FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

download FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

of 40

Transcript of FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    1/40

    1

    FLORIDARURALBROADBANDALLIANCE,LLC

    REQUESTFORBIDSNETWORKEQUIPMENT

    RFB

    2011

    02,

    TOWER

    ATTACHMENT

    AND

    STEEL

    I.INTRODUCTION

    A.GeneralInformation

    Florida Rural Broadband Alliance, LLC (FRBA) is requesting bids from qualified firms to provide the

    requirednetworkequipmenttocompletetheFRBAWirelessMiddleMileNetworkinFlorida. Thisisan

    EQUIPMENTONLYbid,noinstallationservicesarebeingsoughtaspartofthisprocurement. ThisRFBis

    forthepurchaseofTowerAttachmentsandSteelfortheFRBAprojectasdescribedmorefullyherein.

    FRBA isanewly formedLimitedLiabilityCompany,establishedspecifically forthepurposeofbringing

    Broadband services to the region. The company formed through the regional cooperation of local

    governments, economic development agencies and community activists from rural disadvantaged

    communities located in15Florida countiesdesigned tomeet theessentialandadvancedbroadband

    network needs of unserved and underserved communities in the Northwest Florida Rural Area of

    Critical Economic Concern and the South Central Rural Area of Critical Economic Concern (RACECs).

    These RACECs consistofCalhoun, Franklin,Gadsden,Gulf,Holmes, Jackson, Liberty andWashington

    Counties in the Northwest Florida region and Desoto, Glades, Hardee, Hendry, Highlands and

    OkeechobeeCounties,aswellastheunincorporatedareaof Immokalee inCollierCounty inthesouth

    centralregionofFlorida.

    TheAmericanRecoveryandReinvestmentAct(ARRA)providedtheDepartmentofCommercesNational

    Telecommunicationsand InformationAdministration (NTIA)and theU.S.DepartmentofAgriculturesRural Utilities Service (RUS)with $7.2 billion to expand access to broadband services in the United

    States.Ofthosefunds,theActprovided$4.7billiontoNTIAtosupportthedeploymentofbroadband

    infrastructure, enhance and expand Comprehensive Community Infrastructure (CCI), encourage

    sustainable adoption of broadband service, and develop andmaintain a nationwide publicmap of

    broadbandservicecapabilityandavailabilitythroughtheBroadbandTechnologyOpportunitiesProgram

    (BTOP). FRBA was awarded a BTOP grant in the amount of $23,693,665 pursuant to BTOP award

    #NT10BIX5570122onAugust1,2010 to funddeploymentof theFRBARuralMiddleMileNetworks

    NorthwestandSouthCentralRegionalProjects. TheFRBAprojectwillbuildnewMiddleMilebroadband

    infrastructure,whichwillextendthehighspeed internetbackbonecapacitytolocal lastmileproviders

    and community anchor institutions in order to serve vital public sector services and private sector

    commercialcustomerswithintheRACECs. TheProjectmustbecompletedandthegrantclosedoutby

    August1,2013. Asaresult,timeisoftheessenceinperformanceofalltasksnecessaryforsatisfythese

    deadlines,includingtheprocurement,deliveryandinstallationofthenetworkequipment.

    Thisprocurementwillbe financedusing federalassistanceauthorizedby theAmericanRecoveryand

    ReinvestmentActof2009 (ARRA). Any contract resulting from this solicitationwill require that the

    vendorandanysubcontractorcomplywithallprovisionsoftheARRAandtheBTOPprogram.

    Respondentsmust certify, by submission of their bid, that neither the vendor nor its principals is

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    2/40

    2

    presently debarred, suspended,proposed for debarment, declared ineligible,or voluntarily excluded

    fromparticipationinthistransactionbyanyfederaldepartmentoragency.

    FRBA supportsDrug FreeWorkplace Policies and is an EqualOpportunity Employer (EOE).Qualified

    applicantsandvendorsareconsideredforemploymentwithoutregardtoage,race,color,religion,sex,

    nationalorigin,disability,orveteranstatus.

    FRBAencouragesparticipationfromlocallyowned,minorityowned,femaleownedanddisabledowned

    smallbusinesses.Proposersshouldindicateintheirproposalwhetherandtowhatextenttheircompany

    orothersparticipatingintheirbidsatisfysuchcriteria

    ForadditionalinformationaboutFRBA,theProjectandtheGrant,pleasereviewthefollowing:

    FRBAwebsiteatwww.weconnectflorida.com FRBA BTOP Award Information: http://www2.ntia.doc.gov/grantee/floridarural

    broadbandalliance BTOPRecipientHandbook:

    http://www2.ntia.doc.gov/files/BTOP_Recipient_Handbook.pdf

    B.TIMEREQUIREMENTS

    Allbidsmustbereceivedbythedateandtimespecifiedbelow. Bidsreceivedaftertheduedateand

    timewillnotbeacceptedorreviewed.

    ProposedCalendar

    Duedateforbidsby5:00p.m.EST October21,2011

    ContractExecution ByNovember15,2011

    PurchaseOrdersIssued ByNovember15,2011

    C. DELIVERYINSTRUCTIONS

    Tobeconsidered,one(1)signedoriginal,markedOriginalandfive(5)copies,markedCopyofyour

    bidmustbereceivedbyFRBAby5:00p.m.onOctober21,2011atthefollowingaddress:

    FloridaRuralBroadbandAlliance

    RFB201102,TOWERATTACHMENTANDSTEEL

    1211NorthWestShoreBoulevard,Suite715

    Tampa,Florida33607

    8132324887phone

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    3/40

    3

    The titleof theRFB, including theRFBNumbermustbe indicatedon theoutsideshippingordelivery

    labeltoallowsortingofresponsestobyvariousequipmenttypes.Respondentswishingtosubmitbids

    formultiple FRBA Equipment RFBs are required to submit separate responses for each RFB. Any

    packagecontainingresponsesformultipleRFBsmayberejected.

    Additionally, the vendor shall complete the Pricing Worksheet Labeled RFB201102, TOWER

    ATTACHMENT AND STEEL, and send via electronic mail to Sabrina Williams at

    [email protected],alongwithanelectroniccopyoftheBidresponsebytheduedate.

    FRBA isnotresponsible for inconsistenciesbetween theelectronicversionandthehardcopiesofany

    respondent'sbid. By submissionof its electronic andoriginalbids, theBidderacknowledges thatall

    pricingcontainedthereinisaccurateandcanberelieduponbyFRBAinmakinganawardregardlessof

    theformofsubmissionoftheinformation.

    D. COMMUNICATIONSANDADDENDA

    1. Anyquestions shouldbe emailed to SabrinaWilliams at [email protected].

    Questions and Answers to all questions will be promptly posted to the FRBA website

    www.weconnectflorida.com. SabrinaWilliamscanbereachedat8633854900.

    2. FRBAwillrecordresponsesto inquiriesandanyadditionalsubmittalinstructionsinthe

    formofwrittenaddendatothisRFBontheFRBAwebsite.

    3. If revision to the RFB becomes necessary for any reason, FRBAwill providewritten

    addendawhichwillbepostedontheFRBAwebsite.

    4. ItistheresponsibilityofallrespondentstovisittheFRBAwebsiteregularlytoobtainany

    updates. Each respondent should check thewebsite on a daily basis. Failure to acknowledge any

    addenda shall not relieve the respondent of compliancewith the terms thereof. FRBA assumes no

    responsibilityfororalinstructions.

    E. REVIEWPROCESS

    1. FRBAwillreviewallBidsreceivedbythedateandtimedueandwillselectoneormore

    qualifiedBiddersforcontractaward.

    2. FRBAwillevaluateall complete,on timeBidsandwill select theBid(s) that, solelyatFRBAsdiscretionare the lowest responsive and responsiblebidders thatbestmeet the interestsof

    FRBA.

