FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69...

32
2 NAD 83 ( 1992 ) R.GILMAN 04 - 30 - 2012 NAVD88 B H F 037 - 2 ( 11 ) CALAIS M . S A R G E N T 32 N V T S T A TE P L AN E G R I D VT ROUTE 14 (RURAL MINOR ARTERIAL) V T R T 14 T O E A S T C A L A I S V T R T 14 T O S OU T H WOOD B U R Y KINGSBURY BHF 037-2(11) BEGIN PROJECT STA.334+75 BHF 037-2(11) END PROJECT STA.340+00 RESUME ROADWAY END BRIDGE STA.337+66.69 BEGIN BRIDGE END ROADWAY STA.337+08.96 YEARS P A R S ON SBR I N C K E R HO FF 650 ELM STREET MANCHESTER, NH 03101 BRANCH 0 S C A LE 1 " = 40 ’- 0 40 40 V E R M O N T F R E E D O M A N D U N I T Y CANADA ORLEANS ESSEX WA S H I NG T ON L A M O I L L E FRANKLIN GRAND I SLE ADDISON CHI TTENDEN ORANGE CALEDONI A WI NDSOR RUTLAND BENNI NGTON WINDHAM N V T S TATE P L AN E GRI D APPROVED DATE APPROVED DATE S H EET 1 O F S H EET S DATUM VERTICAL HO R I Z ON T A L S U R V E Y E D DA TE : S U R V E Y E D B Y : P R O J E C T M ANAG E R : P R O J E C T NA M E : P R O J E C T NU M B E R : NEW YORK State of M A SS A C HU S ETT S C o mm on w ea lt h o f N E W H A M PS H I R E State of F E D E R A L H I GH W AY AD M I N I S T R A T O R D E P A R T M E N T O F T R AN SP O R T A T I ON BR I DG E P R O J E C T P R O P O S E D I M P R OV E M E N T AG E N C Y O F T R AN SP O R T A T I ON S T A TE O F V E R M ON T QUA L I T Y A SS U R AN C E P R OG R A M : LE V EL PLANS. SP E C I A L P R OV I S I ON S A S A R E I N C O R P O R A TE D I N T H E S E R E V I S I ON S AND S U C H R E V I S E D SP E C I F I C A T I ON S AND F O R U S E ON T H I S P R O J E C T , I N C L UD I NG A LL S U B S E QU E N T F E D E R A L H I GH W AY AD M I N I S T R A T I ON ON J U L Y 20 , 201 1 F O R C ON S T R U C T I ON DA TE D 201 1 , A S A PP R OV E D B Y T H E W I T H T H E S E P L AN S AND T H E S T ANDA R D SP E C I F I C A T I ON S C ON S T R U C T I ON I S T O B E C A RR I E D ON I N A CC O R DAN C E D I R E C T O R O F P R O J E C T D EL I V E R Y 3 35 + 0 0 33 4 + 00 33 6 + 00 33 7 + 00 338 + 00 33 9 + 00 340 + 00 340 + 57 9 . 4 M I LE S NO R T H O F J UN C T I ON W I T H U S R OU TE 2 525 . 00 F EET 467 . 27 F EET 57 . 73 F EET B H F 037 - 2 ( 11 ) CALAIS C OUN T Y O F W A S H I NG T ON T O W N O F C A L A I S P HA S E D R E M OVA L O F E X I S T I NG S T R U C T U R E , AND P HA S E D R E P L A C E M E N T W I T H N E W S T R U C T U R E BR I DG E #82 LE NG T H O F P R O J E C T : LE NG T H O F R OAD W AY : LE NG T H O F S T R U C T U R E : P R O J E C T D E S CR I P T I ON : P R O J E C T L O C A T I ON :

Transcript of FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69...

Page 1: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

2

NAD83 (1992)

R.GILMAN

04-30-2012

NAVD88BHF 037-2(11)

CALAIS

M. SARGENT

32

N

VT S

TATE

PLANE GRID

False Northing:

0.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransve

rse Mercator

NAD83 Vermont Sta

te PlanesVT83

VT ROUTE 14 (RURAL MINOR ARTERIAL)

VT RT 14

TO EAST CALAIS

VT RT 14

TO SOUTH WOODBURY

KI

NG

SB

UR

Y

BHF 037-2(11)BEGIN PROJECTSTA.334+75

BHF 037-2(11)END PROJECTSTA.340+00

RESUME ROADWAYEND BRIDGESTA.337+66.69

BEGIN BRIDGEEND ROADWAYSTA.337+08.96

YEARS

PARSONS BRINCKERHOFF

650 ELM STREET

MANCHESTER, NH 03101

BR

AN

CH

0

SCALE 1" = 40’-0

40 40

VERMONTFREEDOM ANDUNITY

CANADA

ORLEANSESSEX

WASHI

NGTON

LAMOILLE

FRANKLIN

GR

AN

D IS

LE

ADDISON

CHIT

TENDEN

ORANGE

CA

LE

DO

NIA

WIN

DS

OR

RUTLAND

BE

NNIN

GT

ON

WINDHAM

N

VT

ST

AT

E P

LA

NE

GRID

APPROVED DATE

APPROVED DATE

SHEET 1 OF SHEETS

DATUM

VERTICAL

HORIZONTAL

SURVEYED DATE :

SURVEYED BY :

PROJECT MANAGER :

PROJECT NAME :

PROJECT NUMBER :

NEW YORK

State of

MASSACHUSETTS

Commonwealth of

NEW HAMPSHIRE

State of

FEDERAL HIGHWAY ADMINISTRATOR

DEPARTMENT OF TRANSPORTATION

BRIDGE PROJECT

PROPOSED IMPROVEMENT

AGENCY OF TRANSPORTATION

STATE OF VERMONT

QUALITY ASSURANCE PROGRAM : LEVEL

THIS BLOCK IS FOR FULL FHWA OVERSIGHT PROJECTS ONLY

PLANS.

SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE

REVISIONS AND SUCH REVISED SPECIFICATIONS AND

FOR USE ON THIS PROJECT, INCLUDING ALL SUBSEQUENT

FEDERAL HIGHWAY ADMINISTRATION ON JULY 20, 201 1

FOR CONSTRUCTION DATED 201 1, AS APPROVED BY THE

WITH THESE PLANS AND THE STANDARD SPECIFICATIONS

CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE

DIRECTOR OF PROJECT DELIVERY

335+00

334+00

336+00337+00 338+00 339+00 340+00 340+57

9.4 MILES NORTH OF JUNCTION WITH US ROUTE 2

525.00 FEET

467.27 FEET

57.73 FEET

BHF 037-2(11)

CALAIS

COUNTY OF WASHINGTONTOWN OF CALAIS

PHASED REMOVAL OF EXISTING STRUCTURE, AND PHASED REPLACEMENT WITH NEW STRUCTURE

BRIDGE #82

LENGTH OF PROJECT:

LENGTH OF ROADWAY:

LENGTH OF STRUCTURE:

PROJECT DESCRIPTION:

PROJECT LOCATION:

Page 2: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,
Page 3: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

G.K.DONINGTON

(TYP)

SHOULDER

VARIES

SCALE �" = 1’-0"

20’-0" CLEAR ZONE (FILL)

12’-0" CLEAR ZONE (CUT)

BHF 037-2(11)

BORROW

18" SAND

CALAIS

z12b146typical.dgn

S.BROWN

S.BROWN

5’-0"11’-0" TRAVEL LANE11’-0" TRAVEL LANESHOULDER

5’-0"

VARIES

6.0%

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

GENERAL NOTES

WITH STANDARD SHEET B - 5.

SLOPE ROUNDING: ALL CUT SLOPES TO BE ROUNDED IN ACCORDANCE

EXISTING GROUND

EXISTING GROUND

C VT ROUTE 14L

3 32

VT 14 TYPICAL SECTION

2.0% 2.0%

MARKER POSTS: TO BE PLACED AS INDICATED BY THE ENGINEER.

WITH UNDERDRAIN - SEE STANDARD SHEET D-30.

PAY LIMITS OF SAND BORROW: WHEN USED IN CONJUNCTION

DIRECTED BY THE ENGINEER.

