Furthermore, I have communicated with Mrs. Cindy Welsh ...

13
M l Ih cA L essw'€: 9 January 22, 2018 Mr. Steph Pahnateer City Clerk City of' T' immins 220 Algonquin Blvd. E. Timmins, ON P4N I B3 Mr. Palmateer, Maison funeraire Lessard- Stephens Funeral Horne is "I" immins' longest established funeral horne, having served the community and surrounding areas for over 95 years. Since its humble beginnings in 1723 with Mr. Sarnuel Walker, followed by Mr. John Stephens' keen sense of entrepreneurial skills, our funeral home has continuously strived to serve its families with the upmost respect and dignity they deserve. In my 30- plus years of experience as a funeral director, I have had the opportunity to observe and follow the evolution of the funeral industry. Families' needs have evolved significantly over the last two decades. The trend in the industry turned to cremation as a disposition alternative. Our business statistics show that 20 years ago, the cremation rate was 30%; 10 years ago, 50%, and currently 80%. This demonstrates a substantial increase in the demand for cremation, which we predict will continue to rise in the years to came. T' o better serve our community and surrounding areas, Maison fun6raire Lessard- Stephens Funeral Home is in the planning and application stage of obtaining approval to install and operate a crematorium within the City of Timmins. EK Cillin & Associates Inc., all Engineering firm from Stratford, ON, was hired to conduct a. Preliminary FCA Feasibility Assessment for 34 Elm Street. South in November 2017. The purpose of the assessment was to verify if this location complied with noise and air emissions for a crernator according to the Ministry of the Environment. Attached is the report from EK C_« illin & Associates which states that this site has preliminary approval for a cremator. Furthermore, I have communicated with Mrs. Cindy Welsh, Manager of Planning for the City of'"T" immins, in regards to our plans for a cremator at 34 Elm St. South. She has confirmed that according to the city by- laws, the proposed location meets the proper zoning f'or' such an operation. 21 me Eh-n Sud, ' nmmins ( Ontario) tl' 411^4 1M - 11 l:_ hn yak. Vii;. nrnmins, onr . ario F141" J ° M4 705- 2684, 188 - Tc.[ u¢_ wc- Fa / O' a 264 , 14( QbsI v . l uNur^' ble I ate wuu a kr

Transcript of Furthermore, I have communicated with Mrs. Cindy Welsh ...

Page 1: Furthermore, I have communicated with Mrs. Cindy Welsh ...

M l Ih cA L essw'€:9

January 22, 2018

Mr. Steph Pahnateer

City ClerkCity of' T' immins220 Algonquin Blvd. E.

Timmins, ON P4N I B3

Mr. Palmateer,

Maison funeraire Lessard- Stephens Funeral Horne is "I"immins' longest establishedfuneral horne, having served the community and surrounding areas for over 95 years. Since itshumble beginnings in 1723 with Mr. Sarnuel Walker, followed by Mr. John Stephens' keen senseof entrepreneurial skills, our funeral home has continuously strived to serve its families with theupmost respect and dignity they deserve.

In my 30- plus years of experience as a funeral director, I have had the opportunity toobserve and follow the evolution of the funeral industry. Families' needs have evolvedsignificantly over the last two decades. The trend in the industry turned to cremation as adisposition alternative. Our business statistics show that 20 years ago, the cremation rate was30%; 10 years ago, 50%, and currently 80%. This demonstrates a substantial increase in thedemand for cremation, which we predict will continue to rise in the years to came.

T' o better serve our community and surrounding areas, Maison fun6raire Lessard-Stephens Funeral Home is in the planning and application stage of obtaining approval to installand operate a crematorium within the City of Timmins.

EK Cillin & Associates Inc., all Engineering firm from Stratford, ON, was hired toconduct a. Preliminary FCA Feasibility Assessment for 34 Elm Street. South in November 2017.The purpose of the assessment was to verify if this location complied with noise and airemissions for a crernator according to the Ministry of the Environment. Attached is the reportfrom EK C_«illin & Associates which states that this site has preliminary approval for a cremator.

Furthermore, I have communicated with Mrs. Cindy Welsh, Manager of Planning for theCity of'"T" immins, in regards to our plans for a cremator at 34 Elm St. South. She has confirmedthat according to the city by- laws, the proposed location meets the proper zoning f'or' such anoperation.