    3. FRBA maintains the right to request clarifications of information submitted and to

    requestadditionalinformationofanyrespondent.FRBAshallbethesolejudgeofitsownbestinterest

    andthequalificationsofrespondents.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    4/40

    4

    4. FRBAmay requestadditional information froma respondentonly for thepurposeof

    clarifying the respondents Bid. Such additional informationwill be requested inwriting, (electronic

    and/orhardcopy) includinganexplanationastothenatureofthe inquiry, instructionsforresponding

    anddeadline for submittinga response. Information submittedafter thedeadline for respondingwill

    notbeconsideredbyFRBA.

    5. If FRBA determines that additional information should be obtained from all valid

    respondents, all respondentswill receive an identical request for information following the process

    describedabove.

    6. AllawarddecisionsmadebyFRBAwillbefinal.

    7. Finalselectionandcontractnegotiationswillbegovernedbythelawsandprocurement

    regulationsofFRBA,theBTOPandARRAProgramsandanyotherapplicableregulations.

    8. Each selectedBidderwillenter intoa StandardEquipmentPurchaseAgreementwith

    FRBA.Aproposed formpurchaseagreement is includedherein forconvenience. Respondentsshould

    review theproposedcontract formand indicateanyobjectionsor requestedchanges tothestandardcontract termsandconditionswithin theirBid response. ThisRFBdoesnotconstituteandofferora

    contractwithanyrespondent. Acontractoragreementisnotimplieduntilacontractisapprovedand

    executedbyFRBA.

    F. GUIDELINESFORBIDDERS

    1. FRBA reserves the right to reject any or all bids submitted or to waive any non

    substantialirregularitiesinsubmittalswhereversuchrejectionorwaiverisinthebestinterestofFRBA.

    Intheeventallsubmittalsarerejectedorwaived,FRBAreservestherighttoresolicitforotherqualified

    respondents.

    2. FRBA reserves the right to retain all bids submitted and to use any ideas in a bid

    regardlessofwhether thatbid isselected. Submissionofbid indicatesacceptanceby the firmof the

    conditionscontained inthisRequestforBids,unlessclearlyandspecificallynoted inthebidsubmitted

    andconfirmedinthecontractbetweenFRBAandthefirmselected.

    3 There isnoexpressedorimpliedobligationforFRBAtoreimburserespondingfirmsfor

    anyexpensesincurredinpreparingbidsinresponsetothisrequest.

    4. The deployment of the FRBANetworks is contingent upon the continued receipt of

    ARRABTOPfunds. Althoughthedisruptionoffunds isunlikely,allprospectiverespondentsshouldbeawarethatthispossibilityexists. Intheeventoffundsdisruption:(a)theFRBAprojectschedulemaybe

    modified; (b) the projectmay be suspended, extended, or cancelled; and/or (c) FRBAmay delay or

    terminatecontractsorordersasnecessary.

    5. The vendormust identify all subcontractors thatwillbe paidmore than tenpercent

    (10%) of the overall project budget. Additionally, the vendor must provide the role of each

    subcontractor, the subcontractors experience in that role, and the vendors relationship with the

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    5/40

    5

    subcontractor.Allsubcontractorsmusthaveatleastoneyearofexperienceintheservicestheywillbe

    providing.

    Inanysubcontractsenteredintobythevendorfortheperformanceofservices,thevendorshallrequire

    thesubcontractor,totheextentoftheservicestobeperformedbythesubcontractor,tobeboundto

    thevendorbythetermsoftheContractand/orPurchaseOrderandtoassumetowardthevendorallof

    theobligationsand responsibilities that thevendor,by theContractand/orPurchaseOrder,assumes

    towardtheproject.AllsubcontractorsshallbeboundbytheGrantregulationstothesameextentasthe

    vendor. FRBAreservestherighttoreceivecopiesofandreviewallsubcontracts,althoughthevendor

    maydeleteormaskanyproprietary information, includingpricing,contained insuchcontractsbefore

    providingthemtoFRBA.

    Themanagementofany subcontractorwillbe the responsibilityof thevendor,and thevendor shall

    remainresponsible fortheperformanceof itssubcontractorstothesameextentas ifthevendorhad

    notsubcontractedsuchperformance.Thevendorshallmakeallpaymentstosubcontractorsorsuppliers

    ofthevendor.ExceptasotherwiseagreedinwritingbyFRBAandthevendor,FRBAwillnotbeobligated

    for direct payments for the services other than to the vendor. FRBAs written approval of any

    subcontractorengagedbythevendortoperformanyobligationundertheContractshallnotrelievethevendorofanyobligationsorperformancerequiredundertheContract.

    6. Eachvendor(basedonfederaltaxID)maysubmitonlyonebidasaprimarycontractor.

    However,anysuchvendormaybenamedasasubcontractorinotherbids.

    7. A vendormay revise a bid on its own initiative at any time before the deadline for

    submission.Thevendormustsubmittherevisedbidinthesamemannerastheoriginalwassubmitted.

    Innocasewillastatementof intenttosubmitarevisedbid,orcommencementofarevisionprocess,

    extendthebidduedate.

    G. PRICINGANDDELIVERYREQUIREMENTS

    1. The vendor is responsible to deliver all items in new, unharmed and marketable

    conditiontoFRBA.Thevendor isresponsible forreplacingany itemsdamagedduringshippingorthat

    otherwisearrivenot ingoodworkingorder.Thevendor is responsible foranyandallcostassociated

    withdelivery.Shipmenttrackinginformationmustbesenttotheprojectteamonceitisavailable.

    All items shouldbe shipped freeonboard tooneof twoFRBAwarehouse locations foreach

    networkbuild. Approximatelyhalfofthetotalequipmentorderwillbeshippedtoeachlocation:

    FloridaRuralBroadbandAllianceSouthNetworkWarehouse

    c/o:RapidSystems

    1155Highway17North

    Wauchula,FL33873

    FloridaRuralBroadbandAllianceNorthNetworkWarehouse

    Locationtobedetermined;thelocationshallbeinthe32321zipcode.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    6/40

    6

    AllpricingreflectedintheBidresponseshallbeinclusiveofshippingcostsandrequiredwarranties.

    2. Allequipmentmustbedeliveredwithin fourweeksafter receiptofapurchaseorder.

    Theavailabilityofequipmentwithinthisrequiredtimeframeisarequirementforaresponsivebid.

    3. Allequipmentwillbecome thepropertyofFRBAonce it isdeliveredandacceptedby

    FRBA.

    4. Allprices,costs,andconditionsoutlinedinavendorsbidshallremainfixedandvalidfor

    acceptancefor1yearstartingupontheexecutionofaPurchaseAgreement.

    5. FRBA is aware that many hardware/equipment manufacturers are offering special

    discountsfortheBTOPprojects.Vendorsshouldcontactthemanufacturer(s)toobtainthebestpricing.

    H. EQUIPMENTTECHNICALSPECIFICATIONS

    1. AcompleteequipmentlistisprovidedinSectionIIIbelow.

    2. All equipment, transmission methods, and systems must be industrystandard.

    Industrystandard is defined as themost current version of relative standard(s) set by an American

    National Standards Institute (ANSI)or InternationalOrganization for Standardization (ISO)accredited

    StandardsDevelopingOrganization (SDO), suchas the InstituteofElectricalandElectronicsEngineers

    (IEEE), Telecommunications Industry Association (TIA), or Electronic Industries Alliance (EIA). All

    equipmentmustbeRestrictionofHazardousSubstances(RoHS)compliant.

    3. Allequipmentmustbenewandnotrefurbishedorused.

    4.

    Allequipment

    must

    include

    amanufacturer

    5year

    warranty.

    Pricing

    reflected

    on

    the

    bidpricingformshallincludetherequiredwarranty. Failuretoprovidethisrequiredwarrantywillresult

    inyourbidbeingdeemednonresponsive.Therespondentmusthaveallapplicablecertificationsand

    meetallmanufacturercriteriaforbeinganactivedistributororresellerforsaidmanufacturer.