OF 0.025 GAL/SY BETWEEN SUCCESSIVE COURSES OF PAVEMENT AS

TACK COAT: EMULSIFIED ASPHALT IS TO BE APPLIED AT THE RATE

MATERIAL TOLERANCES

SAND BORROW

SUBBASE

PAVEMENT (TOTAL DEPTH)

+/- 1"

+/- 1"

+/- �"

(IF USED ON PROJECT)

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

A.STOCKIN

TYPICAL SECTIONS (1)

** 2-3" LIFTS TYPE IIS

* 2-1�" LIFTS TYPE IVS OVER

PAVEMENT TYPE IIS

** BITUMINOUS CONCRETE

SEE STANDARD G-1b

BOX BEAM GUARDRAIL

(TYP)

CLEAR ZONE

4’-0"

PAVEMENT TYPE IVS

* BITUMINOUS CONCRETE

GRADED CRUSHED STONE

24" SUBBASE OF DENSE

SHOULDER

SHOULDER (TYP)BRIDGE RAILING,

GALVANIZED 3 RAIL

BOX BEAM (TYP)

(SEE S-364A)

2.0% 2.0%

BRIDGE TYPICAL SECTION

(TYP)

NEXT 28D

1’-8"

1’-8"5’-0"5’-0"

32’-0" FACE OF RAIL TO FACE OF RAIL

35’-4" FASCIA TO FASCIA

11’-0" TRAVEL LANE 11’-0" TRAVEL LANE

8’-2�" 8’-2�"

10�" (TYP)

5’-0" 4’-0�" 5’-0" 1’-7"

MEMBRANE

WATERPROOFING

C BRIDGEL

SCALE �" = 1’-0"

PAVEMENT TYPE IVS

* BITUMINOUS CONCRETE

1�" TYPE IVS LIFT

* 1�" TYPE IVS LIFT OVER

1

2

2’-0"

MIN.

3’-0"

Page 4: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

CALAIS

BHF 037-2(11)

G.K.DONINGTON

SCALE �" = 1’-0"

SCALE �" = 1’-0"

12’-0" TRAVELWAY

C

CONSTRUCTIONTRAFFIC

BRIDGE REPLACEMENT PHASE #1 TYPICAL SECTION

BRIDGE REPLACEMENT PHASE #2 TYPICAL SECTION

GRADE

FINAL

12’-0" TRAVELWAY2’-0"

32’-0" RAIL TO RAIL

35’-4" FASCIA TO FASCIA

GRADE

FINAL

CONSTRUCTION TRAFFIC

CLEANED BEFORE MEMBRANE AND PAVEMENT IS INSTALLED.

PHASES, AND THE DECK WILL BE SAND BLASTED AND

TO THE BARE DECK, NO MEMBRANE IS REQUIRED BETWEEN

DURING THE WINTER MONTHS. IF NO SALT IS APPLIED

COMPONENTS IF TRAFFIC WILL BE ON THE BARE DECK

NOTE: SPRAY APPLIED MEMBRANE SHALL BE USED ON NEW

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101S.BROWN

S.BROWN

A.STOCKIN

TYPICAL SECTIONS (2)

~

A

A

~ ~~ ~

~ ~

A

A

1

1

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

H-PILES

APP. SLAB

A

A

AA

A

A

A

A

A

A

A

A

A

A

A

A

A

TYPICAL ABUTMENT SECTION

NOT TO SCALE

TYPICAL CHANNEL SECTION

NOT TO SCALE

BOTTOM OF SUBBASE.

SUBBASE, GRUBBING MATERIAL SHALL BEGIN AT THE

WHENEVER CHANNEL SLOPE INTERSECTS ROADWAY

STONE FILL IN THE AREA UNDER THE BRIDGE.

GRUBBING MATERIAL SHALL NOT BE PLACED ON THE

A

16’-0"

(COMPRESSIBLE FILLER)

SPECIAL PROVISION

GRADE

FINISH

SUBBASE 1’-0" x 1’-0" FILLET

SUPERSTRUCTURE

1

(TYP.)

4’-0"

GROUND

EXISTING

LIMITS OF

EXCAVATION

4’ STONE FILL,

TYPE III

GEOTEXTILE UNDER

STONE FILL

(TYP.)

1’-0"

BACK OF WALL

1’-6" (TYP.) FRONT AND

FOR STRUCTURES

GRANULAR BACKFILL

LIMITS OF

EXCAVATION

LIMITS OF STRUCTURE

THE PROJECT QUANTITY SHEET)

LIMITS OF GRANULAR BORROW

(WHEN INCLUDED AS AN ITEM ON

1

1 �

50’-0"

UNCLASS. CHANNEL

GROUND

EXISTING

ORDINARY

HIGH WATER(TYP.)

MATERIAL

GRUBBING*

1’-0"

GEOTEXTILE UNDER

STONE FILL (TYP.)

UNCLASSIFIED

CHANNEL EXCAVATION

(TYP.)

(TYP.)

4’

1. 5

1

TYPE III

(TYP.)

(TYP.)

8’

*

4’ STONEFILL,

2.0% 2.0%

3’-8�"

L BRIDGE

L BRIDGEC

16’-0"

A

4 32

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

z12b146typical.dgn

1.9

(SEE NOTE)

MEMBRANE WATERPROOFING

Page 5: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

DATUM

VERTICAL

HORIZONTAL

ALI

GN

ME

NT

TI

ES

TR

AV

ER

SE

TI

ES

GP

S

CO

NT

RO

L

POI

NT

S

NAVD 88

NAD 83 (92)

ADJUSTMENT NONE

ELEV. =

ELEV. = ELEV. = ELEV. =

HVCTRL #4 NORTH = 687247.714

EAST = 1661991.095

ELEV. = 903.572

ELEV. =

HVCTRL #3 NORTH = 686689.546

EAST = 1661859.106

ELEV. = 899.626

ELEV. =

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NUMBER:

FILE NAME:

SHEET OF

PROJECT NAME: CALAIS

BHF 037-2 (11)

HVCTRL #1

NORTH = 686146.987

EAST = 1661704.252

ELEV. = 893.670

HAP AZ MK

HVCTRL #2

NORTH = 688019.608

EAST = 1662266.525

ELEV. = 926.050

HAP

S. BALSAM

.

.

#48

.

.

.

S. PINE

.

.

S. SPRUCE

.

.

14.04

34.1

5

55.51

81.59

56.63

63.47

45

#1

S.BALSAM

N

VT

ST

AT

E

PL

AN

E

GRID

N

VT

ST

AT

E

PL

AN

E

GRID

* MAIN TRAVERSE COMPLETED 4/30/2012 BY R.GILMAN P.C. & P.WINTERS & C.CYR

A FIBERGLASS WITNESS POST.

FT) WEST OF POLE NO.42, 54.4 M (178.5 FT) SOUTHWEST OF POLE NO.43, AND 0.3 M (1.0 FT) EAST OF

FT) WEST OF AND ABOUT 1.5 M (4.9 FT) LOWER THAN THE CENTERLINE OF VT ROUTE 14, 21.4 M (70.2

THE TOP OF A 30 CM DIAMETER CONCRETE MONUMENT POURED 1.5 M (4.9 FT) DEEP. IT IS 8.6 M (28.2

INTERSECTION OF VT ROUTE 14 AND BALENTINE ROAD. THE MARK IS SET 5 CM BELOW GROUND SURFACE IN

ROUTE 14 FOR 1.3 MI (2.1 KM) TO THE MARK ON THE LEFT. IT IS ABOUT 0.2 MI (0.3 KM) NORTH OF THE

MOSCOW WOODS ROAD LEFT IN EAST CALAIS VILLAGE. CONTINUE STRAIGHT AHEAD AND GO NORTH ALONG VT

IN NORTH MONTPELIER GO NORTH ALONG VT ROUTE 14 FOR 4.9 MI (7.9 KM) TO THE INTERSECTION OF

GENERAL LOCATION, CALAIS, VT. TO REACH FROM THE INTERSECTION OF VT ROUTE 14 AND VT ROUTE 214

AND 0.3 M (1.0 FT) EAST OF A FIBERGLASS WITNESS POST.

