Page 1: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation
Page 2: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

   I 

 

Table of Contents  EXECUTIVE SUMMARY .................................................................................................................................. 1 1.0 PURPOSE ................................................................................................................................................. 2 2.0 PROGRAM HISTORY ................................................................................................................................ 2 3.0 CURRENT PROGRAM ............................................................................................................................... 4 

  3.1 MISSION STATEMENT ........................................................................................................................ 4   3.2 STATUS OF FLORIDA’S SCENIC HIGHWAYS ........................................................................................ 4   3.3 PROGRAM ORGANIZATION AND PARTICIPANTS ............................................................................... 9   3.4 ELIGIBILITY, DESIGNATION AND IMPLEMENTATION PHASES ......................................................... 10   3.5 PROGRAM MANUAL ........................................................................................................................ 12   3.6 TRAINING AND CONFERENCES ........................................................................................................ 12   3.7 PROMOTION AND MARKETING ....................................................................................................... 13   3.8 ANNUAL REPORTS PROCESS ............................................................................................................ 15 

4.0 SURVEY RESULTS AND ANALYSIS .......................................................................................................... 15   4.1 PROGRAM EVALUATION SURVEY .................................................................................................... 15 

    4.1.1 OVERALL PROGRAM ............................................................................................................... 15     4.1.2 TRAINING RATING, OPTIONS  AND CHANGES ........................................................................ 17     4.1.3 AGENCY COOPERATION, COORDINATION AND PROMOTION ............................................... 19     4.1.4 PARTICIPANTS GOALS ............................................................................................................. 21     4.1.5 PARTICIPANTS CONCERNS ...................................................................................................... 21     4.1.6 PARTICIPANT SUPPORT .......................................................................................................... 23     4.1.7 ELIGIBILITY AND DESIGNATION PROCESSES ........................................................................... 24     4.1.8 REVIEW PROCESSES ................................................................................................................ 25     4.1.9 DSHC, CAG AND CME FUNDING ............................................................................................. 26 

5.0 FSHP STATEWIDE CONFERENCE/WORKSHOP ATTENDEE FEEDBACK ................................................... 28     5.1 TRAINING AND CONFERENCES RESPONSES .............................................................................. 28     5.2 MISCELLANEOUS RESPONSES .................................................................................................... 29     5.3 FUNDING RESPONSES ................................................................................................................ 29     5.4 PROMOTIONAL RESPONSES ...................................................................................................... 30     5.5 LOCAL GOVERNMENT COOPERATION RESPONSES ................................................................... 30     5.6 INTER‐BYWAY COMMUNICATION RESPONSES ......................................................................... 30     5.7 ENHANCEMENT RESPONSES ..................................................................................................... 30 

6.0 ON‐GOING FEEDBACK ........................................................................................................................... 31 7.0 ANNUAL REPORTS FEEDBACK ............................................................................................................... 32 8.0 RECOMMENDATIONS ............................................................................................................................ 34 9.0 FUTURE OF THE PROGRAM – “THE ROAD AHEAD” .............................................................................. 35 10.0 DEFINITIONS AND ACRONYMS ............................................................................................................ 36 APPENDIX  A – SAMPLE SURVEY QUESTIONS ............................................................................................. 41 

Page 3: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   1 

 

EXECUTIVE SUMMARY The Florida Scenic Highways Program  (FSHP) was established by state  in 1993. Since then twenty‐four (24) State Scenic Byways have been designated. The program  includes two (2) National Scenic Byways. Since the program  inception there has been over $30 million  in  federal and state  funds distributed to the highways.  The Florida Scenic Highways Program Evaluation Report briefly summarizes the history of the program, provides  an  overview  of  the  current  program,  gathers/evaluates  participant  feedback  and  provides recommendations for the future of the program. The purpose of this report is to determine what is and isn’t  working  within  the  program  by  evaluating  on‐going  feedback,  Statewide  Conference  attendee feedback,  Annual  Reports  feedback  and  surveying  participants.  The  survey  consisted  of  preparing detailed  questions,  conducting  phone  interviews  (April‐May  2009)  and  compiling  the  feedback.  The survey feedback, Statewide Conference feedback, Annual Reports feedback and on‐going feedback was then evaluated for the purpose of developing recommended future actions.   These recommendations are: 

1. Provide  more  promotional  and  marketing  efforts  specifically  aimed  at  educating  local governments and communities 

2. More promotion and marketing with a focus on websites and internet based marketing 3. Institute  changes  to  insure  consistent  SHAC  membership  representation.  Perhaps 

responsibilities could be shared among several people within a particular agency  4. Provide consistent and differentiated training for all participants throughout their  involvement 

in the program 5. Require FDOT to coordinate project and maintenance efforts with CMEs 6. Promote inter‐byway communication and education 7. Focus on the implementation phase as much as the designation phase  8. Align designation requirements with National Scenic Byway Program requirements 9. Provide better communication of training, promotion and coordination efforts to all participants 10. Increase the frequency of Statewide Conferences/Workshops 11. Provide CMEs with resources and self‐checks for maintaining membership 12. Provide CMEs with additional resources for pursuing funding  13. Provide consistent funding and time resources for DSHCs 14. Make designations more restrictive to improve quality of designations 15. Provide more and better resources for CMEs 16. Better communicate the availability  of resources to CMEs 17. Streamline, simplify and shorten eligibility/designation process 18. Extend interaction and promotion among state and federal agencies 19. Hold regular SHAC and DSHC meetings 20. Improve the Annual Reports process in terms of ease of use and content 

Page 4: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   2 

 

1.0 PURPOSE  The  Florida  Scenic  Highways  Program  (FSHP) Evaluation  Report  briefly  summarizes  the  history  of the  program,  provides  an  overview  of  the  current program, gathers/evaluates participant  feedback and provides  recommendations  for  the  future  of  the program. This report will determine what  is and  isn’t working within the program by evaluating attendee’s feedback  from  the  previous  Statewide  Conferences, Annual  Reports,  on‐going  efforts  and  surveying participants.  Participants  surveyed were  asked questions  to determine  the  effectiveness of  the  FSHP program  in  terms  of  achieving  participant’s  goals,  program  administration,  training,  coordination, promotion,  funding,  the application/reporting  review process and  the  future of  the program. The on‐going  efforts  include  feedback  received by program  staff  and  consultants on  a day‐to‐day basis.  The Statewide Conferences  feedback  is  taken  from  the Goal Setting Forum  section of  the 2008 Statewide Conference proceedings. The Annual Reports feedback was obtained by reviewing the 2002‐2008 annual reports  for problem areas. This  feedback  is then evaluated, based on popular responses and merit, to determine future actions of the program. 

2.0 PROGRAM HISTORY The National Scenic Byways Program  (NSBP) was established  in the  Intermodal Surface Transportation and Efficiency Act  (ISTEA) of 1991, continued with  the Transportation Equity Act  for  the 21st Century (TEA‐21) (1998‐2005) and the Safe, Accountable, Flexible Efficient Transportation Equity Act – A Legacy for Users (SAFETEA‐LU) (2005‐2009). The purpose of the NSBP was to recognize and enhance roads that have  outstanding  scenic,  historic,  cultural,  natural,  recreational  and  archaeological  qualities  and  to support state scenic highways initiatives.  When  developing  the  framework  and  guidelines  for  the NSBP,  the National  Scenic  Byways  Advisory Committee decided  that roads should  first be designated as scenic byways by  individual states before receiving  “National  Scenic  Byway”  or  “All‐American  Road”  status.  This  decision  prompted  the enhancement and development of state scenic highways programs across the country. Grants and other federal monies were made available through ISTEA to establish new state programs or enhance existing state or federal byways.  Prior  to  the  ISTEA  legislation,  several  communities  and  local  governments  in  Florida  had  designated scenic and/or historic corridors under their jurisdiction, but no statewide standards of quality or criteria for  designation  had  been  established. Many  of  these  corridors were  adopted  into  the  jurisdictions’ comprehensive plan or were protected by local regulations.  

Page 5: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   3 

 

In  1993,  Section  335.093  of  the  Florida  Statutes was  passed  to  allow  for  the  designation  of  scenic highways in the State of Florida. The purpose of this legislation was to identify and preserve the intrinsic qualities  of  designated  scenic,  cultural  and  historic  corridors  in  Florida.  In  addition,  the  legislation allowed  the  state,  through  the  Florida  Department  of  Transportation  (FDOT),  to  establish  a  Scenic Highways Program that met the eligibility requirements for federal funding purposes under ISTEA.  In  1994,  the  FDOT  received  a  $150,000  National  Scenic  Byways  Grant  from  the  Federal  Highway Administration  (FHWA)  to develop  the Florida Scenic Highways Program  (FSHP or  the Program). FDOT used this funding to develop a community‐based (or grass roots) process that is designed to strengthen local  commitment  to  the  preservation,  enhancement  and  maintenance  of  the  intrinsic  resources valuable  to  local communities and  regions; create  the Program’s Manual and develop a Pilot Training program.  The procedures and criteria for designation were established  in Florida Administrative Rule 14‐12.021. To further substantiate the program, Thomas F. Barry, Jr. (Secretary of the FDOT) approved and signed FDOT  Procedure  Topic  Number  650‐050‐005  to  establish  the  FSHP  as  an  official  program  of  the Department.  In April 1997, the FHWA presented the FDOT with an Environmental Excellence Award for Excellence in Environmental Process for  its creation of the FSHP and the FSHP Manual. The Florida Scenic Highways Program  effort  was  selected  out  of  154  other  applicants,  representing  34  states,  to  receive  this recognition. The success of this program has been exemplified by the recognition it has received and the interest  of  communities  wishing  to  attain  scenic  highways  designation  for  their  own  corridors. Information  regarding  the  FSHP  has  been  submitted  to  many  other  Department  of  Transportation agencies  including Maine, Ohio, New Mexico and Alabama, to assist  in the development of their state scenic programs. The FSHP Manual was also utilized as a guide to develop the scenic highways program in Cape Town, South Africa.  The  Florida  Scenic  Highways  Program  has  had  numerous  accomplishments  in  recent  years.    These accomplishments have  included Statewide Conferences, tourist and program DVD production, website development, brochures and marketing items, the implementation of training and Roadside Chats and a re‐configuration of the Annual Reports process.  The FSHP program has pending efforts that include two new websites, new Hi‐Definition videos and GPS itineraries  for  hand‐held  personal GPS/Navigation  units.   Recent  efforts  have  attempted  to  focus  on technological  advancements  of  the  program  and  to  be  a  front  runner  of  this  area  across  the  entire National Scenic Byway community. 

Page 6: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   4 

 

3.0 CURRENT PROGRAM The Florida Scenic Highways Program is a result of the FDOT Central Environmental Management Office (EMO)  working  closely  with  the  Scenic  Highways  Advisory  Group  (SHAC),  Corridor  Advocacy  Group (CAG), Corridor Management Entities (CME) and District Scenic Highways Coordinators (DSHC).  These  groups  created  the  Program’s mission  statement, which  reflects  the  interconnected  nature  of Florida’s  roadways,  resources  and  communities.  A  key  component  of  the  Program  is  its  grass  roots approach that requires substantial public participation and community support. 

3.1 MISSION STATEMENT 

3.2 STATUS OF FLORIDA’S SCENIC HIGHWAYS  There are currently twenty‐four (24) state designated scenic highways in the State of Florida (See Table 1). The program  includes  (2) National Scenic Byways. The  Indian River Lagoon Scenic Highway and the A1A Scenic and Historic Coastal Byway (a combination of the Scenic and Historic A1A, A1A Ocean Shore and A1A River & Sea Trail State Scenic Highway) have both received national designation. The Tamiami Trail was de‐designated in 2008 due to a failure of the Corridor Management Entity (CME) membership and eroded public support.  In  addition  to  the  network  of  designated  scenic  highways,  there  are  currently  three  (3)  candidate corridors actively pursuing state‐level designation. 

1. J.C. Penney Memorial Scenic Highway ‐ Currently seeking designation 2. Martin Grade Scenic Highway ‐ Currently seeking eligibility 3. State Road A1A Broward County ‐ Currently seeking designation 

 Since the program  inception there has been over $30 million  in  federal and state  funds distributed to the highways (See Table 1). The majority of funds have gone to Green Mountain Scenic  ($7.8 Million), Tamiami Trail ($8.6 Million) and Indian River Lagoon National Scenic Byway ($2.9 Million).  

The Florida Scenic Highways Program will preserve, enhance and maintain the intrinsic resources of scenic corridors through a sustainable balance of conservation and land use. 

Through community based consensus and partnerships, the program will promote economic prosperity and broaden the traveler’s overall recreational and educational experience. 