    5. All computer andnetworkinghardware, services, and applicationsmust support IPv6

    andmust conform to themandatory components of the Profile for IPv6 in theU.S.Government

    Version1.0 (USGV6) (or laterversion). If thereareanyexceptions, thevendormustprovideexplicit

    detailsofnonconformancebythecomponentalongwithagoodfaithestimateofwhenthecomponent

    willbefullyconformant.

    6. Brand Name or Equal: The overall reliability of the network is dependent on the

    reliability of its network equipment and the compatibility of such equipmentwith existing network

    elements. Therefore,the listofequipmentspecified inSection III includesspecificmanufacturersand

    partnumberstoensurethatallnetworkelementswillbecompatible. Anyrespondentofferingpricing

    forothermanufacturersequivalentpartsmustprovidetheinformationspecifiedinSectionIIIforBrand

    NameEquivalentsandincludemanufacturerspecifications/datasheetsforallproposedalternatives. All

    equipment must be manufactured by a recognized market leader with at least five (5) years ofexperience.Anyproposedequivalentproductsnotmeetingtheminimumcriteriaforcompatibilityand

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    7/40

    7

    manufacturerhistory/experiencemaybe rejected fromconsideration. FRBA shalldeterminewhether

    anyBrandNameEquivalentmeetsthesecriteriaanditsdecisionshallbefinal.

    II.BIDREQUIREMENTS

    A. GENERALREQUIREMENTS

    ABidResponsemustcontainthefollowingtobeconsidered:

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    8/40

    8

    i.TitlePage

    Titlepage showing theRequest forBids subject; the firmsname; thename,address,and telephone

    numberofacontactperson;andthedateofthebid.

    ii.TableofContents

    iii.TransmittalCoverLetter

    Asigned letteroftransmittalbrieflystatingthevendorsunderstandingof thecommitmenttodeliver

    theequipmentwithinthetimeperiod,astatementwhythefirmbelieves itselftobebestqualifiedto

    provide theequipmentandastatement that thebid isa firmand irrevocableoffer foroneyear.The

    cover lettermust be signed by an individual authorized and empowered to bind the vendor to the

    provisions of this RFB and any Contract awarded pursuant to it. Each bid shall stipulate that it is

    predicateduponthetermsandconditionsofthisRFBandanysupplementsorrevisionsthereof.

    iv.DetailedBid

    ThebidresponseshouldaddressallthepointsoutlinedintheRequestforBids Thebidresponseshould

    bepreparedsimplyandeconomically,providingastraightforward,concisedescriptionoftheproposers

    capabilities to satisfy the requirements of the Request for Bids. While additional data may be

    presented,thefollowingsubjectsmustbeincluded.Theyrepresentthecriteriafordeterminingifabidis

    responsive.

    Thedetailedbidresponseshallcontainthefollowinginformation:

    SectionA.ExecutiveSummary

    Provideanexecutivesummarywiththefollowinginformation:

    Overviewofthevendorsfirm;VendorCapabilities.Describe the firm'sexperienceand capabilities inprovidingproducts similar to

    those requested in this RFB, including the ability tomeet the availability and delivery requirements

    statedintheRFB.

    SectionB.FirmQualificationsandExperience

    Thebidshouldstate thesizeofthe firm, thesizeof the firmsaccountteam,andanoverviewofthe

    firmsexperienceindeliveringtheproductsspecifiedintheRFB

    SectionC.

    BidPricingForm

    In this section vendorsmust complete thedetailedbidpricing form forall requestedequipment. AcompleteequipmentlistisprovidedinSectionIIIbelow. Provideapriceforeachitemlistedinclusiveof

    shippingandtaxes. Thepricequotemustbeafirmbideffectiveforaminimumofoneyear.

    B. SectionD.Implementation/ShippingSchedule

    Providedocumentationandassurancethatthevendorwillbeabletodeliverequipmentwithin4weeks

    after receipt of a purchase order. Include an implementation/shipping schedule, byweek, showing

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    9/40

    9

    wheneach itemwillbedelivered.Provideabriefoverviewofhow the implementation schedulewas

    devisedandwillbeexecuted. Provideinformationonthevendorsprojectmanagementcapabilities.

    SectionE.Exceptions/AlternativestoRFBRequirements

    All exceptions to the requirements of this RFBmust be delineated in this section of the vendors

    responsetotheRFB;otherwise,allrequirementsofthisRFBwillbeconsideredtobeacceptablebythe

    vendor. For thebid tobe considered,proposedalternativesmustbe identifiedandexplained in this

    section. Anyexceptionsorproposedvariationsinthestandardcontractlanguageshouldbespecifiedin

    thissection.

    SectionF.ExecutedCertifications. Thebiddershallincludeexecutedcopiesofallrequiredcertifications

    attachedtothisRFB.

    III. EQUIPMENTLIST

    Group *Estimated

    Quantities

    Description Unit

    Type

    Unit

    Price

    Extended

    Price

    Delivery

    Time(in

    days)

    Cable

    60,000

    LMR400LowLoss

    Cable

    US

    Feet

    180,000

    CAT5cablemodel

    #TCL2

    US

    Feet

    Connectors

    600

    NMaleConnector

    LMR400

    Each

    HoistingGrips

    300

    HoistingGrip,Lace

    upLMR400Coax

    Each

    150

    HoistingGrip,Lace

    up1/2inchCoax

    Each

    GroundKits

    900

    GroundKitfor

    LMR400

    Each

    GroundBars

    400

    UniversalGround

    BussBarHarger1/4x

    4x14

    Each

    150

    GroundBar1/4x2x

    12

    Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    10/40

    10

    550

    UniversalGroundBar

    AttachmentKit

    ConnectIt

    Each

    Groundwell

    275

    9"diameterx10.25" Each

    ExothermicWeldshot

    225

    UWM45Ultraweld Each

    225

    UWM60Ultraweld Each

    200

    UWM90Ultraweld Each

    GroundingCable

    150

    #2Solid250foot

    spool

    US

    Feet

    1

    #2SolidCable(Foot) Each

    35,000

    #2Stranded US

    Feet

    10,000

    #6Stranded US

    Feet

    GroundRods

    825

    CopperCladGround

    Rod,3/4in.x10ft.

    Each

    Lugs

    3,000

    2holelugsfor#2

    stranded

    Each

    4,000

    2holelugsfor#6

    stranded

    Each

    ExothermicWeldshot

    135

    Universal

    WeatherproofingKit

    SnapinHangers

    1,000

    LMR400SnapIn

    Hanger(10per

    package)

    Each

    500

    Snapinhangerfor

    1/2"inchLowLoss

    Cable

    Each

    500

    Adapterfor3/8"

    Cablefor1/2"Snap

    InHanger

    Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    11/40

    11

    CoaxBlocks

    200

    MiniCoaxSupport

    BlockforLMR400

    Each

    20

    3/8"Galvanized

    HardwareKitforone

    coaxsupportblock

    Each

    40

    3/8"Galvanized

    HardwareKitfortwo

    coaxsupportblocks

    Each

    20

    3/8"Galvanized

    HardwareKitfor

    threecoaxsupport

    blocks

    Each

    BeamClamps

    100

    BeamClamps\angle

    adapter(10perpackage)

    Each

    100

    Universalround

    memberStandoff

    Adapter2"4"

    Each

    100

    Universalround

    memberStandoff

    Adapter4"6"

    Each

    100

    SnapinStandoff

    Adapters(No

    memberkit)10Pack

    Each

    SectorMounts

    300

    TArmKit,3sector

    foraguyed,self

    support,and/or

    monopole,12"

    standoffand(3)4

    1/2"x72"antenna

    pipesformicrowave

    dishes

    Each

    DishMounts

    125

    8'Diameter

    MicrowaveAntenna

    Mount4"to6"

    roundmemberor

    angle

    Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    12/40

    12

    10

    8'Diameter

    MicrowaveAntenna

    Mountaccomodates

    a11/2"to31/2"

    roundmemberor

    angle

    Each

    AntennaClamps

    10

    4.5inchthickwall

    AntennaPipe(8foot)

    Each

    10

    pipetopipeadapter

    forroundmember

    legsupto3inches(2

    PerBox)

