funding)

Funding Summary

Total New Capital for FY 18 - $96,363,961

2.1% 0.5%

8.9%

8.4%

6.5%

27.3%1.6%

2.7%

22.5%

13.9%

4.2%

Airport Capital ‐ $2,000,000 Civic Center Capital ‐ $500,000

General Capital Projects ‐ $10,015,000 Gas Fund ‐ $8,050,000

Gasoline Tax Street Improvement ‐ $6,264,943 Measure A  ‐ $26,311,739

Tidelands Operations ‐ $1,500,000 Queen Mary ‐ $2,589,000

Transportation ‐ $21,671,000 Water Fund ‐ $13,416,279

Sewer Fund ‐ $4,046,000

CY 18 Adopted CIP 4 City of Long Beach - Public Works

Page 8: FY 18 Adopted CIP Book - Long Beach, California

Strategic InvestmentsAdopted Capital Projects

Provided below is a summary of adopted capital improvement projects for FY 18. These projects are funded through a variety of sources. Additional detail can be found in the FY 18 program pages.

  Airport $2,000,000

Title Status Estimated Cost 

AIRPORT TERMINAL AREA IMPROVEMENT

The Long Beach Airport's historic terminal building is heavily used on a daily basis, requiring regular major maintenance, repairs and improvements. Repairs and improvements as needed.

$1,000,000

AIRPORT PAVEMENT REHABILITATION

Repairs and improvements necessary to comply with Part 139 Certification requirements. Improvements are emergency repairs and unforeseen maintenance on utility, pavement, crack sealing, and slurry sealing, signage, lighting replacement, paving.

$1,000,000

  Beaches and Marinas $1,100,000

Title Status Estimated Cost 

BEACH PARKING LOTS REHABILITATION

Upgrades and additions made to existing parking lot. Repaving, grading for better drainage and striping of parking lot.

$500,000

ALAMITOS BAY AREA IMPROVEMENTS

Demolition and installation of a replacement lifeguard station. $200,000

TIDELANDS CRITICAL FACILITY REPAIRS

Design and construct safety repairs at locations to be determined. $400,000

  Mobility $47,736,182

Title Status Estimated Cost 

PROP A TRANSIT IMPROVEMENTS

Primarily bus stop improvements at various locations and recreational transit.

$1,371,000

CITYWIDE LED LIGHTING Replace conventional high pressure sodium (HPS)  lights with light emitting diodes (LEDs) to extend the useful life and reduce energy costs.

$210,500

MAJOR AND SECONDARY HIGHWAY (ARTERIAL)

Reconstruction and resurfacing of City streets to extend useful life, provide incidental curb, gutter and sidewalk improvements, construct curb ramps and bus pads, and replace pavement markings.

$18,527,624

BRIDGE REHABILITATION AND SEISMIC RETROFIT

Perform bridge deck repairs listed in the County of Los Angeles condition survey dated January 2012.

$300,000

RESIDENTIAL STREET PROGRAM

Repair residential street and alleys through pavement sealing, asphalt overlays, and full reconstruction.

$12,107,058

ALLEYS Ongoing repair and/or replacement of existing alleys identified in the Alley Pavement Management Plan.

$1,800,000

CITYWIDE SLURRY SEAL PROGRAM

Repair residential streets through pavement sealing and slurry sealing.

$2,670,000

ADA RESPONSE PROGRAM Construct and/or improve verified requests for rights‐of‐way access and investigate new requests when received.

$500,000

FY 18 Adopted CIP 5 City of Long Beach - Strategic Investments

Page 9: FY 18 Adopted CIP Book - Long Beach, California

Strategic InvestmentsAdopted Capital Projects

(CONTINUED)

Continue  Mobility

StatusTitle

SIDEWALKS/CURB RAMPS Construct sidewalk curb ramp improvements. $5,700,000

SUSTAINABLE TRANSPORTATION IMPROVEMENT

Design, construct and implement projects and programs to enhance the safety and viability of bicycle and pedestrian routes.

$3,250,000

CITYWIDE STRIPING & SIGNAGE PROGRAM

Install and replace street name signs and traffic control signs at various locations, as needed, throughout the city.

$50,000

NEIGHBORHOOD TRAFFIC MITIGATION

Provide enhancements and improvements to safety, mobility and active transportation to City neighborhoods.

$250,000

TRAFFIC & PEDESTRIAN SIGNALS

Construct pedestrian related safety improvements and high priority traffic signal improvement projects.

$1,000,000

  Parks & Recreation $7,127,500

Title Status Estimated Cost 

PARK BIKE PATH REPLACEMENT

Repair and/or replacement of existing bike paths, facilities, signage, and striping of park bike paths.

$100,000

PARK FACILITY REROOFING Reroof Park Facilities as needed to prevent damage to structures, equipment and inventory citywide.

$292,000

RANCHO LOS ALAMITOS Perform improvements in a manner that is consistent with preserving the historical character of the Rancho.

$500,000

RANCHO LOS CERRITOS Repair and maintenance upgrades to extend the useful life of Rancho Los Cerritos.

$500,000

PARK ACQUISITION & DEVELOPMENT

Acquisition of park land and development of new parks throughout the City.

$4,648,000

GAME FIELD UPGRADES Repair and maintain to prolong the life of game field infrastructure and reduce future  expenses related to heavy usage.

$480,000

IRRIGATION SYSTEM REPLACEMENT

Upgrade and replace park irrigation systems. $357,500

RECREATION BUILDING REHABILITATION

Rehabilitate existing buildings to enhance the functional use. $250,000

  Public Facilities $11,038,000

Title Status Estimated Cost 

CONVENTION CENTER COMPLEX IMPROVEMENTS

Ongoing improvements include the Terrace Plaza fountain upgrades, Terrace Plaza Sound & Lighting upgrades and general facility improvements: painting, flooring and other building upgrades.

$1,400,000

CIVIC CENTER COMPLEX IMPROVEMENTS

Improvements to maintain each facility in a reliable and efficient operating condition

$500,000

FY 18 Adopted CIP 6 City of Long Beach - Strategic Investments

Page 10: FY 18 Adopted CIP Book - Long Beach, California

Strategic InvestmentsAdopted Capital Projects

(CONTINUED)

Continue  Public Facilities

StatusTitle

CITYWIDE REROOFING Replace City buildings roofs as needed to prevent damage to structures, equipment and protect and preseve inventory.

$250,000

GENERAL CITY BUILDING REFURBISHMENT

Refurbish City buildings to minimize structural deficiencies and extend the facility useful life.

$5,974,000

FIRE FACILITIES MODERNIZATION

Upgrades to provide gender separation for restrooms and the conversion of common sleeping dorms to private sleeping quarters in order to provide privacy for the workforce.

$125,000

FACILITY ASSESSMENTS Compile a comprehensive facility listing and identify facilities to be assessed in the City’s Facility Condition Assessment Study.

$200,000

QUEEN MARY PROJECTS Historic preservation and capital improvements to the Queen Mary. $2,589,000

  Utilities $27,362,279

Title Status Estimated Cost 

GAS AND OIL PROGRAM Installation of an Advanced Metering Infrastructure system (AMI) and repair and improvement to the City’s gas pipeline infrastructure.

$8,050,000

STORM DRAIN PUMP STATION REPAIR & CERTIFICATION

Repair and upgrade storm water pumps at various locations in accordance with AQMD regulations.

$1,550,000

STORM DRAIN SYSTEM & WATER QUALITY IMPROVEMENT

Repair storm water catch basins and storm water mainline pipes. Construct storm drain enhancements.

$300,000

SEWER FUND Upgrades and improvements to the City’s sewer infrastructure. $4,046,000

WATER FUND Upgrades and improvements to the City’s potable and reclaimed water infrastructure.

$13,416,279

FY 18 Adopted CIP 7 City of Long Beach - Strategic Investments

Page 11: FY 18 Adopted CIP Book - Long Beach, California

8

Page 12: FY 18 Adopted CIP Book - Long Beach, California

Section Summaries The purpose of the CIP is to provide a comprehensive Infrastructure Investment Program to plan, design, construct, maintain, and repair City facilities and infrastructure. The size, age and diverse infrastructure of the City require significant consideration to determine the best investments to make now, in order to realize the most cost effective returns in the future. The CIP also serves as a financial tool to set aside funds for the wide variety of capital projects as well as a planning tool to ensure capital projects are consistent with the City’s General plan.

How this Document is Organized

The economic vitality and quality of life in the community is enhanced through CIP projects. Capital improvements require a major initial investment, a significant and continuing financial commitment for maintenance and, eventually, replacement. The following pages provide a summary of each section with a dollar amount that represents adopted new funding for FY 18.

Airport

Beaches and Marinas

Harbor

Mobility

Public Facilities

Parks

Utilities

FY 18 Adopted CIP 9 City of Long Beach - Section Summaries

Page 13: FY 18 Adopted CIP Book - Long Beach, California

Program Section Overviews

Airport Long Beach Airport (LGB) serves over 3 million passengers each year and offers a variety of services to air carriers, commercial and general aviation users, as well as the traveling public. Funding for Airport Capital Improvement Projects is derived from several sources including: Federal Aviation Administration (FAA), Airport Improvement Program grants (AIP); Passenger Facility Charges (PFC); Customer Facility Charges (CFC); Airport fees; and bond sale proceeds. The focus of the Airport Capital Improvement Program is to continue improving the safety, security, and operations of the Airport to meet the mandates of the FAA and Transportation Security Administration.

In FY 17, LGB completed security improvements to the airfield perimeter. The improvements included the removal of several thousand feet of deteriorating and/or inadequate perimeter fence, installation of intrusion detection systems, access control systems, and security network infrastructure improvements. Also, completed in FY 17 were improvements to the Lot A parking structure. The Lot A project consisted of demolition of the existing single elevator and staircase tower; installation of a new two-cab elevator and outdoor staircase; new exit driveway; new attendant booth; new ramps, curbs, gutters and islands; and new LED lighting. FY 18 funds have been approved for miscellaneous Terminal Area

Improvements and Airfield Pavement Rehabilitation. Planned projects in FY 18 include selected priorities of the Terminal Area Improvements Phase II. The Terminal Improvements Phase II consists of a new ticketing lobby, TSA In-Line Checked Baggage Screening Facility, baggage claim, Rental Car Facility, and a Ground Transportation Center.

FY 18 Adopted CIP 10 City of Long Beach - Section Summaries

Page 14: FY 18 Adopted CIP Book - Long Beach, California

Beaches and Marinas

Two assets that make Long Beach unique are its beaches and marinas. These City operated and maintained resources provide recreational enjoyment to both residents and visitors. In FY 17, the City completed the Colorado Lagoon Restoration Phase 2B, and continues to work on the Seaside Way Pedestrian Bridge at the Convention Center, which will be substantially complete by the end of FY 17. These new improvements are more efficient and environmentally friendly than they were in their previous condition.

In FY 17, the City also initiated the Colorado Lagoon Open Channel Project, which is anticipated to be completed in FY18. Construction began in FY 18 for the following projects: Leeway Sailing Center Pier Rebuild, Rainbow Harbor Commercial Sewage EVAC System Replacement, Belmont Pool/Granada Parking Lot Improvements, Rainbow Harbor Aquarium Plaza Wave Fountain repairs, and installation of the new Bayshore Lifeguard Station. The Marinas, Beaches & Waterways budget includes a total of $1.1 million in new funding for FY 18. This funding includes the completion of the Belmont Pool/Granada Parking Lot paving and improvements, the new Bayshore Lifeguard Station, and the Tidelands Critical Facility Repairs. Most Tidelands Capital Improvement Projects are subject to State Lands Commission approval.

FY 18 Adopted CIP 11 City of Long Beach - Section Summaries

Page 15: FY 18 Adopted CIP Book - Long Beach, California

Mobility

Preserving our neighborhoods is a key element in the Long Beach Strategic Plan. The Mobility section contains programs designed to meet the increased needs for mobility resulting from economic growth, utilizing a combination of different funding sources. These funds include Proposition A & C, Gas Tax Street Improvement Capital, Transportation Improvement Fees, and Federal, County grants and two new funding sources, Los Angeles County Measure M and the State Road Maintenance and Rehabilitation Act funds.

Mobility improvements include street repair, street and intersection widening, traffic signal system expansion and upgrades, transit improvements, replacement parking, neighborhood traffic management, and bike lanes.

This section also includes programs that monitor and evaluate traffic congestion throughout the City and respond with projects to relieve congestion or enhance traffic safety. The Street Rehabilitation program is designed to help meet that goal. The program delivers improvements including reconstructing and resurfacing major, secondary, and residential streets; upgrading accessibility of curb ramps to comply with current American Disabilities Act (ADA) regulations; replacing of street signs; repairing neighborhood sidewalks, curbs, and gutters; and rehabilitating bridges to repair deficiencies identified by the annual bridge inspection report. Public Works continues to update the Pavement Management System biannually and uses the information to prioritize the streets in need of resurfacing or reconstruction.

There are several factors that are taken into consideration when the City evaluates the selection of streets, such as surface conditions, utility work (pipeline construction), future developments in the area, and potential conflicts with other projects. The goal and objective is to rehabilitate a roadway when it is in “good” condition versus delaying repairs to a state in which the street is in a “poor” condition, significantly increasing the costs of repairs.

FY 18 Adopted CIP 12 City of Long Beach - Section Summaries

Page 16: FY 18 Adopted CIP Book - Long Beach, California

In FY 17, 15 lane miles of arterial streets were replaced, 15 miles if sidewalks were repaired and 6.5 lane miles of bike lanes were added.

The Mobility budget includes $47.7 million in new funding for FY 18, of which $33.6 million has been budgeted for street rehabilitation. Measure A funds total $14 million, of which $2.7 million is for residential street repair, $6.9 million for arterial street improvements, $1.8 million for alley improvements Citywide and $2.6 million for slurry improvements.

In addition to Measure A funding, street rehabilitation also receives local and state funding totaling $27.5 million for major and secondary streets, residential street repair, sidewalks, bridge rehabilitation and related improvements provided in the FY 18 Capital Budget. The remaining $6.1 million in new funding is proposed for sustainable transportation improvements, Citywide signage, traffic mitigation, and traffic & pedestrian signal improvements. Of this amount, $50,000 in Measure A funds have been budgeted to replace the City’s aging traffic signs and $210,500 has been budgeted to upgrade the City’s street lights to LEDs.

FY 18 Adopted CIP 13 City of Long Beach - Section Summaries

Page 17: FY 18 Adopted CIP Book - Long Beach, California

Parks and Recreation Long Beach’s 170 parks and open spaces are fundamental to the fabric of the Long Beach community, and are a cornerstone of the City’s livability initiatives. Long Beach Parks generate property value and tax revenue, increase community health and reduce environmental impacts and costs.

Parks contribute to the economic vitality of Long Beach, as proximity to Long Beach parks increases property value, thereby increasing property tax revenue. Long Beach Parks are a good value compared with the amount residents would pay to use equivalent private facilities. Long Beach Parks host festivals, concerts and athletics events that draw visitors bringing tourism revenue to local restaurants, hotels, and stores, boosting the local economy.

Parks provide space for exercise and respite, and exposure to green space is associated with better physical and mental health. The environmental benefits of Long Beach Parks save residents money through reduced air pollution, greenhouse gas emissions, and storm water management costs. Long Beach Parks are essential to crime reduction efforts and reduce juvenile crime by providing places for children to learn, play and be involved in positive activity. Parks also deliver multi-generational programs and activities for Long Beach’s four-legged residents.

Many of Long Beach’s 170 parks and open spaces face aging infrastructure, and there is a constant and significant effort to rehabilitate existing park assets. Long deferred critical repairs have resulted in necessary capital projects to rehabilitate various park sites. In FY 17, the first year of Measure A funding provided for facility improvements at MacArthur, MLK, and Pan American Parks;

improvements to Animal Care Services, and the historic Rancho Los Alamitos site. Also in FY17, newly-developed parks included Gumbiner Park, the Drake/Chavez Greenbelt, and Molina Park.

FY 18 Adopted CIP 14 City of Long Beach - Section Summaries

Page 18: FY 18 Adopted CIP Book - Long Beach, California

Public Facilities The City of Long Beach owns hundreds of facilities throughout the City contributing to provide residents with public services, recreation, places to learn, and public safety. A few of the popular facilities include the Civic Center comprised of City Hall, Fire Station 1, Police Headquarters and the Main Library, the Department of Health and Human Services, neighborhood branch libraries, and Public Works operations. Long deferred critical repairs are required to sustain the integrity of the City’s various facilities. During FY 17, repairs were completed at the Fleet Services and Environmental Services Bureau facilities included roofing, painting, and on-site water line and skylight repairs. Construction of the new Michelle Obama Library and a new liquefied natural gas filling station was completed along with roof repairs at four Health and Human Services Buildings, HVAC repairs at the Emergency Operations Center, and remodel and repair work at multiple Police Department, Fire Department, and Library locations.