Page 7: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Number

Cor

rido

r N

ame

District

Length (Miles)

Date of LOI

Date of Eligibility

Date of FSH Designation

Date of NSB Designation

Date of 5-Year CMP Update

Nam

es o

f Gra

nts

and

Proj

ect T

ype

Date Applied

Amount of Grant

Tot

al

FDO

T gr

ant t

o de

velo

p th

e C

MP

2000

$25,

000

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Im

plem

entin

g a

Gat

eway

Sys

tem

to E

nhan

ce

Pub

lic A

cces

sibi

lity

to In

trins

ic R

esou

rce

2002

$78,

000

City

of F

lagl

er B

each

: Mat

chin

g G

rant

for G

atew

ay S

yste

m20

02$7

5,00

0

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Pha

se II

fund

ing

to c

onst

ruct

gat

eway

faci

litie

s.20

03$2

20,0

00

FDO

T gr

ant t

o de

velo

p th

e C

MP

2000

$25,

000

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Im

plem

entin

g a

Mul

timod

al G

reen

way

Sys

tem

2002

$330

,000

Flag

ler C

ount

y: M

atch

ing

Gra

nt fo

r Mul

timod

al G

reen

way

Sys

tem

2002

$250

,000

Nat

iona

l Sce

nic

Byw

ay D

iscr

etio

nary

Gra

nt: P

hase

II fu

ndin

g to

con

stru

ct a

mul

ti-m

odal

gr

eenw

ay s

yste

m.

2003

$670

,000

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Web

site

Dev

elop

men

t20

03$4

0,00

0

Flor

ida

Dep

artm

ent o

f Tra

nspo

rtatio

n D

istri

ct 2

: Web

site

Dev

elop

men

t20

03$5

,000

Flor

ida

Dep

artm

ent o

f Tra

nspo

rtatio

n D

istri

ct 5

: Web

site

Dev

elop

men

t20

03$5

,000

FDO

T G

rant

: Con

sulta

nt s

ervi

ces

to p

repa

re 3

NS

B g

rant

app

licat

ions

.20

03$2

4,92

6

2003

TA

BL

E 1

- FS

HP

DE

SIG

NA

TE

D A

ND

EL

IGIB

LE

SC

EN

IC H

IGH

WA

Y IN

FOR

MA

TIO

N

1 2 3

7/10

/06

7/22

/06

09/0

7/00

06/1

3/02

*

06/0

7/01

06/1

3/02

*

06/0

6/01

06/1

3/02

*A

1A O

cean

Sho

re S

ceni

c H

ighw

ay*P

art o

f the

A1A

Sce

nic

& H

isto

ric C

oast

al B

yway

- N

atio

nal S

ceni

c B

yway

57

08/2

2/97

06/1

0/98

04/0

3/00

512

A1A

Riv

er &

Sea

Tra

il Sc

enic

Hig

hway

**P

art o

f the

A1A

Sce

nic

& H

isto

ric C

oast

al B

yway

- N

atio

nal S

ceni

c B

yway

A1A

Sce

nic

& H

isto

ric

Coa

stal

Byw

ay*

*Nat

iona

l Sce

nic

Byw

ay m

ade

up o

f thr

ee in

divi

dual

Fl

orid

a S

ceni

c H

ighw

ays

2, 5

71

DE

SIG

NA

TE

D H

IGH

WA

YS

$398

,000

$1,2

75,0

00

FDO

T G

rant

: Pro

vide

faci

litat

ion

serv

ices

to N

atio

nal S

ceni

c B

yway

CM

E20

03-

2004

$34,

355

FDO

T G

rant

: Pro

vide

NEP

A do

cum

enta

tion

to F

HW

A p

rior t

o th

e co

nstru

ctio

n of

gat

eway

fa

cilit

ies

and

mul

ti-m

odal

gre

enw

ay s

yste

m.

2004

$22,

191

FDO

T G

rant

: Pro

vide

mat

chin

g fu

nds

for 2

004

NS

B S

eed

Gra

nt fo

r Fin

anci

al D

evel

opm

ent

Pla

n.20

04$6

,250

Nat

iona

l Sce

nic

Byw

ay S

eed

Gra

nt- C

MP

Impl

emen

tatio

n20

05$2

5,00

0

Nat

iona

l Sce

nic

Byw

ay S

eed

Gra

nt- C

MP

Impl

emen

tatio

n20

06$2

5,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: V

isito

rs W

elco

me

Inte

rpre

tativ

e/ In

form

atio

n C

ente

r20

07$2

00,0

00

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: N

orth

ern

Gat

eway

Kio

sk20

07$7

2,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

orrid

or M

anag

emen

t Pla

n Im

plem

enta

tion-

Yea

r 320

07$2

5,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: S

ceni

c O

verlo

ok20

07$1

20,0

00

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: F

lagl

er C

ount

y Fa

cilit

ies

Impr

ovem

ents

2007

$152

,000

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

ell P

hone

Tou

r20

08$5

0,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

orrid

or M

anag

emen

t Pla

n Im

plem

enta

tion

for

Org

aniz

atio

nal S

usta

inab

ility

2008

$80,

000

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: F

lagl

er B

each

Gat

eway

Pro

men

ade

Impr

ovem

ents

2008

$373

,520

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: W

ayfin

ding

/Way

show

ing

Sig

nage

Sys

tem

Pla

n20

08$1

20,0

00

$1,3

80,2

42

Page 8: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Number

Cor

rido

r N

ame

District

Length (Miles)

Date of LOI

Date of Eligibility

Date of FSH Designation

Date of NSB Designation

Date of 5-Year CMP Update

Nam

es o

f Gra

nts

and

Proj

ect T

ype

Date Applied

Amount of Grant

Tot

al

TA

BL

E 1

(Con

td.)

- FSH

P D

ESI

GN

AT

ED

AN

D E

LIG

IBL

E S

CE

NIC

HIG

HW

AY

INFO

RM

AT

ION

Nat

iona

l Sce

nic

Byw

ay G

rant

: Cor

ridor

Man

agem

ent P

lan-

Yea

r 120

07$2

5,00

0

Nat

iona

l Sce

nic

Byw

ay G

rant

: Blu

eprin

t for

Roa

dsid

e In

terp

reta

tion

and

Way

findi

ng20

07$8

1,33

2

Nat

iona

l Sce

nic

Byw

ay G

rant

: CM

P Im

plem

enta

tion

& F

undi

ng S

trate

gy -

Year

220

08$4

3,00

0

Tran

spor

tatio

n E

nhan

cem

ent F

unds

- B

ike

path

2003

$300

,000

Tran

spor

tatio

n E

nhan

cem

ent F

unds

-Sid

ewal

ks, L

ands

capi

ng20

05$3

00,0

00

Ann

a M

aria

Isla

nd C

ham

ber o

f Com

mer

ce -

Wel

com

e S

ign

2005

$2,2

00

FDO

T G

rant

: Lan

dsca

ping

2004

$20,

000

FDO

T G

rant

: Gat

eway

Sig

n20

03$1

0,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

orrid

or M

anag

emen

t Pla

n U

pdat

e20

07$3

1,16

0

6C

ourt

ney

Cam

pbel

l Sce

nic

Hig

hway

79.

504

/02/

0104

/23/

0305

/23/

05FD

OT

Cen

tral O

ffice

2006

$400

,000

$400

,000

FDO

T P

lann

ing

Gra

nt- E

ligib

ility

App

licat

ion

2005

$50,

000

FDO

T P

lann

ing

Gra

nt- C

orrid

or M

anag

emen

t Pla

n20

06$6

0,00

0

Priv

ate

Don

atio

n20

01$1

10,0

00854 7

06/2

2/01

12/1

2/00

Bra

dent

on B

each

Sce

nic

Hig

hway

1

116.

2

2.8

Flor

ida

Key

s Sce

nic

Hig

hway

610

604

/30/

97

02/0

9/00

09/0

8/00

04/1

7/01

$110

,000

Big

Ben

d Sc

enic

Byw

ay

322

002

/29/

00

$149

,332

10/2

8/05

Flor

ida

Bla

ck B

ear

Scen

ic B

yway

5

10/1

2/06

, 02

/13/

07Le

on

Cou

nty

Por

tion

Add

ed

07/2

4/06

02/2

0/08

$663

,360

12/1

7/04

,

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Int

erpr

etiv

e/M

aste

r Pla

n20

03$1

20,0

00

Mon

roe

Cou

nty:

Inte

rpre

tive/

Mas

ter P

lan

2003

$40,

000

Flor

ida

Dep

artm

ent o

f Tra

nspo

rtatio

n: In

terp

retiv

e/M

aste

r Pla

n20

03$4

0,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: K

ey D

eer H

abita

t Pre

serv

atio

n20

08$1

,400

,000

Tran

spor

tatio

n E

nhan

cem

ent F

unds

- C

orrid

or M

anag

emen

t Pla

n20

01$2

5,00

0

Fl. D

ept.

of E

nviro

nmen

tal P

rote

ctio

n, O

ffice

of G

reen

way

and

Tra

ils: D

edic

ated

B

icyc

le/P

edes

trian

Fac

ility

2002

$75,

832

Tow

n of

Mon

tver

de: D

edic

ated

Bic

ycle

/Ped

estri

an F

acilit

y20

02$1

8,95

8

Flor

ida

Com

mun

ities

Tru

st: P

urch

ase

land

on

Lake

Apo

pka

2004

$3,5

00,0

00

FDO

T G

rant

: Pro

vide

FS

HP

doc

umen

tatio

n to

ext

end

exis

ting

corr

idor

thro

ugh

the

Tow

n of

O

akla

nd a

nd in

to W

inte

r Gar

den

2004

$15,

000

Flor

ida

Com

mun

ities

Tru

st, L

ake

Cou

nty

and

St.

John

s R

iver

Wat

er M

anag

emen

t Dis

trict

; La

nd P

urch

ase

for F

ernd

ale

Pre

serv

e on

Lak

e A

popk

a20

04$4

,025

,000

Cas

tle a

nd C

ooke

, Inc

.; A

pplic

atio

n fo

r Add

ition

al C

orrid

or20

05$7

,500

Ora

nge

Cou

nty

BO

CC

; App

licat

ion

for A

dditi

onal

Cor

ridor

2005

$3,7

50

City

of W

inte

r Gar

den;

App

licat

ion

for A

dditi

onal

Cor

ridor

2005

$3,7

50

Nat

iona

l Sce

nic

Byw

ay S

eed

Gra

nt- C

MP

Impl

emen

tatio

n20

06$2

5,00

0

Tran

spor

tatio

n E

nhan

cem

ent G

rant

- Mas

ter p

lan

2006

$100

,000

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

orrid

or M

anag

emen

t Pla

n Im

plem

enta

tion-

Yea

r 220

07$2

5,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

MP

Impl

emen

tatio

n P

roje

ct -

Year

320

08$3

5,07

8

513

.25

04/0

2/01

Gre

en M

ount

ain

Scen

ic B

yway

$1,7

10,0

00

07/0

5/02

7/19

/200

4

10/3

1/05

E

xten

sion

A

war

ded

$7,8

59,8

68

9

Page 9: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Number

Cor

rido

r N

ame

District

Length (Miles)

Date of LOI

Date of Eligibility

Date of FSH Designation

Date of NSB Designation

Date of 5-Year CMP Update

Nam

es o

f Gra

nts

and

Proj

ect T

ype

Date Applied

Amount of Grant

Tot

al

TA

BL

E 1

(Con

td.)

- FSH

P D

ESI

GN

AT

ED

AN

D E

LIG

IBL

E S

CE

NIC

HIG

HW

AY

INFO

RM

AT

ION

FDO

T P

lann

ing

Gra

nt- E

ligib

ility

App

licat

ion

2005

$25,

000

FDO

T P

lann

ing

Gra

nt- C

orrid

or M

anag

emen

t Pla

n20

060

FDO

T gr

ant t

o de

velo

p th

e C

MP

2000

$25,

000

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Lag

oon

Hou

se20

01$8

00,0

00

Fl. D

ept.

of T

rans

porta

tion:

Mat

chin

g N

SB

Gra

nt fo

r Lag

oon

Hou

se20

01$1

00,0

00

Fl. I

nlan

d N

avig

atio

n D

istri

ct: M

atch

ing

NS

B G

rant

for L

agoo

n H

ouse

2001

$100

,000

Sce

nic

Hig

hway

Bea

utifi

catio

n G

rant

2001

$147

,780

Priv

ate

Don

atio

n: F

urni

shin

gs fo

r Lag

oon

Hou

se20

01$9

7,00

0

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Re-

cons

truct

ion

of M

elbo

urne

Bea

ch H

isto

ric

Pie

r20

02$1

45,3

46

Tow

n of

Mel

bour

ne B

each

: Mat

chin

g G

rant

for M

elbo

urne

Bea

ch H

isto

ric P

ier

2002

$54,

605

FEM

A/D

CA

: Mat

chin

g G

rant

for M

elbo

urne

Bea

ch H

isto

ric P

ier

2002

$73,

063

Fl. D

ept.

of T

rans

porta

tion:

Inva

sive

Pla

nt S

peci

es M

anag

emen

t Pla

n20

03$8

1,50

0

FDO

T G

rant

: Int

egra

ted

trans

porta

tion

faci

lity

stud

y w

ith w

ater

taxi

feas

ibilit

y.20

04$5

2,50

0

2/27

/06

516

605

/14/

99In

dian

Riv

er L

agoo

n N

atio

nal S

ceni

c B

yway

04/0

3/00

06/1

3/00

6/13

/02

$2,9

06,7

92

$25,

000

1110H

erita

ge C

ross

road

s:

Mile

s of H

isto

ry S

ceni

c H

ighw

ay5

125

05/0

5/05

07/0

6/07

11/1

9/08

Nat

iona

l Sce

nic

Byw

ay G

rant

: Im

plem

enta

tion

of C

orrid

or M

anag

emen

t Pla

n (S

eed

Gra

nt)