21 me Eh-n Sud, ' nmmins ( Ontario) tl' 411^ 4 1M - 11 l:_ hn yak. Vii;. nrnmins, onr . ario F141" J ° M4

705- 2684,188 - Tc.[ u¢_wc- o/ Fa / O' a 264 , 14(QbsI

v . l uNur^'ble I ate wuu a kr

Page 2: Furthermore, I have communicated with Mrs. Cindy Welsh ...

I hereby request from the City of Timmins, a written approval in support of theinstallation of a cremator at the proposed location, as required by the Funeral, Burial andCremation Set-vices Act, 2002, Section 83( 3). Your letter along with the application will then besubmitted to the Ministry of' Environment for the Licensing required to move forward with thisproject.

I thank you in advance for your attention to this matter. Please do not hesitate tocommunicate with me if you have any questions or require more information regarding myrequest.

Respectfully yours,

J

Michel C. Lessard

Funeral Director/Owner/Manager

Maison fun6raire I..,essard- Stephens Funeral Home Inc.

705- 268- 4488

c. c. Mayor Steve Black

Page 3: Furthermore, I have communicated with Mrs. Cindy Welsh ...

356 Ontario Sl , Suite. 362, Stratford, Owario N5A 7X6

Bus: 519. 662 3819 or 1388. 77' 1. 67,54 Fax: 519, 662, 659` 1Email: Web, ite: www.ekginc. com

00 We trike die, RISK out( W MAP

January 17, 2018

Michel Claude Lessard

Maison Fun6raire Lessard- Stephens Funeral Home Inc.21 Elm Street South

Timmins, OntarioP4N 1W4

705) 268-4488

RE: Preliminary ECA Feasibility Assessment, 34 Elm Street, Timmins, Ontario

Dear Michel:

EK Gillin & Associates Inc. ( EKG) was retained by Maison Fun6raire Lessard- StephensFuneral Home Inc. ( Lessard- Stephens), to conduct a Preliminary ECA FeasibilityAssessment for the property at 34 Elm Street Street South, Timmins. Lessard- Stephensis looking for a location to install a cremator for the purposes of incinerating humanremains. The purpose of the assessment is to determine the feasibility of obtaining anECA for such a facility with respect to air emissions, noise impact and zoning.

The site for the proposed activities is located at 34 Elm Street South, Timmins, ON. Thissite is zoned as EA- GC General Commercial and is mostly surrounded by commercialzoning. There is an existing building onsite. The cremator will be the primary use of thisbuilding.

The main funeral home services site is located across the street at 21 Elm Street South.

There are two noise sensitive receptors in the area. The closest is a house located to

the east, about 18m from the center of the property. The second is a hotel located to theNW, about 60m from the center of the property.

E. K. Gillin & Associates Inc.

Page 4: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard- Stephens EKG Prniprnt 18- 21- 009

1. 0 BACKGROUND

1. 1 Air Emissions

Air Emissions are regulated at the provincial level. Section 9 of the Environmental

Protection Act ( EPA) forms the basis for the Air and Noise Approval Program in Ontario.Section 9 requires companies to obtain an approval before construction, alteration,

extension or replacement of any equipment or structure that may emit or from whichmay be emitted a contaminant into the natural environment, other than water. Approvalis also required for the ongoing operation of any equipment that may discharge acontaminant to the atmosphere. The wording of Section 9 is broad and as a result, mostindustrial processes or modifications to industrial processes and equipment require thesubmission of an application for an Environmental Compliance Approval ( ECA) unless

explicitly exempted. Section 194 of the EPA provides an exception to ECA requirementsif the equipment was in place prior to June 29, 1988; however, the MOECC has re-

examined this issue and determined that approvals can be issued for existingequipment installed prior to this date. This determination by the MOECC now facilitatessite-wide approvals to capture all equipment for approval.

O. Reg. 524/98 exempts fuel- burning equipment where the total thermal input of all fuel-burning equipment used to provide comfort heating in the building is less than 1. 58million kilojoules per hour. Other exemptions include any equipment, apparatus,

mechanism or thing that is used for the transfer of outdoor air into a building or structurethat is not a cooling tower, and the ventilation of indoor air out of a space/ room wherethe mechanism does not discharge any contaminant produced by the activities ( withinthe space/ room) other than heat or noise.

Air quality and atmospheric emissions are addressed through air contaminant point-of-impingement ( POI) concentration standards and air pollution dispersion algorithms. POIis defined as the point where airborne emissions from a facility come into contact with alocation beyond the property line. Air dispersion models acceptable to the MOECC maybe used to predict contaminant POI concentrations. The MOECC' s Standards

Development Branch has released a publication entitled " Summary of Standards andGuidelines to support Ontario Regulation 419105 — Air Pollution — Local Air Quality".This publication outlines all of the applicable standards and guidelines that govern POI

standards in Ontario. According to MOECC representatives, POI limits have been set sothat, in theory, if these limits are met, then the AAQC will also be met.