In FY 18, $11.3 million is approved for Public Facilities. Of that amount, $4.1 million is proposed from Measure A funding for general building refurbishment, fire facilities modernization, the convention center and an update to the facility assessment study. The remaining $7.2 million is for Queen Mary and energy efficient upgrades at Civic Center improvements to keep the facility operational until the new city hall and main library are complete.

FY 18 Adopted CIP 15 City of Long Beach - Section Summaries

Page 19: FY 18 Adopted CIP Book - Long Beach, California

Harbor The Harbor Department (Port) continues to implement a long-term capital improvement program designed to provide Port tenants with safe and secure, state-of-the-art facilities capable of accommodating international trade and secure regional economic benefits in a sustainable manner that ensures economic vitality, ecological health, and community integrity.

The Port’s $3 billion investment in capital projects over the next decade will stimulate the economy by creating thousands of direct construction jobs along with indirect service and commercial opportunities. In FY 17, the Port is forecasting to spend $267 million on the Gerald Desmond Bridge as construction is well underway, with all work scheduled to be completed in 2018. FY 18 will also see the Port invest approximately $90 million in its Middle Harbor Redevelopment Project. When the project is complete, the Middle Harbor Terminal will accommodate the newest 20,000+ Twenty-Foot Equivalent Unit (TEU) container ship and be the greenest major container terminal in North America due to its extensive use of on dock rail and cold ironing infrastructure.

Port Security will continue to be a high priority, with the Department investing nearly $19 million in capital projects, including $15 million for fire station upgrades and one new fire boat.

FY 18 Adopted CIP 16 City of Long Beach - Section Summaries

Page 20: FY 18 Adopted CIP Book - Long Beach, California

Utilities The new Utilities section is comprised of three services to Long Beach residents. These are Long Beach Gas and Oil, Long Beach Water and Stormwater/Environmental Compliance. Long Beach Gas and Oil Department Long Beach Gas & Oil (LBGO) oversees 1,900 miles of natural gas pipeline. A key Department objective is the safe delivery of natural gas to its 147,000 businesses and households. All operations are conducted in strict compliance with U.S. Department of

Transportation’s (DOT) pipeline safety regulations, CFR 49 part 190-199. LBGO is engaged in a long-term pipeline infrastructure replacement program focusing on pipelines identified in its Distribution Integrity Management Plan. During the past five years, over 56 miles of distribution pipeline and approximately 5,500 service pipelines have been replaced, improving system integrity.

As part of the Department’s commitment to provide affordable and safe natural gas, LBGO has taken a system-wide approach in reviewing the backbone of the gas distribution system for potential upgrades to increase reliability of gas delivery. LBGO is also in the process of establishing a consistent pressure standard throughout the system to ensure the long-term ability to meet customer demand and has installed or replaced twelve district regulator stations in the past five years. The integrated approach to pressure-consistency, and replacement of aging infrastructure will improve reliability and allow for more efficient operations. In addition, LBGO will continue to work closely with the Public Works Department to coordinate gas projects with street improvement projects.

FY 18 Adopted CIP 17 City of Long Beach - Section Summaries

Page 21: FY 18 Adopted CIP Book - Long Beach, California

Stormwater/Environmental Compliance

The Stormwater/Environmental Compliance Division is responsible for maintaining the City’s 300 miles of storm drains and sewer pipeline, pump stations and monitoring stormwater quality within Long Beach. Water quality compliance is handled through the City’s National Pollutant Discharge Eliminate System (NPDES) permit. In 2016, an assessment of the City’s 23 pump stations was completed and identified over $35 million in repairs and upgrades.

In FY 18, $1.85 million is for Stormwater/Environmental Compliance. Of this amount, $1.55 million is from Measure A funding for storm drain repair and certification. The remaining $300,000 is to install full capture trash inserts to comply with a State-wide environmental mandate.

Long Beach Water Department

Planned capital improvements to the City’s water and sewer system encompass a wide range of projects. The Water Department will continue replacing aging infrastructure that is approaching the end of their useful life including, but not limited to; water pipelines, valves and meters. The Department will coordinate pipeline projects with the Measure A Street Rehabilitation projects. In addition, the Department is continuing with its well and water tank rehabilitation projects. The Sewer CIP budget reflects a sustained level of investment in infrastructure, as the Department follows a programmatic CIP based on an updated Sewer Master Plan.

FY 18 Adopted CIP 18 City of Long Beach - Section Summaries

Page 22: FY 18 Adopted CIP Book - Long Beach, California

Guide to the CIP Program Page

Program Icon: Each Program Section is denoted by an icon displayed at the upper left of the program page.

Airport

Beaches and Marinas

Harbor

Mobility

Public Facilities

Parks

Utilities

Program Title: This summarizes the description of the Program. The City’s diverse programs range from Traffic and Pedestrian Signals to Rainbow Lagoon to Park Bike Path Replacement to Citywide Residential Street Repair.

Program Number: The reference number used to identify the specific CIP.

Program Budget for FY 18: The beginning balance plus new funding for FY 18 Budget, the funding Source shows the different funds making up the total project budget.

FY 18 and Future Years Totals: The total amount of new funding that will be allocated to the program in the current and future fiscal years.

FY 18 Adopted CIP 19 City of Long Beach - Section Summaries

Page 23: FY 18 Adopted CIP Book - Long Beach, California

FY 18 Adopted CIP City of Long Beach ‐ Mobility

Program NumberProgram TitleProgram Icon

Budget Breakdown by Funding Source

FY 18 and Estimated Future Years Totals

SAMPLE PROGRAM PAGE

PROP A TRANSIT IMPROVEMENTS PW4230

Mobility

Project Description Primary bus stop improvements at various locations and recreational transit.

Estimated Operating Repair and maintenance to prolong the life of bus stops.

and Maintenance

Project Timeline Design: October 2017 ‐ January 2018.

Construction: February 2108 ‐ September 2018.

Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665

Funding SourcesFunding Source Begining Balance FY 18 FY 19 FY 20 3 Year Total

PROP A $2,089,697 $1,371,000 $1,371,000 $1,371,000 $6,202,697

TRAFFIC MITIGATION PROGRAM $4 $0 $0 $0 $4

Total $2,089,701 $1,371,000 $1,371,000 $1,371,000 $6,202,701

20

Page 24: FY 18 Adopted CIP Book - Long Beach, California

Measure A

Year 2 Infrastructure Project Map

FY 18 Adopted CIP 21 City of Long Beach - Measure A

Page 25: FY 18 Adopted CIP Book - Long Beach, California

Measure A Funding

Year Two Infrastructure Project List

Mobility 14,333,239$                                     

Arterial Street Improvements  6,902,739                                       

Residential Street Repair (Slurry) 2,670,000                                       

Curbs & Sidewalks 2,700,000                                       

Alley Improvements 1,800,000                                       

Smart Street Light Technology 210,500                                          

Traffic Signage Replacement 50,000                                            

Public Facilities 4,049,000$                                       

Facility Assessment 200,000                                          

Convention Center 1,000,000                                       

Police Academy Building  900,000                                          

Fire Station 7 Improvements  120,000                                          

Fire Station 10 Improvements  125,000                                          

Fire Station 17 Improvements 35,000                                            

Fire Training Center Improvements 325,000                                          

Emergency Operations Center 290,000                                          

Harte Library Branch Improvements 40,000                                            

Bach Library Branch Improvements 67,000                                            

Mark Twain Library Branch Improvements 47,000                                            

Library Roof Improvements 250,000                                          

Health Department Building Improvements 650,000                                          

Parks & Recreation 6,379,500$                                       

Houghton Park Community Center  4,000,000                                       

Rancho Los Alamitos Improvements 500,000                                          

Rancho Los Cerritos Improvements 500,000                                          

Citywide Park Irrigation Improvements 357,500                                          

4th Street Senior Center Improvements 250,000                                          

Stearns Park Community Center Roof Repair 292,000                                          

Veterans Field Turf Improvements 160,000                                          

Hudson Field Turf Improvements 160,000                                          

Admiral Kidd Field Turf Improvements 160,000                                          

Utilities 1,550,000$                                       

Stormwater Protection 1,550,000                                       

Total 26,311,739$                                     

FY 18 Adopted CIP City of Long Beach ‐ Measure A22

Page 26: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

FY18 Adopted CIP City of Long Beach – Airport

Airport

23

Page 27: FY 18 Adopted CIP Book - Long Beach, California

Begining Balan

ce   

Total Funding   

FY 18

FY 19  

FY 20  

Fund

Airport Funding

$12,041

$0

$0

$0

$12,041

AIRPORT 2009 BONDS

$20,119,944

$2,000,000

$2,000,000

$2,000,000

$26,119,943

AIRPORT CAPITAL

$14,377,391

$0

$0

$0

$14,377,391

AIRPORT CUSTOMER

 FACILITY CHARGE

Total

$34,509,376

$2,000,000

$2,000,000

$2,000,000

$40,509,375

FY 18 Adopted CIP 24 City of Long Beach - Airport

Page 28: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Airport

Program

 Snapshot

$1,224,020

$1,000,000

$1,000,000

$1,000,000

$4,224,020

AP1030

AIRPORT TERMINAL AREA

 IMPROVEM

ENT

$111,426

$0

$0

$0

$111,426

AP1035

AIRPORT TERMINAL DEV

ELOPMEN

T

$2,453,560

$1,000,000

$1,000,000

$1,000,000

$5,453,560

AP1070

AIRPORT PAVEM

ENT REH

ABILITATION

$17,249,306

$0

$0

$0

$17,249,306

AP1072

RUNWAY 7R‐25L REH

ABILITATION

$572

$0

$0

$0

$572

AP1073

RUNWAY 7L‐25R REH

ABILITATION

$632,274

$0

$0

$0

$632,274

AP1130

AIRPORT SECURITY ACCESS CONTR

OL (FAA)

$75,732

$0

$0

$0

$75,732

AP1160

RUNWAY INCURSION PREV

ENTION

$3,516,683

$0

$0

$0

$3,516,683

AP1170

AIRPORT TERMINAL AREA

 TRAFFIC IM

PR

$208,354

$0

$0

$0

$208,354

AP1210

AIRPORT PARKING STR

UCTU

RE

$84,303

$0

$0

$0

$84,303

AP1220

AIRPORT SA

FETY AND SEC

URITY

$8,953,145

$0

$0

$0

$8,953,145

AP1270

REN

TAL CAR FACILITY

Total

$34,509,376

$2,000,000

$2,000,000

$2,000,000

$40,509,376

FY 18 Adopted CIP 25 City of Long Beach - Airport

Page 29: FY 18 Adopted CIP Book - Long Beach, California

AIRPORT TERMINAL AREA IMPROVEMENT 

Airport

AP1030

Project Description The Long Beach Airport's historic terminal building is heavily used on a daily basis. This high usage leads to unforseen repairs and consists of emergency repair to non‐scheduled equipment replacement. The new passenger concourse will require similar as‐needed repairs as the facility ages. The critical need is for the Airport to have the ability to keep the facility operational. The Terminal Improvements Phase II consists of a new ticketing lobby, TSA In‐Line Checked Baggage Screening Facility, baggage claim, Rental Car Facility and a Ground Transportation Center.

Estimated Operating and Maintenance

Terminal upgrades are intended to prolong the life of the new infrastructure and ensure the terminal is modernized, efficient and accessible for future use.

Project Timeline Design: October 2017 – March 2018.Construction: April 2018 – September 2018.

Department Contact Airport ‐ Fred Pena ‐ (562) 570‐2630

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  AIRPORT CAPITAL $1,224,020 $1,000,000 $1,000,000 $1,000,000 $4,224,020

Total $1,224,020 $1,000,000 $1,000,000 $1,000,000 $4,224,020

FY 18 Adopted CIP 26 City of Long Beach - Airport

Page 30: FY 18 Adopted CIP Book - Long Beach, California

AIRPORT PAVEMENT REHABILITATION 

Airport

AP1070

Project Description Rehabilitation of municipal airport pavement on an as‐needed basis. Repairs and improvements necessary to comply with Part 139 Certification requirements. Improvements include emergency repairs and unforseen maintenace on utility, pavement, crack sealing and slurry sealing, signage, lighting replacement, pavement marking modifications.

Estimated Operating and Maintenance

Repair and maintenance intended to prolong the life of the airport pavement  and reduce future infrastructure expenses while increasing the safety of the pavement.

Project Timeline Design and Construction on a continuous basis.

Department Contact Airport ‐ Fred Pena ‐ (562) 570‐2630

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  AIRPORT CAPITAL $721,567 $1,000,000 $1,000,000 $1,000,000 $3,721,567

AIRPORT CUSTOMER FACILITY CHARGE $1,733,150 $0 $0 $0 $1,733,150

Total $2,454,718 $1,000,000 $1,000,000 $1,000,000 $5,454,718

FY 18 Adopted CIP 27 City of Long Beach - Airport

Page 31: FY 18 Adopted CIP Book - Long Beach, California

28

Page 32: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

FY18 Adopted CIP City of Long Beach – Beaches & Marinas

Beaches & Marinas

29

Page 33: FY 18 Adopted CIP Book - Long Beach, California

Begining Balan

ce   

Total Funding   

FY 18

FY 19  

FY 20  

Fund

Beaches and M

arinas Funding

($5,868)

$0

$0

$0

($5,868)

GEN

ERAL CAPITAL

$4,599,095

$0

$0

$0

$4,599,095

MARINA CAPITAL

$0

$0

$0

$600,000

$600,000

MEA

SURE A

($11)

$0

$0

$0

($11)

RDA

$92,540,846

$1,100,000

$0

$0

$93,640,845

TIDELANDS

Total

$97,134,062

$1,100,000

$0

$600,000

$98,834,061

FY 18 Adopted CIP 30 City of Long Beach - Beaches & Marinas

Page 34: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Beaches and M

arinas

Program

 Snapshot

($5,879)

$0

$0

$0

($5,879)

PR8100

WETLANDS

$35,294

$0

$0

$0

$35,294

PR8190

FUEL FACILITIES

$6,621

$0

$0

$0

$6,621

PR8230

BEA

CH RESTR

OOM REPLACEM

ENT

$4,313,814

$0

$0

$0

$4,313,814

PR8340

SHORELINE DOWNTO

WN M

ARINA REH

ABILITATION

$1,065,567

$0

$0

$0

$1,065,567

PR8360

RAINBOW HARBOR

$93,408

$0

$0

$100,000

$193,408

PW8000

COLO

RADO LAGOON

($2,184)

$0

$0

$0

($2,184)

PW8020

TRASH

 SYSTEMS

$246,723

$0

$0

$0

$246,723

PW8040

MARINE STADIUM AREA

 IMPRVMNTS

$13,497,987

$0

$0

$0

$13,497,987

PW8110

SEAWALL M

AINTENANCE AND REPAIR

$200,521

$0

$0

$0

$200,521

PW8120

BEA

CH STA

IRWAY REPL

$448,184

$0

$0

$0

$448,184

PW8150

LIFEGUARD FACILITIES AND TOWER

S

$56,686,672

$0

$0

$500,000

$57,186,672

PW8170

BELMONT POOL AND PIER IM

PROVEM

ENTS

$6,948,077

$0

$0

$0

$6,948,077

PW8230

BEA

CH RESTR

OOM REH

ABILITATION

$578,397

$0

$0

$0

$578,397

PW8240

MARINA DOCK AND DEC

KING

$194,685

$0

$0

$0

$194,685

PW8260

BLU

FF EROSION CONTR

OL

$428,359

$0

$0

$0

$428,359

PW8290

BEA

CH M

AINTENANCE YA

RD IM

PROVEM

ENTS

$51,416

$0

$0

$0

$51,416

PW8300

BEA

CH M

ASTER

 PLAN

$1,914,629

$500,000

$0

$0

$2,414,629

PW8310

BEA

CH PARKING LOTS REH

ABILITATION

$1,750,000

$0

$0

$0

$1,750,000

PW8320

BEA

CH PLAYG

ROUNDS

$828,989

$0

$0

$0

$828,989

PW8330

RAINBOW LAGOON

$2,439,698

$0

$0

$0

$2,439,698

PW8360

RAINBOW HARBOR

FY 18 Adopted CIP 31 City of Long Beach - Beaches & Marinas

Page 35: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Beaches and M

arinas

Program

 Snapshot

$2,684,119

$200,000

$0

$0

$2,884,119

PW8380

ALAMITOS BAY AREA

 IMPROVEM

ENTS

$1,462,101

$0

$0

$0

$1,462,101

PW8390

BREA

KWATER STU

DY

$1,235,621

$400,000

$0

$0

$1,635,621

PW8400

TIDELANDS CRITICAL FA

CILITY REPAIRS

$31,242

$0

$0

$0

$31,242

PW8410

TIDELANDS AREA

 ROADWAYS

Total

$97,134,062

$1,100,000

$0

$600,000

$98,834,062

FY 18 Adopted CIP 32 City of Long Beach - Beaches & Marinas

Page 36: FY 18 Adopted CIP Book - Long Beach, California

COLORADO LAGOON 

Beaches and Marinas

PW8000

Project Description Repair and rehabilitate the playground area, irrigation systems and fencing at the Colorado Lagoon.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of the Colorado Lagoon and reduce future infrastructure expenses.