VT ROUTE 14, 30.8 M (101.0 FT) NORTH OF POLE NO.52, 26.8 M (87.9 FT) SOUTH OF POLE NO.1/53,

FT) DEEP. IT IS 14.7 M (48.2 FT) WEST OF AND ABOUT 3 M (9.8 FT) HIGHER THAN THE CENTERLINE OF

3 CM BELOW GROUND SURFACE IN THE TOP OF A 30 CM DIAMETER CONCRETE MONUMENT POURED 1.5 M (4.9

ROUTE 14 FOR 1.7 MI (2.7 KM) TO THE MARK ON THE LEFT ON TOP OF A SMALL KNOLL. THE MARK IS SET

MOSCOW WOODS ROAD LEFT IN EAST CALAIS VILLAGE. CONTINUE STRAIGHT AHEAD AND GO NORTH ALONG VT

IN NORTH MONTPELIER GO NORTH ALONG VT ROUTE 14 FOR 4.9 MI (7.9 KM) TO THE INTERSECTION OF

VT.05650. PHONE 802-456-7467. TO REACH FROM THE INTERSECTION OF VT ROUTE 14 AND VT ROUTE 214

GENERAL LOCATION, CALAIS, VT. OWNERSHIP, HAP AND FLO HARTMAN, ROUTE 14, EAST CALAIS,

ALI

GN

ME

NT

TI

ES

POB 331+75.00NORTH = 686500.5011

EAST = 1661794.3283

PC 332+16.09NORTH = 686540.6033

EAST = 1661803.2680

PT 334+19.15NORTH = 686737.2160

EAST = 1661853.9091

PC 334+39.20NORTH = 686756.4569

EAST = 1661859.5428

PT 337+75.00NORTH = 687076.9900

EAST = 1661959.5792

POE 340+57.26NORTH = 687344.9034

EAST = 1662048.4188

z12b146ti.dgn

G.K.DONINGTON

S.BROWN

SURVEY TIE SHEET

S.BROWN

R.BENJAMIN

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

19-AUG-2014

5 32

Page 6: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

MA

TC

HLIN

E S

TA. 3

38

+12.5

VT RT 14

TO EAST CALAIS

POLE #47

RETAIN EXISTING

RELOCATION (ELECTRIC)

TEMPORARY AERIAL

THE END OF EXISTING WINGWALL)

BRACKET WILL ALLOW A 6’ BUFFER FROM

TO EXISTING POLE #47 (4’ OFFSET

TEMPORARY OFFSET BRACKET ATTACHED

OF THE PROPERTY OWNER

THIS TREE PER REQUEST

DO NOT CUT OR TRIM

SERVICE

ELECTRIC/TELEPHONE

TEMPORARILY REMOVE

ELECTRIC/TELEPHONE

EXISTING AERIAL

POLE #46

EXISTING

RETAIN

12’

RISERS

W/ELECTRIC AND TELEPHONE

RETAIN EXISTING POLE

THE SERVICE LINES ARE INSTALLED

IMPACTS TO THE SPRUCE TREE WHEN

PLACED SO AS TO MINIMIZE THE

THIS TEMPORARY POLE SHALL BE

UTILITY NOTE:

NOTE)

SERVICE (SEE UTILITY

ELECTRIC/TELEPHONE

TEMPORARY POLE FOR

10’ W/8’ OFFSET BRACKET

6’ W/4’ OFFSET BRACKET

KIN

GSB

UR

Y BR

AN

CH

PAVED

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

MATCH EXISTING

STA 334+25.00

BEGIN APPROACH

335+00

333+00

334+00

336+00337+00 338+00

ST

A 334

+19.15

PT

ST

A 334

+39.20

PC

ST

A 333

+17.66

PI

ST

A 336

+07.12

PI

50

+00

51

+00

52

+00

STA 52+00.00

POE

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

STA 334+75.00

BEGIN PROJECT

END APPROACH

LIMITS (TYP)

CONSTRUCTION

(TYP)

70°

ST

A 337

+75.00

PT

STA 50+00.00

POB

EXISTING ROW

(TYP)

R=15’

=CHANNEL STATION 51+00.00

MAINLINE STATION 337+35.00

STA. 336+51 - 336+96 LT

STA. 336+27 - 336+84 RT

REMOVAL AND DISPOSAL OF GUARDRAIL

STA. 336+96 - 337+17 LT

STA. 336+84 - 337+04 RT

GALVANIZED 3 RAIL BOX BEAM

GUARDRAIL APPROACH SECTION,

STA. 337+17 - 337+71 LT

STA. 337+04 - 337+59 RT

GALVANIZED 3 RAIL BOX BEAM

BRIDGE RAILING,

MANUFACTURED TERMINAL SECTION, TANGENT

STA. 336+96 - 337+28 LT

STA. 336+75 - 337+15 RT

COLD PLANING, BITUMINOUS PAVEMENT

STA. 334+25 - 334+75

STA. 334+25 - 340+50

4 INCH YELLOW LINE (DOUBLE)

4 INCH WHITE LINE

STA. 334+25 - 340+50 LT

STA. 334+25 - 340+50 RT

STA. 336+01 - 336+51 LT

STA. 335+77 - 336+27 RT

BOX BEAM GUARDRAIL

CONSTRUCT PAVED APRON

STA. 335+77.57 LT

101

HV

CT

RL

100

HV

CT

RL .

.

GU

YW

.

CO

MB

#46C

OM

B

#1/

45

CO

MB

#47

GU

YW

3

HV

CT

RL

.

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

6

z12b146bdr1.dgn

S.BROWN

S.BROWN

A.STOCKIN

MA

TC

HLIN

E S

TA. 3

38

+12.5

LAYOUT SHEET (1)

E = 1.48’

L = 335.80’

T = 167.92’

R = 9500.00’

CURVE #1

VT ROUTE 14

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

POLE #47

RETAIN EXISTING

RELOCATION (ELECTRIC)

TEMPORARY AERIAL

THE END OF EXISTING WINGWALL)

BRACKET WILL ALLOW A 6’ BUFFER FROM

TO EXISTING POLE #47 (4’ OFFSET

TEMPORARY OFFSET BRACKET ATTACHED

OF THE PROPERTY OWNER

THIS TREE PER REQUEST

DO NOT CUT OR TRIM

SERVICE

ELECTRIC/TELEPHONE

TEMPORARILY REMOVE

ELECTRIC/TELEPHONE

EXISTING AERIAL

POLE #46

EXISTING

RETAIN

12’

RISERS

W/ELECTRIC AND TELEPHONE

RETAIN EXISTING POLE

THE SERVICE LINES ARE INSTALLED

IMPACTS TO THE SPRUCE TREE WHEN

PLACED SO AS TO MINIMIZE THE

THIS TEMPORARY POLE SHALL BE

UTILITY NOTE:

NOTE)

SERVICE (SEE UTILITY

ELECTRIC/TELEPHONE

TEMPORARY POLE FOR

10’ W/8’ OFFSET BRACKET

6’ W/4’ OFFSET BRACKET

Page 7: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

MA

TC

HLIN

E S

TA. 3

38

+12.5

VT RT 14

TO SOUTH WOODBURY

RELOCATION (ELECTRIC)

TEMPORARY AERIAL

POLE #48

RETAIN EXISTING

FIELD

DRIVE

GRAVEL

DRIVE

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

ST

A 340

+57.26

PO

E

EXISTING ROW

EXISTING ROW

=CHANNEL STATION 51+00.00

MAINLINE STATION 337+35.00 COLD PLANING, BITUMINOUS PAVEMENT

STA. 340+00 - 340+50

REMOVAL AND DISPOSAL OF GUARDRAIL

STA. 337+62 - 338+12 LT

STA. 337+49 - 337+94 RT

STA. 337+92 - 339+50 LT

STA. 337+80 - 338+41 RT

STA. 337+71 - 337+92 LT

STA. 337+59 - 337+80 RT

GALVANIZED 3 RAIL BOX BEAM

GUARDRAIL APPROACH SECTION,

STA. 339+50 - 340+00 LT

GUARDRAIL TERMINAL SECTION, TANGENT

ANCHOR FOR STEEL BEAM GUARDRAIL

STA. 338+35 RT 16.6’

BOX BEAM GUARDRAILDRAINAGE NOTES

REMOVE EXISTING HEADWALLS AND 15" CSP

STA 338+41.11 RT 30.87 - STA 338+77.54 RT 24.38

1

2

1

2

4’X9’ STONE PAD TYPE II AT OUTLET

CONSTRUCT 31 LF 15" CSP

SEE CROSS SECTION FOR INVERTS

CONSTRUCT REINFORCED CONCRETE HEADWALL & PIPE END SECTION

STA 338+39.18 RT 39.18 - STA 338+75.00 RT 30.08

.

4

HV

CT

RL

..

.

.

. ..