2004

$25,

000

FDO

T gr

ant f

or s

hore

line

reha

bilit

atio

n20

05$2

4,99

8

Nat

iona

l Sce

nic

Byw

ay S

eed

Gra

nt- C

MP

Impl

emen

tatio

n20

05$2

5,00

0

FDO

T P

lann

ing

Gra

nt- C

orrid

or E

xten

sion

2006

$15,

000

Nat

iona

l Sce

nic

Byw

ay S

eed

Gra

nt- C

MP

Impl

emen

tatio

n20

06$2

5,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

orrid

or M

anag

emen

t Pla

n Im

plem

enta

tion-

Yea

r 120

07$2

5,00

0

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: P

edes

trian

Ped

way

2007

$500

,000

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: W

ater

front

Acq

uisi

tion

2007

$540

,000

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: S

eed

Gra

nt 2

008

2008

$50,

000

12In

dian

Riv

er L

agoo

n T

reas

ure

Coa

st

Scen

ic H

ighw

ay4

42.1

308

/07/

0212

/19/

0301

/01/

06N

atio

nal S

ceni

c B

yway

s G

rant

: Inl

et A

cces

s Im

prov

emen

ts20

08$1

,600

,000

$1,6

00,0

00

13L

emon

Bay

/Mya

kka

Tra

il Sc

enic

Hig

hway

(SR

776

)1

47.9

06/0

6/06

02/1

3/07

02/2

0/08

FDO

T P

lann

ing

Gra

nt- E

ligib

ility

and

Des

igna

tion

App

licat

ions

2007

$146

,763

$146

,763

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: M

aste

r Pla

n 20

06$1

05,4

40

VIS

IT F

LOR

IDA

Mar

ketin

g G

rant

200

620

06$5

,000

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: P

ayne

s P

rairi

e P

rese

rve

Vis

itor C

ente

r20

07$1

60,0

00

FDO

T P

lann

ing

Gra

nt- E

ligib

ility

App

licat

ion

and

CM

P20

05-

2006

$85,

000

FDO

T G

rant

s fo

r CM

P d

evel

opm

ent

2005

-20

06$4

2,00

0

06/0

7/01

12/1

4/99

4804

/03/

00O

ld F

lori

da H

erita

ge H

ighw

ay2

04/0

4/03

an

d 05

/05/

05$1

27,0

00

$270

,440

15O

rmon

d Sc

enic

Loo

p &

Tra

il(C

ompo

sed

of H

isto

ric O

rmon

d-by

-the-

Sea

Tra

il an

d th

e O

rmon

d B

each

Sce

nic

Loop

)

533

.98

14

10/2

2/04

an

d 07

/24/

06

07/0

6/07

Page 10: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Number

Cor

rido

r N

ame

District

Length (Miles)

Date of LOI

Date of Eligibility

Date of FSH Designation

Date of NSB Designation

Date of 5-Year CMP Update

Nam

es o

f Gra

nts

and

Proj

ect T

ype

Date Applied

Amount of Grant

Tot

al

TA

BL

E 1

(Con

td.)

- FSH

P D

ESI

GN

AT

ED

AN

D E

LIG

IBL

E S

CE

NIC

HIG

HW

AY

INFO

RM

AT

ION

Inla

nd N

avig

atio

nal D

istri

ct: B

oat r

amps

2004

$25,

000

Div

isio

n of

For

estry

: 75

trees

pla

nted

2004

$10,

000

FDO

T H

ighw

ay S

yste

m L

ands

capi

ng F

unds

: Hig

hway

Lan

dsca

ping

2003

$250

,000

FDO

T Tr

ansp

orta

tion

Enh

ance

men

t Fun

ds: R

estro

oms

2004

$200

,000

Gra

nt m

atch

from

Bon

go's

, Bur

dette

& A

ssoc

iate

s, C

ente

x R

oone

y C

onst

ruct

ion

Co.

, City

of

Brad

ento

n, E

nviro

nmen

tal A

ffairs

Con

sulta

nts,

and

Kee

p M

anat

ee B

eaut

iful:

Plan

ting

trees

2004

$14,

512

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Int

erpr

etiv

e P

lan

1999

$43,

070

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Mas

ter P

lan

2000

$120

,000

Pre

serv

atio

n 20

00 F

unds

and

the

City

of P

ensa

cola

: Lan

d P

urch

ase

2000

$1,2

00,0

00

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: C

orrid

or M

anag

emen

t Pla

n Im

plem

enta

tion-

Yea

r 120

07$2

9,22

7

Nat

iona

l Sce

nic

Byw

ays

Gra

nt: V

olun

teer

Coo

rdin

ator

2008

$29,

230

18T

he R

idge

Sce

nic

Hig

hway

1

38.7

05/2

8/03

04/3

0/04

02/1

6/05

$019

Riv

er o

f Lak

es H

erita

ge C

orri

dor

510

303

/01/

0610

/18/

0703

/12/

09FD

OT

Pla

nnin

g G

rant

- Elig

ibilit

y A

pplic

atio

n20

06$3

5,25

1$3

5,25

120

Scen

icH

ighw

ay30

A3

2801

/21/

0402

/13/

0702

/20/

08

16 17

4

05/0

1/97

Pens

acol

a Sc

enic

Blu

ffs

311

Palm

a So

la S

ceni

c H

ighw

ay

05/2

1/96

1

04/2

4/98

$1,4

21,5

27

05/0

2/02

08/2

7/03

05/2

8/04

$499

,512

20Sc

enic

Hig

hway

30A

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Mas

ter P

lan

2003

$400

,008

St.

John

s C

ount

y: M

aste

r Pla

n20

03$1

00,0

02

22Su

ncoa

st S

ceni

c Pa

rkw

ay

Turn

pike

4203

/21/

0305

/23/

0507

/24/

06$0

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Int

erpr

etiv

e P

lan

1999

$36,

930

Publ

ic L

ands

Dis

cret

iona

ry G

rant

: Vis

itor C

ente

r--Bi

g C

ypre

ss P

rese

rve

1999

$2,1

00,0

00

Dep

artm

ent o

f Int

erio

r, V

isito

r and

Saf

ety

Am

eniti

es (f

or th

e B

ig C

ypre

ss N

atio

nal P

rese

rve

on T

amia

mi T

rail)

: Wel

com

e C

ente

r19

99$5

,000

,000

Nat

iona

l Sce

nic

Byw

ays

Dis

cret

iona

ry G

rant

: Mas

ter P

lan

2000

$240

,000

Nat

iona

l Par

k S

ervi

ce-F

DO

T S

tate

wid

e E

nhan

cem

ent F

unds

: His

toric

Pre

serv

atio

n P

roje

ct

at M

onro

e S

tatio

n (C

ollie

r Cou

nty)

2004

$785

,000

US

Fis

h an

d W

ildlif

e S

ervi

ce-F

DO

T S

tate

wid

e T

rans

porta

tion

Enh

ance

men

t Fun

ds: T

en

Thou

sand

Nat

iona

l Wild

life

Ref

uge

Trai

l and

Sce

nic

Ove

rlook

(Col

lier C

ount

y)20

04$4

80,0

00

24T

amia

mi T

rail

Scen

ic H

ighw

ay W

indo

ws

to th

e G

ulf C

oast

Wat

ers

170

03/1

2/02

04/2

8/03

12/1

9/03

FDO

T S

tate

wid

e E

nhan

cem

ent F

unds

: Ped

estri

an Im

prov

emen

ts (S

aras

ota,

Man

atee

C

ount

ies)

2004

$300

,000

$300

,000

25W

illia

m B

artr

am S

ceni

c &

His

tori

c H

ighw

ay2

1704

/14/

9806

/28/

0210

/31/

05$0

$30,

420,

027

1J.

C. P

enne

y M

emor

ial S

ceni

c H

ighw

ay2

4.33

05/2

4/06

02/2

0/08

2M

artin

Gra

de S

ceni

c H

ighw

ay4

1205

/08/

08

3St

ate

Roa

d A

1A B

row

ard

Cou

nty

428

09/1

5/00

01/0

1/06

$0$3

0,42

0,02

7

21 23

CA

ND

IDA

TE

CO

RR

IDO

R T

OT

AL

DE

SIG

NA

TE

D C

OR

RID

OR

TO

TA

L

CA

ND

IDA

TE

HIG

HW

AY

S

PRO

GR

AM

TO

TA

L

6/15

/00

12/0

9/98

12/0

2/97

Tam

iam

i Tra

il Sc

enic

Hig

hway

(D

e- D

esig

nate

d)08

/06/

96

04/1

6/98

1

52Sc

enic

& H

isto

ric

A1A

*Par

t of t

he A

1A S

ceni

c &

His

toric

Coa

stal

Byw

ay -

Nat

iona

l Sce

nic

Byw

ay

50

2

$8,6

41,9

30

06/1

3/02

*1/

17/2

002

06/1

4/00

$500

,010

Page 11: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   9 

 

3.3 PROGRAM ORGANIZATION AND PARTICIPANTS There are four (4) key groups currently involved in the Program: 

• The Corridor Advocacy Group (CAG)/Corridor Management Entity (CME) 

• The District Scenic Highways Coordinators (DSHC) 

• The State Scenic Highways Coordinator 

• The Scenic Highways Advisory Committee (SHAC)  The Corridor Advocacy Group (CAG) and Corridor Management Entity (CME) are comprised of citizens, professionals  and  government  representatives.  The  CAG  is  responsible  for maintaining momentum, fostering  community  support  and  developing  the  documentation  that  supports  the  highway’s designation application as a Florida Scenic Highway. Once the corridor attains designation, the Corridor Management  Entity  assumes  responsibility  for  ensuring  that  the  Corridor  Management  Plan  is implemented and that the quality and integrity of the corridor is maintained and/or enhanced.  The  District  Scenic  Highways  Coordinator  (DSHC)  is  the  local  representative  of  FDOT  that  provides technical support and guidance to the local corridor groups. Each of the seven (7) FDOT districts and the Florida’s  Turnpike  Enterprise  has  an  identified DSHC.  In  addition  to  providing  technical  support,  the DSHC also serves as the FDOT representative on the CME.  The  State  Scenic Highways Coordinator  is  the  statewide  representative of  the  Florida Department of Transportation  for  the  Scenic  Highways  Program.  The  Statewide  Scenic  Highways  Coordinator  is responsible for implementing the Program, setting program policies and serving as an ad hoc member of the Scenic Highways Advisory Committee.  The Scenic Highways Advisory Committee (SHAC) consists of a representative from each of the following agencies: 

1. Florida Department of State  2. Florida Fish and Wildlife Conservation Commission 3. Florida Department of Community Affairs 4. Florida Department of Agriculture 5. Florida Department of Environmental Protection 6. Federal Highway Administration 7. Visit Florida 

The  SHAC  is  responsible  for  reviewing  all  documentation  submitted  for  designation,  recommending action on applications to the Secretary of FDOT and ranking projects for federal grants.  

Page 12: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   10 

 

3.4 ELIGIBILITY, DESIGNATION AND IMPLEMENTATION PHASES The  FSHP  process  is  divided  into  three  (3)  phases:  Eligibility,  Designation  and  Implementation.  The process  is  sequential  in  nature,  incorporates  critical  decision  points  and  builds  on work  done  in  the previous phases.  The process was specifically designed in this manner in order to minimize unnecessary work effort and maximize  the  probability  of  success  once  a  corridor  is  determined  to  be  eligible.  The  Florida  Scenic Highways Program Manual guides applicants through each of the phases, which are briefly summarized here. 

Eligibility To be eligible for designation as a Florida Scenic Highway, a corridor must possess at least one (1) of the following six (6) intrinsic resources identified by the National Scenic Byways Program: 

1. Cultural 2. Historical 3. Archaeological 4. Recreational 5. Natural 6. Scenic 

 The initial step in this phase is the organization of the CAG, who serves as the applicant throughout the entire process.  Following  the  submission of  the  Letter of  Intent  (LOI)  to  FDOT,  the CAG develops  its Eligibility  Application.  Three  (3)  assessments  must  be  completed  as  part  of  the  Eligibility  Phase:  a Background Assessment, an  Intrinsic Resource Assessment and a Criteria Assessment. Descriptions of each  assessment  and  their  content  requirements  are  located  in  the  FSHP Manual.  Once  all  of  the assessments are completed, the CAG develops the Corridor Vision and  Initial Goals  for the corridor. A tentative schedule of completion of the Corridor Management Plan (CMP) is also prepared. The three (3) assessments, Corridor Vision and schedule are packaged together as the Eligibility Application, which is submitted  to  the DSHC  for  review.   After  the DSHC  review, a  copy of  the application  is  sent  to each member of the Scenic Highways Advisory Committee (SHAC). The SHAC holds a meeting to vote on the candidate  corridor.  If  the  SHAC  determines  that  the  corridor  qualifies  for  “Eligibility”,  a Recommendation of Eligibility will be forwarded to the FDOT Secretary who will make a formal decision.  

Designation The purpose of the Designation phase is to evaluate the opportunities and constraints that exist within the corridor and develop a plan that effectively incorporates or addresses these issues. This phase is an expansion  of  the  information  compiled  during  the  Eligibility  phase  and  analyzes  the  relationships between the corridor and  its  features. The end result  is the creation of an effective management and protection plan for existing and future conditions, known as the Corridor Management Plan (CMP).   