Project Timeline Design: October 2017 ‐ December 2017.Construction: January 2018 ‐ April 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  MEASURE A $0 $0 $0 $100,000 $100,000

TIDELANDS $93,408 $0 $0 $0 $93,408

Total $93,408 $0 $0 $100,000 $193,408

FY 18 Adopted CIP 33 City of Long Beach - Beaches & Marinas

Page 37: FY 18 Adopted CIP Book - Long Beach, California

BELMONT POOL AND PIER IMPROVEMENTS 

Beaches and Marinas

PW8170

Project Description Provide funding for development and completion of the Belmont Pool.

Estimated Operating and Maintenance

Normal operating and maintenance costs will be determined at project completion.

Project Timeline TBD.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  MEASURE A $0 $0 $0 $500,000 $500,000

TIDELANDS $56,686,672 $0 $0 $0 $56,686,672

Total $56,686,672 $0 $0 $500,000 $57,186,672

FY 18 Adopted CIP 34 City of Long Beach - Beaches & Marinas

Page 38: FY 18 Adopted CIP Book - Long Beach, California

BEACH PARKING LOTS REHABILITATION 

Beaches and Marinas

PW8310

Project Description Repaving and grading for better drainage and striping of parking lots. New gate arm for the boat launch ramp and new electric vehicle charging stations. Upgrades to be made at:    •  Belmont Pool Parking Lot    •  Granada Beach Parking Lot

Estimated Operating and Maintenance

The parking lot will not be expanded, so there are no additional operating and maintenance impacts are anticipated.

Project Timeline Design: January 2017 ‐ September 2017. Construction: October 2017‐ December 2017.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  TIDELANDS $1,914,629 $500,000 $0 $0 $2,414,629

Total $1,914,629 $500,000 $0 $0 $2,414,629

FY 18 Adopted CIP 35 City of Long Beach - Beaches & Marinas

Page 39: FY 18 Adopted CIP Book - Long Beach, California

ALAMITOS BAY AREA IMPROVEMENTS 

Beaches and Marinas

PW8380

Project Description Demolition and installation of a replacement lifeguard station. Demolition of the old facility and purchase of a prefabricated building to be installed on the beach between 54th Place and Ocean Blvd.

Estimated Operating and Maintenance

The proposed facility will be replacing an existing lifeguard structure operated and maintained by Long Beach Lifeguards. No additional operating and maintenance impacts are anticipated.

Project Timeline Installation to be completed by May 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  TIDELANDS $2,684,119 $200,000 $0 $0 $2,884,119

Total $2,684,119 $200,000 $0 $0 $2,884,119

FY 18 Adopted CIP 36 City of Long Beach - Beaches & Marinas

Page 40: FY 18 Adopted CIP Book - Long Beach, California

TIDELANDS CRITICAL FACILITY REPAIRS 

Beaches and Marinas

PW8400

Project Description Funding for project contingencies to address unforeseen expense for existing projects.  Design and construct safety repairs at locations to be determined.

Estimated Operating and Maintenance

Funds used to keep existing project facilities and improvements in good working condition, as well as for emergency repairs due to unforeseen circumstances.

Project Timeline Design and Construction on a continuous as‐needed basis.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  TIDELANDS $1,235,621 $400,000 $0 $0 $1,635,621

Total $1,235,621 $400,000 $0 $0 $1,635,621

FY 18 Adopted CIP 37 City of Long Beach - Beaches & Marinas

Page 41: FY 18 Adopted CIP Book - Long Beach, California

38

Page 42: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

Mobility

FY 18 Adopted CIP 39 City of Long Beach - Mobility

Page 43: FY 18 Adopted CIP Book - Long Beach, California

Begining Balan

ce   

Total Funding   

FY 18

FY 19  

FY 20  

Fund

Mobility Funding

$1,219,201

$450,000

$500,000

$500,000

$2,669,201

AB 2766 AIR QUALITY

$966,551

$0

$0

$0

$966,551

AB32

$1,710,196

$0

$0

$0

$1,710,195

CAPITAL PROJECTS ‐ LEG

ISLATIVE

$411,165

$0

$0

$0

$411,165

CMNTY FACILITIES DIST 2007‐2(BLM

NT SH

R)

$6,545,616

$768,195

$500,000

$500,000

$8,313,810

COMMUNITY DEV

 BLO

CK GRANT

$12,353,162

$3,224,885

$2,950,000

$2,950,000

$21,478,047

GAS TA

X

$6,003,128

$2,798,805

$2,798,805

$2,798,805

$14,399,542

GEN

ERAL CAPITAL

$1,537,490

$0

$0

$0

$1,537,490

LOCAL AGEN

CY 02 BONDS SP ASSESSM

ENT

$5,991,021

$1,500,000

$1,500,000

$1,500,000

$10,491,021

MAP 21

$4,169,614

$14,333,239

$10,067,168

$14,200,689

$42,770,710

MEA

SURE A

$0

$6,700,000

$6,700,000

$6,700,000

$20,100,000

MEA

SURE M LA COUNTY

$1,723,587

$5,900,000

$4,640,000

$4,500,000

$16,763,586

MEA

SURE R

($254)

$0

$0

$0

($254)

PROP 1B

$3,211,135

$2,421,000

$2,371,000

$2,371,000

$10,374,134

PROP A

$11,072,569

$6,200,000

$6,200,000

$6,200,000

$29,672,568

PROP C

$0

$2,740,058

$8,000,000

$8,000,000

$18,740,058

STATE RMRA LOCAL RETURN

$404,085

$0

$0

$0

$404,085

TIDELANDS

$1,312,225

$500,000

$400,000

$400,000

$2,612,224

TRAFFIC M

ITIGATION PROGRAM

($1,100)

$200,000

$200,000

$200,000

$598,900

TRANSPORTA

TION DEV

 ACT

$406,410

$0

$0

$0

$406,409

UPLAND OIL CAPITAL PROJECTS

Total

$59,035,800

$47,736,182

$46,826,973

$50,820,494

$204,419,442

FY 18 Adopted CIP 40 City of Long Beach - Mobility

Page 44: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Mobility

Program

 Snapshot

$2,089,701

$1,371,000

$1,371,000

$1,371,000

$6,202,701

PW4230

PROP A TRANSIT IM

PROVEM

ENTS

$16,882

$0

$0

$0

$16,882

PW5030

SPEC

IAL PROBLEM LOCATIONS

$2,198,371

$210,500

$139,500

$0

$2,548,371

PW5050

CITYW

IDE LED LIGHTING

$29,058,708

$18,527,624

$12,650,000

$16,250,689

$76,487,021

PW5062

MAJOR AND SEC

ONDARY HIGHWAY (ARTERIAL)

$2,199,616

$300,000

$450,000

$300,000

$3,249,616

PW5080

BRIDGE REH

ABILITATION AND SEISM

IC RETROFIT

$527,825

$0

$0

$0

$527,825

PW5090

SHOEM

AKER

 BRIDGE

$9,657

$0

$0

$0

$9,657

PW5130

NEIGHBORHOOD TRAFFIC M

ITIGATION

$3,686,600

$12,107,058

$18,797,000

$18,467,000

$53,057,658

PW5151

RESIDEN

TIAL STREET PROGRAM

$160,799

$0

$0

$0

$160,799

PW5220

MED

IAN LANDSCAPE REN

OVATION

$379,756

$1,800,000

$1,800,000

$1,800,000

$5,779,756

PW5244

ALLEYS

$801,946

$0

$0

$0

$801,946

PW5245

PARKING LOTS

$387,804

$0

$0

$0

$387,804

PW5250

CITYW

IDE INFRASTRUCTU

RE IM

PROVEM

ENTS

($428,878)

$2,670,000

$0

$0

$2,241,122

PW5390

CITYW

IDE SLURRY SEAL PROGRAM

$364,712

$500,000

$500,000

$500,000

$1,864,712

PW5450

ADA RESPONSE PROGRAM

$1,601,679

$5,700,000

$7,579,473

$8,731,805

$23,612,957

PW5500

SIDEW

ALKS/CURB RAMPS

$6,262,720

$3,250,000

$2,390,000

$2,250,000

$14,152,720

PWT010

SUSTAINABLE TRANSPORTA

TION IM

PROVEM

ENT

$71

$0

$0

$0

$71

PWT030

SPEC

IAL PROBLEM LOCATIONS

$917,237

$50,000

$0

$0

$967,237

PWT110

CITYW

IDE STRIPING & SIGNAGE PROGRAM

$444,739

$250,000

$250,000

$250,000

$1,194,739

PWT130

NEIGHBORHOOD TRAFFIC M

ITIGATION

$2,701,653

$0

$0

$0

$2,701,653

PWT170

TRAFFIC M

ITIGATION PROGRAM

$4,722,396

$1,000,000

$900,000

$900,000

$7,522,396

PWT190

TRAFFIC & PED

ESTR

IAN SIGNALS

FY 18 Adopted CIP 41 City of Long Beach - Mobility

Page 45: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Mobility

Program

 Snapshot

$149,124

$0

$0

$0

$149,124

PWT260

MAJOR CORRIDOR ENHANCEM

ENT PROGRAM

$278,390

$0

$0

$0

$278,390

PWT280

LIGHT RAIL TRANSIT RELATED IM

PROVEM

ENTS

$9,997

$0

$0

$0

$9,997

PWT300

PARKING M

ITIGATION

$235,601

$0

$0

$0

$235,601

PWT360

ADAPTIVE TR

AFFIC M

ANAGEM

ENT SYSTEM

$258,691

$0

$0

$0

$258,691

PWT380

TRAFFIC OPER

ATIONS

Total

$59,035,799

$47,736,182

$46,826,973

$50,820,494

$204,419,448

FY 18 Adopted CIP 42 City of Long Beach - Mobility

Page 46: FY 18 Adopted CIP Book - Long Beach, California

PROP A TRANSIT IMPROVEMENTS 

Mobility

PW4230

Project Description Primarily bus stop improvements at various locations and recreational transit.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of bus stops.

Project Timeline Design: October 2017 ‐ January 2018. Construction: February 2108 ‐ September 2018.

Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  PROP A $2,089,697 $1,371,000 $1,371,000 $1,371,000 $6,202,697

TRAFFIC MITIGATION PROGRAM $4 $0 $0 $0 $4

Total $2,089,701 $1,371,000 $1,371,000 $1,371,000 $6,202,701

FY 18 Adopted CIP 43 City of Long Beach - Mobility

Page 47: FY 18 Adopted CIP Book - Long Beach, California

CITYWIDE LED LIGHTING 

Mobility

PW5050

Project Description Replace conventional high pressure sodium (HPS)  lights with light emitting diodes (LEDs) to extend the useful life and reduce energy costs.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of lighting infrastructure and reduce energy costs.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  AB32 $966,551 $0 $0 $0 $966,551

CAPITAL PROJECTS ‐ LEGISLATIVE $67,797 $0 $0 $0 $67,797

GAS TAX $1,884 $0 $0 $0 $1,884

GENERAL CAPITAL $1,059,459 $0 $0 $0 $1,059,459

MEASURE A $3,894 $210,500 $139,500 $0 $353,894

TIDELANDS $98,784 $0 $0 $0 $98,784

Total $2,198,371 $210,500 $139,500 $0 $2,548,371

FY 18 Adopted CIP 44 City of Long Beach - Mobility

Page 48: FY 18 Adopted CIP Book - Long Beach, California

MAJOR AND SECONDARY HIGHWAY (ARTERIAL) 

Mobility

PW5062

Project Description Reconstruction and resurfacing of City streets to extend useful life, provide incidental curb, gutter and sidewalk improvements, construct curb ramps and bus pads, and replace pavement markings.

• Mar n Luther King Jr Ave between E 7th St ‐ E 8th St • W Anaheim St between Oregon Ave ‐ Pacific Ave • E 3rd St between Alamitos Ave ‐ Junipero Ave • E Ocean Blvd between Long Beach Blvd ‐ Atlan c Ave • Queensway Drive between Underpass ‐ Harbor Plaza • Obispo Ave between E 10th St ‐ PCH north end • Redondo Ave between Wilton St ‐ PCH north end  • Clark Ave between E Carson St ‐ Harvey Way • E Willow St between San Vincente Av‐Studebaker Rd • Palo Verde Ave between Barrios St ‐ Wardlow Rd • Atlan c Ave between E 10t St ‐ E Anaheim St • E Anaheim St between Atlan c Ave ‐ Alamitos Ave • Magnolia Av between W 31st St ‐ Wardlow Rd • W Willow St between Golden Ave ‐ Magnolia Ave • E Market St between Atlan c Ave ‐ Orange Ave • South St between Atlan c Ave ‐ Walnut Ave • Long Beach Blvd between Victoria St ‐ Neece St • Orange Ave between E 70th St ‐ East 72nd St • Palo Verde Ave between Spring St ‐ Wardlow Rd • Orange Ave between 64th St ‐ E Artesia Blvd • Del Amo Blvd between WCL – Long Beach Blvd

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of arterial streets and reduce future infrastrucure expenses.

Project Timeline Design: October 2017 ‐ January 2018.Construction: February 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  AB 2766 AIR QUALITY $6,500 $0 $0 $0 $6,500

GAS TAX $6,226,424 $924,885 $650,000 $650,000 $8,451,309

GENERAL CAPITAL $1,091,348 $0 $0 $0 $1,091,348

LOCAL AGENCY 02 BONDS SP ASSESSM $1,537,490 $0 $0 $0 $1,537,490

MAP 21 $4,750,063 $1,500,000 $1,500,000 $1,500,000 $9,250,063

MEASURE A $4,335,683 $6,902,739 $1,300,000 $4,900,689 $17,439,111

MEASURE M LA COUNTY $0 $2,000,000 $2,000,000 $2,000,000 $6,000,000

MEASURE R $69,931 $0 $0 $0 $69,931

PROP A $0 $1,000,000 $1,000,000 $1,000,000 $3,000,000

PROP C $10,703,515 $6,200,000 $6,200,000 $6,200,000 $29,303,515

TRANSPORTATION DEV ACT $338,174 $0 $0 $0 $338,174

UPLAND OIL CAPITAL PROJECTS $816 $0 $0 $0 $816

Total $29,059,944 $18,527,624 $12,650,000 $16,250,689 $76,488,257

FY 18 Adopted CIP 45 City of Long Beach - Mobility

Page 49: FY 18 Adopted CIP Book - Long Beach, California

BRIDGE REHABILITATION AND SEISMIC RETROFIT 

Mobility

PW5080

Project Description In conjunction with the County of Los Angeles and Caltrans, inspect, repair, upgrade, and retrofit City of Long Beach owned bridges. Perform bridge deck repairs 

listed in the County of Los Angeles condi on survey dated January 2012.

Estimated Operating and Maintenance

Repair and maintenance  to prolong the life of bridges and reduce future infrastructure expenses related to infrastructure degradation and heavy vehicular usage.

Project Timeline Ongoing design and construction in FY 18.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $13,725 $0 $0 $0 $13,725

GAS TAX $2,181,785 $300,000 $300,000 $300,000 $3,081,785

MEASURE A $4,106 $0 $150,000 $0 $154,106

Total $2,199,616 $300,000 $450,000 $300,000 $3,249,616

FY 18 Adopted CIP 46 City of Long Beach - Mobility

Page 50: FY 18 Adopted CIP Book - Long Beach, California

RESIDENTIAL STREET PROGRAM 

Mobility

PW5151

Project Description Repair residential street and alleys through pavement sealing, asphalt overlays, and full reconstruction. Repair work to also include replacement of damaged curbs, gutters, drive approaches, installation of access ramps 

and replacement signage.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of residential streets and reduce future infrastructure expenses related to normal erosion, root damage and vehicular usage.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $883,348 $0 $0 $0 $883,348

COMMUNITY DEV BLOCK GRANT $111,339 $0 $0 $0 $111,339

GAS TAX $361,681 $0 $0 $0 $361,681

GENERAL CAPITAL $1,066,643 $567,000 $567,000 $567,000 $2,767,643

MEASURE A $0 $0 $1,830,000 $1,500,000 $3,330,000

MEASURE M LA COUNTY $0 $3,900,000 $3,900,000 $3,900,000 $11,700,000

MEASURE R $1,016,277 $4,900,000 $4,500,000 $4,500,000 $14,916,277

STATE RMRA LOCAL RETURN $0 $2,740,058 $8,000,000 $8,000,000 $18,740,058

UPLAND OIL CAPITAL PROJECTS $247,312 $0 $0 $0 $247,312

Total $3,686,600 $12,107,058 $18,797,000 $18,467,000 $53,057,658

FY 18 Adopted CIP 47 City of Long Beach - Mobility

Page 51: FY 18 Adopted CIP Book - Long Beach, California

ALLEYS 

Mobility

PW5244

Project Description Repair residential alleys through pavement sealing, asphalt overlays, and full reconstruction.