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

7

z12b146bdr1.dgn

S.BROWN

S.BROWN

A.STOCKIN

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

MA

TC

HLIN

E S

TA. 3

38

+12.5

LAYOUT SHEET (2)

VT RT 14

TO SOUTH WOODBURY

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 8: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

860

870

880

890

900

910

920920

333

+50

333

+75

334

+00

334

+25

334

+50

334

+75

335

+00

335

+25

335

+50

335

+75

336

+00

336

+25

336

+50

336

+75

337

+00

337

+25

337

+50

337

+75

PVI 334+25.00

ELEV 900.68

PV

C 334

+31.91

EL

EV 900.66

LO 334

+58.80

EL

EV 900.62

PVI 335+16.91

ELEV 900.41

PV

T 336

+01.91

EL

EV 901.76

PV

C 336

+09.90

EL

EV 901.89

PVI 337+22.90

ELEV 903.70

L =170.00 FT

K =90

L =226.00 FT

K =110

STA 334+75.00

BEGIN PROJECT

Q50 900.1

STA 334+25.00

BEGIN APPROACH

TO BE REMOVED

EXISTING ABUTMENTS

-0.2894% 1.6270%

FG = 903.03

STA 337+08.96

BEGIN BRIDGE

FG = 903.28

STA 337+66.69

END BRIDGE

901.0

900.8

900.7

900.7

900.6

900.5

900.5

900.4

900.4

900.4

900.4

900.4

900.4

900.5

900.5

892.2

891.8

900.7

900.68

900.63

900.64

900.72

900.87

901.09

901.38

901.73

902.12

902.46

902.74

902.96

903.13

903.24

903.29

EXISTING GROUND

ELEV = 900.08

LOW BEAM

860

870

880

890

900

910

920920

333

+50

333

+75

334

+00

334

+25

334

+50

334

+75

335

+00

335

+25

335

+50

335

+75

336

+00

336

+25

336

+50

336

+75

337

+00

337

+25

337

+50

337

+75

PVI 334+25.00

ELEV 900.68

PV

C 334

+31.91

EL

EV 900.66

LO 334

+58.80

EL

EV 900.62

PVI 335+16.91

ELEV 900.41

PV

T 336

+01.91

EL

EV 901.76

PV

C 336

+09.90

EL

EV 901.89

PVI 337+22.90

ELEV 903.70

L =170.00 FT

K =90

L =226.00 FT

K =110

STA 334+75.00

BEGIN PROJECT

Q50 900.1

STA 334+25.00

BEGIN APPROACH

TO BE REMOVED

EXISTING ABUTMENTS

-0.2894% 1.6270%

FG = 903.03

STA 337+08.96

BEGIN BRIDGE

FG = 903.28

STA 337+66.69

END BRIDGE

901.0

900.8

900.7

900.7

900.6

900.5

900.5

900.4

900.4

900.4

900.4

900.4

900.4

900.5

900.5

892.2

891.8

900.7

900.68

900.63

900.64

900.72

900.87

901.09

901.38

901.73

902.12

902.46

902.74

902.96

903.13

903.24

903.29

EXISTING GROUND

ELEV = 900.08

LOW BEAM

860

870

880

890

900

910

920920

860

870

880

890

900

910

920920

Q50 900.1

J.KHERA

S.BROWN

R.BENJAMIN

8

z12b146profile.dgn

PROFILE SHEET (1)

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

C

CGRADES SHOWN TO THE NEAREST HUNDREDTH ARE FINISH GRADE ALONG L

GRADES SHOWN TO THE NEAREST TENTH ARE EXISTING GROUND ALONG L

NOTE:

HORIZONTAL

0SCALE IN FEET

0

VERTICAL

20 40 60

10

20

30

Page 9: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

860

870

880

890

900

910

920920

337

+75

338

+00

338

+25

338

+50

338

+75

339

+00

339

+25

339

+50

339

+75

340

+00

340

+25

340

+50

340

+75

HI 337

+85.47

EL

EV 903.29

PV

T 338

+35.90

EL

EV 903.18

PV

C 338

+45.25

EL

EV 903.13

LO 338

+86.82

EL

EV 903.04

PVI 339+45.25

ELEV 902.68

PV

T 340

+45.25

EL

EV 904.42

PVI 340+50.00

ELEV 904.51

L =200.00 FT

K =91

K =110

L =226.00 FT

-0.5348% 1.8947%

900.7

900.8

900.9

901.1

901.4

901.7

902.1

902.5

903.0

903.5

904.0

904.5

903.29

903.28

903.22

903.11

903.05

903.05

903.12

903.26

903.47

903.75

904.09

904.51

STA 340+00.00

END PROJECT

STA 340+50.00

END APPROACH

EXISTING GROUND

S.BROWN

R.BENJAMIN

9

J.KHERA

z12b146profile.dgn

PROFILE SHEET (2)

K =110

L =226.00 FT

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF 32

C

CGRADES SHOWN TO THE NEAREST HUNDREDTH ARE FINISH GRADE ALONG L

GRADES SHOWN TO THE NEAREST TENTH ARE EXISTING GROUND ALONG L

NOTE:

HORIZONTAL

0SCALE IN FEET

0

VERTICAL

20 40 60

10

20

30860

870

880

890

900

910

920920

901.0

Page 10: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

10

z12b146notes.dgn

S.BROWN

S.BROWN

A.STOCKIN

EPSC PLAN NARRATIVE

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 11: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

MA

TC

HLIN

E S

TA. 3

38

+12.5

RESIDENCE

HISTORICALN

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

MA

TC

HLIN

E S

TA. 3

38

+12.5

PL

PL

CHRISTOPHER

MATTOGNO, LISA &

HARTMAN, FLO HARTMAN, FLO

S 144(2) - 1946

CALAIS-WOODBURY

PRIOR PROJECT PLANS

KIN

GSB

UR

Y BR

AN

CH

PAVED

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

GRAVEL

TURNOUT

WIDTH = 31’-5"

LENGTH = 34’-0"

RECONSTRUCTED IN 1946.

BUILT IN 1919,

CONCRETE T-BEAM STRUCTURE

EXISTING BRIDGE INFO

OH

W

SOIL INFORMATION

WEIDER VERY FINE SANDY LOAM

0%-3% SLOPES

K VALUE = .32

NOT HIGHLY ERODIBLE SOIL INFORMATION

RUMNEY FINE SANDY LOAM

0%-2% SLOPES

K VALUE = .24

NOT HIGHLY ERODIBLE

MATCH EXISTING

STA 334+25.00

BEGIN APPROACH

335+00

333+00

334+00

336+00337+00 338+00

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

STA 334+75.00

BEGIN PROJECT

END APPROACH

EXISTING ROW

(TYP)

R=15’

890

OH

W

OH

W

OH

W

OH

W

OH

W

.

.

1454

GU

YW

.

1001

CO

MB

#461576

CO

MB

#1/

45

1436

CO

MB

#47

1578

GU

YW

900

900

900

900

900900

900

900

900900

900900

900

900

900

.

1766

S.BROWN

11

S.BROWN

A.STOCKIN

EPSC EXISTING CONDITIONS SITE PLAN (1)

z12b146existsite.dgn

MA

TC

HLIN

E S

TA. 3

38

+12.5

SOIL BOUNDARY

LEGEND

AERIAL ELECTRIC

RESIDENCE

HISTORICAL

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

VT RT 14

TO EAST CALAIS

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 12: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

MA

TC

HLIN

E S

TA. 3

38

+12.5

TO REMAIN

EXISTING CULVERT

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

HARTMAN, FLO

HARTMAN, FLO

FIELD

DRIVE

GRAVEL

DRIVE

SOIL INFORMATION

STETSON LOAM

3%-8% SLOPES

K VALUE = .17

NOT HIGHLY ERODIBLE

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

EXISTING ROW

EXISTING ROW

=CHANNEL STATION 51+00.00

MAINLINE STATION 337+35.00

900

900

900

#48

.

4

HV

CT

RL

.

#49

TR

ANSF

OR

ME

R

BO

X

EL

EC

TRIC

ME

TE

R P

ED

ES

TA

L

..

.

. ..

#50

12

S.BROWN

S.BROWN

A.STOCKIN

z12b146existsite.dgn

EPSC EXISTING CONDITIONS SITE PLAN (2)

MA

TC

HLIN

E S

TA. 3

38

+12.5

SOIL BOUNDARY

LEGEND

AERIAL ELECTRIC

TO REMAIN

EXISTING CULVERT

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

VT RT 14

TO SOUTH WOODBURY

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 13: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

VT RT 14

TO EAST CALAIS

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

SILT FENCE

PROJECT DEMARCATION FENCE

LIMITS OF SOIL DISTURBANCE

PRODUCT RECP

ROLLED EROSION CONTROL

PAD

VEHICLE TRACKING

FILTER CURTAIN

WETLANDS IMPACTS = 0 SF

PERMANENT OHW IMPACTS = 144 SF

TEMPORARY OHW IMPACTS = 0 SF

IMPACTS

TEMPORARY ARCHAEOLOGICAL= 1661 SF

IMPACTS

PERMANENT ARCHAEOLOGICAL= 334 SF

13

S.BROWN

S.BROWN

A.STOCKIN

z12b146erobdr.dgn

EPSC CONST. CONDITIONS SITE PLAN (1)

MA

TC

HLIN

E S

TA. 3

38

+12.5

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

IMPACTS (TYP)

PERMANENT ARCH.

IMPACTS (TYP)

TEMP. ARCH.

IMPACTS (TYP)

PERMANENT OHW

KIN

GSB

UR

Y BR

AN

CH

#6067

PAVED

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

HVCTRL

3

HVCTRL

100

HVCTRL

101

EXISTING BRIDGE INFO

CONCRETE T-BEAM STRUCTURE

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

101

HV

CT

RL

100

HV

CT

RL .

