EMS Project Management
From URS to Handover
Presented by Matt Kennett
22
From URS to Handover | Introduction
33
From URS to Handover | Introduction
44
From URS to Handover | Introduction
Lighthouse LMS Pharma
55
From URS to Handover | Introduction
66
From URS to Handover | Introduction
77
From URS to Handover | EMS Overview
What is an EMS?
Room / Area• Temperature• Relative Humidity• Pressure• Particle Counts• Gas Levels
Plant / Equipment• Particle Counts• Temperature• Pressure• CO2%• Fault Status
The EMS monitors and records environmental parameters in
controlled environments. It is independent from the controlling
system. It is GMP validated, and is relied on heavily for providing
data and reports for regulatory compliance.
88
REAL-TIME ALARMS
From URS to Handover | EMS Overview
99
SMS and Email Notifications
From URS to Handover | EMS Overview
1010
Real-Time Audible / Visual Alarm Indication
From URS to Handover | EMS Overview
1111
Particle Monitoring (Grade A BSC)
From URS to Handover | EMS Overview
1212
CO2 Incubator• Temperature• CO2%• Equipment Fault
Liquid Nitrogen Tank• Temperature• High Level Alarm• Low Level Alarm• Equipment Fault
Lab Fridge• Temperature• Equipment Fault
Equipment Monitoring
From URS to Handover | EMS Overview
1313
Corporate Overview
Established in 1987 and representing some
of the world’s leading equipment
manufacturers, LAF Technologies has
rapidly grown to become one of
Australasia’s largest, most successful and
respected suppliers of contamination
control, environmental monitoring and
advanced measurement instrumentation.
Fully NATA accredited to ISO17025, the
company is also arguably Australasia’s
leading service provider in the specialized
testing, decontamination and validation of
clean rooms, biological safety cabinets,
laminar air flow cabinets, fume hoods and
controlled environments. With offices in
Melbourne and Brisbane and specialist
distributors and service providers positioned
throughout Australasia, LAF Technologies
is committed to providing technically
advanced products and services at very
competitive prices.
The company is 100% Australian owned
and employs a wide variety of specialist
sales staff, service technicians, engineering,
field and support staff, along with other key
personnel. LAF Technologies also prides
itself on maintaining state-of-the-art service
/ repair facilities, NATA & ISO21501-4
accredited calibration laboratories and a
popular rental department, all in an effort to
provide flexibility and total peace of mind for
our valued clients. The company is also fully
ISO9001 quality accredited and maintains
accreditation to the latest ECO WARRANTY
environmental management standards. Our
national field services team employs a large
network of highly trained industry
professionals who operate 24/7 providing
world class testing services to the latest ISO
international standards for many of
Australasia’s leading manufacturers and
research organizations.
From URS to Handover | Corporate Overview
1414
From URS to Handover | Corporate Overview
1515http://www.laftech.com.au
From URS to Handover | Corporate Overview
1616
From URS to Handover | EMS Then vs. EMS Now
1717
From URS to Handover | EMS Then vs. EMS Now
1818
From URS to Handover | EMS Then vs. EMS Now
1919
• Increasing demand
• Better technology and platforms
• Practical knowledge and planning is often lacking.
From URS to Handover | EMS Then vs. EMS Now
2020
From URS to Handover | Initiation & Kick-Off
2121
EMS Project Management: From URS to Handover
No time for a plan…
• Options not looked at
• Immediate design constraints
• Working to a budgetary figure rather than a list of requirements
2222
From URS to Handover | Initiation & Kick-Off
• What are we monitoring?• Where are we monitoring?• When does it get installed?
2323
From URS to Handover | Initiation & Kick-Off
• What are we monitoring?• Where are we monitoring?• When does it get installed?
• How can we suit the EMS to what we do?
• Who is responsible for management of the system?
• Why reinvent the wheel? Seek advice!
2424
From URS to Handover | Initiation & Kick-Off
Invest in an expert. It will save you later.
2525
From URS to Handover | Initiation & Kick-Off
2626
From URS to Handover | Initiation & Kick-Off
Develop that URS!
• The backbone of a well executed EMS project
• Documented traceability from day one
• Ensures every single design requirement is met, accounted for, and delivered AS EXPECTED
• No matter how simple or complex the requirement. Get creative. Today’s systems are very capable.
2727
From URS to Handover | Initiation & Kick-Off
Develop that Scope!
• Straight forward, accurate definition of project deliverables
• A clearer picture at handover
• Important for us to be able to say we’re 100% complete
• Equally as important for the customer to be able to identify project shortfalls
2828
From URS to Handover | Initiation & Kick-Off
….when choosing the System and Supplier that’s right for you
• Suitable Technology – Modern and current is crucial
• Support and Service – Local? International? On-the-spot support?
• Quality of URS response – Do they really meet your needs?
• On-going management requirements – Cheap now / Expensive later?
• Reference Sites – Get the low down before you engage
2929
From URS to Handover | On-going Management
Well, who’s responsible for all this then?
3030
From URS to Handover | On-going Management
NATA Accredited Particle Counter Calibration Facility @ Laftech, Melbourne
3131
From URS to Handover | On-going Management
You want me to what?!
3232
From URS to Handover | On-going Management
• Heavy reliance on in-house networks and IT systems• Usually installed alongside facility IT systems• IT departments in smaller companies are struggling!
3333
From URS to Handover | On-going Management
THE IT CONSULTANT…
3434
From URS to Handover | On-going Management
The wider the knowledge gap, the bigger the phone bill.
3535
From URS to Handover | On-going Management
3636
From URS to Handover | On-going Management
• Get it sorted out early in the project!• Customer confidence at system handover• Maintenance costs are known from day one• All works pre-scheduled and prioritised
3737
From URS to Handover | Installation Issues
It doesn’t matter how good you are…
Sometimes, you get it wrong.
3838
From URS to Handover | Installation Issues
Fix it properly…
3939
From URS to Handover | Installation Issues
Fix it properly…
Don’t just get it over the line
4040
From URS to Handover | Validation Issues
• Allow the time for detaileddocument reviews
• Allow time for problemsduring validation – that’s thewhole point of it!
• Avoid “good enough” patchup jobs
4141
From URS to Handover | User Training & Support
• Good training is critical in a successful handover.
• Know who’s responsible for what. Get the RIGHT training.
• Modular Training
• Training new users in the future
• Training Resources
4242http://www.laftech.com.au/emshelp
From URS to Handover | User Training & Support
4343
From URS to Handover | System Handover
• Review the IQ/OQ
• Close out any outstanding actions
• Review the scope
• Close out any outstanding actions
SIGN OFF!
4444
From URS to Handover | System Handover
…separation anxiety
4545
From URS to Handover | Thanks for having us!
…until next time!
4646
From URS to Handover | Questions?