Estimated Operating and Maintenance

Repair and maintenance to upgrade and prolong the life of alleys and reduce future infrastructure expenses related to normal erosion and vehicle use.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $59,094 $0 $0 $0 $59,094

COMMUNITY DEV BLOCK GRANT $35,527 $0 $0 $0 $35,527

MEASURE A $285,135 $1,800,000 $1,800,000 $1,800,000 $5,685,135

Total $379,756 $1,800,000 $1,800,000 $1,800,000 $5,779,756

FY 18 Adopted CIP 48 City of Long Beach - Mobility

Page 52: FY 18 Adopted CIP Book - Long Beach, California

CITYWIDE SLURRY SEAL PROGRAM 

Mobility

PW5390

Project Description Repair residential streets through pavement sealing and slurry sealing. Repair work to also include patching the street pavement and installation of traffic striping and marking.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of asphalt streets and reduce future infrastructure expenses related to vehicular usage.

Project Timeline Design: October 2017 ‐ January 2018. Construction: April 2018‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  GAS TAX $75,399 $0 $0 $0 $75,399

GENERAL CAPITAL $4,927 $0 $0 $0 $4,927

MEASURE A ($509,204) $2,670,000 $0 $0 $2,160,796

Total ($428,878) $2,670,000 $0 $0 $2,241,122

FY 18 Adopted CIP 49 City of Long Beach - Mobility

Page 53: FY 18 Adopted CIP Book - Long Beach, California

ADA RESPONSE PROGRAM 

Mobility

PW5450

Project Description Construct access ramps and sidewalks on public rights of way based on verified requests.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of residential sidewalks and reduce future infrastructure expenses related to normal erosion, root damage and heavy pedestrian usage in compliance with ADA specifications.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $3,000 $0 $0 $0 $3,000

GAS TAX $356,198 $500,000 $500,000 $500,000 $1,856,198

GENERAL CAPITAL $6,272 $0 $0 $0 $6,272

Total $365,470 $500,000 $500,000 $500,000 $1,865,470

FY 18 Adopted CIP 50 City of Long Beach - Mobility

Page 54: FY 18 Adopted CIP Book - Long Beach, California

SIDEWALKS/CURB RAMPS 

Mobility

PW5500

Project Description Construct curb ramp improvements for compliance with ADA specifications.

Estimated Operating and Maintenance

Repair and maintenance to upgrade curb ramps and reduce future infrastructure expenses related to heavy pedestrian usage in compliance with ADA specifications.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  COMMUNITY DEV BLOCK GRANT $768,195 $768,195 $500,000 $500,000 $2,536,390

GENERAL CAPITAL $833,484 $2,231,805 $2,231,805 $2,231,805 $7,528,899

MEASURE A $0 $2,700,000 $4,847,668 $6,000,000 $13,547,668

Total $1,601,679 $5,700,000 $7,579,473 $8,731,805 $23,612,957

FY 18 Adopted CIP 51 City of Long Beach - Mobility

Page 55: FY 18 Adopted CIP Book - Long Beach, California

SUSTAINABLE TRANSPORTATION IMPROVEMENT 

Mobility

PWT010

Project Description • Citywide 8‐80 Connections• Design, construct, implement projects and programs to enhance the safety and viability of bicycle and pedestrian routes• Grant Matching Funds• Liveability Initiatives• PCH Ride

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of bike corridors and reduce future infrastructure expenses.

Project Timeline Design: October 2017– February 2018. Bid & Award: March 2018 – August 2018. Construction: September 2018 – February 2019.

Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  AB 2766 AIR QUALITY $1,162,701 $450,000 $500,000 $500,000 $2,612,701

GAS TAX $318,158 $750,000 $750,000 $750,000 $2,568,158

GENERAL CAPITAL $333,058 $0 $0 $0 $333,058

MAP 21 $587,862 $0 $0 $0 $587,862

MEASURE M LA COUNTY $0 $800,000 $800,000 $800,000 $2,400,000

MEASURE R $159,956 $1,000,000 $140,000 $0 $1,299,956

PROP A $325,856 $50,000 $0 $0 $375,856

PROP C $46,674 $0 $0 $0 $46,674

TIDELANDS $305,301 $0 $0 $0 $305,301

TRAFFIC MITIGATION PROGRAM $203,237 $0 $0 $0 $203,237

TRANSPORTATION DEV ACT $2,820,171 $200,000 $200,000 $200,000 $3,420,171

Total $6,262,974 $3,250,000 $2,390,000 $2,250,000 $14,152,974

FY 18 Adopted CIP 52 City of Long Beach - Mobility

Page 56: FY 18 Adopted CIP Book - Long Beach, California

CITYWIDE STRIPING & SIGNAGE PROGRAM 

Mobility

PWT110

Project Description Install and replace street name signs and traffic control signs at various locations, as‐needed, throughout the City.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of signs and striped streets.

Project Timeline Signs are to be installed as‐needed, throughout the fiscal year.

Department Contact Public Works ‐ Public Service ‐ Mike Sickles ‐ (562) 570‐3263

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $5,244 $0 $0 $0 $5,244

GENERAL CAPITAL $884,362 $0 $0 $0 $884,362

MEASURE A $50,000 $50,000 $0 $0 $100,000

MEASURE R $18,000 $0 $0 $0 $18,000

UPLAND OIL CAPITAL PROJECTS $20,324 $0 $0 $0 $20,324

Total $977,929 $50,000 $0 $0 $1,027,929

FY 18 Adopted CIP 53 City of Long Beach - Mobility

Page 57: FY 18 Adopted CIP Book - Long Beach, California

NEIGHBORHOOD TRAFFIC MITIGATION 

Mobility

PWT130

Project Description Enhancements and improvement projects to safety, mobility and active transportation of City neighborhoods.

Estimated Operating and Maintenance

Repair and maintenance to allow a broader range of traffic calming devices to be studied and potentially installed. Any new devices installed will require maintenance over their lifetime.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $79,456 $0 $0 $0 $79,456

COMMUNITY DEV BLOCK GRANT $160,235 $0 $0 $0 $160,235

GAS TAX $116,293 $250,000 $250,000 $250,000 $866,293

GENERAL CAPITAL $21,000 $0 $0 $0 $21,000

PROP A $81,862 $0 $0 $0 $81,862

Total $458,847 $250,000 $250,000 $250,000 $1,208,847

FY 18 Adopted CIP 54 City of Long Beach - Mobility

Page 58: FY 18 Adopted CIP Book - Long Beach, California

TRAFFIC & PEDESTRIAN SIGNALS 

Mobility

PWT190

Project Description Construct pedestrian related safety improvements and high priority traffic signal safety improvement projects to address accident prone intersections and safety concerns. Implement Countdown Pedestrian Indications intersections flashing beacons at crosswalks, lighting at crosswalks, and crosswalk signals.

Estimated Operating and Maintenance

Repair and maintenance intended to prolong the life of traffic control infrastructures and reduce future infrastructure expenses.

Project Timeline Design: October 2017 ‐ January 2018. Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Transportation Mobility ‐ Abraham Bandegan ‐ (562) 570‐6665

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $184,285 $0 $0 $0 $184,285

GAS TAX $2,704,829 $500,000 $500,000 $500,000 $4,204,829

GENERAL CAPITAL $15,000 $0 $0 $0 $15,000

MAP 21 $3,269 $0 $0 $0 $3,269

MEASURE R $450,000 $0 $0 $0 $450,000

PROP C $148,348 $0 $0 $0 $148,348

TRAFFIC MITIGATION PROGRAM $469,941 $500,000 $400,000 $400,000 $1,769,941

TRANSPORTATION DEV ACT $746,725 $0 $0 $0 $746,725

Total $4,722,396 $1,000,000 $900,000 $900,000 $7,522,396

FY 18 Adopted CIP 55 City of Long Beach - Mobility

Page 59: FY 18 Adopted CIP Book - Long Beach, California

56

Page 60: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

Parks & Recreation

FY 18 Adopted CIP 57 City of Long Beach - Parks & Recreation

Page 61: FY 18 Adopted CIP Book - Long Beach, California

Begining Balan

ce   

Total Funding   

FY 18

FY 19  

FY 20  

Fund

Parks & Recreation Funding

($16,543)

$0

$0

$0

($16,543)

AB32

$1,224,157

$0

$0

$0

$1,224,156

CAPITAL PROJECTS ‐ LEG

ISLATIVE

$4,972,002

$0

$0

$0

$4,972,001

COMMUNITY DEV

 BLO

CK GRANT

$2

$0

$0

$0

$2

GAS TA

X

$6,912,411

$148,000

$2,500,000

$0

$9,560,414

GEN

ERAL CAPITAL

$4,497,585

$6,379,500

$4,169,000

$357,500

$15,403,586

MEA

SURE A

$19

$0

$0

$0

$19

OPEN

 SPACE BONDS

$122,719

$500,000

$0

$0

$622,719

PARK IM

PACT FEES

($165)

$100,000

$100,000

$100,000

$299,835

TRANSPORTA

TION DEV

 ACT

$99,480

$0

$0

$0

$99,479

UPLAND OIL CAPITAL PROJECTS

Total

$17,811,666

$7,127,500

$6,769,000

$457,500

$32,165,668

FY 18 Adoptep CIP 58 City of Long Beach - Parks & Recreation

Page 62: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Parks & Recreation

Program

 Snapshot

($441)

$0

$0

$0

($441)

PR3100

MLK POOL

$506

$0

$0

$0

$506

PR3180

MATC

HING FUNDS

$369,000

$0

$0

$0

$369,000

PR3225

MED

IAN LANDSCAPE REV

OVATION

$25,469

$0

$0

$0

$25,469

PR3320

LOS ANGELES RIVER

 STU

DIES & IM

PROVEM

ENTS

$21,618

$0

$0

$0

$21,618

PR3330

DEV

ELOPMEN

T FEE STUDIES

($107)

$0

$0

$0

($107)

PR3360

DEFOREST PARK

$0

$100,000

$100,000

$100,000

$300,000

PW3010

PARK BIKE PATH

 REPLACEM

ENT

$245,951

$292,000

$0

$0

$537,951

PW3020

PARK FACILITY RER

OOFING

$12,501

$0

$200,000

$0

$212,501

PW3040

GAME COURT REH

ABILITATION

$498,665

$500,000

$0

$0

$998,665

PW3050

RANCHO LOS ALAMITOS

$497,110

$500,000

$0

$0

$997,110

PW3060

RANCHO LOS CER

RITOS

$4,043,059

$4,648,000

$2,500,000

$0

$11,191,059

PW3070

PARK ACQUISITION & DEV

ELOPMEN

T

$4,117

$0

$0

$0

$4,117

PW3090

PARKING LOT UPGRADE

$898,579

$0

$0

$0

$898,579

PW3110

PARK IN

FRASTRUCTU

RE

$281,265

$0

$0

$0

$281,265

PW3120

PARK AMEN

ITIES

$67,457

$0

$495,000

$0

$562,457

PW3130

TREE

 TRIM

MING ‐ PARKS

$68,750

$0

$0

$0

$68,750

PW3140

PARK LAKE AER

ATION

$284,878

$0

$0

$0

$284,878

PW3150

BIXBY PARK REH

ABILITATION

$14,987

$0

$0

$0

$14,987

PW3160

FENCING AND RAILING REH

AB

$1,380,980

$480,000

$0

$0

$1,860,980

PW3170

GAME FIELD UPGRADES

$2,176,570

$0

$0

$0

$2,176,570

PW3190

PLAY EQ

UIPMEN

T REPLACEM

ENT(GP)

FY 18 Adoptep CIP 59 City of Long Beach - Parks & Recreation

Page 63: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Parks & Recreation

Program

 Snapshot

($17,417)

$0

$0

$0

($17,417)

PW3200

REC

REA

TION PARK REH

AB

$4,258,468

$357,500

$0

$357,500

$4,973,468

PW3220

IRRIGATION SYSTEM REPLACEM

ENT

$107,521

$0

$0

$0

$107,521

PW3230

PARK SEC

URITY LIGHTING

$647,186

$250,000

$0

$0

$897,186

PW3240

REC

REA

TION BUILDING REH

ABILITATION

$463,503

$0

$1,620,000

$0

$2,083,503

PW3250

RESTR

OOM REH

ABILITATION

$18,359

$0

$0

$0

$18,359

PW3260

SIDEW

ALK HAZA

RD ABATEMEN

T

$859,428

$0

$1,854,000

$0

$2,713,428

PW3300

EL DORADO PARK REH

ABILITATION

$11,487

$0

$0

$0

$11,487

PW3310

OPEN

 SPACE/REC

. STR

ATEGIC PLAN

$572,214

$0

$0

$0

$572,214

PW3320

LOS ANGELES RIVER

 STU

DIES & IM

PROVEM

ENTS

Total

$17,811,666

$7,127,500

$6,769,000

$457,500

$32,165,666

FY 18 Adoptep CIP 60 City of Long Beach - Parks & Recreation

Page 64: FY 18 Adopted CIP Book - Long Beach, California

PARK BIKE PATH REPLACEMENT 

Parks & Recreation

PW3010

Project Description On‐going repair and/or replacement of existing bike paths, facilities, signage, and striping of park bike paths. Ongoing repair and replacement of bike path paving and striping at:• Channel View Park• El Dorado Regional Park (including parkconnections to the San Gabriel River BikePath)• Heartwell Park, including off‐siteconnection to the San Gabriel River BikePath• PW right‐of‐way off‐street bike pathbetween Martin Luther King, Jr. Avenueand Orange Avenue• Recreation Park• 6th Street off‐site connection to the LARiver Bike Path

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of bike paths and reduce future infrastructure expenses.

Project Timeline Design:  October 2017. Construction: November 2017 – October 2018.

Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  TRANSPORTATION DEV ACT $0 $100,000 $100,000 $100,000 $300,000

Total $0 $100,000 $100,000 $100,000 $300,000

FY 18 Adopted CIP 61 City of Long Beach - Parks & Recreation

Page 65: FY 18 Adopted CIP Book - Long Beach, California

PARK FACILITY REROOFING 

Parks & Recreation

PW3020

Project Description Reroof park facilities to prevent damage to structures, equipment and inventory, citywide. Improvements will be made to the following facility:                                                                                                   • Stearns Park Community Center

Estimated Operating and Maintenance

Improvements to increase the longevity of City‐owned assets and decrease ongoing maintenance costs.

Project Timeline Design:  November 2017. Construction: December 2017 – October 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $30,760 $0 $0 $0 $30,760

COMMUNITY DEV BLOCK GRANT $192,042 $0 $0 $0 $192,042

GENERAL CAPITAL $16,441 $0 $0 $0 $16,441

MEASURE A $6,709 $292,000 $0 $0 $298,709

Total $245,951 $292,000 $0 $0 $537,951

FY 18 Adopted CIP 62 City of Long Beach - Parks & Recreation

Page 66: FY 18 Adopted CIP Book - Long Beach, California

GAME COURT REHABILITATION 

Parks & Recreation

PW3040

Project Description Repair and construction of sports courts at the following locations:• Silverado Park• Los Cerritos Park

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of game courts and reduce future infrastructure expenses.

Project Timeline Design: October 2017 ‐ July 2018.Construction: August 2018.

Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $12,501 $0 $0 $0 $12,501

MEASURE A $0 $0 $200,000 $0 $200,000

Total $12,501 $0 $200,000 $0 $212,501

FY 18 Adopted CIP 63 City of Long Beach - Parks & Recreation

Page 67: FY 18 Adopted CIP Book - Long Beach, California

RANCHO LOS ALAMITOS 

Parks & Recreation

PW3050

Project Description Perform improvements in a manner that isconsistent with preserving the historical character of the Rancho.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of the Rancho through seismic retrofit and reduce future infrastructure expenses.