..

3

HV

CT

RL

.

MATCH EXISTING

STA 334+25.00

BEGIN APPROACH

335+00

333+00

334+00

336+00337+00 338+00

50

+00

51

+00

52

+00

STA 334+75.00

BEGIN PROJECT

END APPROACH

LIMITS (TYP)

CONSTRUCTION EXISTING ROW

LEGEND

SILT FENCE

PROJECT DEMARCATION FENCE

LIMITS OF SOIL DISTURBANCE

PRODUCT RECP

ROLLED EROSION CONTROL

PAD

VEHICLE TRACKING

FILTER CURTAIN

PIPE INLET PROTECTION

WETLANDS IMPACTS = 0 SF

PERMANENT OHW IMPACTS = 144 SF

TEMPORARY OHW IMPACTS = 0 SF

IMPACTS

TEMPORARY ARCHAEOLOGICAL= 1661 SF

IMPACTS

PERMANENT ARCHAEOLOGICAL= 334 SF

Page 14: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

VT RT 14

TO SOUTH WOODBURY

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

MA

TC

HLIN

E S

TA. 3

38

+12.5

LIMITS (TYP)

CONSTRUCTION

SOIL INFORMATION

STETSON LOAM

3%-8% SLOPES

K VALUE = .17

NOT HIGHLY ERODIBLE

CULVERT

EXISTING

IMPACTS (TYP)

PERMANENT ARCH.

IMPACTS (TYP)

TEMP. ARCH.

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

EXISTING ROW

EXISTING ROW

FIELD

DRIVE

GRAVEL

DRIVE

.

..

.

.

. ..

FIELD

DRIVE

GRAVEL

DRIVE

SUBTERRANEAN

ELECTRICAL

TRANSFORMER

BOX

HVCTRL

4.

4

HV

CT

RL

..

.

.

. ..

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

EXISTING ROW

EXISTING ROW

LEGEND

SILT FENCE

PROJECT DEMARCATION FENCE

LIMITS OF SOIL DISTURBANCE

PRODUCT RECP

ROLLED EROSION CONTROL

PAD

VEHICLE TRACKING

FILTER CURTAIN

PIPE INLET PROTECTION

WETLANDS IMPACTS = 0 SF

PERMANENT OHW IMPACTS = 144 SF

TEMPORARY OHW IMPACTS = 0 SF

IMPACTS

TEMPORARY ARCHAEOLOGICAL= 1661 SF

IMPACTS

PERMANENT ARCHAEOLOGICAL= 334 SF

14

S.BROWN

S.BROWN

A.STOCKIN

EPSC CONST. CONDITIONS SITE PLAN (2)

z12b146erobdr.dgn

Page 15: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

VT RT 14

TO EAST CALAIS

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

LEGEND

LIMITS OF SOIL DISTURBANCE

15

S.BROWN

S.BROWN

A.STOCKIN

z12b146sitebdr.dgn

EPSC FINAL CONDITIONS SITE PLAN (1)

MA

TC

HLIN

E S

TA. 3

38

+12.5

DISTURBED AREAS

REQUIRING RE-VEGETATION

KIN

GSB

UR

Y BR

AN

CH

PAVED

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

EXISTING BRIDGE INFO

CONCRETE T-BEAM STRUCTURE

OH

W

890

OH

W

OH

W

OH

W

OH

W

OH

W

900

900

900

900

900900

900

900900

900

900

.

..

.

MATCH EXISTING

STA 334+25.00

BEGIN APPROACH

335+00

333+00

334+00

336+00337+00 338+00

50

+00

51

+00

52

+00

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

STA 334+75.00

BEGIN PROJECT

END APPROACH

LIMITS (TYP)

CONSTRUCTION EXISTING ROW

Page 16: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

VT RT 14

TO SOUTH WOODBURY

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

3216

S.BROWN

S.BROWN

A.STOCKIN

EPSC FINAL CONDITIONS SITE PLAN (2)

z12b146sitebdr.dgn

MA

TC

HLIN

E S

TA. 3

38

+12.5

LEGEND

LIMITS OF SOIL DISTURBANCE

REQUIRING RE-VEGETATION

DISTURBED AREAS

FIELD

DRIVE

GRAVEL

DRIVE

.

4

HV

CT

RL

..

.

.

. ..

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

EXISTING ROW

EXISTING ROW

Page 17: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

NOT TO SCALE

SILT FENCE

SYMBOLSYMBOL

CONSTRUCTION SPECIFICATIONS

VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC

NOT TO SCALESTAPLESTAPLE

JUTE MESH

EROSION CONTROL MATTING

EXCELSIOR BLANKET

FIRMLY

TAMP SOIL

4"MIN

DETAIL 1 TERMINAL FOLD

3"MIN

1"MIN

STAPLE DETAIL

SHALL BE PLACED LOOSELY OVER GROUND SURFACE. DO NOT STRETCH.

DISTURBED AREAS SHALL BE SMOOTHLY GRADED. EROSION CONTROL MATERIAL

APPROXIMATELY 12" INTERVALS.

ALL TERMINAL ENDS AND TRANSVERSE LAPS SHALL BE STAPLED AT

REQUIRED PER 4’X150’ ROLL OF MATERIAL.

ARE REQUIRED PER 4’X225’ ROLL OF MATERIAL AND 125 STAPLES ARE

APART AND IN ROWS APPROXIMATELY 3’ APART. APPROXIMATELY 175 STAPLES

STAPLES ARE TO BE PLACED ALTERNATELY, IN COLUMNS APPROXIMATELY 2’

APPLY FERTILIZER, LIME SEED PRIOR TO PLACING MATTING.

5.

4.

3.

2.

1.

REVISIONS

APRIL 16, 2007 JMF

DETAIL 2 JUNCTION SLOT

6"12" 12"

EXCELSIOR BLANKET

EROSION CONROL MATTING

JUTE MESH

STAPLESSTAPLES

DETAIL 3 ANCHOR SLOT

EROSION CONTROL MATTING

EXCELSIOR BLANKET

JUTE MESH STAPLE

STAPLES

12"

FIRMLY

TAMP SOIL

4" MIN6"-12"

6"-12"6"-12"

DETAIL 4 LAP JOINT

3

2

1

H

V

4

TOGETHER

EXCELSIOR BLANKET SHALL BE BUTTED

JUTE MESH, EROSION CONTROL MATTING

(RECP) SIDE SLOPE

CONTROL PRODUCT

ROLLED EROSION

ESTABLISHING VEGETATION.

APPLY TO SLOPES GREATER THAN 3H:1V OR WHERE NECESSARY TO AID IN

JANUARY 13, 2009 WHF

CONSTRUCTION SPECIFICATIONS

VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC

SEE NOTE #3 FOR POST SPACING

(SEE NOTE #1)

WOVEN WIRE FENCE

16" MIN

FILTER CLOTH

EMBED 6"MIN

FLOW

FLOW

WOVEN WIRE

AND POST)

(UPSLOPE OF WIRE

FILTER CLOTH

CLOTH 6" MIN

EMBED FILTER

4"

SEDIMENT REACHES HALF OF FABRIC HEIGHT.

MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN

SILT FENCE

REVISIONS

MARCH 21, 2008 WHF

FLOW

POST DETAIL

OVER-LAPPED BY 6" AND FOLDED.

WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE

DECEMBER 11, 2008 WHF

JANUARY 13, 2009 WHF

GUIDANCE.

THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL

EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM

REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR

NOTES:

SILT FENCE, WOVEN WIRE REINFORCED (PAY ITEM 649.515).

FOR SILT FENCE (PAY ITEM 649.51) OR GEOTEXTILE FOR

SECTION 649 AND AS SHOWN IN THE PLANS FOR GEOTEXTILE

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

MAX. MESH OPENING.

STORMWATER PERMIT. WOVEN WIRE SHALL BE A MIN. 14 GAUGE WITH A 6"

RECEIVING WATERS WHEN THE PROJECT FALLS UNDER A CONSTRUCTION

WOVEN WIRE REINFORCED FENCE IS REQUIRED WITHIN 100’ UPSLOPE OF

OR APPROVED EQUIVALENT.

FILTER CLOTH SHALL BE EITHER FILTER X, MIRAF1100X, STABILINKA T140N

6’.

EXCEED 4’ AND WHEN ELONGATION IS <50%, POST SPACING SHALL NOT EXCEED

FILTER-CLOTH FENCE, WHEN ELONGATION IS >50%, POST SPACING SHALL NOT

POST SPACING FOR WIRE-BACKED FENCE SHALL BE 10’ MAXIMUM. FOR

WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.

TIES. FILTER CLOTH IS TO BE FASTENED SECURELY TO WOVEN WIRE FENCE

WOVEN WIRE FENCE IS TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE

6.

