FRF Flushing

download FRF Flushing

of 13

Transcript of FRF Flushing

  • 8/18/2019 FRF Flushing

    1/13

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet # of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    #.0

    2.0

    .0

    4.0

    5.0

    /.0

    .0

    1.0

    .0

    #0.0

    PLANT DETA(LS

    B3ECT( E

    PR P SAL

    SER (CES RE '(RED

    SA)ET+ PRECA'T( NS

    E!ER*ENC+ PR CED'RE

    STATE ) THE PLANT

    !ETH D

    C !PLET( N CR(TER(A

    APPEND(CES

    DRA6(N*

    L * SHEET

  • 8/18/2019 FRF Flushing

    2/13

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet 2 of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    #.0

    1.0.1

    1.0.2

    1.0.3

    1.0.4

    1.0.5

    1.1

    1.2

    PLANT DETA(LS

    In 500 MW Units Fire Resistant Fluid (FRF) is used for the control systeand !" #y$ass syste ainly to a%oid fire accidents in case of lea&a'e of

    or&in' fluid o%er $arts at hi'h te $eratures. his syste consists of thefollo in'*

    Cont&o% )%uid Tan7 ,C)T

    he an& contains the FRF and the $u $s are ounted inside the tan&.

    Pum89

    hese are eant to circulate the fluid throu'h the syste at re+uired $ressureand flo .

    a8ou& )an9

    hese are used to e,haust the %a$our fro the syste .

    )i%te&9

    Filters are used to arrest the solid $articles enterin' into the syste . -ne of the filters is &e$t in since hile the other is stand y.

    )i&e Re9i9tant )%uid Coo%e&9

    hese are eant for aintainin' the te $erature of FRF.

    he fluid circulated in the syste is di%ided for different $ur$oses such as/ontrol fluid econdary fluid ri$ fluid and tart u$ fluid.

    /hec& %al%es such as e,traction %al%e and /R s in' chec& %al%es areo$erated y FRF.

    STAT'S

    Signatu&e9

    NTPC BHEL

  • 8/18/2019 FRF Flushing

    3/13

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet of #4

    P%ant a&ea: T'RB(NE

    PR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    2.0

    .0

    3.1

    3.2

    3.3

    3.4

    3.5

    3.

    3.

    B3ECT( E

    o flush the /ontrol Fluid syste to re o%e echanical i $urities fro thesyste .

    PR P SAL

    Flushin' shall e carried out usin' the nor al o$eratin' Fire Resistant Fluidreco ended in the - M anual. he +uantity of FRF re+uired for

    flushin' shall e 15 6! hich is a$$ro,i ately 507 of the nor al +uantity.her al shoc&s shall e 'i%en to the syste y a&in' sudden chan'es in

    the fluid te $erature fro 0 8 5 0/ to 35 8 40 0/ to a&e the flushin'effecti%e. Ra$$in' of the fluid lines shall e carried out durin' ther alshoc&s s$ecially at eld 9oints.

    :o additional heatin' arran'e ent shall e re+uired as the fire resistant fluid'ets heated u$ durin' runnin' of the control fluid $u $ itself and y &ee$in'the tan& heaters -:. ;o%ernin' rac& to$ and /ontrol %al%es

  • 8/18/2019 FRF Flushing

    4/13

    NTPC BHELStation: NTPC-

    Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet 4 of #4

    P%ant a&ea: T'RB(NE

    PR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    4.0

    4.1

    4.2

    4.3

    4.4

    4.5

    4.

    4.

    4.>

    5.0

    5.1

    5.2

    5.3

    5.4

    5.5

    5.

    5.

    SER (CES RE '(RED

    ?%aila ility of re+uired +uantity of FRF.

    ?%aila ility of sufficient s&illed an$o er for su$er%ision @ e,ecution of the $rocess.

    ?%aila ility of la oratory facilities for analysis of FRF sa $les.

    ?%aila ility of ser%ice air for filter cleanin'. ?%aila ility of $ro$er li'htin' arran'e ent.

    ?%aila ility of co unication facility.

    ?%aila ility of $orta le fire e,tin'uishers.

    ?%aila ility of $ressuri=in' $u $.

    SA)ET+ PRECA'T( NS

    First aid &it should e readily a%aila le.

    ?de+uate li'htin' should e a%aila le near /F and in flushin' area.

    Fire fi'htin' e+ui$ ent @ syste s should e ready for use.

    ?rea of flushin' should ha%e easy and free access.

    $illa'e lea&a'e and conta ination of FRF should e a%oided.

    Weldin' @ 'as cuttin' should not e carried out in flushin' area.