Project Timeline Design: October 2017 – July 2018. Construction: August 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  GENERAL CAPITAL $1,595 $0 $0 $0 $1,595

MEASURE A $497,071 $500,000 $0 $0 $997,071

Total $498,665 $500,000 $0 $0 $998,665

FY 18 Adopted CIP 64 City of Long Beach - Parks & Recreation

Page 68: FY 18 Adopted CIP Book - Long Beach, California

RANCHO LOS CERRITOS 

Parks & Recreation

PW3060

Project Description Repair and maintenance upgrades to extend the useful life of Rancho Los Cerritos. Work to be initiated in FY 18:• Driveway / parking lot upgrades• Furnace replacement• Irrigation and turf replacement• Termite treatment

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of the Rancho and reduce future infrastructure expenses.

Project Timeline Design:  October 2017. Construction: November 2017 – October 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  MEASURE A $497,110 $500,000 $0 $0 $997,110

Total $497,110 $500,000 $0 $0 $997,110

FY 18 Adopted CIP 65 City of Long Beach - Parks & Recreation

Page 69: FY 18 Adopted CIP Book - Long Beach, California

PARK ACQUISITION & DEVELOPMENT 

Parks & Recreation

PW3070

Project Description Acquisition of park land and development of parks throughout the City. Improvements to include the following locations: • Davenport Park• Houghton Park• Willow Springs Park

Estimated Operating and Maintenance

Development of parks creates open spaces, recreation areas, increases property values and supports the health of Long Beach's neighborhoods.

Project Timeline Design:  October 2017. Construction: November 2017 – October 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $45,106 $0 $0 $0 $45,106

COMMUNITY DEV BLOCK GRANT $1,801,400 $0 $0 $0 $1,801,400

GAS TAX $2 $0 $0 $0 $2

GENERAL CAPITAL $2,143,403 $148,000 $2,500,000 $0 $4,791,403

MEASURE A ($3,458) $4,000,000 $0 $0 $3,996,542

OPEN SPACE BONDS $19 $0 $0 $0 $19

PARK IMPACT FEES $1,101 $500,000 $0 $0 $501,101

UPLAND OIL CAPITAL PROJECTS $55,485 $0 $0 $0 $55,485

Total $4,043,059 $4,648,000 $2,500,000 $0 $11,191,059

FY 18 Adopted CIP 66 City of Long Beach - Parks & Recreation

Page 70: FY 18 Adopted CIP Book - Long Beach, California

TREE TRIMMING ‐ PARKS 

Parks & Recreation

PW3130

Project Description Investment into the City’s Urban Forest to include:• Tree Trimming• Tree Planting

Estimated Operating and Maintenance

Trimming to prolong the life of the urban forest.

Project Timeline Continuous.

Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $63,938 $0 $0 $0 $63,938

MEASURE A $3,519 $0 $495,000 $0 $498,519

Total $67,457 $0 $495,000 $0 $562,457

FY 18 Adopted CIP 67 City of Long Beach - Parks & Recreation

Page 71: FY 18 Adopted CIP Book - Long Beach, California

GAME FIELD UPGRADES 

Parks & Recreation

PW3170

Project Description Restoration and rehabilitation of game fields. Improvements include the following locations: • Admiral Kidd Field Turf Improvements• Hudson Field Turf Improvements• Veterans Field Turf Improvements

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of game field infrastructure and reduce future expenses related to heavy usage.

Project Timeline Design:  October 2017. Construction: November 2017 – October 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  COMMUNITY DEV BLOCK GRANT $600,000 $0 $0 $0 $600,000

GENERAL CAPITAL $780,980 $0 $0 $0 $780,980

MEASURE A $0 $480,000 $0 $0 $480,000

Total $1,380,980 $480,000 $0 $0 $1,860,980

FY 18 Adopted CIP 68 City of Long Beach - Parks & Recreation

Page 72: FY 18 Adopted CIP Book - Long Beach, California

IRRIGATION SYSTEM REPLACEMENT 

Parks & Recreation

PW3220

Project Description Upgrade and replacement of park irrigationsystems to conserve water and properly maintainlandscaping.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of irrigation infrastructure and reduce future infrastructure expenses related to leaks and aging pipes.

Project Timeline Implementation: October 2017 – September 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $1,926 $0 $0 $0 $1,926

COMMUNITY DEV BLOCK GRANT $944,000 $0 $0 $0 $944,000

GENERAL CAPITAL $2,577,416 $0 $0 $0 $2,577,416

MEASURE A $735,126 $357,500 $0 $357,500 $1,450,126

Total $4,258,468 $357,500 $0 $357,500 $4,973,468

FY 18 Adopted CIP 69 City of Long Beach - Parks & Recreation

Page 73: FY 18 Adopted CIP Book - Long Beach, California

RECREATION BUILDING REHABILITATION 

Parks & Recreation

PW3240

Project Description Rehabilitate existing buildings to enhance thefunctional use and maximise operatingefficiencies. Work to be initiated in FY 18:• 4th Street Street Senior Center

Estimated Operating and Maintenance

Repair and maintenance to prolong the recreation buildings and reduce ongoing infrastructure expenses due to increased park usage.

Project Timeline Design: October 2017 – March 2018.Construction: April 2018 – September 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $196,841 $0 $0 $0 $196,841

GENERAL CAPITAL $3,420 $0 $0 $0 $3,420

MEASURE A $346,047 $250,000 $0 $0 $596,047

PARK IMPACT FEES $100,000 $0 $0 $0 $100,000

TRANSPORTATION DEV ACT $879 $0 $0 $0 $879

Total $647,186 $250,000 $0 $0 $897,186

FY 18 Adopted CIP 70 City of Long Beach - Parks & Recreation

Page 74: FY 18 Adopted CIP Book - Long Beach, California

RESTROOM REHABILITATION 

Parks & Recreation

PW3250

Project Description Repair and construction of restrooms at the following locations:• Drake Park• El Dorado Regional Park• MacArthur Park

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of restrooms and reduce future infrastructure expenses.

Project Timeline Design: October 2017 ‐ July 2018.Construction: August 2018.

Department Contact Parks & Recreation ‐ Meredith Reynolds ‐ (562) 570‐3165

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $40,048 $0 $0 $0 $40,048

COMMUNITY DEV BLOCK GRANT $250,000 $0 $0 $0 $250,000

GENERAL CAPITAL $4,798 $0 $0 $0 $4,798

MEASURE A $168,658 $0 $1,620,000 $0 $1,788,658

Total $463,503 $0 $1,620,000 $0 $2,083,503

FY 18 Adopted CIP 71 City of Long Beach - Parks & Recreation

Page 75: FY 18 Adopted CIP Book - Long Beach, California

EL DORADO PARK REHABILITATION 

Parks & Recreation

PW3300

Project Description Repair and rehabilite facilities at the City's largest park.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of El Dorado Park and reduce future infrastructure expenses.

Project Timeline Design: October 2017 ‐ July 2018.Construction: August 2018.

Department Contact Park & Recreations ‐ Meredith Reynolds ‐ (562) 570‐3165

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $47,413 $0 $0 $0 $47,413

COMMUNITY DEV BLOCK GRANT $299,805 $0 $0 $0 $299,805

GENERAL CAPITAL $512,210 $0 $0 $0 $512,210

MEASURE A $0 $0 $1,854,000 $0 $1,854,000

Total $859,428 $0 $1,854,000 $0 $2,713,428

FY 18 Adopted CIP 72 City of Long Beach - Parks & Recreation

Page 76: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

Public Facilities

FY 18 Adopted CIP 73 City of Long Beach - Public Facilities

Page 77: FY 18 Adopted CIP Book - Long Beach, California

Begining Balan

ce   

Total Funding   

FY 18

FY 19  

FY 20  

Fund

Public Facilities Funding

$0

$2,500,000

$0

$0

$2,500,000

AB32

$32,000

$0

$0

$0

$32,000

AIRPORT CAPITAL

$1,974,207

$0

$0

$0

$1,974,209

CAPITAL PROJECTS ‐ LEG

ISLATIVE

$2,115,278

$500,000

$0

$0

$2,615,277

CIVIC CEN

TER

$56,485

$0

$0

$0

$56,485

COMMUNITY DEV

 BLO

CK GRANT

$1,658,023

$0

$0

$0

$1,658,022

FLEET CAPITAL

$3,713,226

$1,000,000

$0

$0

$4,713,228

GEN

ERAL CAPITAL

$1,766,950

$4,049,000

$3,390,000

$0

$9,205,950

MEA

SURE A

($8,323)

$0

$0

$0

($8,322)

MEA

SURE R

($3,000)

$0

$0

$0

($3,000)

PROP A

$9,502

$0

$0

$0

$9,502

PROP C

($81,208)

$2,589,000

$0

$0

$2,507,792

QUEEN M

ARY

$2,024,131

$400,000

$0

$0

$2,424,131

TIDELANDS

$17,378

$0

$0

$0

$17,378

TIDELANDS CAPITAL GRANTS

($6,450)

$0

$0

$0

($6,450)

UPLAND OIL CAPITAL PROJECTS

Total

$13,268,199

$11,038,000

$3,390,000

$0

$27,696,202

FY 18 Adoptex CIP 74 City of Long Beach - Public Facilities

Page 78: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Public Facilities

Program

 Snapshot

$32,000

$0

$0

$0

$32,000

PW1050

UNDER

GROUND FUEL TANK

$2,051,468

$1,400,000

$0

$0

$3,451,468

PW2040

CONVEN

TION CEN

TER COMPLEX IM

PROVEM

ENTS

$126,268

$0

$0

$0

$126,268

PW4070

ANIM

AL CONTR

OL SH

ELTER

$2,046,388

$500,000

$0

$0

$2,546,388

PW4100

CIVIC CEN

TER COMPLEX IM

PROVEM

ENTS

$210,908

$0

$0

$0

$210,908

PW4110

CIVIC CEN

TER COMPLEX REFURBISHMEN

T

$18,694

$250,000

$250,000

$0

$518,694

PW4140

CITYW

IDE RER

OOFING

($409)

$0

$0

$0

($409)

PW4150

CITYW

IDE TR

EE TRIM

MING

$1,827,074

$0

$0

$0

$1,827,074

PW4160

COOPER

ATIVE INFRASTRUCTU

RE IM

PROVEM

ENTS

$38,398

$0

$0

$0

$38,398

PW4174

FACILITY REPAIRS

$1,179

$0

$0

$0

$1,179

PW4200

DOWNTO

WN BIKE STATION DEM

O PROJ

$1,418,241

$5,974,000

$3,140,000

$0

$10,532,241

PW4240

GEN

ERAL CITY BUILDING REFURBISHMEN

T

$27,187

$0

$0

$0

$27,187

PW4260

PUBLIC SAFETY BUILDING

$111,760

$0

$0

$0

$111,760

PW4280

TEMPLE/W

ILLO

W FACILITIES

$14,329

$0

$0

$0

$14,329

PW4301

NORTH

 BRANCH LIBRARY

$1,095,993

$0

$0

$0

$1,095,993

PW4320

REG

IONAL FU

EL STO

RAGE

$257,882

$0

$0

$0

$257,882

PW4322

CNG FUELING STA

TIONS

$411,021

$125,000

$0

$0

$536,021

PW4370

FIRE FA

CILITIES MODER

NIZATION

$1,082,220

$0

$0

$0

$1,082,220

PW4420

CITY PLACE PARKING GARAGE

$0

$200,000

$0

$0

$200,000

PW4450

FACILITY ASSESSM

ENTS

$2,422,200

$0

$0

$0

$2,422,200

PW4490

MEN

TAL HEA

LTH AMER

ICA FACILITY

$159,603

$0

$0

$0

$159,603

PW4500

SCHROED

ER HALL EAST POLICE STATION

FY 18 Adopted CIP 75 City of Long Beach - Public Facilities

Page 79: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Public Facilities

Program

 Snapshot

($3,000)

$0

$0

$0

($3,000)

PW5340

CITYW

IDE PED

ESTR

IAN SAFETY ENHNCMNT PROG

($81,208)

$2,589,000

$0

$0

$2,507,792

PW6200

QUEEN M

ARY PROJECTS

Total

$13,268,198

$11,038,000

$3,390,000

$0

$27,696,198

FY 18 Adopted CIP 76 City of Long Beach - Public Facilities

Page 80: FY 18 Adopted CIP Book - Long Beach, California

CONVENTION CENTER COMPLEX IMPROVEMENTS 

Public Facilities

PW2040

Project Description The Convention Center’s Capital Improvements will provide facility upgrades to address infrastructure needs and to enhance the competitive position of the Center.Work to be initiated in FY 18:

• Terrace Plaza Fountain upgrades • Terrace Plaza Sound & Ligh ng Upgrades • General pain ng, flooring and other building upgrades

Estimated Operating and Maintenance

These Capital Improvements increase the longevity of the City‐owned asset, decrease maintenance costs, and improve the marketability of the Center.  The Center provides an incredible amenity for the local community and regional visitors, and is an important economic driver for the City.

Project Timeline Design and Permitting:  October 2017. Construction: November 2017 – October 2018.

Department Contact Economic Development ‐ Johnny Vallejo ‐ (562) 570‐6792

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  MEASURE A $0 $1,000,000 $0 $0 $1,000,000

TIDELANDS $2,039,686 $400,000 $0 $0 $2,439,686

TIDELANDS CAPITAL GRANTS $17,378 $0 $0 $0 $17,378

Total $2,057,063 $1,400,000 $0 $0 $3,457,063

FY 18 Adopted CIP 77 City of Long Beach - Public Facilities

Page 81: FY 18 Adopted CIP Book - Long Beach, California

CIVIC CENTER COMPLEX IMPROVEMENTS 

Public Facilities

PW4100

Project Description The Civic Center Complex facility requires improvements to maintain each facility in a reliable and efficient operating condition. A majority of these projects will be initiated based on operational needs in conjunction with the new city hall and main library. Public Safety Building retrofits include LED lighting and maintenance on boilers.

Estimated Operating and Maintenance

Repair and maintenance to city hall, main library and surrounding complex to reduce ongoing infrastructure expenses while the new city hall and main library are under construction.

Project Timeline Design: September 2017 – October 2017. Construction: November 2017 – October 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CIVIC CENTER $2,056,347 $500,000 $0 $0 $2,556,347

Total $2,056,347 $500,000 $0 $0 $2,556,347

FY 18 Adopted CIP 78 City of Long Beach - Public Facilities

Page 82: FY 18 Adopted CIP Book - Long Beach, California

CITYWIDE REROOFING 

Public Facilities

PW4140

Project Description Replace City building roofs to prevent damage to structures, equipment, and protect and preseve inventory. Roof replacement can extend the lifespan of buildings, facilities, and substructures around the City including parks establishments and community centers.Work to be initiated in FY 18:

• Fire Sta ons • Neighborhood Branch Libraries

Estimated Operating and Maintenance

These Capital Improvements increase the longevity of City‐owned assets and decrease maintenance costs. 

Project Timeline Design:  October 2017.Construction: November 2017 – October 2018,

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CIVIC CENTER $5,237 $0 $0 $0 $5,237

GENERAL CAPITAL $13,457 $0 $0 $0 $13,457

MEASURE A $0 $250,000 $250,000 $0 $500,000

Total $18,694 $250,000 $250,000 $0 $518,694

FY 18 Adopted CIP 79 City of Long Beach - Public Facilities

Page 83: FY 18 Adopted CIP Book - Long Beach, California

GENERAL CITY BUILDING REFURBISHMENT 

Public Facilities

PW4240

Project Description Refurbish City buildings to minimize structural deficiencies and extend the facility useful life.Work to be initiated in FY 18:• Bach, Twain, and Bret Harte Libraries

• Emergency Opera ons Center • Energy Efficient Upgrades

• Fire Stations 7 and 17• Fire Station Training Center

• Health Department Facili es • Police Academy

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of municipal buildings and reduce ongoing infrastructure expenses.

Project Timeline Design: October 2017 – March 2018. Construction: April 2018 – September 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $22,084 $0 $0 $0 $22,084

COMMUNITY DEV BLOCK GRANT $56,485 $2,500,000 $0 $0 $2,556,485

GENERAL CAPITAL $766,546 $1,000,000 $0 $0 $1,766,546

MEASURE A $573,126 $2,474,000 $3,140,000 $0 $6,187,126

Total $1,418,241 $5,974,000 $3,140,000 $0 $10,532,241

FY 18 Adopted CIP 80 City of Long Beach - Public Facilities

Page 84: FY 18 Adopted CIP Book - Long Beach, California

FIRE FACILITIES MODERNIZATION 

Public Facilities

PW4370

Project Description Modernize fire department facilities at Fire Stations throughout the City. Upgrades include providing gender separation for restrooms and the conversion of common sleeping dorms to private sleeping quarters in order to provide privacy for the workforce.Work to be initiated in FY 18:

• Fire Sta on 9

Estimated Operating and Maintenance

Upgrade and maintenance to prolong the life of municipal fire facilities and reduce ongoing infrastructure expenses.