5.

4.

3.

2.

1.

SYMBOL

CONSTRUCTION SPECIFICATIONS

CULVERT

2’

2’

21

GEOTEXTILE

R

A A

PLACE STONE OVER GEOTEXTILE.

THE GEOTEXTILE MUST BE DISPOSED OF APPROPRIATELY.

THE AREA CONTRIBUTING TO THE CHECK DAM SHALL NOT EXCEED 4 ACRES.

REVISIONS

MARCH 6, 2008 WHF

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: ILLINOIS USDA-NRCS

R

2"-3" STONE

(AS NECESSARY)

FILTERING STONE

SECTION A-A

USE 2" TO 3" STONE. FILTERING STONE SHALL BE 3/4".

WHFJANUARY 13, 2009

ITEM 653.40).

SECTION 653 FOR INLET PROTECTION DEVICE, TYPE I (PAY

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

MUST BE REMOVED).

PROTECTS THE AREA FROM EROSION AND CHANNEL BLOCKAGE . (GEOTEXTILE

THE CHECK DAM(S) SHALL BE FLATTENED AND GRADED IN A MANNER WHICH

6.

5.

4.

3.

2.

1.

IN AN APPROVED WASTE AREA.

VEGETATION, THE SEDIMENT TRAPPED BEHIND THE DAM SHALL BE DISPOSED OF

ONCE THE AREAS UPSTREAM FROM THE CHECK DAM ARE STABILIZED WITH

EPSC DETAILS (1)

z12b146epscdet.dgn

S.BROWN

S.BROWN

17

A.STOCKIN

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

PROTECTION

PIPE INLET

GUIDANCE.

THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL

EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM

REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR

NOTES:

(PAY ITEM 653.21).

MATTING (PAY ITEM 653.20) OR PERMANENT EROSION MATTING

653 AND AS SHOWN IN THE PLANS FOR TEMPORARY EROSION

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH SECTION

WOVEN WIRE

SILT FENCE

NOT TO SCALE

FLOW

DIA.

PIPE

7’18"

8’30"

7’24"

Page 18: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

ROADWAYS AND TRANSPORTATION FACILITIES

ADAPTED FROM VTRANS TECHNICAL LANDSCAPE MANUAL FOR

CLOTH

FILTER

GROUND

EXISTING

50’MIN

3’

GROUND

EXISTING

12’MIN

10’ MIN

10’ MIN

5:1

PAVEMENT

EXISTING

PAVEMENT

EXISTING

PLAN VIEW

12’MIN

SYMBOL

CONSTRUCTION SPECIFICATIONS

GUIDANCE.

THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL

EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM

REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR

NOTES:

VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC

ENTRANCE

CONSTRUCTION

STABILIZED

REVISIONS

MARCH 24, 2008 WHF

9.

8.

7.

6.

5.

4.

3.

2.

1.

JANUARY 13, 2009 WHF

OR AS SPECIFIED IN THE CONTRACT.

SECTION 653 FOR VEHICLE TRACKING PAD (PAY ITEM 653.35)

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

EQUIVALENT.

STONE SIZE- USE 1-4" STONE, RECLAIMED OR RECYCLED CONCRETE

30’ MINIMUM LENGTH APPLIES).

LENGTH- NOT LESS THAN 50’ (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A

THICKNESS- NOT LESS THAN 8".

WHERE INGRESS OR EGRESS OCCURS. 24’ IF SINGLE ENTRANCE TO SITE.

WIDTH- 12’ MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS

STONE.

GEOTEXTILE MUST BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING

PERMITTED.

PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE

CONSTRUCTION ENTRANCES SHALL BE PIPED BENEATH THE ENTRANCE. IF

SURFACE WATER- ALL SURFACE WATER FLOWING OR DIVERTED TOWARD

PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.

RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO

WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC

MAINTENANCE- THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH

DEVICE.

WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING

WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED

ACCORDING TO PERMIT REQUIREMENTS.

PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED

CONSTRUCTION GUIDANCE

GROWTH OF GRASS.

TO SEPTEMBER 15 AND AFTER APRIL 15 CAN BETTER ENSURE A VIGOROUS

TURF ESTABLISHMENT: PLACING SEED, FERTILIZER, LIME AND MULCH PRIOR

TYPES OF SOIL AMENDMENTS TO BE APPLIED

AND THE TYPE OF HYDROSEED WILL ULTIMATELY DICTATE THE AMOUNTS AND

HYDROSEEDING: ALTHOUGH GUIDANCE IS GIVEN ABOVE THE SITE CONDITIONS

DIRECTED BY THE ENGINEER.

TOPSOIL: TO BE USED WITH SEED AS INDICATED ON THE PLANS, OR AS

ACHIEVE 90% GROUND COVER OR AS DIRECTED BY THE ENGINEER.

HAY MULCH: TO BE PLACED ON EARTH SLOPES AT THE RATE OF 2 TONS/ACRE,

DIRECTED BY THE ENGINEER

FERTILIZER AND LIMESTONE: SHALL FOLLOW RATES SHOWN ON PLAN OR AS

WEIGHT AND SHALL BE FREE OF ALL NOXIOUS SEED.

ALL SEED MIXTURES: SHALL NOT HAVE A WEED CONTENT EXCEEDING 0.40% BY

ESTABLISHED LAWN AREAS DISTURBED BY THE CONTRACTOR.

URBAN SEED MIX: USE AS INDICATED IN THE PLANS AND/OR FOR ALL

ESTABLISHED UPLAND (NON WETLAND) AREAS DISTURBED BY THE CONTRACTOR.

RURAL SEED MIX: USE AS INDICATED IN THE PLANS AND/OR FOR ALL

8.

7.

6.

5.

4.

3.

2.

1.

REVISIONS

TURF ESTABLISHMENT

JUNE 23, 2009 WHF

JANUARY 15, 2010 WHF

FEBRUARY 16, 2011 WHF

EPSC DETAILS (2)

z12b146epscdet.dgn

S.BROWN

S.BROWN

18

A.STOCKIN

SYMBOL

CONSTRUCTION SPECIFICATIONS

NOT TO SCALE

ANCHOR

GRADING LIMIT

CONSTRUCTION

ANCHORS

LENGTH B/T

100’ MAX

10’ MINBARRIER

FLOATING SILT

EXISTING HIGHWAY

FL

OW

BOTTOM

WATERWAY

SYSTEM

ANCHOR

WEIGHTED

ABUTMENT

BRIDGEBARRIER

FLOATING SILT

REVISIONS

AA

SECTION A-A

JANUARY 13, 2009 WHF

APRIL 1, 2008 WHF

ITEM 649.61).

SECTION 649 FOR GEOTEXTILE FOR FILTER CURTAIN (PAY

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

FILTER CURTAIN

A WATERWAY WITH STREAM VELOCITIES GREATER THAN 1.5 FEET/SECOND.

FILTER CURTAIN SHALL NOT BE PLACED ACROSS A FLOWING WATERWAY, OR IN

TO CONFORM TO THE BOTTOM OF THE WATERWAY.

THE WEIGHTED ANCHOR SYSTEM SHALL BE A TYPE WHICH ALLOWS THE CURTAIN

MINIMIZING THE ESCAPE OF SEDIMENTS INTO WATERWAY.

THE CURTAIN SHALL BE REMOVED BY SLOWLY PULLING TOWARD THE SHORE

MAXIMUM 100’ LENGTH BETWEEN ANCHORS.

DISTURBANCE.

LAST SECTION SHALL TERMINATE A MINIMUM OF 10’ BEYOND LIMIT OF

5.

4.

3.

2.

1.

SEPTEMBER 4, 2009 WHF

RIPRAP TYPICAL

TYPE OR USE OF COFFERDAM IF USED.

CURTAIN. IT IN NO WAY DEFINES THE

OF A TYPICAL INSTALLATION OF FILTER

NOTE: THIS DRAWING IS A DEPICTION

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

8"MIN

(OPTIONAL)

BERM

MOUNTABLE

PROFILE

NOT TO SCALE

Page 19: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

VT RT 14

TO EAST CALAIS

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

CONSTRUCT SIGNAL

50’500’

500’

BRIDGE

LANEONE

AHEADWORK

BRIDGE

AHEAD

500’

END

ROAD WORK

WHITE LINE

TEMPORARY 4"

50’

MA

TC

HLIN

E S

TA. 3

38

+12.5

50’

335+00

333+00

334+00

336+00337+00 338+00

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

MA

TC

HLIN

E S

TA. 3

38

+12.5

VT RT 14

TO EAST CALAIS

KIN

GSB

UR

Y BR

AN

CH

MATCH EXISTING

STA 334+25.00

BEGIN APPROACH

335+00

333+00

334+00

336+00337+00 338+00

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

STA 334+75.00

BEGIN PROJECT

END APPROACH

..