    Each

    10

    pipetopipeadapter

    forroundmember

    legsupto5inches(2PerBox)

    Each

    10

    pipetopipeadapter

    forroundmember

    legsupto7inches(2

    PerBox)

    Each

    10

    pipetopipeadapter

    forroundmember

    legsupto9inches(2

    PerBox)

    Each

    ChainMounts

    10

    DoubleSectorChain

    Mount

    Each

    10

    Quadsectorchain

    mount

    Each

    10

    MicrowaveChain

    Mount,Upto48"

    Each

    10

    MicrowaveChain

    Mount,Upto60"

    Each

    10

    HorizontalBraceKit

    forEU15985CM48or

    EU15985CM60,

    Order1PerDish

    Each

    10

    AncillaryBraceKit

    forEU15985CM48or

    EU15985CM60,

    Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    13/40

    13

    Order1PerMount

    10

    DishStandoffKitfor

    EU15985CM48or

    EU15985CM60,

    Order1PerMount

    Each

    10

    DishPipeMountfor

    EU15985CM48or

    EU15985CM60,

    Order1PerMount

    Each

    IceBridgeKit

    300

    12"x10'GratedIce

    BridgeKit

    Each

    CableLadders

    1,050CoaxLadder10'x6

    RunsUniversal(with

    Hardwarekitfor

    roundandangled

    members)

    Each

    100

    CoaxLadder10'x8

    RunsUniversal

    Each

    100

    CoaxLadder10'x12

    RunsUniversal

    Each

    Theabovecoax

    ladders

    must

    include

    hardwarekitsfor

    roundandangle

    members

    Banding

    10

    StainlessSteel

    Banding,1/2"x100'

    Each

    10

    StainlessSteelBuckle

    Clamps

    Each

    Jumpers

    150

    AndrewC1953'

    NMNMM7Mkit

    Each

    150

    LMR24010ftNMNM Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    14/40

    14

    *Vendors

    may

    propose

    different

    equipment

    from

    the

    manufacturer

    and

    part

    number

    specified

    above

    butallequipmentmusthaveequalorbetterfeaturesetsthanthemodelslistedabove.

    Vendorsproposingtofurnish"equal"productsinaccordancewith"BrandNameorEqual"provisionsof

    thisRequestforBidsshallprovidethefollowingdescriptionforeachproductforwhichasubstitutionis

    proposed:

    BRANDNAME

    ProductEqual:______________________________

    Manufacturer'sName:____________________________________

    Address:____________________________

    City,State,Zip:______________________________

    ProductName(Ifany):____________________________________

    Productmake,orcatalogdescription:___________________________________

    If"equal"productsareproposed,provideadetaileddescriptionofeachproductproposedincluding

    manufacturerspecification/datasheets.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    15/40

    15

    IV. REQUIREDCERTIFICATIONS

    GRANT AWARD CONDITIONS

    TheVendorandallsubcontractors,agreetocomplywithallprovisionsandtermsandconditionsof

    the award and all applicable federal and state statutes. They include, but are not limited to, the

    following:

    DepartmentofCommerceFinancialAssistanceStandardTermsandConditions AwardSpecificSpecialAwardConditions 15CFRPart14,UniformAdministrativeRequirementsforGrantstoInstitutionsofHigher

    Learning,HospitalsandOtherNonprofitsandCommercialOrganizations

    OMBCircularA87 OMBCircularA133 OMBCircularA122 DOCAmericanRecoveryActAwardTerms74FR33104,74FR41676,74FR42644 AmericanRecoveryandReinvestmentActof2009 2CFRPart1326,SubpartCGovernmentwideDebarmentandSuspensions 15CFRPart28,NewRestrictionsonLobbying CopelandAntiKickbackAct DavisBaconAct Sections103and107oftheContractWorkHoursandSafetyStandardsAct

    Inaddition,thefollowingrequirementswillbemet,asapplicable:

    Vendor shall provide all information needed for FRBA reporting to the NTIA, to meet allreporting deadlines. Failure to provide the information on a timely basis could impact the

    approvalofanypendingpayrequests. Any past, present or potential conflicts of interest,whether real or in appearance shall be

    avoidedasprovidedinChapter15CFRPart14.

    Vendorcertifiesthat its firmoranyof itsprincipals (meaningofficers,directors,partners,andpersonshavingprimarymanagementorsupervisoryresponsibilitieswithinthebusiness)arenot

    currently debarred, suspended, or proposed for debarment by any federal entity.

    Inaddition,itiscertifiedthatneitherthefirmnoranyofitsprincipalshavenot,withinathree

    yearperiodprecedingthisoffer,beenconvictedoforhadajudgmentrenderedagainstthemfor

    anyof the following: fraudora criminaloffense in connectionwithobtaining,attempting to

    obtain, or performing a public (Federal, state, or local) contract or subcontract, violation of

    Federal or state antitrust statutes relating to the submission of offers, or committed

    embezzlement, theft, forgery, bribery, falsification or destruction of records, making false

    statements,taxevasion,orreceivingstolenproperty.Itisfurthercertifiedthattheabovelisted

    arenotpresentlyindictedfororcriminallyorcivillychargedbyagovernmententitywithanyof

    these offenses. The undersigned further certifies that the respondent (vendor) or any of its

    principals have not, within a threeyear period preceding this offer, had any contracts

    terminated fordefaultbyany Federalagency. Theundersignedagrees to immediatelynotify

    FRBAofanychangethatoccurs inthisstatusupuntilthetimetheawardofthisprocurement

    hasbeenmade.Ifitisdeterminedthattherespondent(vendor)signedthisproposal(purchase

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    16/40

    16

    order,requestforproposal)whileknowinglywithholdinginformationthatwouldhavemadethe

    firm ineligibleforacontractundertheseprovisions, inadditiontootherremediesavailableto

    thegovernment,FRBAmayterminatethecontract.

    Respondentherebyagreestoandcomplieswiththispledge.

    Name: _________________________________________

    Date: _________________________________________

    Signature: _________________________________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    17/40

    17

    REFERENCES

    Please provide the following information (three references) describing your experiencewith similar

    projects

    NameofClient Project(What,When,Where)

    ClientContactInformation

    (Name,Phone,Email)

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    18/40

    18

    EQUALOPPORTUNITYEMPLOYER(EOE)STATEMENT

    Bysubmittingabidinresponsetothissolicitation,therespondentagreesto: Notdiscriminateagainstanyemployeeorjobapplicantbecauseoftheirrace,creed,color,sex,maritalstatusornationalorigin; Postacopyofthispledgeinaconspicuousplace,availabletoallemployeesandjobapplicants. Placeorcausetobeplacedastatementinallsolicitationsoradvertisementforjobapplicants,

    includingsubcontracts,thattheRespondentisanEqualOpportunityEmployer.

    Respondentherebyagreestoandcomplieswiththispledge.

    Name: _________________________________________

    Date: _________________________________________

    Signature: _________________________________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    19/40

    19

    MBE/WBE/DBEBUSINESSPARTICIPATION

    MinorityBusinessParticipation

    Minority Business Enterprise (MBE), Women Owned Business Enterprise (WBE), Disadvantaged BusinessEnterprise (DBE) participation is encouraged. It is the goal of the NFBA to consider (a) a respondents

    qualificationasanMBE/WBE/DBEand/or(b)therespondentscommitmenttoutilizeotherMBE/WBE/DBEin

    fulfillingitsobligationsontheproject.

    ThesupplermayprovideanMBE/WBE/DBEParticipationStatementwithintheRFBresponse:

    Anexplanation/narrativeofhowtherespondentand/oritssubcontractorsqualifyasanMBE/WBE/DBEfortheproject.

    ListofthelocallycertifiedMBE/WBE/DBEfirmsthatwillbeutilizedontheprojectincludingtheservicesorequipmenttheyareabletoprovide.

    DescribethemethodologyformonitoringtheMBE/WBE/DBEparticipationonacontinuingbasis.