Project Timeline Construction: October 2017 – September 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  GENERAL CAPITAL $299,447 $0 $0 $0 $299,447

MEASURE A $112,875 $125,000 $0 $0 $237,875

Total $412,322 $125,000 $0 $0 $537,322

FY 18 Adopted CIP 81 City of Long Beach - Public Facilities

Page 85: FY 18 Adopted CIP Book - Long Beach, California

FACILITY ASSESSMENTS 

Public Facilities

PW4450

Project Description Develop list of all City‐owned buildings and facilities and complete an independent Facility Condition Assessment. This will include comprehensive building evaluations (structural, mechanical, electrical, plumbing, and energy and water conservation) for City facilities, identifying corrective work needed, and developing budget estimates and projected schedules for the completion of all recommended and preventative maintenance work.

Estimated Operating and Maintenance

Maintenance of a comprehensive facility deficiency listing will be essential to identifying future rehabilitation work and minimize maintenance costs.

Project Timeline Assessment: December 2017 ‐ December 2018.Construction: August 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  MEASURE A $0 $200,000 $0 $0 $200,000

Total $0 $200,000 $0 $0 $200,000

FY 18 Adopted CIP 82 City of Long Beach - Public Facilities

Page 86: FY 18 Adopted CIP Book - Long Beach, California

QUEEN MARY PROJECTS 

Public Facilities

PW6200

Project Description The Queen Mary requires historic preservationand capital improvements to properly maintain the structure and its historically significant elements. Projects will be initiated based on operational needs, identified capital deficiencies and ongoing survey/studies.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of the ship and reduce future infrastructure expenses related to passenger usage.

Project Timeline Design: October 2017 – March 2018.  Construction: March 2018 – September 2018.

Department Contact Public Works ‐ Project Management ‐ Eric Lopez ‐ (562) 570‐5690

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  QUEEN MARY ($81,208) $2,589,000 $0 $0 $2,507,792

Total ($81,208) $2,589,000 $0 $0 $2,507,792

FY 18 Adopted CIP 83 City of Long Beach - Public Facilities

Page 87: FY 18 Adopted CIP Book - Long Beach, California

84

Page 88: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

Utilities

FY 18 Adopted CIP 85 City of Long Beach - Utilities

Page 89: FY 18 Adopted CIP Book - Long Beach, California

Begining Balan

ce   

Total Funding   

FY 18

FY 19  

FY 20  

Fund

Utilities Funding

$5,046

$0

$0

$0

$5,046

CAPITAL PROJECTS ‐ LEG

ISLATIVE

$27,127,543

$0

$0

$0

$27,127,543

COMMUNITY DEV

 BLO

CK GRANT

$0

$500,000

$500,000

$500,000

$1,500,000

FACITILITY WORK

$0

$250,000

$250,000

$250,000

$750,000

GAS CONTR

OL/CATH

ODIC PROTECTION

$0

$25,000

$25,000

$25,000

$75,000

GAS METER

 REPLACEM

ENT

$1,285,260

$300,000

$300,000

$300,000

$2,185,260

GAS TA

X

$4,686,727

$0

$300,000

$300,000

$5,286,727

GEN

ERAL CAPITAL

$0

$6,175,000

$6,175,000

$6,175,000

$18,525,000

MAIN PIPELINE REPLACEM

ENT

$0

$1,550,000

$3,450,000

$0

$5,000,000

MEA

SURE A

$0

$1,100,000

$1,100,000

$1,100,000

$3,300,000

SERVICE PIPELINE REPLACEM

ENT

$0

$4,046,000

$0

$0

$4,046,000

SEWER

 FUND

$163,092

$0

$0

$0

$163,092

TIDELANDS

$0

$13,416,279

$0

$0

$13,416,279

WATER FUND

Total

$33,267,668

$27,362,279

$12,100,000

$8,650,000

$81,379,947

FY 18 Adopted CIP 86 City of Long Beach - Utilities

Page 90: FY 18 Adopted CIP Book - Long Beach, California

Beg Balan

ce   

Total Funding   

FY 18  

FY 19  

FY 20  

Project

Project Title

Utilities

Program

 Snapshot

$0

$8,050,000

$8,050,000

$8,050,000

$24,150,000

LBGO

GAS AND OIL PROGRAM

$100,000

$0

$0

$0

$100,000

PW7010

STORMWATER/U

RBAN RUNOFF M

GMT

$208,685

$1,550,000

$3,750,000

$300,000

$5,808,685

PW7020

STORM DRAIN PUMP STA

TION REPAIR & CER

TIFICATION

$81,474

$0

$0

$0

$81,474

PW7030

STORM DRAIN REFURB‐TELEM

ETRY

$6,909,119

$300,000

$300,000

$300,000

$7,809,119

PW7060

STORM DRAIN SYSTEM & W

ATER QUALITY IM

PROVEM

EN

$25,968,391

$0

$0

$0

$25,968,391

PW7090

LB‐M

UST W

ATER TREA

TMEN

T FA

CILITY

$0

$4,046,000

$0

$0

$4,046,000

SEWER

SEWER

 FUND

$0

$13,416,279

$0

$0

$13,416,279

WATER

WATER FUND

Total

$33,267,668

$27,362,279

$12,100,000

$8,650,000

$81,379,947

FY 18 Adopted CIP 87 City of Long Beach - Utilities

Page 91: FY 18 Adopted CIP Book - Long Beach, California

STORM DRAIN PUMP STATION REPAIR & CERTIFICATION 

Utilities

PW7020

Project Description Repair and upgrade storm water pumps at various locations in accordance with AQMD regulations.  Initiate and construct improvements at pump stations that are idntified in the 2015 Pump Station Assessment Study.

Estimated Operating and Maintenance

Repair and maintenance to prolong the life of storm drain pumps and reduce future infrastructure expenses related to normal  degradation.

Project Timeline Design: October 2017 ‐ January 2018 Construction: January 2018 ‐ September 2018.

Department Contact Public Works ‐ Engineering ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  CAPITAL PROJECTS ‐ LEGISLATIVE $5,046 $0 $0 $0 $5,046

GENERAL CAPITAL $89,767 $0 $300,000 $300,000 $689,767

MEASURE A $0 $1,550,000 $3,450,000 $0 $5,000,000

TIDELANDS $115,956 $0 $0 $0 $115,956

Total $210,770 $1,550,000 $3,750,000 $300,000 $5,810,770

FY 18 Adopted CIP 88 City of Long Beach - Utilities

Page 92: FY 18 Adopted CIP Book - Long Beach, California

STORM DRAIN SYSTEM & WATER QUALITY IMPROVEMENT 

Utilities

PW7060

Project Description Repair storm water catch basins and storm water mainline pipes. Construct storm drain enhancements. Conduct water quality improvements along Queensway Bay, San Pedro Bay, Alamitos Bay, and Los Cerritos Channel. Required monitoring modeling and implementation actions associated with Total Maximum Daily Loads (TMDL) as mandated by the State and Federal agencies. Improvements include construction of bioswales, low flow diversions and Structural Best Management Practices (BMP) for trash, metal and bacteria.

Estimated Operating and Maintenance

Repair and maintenance to modernize storm drain catch basins and mainline pipes to reduce future infrastructure expenses related to normal degradation and heavy usage.

Project Timeline Design: October 2017 ‐ March 2018. Construction: April 2018 ‐ April 2019.

Department Contact Public Works ‐ Stormwater ‐ Alvin Papa ‐ (562) 570‐6386

Funding SourcesFunding Source Beg Balance  3 Year Total  FY 18   FY 19   FY 20  COMMUNITY DEV BLOCK GRANT $1,568,710 $0 $0 $0 $1,568,710

GAS TAX $1,287,345 $300,000 $300,000 $300,000 $2,187,345

GENERAL CAPITAL $4,005,927 $0 $0 $0 $4,005,927

TIDELANDS $47,136 $0 $0 $0 $47,136

Total $6,909,119 $300,000 $300,000 $300,000 $7,809,119

FY 18 Adopted CIP 89 City of Long Beach - Utilities

Page 93: FY 18 Adopted CIP Book - Long Beach, California

Proje

ctDe

scrip

tion

Budg

etFY

2017

Budg

etFY

2018

Budg

etFY

2019

Budg

etFY

2020

Budg

etFY

2021

Budg

etFY

2022

Five-

Year

Total

GOMN

Main

Pipe

line R

eplac

emen

t 6,4

75,00

0

6,175

,000

6,1

75,00

0

6,175

,000

6,1

75,00

0

6,175

,000

30

,875,0

00

GO

SVSe

rvice

Pipe

line R

eplac

emen

t1,7

75,00

0

1,100

,000

1,1

00,00

0

1,100

,000

1,1

00,00

0

1,100

,000

5,5

00,00

0

GO

RMGa

s Mete

r Rep

lacem

ent

1,050

,000

25

,000

25,00

0

25

,000

25,00

0

25

,000

125,0

00

GOBF

Facil

ity W

ork

500,0

00

500,0

00

500,0

00

500,0

00

500,0

00

500,0

00

2,500

,000

GOCP

Gas C

ontro

l/Cath

odic

Prote

ction

250,0

00

250,0

00

250,0

00

250,0

00

250,0

00

250,0

00

1,250

,000

GOMB

Billa

ble P

ipelin

e Wor

k2,0

00,00

0

2,000

,000

50

0,000

50

0,000

50

0,000

50

0,000

4,0

00,00

0

Subto

tal12

,050,0

00

10

,050,0

00

8,5

50,00

0

8,550

,000

8,5

50,00

0

8,550

,000

44

,250,0

00

Le

ss B

illable

Pipe

line W

ork

(2,00

0,000

)

(2

,000,0

00)

(500

,000)

(5

00,00

0)

(500

,000)

(5

00,00

0)

(4,00

0,000

)

Ne

t CIP

Bud

get

10,05

0,000

8,050

,000

8,0

50,00

0

8,050

,000

8,0

50,00

0

8,050

,000

40

,250,0

00

Note:

Gas M

eter R

eplac

emen

t bud

get is

redu

ced t

o $25

K in

FY20

18.

LBGO

antic

ipates

AMI

mete

r insta

llatio

n will

be co

mplet

ed in

FY2

017.

FY 20

18 -

FY 20

22 C

apita

l Impr

ovem

ent P

rogr

amLo

ng B

each

Gas

& O

il

LBGO

is co

mplet

ing th

e ins

tallat

ion of

an A

dvan

ced M

eterin

g Infr

astru

cture

syste

m (A

MI).

Initia

l fun

ding p

rovid

ed by

a sp

ecial

fee t

o the

rate

paye

r with

addit

ional

fundin

g fro

m a l

ease

-to-o

wn

finan

cing p

rogr

am. D

ebt s

ervic

e will

be co

vere

d with

savin

gs fr

om ex

isting

mete

r rea

ding c

ontra

ct.

AMI c

ost is

not in

clude

d in t

he nu

mber

s pro

vided

.

90

hatai
Typewritten Text
FY 18 Adopted CIP
hatai
Typewritten Text
City of Long Beach - Utilities
Page 94: FY 18 Adopted CIP Book - Long Beach, California

FY

17

FY

18

FY

16

FY

17

Est

imat

edN

ewP

ota

ble

Wat

erA

ctu

als

Bu

dg

et E

xpen

dit

ure

s B

ud

get

Wat

er C

IP b

y In

-Hou

se W

orkf

orce

2,26

7,87

8

2,

850,

000

2,85

0,00

0

2,85

0,00

0

P

ipel

ine

Sys

tem

Impr

ovem

ents

4,30

7,10

3

2,

817,

300

2,46

4,30

0

2,37

9,70

0

R

eser

voir/

Trea

tmen

t Pla

nt Im

prov

emen

ts2,

092,

307

1,70

6,00

0

2,

065,

700

2,

945,

100

Wat

er S

uppl

y P

roje

cts

1,71

5,03

3

3,

894,

500

4,02

3,80

0

3,30

5,60

0

Fa

cilit

y Im

prov

emen

ts65

1,69

9

520,

000

60

3,00

0

1,

135,

879

Dev

elop

er R

eim

burs

ed69

3,85

8

-

65

0,00

0

-

Inte

rest

Exp

ense

Cap

italiz

ed58

7,28

0

800,

000

80

0,00

0

80

0,00

0

Oth

er41

4,47

7

-

-

-

T

ota

l Po

tab

le12

,729

,634

12,5

87,8

00

13

,456

,800

13,4

16,2

79

Rec

laim

ed W

ater

Sys

tem

Exp

ansi

on63

,679

-

-

-

T

ota

l Rec

laim

ed63

,679

-

-

-

To

tal W

ater

Fu

nd

12,7

93,3

13

12

,587

,800

13,4

56,8

00

13

,416

,279

Se

wer S

ewer

Pip

elin

e Im

prov

emen

ts87

6,96

0

2,06

1,90

0

2,

883,

300

2,

422,

800

Sew

er L

ift S

tatio

ns2,

640,

804

1,66

7,50

0

76

4,70

0

1,

573,

200

Faci

lity

Impr

ovem

ents

-

15

,000

18,5

00

-

Inte

rest

Exp

ense

Cap

italiz

ed12

5,41

4

50,0

00

50

,000

50,0

00

O

ther

167,

133

-

-

-

To

tal S

ewer

Fu

nd

3,81

0,31

1

3,

794,

400

3,71

6,50

0

4,04

6,00

0

Gra

nd

To

tal

16,6

03,6

24$

16

,382

,200

$

17,1

73,3

00$

17

,462

,279

$

Not

e: T

his

is o

nly

a su

mm

ary

of th

e de

partm

ent's

pro

ject

s.

Fis

cal

Yea

r 20

18 C

apit

al I

mp

rove

men

t P

rog

ram

Su

mm

ary

of

Lo

ng

Bea

ch W

ater

Dep

artm

ent

Pro

ject

s

91

hatai
Typewritten Text
FY 18 Adopted CIP
hatai
Typewritten Text
City of Long Beach - Utilities
Page 95: FY 18 Adopted CIP Book - Long Beach, California

92

Page 96: FY 18 Adopted CIP Book - Long Beach, California

Pro

ject

Ince

pti

on

Fo

reca

stT

hro

ug

hF

Y 1

7A

do

pte

dat

FY

16

Est

imat

ed

FY

18

Co

mp

leti

on

Act

ual

sE

xpen

dit

ure

sB

ud

get

Ter

min

al P

roje

cts

Pie

rs D

/E/F

(Mid

dle

Har

bor)

$1,4

99,0

00$9

73,9

43$7

0,02

7$9

1,83

4T

ota

l Ter

min

al P

roje

cts

$1,4

99,0

00$9

73,9

43$7

0,02

7$9

1,83

4

New

Fir

e S

tati

on

s/F

ire

Bo

ats/

Po

rt S

afet

y an

d S

ecu

rity

Pro

ject

sN

ew F

ire S

tatio

ns /

Fire

Boa

ts /

Sec

urity

Pro

ject

s$1

86,8

45$7

2,08

2$1

3,41

4$1

3,22

1 T

ota

l Po

rt-w

ide

Sec

uri

ty &

Saf

ety

Pro

ject

s$1

86,8

45$7

2,08

2$1

3,41

4$1

3,22

1

Str

eets

, Bri

dg

es, &

Rai

lway

sG

eral

d D

esm

ond

Brid

ge R

epla

cem

ent

$1,4

15,4

92$8

73,3

67$1

91,0

86$2

14,9

87R

ail P

roje

cts

$1,0

09,7

09$1

30,1

58$2

8,80

9$1

3,03

4T

ota

l Str

eets

, Bri

dg

es, &

Rai

lway

s$2

,425

,201

$1,0

03,5

25$2

19,8

95$2

28,0

21

Mis

cella

neo

us

Env

ironm

enta

l Pro

ject

sN

/A [1

]N

/A [1

]$1

,992

$14,

406

Eng

inee

ring

Mis

cella

neou

s P

roje

cts

$502

,482

$87,

460

$41,

013

$56,

729

Por

t Inf

rast

ruct

ure

(Stre

ets,

Wat

er, S

torm

Wat

er, S

ewer

)$1

72,6

89$1

1,73

0$1

9,51

9$4

8,16

4In

form

atio

n Te

chno

logy

Pro

ject

sN

/A [1

]N

/A [1

]$2

,920

$4,1

65Fu

rnitu

re, F

ixtu

res,

and

Equ

ipm

ent [

2]N

/A [1

]N

/A [1

]$1

,575

$1,5

53T

ota

l Mis

cella

neo

us

Pro

ject

s$6

75,1

71$9

9,19

0$6

7,01

9$1

25,0

17

To

tal C

apit

al P

roje

cts

$4,7

86,2

17$2

,148

,740

$370

,355

$458

,093

*All

proj

ects

sta

ted

in m

illio

ns.

[1] O

nly

proj

ects

with

FY

201

7 es

timat

ed e

xpen

ditu

res

or a

n FY

201

8 bu

dget

ed a

mou

nt a

re s

how

n ab

ove.