....

..

19

J.KHERA

S.BROWN

A.STOCKIN

z12b146tcs.dgn

TRAFFIC CONTROL PHASE ONE

MA

TC

HLIN

E S

TA. 3

38

+12.5

ENERGY ABSORPTION

ATTENUATOR

BARREL

TEMPORARY BARRIER

LEGEND

STOP BAR

TRAFFIC CONTROL PHASE 1

3. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 1.

2. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 1.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN.

TRAFFIC CONTROL PHASE 1

3. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 1.

2. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 1.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN.

Page 20: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

END

ROAD WORK

50’ 500’ 500’ 500’

BRIDGELANEONE

AHEADWORK

BRIDGE

AHEAD

CONSTRUCT SIGNAL

339+00 340+00 340+57

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

VT RT 14

TO SOUTH WOODBURY

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

=CHANNEL STATION 51+00.00

MAINLINE STATION 337+35.00

TRAFFIC CONTROL PHASE 1

3. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 1.

2. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 1.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN.

.

4

HV

CT

RL

..

.

.

. ..

MA

TC

HLIN

E S

TA. 3

38

+12.5

20

J.KHERA

S.BROWN

A.STOCKIN

TRAFFIC CONTROL PHASE ONE

z12b146tcs.dgn

ENERGY ABSORPTION

ATTENUATOR

BARREL

TEMPORARY BARRIER

LEGEND

STOP BAR

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

VT RT 14

TO SOUTH WOODBURY

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 21: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

VT RT 14

TO EAST CALAIS

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

50’50’500’

500’

WORK

BRIDGE

AHEAD

500’

END

ROAD WORK

50’

BRIDGE

LANEONE

AHEAD

WHITE LINE

TEMPORARY 4"

CONSTRUCT SIGNAL

MA

TC

HLIN

E S

TA. 3

38

+12.5

ENERGY ABSORPTION

TEMPORARY BARRIER

MATCH EXISTING

STA 334+25.00

BEGIN APPROACH

335+00

333+00

334+00

336+00337+00 338+00

BEGIN BRIDGE

END ROADWAY

STA. 337+08.96

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

STA 334+75.00

BEGIN PROJECT

END APPROACH

TRAFFIC CONTROL PHASE 2

4. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 2.

3. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 2.

2. REMOVE PORTION OF EXISTING BRIDGE AS NECESSARY FOR PROPOSED DRILLED SHAFT CONSTRUCTION.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN.

21

J.KHERA

S.BROWN

A.STOCKIN

z12b146tcs.dgn

TRAFFIC CONTROL PHASE TWO

MA

TC

HLIN

E S

TA. 3

38

+12.5

ENERGY ABSORPTION

ATTENUATOR

BARREL

TEMPORARY BARRIER

LEGEND

STOP BAR

TRAFFIC CONTROL PHASE 2

4. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 2.

3. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 2.

2. REMOVE PORTION OF EXISTING BRIDGE AS NECESSARY FOR PROPOSED DRILLED SHAFT CONSTRUCTION.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN.

4. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 2.

3. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 2.

2. REMOVE PORTION OF EXISTING BRIDGE AS NECESSARY FOR PROPOSED DRILLED SHAFT CONSTRUCTION.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN.

Page 22: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

50’ 500’ 500’ 500’

END

ROAD WORK

WORK

BRIDGE

AHEAD

BRIDGELANEONE

AHEAD

CONSTRUCT SIGNAL

MA

TC

HLIN

E S

TA. 3

38

+12.5

STA 340+00.00

BEGIN APPROACH

END PROJECT

MATCH EXISTING

STA 340+50.00

END APPROACH

339+00 340+00 340+57

RESUME ROADWAY

END BRIDGE

STA. 337+66.69

22

J.KHERA

S.BROWN

A.STOCKIN

TRAFFIC CONTROL PHASE TWO

z12b146tcs.dgn

MA

TC

HLIN

E S

TA. 3

38

+12.5

ENERGY ABSORPTION

ATTENUATOR

BARREL

TEMPORARY BARRIER

LEGEND

STOP BAR

TRAFFIC CONTROL PHASE 2

4. SEE TYPICAL SECTIONS (2) FOR A STANDARD SECTION DURING TRAFFIC CONTROL PHASE 2.

3. MAINTAIN ONE LANE OF ALTERNATING TRAFFIC THROUGHOUT DURATION OF PHASE 2.

2. REMOVE PORTION OF EXISTING BRIDGE AS NECESSARY FOR PROPOSED DRILLED SHAFT CONSTRUCTION.

1. INSTALL TEMPORARY TRAFFIC SIGNALS AND ASSOCIATED SIGNS, STRIPING AND BARRIERS AS SHOWN. N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

VT RT 14

TO SOUTH WOODBURY

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 23: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

N

VT S

TATE

PLANE GRID

False Northing: 0

.0000

False Easting: 16

40416.6667

Origin Latitude: 4

2°30’00.0000"N

Central Meridian:

72°30’00.0000"W

US Survey FootTransver

se Mercator

NAD83 Vermont Sta

te PlanesVT83

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

ELEVATION BOTTOM

EXISTING RIVER

(3 RAIL BOX BEAM GALVANIZED)

BRIDGE RAIL

L

L3 RAIL BOX BEAM (GALVANIZED)

APPROACH SECTION (TYP)

900

910

920

890

880

TO C BRG ABUTMENT 2

56’-8�" C BRG ABUTMENT 1

SCALE 1" = 10’-0

10 0 10

900

910

920

890

880

TO EAST CALAIS

VT RT 14

TO SOUTH WOODBURY

VT RT 14

END APPROACH SLAB

STA. 337+78.69

BEGIN APPROACH SLAB

END BRIDGE

STA. 337+66.69

BEGIN BRIDGE

END APPROACH SLAB

STA. 337+08.96

BEGIN APPROACH SLAB

STA. 336+88.96

KIN

GSB

UR

Y BR

AN

CH

7 @ 7’-10�" = 54’-11�"

BRIDGE RAIL SPACINGPOST (TYP)

3’-6" FIRST RAIL

70°

FLOW15"

CGMP#6067

DRIVE

GRAVEL

DRIVE

GRAVEL

337+00 338+00

51

+00

OH

W

OH

W

900900900

900

.

23PLAN AND ELEVATION SHEET

S.BROWN

S.BROWN

A.STOCKIN

z12b146pe.dgn

Page 24: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

333+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

333+50

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

333+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

334+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

334+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

334+50

880

890

900

910

920

STA.333+25 TO STA.334+50

F.G. = 900.68

F.G. = 900.63

-0.020 0.027 -0.087

-0.020 0.016 -0.076

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

DRI

VE

GR

AV

EL

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

DR

OA

D

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

1:-4.51:-20.0

1:-6.01:-6

.0

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

24

J.KHERA

J.KHERA

R.BENJAMIN

MAINLINE CROSS SECTIONS

z12b146xs.dgn

MATCH EXISTING CROSS SLOPES

BEGIN APPROACH

STA. 334+25.00

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

Page 25: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

334+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

335+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

335+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

335+50

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

335+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

336+00

880

890

900

910

920

STA.334+75 TO STA.336+00

F.G. = 900.67

F.G. = 900.72

F.G. = 900.87

F.G. = 901.09

F.G. = 901.38

F.G. = 901.73

-0.020

-0.020-0.007 -0.0531:-4.0

1:-4.0

-0.020 -0.0301:-4.0

-0.020 -0.020

-0.020 -0.020

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

DR

OA

D

PA

VE

D

RO

AD

PA

VE

DR

OA

D

PA

VE

D

1:-30.0

-0.018 -0.042

0.005 -0.065 1:-4.51:-20.

