Green Hill by Waste and Mud from the Environmentally Sustainable View Point as PPP Project
( Before and after HIgh Wave Disaster )
Before Tsunami Disaster at Ishinomaki
After Tsunami Disaster at Ishinomaki
2015.03.19
Masaki AriokaExecutive Director of NPO SLIM Japan
![Page 2: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/2.jpg)
【Conventional Method】(Master Plan by ME 2011.05) 【Green Hill Method】
Debris Treatment Process Comparisonbetween Conventional Method and Green Hill Method
Green Hill Area(Fort by Debrisinto Soil Mortar)
Soil Mortarby Mud/Sludge
Recycle & Reuse(Concrete Rubble)
Reinforc ing Are
Soil Coveredby Soil Wate
BankingGreen Hill
Intermedeate treatment Place
Final Disposal Area( Inc inerater Residues
and Non-Classif ied Waste)
Detailed Classifyby Type
Incineration
Rough Separetion at the Siteduring Searching Missing People
Tsunami Mud/Sludge andSoil Covered by Soil Water
Debris Spread Sites
Temporal Stoch Place(Rough Separation)
[Transportation]
[Transportation]
[Transportation]
(Reinforced Area)
![Page 3: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/3.jpg)
3
Image of Green HillBy using Debris and Sludge
Make the Hill Core by Using of Debris and Soil Mortal
Make the Hill Core (Fort) by Using of Debris and
Soil Mortal
Mixed Debris Coreby using Soil Mortal
Hard Debris Coreby using Soil Mortal
Seepage ControlHard Debris Core
by using Soil Mortal
Wooded Area
Excavated
Sand Bag
![Page 4: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/4.jpg)
Morenuma Park in Sapporo, Hokkido(2.7millm3 Waste Embakment)
Play Mountain
Mt. Moere
![Page 5: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/5.jpg)
Intermediate treatment Place
Incinerator at the site Separation by Hand
![Page 6: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/6.jpg)
(1) Reduction of Traffic Hazard by ‘Local Reuse of Debris with less Separation and less Transportation’ under Extraordinary Situation.
(2) The Simpler Works, the More Efficient Results from the View Point of Time, Cost, Energy and Environment.
(3) Sustainability by Maintenance and Risk Management more than 30% of the Total Cost at least 30 years.
notes Proportion
Ⅰ Preliminary Planning,Survay and Dsign 2.2%
Ⅱ Direct Cost Debris Teratment and banking 56.7%
1 Baried in tsunami mad soil morta l 29.3%
2 Baried in tsunami mad soil morta l 7.8%
3 Including slaty soil by tsunami 6.5%
4 13.1%
Ⅲ 30 eyars 31.6%
Ⅳ Except public land such as roads 9.5%
100.0%
Cost Item
Maintenance and Risk contingency allowance
Land cost for banking area
Total
Mixed Debris Core
Hard Debris Core
Banking, Drainage and greening
Temorary works, Site and overhead office enpense
What are Advantages of Green Hill Concept
Breakdown of Debris and Mud Treatment (almost half cost compared with conventional method)
![Page 7: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/7.jpg)
Finance Scheme for Green Hill Concept
2011.04
2011.10
![Page 8: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/8.jpg)
Country with Low Sea Level and Flat Land
Maximum Altitude : 15 m
Nuku’alofa
![Page 9: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/9.jpg)
2009/9/29MG 8.1, Hmax = 4.5m~6m Death toll : more then 189
Samoa Earthquake
![Page 10: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/10.jpg)
Although Tongan People are afraid of Tsunami Disaster, only the thing they can do is to evacuate to relatively higher place far from their residential area.
![Page 11: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/11.jpg)
Raw garbage
Dayliy solidrubbish
Cement
Constructionwastes
Mud in theswamp
Recycle ofWaste
Soil Mortal
Dead treesSedumentation in
the ragoon
Scrapped cars
Minimamizing Damage
High waveDisater preventation
and reductionTsunami
Sea level rise
Earth warming
Garbage reclamation pit
Soil by excavation of the pit
Green Hill by Waste and Mud (WMGL)
【Seaside Disaster】
【Reuse Waste】 【Recycle Mud】
![Page 12: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/12.jpg)
Typical Seaside of South Pacific Island
![Page 13: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/13.jpg)
WasteMud in Swamp
Scraped Car Dead Tree
![Page 14: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/14.jpg)
Daily Waste Landfill Place
2012.07.06
2014.12.11
Two and half years
![Page 15: from the Environmentally Sustainable View Point as PPP ...](https://reader034.fdocuments.net/reader034/viewer/2022042710/6266c3addfbd68335047fa28/html5/thumbnails/15.jpg)
SLIM Proposal to ERCA (Environmental Restoration and Conservative Agency) (1) Consensus Formation with Related Authorities and Community Leaders
and Confirmation of Feasibility by Basic Study(2) Confirmation of Various Engineering Factors Required for Project
Realization and Effectiveness of Soil Mortar by Using Locally Available Sludge
(3) Pilot Levee Construction as Starting Point for Mid to Long Term Project Realization
THREE PHASE OF EXECUTION SCHEDULE OF CAPACITY BUILDING PROJECT (For three years)
Green Hill by Waste and Mud from the view point of PPP
DIB to be considered as an alternative financial facility.