Page 13: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   11 

 

The Corridor Management Plan consists of fourteen (14) elements, which are listed here and described in the FSHP Manual: 

1. Background Conditions Analysis 2. Intrinsic Resource Assessment  3. Designation Criteria 4. Corridor Vision 5. Goals, Objectives and Strategies 6. Corridor’s Story 7. Corridor Management Entity 8. Community Participation Program 9. Local Support 10. Protection Techniques 11. Funding and Promotion 12. Comprehensive Plan Relationship 13. Partnerships and Agreements 14. Action Plan 

 To  foster a  sense of  responsibility and ensure a  commitment by  local government(s) and partners  to implement the CMP, portions of the CMP must be  incorporated into the appropriate local government comprehensive plan(s).   The Designation Application consists of a completed designation application  form and  the CMP. Once compiled,  the  CAG  submits  the  preliminary  Designation  Application  to  the  District  Scenic  Highways Coordinator  (DSHC), who  circulates  it  among  all  Unit Managers within  the  respective  District(s)  for review. Following revisions, the Designation Application form  is signed by the CAG Chairperson and an authorized representative from each participating local government through which the corridor passes.  The  final  Designation  Application  is  then  sent  to  the  DSHC  for  distribution  to  the  Scenic  Highways Advisory Committee  (SHAC).  If the SHAC recommends designation of the corridor, the FDOT Secretary will be notified and a letter will be sent to the CAG.   Each designated  corridor may have  a Dedication Ceremony  to  commemorate  the new  Florida  Scenic Highway.  The CAG  is  responsible  for determining  the details of  the  ceremony  and  coordinating with partners to make it happen. 

Implementation The primary duty of the CME is to implement the strategies identified in the Action Plan of the CMP. The CME is also responsible for on‐going activities within the corridor. As corridors do not remain static but change with their surrounding environments, reviews of the actual corridor and the CMP are part of the Implementation phase. The CMP must adapt to the changing conditions of the corridor while continuing to work toward the goals set forth by the Corridor Vision. To accomplish this CMEs prepare an Annual Report and a Five‐year CMP Update for review by the FDOT. 

Page 14: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   12 

 

 The Annual Report serves two purposes: 

1. Provides  a  status  report  on  the  intrinsic  resource  conditions,  implementation  strategies  and other CME activities. 

2. Compels  the CME  to analyze and discuss  the effectiveness of corridor strategies  in  relation  to the Corridor Vision. 

 The Corridor Management Entity (CME) completes a more comprehensive review of the scenic highway corridor and  its CMP every  five  (5) years after  the date of designation.   The purpose of  this Five‐Year CMP Update  is to assess, from a  longer historical perspective, things  like: the successes and failures of the CMP, the realization of corridor goals and objectives and the effectiveness of other areas within the CMP.  As  part  of  this  update,  the  Corridor  Vision  and  Goals  can  be  re‐evaluated  and  amended,  if necessary. 

3.5 PROGRAM MANUAL The Florida Scenic Highways Program Manual was  first prepared  in 1996 and  last updated  in 2009  in order to establish the procedure and administrative process by which public roads are to be nominated and designated. The Manual was designed  to give applicants  step‐by‐step  instructions on  completing the three phases of the program. As the Program grows, the Manual is revised to keep it current. 

3.6 TRAINING AND CONFERENCES To assist all  the participants of  the Program,  training on each phase of  the Program  is available upon request  from  the  Florida  Department  of  Transportation  District  and  Central  Offices.  The  training program  has  been  developed  and  organized  in  modules  in  order  for  communities  to  receive personalized  training  sessions  relevant  to  their  progress within  the  program  process.  The  individual training courses are presented upon request to CAG/CMEs.   The implementation of numerous training opportunities, workshops and Roadside Chats has taken place over the last few years. Roadside Chats are when the state scenic coordinator provides on request, fact‐to‐face assistance to address CAG/CME’s  issues. FSHP staff has given  Introduction Eligibility training to groups  submitting  a  Letter  of  Interest  and  Eligibility  Application,  Designation  training  to  groups submitting  a  Corridor Management  Plan  and Implementation  training  for newly  designated  groups.  Grant  workshops  and  other corridor  specific  workshops have  been  given  across  the state  by  National  Scenic Byways  representatives  and FSHP  staff.    Roadside  Chats were developed by  the State Scenic  Highways  Coordinator 

Page 15: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   13 

 

and FSHP staff  to allow  for all of  the scenic highway groups across  the state  to get  their own specific visits and question and answer sessions.  Many more workshops and Roadside Chats are planned for the future.  Statewide Scenic Conferences/Workshops were held in 2001, 2006 and 2008 in Cocoa Beach, Bradenton and Sarasota.  These workshops were significant successes for the FSHP community and will continue to provide networking and training in years to come.  Conferences are held every two years and from 2006 to 2008 the FSHP Statewide Conference attendance doubled.  Almost all feedback received by FSHP staff was positive feedback about sessions and gatherings that were held during both conferences. 

3.7 PROMOTION AND MARKETING A Marketing Plan for the Florida Scenic Highways Program was prepared  in April 2000 and updated  in 2004. These plans  identified 25  target markets  for  the development of print and electronic marketing materials. Five (5) of these were established as major markets towards which all FSHP marketing efforts would be focused. The five (5) major target markets are:  (1) tourism industry; (2) surrounding corridor communities;  (3)  media;  (4)  public  institutions;  and  (5)  travelers.  The  plan  also  identified  specific marketing and promotional  items  to be utilized when marketing  to  the  five  (5) major  target markets. Some of these items are the program website, brochures, press kits, trinkets/giveaways, travel displays at Florida Welcome and Visitors Centers,  coloring books and  local event  sponsorships  (e.g. 10K  runs, bike races, ribbon cutting ceremonies).   The mission of the Marketing Plan is: “Develop and produce dynamic promotional media designed to promote activity along the network of Florida’s Scenic Highways.” 

 The  Florida  Scenic  Highways  Program  has  had numerous  marketing  and  promotional accomplishments  in  recent  years.    These accomplishments  have  included  tourist  and program  DVD  production,  website  development, brochures  and  other marketing  items.  In  addition the FSHP program has pending efforts  that  include two  new  websites,  new  Hi‐Definition  videos  and GPS itineraries for hand‐held GPS units.    Two  DVDs  (tourist  and  program‐based)  were produced  in  2005‐2006  that  have  become  more than  useful  to  tourists  and  potential  program entrants.    Filming  took  place  in  2005  that highlighted many of  the major  resources along  the designated highways back  then  and were used  for the  DVDs.    Hundreds  of  tourist  DVDs  has  been 

Page 16: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   14 

 

distributed  at  trade  shows,  byway  celebrations,  festivals  and  conferences  around  the United  States.  These have helped  to  attract many  travelers  to  the  scenic highways of  Florida.    In  addition program DVDs have been distributed to potential groups looking to join the FSHP community.  These highlight the required program documents and outline what  is  required of groups wanting  to start  the designation process.  A current effort exists to create Hi‐Definition film footage that are a result of having thirteen (13) newly designated scenic highways since the previous DVDs were made in 2005‐2006.  These videos are a result of significant program and program manual changes.   The ten (10) previously designated corridors and the recent thirteen (13) will all have Hi‐Definition footage as a result.    An original website was developed a few years ago through the Florida Department of Transportation (FDOT)  Environmental Management Office  (EMO).This website was  the  first  Florida  Scenic Highways Program website  and  contained  links  for  all  candidates  and  designated  highways.    There  is  a main candidate highways page that  lists all of the candidate highways.   Once a highway  is designated more links are provided, including views of the highway, a map of the highway, activities and tour directions.  There are also program related pages like funding opportunities and useful information for all highways.  Two  new  websites  are  currently  in  development,  to  be  unveiled  in  2010.  These  efforts  include  a complete  revamping  of  the  current website  and making  that  into  a  program website  and  a  general tourist website.   Both of  the websites will be mobile device  compatible websites  so users can access them wherever  they  need  to  and  on  the  go.    The  program  website will  be  centered  on  the  FSHP community and will have a calendar of events, workshop/training  information,  important bulletins and other  information  just  for members  of  the  FSHP.    The  tourist  website  will  be  geared  towards  the travelers  of  all  Florida  scenic  highways  and  will  have  maps,  videos,  feedback  sections  and  other information just for travelers to the state of Florida and its scenic highways.  A  future  effort  of  the  FSHP  is  to  create  GPS  itineraries  of  all  the  designated  scenic  highways.  GPS itineraries are an entirely new area of  technology  that will be used  in personal GPS navigation units.  GPS/Navigation  units  have  recently  become  popular  travel  tools  for many  people.    The  FSHP  GPS itineraries will contain all of the Florida Scenic Highways and their significant resources and will be made available  to  the  public  via  civilian  GPS/Navigation  units  and  in  other  popular  software  formats.  In addition the itineraries will be posted to the FSHP web site, point of interest sites and itinerary sharing websites such a Tomtom.com, POIFriend.com and Garmin.com.  Many other marketing and promotional items have been produced over the past years that feature the FSHP.   Different versions of the Capture Florida statewide brochure have been produced with updates adding new scenic highways every couple of years.  These brochures have been distributed all over the state  of  Florida  and  around  the  world.    Florida  Visitor  Centers  have  displayed  and  distributed  the brochures,  as  well  as members  of  the  FSHP  community,  at  numerous  festivals  and  events.    Other promotional  items  like beach balls, water bottles, stickers, pens, pencils, playing cards, etc. have been developed and distributed.  All of these brochures and promotional items have helped to make the FSHP more widely known all over the United States and around the world. 

Page 17: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   15 

 

3.8 ANNUAL REPORTS PROCESS The Annual Reports process, implemented in 2002, is an all‐electronic process that groups can complete online.   This allows each CME  to  complete  their Annual Reports on a more precise and  timely basis.  There  is a  series of questions  that all groups must answer  to  complete  their Annual Reports and  the online  format  is a  simplified process.   All of  the FSHP  staff can  then  look at a certain group’s Annual Report online, which allows them to review the reports easier.  The Annual Reports webpage will be re‐configured again in the future and incorporated into the new website. 

4.0 SURVEY RESULTS AND ANALYSIS Phone  interviews of participants  in  the Florida Scenic Highways Program were conducted  in April and May of 2009. The  interviews were conducted by a neutral party to assess the programs strengths and weakness  and  to  improve  the  overall  quality  of  the  program.    Feedback  was  obtained  from administration  to  the  grass  roots  level.  Four  (4)  participant  groups were  also  interviewed:  Corridor Management  Entities  (CME),  Corridor Advocacy Groups  (CAG),  Scenic Highways  Advisory  Committee (SHAC) members and the District Scenic Highways Coordinators (DSHC).   The respondents were asked a variety of questions  (See Appendix A). The questions were designed to determine  the  effectiveness  of  the  FSHP  program  in  terms  of  achieving  participants  goals,  program administration,  promotion,  training,  coordination,  funding  and  review  processes.  Questions  were tailored  to  the appropriate group based on  relevance. Some questions are open ended and broad by design. The purpose allows the respondents to define issues. Some questions are rated to help evaluate the current Evaluation of the program and establish a baseline for future program evaluations.  

4.1 PROGRAM EVALUATION SURVEY  The following results represent the common themes and responses from the various respondents. Since many  questions were  open‐ended  the  responses  vary widely.  That  being  said,  not  all  responses  are presented here. Responses presented represent the most common and relevant responses.   Rated responses are based on a percentage factor with 100% being a perfect rating. Respondents were asked pick a value between one (1) and ten (10). The scale uses one (1) as least desirable and ten (10) as most desirable. The responses were then averaged to come up with a percentage approval rating.   The following results are based on previously prepared questions that were asked to respondents during phone interviews (See Appendix A). Some respondents had multiple answers for a single question. Each these answers were included in the results.  

4.1.1 OVERALL PROGRAM  The following results show responses in terms of technology, suggestions, program challenges, program longevity, preservation techniques and rating the FSHP.  

Page 18: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   16 

 

The CAG, CME, DSHC and SHAC members were asked  to  (on a scale of 1‐10)  rate  the overall FSHP  in terms of achieving the CAG and CMEs goals. The averaged approval ratings are: 

1. Combined Overall Program Approval Rating 79% 2. CAG Overall Program Approval Rating 90% 3. CME Overall Program Approval Rating 77% 4. SHAC Overall Program Approval Rating 78% 5. DSHC Overall Program Approval Rating 80% 

 The CAG, CME, DSHC and SHAC members were asked “If you could change one thing about the Florida Scenic Highways Program what would it be?” Responses are sorted by the percentage of responses: 

1. Change nothing (28%) 2. Streamline, simplify and shorten the process and FSHP manual (22%) 3. More support from FDOT, FSHP staff and DSHC (22%) 4. Limits on designations and different types of designations (10%) 5. More state legislator support (3%) 6. Increased Marketing (3%) 7. More consistency in grant application scoring (3%) 8. More training for SHAC (3%) 9. Site visits as part of review process (3%) 10. More training for CAGs and CMEs (3%) 

 CAG,  CME,  DSHC  and  SHAC members were  asked  “What measures  need  to  be  taken  to  insure  the program’s long‐term success?” Responses are sorted by percentage of responses: 

1. Increased funding (22%) 2. Improve quality of designations (13%) 3. Increased promotion (13%) 4. Improved participant training   (10%) 5. Improve staffing (10%) 6. Enhanced state support (10%) 7. Federal support (7%) 8. Don’t know (7%) 9. Stronger FDOT support (2%) 10. Stronger Public support (2%) 11. Inter‐agency cooperation (2%) 12. Clear objectives and strategies (2%)  

 The CAG, CME, DSHC and SHAC members were asked “How can technology further the CME’s goals or better the program as a whole?” 