[2] F

urni

ture

, Fix

ture

s, a

nd E

quip

men

t cat

egor

y is

par

t of H

arbo

r Dep

t's N

on-P

erso

nal B

udge

t and

is n

ot tr

acke

d cu

mul

ativ

ely

for a

ll ye

ars

Fis

cal Y

ear

2018

Cap

ital

Imp

rove

men

t P

rog

ram

Su

mm

ary

of

Har

bo

r D

epar

tmen

t P

roje

cts1

93

hatai
Typewritten Text
FY 18 Adopted CIP
hatai
Typewritten Text
City of Long Beach - Harbor
hatai
Typewritten Text
Page 97: FY 18 Adopted CIP Book - Long Beach, California

94

Page 98: FY 18 Adopted CIP Book - Long Beach, California

Pro

ject

Nam

eG

ran

t N

ame

Aw

ard

Am

ou

nt

14th

Str

eet P

ark

Exp

ansi

onLA

Cou

nty

Bon

ds D

iscr

etio

nary

Fun

ds20

0,00

0$

A

rter

ial S

tree

t Im

prov

emen

tsS

AF

ET

EA

-LU

899,

806

$

Bea

ch S

tree

ts M

idto

wn

Met

ro O

pen

Cyc

le B

each

Str

eets

190,

000

$

City

of B

ellfl

ower

Tra

ffic

Sig

nal I

nsta

llatio

n P

artn

ersh

ip25

,655

$

E

l Dor

ado

Duc

k P

ond

Rep

air

LA C

ount

y B

onds

Dis

cret

iona

ry F

unds

300,

000

$

El D

orad

o R

egio

nal P

ark

Res

troo

m R

ehab

ilita

tion

LA C

ount

y B

onds

Dis

cret

iona

ry F

unds

250,

000

$

Hou

ghto

n P

ark

AD

A Im

prov

emen

tsLA

Cou

nty

Bon

ds D

iscr

etio

nary

Fun

ds30

0,00

0$

I-

605

Sou

ndw

all

Met

ro25

0,00

0$

LE

D C

onve

rsio

n A

B-3

2 -

Cap

and

Tra

de F

unds

1,13

6,54

0$

Red

Car

Gre

enw

ay R

OW

Sou

thLA

Cou

nty

Bon

ds D

iscr

etio

nary

Fun

ds81

,000

$

S

easi

de P

art A

rtifi

cial

Tur

fC

omm

unity

Dev

elop

men

t Blo

ck G

rant

250,

000

$

Sea

side

Par

t Art

ifici

al T

urf

Sta

te P

arks

Pro

p 40

You

th S

occe

r60

0,00

0$

S

tear

ns P

ark

Com

mun

ity C

ente

r R

oof R

epai

rLA

Cou

nty

Bon

ds D

iscr

etio

nary

Fun

ds20

0,00

0$

S

tear

ns P

arn

Irrig

atio

n U

pgra

des

LA C

ount

y B

onds

Dis

cret

iona

ry F

unds

944,

000

$

Will

ow s

prin

gsP

ropo

sitio

n 84

924,

000

$

Wrig

ley

Gre

en B

elt D

evel

opm

ent

LA C

ount

y B

onds

Dis

cret

iona

ry F

unds

325,

000

$

To

tal

6,87

6,00

1$

Fis

cal Y

ear

2018

Cap

ital I

mpr

ovem

ent P

rogr

amG

rant

Fun

ding

Not

Iden

tifie

d in

CIP

Boo

k

Ple

ase

note

this

pag

e re

pres

ents

gra

nts

that

are

app

ropr

iate

d 10

/1/1

6 -

9/30

/17

and

not c

onsi

dere

d ne

w m

oney

(no

t app

ropr

iate

d du

ring

the

annu

al b

udge

t pre

para

tion

proc

ess)

.

FY

17 M

id-Y

ear

App

ropr

iate

d P

roje

cts

FY 18 Adopted CIP 95 City of Long Beach - Grant Funded Projects

Page 99: FY 18 Adopted CIP Book - Long Beach, California

Fis

cal Y

ear

2018

Cap

ital I

mpr

ovem

ent P

rogr

amG

rant

Fun

ding

Not

Iden

tifie

d in

CIP

Boo

k

FY

17 M

id-Y

ear

App

ropr

iate

d P

roje

cts

Pro

ject

Nam

eG

ran

tor

Ag

ency

Po

ten

tial

Aw

ard

Dat

eG

ran

t A

mo

un

tE

l Dor

ado

Duc

k P

ond

Res

tora

tion

San

A

ugus

t20

161,

754,

000

$

P

E R

OW

Sou

th

CA

Sta

te P

arks

/LW

CF

Aug

ust

2016

450,

000

$

Ana

heim

Cor

ridor

Saf

ety

Impr

ovem

ents

Cal

tran

sD

ecem

ber

2016

2,00

0,00

0$

Los

Coy

otes

Dia

gona

l Sig

nal I

mpr

ovem

ents

Cal

tran

sD

ecem

ber

2016

1,50

0,00

0$

Con

tinen

tal C

ross

wal

k U

pgra

des

Cal

tran

sD

ecem

ber

2016

250,

000

$

Ped

estr

ian

Cou

ntdo

wn

Sig

nal U

pgra

des

Cal

tran

sD

ecem

ber

2016

250,

000

$

Run

way

7R

-25L

FA

AS

epte

mbe

r20

1712

,881

,879

$

D

elta

Ave

nue

Bik

e B

oule

vard

Sta

te A

TP

Dec

embe

r20

181,

075,

105

$

C

ityw

ide

8-80

Con

nect

ions

Sta

te A

TP

Dec

embe

r20

186,

754,

000

$

A

ther

ton

Brid

ge a

nd C

ampu

s C

onne

ctio

nsS

tate

AT

PD

ecem

ber

2018

3,03

1,00

0$

Pro

ject

Nam

eG

ran

tor

Ag

ency

Po

ten

tial

Aw

ard

Dat

eG

ran

t A

mo

un

tA

rtes

ia G

reat

Bou

leva

rdM

etro

Sep

tem

ber

2020

6,00

0,00

0$

Gre

at 7

th S

tree

t Con

nect

ions

Met

roS

epte

mbe

r20

205,

200,

000

$

M

id-C

ity S

igna

l Coo

rdin

atio

nM

etro

Sep

tem

ber

2020

1,91

8,00

0$

Par

k or

Rid

eM

etro

Sep

tem

ber

2020

794,

000

$

15th

Str

eet B

icyc

le B

oule

vard

Met

roJu

ly

2018

1,00

0,00

0$

Long

Bea

ch B

lvd

Ped

estr

ian

Impr

ovem

ents

Met

roJa

nuar

y20

191,

700,

000

$

M

arke

t Str

eet P

edes

tria

n S

tree

tsca

peM

etro

Janu

ary

2020

3,20

0,00

0$

Par

king

Gui

danc

e &

Way

findi

ng S

yste

ms

Met

roO

ctob

er20

1790

0,00

0$

S

anta

Fe

Ave

nue

Syn

chro

niza

tion

Enh

ance

me

Met

roJa

nuar

y20

202,

000,

000

$

E

nhan

ced

Ped

estr

ian

Cro

ssin

gs (

HS

IP)

Met

roO

ctob

er20

1725

0,00

0$

W

illow

Str

eets

cape

Impr

ovem

ents

Met

roJa

nuar

y 20

182,

100,

000

$

T

ota

l55

,007

,984

$

Pot

entia

l Pro

ject

s to

be

fund

ed b

y G

rant

s

FY 18 Adopted CIP 96 City of Long Beach - Grant Funded Projects

Page 100: FY 18 Adopted CIP Book - Long Beach, California

Page Program Program Name

26 AP1030 Airport Terminal Area Improvement

27 AP1070 Airport Pavement Rehabilitation

90 GOBF Facility Work

90 GOCP Gas Control And Cathodic Protection

90 GOMB Billable Pipeline Work

90 GOMN Main Pipeline Replacement

90 GORM Gas Meter Replacement

90 GORSV Service Pipeline Replacement

77 PW2040 Convention Center Complex Refurb

61 PW3010 Park Bike Path Replacement

62 PW3020 Park Facility Reroofing

63 PW3040 Game Court Rehabilitation

64 PW3050 Rancho Los Alamitos

65 PW3060 Rancho Los Cerritos

66 PW3070 Park Acquisition & Development

67 PW3130 Tree Trimming ‐ Parks

68 PW3170 Game Field Upgrades

69 PW3220 Irrigation System Replacement

70 PW3240 Recreation Building Rehabilitation

71 PW3250 Restroom Rehabilitation

72 PW3300 El Dorado Park Rehabilitation

78 PW4100 Civic Center Complex Improvements

79 PW4140 Citywide Reroofing

43 PW4230 Prop A Transit Improvements

80 PW4240 General City Building Refurbishment

81 PW4370 Fire Facilities Modernization

82 PW4450 Facility Assessments

44 PW5050 Citywide Led Lighting

45 PW5062 Major And Secondary Highway (Arterial)

46 PW5080 Bridge Rehabilitation And Seismic Retrofit

47 PW5151 Residential Street Program

48 PW5244 Alleys

49 PW5390 Citywide Slurry Seal Program

50 PW5450 Ada Response Program

51 PW5500 Sidewalks/Curb Ramps

83 PW6200 Queen Mary Projects

88 PW7020 Storm Drain Pump Station Repair & Certification

89 PW7060 Storm Drain System & Water Quality Impro

33 PW8000 Colorado Lagoon

34 PW8170 Belmont Pool And Pier Improvements

35 PW8310 Beach Parking Lots Rehabilitation

36 PW8380 Alamitos Bay Area Improvements

Fiscal Year 2018 Capital Improvement Program

Index ‐ Numerical

FY 18 Adopted CIP 97 City of Long Beach - Index

Page 101: FY 18 Adopted CIP Book - Long Beach, California

Page Program Program Name

Fiscal Year 2018 Capital Improvement Program

Index ‐ Numerical

37 PW8400 Tidelands Critical Facility Repairs

52 PWT010 Sustainable Transportation Improvement

53 PWT110 Citywide Striping & Signage Program

54 PWT130 Neighborhood Traffic Mitigation

55 PWT190 Traffic & Pedestrian Signals

FY 18 Adopted CIP 98 City of Long Beach - Index

Page 102: FY 18 Adopted CIP Book - Long Beach, California

Fiscal Year 2018 Capital Improvement Program

Glossary AB2766 (Air Quality): This funding source was enacted to support programs that reduce air pollution from motor vehicles. Funds are collected by the Department of Motor Vehicle (DMV) and subvened to the South Coast Air Quality Management District (AQMD) for disbursement. The City receives these funds to implement programs and measures that reduce air pollution from motor vehicles mandated by the requirements of federal and state Clean Air Acts and the Air Quality Management Plan (AQMP). AB2928 (Traffic Congestion Relief): The State Assembly Bill that established legislation for the Traffic Congestion Relief Fund in the State Treasury for allocation of street and road funds to cities and counties for maintenance and reconstruction. This funding source was replaced in 2002 by the Transportation Congestion Improvement Act. See State Proposition 42. Americans with Disabilities Act of 1990 (ADA): A Federal law enacted to provide for the protection of individuals with disabilities. This protection ranges from prohibitions against discrimination in employment to specific requirements for modifications of public facilities and transportation systems. Airport Area Assessment District: The assessment district formed for the purpose of constructing upgrades in the airport area to improve traffic flow. The upgrades include street widening, grade separation, dedicated turn lanes, traffic signals, and signage. See Assessment District. Airport Capital: A sub-fund of the Airport Fund. The non-grant portion of the Airport Fund capital expenditures. See Airport Fund. Airport COPS: Certificates of Participation issued by the Long Beach Airport to fund capital improvements. See Certificates of Participation. Airport Fund: The fund designation used to account for revenues and expenditures applicable to the operation and maintenance of the Long Beach Airport and its leaseholds. The major revenue sources consist of revenues related to airport operations leases and grants. The Airport Fund is an Enterprise Fund. See Enterprise Fund. Airport Customer Facility Charges: A fee charged by car rental agencies on each rental transaction and passed on to the Airport to expend on a car

rental facility or transportation system between the rental facility and the terminal. Airport Passenger Facility Charges: The amount added to the passenger airline ticket to provide a funding source for airport improvements. Appropriation: An authorization granted by the City Council that permits officials to make expenditures and incur obligations for specific purposes. Assessment District: A separate local government entity formed to provide specific local public services. Assessment districts can be established to provide a single service such as sewage treatment or to provide multiple services such as police and fire protection, parks and recreation facilities, and water distribution systems. Property owners within the assessment district’s boundary pay into the district in direct proportion to the benefits or services they receive. Beginning Balance: Unspent funds carried over from prior fiscal years that become part of the FY 18 appropriation. Bond: A method of financing long-term debt, issued by a government or private corporation, which bears interest. Budget: A plan of anticipated expenditures and revenue for a certain period. California Energy Commission: California’s primary energy policy and planning agency. Caltrans: The State of California Department of Transportation. Caltrans administers both U.S. Department of Transportation grants and its own grants for improvements to streets and highways. Caltrans Construction Cooperative Grant: A grant issued by Caltrans for the City of Long Beach to provide various services in connection with the State’s Interstate 710 construction project. Capital: Assets that add to the long-term net worth of the City. Capital Improvement: Construction or major repair of City-owned buildings and infrastructure which helps meet health, safety, and legal concerns and mandates, prolongs the life of City assets or avoids or minimizes future repair costs, benefits the community and supports goals articulated in the City

FY 18 Adopted CIP 99 City of Long Beach

Page 103: FY 18 Adopted CIP Book - Long Beach, California

of Long Beach Strategic Plan, has potential to generate operating savings or increase productivity, and is consistent with the City’s General Plan. Certificates of Participation (COPS): Interest-bearing debt instruments sold to investors by a non-profit agency to finance construction. The agency then leases the facility and uses the revenues to repay the debt. CFD No. 5 Bond: See Community Facilities District (CFD) No. 5 Bond. CFO: Chief Financial Officer. CIP Category: A group of similar programs organized into a major section of the CIP budget document. Civic Center 1997A Bond: A bond issued in 1997 by the Long Beach Finance Authority to fund various capital improvement projects in the Civic Center Complex. Civic Center Capital: A sub-fund of the Civic Center Fund. The non-bond portion of the Civic Center Fund capital expenditures. The major ongoing revenue source to the Fund is rental payments from the departments occupying the facilities. Civic Center Fund: The fund designation used to account for revenues and expenditures applicable to the operation and maintenance of the City Hall Complex and the Main Library Complex. The major ongoing revenue source to the Fund is rental payments from the departments occupying the facilities. Coastal Conservancy Grant: State bond proceeds used to provide grant that protect coastal or ocean resources from development, natural or economic conditions. Established in 1976, the California Coastal Conservancy is funded largely by State bonds. Community Development Block Grant (CDBG): Federal entitlement funds (based on various criteria) received by the City of Long Beach from the U.S. Department of Housing and Urban Development (HUD) for the purpose of benefiting low and moderate-income areas and disabled residents. Community Facilities District (CFD) No. 5 Bond: The 2000 Special Tax Bonds issued to finance the acquisition and construction of certain street and other public improvements for the Long Beach Towne Center.