E. K. Gillin & Associates Inc. 2

Page 5: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard- Stephens EKG Project 18- 21- 009

In July 2005 " Ontario Regulation 419/05 Air Pollution — Local Air Quality", was published

and took effect November 30, 2005. This regulation revokes and replaces Ontario

Regulation 346 General —Air Pollution and introduces:

New effects- based air standards with variable averaging times;New air dispersion models;

A new risk- based decision making process;Outlines the required content of Emission Summary and Dispersion ModelingESDM) reports; and,

Outlines the circumstances under which a person could request an alteration to astandard set out for a contaminant.

1. 2 Noise Emissions

Noise is considered a contaminant under the EPA. As such, an ECA is required forequipment that generates noise under Section 9 of the EPA. Facilities that emit noise

must conduct a noise screening or acoustic assessment that demonstrates compliance.Noise screenings apply a minimum separation distance that a facility must be awayfrom a nearest noise sensitive receptor. This ' minimum separation distance' is

determined by a facility' s NAICS code, the class of neighbourhood as well as the typesof activities that occur at the facility. All facilities that do not meet the minimum

separation distance as determined in the noise screen process must complete a more

detailed acoustic assessment in order to validate that they are in compliance with theministry guidelines.

Acceptable noise levels in residential and recreation areas are determined as outlined inthe MOECC Publication " NPC-300 Environmental Noise Guideline" ( NPC- 300).

1. 3 Zoning

Generally, restrictions for areas that are zoned for industrial uses are minimal. Not allindustrial zones permit the same land uses and specific industrial designations haveimposed restrictions. Commercial zoning designations are more restrictive than

industrial zoning. Often times many types of industrial processes are prohibited frombeing installed in these zones. In many instances, exemptions or even rezoning arerequired prior to installation of industrial processes. The legislation that governs zoning

for the City of Timmins is By- law No. 2001- 7100.

E. K. Gillin & Associates Inc. 3

Page 6: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard- Stephens EKG Project 18- 21- 009

2. 0 COMPLIANCE ASSESSMENT

2. 1 Air

Air dispersion modelling was conducted using US EPA AERMOD. The assessment wasbased on the specifications of the proposed unit and details of the surrounding area,

The location of the cremator stack was chosen where it would be likely to fit well withinthe building. Also, the presence of HVAC and unit heaters were also modelled.

The results of the modelling show compliance with the limits imposed by O. Reg.419/05. A full Emission Summary and Dispersion Modelling Report ( ESDM) can be

developed when the proponent wishes to apply for an ECA.

2. 2 Noise

Noise modelling was conducted using SoundPlan 4. 0 noise modelling software. Thesoftware employs calculations specified in ISO 9613- 2: 1996, which is accepted as theindustrial noise standard for demonstrating compliance in Ontario.

The output from the model was compared to the limits in the NPC- 300 Guideline anddemonstrate compliance with the applicable limits.

2. 3 Zoning

As indicated above the zoning for the proposed incinerator location is EA-GC - General

Commercial.

As described by By- Law No. 2001- 7100, there are two types of activities which includecremators in their descriptions. These two types of activities are presented below.

Funeral Home

Means a building or part of a building wherein undertaking services are offeredand may include subsidiary activities such as the sale of caskets and funeralaccessories, memorial services, crematorium, provided such activities are clearly

secondary and incidental to the main undertaking service.

Cemetery

Means a cemetery within the meaning and as regulated by the Cemeteries Actand may include a crematorium, mausoleum and columbarium.

E. K. Gillin & Associates Inc. 4

Page 7: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard- Stephens EKG Pro`ect 18- 21- 009

A Funeral Home, as described in the by- law, is a permitted land- use for the zoningdesignation EA- GC — General Commercial. However, according to the by- law, thecrematorium would have to be the secondary activity at the site and not the primaryactivity. The proponent will require written permission from the municipality to operate inorder to receive a license for a cremation facility through the BAO.

E. K. Gillin & Associates Inc.

Page 8: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard-Stephens EKG Pro ect 18- 21- 009

3. 0 CONCLUSIONS AND RECOMMENDATIONS

A summary of the air and noise results can be found in Appendix A. From the results ofthe air and noise assessment it is likely that the facility will be able to meet the provincialrequirements for the installation of a cremator facility at the site referenced above.