0

1:-30.0

1:-50.0

1:-20.0

1:-3.5

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

25

J.KHERA

J.KHERA

R.BENJAMIN

MAINLINE CROSS SECTIONS

z12b146xs.dgn

BEGIN PROJECT

STA. 334+75.00

1:-3.5

1:-10.0

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

Page 26: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

336+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

336+50

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

336+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

337+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

337+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

337+50

880

890

900

910

920

STA.336+25 TO STA.337+50

ED

GE

BR

OO

K

RI

GH

T :

O:

F.G. = 902.11

F.G. = 902.46

F.G. = 902.71

F.G. = 902.96

F.G. = 903.10

F.G. = 903.24

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

1:-3.0

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

DRI

VE

GR

AV

EL

GU

AR

DR

AI

L

SI

DE

WA

LK

SI

DE

WA

LK

GU

AR

DR

AI

L

GU

AR

DR

AI

L

GU

AR

DR

AI

L

GU

AR

DR

AI

L

BR

OO

K

ED

GE

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

1:-2.0 1:-2.5

1:-3.5

1:-3.0

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

26

J.KHERA

J.KHERA

R.BENJAMIN

MAINLINE CROSS SECTIONS

z12b146xs.dgn

BEGIN BRIDGE

STA. 337+08.96

1:-4.0

1:-3.0

1:-10.0

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

Page 27: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

337+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

338+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

338+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

338+50

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

338+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

339+00

880

890

900

910

920

STA.337+75 TO STA.339+00

F.G. = 903.29

F.G. = 903.28

F.G. = 903.21

F.G. = 903.11

F.G. = 903.08

F.G. = 903.05

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

BR

US

H

ED

GE

BR

US

H

ED

GE

DRI

VE

GR

AV

EL

DRI

VE

GR

AV

EL

DRI

VE

GR

AV

EL

GU

AR

DR

AI

LG

UA

RD

RAI

L

BR

OO

K

ED

GE

GU

AR

DR

AI

L

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

1:-2.5

1:-4.0

1:-4.0

1:-10.0

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

27

J.KHERA

J.KHERA

R.BENJAMIN

MAINLINE CROSS SECTIONS

z12b146xs.dgn

END BRIDGE

STA. 337+66.69

1:-3.0

1:-3.0

15" CMP

15" CMP

INV = 897.25

INV = 899.24

STA 339+13 RT 30’

EXISTING UTILITY POLE

GR

AV

EL

DRI

VE

1:-3.0

1:-2.0

1:-2.0

1:-2.0

1:-2.0

1:-2.0

1:-2.0

1:-2.0

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

Page 28: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

339+25

880

890

900

910

920

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

339+50

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

339+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

340+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

340+25

880

890

900

910

920

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

340+50

890

900

910

920

STA.339+25 TO STA.340+50

F.G. = 903.15

F.G. = 903.26

F.G. = 903.50

F.G. = 903.75

F.G. = 904.11

F.G. = 904.51

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

-0.020 -0.020

1:-6.9 -0.024 -0.015 1:-6.0

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

1:-4.0

1:-4.0

1:-4.0

1:-4.0

1:-5.01:-14.0

1:-40.0

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

28

J.KHERA

J.KHERA

R.BENJAMIN

MAINLINE CROSS SECTIONS

z12b146xs.dgn

END PROJECT

STA. 340+00.00

MATCH EXISTING CROSS SLOPES

END APPROACH

STA. 340+50.0

1:-3.0

1:-3.0

1:-10.0

1:-6.0

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

Page 29: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

STA 337+08.96

BEGIN BRIDGE

BANKING DIAGRAM

BEGIN APPROACH

STA 334+25.00

334

+25

334

+50

334

+75

335

+00

335

+25

335

+50

335

+75

336

+00

336

+25

336

+50

336

+75

337

+00

337

+25

337

+50

337

+75

RIGHT

LANE

334

+25

334

+50

334

+75

335

+00

335

+25

335

+50

335

+75

336

+00

336

+25

336

+50

336

+75

337

+00

337

+25

337

+50

337

+75

MATERIAL TRANSITIONS

STA 334+75.00

BEGIN PROJECT

STA 337+66.69

END BRIDGE

24:1

BEGIN APPROACH

STA 334+25.00

STA 334+37.50

BEGIN TRANSITION

24" SUBBASE OF DENSE CRUSHED GRAVEL

STA 335+29.06

TYPE IV (TYP)

2-1�" LIFTS OF

TYPE II (TYP)

2-3" LIFTS OF

18" SAND BORROW

LEFT LANE

-1%

-6%

-5%

-4%

-3%

-2%

0

3%

1%

2%

4%

5%

STA 335+73.06

-7%

-8%

-9%

5

4

3

2

1 FT

6

340

+50

-1%

0

-2%

-3%

-4%

-5%

-6%

3%

1%

2%

4%

5%

5

4

3

2

1 FT

6

-7%

-8%

-9%

HORIZONTAL

0SCALE IN FEET

0

VERTICAL

20 40 60

2

4

6

J.KHERA

29

J.KHERA

z12b146xs2.dgn

MATERIAL TRANSITION AND BANKING SHEET (1)

R.BENJAMIN

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 30: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

334

+25

-1%

-6%

-5%

-4%

-3%

-2%

0

3%

1%

2%

4%

5%

-7%

-8%

-9%

5

4

3

2

1 FT

6

END APPROACH

STA 340+50.00

337

+75

338

+00

338

+25

338

+50

338

+75

339

+00

339

+25

339

+50

339

+75

340

+00

340

+25

340

+50

LEFT LANE

337

+75

338

+00

338

+25

338

+50

338

+75

339

+00

339

+25

339

+50

339

+75

340

+00

340

+25

340

+50

END APPROACH

STA 340+50.00

STA 340+37.50

END TRANSITION

24:1

STA 340+00.00

END PROJECT

BANKING DIAGRAM

MATERIAL TRANSITIONS

RIGHT LANE

24" SUBBASE OF DENSE CRUSHED GRAVEL

STA 340+40.10

STA 340+37.90

TYPE II (TYP)

2-3" LIFTS OF

TYPE IV (TYP)

2-1�" LIFTS OF

18" SAND BORROW

-1%

0

-2%

-3%

-4%

-5%

-6%

3%

1%

2%

4%

5%

5

4

3

2

1 FT

6

-7%

-8%

-9%

HORIZONTAL

0SCALE IN FEET

0

VERTICAL

20 40 60

2

4

6

J.KHERA

30

J.KHERA

z12b146xs2.dgn

MATERIAL TRANSITION AND BANKING SHEET (2)

R.BENJAMIN

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"

20 0 20G.K.DONINGTON

19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OFYEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

Page 31: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+25

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+50

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-40-50-60-70

50+75

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+00

880

890

900

910

920

880

890

900

910

920

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+25

880

890

900

910

920

STA.50+00 TO STA.51+25

RO

AD

PA

VE

D :

R:

WO

OD

S

ED

GE

WO

OD

S

ED

GE

BR

US

H

ED

GE

BR

US

H

ED

GE

BR

US

H

ED

GE

DRI

VE

GR

AV

EL

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

WO

OD

S

ED

GE

GU

AR

DR

AI

L

GU

AR

DR

AI

L

GU

AR

DR

AI

L

GU

AR

DR

AI

L

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

RO

AD

PA

VE

D

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

31

J.KHERA

J.KHERA

R.BENJAMIN

z12b146xs.dgn

CHANNEL CROSS SECTIONS

GRUBBING MATERIAL

STONE FILL TYPE III

GEOTEXTILE UNDER STONE FILL

UNCLASSIFIED CHANNEL EXCAVATIONEND

STA. 51+25.00 LT

GRUBBING MATERIAL

STONE FILL TYPE III

GEOTEXTILE UNDER STONE FILL

UNCLASSIFIED CHANNEL EXCAVATIONBEGIN

STA. 51+50.00 LT

GRUBBING MATERIALEND

STA. 50+71.00 LT

GRUBBING MATERIALBEGIN

STA. 51+13.00 LT

GRUBBING MATERIAL

STONE FILL TYPE III

GEOTEXTILE UNDER STONE FILL

UNCLASSIFIED CHANNEL EXCAVATIONSTART

STA. 51+50.00 RT

-30

GRUBBING MATERIAL

STONE FILL TYPE III

GEOTEXTILE UNDER STONE FILL

UNCLASSIFIED CHANNEL EXCAVATIONEND

STA. 51+25.00 RT

ABUTMENTS

REMOVE EXISTING

OHW ELEV. 894.1’

OHW ELEV. 894.2’

OHW ELEV. 893.9’

OHW ELEV. 894.0’

OHW ELEV. 894.2’

OHW ELEV. 894.2’

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32

Page 32: FREED UNITY OM AN PROPOSED IMPRVEMENT RIGE PROJECT … · resume roadway end bridge sta.337+66.69 begin bridge end roadway sta.337+08.96 years parsns rinckerof 650 elm street manchester,

880

890

900

910

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+50

880

890

900

910

880

890

900

910

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+75

880

890

900

910

880

890

900

910

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

52+00

880

890

900

910

STA.51+50 TO STA.52+00

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

WO

OD

S

ED

GE

BR

US

H

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

BR

OO

K

ED

GE

YEARS

PARSONS BRINCKERHOFF650 ELM STREET

MANCHESTER, NH 03101

32

J.KHERA

J.KHERA

R.BENJAMIN

z12b146xs.dgn

CHANNEL CROSS SECTIONS

OHW ELEV. 893.6’

OHW ELEV. 892.8’

OHW ELEV. 892.7’

CALAIS

BHF 037-2(11)

SCALE 1" = 20’-0"19-AUG-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

G.K.DONINGTON

32