    Hello everyone!!

    It gives me immense pleasure to present before you the updates of FormulaSAE IIT Roorkee team after the FSAE Australia competition. Our team

    performed very well in the competition and successfully finished the

    endurance event, a feat which has been achieved in the past by very few

    teams! Our motivation and sincere efforts got appreciated by everyone

    involved in the competition, ie the judges, organizers, and other teams.

    Our success could not have been possible without the support of our university

    administration, our faculty, sponsors and all our alumni supporters and donors.We are very thankful to everyone involved in making our dream come true,

    and hope to get the same support this year and years to come.

    Our efforts would have been meaningless without the support of our Faculty

    Adviser, Dr Nalin Sharda, Assistant Professor, Victoria University, Footscray.

    Not only did he help us in getting workshop space in the VU campus for

    assembly and repairs, he worked as hard as a team member to get the car up

    and running. It was only due to Dr Shardas, Dr Sharmas and Dr Pattabhisefforts that the team was able to perform so well in the competition. And it is

    only due to these gentlemen that the team did not starve during the

    competition!

    Our team is also grateful to the Aussie people, who selflessly came forward to

    help our inexperienced team to get out of trouble(s). Thanks to judges,

    organizers and scrutineers for giving us so much of personal time. Also a big

    thanks to all the teams for helping us getting our car out on track and cheeringus up. And for letting us use their tools/equipment and lending us stuff (some

    of which we did not return!)

    Kindly read forward for a day by day account of the competition fortnight.

    (Detailed event report in a separate file)

  • 8/3/2019 FSAE IIT Roorkee December Newsletter

    3/7

    Pre Competition in Australia: 8-14 December 2011

    Friday, December 9:

    Manufacturing team started assembly of the car Static events team started work on presentationsSaturday, December 10:

    Visit to RMIT Racing workshop Interaction with the famous Geoff Pearson, Faculty Advisor of RMITSunday, December 11 - Wednesday, December 14:

    Workshop specially opened by VU on Sunday Fabrication and Presentation work resumed Dr Sharda joined us on Monday Driver practice and troubleshooting on Wednesday

    Competition Day 0: Thursday, 15 December, 2011

    Transfer of car from VU Footscray to Weribbee (Thanks Simon!) Pit setup Interaction with other teams, learning about their cars

  • 8/3/2019 FSAE IIT Roorkee December Newsletter

    4/7

    Competition Day 1: Friday, 16 December, 2011

    Most Hectic Day Business Plan Presentation in the morning, good job done by the presenters Immediately followed by Cost Event, judges impressed by our efforts Technical Inspection in the afternoon, where some small issues were noted

    by scrutineers. These needed to be fixed before our car could enter the

    track.

    Design Event in the evening. Judges were impressed by the grasp ofengineering fundamentals of the team members.

    Back to pits to make changes for the Technical Inspection.

    Competition Day 2: Saturday, 17 December, 2011

    Cleared Tech-Inspection early morning! Driver egress test passed by Ashmeet Singh Sidhu. Passed the Tilt-table test. Unable to clear Noise test, as our engine made 115 db, 5 more than

    maximum allowed.

    Unable to clear Brake test as front wheels did not lock. Discovered thealmost unfixable front brake caliper problem.

    Immediately started working on the caliper, and the exhaust to reduce thenoise.

    Missed the Acceleration, Skidpad and Autocross events.

  • 8/3/2019 FSAE IIT Roorkee December Newsletter

    5/7

    Competition Day 3: Sunday, 18 December, 2011

    Cleared the Noise and Brake test early morning! Off to the enduranceevent.

    Started the endurance event Problems in gear shifter during the event, so car stuck in second gear all the

    time.

    Drivers Prashant Arora and Aneesh Mittal did a great job of finishing theendurance run without any further problems.

    Came out to be first in Fuel Economy!! Thanks to the Royal Enfield engine!

    Sadly, our total time was more than the maximum time allowed to finish the

    endurance, so we were not awarded any points for it, or for the fuel economy.

    Formula SAE IIT Roorkee team did a great job overall. Our team is one of the

    very few teams to complete the endurance run in first attempt.

  • 8/3/2019 FSAE IIT Roorkee December Newsletter

    6/7

    Upcoming Event:

    Auto Expo, New Delhi (5-11 January, 2012)

    We are excited to announce that our car will be on display in Hall 12 at Auto-

    Expo 2012, New Delhi. We would be honoured to have you visit our stall, to

    meet our team and look at the efforts of IIT Roorkee students and future

    engineers.

  • 8/3/2019 FSAE IIT Roorkee December Newsletter

    7/7

    Future Plans: Formula SAE Season 2012

    At Formula SAE IIT Roorkee, we always aim to grow bigger and achieve higher.

    Hence, with a lot of knowledge and experience from our participation in

    Australia, the team plans to participate in two events this year:

    Formula SAE Italy, September 2012 Formula SAE Australia, December 2012With a bigger and better team, we aim to make a much evolved car and aimfor better results this year. We look forward to everybodys help and support

    again this year!

    Thanks for being a part and parcel of our team. Wish you a very Happy New

    Year!

    Contact us at:

    Phone: +91-8006000266, +91-9457030695

    Email:[email protected]

    Website: formulaiitr.com

    mailto:[email protected]:[email protected]:[email protected]:[email protected]