    RespondentqualifiesasanMBE/WBE/DBEParticipantYes[ ]No[ ]

    Name: _________________________________________

    Date: _________________________________________

    Signature: _________________________________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    20/40

    20

    CONFLICTOFINTERESTSTATEMENT

    Bysubmittingabidinresponsetothissolicitation,therespondentagreesthat:

    Respondentisawareoftheconflictofinterestprovisionspecifiedin15CFR14.42. Respondentdoesnotandshallnothaveanyemploymentoragreement,oralorwritten,withany

    thirdpartyrelatingtoanyinterestswhichareinconflictwithorotherwiseinconsistentwithany

    interestorpositionofFRBAoritsrepresentatives

    Respondentshallnotaccept,duringthetermofanycontractarisingfromthisRFB,anyretaineroremploymentfromathirdpartywhoseinterestsappeartobeconflictingorinconsistentwith

    thoseofFRBA.

    Respondentherebyagreestoandcomplieswiththispledge.

    Name: _________________________________________

    Date: _________________________________________

    Signature: _________________________________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    21/40

    21

    Ifnotfurnishingany"equal"products,completethefollowingcertification.

    Icertifythatthe"BrandName"productsspecifiedhavebeenreviewedandnosubstitutionswillbe

    usedinthedeliveryoftheseitems.

    ________________________________________________________

    Name

    ________________________________________________________

    Title

    ________________________________________________________

    Signature

    _________________________________________________________

    Date

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    22/40

    22

    BYRDANTILOBBYINGSTATEMENT(31U.S.C.1352)

    TheundersignedSellercertifies,tothebestofhisorherknowledgeandbelief,that:

    (1) No Federal appropriated funds have been paid orwill be paid, by or onbehalfof theundersigned, toanyperson for influencingorattempting to

    influenceanofficeroremployeeofanagency,aMemberofCongress,an

    officeroremployeeofCongress,oranemployeeofaMemberofCongress

    inconnectionwiththeawardingofanyFederalcontract,themakingofany

    Federal grant, themaking of any Federal loan, the entering into of any

    cooperative agreement, and the extension, continuation, renewal,

    amendment, or modification of any Federal contract, grant, loan, or

    cooperativeagreement.

    (2) IfanyfundsotherthanFederalappropriatedfundshavebeenpaidorwillbepaidtoanypersonformakinglobbyingcontactstoanofficeroremployeeof

    anyagency,aMemberofCongress,anofficeroremployeeofCongress,oran employee of aMember of Congress in connection with this Federal

    contract, grant, loan, or cooperative agreement, the undersigned shall

    complete and submit Standard FormLLL, Disclosure Form to Report

    Lobbying, inaccordancewithits instructionsasamendedbyGovernment

    wide Guidance for New Restrictions on Lobbying, 61 Fed. Reg. 1413

    (1/19/96).

    (3) The undersigned shall require that the language of this certification beincluded in the award documents for all subawards at all tiers (including

    subcontracts,subgrants,andcontractsundergrants,loans,andcooperative

    agreements)andthatallsubrecipientsshallcertifyanddiscloseaccordingly.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    23/40

    23

    Thiscertification isamaterialrepresentationoffactuponwhichreliancewasplacedwhenthis

    transaction wasmade or entered into. Submission of this certification is a prerequisite for

    making or entering into this transaction imposed by 31, U.S.C. 1352 (as amended by the

    LobbyingDisclosureActof1995).Anypersonwhofailstofiletherequiredcertificationshallbe

    subject toacivilpenaltyofnot less than$10,000andnotmore than$100,000 foreachsuch

    failure.

    Pursuant to31U.S.C.1352(c)(1)(2)(A),anypersonwhomakesaprohibitedexpenditureor

    failstofileoramendarequiredcertificationordisclosureformshallbesubjecttoacivilpenalty

    ofnotlessthan$10,000andnotmorethan$100,000foreachsuchexpenditureorfailure.

    The Seller,___________________, certifies or affirms the truthfulness and accuracy of each

    statement of its certification and disclosure, if any. In addition, the Seller understands and

    agreesthattheprovisionsof31U.S.C.A3801,etseq.,applytothiscertificationanddisclosure.Date___________________

    Signature______________________________ CompanyName______________________________

    Title______________________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    24/40

    24

    V. PROPOSEDCONTRACTFORM

    MASTEREQUIPMENTPURCHASEAGREEMENT

    STANDARDTERMSANDCONDITIONS

    The following Master Equipment Purchase Agreement is entered into as of this _____ day of

    _______________, 2011byanbetweenFloridaRuralBroadbandAlliance,LLC,aFloridalimitedliability

    company(theBuyer)and____________________, a________________ corporation(theSeller).

    TheBuyerandtheSeller,fortheconsiderationhereinsetforth,agreeasfollows:

    Section1. ContractDocuments. TheContractDocuments consist of thisAgreement, the LegalAdvertisement for FRBA RFB201102, TOWER ATTACHMENT AND STEEL__ (the RFB), the RFB,

    includinganyaddenda,theSellersResponsetotheRFBincludingallattachmentsandanydulyexecuted

    andissuedamendmentsrelatingthereto. AlloftheforegoingContractDocumentsareincorporatedby

    referenceandmadeapartofthisAgreement(allofsaiddocumentsincludingtheAgreementsometimes

    beingreferredtohereinasthe"ContractDocuments"andsometimesasthe"Agreement"). Acopyof

    the Contract Documents shall be maintained by Seller at all times during the performance of the

    Agreement.

    Section2. EquipmentPurchases. TheSelleragreesto furnish_____________________________

    equipmentasdescribedintheContractDocumentsandpursuanttotheUnitPricingScheduleattached

    hereto as Exhibit A and incorporatedhereinby reference (the Equipment)pursuant toPurchase

    OrdersissuedbyBuyerduringthetermofthisAgreement.

    Section3. AgreementTerm. The Equipment required under this Agreement shall be

    provided fortheperiodbeginning immediatelyuponexecutionofthisAgreementbybothpartiesand

    endingthree(3)yearsfromthedatehereof,subjecttoextensionbywrittenagreementofbothparties.

    Section4. Notices. AllnoticesrequiredormadepursuanttothisAgreementbyeitherparty

    shallbeinwritingtotheaddressesshownbelow:

    FloridaRuralBroadbandAlliance,LLC

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    25/40

    25

    4636Highway90,SuiteK

    Marianna,Florida32446

    [SELLERADDRESS]

    Either party may change its above noted address by giving written notice to the other party in

    accordancewiththisSection.

    Section5. Terms andAcceptanceThereof.Noprovisionsprintedorotherwise contained inany

    acknowledgmenthereofwhichare inconsistentwithor inadditiontothetermsandconditionsherein

    stated,andnoalterationof thisAgreement, shallhaveany forceoreffectunless theBuyerexpressly

    agreestotheminwritingthroughadulyauthorizedagentoftheBuyer.

    IFANYOTHERTERMSANDCONDITIONSAREPUTFORWARDBYTHESELLEROFTHEEQUIPMENT(THE

    SELLER),THEYAREOBJECTEDTOBYTHEBUYERANDSHALLHAVENOFORCEOREFFECTUNLESSTHE

    BUYEREXPRESSLYAGREESTOTHEMINWRITING.

    Section6. Termination. The Buyer may terminate this Agreement, in whole or in part, for

    convenienceatany timeupon five (5)dayswrittennotice toSeller. Unlessdirectedotherwise in the

    noticeof termination, theSeller shall incurno furtherobligations in connectionwith thisAgreement

    uponreceiptofsuchnotice.

    Section7. PurchaseOrders. The Buyer will not accept any Equipment pursuant to this

    Agreement unless a duly authorized and signed Purchase Order, in substantially the form attached

    heretoasExhibitBhasbeenissuedforsuchEquipment. ThePurchaseOrdernumbermustappearon

    allinvoices,packingslipsandallcorrespondenceregardingtheorder. QuantitiesspecifiedinaPurchase

    Order cannotbechangedwithout theBuyerswrittenapproval. Equipment shipped inexcessof thequantitydesignatedinaPurchaseOrdermaybereturnedatSellersexpense.