The proponent will also require written permission from the city to engage in theproposed activity on the site.

EX. Gillin & Associates Inc. would like to thank those involved in this survey. Shouldanyone wish additional information regarding this report, please contact us at your

convenience.

Spencer Bannon B. EngEnvironmental Consultant

E. K. Gillin & Associates Inc. 6

Page 9: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard- Stephens EKC Pro*ect 18- 21- 009

APPENDIX A

Results Tables

E. K. Gillin & Associates Inc. 7

Page 10: Furthermore, I have communicated with Mrs. Cindy Welsh ...

m

co cnCD rn

o"

m

ur N = to >

C:ry b

ar-

a -o N d p O `" '? C O CY crN CU N 0)

ro m - cry to 3 a cn Cr to ctr cu

v nr, nr — .0ns

m ro cu mR

0 a

0 CD CD m

x 3 Crcn

x cp ocin cin

z Ch

an

X.

rn m31

CDm o ro ti

r

rom a C7nr

m3>

p p Z, . A m Cn m 4 pP C oc P W W A CY C17 A A [ C Js C Cw J+ Cn 0

orn N ca ( o ca , a c o foo U, crCr

c) 7> 0 b 7> b o ( o is o o w > cn W W - 4

cn co cc> N N co o W -- r

cry

Cri Cn N 0 (3) C7 w t73 W CCr J N o

J -+ - b 6' UJ CO cTi W 00 C%7 Co C, M, W -+ i "n"1

C. w Co + lb A C7 o O tC7 W W fn K15 W w Ut I Cb CY5 c Cf7 W Cr3 --+ W W - 4ti V «wn : Slti *(

J ` tel is OS N N Cn N N N - fC7 CCr -+ d0 CA CJi w W W ` J W do ».•. - A ...•. CS Ji -• Cr Ctr ,"mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm

L oNN) W

44c bobbb0000 "obo 0000bbo

CD - 4 - MMc77 N N w ` J N N - I - 1 - J Cn 4S O'S W '! G77 C7t -* - J ` J ^•• J ' ted N ` J Ch O G7 Cr l - I ( 31 W

mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm

77 77J7 7J7Jx7 ] mxmm717 I7J 177 ? J7a I7xx7J ; 7X7 7XxXxm0 0 ` p !s z" m' ca. .

000000000000000000000000000lJOC7000a` °

cr0000000000000000 C7 © CJI D00 C7ClI C7C7000 00

NN _,, NNN ,,,, NNry gy NNW NNN ,,yNNNp NNNNgy yNN -' N < M

X ZT = r

Page 11: Furthermore, I have communicated with Mrs. Cindy Welsh ...

Preliminary ECA Feasibility Assessment January 2018Lessard-Stephens EKG Project 18- 21- 009

Table 2, Acoustic Assessment Summary Table

Verified by compliancePointof Point of ReceptionTime of Day

SPL atAcoustic

Performance with

Reception ID Description POR( Le Limit( Leq) Performanceq) Audit( Yes/ No) LlmltjYqsINqL

0700- 1900 45.8No 50 Yes

R1 ( 1" Floor) east building of hotel at

1900- 2300 45. 8 Na 50 Yes

14 Mountjoy St. S ­ 23001- -

0700 34. 1 No 45­­­__­__...._,_.._...YeI

s

Yes0700- 1900 4& 2 No 50n east building of hotel at

00- 2300 48. 2 No 50 YesRI ( 2

aFloor)