1. Websites (45%) 2. Internet based marketing (13%) 3. Cell phone tours (9%) 4. Support media (9%) 

Page 19: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   17 

 

5. GPS data (9%) 6. Webinars and web based documents (9%)  7. E‐Mail (6%) 

 SHAC members were asked “Does your agency have any resource preservation techniques that could be incorporated  into  the  Florida  Scenic  Highways  Program”  Responses  are  sorted  by  percentage  of responses: 

1. No improvements suggested (50%) 2. Land acquisition techniques (25%) 3. Mitigation of impacts (25%) 

 DSHCs  were  asked  “What  challenges  is  the  Florida  Scenic  Highways  Program  currently  facing?” Responses are sorted by percentage of responses: 

1. Funding (50%) 2. Sustainability of the participant organizations (10%) 3. Keeping CMEs organized and together after designation (10%) 4. CAG/CME membership (10%) 5. Local government support (10%) 6. Educating the public (10%) 

 DSHCs were asked “Would  restricting  the number of designations per year benefit  the overall Florida Scenic Highways Program?” The best response for this question was “Don’t restrict and don’t dilute.” All others, with the exception of one (1), did not think that restricting the number of designations per year was a good  idea. The  individual that thought  it was a good to restrict the number of designations was concerned with maintaining the quality of designation. 

4.1.2 TRAINING RATING, OPTIONS AND CHANGES The following responses indentify and rate training received by and training suggestions from CAG, CME and SHAC members.  The  CAG,  CME, DSHC  and  SHAC members were  asked  to  (on  a  scale  of  1‐10)  rate  the  training  they received. The averaged approval ratings are: 

1. Combined Overall Training Approval Rating 61% 2. CAG Overall Training Approval Rating: 95% 3. CME Overall Training Approval Rating 63% 4. SHAC Overall Training Approval Rating 68% 5. DSHC Overall Training Approval Rating 51% 

 What training options are respondents aware of in order of the most common response? 

CAG/CME  1. Statewide Conferences/Workshops (33%) 2. Webinars (19%) 

Page 20: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   18 

 

3. FDOT Staff or Consultants (15%) 4. Conference calls (10%) 5. Unaware of any available training options (8%) 6. Other training avenues mentioned include compact discs, manual, meetings, roadside chats 

and guest speakers (3% each) SHAC 

1. Manual (50%) 2. FDOT staff and conferences\workshops were all mentioned equally (25% each) 

DSHC 1. Unaware of any available training options (27%) 2. FDOT staff or consultants (27%) 3. Conference calls (19%) 4. Webinars,  internet  research  and  conferences/workshops were  all mentioned  equally  (9% 

each)  Training options most utilized in order of most frequent responses:         CAG/CME  

1. Statewide Conferences/Workshops (40%) 2. FDOT staff or consultants (23%) 3. Webinars (13%) 4. Conference calls (9%) 5. Other training avenues mentioned include compact discs, manual, meetings, roadside chats 

and guest speakers (3% each)        SHAC 

1. Learn as you go (33%) 2. Manual (33%) 3. FDOT staff and conferences/workshops all utilized equally (16% each) 

       DSHC 1. Unaware of any available training options (38%) 2. Consultants (26%) 3. Conference calls (12%) 4. Internet research (12%) 5. Conferences/workshops (12%) 

 

Recommended Training Improvements:   CAG/CME 

1. No suggestions (29%) 2. Inter‐byway communication and training (17%) 3. More training at the beginning of the FSHP eligibility/designation process (13%) 4. Optimize locations of training so that CAG/CMEs can attend (9%) 5. Continue offering Statewide Conferences/Workshops (4%) 6. Face‐to‐face training (4%) 

Page 21: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   19 

 

7. Training directly from FSHP staff//consultants (4%) 8. Grant application training (4%) 9. Best management practices for CMEs   (4%) 10. Post designation Training (4%) 11. Specialized workshops (4%) 12. FSHP staff should better communicate training options (4%) 

SHAC 1. New member training (25%) 2. Updated training more often (25%)  3. Yearly conferences/workshops (25%) 4. Promoting training options (25%) 

DSHC 1. New coordinator training (13%) 2. More training options (13%)  3. Meeting with all coordinator (13%)s 4. Annual DSHC meetings (13%) 5. Educating CME and public on preserving intrinsic qualities (13%) 6. Technical training (13%) 7. Conflict management (13%) 8. Lessons learned training (13%) 

4.1.3 AGENCY COOPERATION, COORDINATION AND PROMOTION   The following results show respondents views on the programs promotional efforts and the cooperation and coordination among involved agencies and local governments.   CAGs and CMEs were asked “How do you (on a scale of 1‐10) rate the cooperation you’ve received from local governments?” The respondents’ averaged approval rating was 79%.  CAGs  and  CMEs were  asked  “What  can  be  done  to  improve  cooperation  from  local  governments?” Responses are sorted by percentage of responses: 

1. Educating, marketing and communicating to local municipalities (64%) 2. No improvements suggested (32%) 3. Manage grants locally (2%) 

 

The CAG, CME, DSHC and SHAC members were asked to (on a scale of 1‐10) rate the FSHP’s state and federal agency coordination efforts. Responses are sorted by percentage of responses: 

1. Unaware of coordination efforts (64%) 2. Those aware of the coordination efforts (36%)  gave an averaged approval rating of 79% 

 

The DSHC and SHAC members were asked “Are there any state agencies, not currently represented, that should be involved in the Florida Scenic Highways Program?” They responded: 

1. No agencies suggested (43%) 2. Fish and wildlife (15%) 

Page 22: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   20 

 

3. Division of Community Development (7%) 4. Department of Community Affairs (DCA) (7%) 5. Department of Forestry (7%) 6. Department of Environmental Protection (DEP) (7%) 7. State Park Service (7%) 8. State or other tourism boards (7%) 

 The  DSHC  and  SHAC members were  asked  “How  do  you  (on  a  scale  of  1‐10)  rate  the  cooperation between  involved agencies?” Three  (3) respondents  indicated  that  they had no knowledge and hence their responses were excluded. They responded with an averaged approval rating of 89%. When asked what improvements they would suggest they responded: 

1. No improvements suggested (67%) 2. Education of other agencies (11%) 3. Increase involvement with local agencies (11%) 4. Educate agencies that CMEs are not a regulatory agency (11%) 

 

The CAG, CME, DSHC and SHAC members were asked what state and federal coordination efforts they would like to see. Responses are sorted by percentage of responses: 

1. Make sure the SHAC is fully staffed and trained (17%) 2. Work with agencies at local levels (17%) 3. State parks department (8%) 4. Communication among any agencies that may be interested (8%) 5. Would like to see better coordination within the FDOT itself (8%) 6. Have scenic chapter in FDOT Maintenance manual (8%) 7. Coordination with VISIT FLORIDA (8%) 8. Train relevant agencies (8%) 9. Road user groups. Bike/pedestrian etc (8%) 10. Water management, forestry, DEP and land management agencies (8%) 

 

CAGs, CMEs and DSHCs were asked “How do you (on a scale of 1‐10) rate the Florida Scenic Highways Program’s promotional and marketing efforts?” The respondents gave the program’s promotional and marketing efforts an averaged approval rating of 66%.  

CAGs,  CMEs  and  DSHCs  were  asked  what  improvements  they  would  like  to  see  for  the  program’s promotional and marketing efforts. The results are in order of occurrence: 

1. More of the same and/or updates to existing efforts (31%) 2. No improvements suggested (15%) 3. Website improvements (12%) 4. Communication marketing efforts to participants (12%) 5. More interaction with VISIT FLORIDA (9%) 6. Educating public and local governments (9%) 7. Improved signage (6%) 8. Internet marketing (3%) 9. Improved use of technology (3%) 

Page 23: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   21 

 

4.1.4 PARTICIPANTS GOALS The following results  identify the participant’s goals and the effectiveness of the program  in achieving those goals.  CAGs and CMEs were asked “Why did you seek designation as a scenic byway?” Responses are sorted by percentage of responses: 

1. Promote (41%) 2. Preserve (39%) 3. Enhance (20%) 

 The  CMEs were  also  asked  if  achieving  designation  has  helped  to  achieve  their  goals.  All  but  three agreed that being designated has helped to achieve their goals.  CMEs were asked “How has being designated as a Florida Scenic Highway helped to further your goals?” Responses are sorted by percentage of responses: 

1. Improved community support and cohesiveness (36%) 2. Achieve funding (18%) 3. Credibility (14%) 4. Promotion (14%) 5. Improved support from local government (11%) 6. Achieve national designation (7%) 

 CAGs  and  CMEs were  asked  “What  unexpected  benefits  have  you  received  from  the  Florida  Scenic Highways Program process?” Responses are sorted by percentage of responses: 

1. No unexpected benefits (37%) 2. Community recognition and cohesiveness (29%) 3. Funding opportunities (19%) 4. Increased support from local governments (10%) 5. Increased byway attractions (5%) 

 SHAC  members  were  asked  “Are  the  goals  of  your  agency  being  furthered  by  the  Florida  Scenic Highways Program?” All but one  (1) member  thought  their agencies goals were being  furthered. The department  of  Forestry  representative  presented  that maintenance measures  like  controlled  burns aren’t always well received by scenic byways.  SHAC members were  asked  “Have  you  found  the  goals  of  the  participants  to  be  in  line with  your agencies goals?” All SHAC members thought that the participant’s goals were in line with their goals. 

4.1.5 PARTICIPANTS CONCERNS The following results identify the CAGs and CMEs general concerns and suggestions.   

Page 24: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   22 

 

DSHCs,  CAGs  and  CMEs  were  asked  “What  road  blocks  have  you  (CAGs  and  CMEs)  experienced?” Responses are sorted by percentage of responses: 

1. Local government (25%) 2. No major roadblocks (21%) 3. Funding (14%) 4. Membership (11%) 5. Time and scheduling (11%) 6. Community support (6%) 7. Development (6%) 8. Administrative Support (6%) 

 CMEs were asked what areas of maintaining support has been an  issue and  if so what are the causes. Responses are sorted by percentage of responses: 

1. No problems with support (36%) 2. Membership (28%) 

A. Maintaining interest (43%) B. Lack of population along byway (29%) C. Motivation (14%) D. Volunteer coordinator (14%) 

3. Local government (28%) A. Lack of education and understanding (43%) B. Political representation (29%) C. Consistency of relationships (14%) D. Time (14%) 

4. Community (8%) A. Lack of continued exposure (50%) B. Lack of volunteer coordinator (50%) 

 CAGs and CMEs were asked “What is the key component to your CME/CAG’s sustainability?” Responses are sorted by percentage of responses: 

1. Maintaining membership (45%) 2. Maintaining leadership, interest, an enthusiasm (17%) 3. Funding (8%) 4. Community support (8%) 5. Maintaining local government support (6%) 6. FSHP Annual Report process (2%) 7. Achieving goals (2%)  8. Maintaining uniqueness of intrinsic resources (2%)  9. Administrative (FDOT) support (2%)  10. Establishing nonprofit structure (2%) 11. Nonprofit structure (2%) 

 

Page 25: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   23 

 

CAGs and CMEs were asked “What do you think will be the key component to maintaining your byway’s designation?” Responses are sorted by percentage of responses: 

1. Maintaining membership (26%) 2. Promotion and marketing (10%) 3. Local government support (10%) 4. Maintain and improve corridor (10%) 5. Maintaining leadership, interest, an enthusiasm (10%) 6. Funding (10%) 7. Community support (6%) 8. Achieving goals (6%) 9. CMP adherence (6%) 10. Preventing development (3%) 11. Relationship with DSHC (3%) 

4.1.6 PARTICIPANT SUPPORT The following results identify and assess the support resources available to CAGs and CMEs.   CAGs, CMEs and DSHCs were asked “How do you (on a scale of 1‐10) rate the assistance given by your District Coordinator? (DSHC)” The DSHCs were asked to (on a scale of 1‐10) rate themselves in terms of the assistance they give. The averaged approval ratings are: 

1. Combined approval rating of 84% 2. The respondents gave the DSHCs an approval rating of 87% 3. The DSHCs gave themselves an approval rating of 74% 4. CMEs  and  CAGs were  asked  if  their DSHC  responded  in  a  timely manner. All  except  one  (1) 

responded positively   CAGs  and CMEs were  asked  “Have  you  established  a  good working  relationship with  the DSHC?” All respondents said they had established a good working relationship.  CME and CAGs suggested these DSHC improvements: 

1. No improvements suggested (82%) 2. Better education (10%) 3. Assistance with grant writing (4%) 

4. Dedicated DSHC (4%)  DSHCs were asked “In what ways do you assist CAGs and CMEs?”Responses are sorted by percentage of responses: 

1. Attend meetings (28%) 2. Moral support (18%) 3. Keep informed (12%) 4. Obtaining funding (12%) 5. Technical support (12%) 

Page 26: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   24 

 

6. Provide staff and consultants (12%) 7. Liaison to FDOT Central Office (6%) 

 DSHCs  were  asked  “What  else  could  you  do  to  assist  CAGs  and  CMEs?”  Responses  are  sorted  by percentage of responses: 

1. Nothing more they could be doing (45%) 2. Give them more time (22%) 3. Administrative support (11%) 4. Attend more meetings (11%) 5. Need more funding to do more (11%) 

 DSHCs  were  asked  “What  additional  resources,  if  any,  could  you  use?”  Responses  are  sorted  by percentage of responses: 

1. Time (22%) 2. Training (11%) 3. Funds (11%) 4. Personnel and/or consultants (11%) 5. Educate communities (11%) 6. Educate CMEs (11%) 7. More training options (11%) 8. Clearly defined job description for DSHC (11%) 

 CAGs  and  CMEs were  asked  “How would  you  (on  a  scale  of  1‐10)  rate  the  availability  of  resource materials?” The respondents’ averaged approval rating was 84%.  

