Furnace Replacement & Installation Checklist

4
Gas Furnace Replacement Checklist INSPECTION & ADJUSTMENTS Documents: Warranty and manual in envelope attached to furnace Agency given copy of sizing calculation Photos documenting furnace conditions and manufacturer nameplate Installation information sticker (installer name, phone number, date) Design temperature heat loss calculation: BTU per hour Electrical: Service disconnect is present and operational Dedicated circuit and breaker properly rated Set heat circuit and anticipator (thermostat) PMI Not applicable Gas Piping: Sized for BTUs of all appliances No leaks Shut off present Sediment trap present CSST bonded Air Filter: Filter opening covered/sealed Filter removes easily with no obstructions Filter Size: x General: Furnace elevated off basement floor. Note: If not in basement, can be on floor if approved. Combustion air and exhaust piping properly installed, terminated and supported Distribution plenums sealed and all major duct leaks properly sealed per specifications Condensate properly drained per local code and PMI Test holes sealed Orphaned water heater has proper draft (see p. 2) Permit required Installed and Measured BTUs of New Furnace: BTUs (high input): Measured Input (2 cu. ft. of gas): Minutes: Seconds: BTUs (low input): Measured Input (2 cu. ft. of gas): Minutes: Seconds: (if applicable) Measured Gas Pressure in Inches of Water Column(IWC): Input (High): Input (Low) – if applicable: Manifold (High): Manifold (Low): PERFORMANCE TESTING Steady State Efficiency Test Distribution Static Pressure Adjust to Achieve Typical Ranges for Gas Burning Appliances (see page 2) IWC or Pa Total SSE % O2% CO PPM Intake Air °F Flue °F PMI AFUE% Return Supply Pressure High Input Low Input Temperature Rise Variable Speed Furnaces Heating CFM* Fan Speed Setting Supply °F Return °F (Supply – Return) PMI Min PMI Max High Input Low Input (if applicable) *CFM Measurement Method: Plate Method Fan Tables Other: I certify the visual inspection and performance tests were completed as indicated. I certify the heating system was installed to my satisfaction on the date indicated. Installer Signature: Customer Signature: Printed Name: Printed Name: Date: Date: Customer: Contractor: Brand: Model #: Date Installed: Serial #: Page 1 of 2

Transcript of Furnace Replacement & Installation Checklist

Page 1: Furnace Replacement & Installation Checklist

Gas Furnace Replacement Checklist

INS

PE

CT

ION

& A

DJ

US

TM

EN

TS

Documents: ☐ Warranty and manual in envelope attached to furnace ☐ Agency given copy of sizing calculation

☐ Photos documenting furnace conditions and manufacturer nameplate☐ Installation information sticker (installer name, phone number, date)

☐ Design temperature heat loss calculation: BTU per hour

Electrical: ☐ Service disconnect is present and operational ☐ Dedicated circuit and breaker properly rated☐ Set heat circuit and anticipator (thermostat) PMI ☐ Not applicable

Gas Piping: ☐ Sized for BTUs of all appliances ☐ No leaks ☐ Shut off present☐ Sediment trap present ☐ CSST bonded

Air Filter: ☐ Filter opening covered/sealed ☐ Filter removes easily with no obstructions

Filter Size: x

General:

☐ Furnace elevated off basement floor. Note: If not in basement, can be on floor if approved.☐ Combustion air and exhaust piping properly installed, terminated and supported☐ Distribution plenums sealed and all major duct leaks properly sealed per specifications☐ Condensate properly drained per local code and PMI ☐ Test holes sealed☐ Orphaned water heater has proper draft (see p. 2) ☐ Permit required

Installed and Measured BTUs of New Furnace:

BTUs (high input): Measured Input (2 cu. ft. of gas): Minutes: Seconds:

BTUs (low input): Measured Input (2 cu. ft. of gas): Minutes: Seconds: (if applicable)

Measured Gas Pressure in Inches of Water Column(IWC):

Input (High): Input (Low) – if applicable: Manifold (High):

Manifold (Low):

PE

RF

OR

MA

NC

E T

ES

TIN

G

Steady State Efficiency Test Distribution Static Pressure Adjust to Achieve Typical Ranges for Gas Burning Appliances (see page 2) ☐ IWC or ☐ Pa Total

SSE % O2% CO PPM Intake Air °F Flue °F PMI AFUE% Return Supply Pressure High Input

Low Input

Temperature Rise Variable Speed Furnaces

Heating CFM* Fan Speed Setting Supply °F Return °F (Supply – Return) PMI

Min PMI Max

High Input Low Input (if applicable)

*CFM Measurement Method: ☐ Plate Method ☐ Fan Tables ☐ Other:

I certify the visual inspection and performance tests were completed as indicated.

