From the Beginning Design Standards and Other Post-Construction Program Elements.
-
Upload
shavonne-hancock -
Category
Documents
-
view
213 -
download
0
Transcript of From the Beginning Design Standards and Other Post-Construction Program Elements.
![Page 1: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/1.jpg)
From the From the BeginningBeginning
Design Standards and Other Post-Construction Program
Elements
![Page 2: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/2.jpg)
Post-Construction BMPsPost-Construction BMPs
Long term BMPs that help protect runoff throughout the life of the
completed project
![Page 3: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/3.jpg)
Impervious AreaImpervious Area
• More runoff, More Pollutants
![Page 4: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/4.jpg)
Post Construction GoalsPost Construction Goals
Water Quality Goals
– Reduce impervious area
– Limit pollutant exposure
– Diminish pollutant transport
Program Goals– Process to
ensure that “Water Quality Goals” are met
![Page 5: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/5.jpg)
ProgramProgram
• Ordinance requiring developers to incorporate post construction BMPs
• Strategy of BMPs • Enforcement of ordinance• Long-term operation and
maintenance of BMPs
![Page 6: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/6.jpg)
OrdinanceOrdinance
• Model Ordinance– www.stormwatercenter.net– Model Urban Runoff Program
• Reference to separate document
![Page 7: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/7.jpg)
BMP StrategyBMP Strategy• Site and watershed conditions
– constraints– topography– areas to utilize
• Pollutants of concern– 303(d) list– pollutants expected to be present
• Options• Sizing
![Page 8: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/8.jpg)
BMPsBMPs
Site Design
Source Control
Treatment
![Page 9: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/9.jpg)
Site DesignSite Design
• Minimize building footprint• Cluster development (leaving more
useful open space)• Minimize directly connected
impervious areas (DCIA) – direct roof downspouts to landscape areas
• Protect slopes and channels• Aquatic buffers
![Page 10: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/10.jpg)
Source ControlSource Control
• Outdoor material storage areas• Trash enclosures• Equipment wash areas
![Page 11: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/11.jpg)
TreatmentTreatment
• Vegetated swales• Detention basins• Constructed wetlands
![Page 12: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/12.jpg)
RequirementsRequirements
• Attachment 4 - Design Standards
• Conserve Natural Areas
• Limit Directly Connected Impervious Area
• Parking Lots
• Restaurants• Retail Gasoline
Outlets• Vehicle
Equipment Wash Areas
• Storage Volume • Treatment Flow
![Page 13: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/13.jpg)
EnforcementEnforcement
• Site Plan Review– Checklist
• Site Inspection– As part of final approval
![Page 14: From the Beginning Design Standards and Other Post-Construction Program Elements.](https://reader035.fdocuments.net/reader035/viewer/2022070411/56649f395503460f94c56aa6/html5/thumbnails/14.jpg)
MaintenanceMaintenance
• Legal agreements• Conditional use permits• Homeowner’s association• Conditions, covenants, and
restrictions• Databases• Inspections checklists