1. CAGs and CMEs suggest the following improvement for resource materials : A. No improvements suggested (52%) B. Communicate available resources (14%) C. Website resources (9%) D. Best practices document (9%) E. Grant resources (4%) F. Interconnectivity with other byways (4%) G. Update program manual (4%) H. CME bylaws (4%) 

4.1.7 ELIGIBILITY AND DESIGNATION PROCESSES The following results assess the current state of the eligibility and designation processes.  CAGs and CMEs were asked “How do you (on a scale of 1‐10) rate the eligibility/designation process?” Some respondents (3) indicated that they had no knowledge and hence their responses were excluded. The respondents’ averaged approval rating was 75%.  

Page 27: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   25 

 

CAGs  and  CMEs  were  asked  “What  could  be  improved  about  the  eligibility/designation  process?” Responses are sorted by percentage of responses:  

1. No improvements suggested (48%) 2. Streamline and shorten (32%) 3. Funding (5%) 4. Would like to see requirements consistent with the NSBP (5%) 5. Sunshine law support (5%) 6. Clarification of types of designation (5%) 

 SHAC members  were  asked  “Would  you  like  to  see  any  changes  to  eligibility  requirements?”  They responded: 

1. No (50%) 2. Yes (50%) Would like to see stricter requirements and see scenic qualities. 

 SHAC members were asked  “Would you  like  to  see any  changes  to designation  requirements?” They responded: 

1. No (75%) 2. Yes (25%). Applicants should make preservation techniques a priority and be clearly represented 

in documents 

4.1.8 REVIEW PROCESSES The  following  results  assess  the  current  state  and  effectiveness  reviewing designation,  eligibility  and Annual Reports.   

CMEs  were  asked  “How  do  you  (on  a  scale  of  1‐10)  rate  the  Annual  Report  process?”  Nine  (9) respondents  indicated  that  they  had  no  knowledge  and  hence  their  responses were  excluded.  The respondents’ averaged approval rating was 72%. 

1. The CMEs were asked what improvements could be made. Responses are sorted by percentage of responses:  A. No improvements suggested (65%) B. Simplified and eliminate redundancy (21%) C. Communicate requirements (7%) D. Deadline flexibility (7%) 

 

The DSHCs and SHAC members were asked “How do you  (on a scale of 1‐10)  rate  the Annual Report process  in  terms of monitoring designated byways?” Four  (4)  respondents  indicated  that  they had no knowledge and hence  their  responses were excluded. The  respondents’ averaged approval  rating was 80%.  

SHAC members were asked “How do you  (on a  scale of 1‐10)  rate  the  resources available  to you  for reviewing eligibility documents?” The respondents’ averaged approval rating was 80%. 

1. When asked “What resource improvements would you like to see?” they responded: A. No improvements suggested (50%) 

Page 28: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   26 

 

B. Training on eligibility review (25%) C. Electronic documents (25%) 

 SHAC members were asked “How do you  (on a  scale of 1‐10)  rate  the  resources available  to you  for reviewing designation documents?” The respondents’ averaged approval rating was 83%. 

1. When asked “What resource improvements would you like to see?” they responded: A. No improvements suggested (33%) B. Training on designation review (33%) C. Would like to see hard copies of documents (33%) 

 SHAC  members  were  asked  “Do  eligibility/designation  documents  provide  you  with  sufficient information  for review?” The respondents all answered positively. Only one  (1) respondent suggested that site visits or videos of the corridors would be useful for eligibility review.  DSHCs and SHAC members were asked “Do you have sufficient time to review the eligibility/designation documents?” All answered yes. When asked how much time they require they responded one‐two (1‐2) weeks for eligibility documents and two‐four (2‐4) weeks for designation documents.  DSHCs and SHAC members were asked “Do you review the Annual Reports”. Half of the SHAC members said they review Annual Reports.  Six (6) out of nine (9) DSHCs said that they or their consultants review the Annual Reports. 

4.1.9 DSHC, CAG AND CME FUNDING The  following  results are aimed at assessing and  identifying program and participant  funding  sources and concerns.   DSHCs were asked “Where did you get your funding?” Responses are sorted by percentage of responses: 

1. FDOT District Funding (29%) 2. Grants (29%) 3. No funding (14%) 4. Private fundraising (14%) 5. FDOT Grants (7%) 6. Planning office (7%) 

 DSHCs  were  asked  “What  do  you  use  the  funding  for?”  Responses  are  sorted  by  percentage  of responses: 

1. Consultants and staff (45%) 2. No funding (22%) 3. Assisting CAG/CMEs (11%) 4. Right of way (ROW) acquisition (11%) 5. Feasibility study (11%) 

 

Page 29: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   27 

 

CAGs and CMEs were asked “How do you  (on a scale of 1‐10) rate ability to obtain  funding?” Two  (2) respondents  indicated  that  they  had  no  knowledge  and  hence  their  responses were  excluded.  The remaining respondents’ averaged approval rating was 67%.  CAGs and CMEs were asked “What channels of funding have worked?” Three (3) respondents indicated that  they  had  no  knowledge  and  hence  their  responses  were  excluded.  Responses  are  sorted  by percentage of responses: 

1. NSB grants (33%) 2. State grants (19%) 3. State program funds (19%) 4. Local governmental agencies (15%) 5. Private fundraising (7%) 6. FDOT transportation funds (7%) 

 CAGs  and  CMEs  were  asked  “What  channels  of  funding  have  not  worked?”  Three  (3)  respondents indicated  that  they had no  knowledge and hence  their  responses were excluded. The most  common explanation as to why efforts didn’t work had to do with competition for grants and  lack of support to pursue funding sources. Responses are sorted by percentage of responses: 

1. All efforts have worked (50%) 2. NSB grants (20%) 3. Private fundraising (20%) 4. State Greenways (5%) 5. VISIT FLORIDA funds (5%) 

 

Page 30: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   28 

 

5.0 FSHP STATEWIDE CONFERENCE/WORKSHOP ATTENDEE FEEDBACK The Following is an excerpt from the Florida Scenic Highways Program Goal Setting Forum section of the Florida Scenic Highways Program 2008 Statewide Conference Proceedings.  

During  the  final session of  the conference FSHP staff asked  that  the participants provide  input on  the goals, obstacles, opportunities and constraints they are facing in the program.   

The  participants  were  asked  to break  into  groups  based  on  the tables at which they were sitting and  provide  feedback  on  the following  types  of  questions: What can the program do better for  participants?  What  are  the obstacles  CAG  and  CME  groups face? What new  items could the program  develop  to  help  CAG and CME groups succeed?  

The participants spent some time within their respective groups brainstorming  ideas and strategies for the program. FSHP staff collected the results and led each group in presenting their results to the entire delegation.   

The  following  outlines  the  suggestions,  obstacles,  and  ideas  conference  participants  presented.  This input is broken down by common program areas. The percentages of responses presented by common program areas are: 

1. TRAINING AND CONFERENCES (35%) 2. MISCELLANEOUS RESPONSES (22%) 3. FUNDING (17%) 4. PROMOTIONAL (9%) 5. LOCAL GOVERNMENT COOPERATION (7%) 6. INTER‐BYWAY COMMUNICATION (7%) 7. ENHANCEMENT (3%) 

 All of the responses from the "Goal setting session" are listed in the following sections. For the purpose of  this  report  the  responses were  broken  out  by  common  program  areas.  Some  responses  covered several  program  areas  and  are  listed  in  each  area.  The  number  of  responses  (if more  than  one)  is denoted in parenthesis [i.e. (2)].  

5.1 TRAINING AND CONFERENCES RESPONSES  1. Continue the biannual conference 2. FDOT Coordination/Training 

Page 31: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   29 

 

       A. Uniform MSG/Policies/Program Consistency of information 3. Next conference 

A. Listen more and talk less B. CMEs‐ Story/Successes/Failures C. Sustainability of CMEs 

4. Regional, quarterly Scenic Highway meetings ‐ roundtable style 5. Add an “Orientation” portion of conference vs. issues for long‐established CMEs 6. Training to develop technical skills for media outreach 7. Specific Workshops to address issues 

A. Grants/fundraising B. Publicity C. CME Organizational D. Advocacy 

8. Hold state FSHP conference annually 9. All district coordinators have on‐going training & coordination 10. Roadside chat – for CAG/CME support 11. CAG/CME/Board Training 12. Sunshine Law workshop relating to the FSHP (3) 13. Governance and Incorporation Guidance 

5.2 MISCELLANEOUS RESPONSES  1. Certain characters foul up the Annual Report format 2. Limit the number of designations 3. Future years‐ No FDOT 

A. All highways are designated roadways/corridors, then sustainability through CMEs 4. 501(c) (3) application training process 5. Scenic Highways have more impact in regulating decisions 6. Provide more statistics/data on economic benefits of Scenic Highways 7. Online Resource Center (samples, information) 8. Non‐Profit Designation 9. Central Archive provided for public records 10. Clear Information and Direction On: 

A. Federalization of Road          • If you get a grant 

11. Better Coordination‐ between CME & FDOT 12. Non‐federal money 

5.3 FUNDING RESPONSES  1. More funding for grants 2. More money is needed 3. More money needed 4. Need to know what’s expected 

A. To Get a Grant 

Page 32: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   30 

 

B. After we get a grant • How to process • How to manage • Reporting requirements 

C. Must all Federal Rules be followed         • RFPs         • Licenses         • Minority owned companies 

5.4 PROMOTIONAL RESPONSES  1. FSHP  branding  materials  for  each  CAG/CME  to  be  used  for  public  outreach  programs,  i.e. 

banner, brochures and give‐a‐ways 2. Standardize symbols for all scenic highway maps 3. Training to develop technical skills for media outreach 4. Sell T‐Shirts 5. Have state develop a strategy to integrate tourism into scenic highway organizations 

5.5 LOCAL GOVERNMENT COOPERATION RESPONSES  1. Closer partnering with local government to ensure timely completion of grant projects 2. JPA/LAP Issue 

A. Process/Information Flow 3. Have state develop a community Toolkit to educate community and local officials 4. Governance and Incorporation Guidance 

5.6 INTER‐BYWAY COMMUNICATION RESPONSES  1. Field trips to different byways 2. More CME group discussions 3. Enhanced coordination among CME 4. Create networking tool on website (state) so CAGs/CMEs can communicate with each other 

5.7 ENHANCEMENT RESPONSES  1. Encourage the state to remove billboards from Scenic Highways 2. Facilitate placement of utility lines underground 

Page 33: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   31 

 

6.0 ON­GOING FEEDBACK  On‐going  feedback  for  the  FSHP  has  been both positive and negative.   The main  thing that  the  FSHP  staff  and  consultants  have been  praised  for  is  their  knowledge  of  the program, ability to help everyone associated with  the  program  and  their  responsiveness to people who need help.   The process that has been developed with the requesting and delivering  of  promotional  items  for  events and  festivals  has  received  very  positive feedback.    Members  of  the  FSHP  simply request items and they are immediately sent to  them  by  a  member  of  the  FSHP  staff.  Another area that has received acclaim over the past  few years  is  the Statewide Conferences/Workshops.   FSHP staff has been  told  time and  time again how relevant the sessions are and how  the conferences are overall an enjoyable experience  for most that attend.  Some of  the negative  feedback has  involved  the Scenic Highways Advisory Committee  (SHAC), Annual Reports, the de‐designation of The Tamiami Trail National Scenic Byway, issues with the website and the overall difficulty of  the designation process.   The SHAC has had some  trouble  in  recent years keeping members, as changes to governmental agencies have caused members to have to resign their post on the SHAC.   After a member  leaves  the SHAC  it usually  takes some  time  to  find a  replacement.   There were also problems with the SHAC meeting schedule in the past. The meetings were irregular and there was no formal schedule.  This has since been fixed with the development of annual SHAC schedule.  The Annual Report process was incorporated on the website to make the process easier, but there have also been  some  technical  difficulties with  it.    Some  groups  have  had  difficulty  entering  information  and character style limits and word limits have caused problems when submitting Annual Reports.  In 2008, the FSHP and the National Scenic Byways Program had  its  first highway de‐designated  in the Tamiami Trail National Scenic Byway.  This was due to an absence of a CME agreement and lack of a grass roots effort  in  the  area.    This  unfortunately  caused  some  negative  feedback  for  the  FSHP  and NSB.    The website  that was  developed  for  the  FSHP  a  few  years  ago was  certainly  a welcome  addition  to  the program, but it has had some problems.  It is done through the FDOT with little information for travelers to  the  state.  The  site mainly  contains  information  for  the  FSHP  community, which  is hard  to  find  at times.  Updates to the site’s layout have been minimal and content is just updated as needed.  This will soon be remedied with the development of two new websites, a program and tourist website.   There have been a  few complaints about  the difficulty of  the designation process also.   Some  feedback has been received from groups that the process takes too long and is difficult for many grass roots programs 

POSITIVE FEEDBACK:    Program staff/consultants are able and responsive    Promotional items well received    Statewide Conferences/Workshops well received  NEGATIVE FEEDBACK:    Maintaining SHAC is a problem    Regular SHAC meetings implemented    Annual Reports technical difficulties    Tamiami De‐Designation    Web site improvements    Designation process too long and complicated 

Page 34: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   32 

 

to go through.  The process for designation will be analyzed in the near future to determine how and if it can be streamlined.  All on‐going feedback, whether positive or negative, is greatly appreciated and will be taken in account whenever  it  is  received.   The FSHP  staff would  like  to  thank everyone  involved with  the program  for their  continued efforts,  thoughts and  ideas.   The  FSHP  can only get better with  the  feedback  that  is given. 