    !oad on fluid $u $s should not e,ceed full load current of the otor.

    STAT'S

    Signatu&e9

  • 8/18/2019 FRF Flushing

    5/13

  • 8/18/2019 FRF Flushing

    6/13

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet / of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    .

    .>

    .A

    .10

    .11

    1.0

    1.#

    >.1.1

    >.1.2

    >.1.3

    >.1.4

    >.1.5

    Ba$our e,traction syste alon' ith %a$our e,traction fans is a%aila le for o$eration.

    ?ll the filter ele ents in the syste other than the tan& filters are re o%ed efore initial flushin'.

    :ecessary y$assin' as $er sche e has een carried out and the correctnessof loo$in's chec&ed.

    he e+ui$ ent roo the %al%e roo and the oil channels are $ainted iths$ecial $aint as $er su$$liers reco endations.

    ?ll the drain %al%es of the syste are closed.

    !ETH D

    )R) )i%%ing

    FRF is filled in the /F (/ontrolled Fluid an&) $refera ly throu'h theRe'enerati%e $u $s. Fillin' can also e done fro the /F to$ throu'h tan& filters.

    he o$eration of fluid tan& le%el indicator is chec&ed durin' fluid fillin'.!e%el is closely onitored to a%oid any o%erflo .

    Re'enerati%e syste of FRF is run continuously ith tan& heaters -:. Itsechanical filters are cleaned inter ittently to re o%e the slud'e collected.

    /F filters are cleaned as and hen re+uired.

    ?ll the safety $recautions of FRF are strictly follo ed durin' fillin'flushin' and handlin' of FRF.

    STAT'S

    Signatu&e9

  • 8/18/2019 FRF Flushing

    7/13

    NTPC BHEL

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    1.2

    >.2.1

    >.2.2

    >.2.3

    >.2.4

    >.2.5

    >.2.

    >.2.

    >.2.A

    >.2.10

    )R) )%u9$ing

    yste is lined u$ for flushin' as $er sche e.

    he !" (> ar) and " (32 ar) control fluid syste s are flushed to'ether.

    Cirection of rotation of oth FRF $u $s is chec&ed ith short start @ sto$co and. he trial run of the $u $s is ta&en u$ alon' ith flushin'

    $rocess.

    Flushin' is started y runnin' FRF $u $s for short duration and syste ischec&ed for lea&a'es and attended.

    FRF $u $s are ta&en in ser%ice for further flushin' after attendin' all thelea&a'es. Re'enerati%e $u $s are run continuously ith tan& heaters -: to

    aintain +uality of FRF durin' flushin' $rocess.

    /are is ta&en that FRF $u $ load is li ited to full load current of the otor.If re+uired oth $u $s are run.

    Flushin' of control fluid syste is carried out y di%idin' the syste in 4 to5 circuits to achie%e a,i u %elocity throu'h the $i$elines. his alsoli its fluid $u $ otor current. his is suita ly decided at site.

    Initially /ontrol fluid an& filters are ins$ected once e%ery > hours andcleaned. hereafter fre+uency is 'radually chan'ed to once a day de$endin'u$on the filter condition.

    he te $erature of control fluid after heatin' should e et een 0 to 5 0/.?fter flushin' for 283 hours at this te $erature the te $erature is reduced to

    ini u $ossi le y o$enin' the ater outlet. his $rocess of ther alshoc& is re$eated se%eral ti es. Ra$$in' of fluid lines is carried out durin'ther al shoc&s.

    STAT'S

  • 8/18/2019 FRF Flushing

    8/13

    Signatu&e9

    NTPC BHEL

    Station: NTPC-

    Ramagundam

    BHEL Ref No. PS-DC-202-500-0004A

    NTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet 1 of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    >.2.11

    >.2.12

    >.2.13

    1.

    >.3.1

    >.3.1.1

    >.3.2

    >.3.2.1

    >.3.2.2

    >.3.2.3

    >.3.2.4

    ?fter all the circuits ha%e een flushed and fluid tan& strainer re ains cleanfor 24 ours all the filter ele ents in the syste re o%ed efore initialflushin' are $ut ac& for final flushin'.

    Curin' flushin' one sa $le a day ust e analysed.

    Flushin' is declared co $leted as $er co $letion criteria.

    H d&au%i; Te9ting of Line9

    *ene&a%

    ydraulic test of %arious lines shall e carried out as $er details 'i%en elo *

    . :o. yste tandard "ressure est "ressure Curation

    1. "ressure Fluid > ar 20 ar 10 in

    ( ithout rac&)2. " /ontrol Fluid 32 ar A ar 10 in ( ithout filter ele ents) P&e8a&ation

    #lan& flan'es are installed and %al%es closed here%er the su syste isconnected to drain as $er flushin' sche e.

    est 'au'es are $ro%ided as $er test $ressure re+uire ent.