14 Mountjoy St. S __ Zj7OO- 07-00 No 45 -"-- Yes

0700- 1900 49. 3 No 50 Yes

R1 ( 3`1

Floor) east building of hotel at

14 Mountjoy St. S1. 900- 2300 49. 3 No 50 Yes

2300- 0700 36. 1 No 45 Yes

0700- 1900 49. 8 N o 0 Yes

R1 ( 4"' Floor) east building of hotel at

1900- 2300 49. 8 No 50 Yes

14 Mountjoy St. S 2300- 0700 37. 4 No 45 Yes

0700- 1900 41. 2 No 50_ Yes

west builng of hotel at 50--_ YesR2( 1" Floor) 1900- 2300 41, 2 No

14 Mountjdioy St. S _ 1

2300- 0700 27. 3 No 45 Yes

0700- 1900 41. 8 Ido 50 Yes

R2( 2Id

Floor) west building of hotel at

00- 230041.8 5o14 Mountjoy St. S

27. 6 4.51

Ye.s

Id west building of hotel at0700-

192300- 6CF-'- 4-28 No 50 Yes

R2( 3 Floor) 14 Mountjoy St. S 1900L - 2300 42, 8 No 50 Yes

2300- 0700 28. 0 No 45 Yes

0700- 1900 42.6 No 50 - Yes

R2( 4Ih

Floor) west building of hotel at

1900- 2300 42. 6 No 50 Yes

14 Mountjoy St. S 2300- 0700 28. 5 No 4"5- Yes

0700- 1900 423 50 Yes

west building of hotel at - 50 YesR2( 5Floor) 1900- 2300 42. 3

14 Mountjoy St. S ---, i

2300- 0700 29. 1 Na Yes

Q700- 1900 42. 9 No 50 yles.­----------

R2( 6"' Floor) 14 Mountjoy St. S

west building of hotel at1900 2300 No 50 Yes

2300- 0700 29. 9 No 45 Yes

0700- 1900 433 No 50 Yes

R2( 7Ih

Floor) west building of hotel at

900- 2300 43. 3 No 50 Yes

14 Mountjoy St. S 2300- 0700 30. 4 No 45 Yes

0700- 1900 433 No Yes

R2(81h

Floor) west building of hotel at

14 Mountjoy St. S1900- 2300 43, 3 -- N.- _ 50Yes

2300 0700 30. 7 Na 45s

west building of hotel at0700- 1900 43A No 50 Yes

R2( 9" Floor) 14 Mountjoy St. S

1900- 2300 43. 4 No 50 Yes

2300- 0700 31. 3 No 45 Yes

1"'- floor plane- of- 0700- 1900 46,2 No Yes

R3A( 1" Floor) window of house at 21 1900- 2300 46. 2 No 50 Yes

Maple St. S 2300- 0700 38. 9 No 45 Te's,

2"- floor plane- of- 0700- 1900 47. 5 No 50 Yes

R3A( 2"' Floor) window of house at 21 1900- 2300 47. 5 No 50 Yes

Maple St. S 2300- 0700 39. 8 No 45 Yes

western property line of 0700- 1900 46, 0 No 50 Yes

R313 house at 21 Maple St. 1900- 2300 46.0 No ----­

S 2300- 0700 42. 2 No N/ A Yes

E. K. Gillin & Associates Inc. 9

Page 12: Furthermore, I have communicated with Mrs. Cindy Welsh ...

t a y Thermogenic SeriesaCremation nit CU-150

Made in Canada

Combustion an

Manufacturing Ltd. (CB)

is a trusted name in thelj iri f c {

G cremation industry withover 50 years experience.

ter We are a Canadian

company at the forefrontd of technology for

er cremation and

environmental equipment.

CB stands behind

its equipment with a

diversified line of

E4 r l products and an1 i

i r/d la,

ih

fir° $ t;

Industry leading Serviceru Department. We offer a

wide range of products

for human and animal

cremation as well as a

complete line of emission

monitoring systems.

Our service technicians

possess the necessaryfuel licences to provide

complete service for

your equipment

including gas, electricaland refractory work.

Designed to provide reliable and efficient operation

Average cremation cycle of leas than 2 hours s a complete service

produces low emission levels while offering automated provider, we are equipped

cycle completion and cool down to handle all aspects of

Rear enclosed blower provides quiet cremator operation your project from the

Niel options: Natural Gas and Propane planning and approval

Electrical options: 2401575 Volts AC, Single or Three phase stages through to the

Control panel options: Selector switch with indicators or installation and

AMUtouch screen. Left side mount, right side mount or commissioning of your

motomount new unit.

905. 640,6068 Fax 905. 640. [email protected] www.commercialburner.ca

Page 13: Furthermore, I have communicated with Mrs. Cindy Welsh ...

SeriesThermogenicCremation Unit CU-150

Made in Canada

yrtraWir: I.. oaciing.DoorS cew.° jfiutio

Push Button operation with Supplies

a • Ai,hicoxygen to the

integrated Safety Pins to prevent combustion process, resulting

unauthorized movement in low emission levels

777

Selectable Manual or

Automatic operation 7

COua,hon VestibuleProvides safe and

efficient remains

collection

Dished...._ _._ ..y tr tzer l. lr. r rr

Hot Hearth" configuration

provides effective control of fluids

while increasing fuel efficiency

CU- 150 Exterior Dimensions

1801/ 2" -65 1 f2 l

313/ 8"

8961,

80

365/ 8"

Front Side

KIM' 905. 640.6068 Fax 905. 640.8678

[email protected] www.commercialburnenca