7.0 ANNUAL REPORTS FEEDBACK The 2002‐2008  FSHP Annual Reports were  reviewed  for  common problem  areas  listed by CMEs. The CMEs  were  instructed  to  “Describe  any  problems  that  have  arisen  regarding  the  corridor.”  The responses were grouped by  relevance  to common problem areas. Some  individual  responses covered several different problem areas and were counted as one (1) response for each of those areas. Problem areas  that were  repeated each year were counted as one  (1)  response  for each year mentioned. The problem areas mentioned in order of prevalence are:  

1. No problems listed (15%) 2. Report not completed (14%) 3. Preservation (13%) 4. Neglected to report (12%) 5. Local government support (11%) 6. Development (9%) 7. FDOT coordination (5%) 8. Funding (5%) 9. Public support (4%) 10. Membership (3%) 11. Time delays (3%) 12. Promotion (2%) 13. Administrative support (2%) 14. Safety (2%) 

 The “Reports not completed” area indicates that either there was no information entered or a response of “Not Applicable” was entered. The exact reasons for this are either that the CME was just designated, or  the CME had  filed  its  five  (5) year CMP update. The complexity of  the process was addressed by a 2005  update  and  improvements  are  evidenced  by  almost  all  of  reports  for  2006  having  a  status  of completed.   The  “Neglected  to  report”  area  indicates  the number of designated  corridors  that when  required  to complete  the annual  reports did not  complete any  sections on  the web  site and have a  status of “In progress”  

Page 35: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   33 

 

The “No problems listed” area indicates that the CMEs completed portions of the report but did not list any problem areas.  The  “Preservation”  area  responses  centered  around  decreased  intrinsic  resources  due  to  hurricane damage, development and roadway maintenance or improvements.  The  “Local  government  support”  area  responses  focused  around  local  official  resistance,  lack  of regulatory impact, lack of education and bureaucratic red tape.  The “Development” area had to do with the preexisting development or new developments  infringing on or destroying intrinsic resources. Respondents in this area also discussed the lack of impact the CME had on making or implementing regulatory changes in regards to development.  The “FDOT Coordination” area has to do with coordination problems between the FSHP and FDOT itself. The  common  complaint was  that  FDOT maintenance or projects did not  consider or  coordinate with CMEs before proceeding with work on their corridor.  The “Funding” area focused on the CMEs’ ability to obtain funding and administration of funding once achieved.  The  “Public  support”  area mostly  has  to  do with  educating  the  public  as  to  promote  support  and diminish resistance.  The  “Membership”  area  responses were  centered on either maintaining members or having enough members to accomplish goals.  The  “Time  delays”  typically  dealt with  the  inability  to  expedite  projects  due  to  local  government  or administrative impedance.  The  “Promotion”  area mostly had  to do with  adequately promoting  their byway  to  the public,  local government, or tourists.  The  “Administrative  Support”  area  had  to  do with  having  the manpower  necessary  to  oversee  and implement projects on a day to day basis.  The “Safety” area had to do with the inability to implement changes that would improve safety because of poor designs or illegal road racing.  

Page 36: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   34 

 

8.0 RECOMMENDATIONS  These  recommendations  are  a  summary  of  the  results  received  from  the  goal  setting  session  at  the Statewide  Conferences,  on‐going  feedback,  Annual  Reports  feedback  and  survey  feedback.  These recommendations  are  based  on,  but  not  limited,  to  the  respondents’  most  common  themes  and suggestions.  Some  suggestions  are  included  based  on  their  merit  and  not  on  the  occurrence  in responses. While  these recommendations should be  taken  into consideration  they are not necessarily recommended as program priorities. These recommendations reflect the feedback given by respondents regardless  of  priority  or  feasibility.  The  feasibility  and  priorities  of  these  recommendations  will  be determined by the programs administration. Many respondents are quite pleased with the program and whose only suggestion, if any, was more of what the program is currently doing. For a complete picture of respondents’ feedback please see the Survey Results, On‐going Feedback, Annual Reports Feedback and Statewide Conferences/Workshops sections in this report.  

1. Provide  more  promotional  and  marketing  efforts  specifically  aimed  at  educating  local governments and communities 

2. More promotion and marketing with a focus on websites and internet based marketing 3. Institute  changes  to  insure  consistent  SHAC  membership  representation.  Perhaps 

responsibilities could be shared among several people within a particular agency  4. Provide consistent and differentiated training for all participants throughout their  involvement 

in the program 5. Require FDOT to coordinate project and maintenance efforts with CMEs 6. Promote inter‐byway communication and education 7. Focus on the implementation phase as much as the designation phase  8. Align designation requirements with National Scenic Byway Program requirements 9. Provide better communication of training, promotion and coordination efforts to all participants 10. Increase the frequency of Statewide Conferences/Workshops 11. Provide CMEs with resources and self‐checks for maintaining membership 12. Provide CMEs with additional resources for pursuing funding  13. Provide consistent funding and time resources for DSHCs 14. Make designations more restrictive to improve quality of designations 15. Provide more and better resources for CMEs 16. Better communicate the availability  of resources to CMEs 17. Streamline, simplify and shorten eligibility/designation process 18. Extend interaction and promotion among state and federal agencies 19. Hold regular SHAC and DSHC meetings 20. Improve the Annual Reports process in terms of ease of use and content 

Page 37: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   35 

 

9.0 FUTURE OF THE PROGRAM – “THE ROAD AHEAD”     The history of  the  FSHP has been  a  story of  increasing  success  and quality. This  is evidenced by  the increase of state and nationally designated byways from nine (9)  in 2003 to twenty‐four (24) currently (2009).  Further  evidence  of  this  is  the  funding distribution has more  than doubled  since  2003.    This report and previous reports, indicates a history of  the  program’s  efforts  to  maintain  a  high‐level of quality and efforts to improve quality.  The vision for the future, as in the past, should focus on achieving participant’s goals. Preserve, Promote, Protect and Enhance. These goals can be achieved by maintaining and  improving  the quality  of  the  program,  achieving  the  highest quality  designations  and  maintaining  the quality  of  existing  designations.  The  highest levels of quality will be attained by  constantly improving,  promoting,  educating,  monitoring and  maintaining  consistency  within  and without  the  program.    Let’s  remember  why we’re  here, who were  here  for  and what we are  preserving.    Let’s  keep  the  road  ahead beautiful! 

Page 38: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   36 

 

10.0 DEFINITIONS AND ACRONYMS  “All‐American  Roads”  are  public  roads  that  have  been  designated  by  the  federal  government  as satisfying National Scenic Byways criteria and have satisfied the additional criteria and requirements for designation  as  All‐American  Roads  pursuant  to  the  National  Scenic  Byways  Program  and  its implementing legislation and regulations.   “Archeological Resources” are the physical evidence or remains of known historic or prehistoric human life, activity or culture in Florida.  For example, significant ruins, artifacts, inscriptions, structural and/or human  remains may  all  be  considered  archeological  resources.  These  resources  differ  from  historic resources in that they may have existed before written records were kept in an area.  “Corridor Advocacy Group” (CAG) means a group of interested citizens, business interests, civic groups, local government  representatives,  Indian Tribal Councils and other corridor advocates  formed  to seek designation for a roadway as a Florida Scenic Highway.    “Corridor  Management  Entity”  (CME)  means  an  organization  created  through  joint  powers  of agreement or memorandum of understanding, or other agreement to perpetually administer, manage and monitor the designated corridor.   “Corridor Management Plan”  (CMP) means a  formal policy and plan  recognized by  the Department, elements  of  which  are  adopted  by  a  local  general  purpose  government(s),  as  applicable,  into  its comprehensive plan.    The CMP  addresses  the  goals, policies  and objectives,  standards, management strategies, regulatory controls and practices and Action Plans applicable to a designated Florida Scenic Highway.   Each Florida Scenic Highway shall have a CMP  intended  to preserve, enhance and maintain the intrinsic resources of the corridor and maintain roadway safety.  The CMP also shall address tourism and the local economy within the designated corridor.   “Corridor Video” means  a  videotape made of  the  corridor.    It  simulates or  represents  the  traveler's experience and will be used by the Scenic Highways Advisory Committee in determining eligibility.   “Cultural Resources” are portions of the human environment that express aesthetics, traditions, values and customs.  Traditions are usually associated with distinct groups of people which are passed on from one generation to the next. Cultural Resources may include crafts, music, arts, dance or drama, rituals, tribal or ethnic customs,  festivals,  languages, museums,  foods, special events, vernacular architecture, physical  or  recognized  legacies,  non‐resource  based  recreational  activities  and  customs  practiced  by people, either in the past or present.  “Department” means the Florida Department of Transportation.    

Page 39: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   37 

 

“Designation Application” means the package of information, including the Corridor Management Plan (CMP)  that  is  submitted  to  the Department  for  review  to  determine whether  a  roadway  should  be officially designated as a Florida Scenic Highway.   “Designation Phase” means the second phase of the process for the Florida Scenic Highways Program which ends with an approval/denial for state designation.   “Designation Classification” means a Florida Scenic Highway must fall into one of two (2) classifications: Scenic  or  Heritage.    Scenic  Corridors  are  those  highways  that  meet  program  criteria  for  natural, recreational or scenic resources.  Heritage Corridors are those highways that meet program criteria for historic, archeological or cultural resources.  “District” means one (1) of the eight (8) Florida Department of Transportation Districts within the State.   “District Scenic Highways Coordinator” (DSHC) means a person who has been appointed to implement the Florida Scenic Highways Program within the District.  “Eligibility  Application”  means  the  package  of  information  submitted  to  the  Department  for determination of a roadway’s eligibility as a Florida Scenic Highway.   “Eligibility Phase” means the first phase of the process for the Florida Scenic Highways Program where the Department determines whether  or not  a  roadway  is  eligible  for designation  as  a  Florida  Scenic Highway.   “Federal  Highway  Administration  (FHWA)”  is  the  federal  agency  which  oversees  all  highway transportation issues for the nation.  “Florida  Scenic Highway” means  any public  road  that  is  so designated  by  the  Secretary pursuant  to Section  335.093,  Florida  Statutes.    These  roadways  offer  travelers  views  of  cultural,  historical, archeological,  recreational,  natural  or  scenic  resources  and  provide  a  relaxed  recreational  and educational experience.   The  intrinsic resources of the corridor must be considered of significant value by the surrounding communities.   The corridor often  includes vistas, rest areas and other amenities  in harmony with the scenic character of the road.   “Florida Scenic Highways Program” (FSHP) encompasses the process and criteria that define a system of public  roads  that  are  officially  designated  by  the  Secretary  as  Florida  Scenic Highways.    It may  also include public roads  that are part of  the National Scenic Byways Program.   The FSHP  is voluntary and grass  roots  in nature and  there are no penalties attached  for  local general purpose governments not participating in the program.      