I certify the heating system was installed to my satisfaction on the date indicated.

Installer Signature: Customer Signature:

Printed Name: Printed Name:

Date: Date:

Customer: Contractor: Brand: Model #:

Date Installed: Serial #:

Page 1 of 2

Page 2: Furnace Replacement & Installation Checklist

Acceptable Draft Test Readings for Gas Appliances with Respect to Outdoor

°F <10° 10°-90° >90°Pa. -2.5 (°F Out / 40) - 2.75 -0.5

IWC. -.010 (°F Out / 10,000) - 0.011 -.002

Typical Ranges for Gas Burning Appliances

Performance Indicator SSE 80+ SSE 95+

Carbon monoxide (CO) ppm ≤ 100 ≤ 100 or PMI Stack temperature °F 325°- 450° 90°- 120° Temperature Heat Rise °F 40° - 70° 45° - 70° or PMI

Oxygen (O2) % 4 - 9% 4 - 9% Natural gas pressure output at manifold - Inches of Water Column (IWC) 3.2 - 3.9 IWC 3.2 - 3.9 IWC

Propane pressure output at manifold (IWC) 10-11 IWC 10 – 11 IWC Steady-state efficiency (SSE) 82 - 86% 95 - 97% Supply temperature °F 120° - 140° 95° - 140°

Comments:

Measure supply temperature here or here

Measure supply temperature and use the highest measured temperature

Measure return

temperature here

Measure return

temperature here

Furnace Furnace

Page 2 of 2

Page 3: Furnace Replacement & Installation Checklist

Building Inspection Measurement Specification

Is building insulated Y N

Secondary backup heat source Y N

Interior tank capacity

Make up air Y N

Total sq. ft. of space (approx)

Set-up & Assembly Measurement Specification

Furnace to floor distance

Fuel pump to Furnace distance

Fuel tank to Furnace distance

Fuel System Measurement Specification

Fuel Tubing Length (pressure) H= V= Fuel pump to preheater. H=Horizontal/V=Vertical

Fuel Tubing Length (suction) Vertical length of pickup if a non-EnergyLogic tank

Pressure Gauge (fuel pump) 0 to 12 PSI

Vacuum Gauge (fuel pump) 0"-1" Hg - Complete System/3"-5" Hg - Regular System

Fuel Tank level E 1/2 F

Pipe sealant used Y N

Leak check Y N

Pickup Filter used Y N

Fuel Pickup location Y N At least 6" from bottom, for Regular Systems only

Vacuum Test Y N Pump pulls down and holds at 25" Hg

Spin-Up Test Y N Pump spins up to 55 PSI within 1 second

Furnace Installation & Startup Checklist

Page 1 of 2

Customer: Technician:Brand: Model #:

Date Installed: Serial #:

Page 4: Furnace Replacement & Installation Checklist

Electrical Components Measurement Specification

Wall Thermostat location Wall Do not mount on furnace or supports

Fan Shipping Bracket removed Y N

20 Amp Circuit Breaker Y N Dedicated power supply - 25 Amp Max per UL Standard

Fan & Limit Control Reading (cold) Arrow on room temperature

Flue Set-up Measurement Specification

Max. 45 degree elbow Y N No more than 45 degress from vertical

4' above roof - recommended Y N Extend 4' above roof within 20' of structures

Rain/Wind Cap present on Flue Y N

Double walled Y N Double walled at point through ceiling

Barometric Dampener open Y N Should be open slightly

Combustion Measurement Specification

CO2 Between 9% and 11%

Air Shutter setting Model 140: 5 Model 200: 7 Model 340: 4

Draft Gauge zero Remove probe from stack to zero gauge

Draft in flue stack + 0.05" Water Column

Smoke Spot Zero to Two

Ohm Reading 250 to 500 ohms at cad cell

Duct Static DP Max. 0.28" (N/A for systems without ducts)

Stack Temperature Record for monitoring only

Overfire Pressure Less than +0.02" Water Column

Ten & Ten Light-Off Test Was Light-Off instantaneous each time?

Customer Sign-off

Received Manual Y N

Maintenance overview Y N

Warranty overview Y N

Customer Name: __________________________________________

Customer Signature: ___________________________________

Date: _______________

Page 2 of 2