    Section8. Reserved.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    26/40

    26

    Section9. PricingSchedule/ContinuityofSupply. Seller agrees to provide the Equipment at the

    fixedunitpricesstatedintheattachedPricingSchedule,includingthecostsofdeliverytoBuyer,forone

    yearfromthedateofexecutionofthisAgreement,withnoincrease.

    Seller shallprovide continuityof supplyof the Equipment and spareparts foraperiodof five years

    followingtheproductsendoflife.

    Section 10. License of Software. Seller hereby grants Buyer a nonexclusive, nontransferable and

    perpetual license to use any and all software that is embedded in the Equipment covered by this

    Agreement and any and all software that is otherwise preinstalled by the Seller on the Equipment

    covered by this Agreement at the time of delivery, together with the documentation under each

    programelementthereof.

    Section11.Invoices,DueDatesandPayments.TheSellermustsubmitan invoicetotheBuyerbefore

    anypaymentwillbeprocessed.The Sellers invoices shallbe forwarded to theBuyerat theaddress

    noted in Section 4 herein and all line items must show the Buyers Purchase Order number, theEquipmentthatisthesubjectoftheinvoiceandanyotherrequiredinformation.

    Section12. ShippingandDeliveries. Allitemsshouldbeshippedfreeonboardtooneoftwo

    FRBAwarehouselocationsforeachnetworkbuild. Approximatelyhalfofthetotalequipmentorderwill

    beshippedtoeachlocation:

    FloridaRuralBroadbandAllianceSouthNetworkWarehouse

    c/o:RapidSystems

    1155Highway17North

    Wauchula,FL33873

    FloridaRuralBroadbandAllianceNorthNetworkWarehouse

    TobeDetermined

    unless otherwise expressly indicated on any associated Purchase Order. Seller shall retain title and

    assumeallresponsibility, liabilityandriskfortheEquipmentduringtransitandshallberesponsiblefor

    filingofclaimsforlossordamagesresultinguntiltheEquipmenthasbeendeliveredtoBuyer.

    In the event that the FOB delivery address is changed by Buyer during the fixed price term of the

    Agreement,Sellershalldocumentanyadditionalshippingchargesrequiredasaresultofsuchchangein

    anamendmenttothisAgreementsignedbybothparties.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    27/40

    27

    No additional amounts shall be chargeable to the Buyer because of taxes or excises, presently or

    hereafter levied on the Seller with the exception of applicable sales and use taxes and customary

    applicablecustomfees.Unlessotherwiseagreedto inwritingbytheBuyer,allcurrencyamountsshall

    beUnitedStatesdollars.Unlessotherwiseexpresslyconsentedto inwritingbytheBuyer,nopayment

    willbemadeforpacking,boxing,drayageorstorage.TheBuyerreservestherighttocancelallorany

    partofthisorderifEquipmentisnotdeliveredonthedateordatesspecifiedherein;acceptanceinsuch

    casesshall innowaybindtheBuyertoacceptfurtherdeliveriesonanyorder.Partialdeliveryontime

    willnotexcusenondelivery.

    AlldeliveriesaretobemadeMondaythroughFriday,excludingholidays,unlessotherwisestipulatedin

    aPurchaseOrder.

    Section13. Acceptance. Equipmentdeliveredhereundershallbedeemedtohavebeenaccepted

    (Acceptance)whenallofthe followinghaveoccurred:a.TheEquipment(includingany licensedand

    operating software acquired in connection therewith) has been properly received, inspected and

    deemedready forusebytheBuyer.b.TheEquipment (includingany licensedandoperatingsoftware

    acquired in connection therewith) operates in accordance with the Sellers specifications and

    documentationprovidedtoBuyerandanyadditionalpublishedspecificationsoftheSellerandanyother

    manufacturer of the Equipment or developer of any licensed and operating software acquired in

    connection therewith. In theevent that theBuyerdoesnotaccept theEquipment in themanner set

    forthabove,theBuyermayrequesttheremovaloftheEquipmentandthesoftware,andtheBuyershall

    haveno liabilityunderthesetermsandconditions,andtheSellerwillreturnanymoniespaidtosuch

    datebytheBuyer.InnoeventshalluseofanypieceoftheEquipmentpriortoacceptance,constitute

    AcceptanceofanypieceoftheEquipmentorpartofthesoftwarebytheBuyer.

    Section14.NewEquipment.TheSellercovenantsandwarrantsthattheEquipmentandallof itsparts

    andcomponentsarenewandunused.

    Section15.SellersWarranties.TheSellerwarrantsthat(i)theEquipmentbeingpurchasedpursuantto

    these termsandconditionswillconform toandperform inaccordancewithanyandallperformance

    specifications and documentation published by the Seller, any and all warranties, performance

    specificationsanddocumentationotherwisedeliveredbytheSellertotheBuyerinconnectionwiththe

    ContractDocuments,securingtherelatedPurchaseOrderandanyandallexpandedspecificationsput

    forwardbytheBuyerandidentifiedbytheBuyer,andtotheextentthatagreedspecificationsmaynot

    becomplete,theEquipmentbeingpurchasedpursuanttothesetermsandconditionswillalsoconform

    to the specifications standard in the industry, (ii) the Equipmentbeingpurchasedpursuant to these

    termsandconditionswillbefreefromdefectsinmaterialandworkmanship,and(iii)allstatementson

    thepacking lists shallbeaccurateand theBuyermay rely thereon.TheSeller further representsand

    warrantsandguaranteesthattheEquipmentbeingpurchasedpursuanttothesetermsandconditions

    complieswithallapplicableprovisionsoflaws,ordinances,codesandregulations,includingthoseofthe

    UnitedStates,thestatesoftheUnitedStatesandlocalitieswithinsuchstates.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    28/40

    28

    Section16. Remedies for Breach of Warranty. The Buyer may reject any Equipment and any

    softwarewhichdonotconformtotheSellerswarranties,includingthosesetforthinSection15,atany

    timeafterdeliveryandbeforeorafteracceptance,whensuchbreachofwarrantybecomesknownto

    theBuyer, in anymanner including recognition of latent defects (nonconforming goods); and the

    Sellershallbeliableforalldirectcosts,damagesandlossessufferedbytheBuyerbyreasonofsuchnon

    conforminggoodsbut,absentgrossnegligenceorwillfulmisconductonthepartoftheSeller,shallnot

    beresponsibleforany indirect,punitive,exemplaryorconsequentialdamages.IftheBuyer learnsthat

    nonconforminggoodshavebeendelivered,theBuyershallhavetherighttodoanyone,orall,ofthe

    following: (i)cancelanyundeliveredportionof thePurchaseOrderand,at theBuyersoption, return

    eitheralloftheequipmentandanysoftwareoronlythenonconforminggoodsattheSellersriskand

    expensefor(attheBuyersoption)creditorpromptreplacementattheinvoiceprice,(ii)repairanduse

    thenonconforminggoods,deductingthecost incurred insuchrepairandusefromanysumsduethe

    Seller,orondemand,theSellerwillreimbursetheBuyerforallsuchcosts,(iii)uponnoticetotheSeller,

    holdthenonconforminggoodsforareasonabletimeandresellorreturnthemaccordingtotheSellers

    instructions (the net proceeds of any such resale shall be credited to the Sellers account), and (iv)

    exerciseanyotherremediesthatmaybeavailableunderapplicablelaw.

