Full sized cooling tests, small low flow ducts Thermal camera window not shown > 300 CFPM air flow for verification of cooling capability ooling tests will begin as soon as prototype sectors completed inch diameter tube mocks up C 1 dust collector for air supply
description
Full sized cooling tests, small low flow ducts. 9 inch diameter tube mocks up M SC. Thermal camera window not shown. > 300 CFPM air flow for verification of cooling capability. dust collector for air supply. Cooling tests will begin as soon as prototype sectors completed. - PowerPoint PPT Presentation
Transcript of Full sized cooling tests, small low flow ducts
Full sized cooling tests, small low flow ducts
Thermal camera window not shown
> 300 CFPM air flow for verification of cooling capability
Cooling tests will begin as soon as prototype sectors completed
9 inch diameter tube mocks upMSC
1dust collector for air supply