From: Akaruchai Nochaiwong [email protected] March 7 ... MOU/daily... · [email protected],...

3
From: Akaruchai Nochaiwong [email protected] Subject: Daily Operation update on R&D S1 Electromagnetic survey for Waterflood Monitoring in Tap Reat Area: 6 March 2016 Date: March 7, 2016 at 7:55 AM To: Somporn Rassadanukul [email protected], Geerati Pombunmee [email protected], Phathompat Boonyasaknanon [email protected], Sumeth Anantasate [email protected], Panumat Yoosin [email protected], Udom Arayatanon [email protected], Chiradet Khachamart [email protected], Angkana Sriwantaneeyakul [email protected], Saovajit Nanruksa [email protected], Worravit Tragunveerayut [email protected], Nontapong Panudulkitti [email protected], Prapun Sooksawat [email protected] Cc: Chalermkiat Tongtaow [email protected], Piya Sukhumpanumet [email protected], Chayong Borisuitsawat [email protected], Kanok Intharawijitr [email protected], Nopadon Chinabutr [email protected], Supakorn Krisadasima [email protected], Tawee Limsoontorn [email protected], Suwit Pabchanda [email protected], Phanachit Dhanasin [email protected], Sutus Preuksjamas [email protected], Songkram Noikongdee [email protected], Patchara Chacharoen [email protected], Piti Akrapipatkul [email protected], Poonsawat Prachukbunchong [email protected], Padsakorn Suwanruji [email protected], Sarawut Uparawanna [email protected], Panlop Limsakul [email protected], Chalong Jaruwattanasakul [email protected], Alisara Ngamlurdwongsakul [email protected], Inthira Kongbua [email protected], Kurt Strack ([email protected]) [email protected], Sophon Jumras [email protected], Anupong Kongsub [email protected], Ing-orn Soisuwan [email protected], Patcharin Kaewkert [email protected], Natthaya Piyapongpan [email protected], GGS-O Staff [email protected]

Transcript of From: Akaruchai Nochaiwong [email protected] March 7 ... MOU/daily... · [email protected],...

Page 1: From: Akaruchai Nochaiwong AkaruchaiN@pttep.com March 7 ... MOU/daily... · PhathompatB@pttep.com, Sumeth Anantasate SumethA@pttep.com, Panumat Yoosin PanumatY@pttep.com, Udom Arayatanon

From: Akaruchai Nochaiwong [email protected]: Daily Operation update on R&D S1 Electromagnetic survey for Waterflood Monitoring in Tap Reat Area: 6 March 2016

Date: March 7, 2016 at 7:55 AMTo: Somporn Rassadanukul [email protected], Geerati Pombunmee [email protected], Phathompat Boonyasaknanon

[email protected], Sumeth Anantasate [email protected], Panumat Yoosin [email protected],Udom Arayatanon [email protected], Chiradet Khachamart [email protected], Angkana [email protected], Saovajit Nanruksa [email protected], Worravit Tragunveerayut [email protected],Nontapong Panudulkitti [email protected], Prapun Sooksawat [email protected]

Cc: Chalermkiat Tongtaow [email protected], Piya Sukhumpanumet [email protected], Chayong [email protected], Kanok Intharawijitr [email protected], Nopadon Chinabutr [email protected],Supakorn Krisadasima [email protected], Tawee Limsoontorn [email protected], Suwit [email protected], Phanachit Dhanasin [email protected], Sutus Preuksjamas [email protected],Songkram Noikongdee [email protected], Patchara Chacharoen [email protected], Piti [email protected], Poonsawat Prachukbunchong [email protected], Padsakorn Suwanruji [email protected],Sarawut Uparawanna [email protected], Panlop Limsakul [email protected], Chalong [email protected], Alisara Ngamlurdwongsakul [email protected], Inthira Kongbua [email protected],Kurt Strack ([email protected]) [email protected], Sophon Jumras [email protected], Anupong [email protected], Ing-orn Soisuwan [email protected], Patcharin Kaewkert [email protected],Natthaya Piyapongpan [email protected], GGS-O Staff [email protected]

Page 2: From: Akaruchai Nochaiwong AkaruchaiN@pttep.com March 7 ... MOU/daily... · PhathompatB@pttep.com, Sumeth Anantasate SumethA@pttep.com, Panumat Yoosin PanumatY@pttep.com, Udom Arayatanon

Dear All, Please see below for daily operation update: Site preparation

- Fence preparation is 90% complete. Postpone of door installation due to activity inbasecamp.

- Preparation of electrical work is in progress.- Trench digging is about 60% complete (1200m)- Security guards are on location.- Fuel tank at site.

Equipment mobilization

- Wire (5000m), HDPE (5000m) and Generators at site- EM equipment: Plan to mobilization on Monday with police support.

PR / CSR / DMF

- 3 DMF will join PR during 8 March 2016.- Plan to have public communication on 8 March 2016

SSHE

- Wire deviation complete- Generators deviation is complete- PTW for Site preparation, trench digging and lifting work were endorsed by S1

construction team and GGS/O (as area owner)- Plan Sound baseline measurement on Monday.- Plan for HSE audit on 10 Mar 2016.- HSE statistic: No HSE issue yet.

Drilling program

- PERF program for TRT-E will be around April 2016. Best regards,Akaruchai N.

ELECTRONIC MAIL DISCLAIMER:The electronic transmission, information and any attached documents contained in this e-mail are confidential, proprietaryto the sender, and are intended only for the person or entity to which it is addressed. If you have received this electronictransmission in error, please immediately notify the sender and delete or destroy the original electronic transmission andany attached documents from your system without copying it, disclosure or distribution or the taking of any actionconcerning the contents of this electronic transmission or any attachments. Any review, distribution, copying,retransmitting, dissemination, disclosure or use of this electronic transmission or any part of it in any form for any purposewhatsoever is strictly prohibited and subject to liability and legal claim. Please be aware that electronic transmissioncannot be guaranteed to be secure or error free as information could be intercepted, corrupted, lost, destroyed, arrive lateor incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contentsof this message which arise as a result of electronic transmission. If verification is required please request a hard copyversion.