Construction Support: Engineering work during the construction process, which ensures that projects are constructed in accordance with design parameters and specifications. Primary construction engineering functions include construction, inspection, laboratory services, field surveys, and design plan updates or interpretation. Contract Award Process: Procurement preparation for Council award and all pertinent contract documentation prior to the initiation of construction. Debt Service: The principal and interest payment on borrowed money according to a predetermined schedule. Department of Boating and Waterways (DBAW): A State agency that provides grants and loans for improvements in the Tidelands areas of the City. Design: The process of identifying project options, developing a project scope, conducting feasibility analyses, and creating plans, specifications, and estimates for a capital improvement. Primary design engineering functions include drafting, design, development of specifications, and traffic engineering. Economic Development Administration (EDA): Created by Congress pursuant to the Public Works and Economic Development Act of 1965 to generate new jobs, retain existing jobs, and stimulate industrial and commercial growth in economically distressed areas of the United States. Edison Grant: A grant received from Edison International under the LED Traffic Signal Rebate Program to provide for more energy efficient traffic signals. Environmental Enhancement and Mitigation Program (EEMP) Grant: Annually, the EEMP offers grants for projects to mitigate the environmental impacts caused by new or modified state transportation facilities. These grants are offered to local, state, and federal governmental agencies. The EEMP was established in 1989. El Dorado Regional Park Development Grant: A National Park Service federal grant administered by the State Department of Parks and Recreation to upgrade the El Dorado Park campsites. Enterprise Fund: The fund designation used to account for City operations that are financed and operated in a manner similar to private business enterprises. The intent of the City in using this type of fund is to determine that the costs (expenses, including depreciation) of providing these services to the general public on a continuing basis are financed

FY 18 Adopted CIP 100 City of Long Beach

Page 104: FY 18 Adopted CIP Book - Long Beach, California

or recovered primarily through user charges. The City’s Enterprise Funds include Airport, Development Services, Gas, Refuse/ Recycling, Sewer, Towing, Water, and SERRF. Environmental Protection Agency (EPA) Grant: Federal funds used to address environmental issues for pre-approved projects. FAA: Federal Aviation Administration. FAA AIP Program Grant: An Airport Improvement Program (AIP) grant from the FAA to construct capital improvements for pre-approved projects at the Long Beach Airport. FEMA: Federal Emergency Management Agency. Provides funds, services, hiring, and post-disaster assistance for response and recovery in the event of natural disasters. FEMA HMGP: The FEMA Hazard Mitigation Grant Program. The Governor’s Office of Emergency Services (OES) administers this program in California. Fiscal Year (FY): A designated time frame which identifies the beginning and ending dates for recording an entity’s financial transactions. The fiscal year for the City of Long Beach is from October 1 through September 30. Fleet Capital: A sub-fund of the Fleet Fund. It is comprised of the non-grant and non-bond portion of the Fleet Fund capital expenditures. See Fleet Fund. Fleet Fund: The fund designation used to account for revenues and expenditures applicable to the City’s operation, maintenance, and timely replacement of the City’s fleet of vehicles and equipment. There are two major sources of ongoing revenue for the Fund, Fleet Services charges to the City departments and land rental payments. Fund: An accounting entity with a self-balancing set of accounts recording financial resources and transactions for specific activities. Fund Type: A classification term used to group funding sources into specific categories of government functions or services. Funding Source: The specific source of appropriated funds.

FY 18 New Budget: The new allocation of monies that is part of the FY 18 budget appropriation. Gas Capital: A sub-fund of the Gas Fund. This is the non-grant portion of the Gas Fund capital expenditures. See Gas Fund. Gas Fund: The fund designation used to account for revenues and expenditures applicable to activities associated with the transmission and distribution of natural gas to the City’s users. The Gas Fund is an Enterprise Fund. See Enterprise Fund. Gasoline Tax Street Improvement Capital: A sub-fund of the Gasoline Tax Street Improvement Fund. This is the non-grant portion of the Gasoline Tax Street Improvement Fund. Gasoline Tax Street Improvement Fund: The fund designation used to account for revenues and expenditures of gasoline tax funds apportioned under the State Streets and Highways Code, as well as other sources dedicated to transportation improvements. Expenditures may be made for any street-related purpose on the City’s system of streets, including maintenance. In addition to the gasoline tax revenue from the State of California, other transportation-related revenue sources include funding from the Federal Transportation Equity Act for the Twenty-First Century (TEA-21) and the State Traffic Congestion Relief Fund and State Proposition 42 (AB2928). General Capital Projects Fund: The fund designation used to account for the all-years Capital Improvement Program with multiple funding sources, including the General Fund that pays for the City’s general projects. General Fund: The fund designation used to account for financial resources applicable to the general governmental operations of the City of Long Beach. The largest sources of revenue for the General Fund are property taxes, sales taxes, utility user’s taxes, and motor vehicle license fees. Grants: Disbursement of assets from another government agency or entity to be expended for a pre-approved purpose, activity, or facility. Highways-Through-Cities Grant (HTC): A Los Angeles County financial aid program to assist Cities with their major and secondary highway rehabilitation projects. This is a discretionary program based on each Supervisor’s decision regarding which projects to assist in the cities within their district. Financing is provided by each County Supervisor District’s Road Construction program allocation of State gas tax funding.

FY 18 Adopted CIP 101 City of Long Beach

Page 105: FY 18 Adopted CIP Book - Long Beach, California

HBRR: Highway Bridge Rehabilitation and Replacement Program. See TEA-21 HBRR. Health Fund: The fund designation used to account for revenues and expenditures applicable to the support of the operations of the Department of Health and Human Services. HVAC: Heating, ventilation, and air conditioning. Internal Service Fund: The fund designation used to account for the finance of goods and services provided by one City department to another on a cost-reimbursement basis, e.g., computer services, fleet services, etc., including depreciation. ISTEA: Intermodal Surface Transportation Efficiency Act (of 1991). The Transportation Equity Act for the Twenty-First Century (TEA-21) superseded this funding source in 1998. The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) superseded TEA-21 in 2005. The Moving Ahead for Progress in the 21st (MAP-21) Century Act supercedes SAFETY-LU in 2012. LED: Light Emitting Diode. A component of an electronic display. Long Beach and Los Angeles Harbor Contributions: Monies received from the Long Beach and Los Angeles Harbors to fund various street improvements to improve the traffic flow out of the Long Beach and Los Angeles harbor areas. Los Angeles County Grant: Grants issued by the County of Los Angeles to the City of Long Beach to fund various capital improvement projects. MAP-21: The authorized bill that governed United States federal surface transportation spending. The bill was signed into law by President Bush on August 10, 2005 and expired on September 30, 2009 but Congress renewed its funding formulas ten times after its expiration date, until replacing the bill with Moving Ahead for Progress in the 21st (MAP-21) Century Act in 2012. The $286.4 billion measure contained a host of provisions and earmarks intended to improve and maintain the surface transportation infrastructure in the United States, including interstate highway system, transit systems around the country, bicycling and pedestrian facilities, and freight rail operations. Marina Capital: A sub-fund of the Marina Fund. The non-grant and non-loan portion of the Marina Fund capital expenditures. See Marina Fund. Marina Fund: The fund designation used to account for the revenues and expenditures

applicable to the operation, maintenance, and development of the City’s marinas in the Tidelands area. Measure A: In June 2016, Long Beach voters approved Measure A, a Transaction and Use Tax. The Measure added a transactions and use (sales) tax on the sale and/or use of all tangible personal property sold at retail in the City for a 10 year period. Measure D: In November 2010, Long Beach voters approved Measure D, a City Charter amendment that removed control of oil properties and all oil operations in the Port of Long Beach from the Long Beach Board of Harbor Commissioners, giving the authority instead to the Long Beach City Council. Measure D transfers 5% of the port's gross earnings to Tidelands Operating Fund. Measure R: A ballot measure proposed by the Los Angeles County that was passed in 2008. This increases the county sales tax by one half-cent to fund transportation projects. Collection of Measure R sales tax revenue commenced on July 1, 2009. MTA Grant: State and Federal funding awarded to the City of Long Beach through the Metropolitan Transportation Authority (MTA) “Call for Projects”. Non-Point Source Pollution (NPS): Water pollution which originates from many different sources rather than one specific, identifiable source. NPS occurs when rainfall, irrigation waters, and water habits (washing cars/pets) create a flow over land and impervious surfaces and are deposited into the receiving waters via the storm drain system. Park Impact Fees: Fees collected on new residential development to mitigate impact on Parks, Recreation and Marine facilities for the purpose of assuring that the park land and recreational facility standards established by the City of Long Beach are met with respect to the additional needs created by such development. Program: A specific undertaking for the delivery of a capital improvement including procurement, construction or installation of facilities or related equipment. Proposition A: A source of funding from the Los Angeles County sales tax of one-half cent used exclusively to construct, improve, and maintain mass transit services and facilities. See Transportation Fund. Proposition 1B (Transportation Bond): Funding derived from Budget Bill: SB78 and Trailer Bill: SB88 and implemented as “The Highway Safety, Traffic

FY 18 Adopted CIP 102 City of Long Beach

Page 106: FY 18 Adopted CIP Book - Long Beach, California

Reduction, Air Quality, and Port Security Bond Act of 2006” passed by the voters in November 2006. This authorized the state to sell approximately $20 billion of general obligation bonds to fund transportation projects to relieve congestion, improve the movement of goods, improve air quality, and enhance the safety and security of the transportation system. Proposition C: A source of funding from the Los Angeles County sales tax of one-half cent used to construct, improve, and maintain mass transit services and facilities. This funding also provides an expanded list of eligible project expenditures including: congestion management programs, bikeways and bike lanes, street improvements supporting public transit service, and pavement management system projects. See Transportation Fund. Proposition C MTA Grant: See MTA Grant. Proposition 42: See State Proposition 42. Public Safety Facilities Capital Improvements Lease Revenue Bond: The 2002 bond issued by the Long Beach Finance Authority to finance public safety facility capital improvement projects. Rainbow Harbor Area Fund: The fund designation used to account for revenues and expenditures applicable to the operation, maintenance, and development of the City’s Rainbow Harbor area. Rainbow Harbor Capital: A sub-fund of the Rainbow Harbor Area Fund. The non-grant and non-loan portion of the Rainbow Harbor Area Fund capital expenditures. Safe Routes to School Program: Administered by Caltrans, this 2003 program provides state and federal funds for projects that protect the safety of children traveling to and from school. Projects were developed through collaboration with the Long Beach Unified School District. SERRF Refunding 03 Bonds: The 2003 refunding bonds for the finance of the construction of the Southeast Resource Recovery Facility (SERRF). Sewer Capital: A sub-fund of the Sewer Fund. The non-grant portion of the Sewer Fund capital expenditures. See Sewer Fund. Sewer Fund: The fund designation used to account for revenues and expenditures applicable to the operation, maintenance, and replacement of the City’s sewer system in a cost effective manner. The major sources of revenue include a water usage charge based on water that will enter the sewer

system and a service charge based on the size of the customer’s water meter. The Sewer Fund is an Enterprise Fund. Skylinks Golf Course 03 Bonds: The 2003 bond issued by the Long Beach Finance Authority to finance improvements to the Skylinks Golf Course. South Coast Air Quality Management District (SCAQMD): Agency responsible for preparation of the state implementation plan (SIP) applicable within its boundaries, adoption of control regulations for stationary sources, and implementation of indirect source and transportation control measures. State Bond Act of 1988: The 1988 bond issued by the State of California to fund various parks and recreation projects. State Grant – California Endowment Fund: State funding awarded to the City of Long Beach to establish a Latino Diabetes Prevention and Management Program. State Grant – Energy Commission: Funding authorized by Assembly Bill 970 and administered by the California Energy Commission (CEC). These funds were used to purchase and install light-emitting diode (LED) traffic signals and battery back up systems. State Grant – Public Libraries: Funding for new library facilities provided under the California Reading and Literacy Improvement and Public Library Construction and Renovation Bond Act of 2000. State Implementation Plan (SIP): The 1970 Clean Air Act requires each state to develop a state implementation plan to attain National Ambient Air Quality Standards (NAAQS) by the applicable attainment deadlines. SIPs must be approved by the Federal Environmental Protection Agency. State Library Bond: California Reading and Literacy Improvement and Public Library Construction and Renovation Bond Act of 2000 (Proposition 14). The bond proceeds are designated for site acquisition, new building construction, remodeling, renovation, and upgrading electrical and telecommunications systems.\ State Proposition 12 Bond: Funding derived from Assembly Bill 18 and Senate Bill 1147 and implemented as the Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Act of 2000. The program includes entitlement (funding for cities based on population) and competitive grants for improvement of park land and facilities.

FY 18 Adopted CIP 103 City of Long Beach

Page 107: FY 18 Adopted CIP Book - Long Beach, California

State Proposition 13 (Costa-Machado Water Act of 2000) - Coastal Non-point Source Program: A source of funding from the State Water Resources Control Board (SWRCB) for the Los Angeles River and Colorado Lagoon California Beaches Initiative projects. State Proposition 40 Bond: Funding derived from the California Clean Water, Clean Air, Safe Neighborhood Parks, and Coastal Protection Act of 2002. Proposition 40 provides both entitlement and competitive grant programs to California cities for improvement of community recreation areas. State Proposition 40 Water Board Grant: Funding derived from the SWRCB from the Clean Beaches Initiative. This grant was obtained for the remediation of the Colorado Lagoon. State Proposition 42: Funding derived from Assembly Bill 2928 and implemented as State Transportation Congestion Improvement Act, passed in 2002. This requires sales and user taxes on motor fuels to be used for public transportation, city and county road repairs and improvements, and state highway improvements. State Proposition 46 Jobs Housing Balance Incentive Grant: The Housing and Emergency Shelter Trust Fund Act of 2002. This authorized the award of a one-time $25 million grant for cities and counties meeting the terms and conditions of the program for the 2001 calendar year. The City obtained this grant as part of the matching fund requirement for the MacArthur Park Branch Library project. State Transportation Improvement Grant: Federal funds from the Department of Transportation given to the State of California for major transportation projects. This funding has been used primarily for Citywide street repair and improvements. State Water Bond 2000: Funding derived from the Safe Drinking Water, Clean Water, Watershed Protection, and Flood Protection Act of 2000. The funds are administered by the SWRCB for non-point source pollution control, watershed management plan development and implementation, wastewater recycling, and the protection of various targeted watersheds. TDA-SB821: Transportation Development Act funding from sales tax receipts as specified in the California Streets and Highways Code. The TDA SB-821 is the Senate Bill that established legislation for the Transportation Development Act.

Transportation Equity Act for the Twenty-First Century (TEA-21): Enacted on June 9, 1998, this federal legislation authorizes the Federal surface transportation programs for highways, highway safety, and transit. TEA-21 provides states with the flexibility to set their own transportation priorities and to explore creative financing mechanisms within certain guidelines. TEA-21 supersedes the 1991 ISTEA program. TEA-21 HBRR: Highway Bridge Replacement and Rehabilitation funds used specifically for bridges within the city limits. See TEA-21. TEA-21 MTA Grant: See MTA Grant. Temple/Willow Bond: Bonds issued by the City to fund the construction of the new Fleet and Towing facility located on the corner of Temple Avenue and Willow Street. Tidelands Operations Capital: A sub-fund of the Tidelands Operations Fund. The non-grant and loan portion of the Tidelands Operations Fund capital expenditures. See Tidelands Operations Fund. Tidelands Operations Fund: The fund designation used to account for revenues and expenditures applicable to the operations, maintenance, and development of the convention center and beaches in the Tidelands area. Traffic Mitigation Program: The goal of the Program is to relieve arterial congestion, accommodate planned growth, and implement specific programs including street widening, left turn pockets, parking prohibition, off-street replacement parking, and traffic signal synchronization. The City receives the monies from the payment of Transportation Improvement Fees. The Traffic Mitigation Program monies are appropriated in the Capital Projects Fund. Transactions and Use Tax (Measure A): Additional sales tax added for transactions on the sale of all tangible personal property sold at retail in the City for a 10 year period starting in January of 2017. Transportation Development Act: The Transportation Development Act TDA SB-821 of 1971, law provides funding to be allocated to transit and non-transit related purposes that comply with regional transportation plans. Funding comes from sales tax receipts as specified in the California Streets and Highways Code. Transportation Fund: The fund designation which accounts for revenues and expenditures applicable to the City’s share of an additional one and a half

FY 18 Adopted CIP 104 City of Long Beach

Page 108: FY 18 Adopted CIP Book - Long Beach, California

percent sales tax. The tax is collected by the County of Los Angeles to finance transportation projects: Propositions A, 1B, C and Measure R. Transportation Improvement Fees: Fees collected from land developers to mitigate cumulative traffic impacts. Sometimes referred to as Transportation Development Fees. See Traffic Mitigation Program. TSM-State Grant: Traffic System Management funds administered by the California Department of Transportation (Caltrans) for traffic-related improvements. Receipt of the grant funds is contingent upon Caltrans’ approval of the proposed projects. Upland Oil Revenue Fund: An oil fund used to account for proceeds from oil operations north of the mean high tide in Long Beach, oil fields of working interest of Signal Hill east and west, Recreation Park on the north side of 7th Street and Marine Stadium. Revenues are used to spur investment opportunities in one-time capital improvements, budget requirements, and essential needs. The Upland Oil fund will allow for important contributions to public safety, infrastructure, libraries, parks, recreation, and technology. Urban Area Security Initiative (UASI): A grant awarded by the U.S. Department of Homeland Security to the City of Long Beach to fund planning, equipment, training, and personnel costs associated with the protection of critical infrastructure in and around the Long Beach Urban Area. Water Fund: The fund designation used to account for revenues and expenditures used to meet the water needs of the citizens of Long Beach with a dependable supply of high-quality water at a reasonable cost. The major sources of revenue include a volumetric charge for water used by customers and a service charge based on the size of the customer’s water meter. The Water Fund is an Enterprise Fund. See Enterprise Fund. West Long Beach Business Park Assessment District: The assessment district established to fund various street improvements in the West Long Beach area. See Assessment District.

FY 18 Adopted CIP 105 City of Long Beach

Page 109: FY 18 Adopted CIP Book - Long Beach, California