  • 8/18/2019 FRF Flushing

    9/13

    Signatu&e9

    NTPC BHELStation: NTPC-

    Ramagund

    am

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    >.3.2.5

    >.3.2.

    >.3.2.

    >.3.2.>

    >.3.3

    >.3.3.1

    >.3.3.2

    >.3.3.3

    >.3.3.4

    >.3.3.5

    >.3.3.

    Bentin' arran'e ents $ro%ided at lind ends ith %al%es. !ocation of %ent%al%es is decided at site as $er site lay out.

    > ar syste is $ressurised y feedin' 32 ar fluid throu'h a te $oraryconnection $ro%ided for this $ur$ose.

    ?II du$le, filter ele ents are re o%ed efore hydraulic testin'.

    32 ar syste is tested y installin' a se$arate $ressurisin' $u $.

    Te9t P&o;edu&e

    /ontrol fluid $u $ is run and syste filled.

    Bentin' of total syste is carried out.

    "ressure of > ar syste is raised to 20 ar y feedin' 32 ar fluid throu'hthe te $orary connection $ro%ided. yste is chec&ed for lea&a'es for 10

    inutes.

    /ontrol fluid $u $ is sto$$ed.

    > ar $ressure fluid syste is isolated. "ressure is raised to A ar in 32 "control fluid syste and is held for 10 inutes. yste is chec&ed for lea&a'es.

    If lea&a'es are o ser%ed syste is de$ressuri=ed lea&a'es attended andhydraulic test is re$eated.

    STAT'S

  • 8/18/2019 FRF Flushing

    10/13

    Signatu&e9

    NTPC BHEL

    Station: NTPC-

    Ramagundam

    BHEL Ref No. PS-DC-202-500-0004A

    NTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet #0 of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    1.4

    >.4.1

    >.4.2

    >.4.3

    >.4.4

    >.4.5

    >.4.

    .0A.1

    A.2

    A.3

    A.4

    No&ma%i9ation

    /ontrol fluid is drained fro the total syste is drained in #arrels.

    /ontrol fluid tan& is cleaned and ins$ected.

    /ontrol fluid coolers are cleaned and ins$ected.

    ?ll the $ro%isional arran'e ents ade in the syste for flushin' hydraulic testin' are re o%ed and syste nor alised.

    he drained control fluid is refilled after the tan& is a solutely clean. Fluid isfilled throu'h the re'enerati%e syste only.

    Re+uired +uantity of /ontrol fluid is &e$t filled in the tan& and le%eleasured and recorded.

    C !PLET( N CR(TER(AFRF sa $les are collected at Re'enerati%e $u $s inlet ( ith "u $ ino$eration) and analysed at re'ular inter%al $refera ly once a day for Mechanical i $urities Water content ?cid content.

    a. Mechanical i $urities !ess than 0.057 y ei'ht . Water content !ess than 0.17 y ei'htc. ?cid content !ess than 0.1 ' 6- @'

    /ontrol fluid an& filter re ains clean after 24 hours of flushin'.

    ?ll du$le, filters re ain clean after 12 hours of flushin'.

    If the a o%e are et then the sa $le is sent to R C la at :-IC? or anyother a$$ro%ed la for further analysis.

    STAT'S

  • 8/18/2019 FRF Flushing

    11/13

    Signatu&e9

    NTPC BHEL

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet ## of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    A.5 /ontrol syste flushin' is declared co $lete ased on the follo in'*

    a. "article count in the fluid sa $le should e as $er :? 1 3> /lass . edi ents should not e ore than 5 ' @ 100 l of fluid.c. $ecific resistance chec&ed as $er I

  • 8/18/2019 FRF Flushing

    12/13

    Signatu&e9

    NTPC BHEL

    Station: NTPC-Ramagundam

    BHEL Ref No. PS-DC-202-500-0004ANTPC Ref no. C S-C !!-R-Commg-PR "0#2 S$eet #4 of #4

    P%ant a&ea: T'RB(NEPR CED'RE ) R )L'SH(N* ) T* C NTR L (L S+STE! ,)R) )L'SH(N*

    L * SHEET

    . :o. "u $in

    ser%ice

    "u $Cischar'e $ressure

    /ontrol fluidte $erature

    . :o. of ther alshoc&

    Re ar&s

    #eforecooler

    ?ftercooler

  • 8/18/2019 FRF Flushing

    13/13

    Signatu&e9

    NTPC BHEL