Page 40: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   38 

 

“Heritage  Classification” means  a  level  of  designation  within  the  Florida  Scenic  Highways  Program emphasizing historical, archeological and cultural qualities which dominate the corridor.  “Historical  Resources”  means  distinctive  physical  elements  in  the  landscape,  either  natural  or manmade,  that  reflect  actions  of  humans  as  they  relate  to  past  events,  sites,  or  structures.  These historical  resources  symbolize an  important era  in Florida history and portray a  legacy of Florida  that educates viewers while providing an appreciation of the past.   Resources may  include buildings, Indian habitations, trails, engineering structures, settlement patterns and landscapes.  “Implementation Phase” means the third phase of the process for the Florida Scenic Highways Program where, following designation, a Corridor Management Entity implements the actions and requirements developed in the Corridor Management Plan (CMP).   “Intermodal  Surface  Transportation  Efficiency  Act  (ISTEA)”  refers  to  the  federal  legislation  which initiated the development of the National Scenic Byways Program.  “Intrinsic  Resources”  means  the  cultural,  historical,  archeological,  recreational,  natural  or  scenic qualities  or  values  along  a  roadway  that  are  necessary  for  designation  as  a  Florida  Scenic Highway.  Intrinsic resources are features considered significant, exceptional and distinctive by a community and are  recognized  and  expressed by  that  community  in  its  comprehensive plan  to be of  local,  regional, statewide or national significance and worthy of preservation and management.   “Legislatively Designated Scenic Highways” are roadways designated scenic and/or historic by actions of the Florida Legislature.   “Letter of Eligibility” means the written notification form the Department to the applicant stating the Department’s decision to grant eligibility as a Florida Scenic Highway and initiate the Designation Phase.  This letter would also apply for the National Scenic Byways Program.  “Letter  of  Intent”  (LOI)  means  the  written  notification  form  submitted  by  the  applicant  to  the Department  stating  the  applicant’s  intent  to  pursue  designation  for  a  roadway  as  a  Florida  Scenic Highway.   “Local Government” means a county, municipality, or consolidated city‐county government.   “Local Government Comprehensive Plan”  refers  to  the  local government plan  for  regulating  land use and development within their jurisdiction, as defined by Section 163.3164, Florida Statutes.     “Metropolitan  Planning Organization  (MPO)  or Metropolitan  Transportation  Planning Organization (MTPO)”  means  the  forum  for  cooperative  transportation  decision  making  for  the  metropolitan planning  area,  as  defined  by  Federal  Transportation  Planning  Regulation  23  CFR  450.104.    MPOs 

Page 41: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   39 

 

designated prior to the promulgation of this regulation remain in effect until redesignated in accordance with § 450.106 and nothing in this part is intended to require or encourage such redesignation.    “National Scenic Byway” means a  scenic highway which  is designated by  the  federal government as satisfying the criteria  for a National Scenic Byway pursuant to Section 1047(f) of Title 23 USC and any federal  regulation and/or guidelines.   These  roadways offer drivers and passengers  views of  cultural, historical, archeological, recreational, natural or scenic resources and provide a relaxed recreational and educational experience.   “Natural Resources” means  the natural environment  such as wetlands, marshes, geological  features, forests,  landforms  or  topography,  as  well  as  water  bodies  and  vegetation  that  are  indigenous  and characteristic  of  Florida  and  its  differing  regions.  These  resources  should  show minimal  evidence  of exotic vegetation and adverse human disruption.  “Program Manual” means the Florida Scenic Highways Program Manual created by the Department to guide an applicant seeking designation for a roadway as a Florida Scenic Highway.  It details each phase in  the  Program  Process  and  offers  step‐by‐step  instructions.    The Manual  also  contains  all  forms  an applicant needs to submit to the Department for eligibility and designation.   “Program  Process” means  the  graphical  representation  or  flowchart  of  the  process  that  defines  the Eligibility, Designation and Implementation Phases of the Florida Scenic Highways Program.   “Public Road” means a  road which  is open and available  for use by  the public and dedicated  to  the public use, according to law or by prescription.  “Recreational Resources” are those that provide either active or passive outdoor recreational activities directly dependent upon the natural or cultural elements of the landscape.  These activities may include boating,  saltwater  and  freshwater  fishing,  hiking,  canoeing,  camping  (RV/Trailer  and  tent),  biking, saltwater beach activities, wildlife viewing, horseback riding, driving, hunting and picnicking.  “Scenic  Classification”  means  a  level  of  designation  within  the  Florida  Scenic  Highways  Program emphasizing natural, recreational and scenic qualities which dominate the corridor.  “Scenic Highways  Advisory  Committee”  (SHAC) means  the  Scenic  Highways  Advisory  Committee  as appointed by the Secretary.    “Scenic Highways Coordinator” means the statewide Scenic Highways Coordinator as recognized by the Secretary.    The  Scenic Highways Coordinator will be  responsible  for  implementing  the  Florida  Scenic Highways Program and will be assisted by District Scenic Highways Coordinators.   

Page 42: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   40 

 

“Scenic Resources” are a combination of natural and manmade features that give remarkable character to  the  visual  landscape.  These  resources  are  striking  in  appearance  and  provide  a  pleasing  and memorable experience to those who view them.   “State Highway System” means the following, which shall be facilities to which access is regulated: (a)  The interstate system; (b)  All rural arterial routes and their extensions into and through urban areas; (c)  All urban principal arterial routes; and (d)  The urban minor arterial mileage on the existing State Highway System as of July 1, 1987, plus 

additional mileage to comply with the two (2) percent requirement.  “Transportation  Equity  Act  of  the  21st  Century  (TEA‐21)”  refers  to  the  federal  legislation  which followed  the  Intermodal  Surface  Transportation  Efficiency  Act  (ISTEA)  of  1991  and  continued  the implementation of the National Scenic Byways Program and its grant program. 

Page 43: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   41 

 

 

       

APPENDIX A – SAMPLE SURVEY QUESTIONS 

Page 44: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   42 

 

FLORIDA  SCENIC  HIGHWAYS  PROGRAM EVALUATION REPORT QUESTIONNAIRE Date: 4/22/09  

SURVEY QUESTION INTENT AND FORMATION: The Florida Scenic Highways Programs participants will be interviewed to assess current status and effectiveness. The CAG, CME, DSHC and SHAC members will all be interviewed.    Questions are specific to CAG, CME, DSHC and SHAC members. The CME’s and CAG’s questions are aimed at establishing the program’s effectiveness in accomplishing CAG and CME goals. The DSHC and SHAC questions are aimed at establishing the program’s effectiveness in regards to administration, training, coordination, funding and the review process.  Some questions are open ended and broad by design. The purpose is to allow the participants to define issues. Rated questions will help to evaluate the current status of the program.  Rated questions will also help establish a baseline for future program evaluations. Questions with ratings have a range of 0‐10. Zero indicating no opinion or knowledge, one (1) indicating least desirable and ten (10) indicating most desirable.   

Page 45: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   43 

 

CAG QUESTIONS:  1. In terms of achieving your goals, what overall rating would you give the Florida Scenic 

Highways Program? 2. If you could change one thing about the Florida Scenic Highways Program what would it be? 3. Why are you seeking designation as a scenic byway?  4. How do you rate the cooperation you’ve received from local governments? 

A. What can be done to improve cooperation from local governments?  5. Have you received training?  

A. How do you rate the training you’ve received?  B. What training options are available to you?  C. What training options did you utilize? D. What training improvements do you recommend? 

6. What road blocks have you experienced? 7. How do you rate your ability to obtain funding? 

A. What channels of funding have worked? Why? B. What channels of funding have not worked? Why? 

8. How do you rate the eligibility/designation process? A. What could be improved about the eligibility/designation process? 

9. How would you rate the availability of resource materials? A. What improvements do you suggest? 

10. How do you rate the assistance given by your district coordinator?  A. What improvements do you suggest? B. Have you established a good working relationship with the DSHC? C. Does your DSHC respond in a timely manner? 

11. In what ways can technology better the Florida Scenic Highways Program? 12. How do you rate your impressions of Florida Scenic Highways Program’s state and federal 

coordination efforts?  A. What additional coordination efforts would you like to see? 

13. What is the key component to your CAG’s sustainability? 14. What do you think will be the key component to maintaining your byway’s designation? 15. How do you rate the Florida Scenic Highways Program’s promotional and marketing efforts?  

A. What improvements would you like to see? 16. What unexpected benefits have you received from the Florida Scenic Highways Program 

process? 

Page 46: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   44 

 

CME QUESTIONS 1. In terms of achieving your goals, what overall rating would you give the Florida Scenic 

Highways Program? 2. If you could change one thing about the Florida Scenic Highways Program what would it be? 3. Why did you seek designation as a scenic byway?  

A. Has the designation helped to achieve those goals? 4. How do you rate your ability to obtain funding? 

A. What channels of funding have worked? Why? B. What channels of funding have not worked? Why? 

5. How do you rate the cooperation you’ve received from local governments? A. What can be done to improve cooperation from local governments?  

6. How has being designated as a Florida Scenic Highway helped to further your goals? 7. Have you received training?  

A. How do you rate the training you’ve received?  B. What training options are available to you?  C. What training options did you utilize? D. What training improvements do you recommend? 

8. How do you rate the Annual Report process? A. What improvements could be made? 

9. How do you rate the eligibility/designation process? A. What could be improved about the eligibility/designation process? 

10. What road blocks have you experienced? 11. Have you found that maintaining support has been an issue?  

A. If so in what areas? (Member, community, local government) B. What are the causes for lack of support? 

12. How do you rate the assistance given by your district coordinator?  A. What improvements do you suggest? B. Have you established a good working relationship with the DSHC? C. Does your DSHC respond in a timely manner? 

13. How would you rate the availability of resource materials? A. What resource improvements do you suggest? 

14. In what ways can technology further your goals? 15. What is the key component to your CME’s sustainability? 16. What is the key component to your maintaining your byway’s designation? 17. How do you rate the Florida Scenic Highways Program’s state & federal coordination 

efforts?  A.  What additional coordination efforts would you like to see? 

18. How do you rate the Florida Scenic Highways Program’s promotional and marketing efforts?  A. What improvements would you like to see? 

19. What measures need to be taken to insure the program’s long term success? 20. What unexpected benefits have you received from the FSHP process? 

Page 47: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   45 

 

SHAC QUESTIONS 1. In terms of achieving the participant’s goals, what overall rating would you give the Florida 

Scenic Highways Program? 2. If you could change one thing about the Florida Scenic Highways Program what would it be? 3. Are the goals of your agency being furthered by the Florida Scenic Highways Program? 4. Have you found the goals of the participants to be in line with your agencies goals? 5. Would you like to see any changes to eligibility requirements?  6. Would you like to see any changes to designation requirements?  7. How do you rate the resources available to you for reviewing eligibility documents?  

A. What resource improvements would you like to see? 8. How do you rate the resources available to you for reviewing designation documents?  

A. What additional resources would you like to see? 9. Do eligibility documents provide you with sufficient information for review?  

A. What would you like to see added?  10. Do designation documents provide you with sufficient information for review? 

A.  What would you like to see added?  11. Do you have sufficient time to review the eligibility documents?  

A. How much time do you require? 12. Do you have sufficient time to review the designation documents? 

A.  How much time do you require? 13. Do you review the Annual Reports? 14. How do you rate the Annual Report process in terms of monitoring designated byways? 15. How do you rate your impressions of Florida Scenic Highways Program’s state and federal 

coordination efforts?  A. What additional coordination efforts would you like to see? 

16. How do you rate the cooperation between involved agencies? A. What improvements could be made? 

17. Are there any state agencies that should be involved in the Florida Scenic Highways Program? 

18. Have you received training?  A. How do you rate the training you’ve received?  B. What training options are available to you?  C. What training options did you utilize? D. What training improvements do you recommend? 

19. Does your agency have any resource preservation techniques that could be incorporated into the Florida Scenic Highways Program? 

20. In what ways could technology benefit the Florida Scenic Highways Program? 21. What measures need to be taken to insure the program’s long term success? 

  

Page 48: FSHP Evaluation Report...2017/02/08  · Florida Scenic Highways Program Evaluation Report 2009 3 In 1993, Section 335.093 of the Florida Statutes was passed to allow for the designation

Florida Scenic Highways Program Evaluation Report  2009 

 

   46 

 

DSHC QUESTIONS 1. In terms of achieving the participant’s goals, what overall rating would you give the Florida 

Scenic Highways Program? 2. If you could change one thing about the Florida Scenic Highways Program what would it be? 3. How do you rate the Florida Scenic Highways Program’s effectiveness in accomplishing the 

participant’s goals? 4. What do you use consultants for?  

A. Should we speak with them? 5. How do you rate yourself in terms of assisting participants to accomplish their goals? 6. What challenges is the Florida Scenic Highways Program currently facing? 7. Do you review the Annual Reports? 8. How do you rate the Annual Report process in terms of monitoring designated byways? 9. Do you receive any funding from your district?  

A. Where did you get your funding? B. How much funding do you receive? C. What type of funding do you receive? D. What do you use the funding for? 

10. How do you assist CME’s and CAG’s in obtaining funding?  11. What road blocks have your CAG/CMEs encountered? 12. What obstacles have you encountered implementing the Florida Scenic Highways Program? 13. What additional resources, if any, could you use? 14. In what ways do you assist CAGs? 

A. What else could you do? 15. In what ways do you assist CMEs? 

A. What else could you do? 16. Would restricting the number of designations per year benefit the overall Florida Scenic 

Highways Program? 17. Have you received training?  

A. How do you rate the training you’ve received?  B. What training options were available to you?  C. What training options did you utilize? D. What training improvements do you recommend? 

18. In what ways can technology better the Florida Scenic Highways Program? 19. How do you rate the Florida Scenic Highways Program’s promotional and marketing efforts?  

A. What improvements would you like to see? 20. How do you rate the Florida Scenic Highway Program’s state & federal coordination efforts?  

A. What additional coordination efforts would you like to see? 21. How do you rate the cooperation between involved agencies? 

A. What improvements could be made? 22. Are there any state agencies that should be involved in the Florida Scenic Highway Program? 23. What measures need to be taken to insure the program’s long term success?