    Section17. Indemnification IncludingPatent Indemnity.The Selleragrees to indemnify,defend and

    holdharmlesstheBuyer,itsofficers,agentsandemployees,againstandfromallclaims,suits,damages,

    costs, expenses and losses (including without limitation: all incidental and consequential damages,

    economicloss,propertydamage,personalinjuryordeath)(i)whicharisesoutofabreachbytheSeller

    of these terms and conditions or anywarranties applicable to the Equipment and any licensed and

    operatingsoftwareacquiredby theBuyer from theSeller inconnectionwith theEquipmentacquired

    hereunder,orwhich result fromanynonconformingdelivery (including latedeliveriesor incomplete

    deliveries),orany infringementofanycopyright,patent, trademark,ordesignorthe like (whetheror

    not registered)basedon themanufacture,useor saleofanyof theEquipmentandany licensedand

    operatingsoftwareacquiredbytheBuyerfromtheSellerinconnectionwiththeEquipment,or(ii)which

    in anymanner result from any defect in the Equipment and any licensed and operating software

    acquiredby theBuyer from the Seller in connectionwith the equipment,nonconformity toornon

    compliancewithany law, ruleor regulation relating to thesafety,qualityordesignof theEquipment

    andany licensedandoperatingsoftwareacquiredbytheBuyerfromtheSeller inconnectionwiththe

    Equipment,andanyandallof theBuyers reasonablecostsandexpenses, includingprofessional fees

    andcosts,ofinvestigating,settlingordefendinganysuit,actionorclaim.Eachdefenseobligationstated

    herein isherebydeemedaseparateanddistinctobligation,fullyseverablefromanyotherdutystated

    herein. ThissectionoftheAgreementwillextendbeyondthetermoftheAgreement.

    Section18. Reserved.

    Section19. No Use of Brand Equity Without Permission. Without obtaining prior written

    permissionfromanofficeroftheBuyer,theSellermaynotutilizetheBuyersnameinthepromotionof

    itsbusinessoritsproducts.

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    29/40

    29

    Section20. Insurance.TheSellershallprocureandmaintainproducts liability insuranceacceptableto

    BuyerandshallfurnishtotheBuyercertificatesthereofinconnectionwiththisAgreement.

    Section21.NonWaiver;RemediesnotExclusive.TheBuyerswaiverofanybreachorfailuretoenforce

    anyofthetermsorconditionsofthisAgreementatany timeshall innowayaffect, limitorwaive its

    rightshereaftertoenforcestrictcompliancewiththisAgreement.

    Section22.Assignment.TheSellershallnotdelegateorassignanydutiesorclaimsunderthiscontract

    withouttheBuyerspriorwrittenconsent.

    Section23. EntireAgreement;Amendment. This agreement represents the entire agreementof the

    parties.Noamendment,modificationorreleasefromanyprovisionhereof,shallariseoutofacourseof

    action or mutual agreement unless such agreement is in writing, signed by both parties.

    Notwithstanding any termsput forthby Seller (including anyonline terms and conditions on any of

    Sellerswebsites)thetermsofthisdocumentshallgovernalltransactionsbetweentheparties.

    Section 24. Governing Law and Venue. Any questions concerning validity, interpretation or

    performanceofthiscontractshallbegovernedbytheinternallawsoftheStateofFloridaandvenueof

    anylegalproceedingshallbeinthestateorfederalcourtsofLeonCounty,Florida.

    Section25. SpecialGrantAwardConditions. Seller acknowledges that Buyers purchase of

    Equipment pursuant to this Agreement is in connection with a project to be funded with federal

    stimulus grant funds pursuant to Grant Award Number NT10BIX5570122 awarded to the NFBA on

    August 1,2011 (the Grant). The Seller agrees tobebound by the special grantaward conditions

    outlined in Exhibit C attached hereto and incorporated herein for any Purchase Orders issued

    pursuanttothisAgreementthatwillbefundedwithGrantmonies.

    Inwitnesswhereof,thepartiesevidencetheiragreementthroughtheexecutionofthisAgreementby

    theirdulyauthorizedsignatories.

    FLORIDARURALBROADBANDALLIANCE,LLC, aFlorida

    limitedliabilitycompany

    Witness:___________________

    PrintName:________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    30/40

    30

    By:___________________________________

    Name:_______________________________

    Title:_________________________________

    Date:________________________________

    Witness:_____________________

    PrintName:__________________

    Vendor,Inc.

    Witness______________________ By:_____________________________

    PrintName:__________________ Name:__________________________

    Title:___________________________

    Date:___________________________

    Witness:_____________________

    PrintName:__________________

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    31/40

    31

    EXHIBITA

    PRICINGSCHEDULE

    (ExcelSpreadsheet,RFB201102,TOWERATTACHMENTANDSTEEL)

    Group *Estimated

    Quantities

    Description Unit

    Type

    Unit

    Price

    Extended

    Price

    Delivery

    Time(in

    days)

    Cable

    60,000

    LMR400LowLossCable US

    Feet

    180,000

    CAT5cablemodel#TC

    L2

    US

    Feet

    Connectors

    600

    NMaleConnector

    LMR400

    Each

    HoistingGrips

    300

    HoistingGrip,Laceup

    LMR400Coax

    Each

    150

    HoistingGrip,Laceup

    1/2inchCoax

    Each

    GroundKits

    900

    GroundKitforLMR400 Each

    GroundBars

    400

    UniversalGroundBuss

    BarHarger1/4x4x14

    Each

    150

    GroundBar1/4x2x12 Each

    550

    UniversalGroundBar

    AttachmentKitConnect

    It

    Each

    Groundwell

    275

    9"diameterx10.25" Each

    ExothermicWeldshot

    225

    UWM45Ultraweld Each

    225

    UWM60Ultraweld Each

    200

    UWM90Ultraweld Each

    GroundingCable

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    32/40

    32

    150

    #2Solid250footspool US

    Feet

    1

    #2SolidCable(Foot) Each

    35,000

    #2Stranded US

    Feet

    10,000

    #6Stranded US

    Feet

    GroundRods

    825

    CopperCladGround

    Rod,3/4in.x10ft.

    Each

    Lugs

    3,000

    2holelugsfor#2

    stranded

    Each

    4,000

    2holelugsfor#6

    stranded

    Each

    Exothermic

    Weld

    shot

    135

    Universal

    WeatherproofingKit

    SnapinHangers

    1,000

    LMR400SnapInHanger

    (10perpackage)

    Each

    500

    Snapinhangerfor1/2"

    inchLowLossCable

    Each

    500

    Adapterfor3/8"Cable

    for1/2"SnapInHanger

    Each

    CoaxBlocks

    200

    MiniCoaxSupportBlock

    forLMR400

    Each

    20

    3/8"Galvanized

    HardwareKitforone

    coaxsupportblock

    Each

    40

    3/8"Galvanized

    HardwareKitfortwo

    coaxsupportblocks

    Each

    20

    3/8"Galvanized

    HardwareKitforthree

    coaxsupportblocks

    Each

    BeamClamps

    100

    BeamClamps\angle

    adapter(10per

    package)

    Each

    100

    Universalround

    memberStandoff

    Adapter2"4"

    Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    33/40

    33

    100

    Universalround

    memberStandoff

    Adapter4"6"

    Each

    100

    SnapinStandoff

    Adapters(Nomember

    kit)10Pack

    Each

    SectorMounts

    300

    TArmKit,3sectorfora

    guyed,selfsupport,

    and/ormonopole,12"

    standoffand(3)41/2"x

    72"antennapipesfor

    microwavedishes

    Each

    DishMounts

    125

    8'DiameterMicrowave

    AntennaMount4"to6"

    roundmemberorangle

    Each

    10

    8'DiameterMicrowave

    AntennaMount

    accommodatesa11/2"

    to31/2"roundmember

    orangle

    Each

    AntennaClamps

    10

    4.5inchthickwall

    AntennaPipe(8foot)

    Each

    10

    pipetopipeadapterfor

    roundmemberlegsup

    to3inches(2PerBox)

    Each

    10

    pipetopipeadapterfor

    roundmemberlegsup

    to5inches(2PerBox)

    Each

    10

    pipetopipeadapterfor

    roundmemberlegsup

    to7inches(2PerBox)

    Each

    10

    pipetopipeadapterfor

    roundmemberlegsup

    to9inches(2PerBox)

    Each

    ChainMounts

    10

    DoubleSectorChain

    Mount

    Each

    10

    Quadsectorchain

    mount

    Each

    10

    MicrowaveChain

    Mount,Upto48"

    Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    34/40

    34

    10

    MicrowaveChain

    Mount,Upto60"

    Each

    10

    HorizontalBraceKitfor

    EU15985CM48or

    EU15985CM60,Order1

    PerDish

    Each

    10

    AncillaryBraceKitfor

    EU15985CM48or

    EU15985CM60,Order1

    PerMount

    Each

    10

    DishStandoffKitfor

    EU15985CM48or

    EU15985CM60,Order1

    PerMount

    Each

    10

    DishPipeMountfor

    EU15985CM48or

    EU15985CM60,Order1

    PerMount

    Each

    IceBridgeKit

    300

    12"x10'GratedIce

    BridgeKit

    Each

    CableLadders

    1,050

    CoaxLadder10'x6Runs

    Universal(with

    Hardwarekitforround

    andangledmembers)

    Each

    100

    CoaxLadder10'x8Runs

    Universal

    Each

    100

    CoaxLadder10'x12

    RunsUniversal

    Each

    Theabovecoaxladders

    mustincludehardware

    kitsforroundandangle

    members

    Banding

    10

    StainlessSteelBanding,

    1/2"x100'

    Each

    10

    StainlessSteelBuckle

    Clamps

    Each

    Jumpers

    150

    AndrewC1953'NMNM

    M7Mkit

    Each

    150

    LMR24010ftNMNM Each

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    35/40

    35

    EXHIBITB

    SPECIALGRANTCONDITIONS

    1. Grant Provisions. For the purposes of Grant #NT10BIX5570122 awarded to Florida Rural

    BroadbandAlliance,LLConAugust1,2010,Selleracknowledges thatthisAgreement issubjectto the

    specialgrantawardconditionsoutlinedinthisExhibittotheextentsuchprovisionsareapplicabletothis

    Agreement.

    (a) Debarment. Sellercertifiesthatitiseligibletoreceivestateandfederallyfundedcontracts.Seller also certifies that no party, which is debarred from such contracts, will be

    subcontractedtoperformservicesunderthisAgreement.

    (b) Signage. AsrequiredbythetermsoftheStimulusActandtheGrant,FRBAshallhavetherighttoerectsignageatanyworksitetocomplywiththestimulusactsignagerequirements.

    (c) FederalAuditsandInspections. SellerwillcooperateinanyauditorinspectionofFRBAsnetwork,assets,equipmentinstallationoroperationsrequiredfororonbehalfofFRBA,the

    DepartmentofCommerce,theNTIA,NOAA,theOfficeoftheInspectorGeneraloranyother

    stateorfederalagencywithjurisdictionovertheBTOPgrant. Sellerunderstandsthatsuch

    auditsandinspectionsmayincludecontractspaidwithgrantfundssuchastheAgreement.

    Seller understands it is responsible for maintaining documentation pursuant to this

    Agreement. AllaccessrightstoSellerfacilitiesgrantedtoFRBAhereundershallalsoextendtoanysuchfederalinspectorsorauditors.

    (d) AvailabilityofFunds. All payments to bemade by FRBA under this Agreement aresubjecttotheavailabilityofgrantfundspursuanttotheBTOPgrant. FRBApledgestotake

    allactionsnecessarytokeepitsBTOPgrantingoodstanding.

    (e) Invoicing. Notwithstandinganythingtothecontraryherein,paymentsmadebyFRBAshallbemadebymeansofacheckwithin30daysafterapprovalofaninvoice.

    2. CompliancewithFederalandStateStatutes. ByitsexecutionofthisAgreement,Selleragreesthat itwillcomplywithallapplicablefederalandstatestatutes ifandtotheextentthattheyapplytoSellerandtheAgreement,including,butnotlimitedto,thefollowing:

    (a) EqualEmploymentOpportunity

    DuringtheperformanceofthisAgreement,Selleragreesasfollows:

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    36/40

    36

    i. SellerwillcomplywithallprovisionsofExecutiveOrder11246ofSeptember24,

    1965, as amended by Executive Order 11375 of October 13, 1967 and as

    supplementedinDepartmentofLaborregulations(41CFRChapter60).

    ii. SellerwillfurnishallinformationandreportsrequiredbyExecutiveOrder11246

    of September 24, 1965, and by the rules, regulations, and orders of the

    Secretary of Labor, or pursuant thereto, andwill permit access to its books,

    records and accounts by FRBA, or the State of Florida or the United States

    Secretaryof Labor forpurposesof investigation to ascertain compliancewith

    suchrules,regulationsandorders.

    iii. In theeventof Seller'snoncompliancewith theequalopportunity clausesofthisContractorwithanyofsuchrules,regulationsororders,thisContractmay

    be cancelled, terminatedor suspended inwholeor inpartandSellermaybe

    declared ineligible for further government contracts in accordance with

    proceduresauthorized inExecutiveOrder11246of September 24,1965, and

    such other sanctionsmay be imposed and remedies invoked as provided in

    ExecutiveOrder11246ofSeptember24,1965,orbyrule,regulation,ororderof

    theSecretaryofLabor,orasotherwiseprovidedbylaw.

    iv. Seller will include the provisions of paragraphs (a) through (c) in every

    subcontractorpurchaseorderunlessexemptedbyrules,regulationsororders

    of the Secretary of Labor issued pursuant to Section 204 of Executive order

    11246ofSeptember24,1965,sothatsuchprovisionswillbebindinguponeach

    subcontractor or vendor. Seller will take such action with respect to any

    subcontractorpurchaseorderasthelocalgoverningauthority(s)representative

    maydirectasameansofenforcingsuchprovisions includingsanctionfornon

    compliance:Provided,however,thatintheeventSellerbecomesinvolvedin,or

    isthreatenedwith,litigationwithasubcontractororvendorasaresultofsuch

    direction by FRBA, Sellermay request the United States to enter into such

    litigationtoprotecttheinterestsoftheUnitedStates.

    (b) CivilRightsActof1964

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    37/40

    37

    UnderTitleVIoftheCivilRightsActof1964,nopersonshall,onthegroundsofrace,color,

    or national origin, be excluded from participation in, be denied the benefits of, or be

    subjected to discrimination under any program or activity receiving federal financial

    assistance.

    (c) AccessandRetentiontoRecords

    FRBA,theDepartmentofCommerce,theComptrollerGeneraloftheUnitedStates,andany

    oftheirdulyauthorizedrepresentatives,shallhaveaccesstoanybooks,documents,papers,

    andrecordsofSellerwhicharedirectlypertinenttothisContractforthepurposeofmaking

    audit,examination,excerpts,and transcriptions. Seller shall retainall records relating to

    this Contract for five (5) years after FRBAmakes final payment and all other pending

    mattersareclosed.

    (d) CopelandAntiKickbackAct(18U.S.C874and40U.S.C.276c)

    All contracts and subgrants in excess of $2000 for construction or repair awarded by

    recipients and subrecipients shall include a provision for compliancewith the Copeland

    AntiKickbackAct (18U.S.C.874),as supplementedbyDepartmentof Labor regulations

    (29CFRPart3,ContractorsandSubcontractorsonPublicBuildingorPublicWorkFinanced

    inWholeorinPartbyLoansorGrantsfromtheUnitedStates).TheActprovidesthateach

    contractor or subrecipient shall be prohibited from inducing, by anymeans, any person

    employed in theconstruction,completion,orrepairofpublicwork,togiveupanypartof

    thecompensationtowhichheisotherwiseentitled.Therecipientshallreportallsuspected

    orreportedviolationstotheDepartmentofCommerceoperatingunit.

    (f) DavisBaconAct,asamended(40U.S.C.276atoa7)

    Allconstructioncontractsawardedbytherecipientsandsubrecipientsofmorethan$2000

    shallincludeaprovisionforcompliancewiththeDavisBaconAct(40U.S.C.276atoa7)and

    as supplemented by Department of Labor regulations (29 CFR Part 5, Labor Standards

    Provisions Applicable to Contracts Governing Federally Financed and Assisted

    Construction).UnderthisAct,contractorsshallberequiredtopaywagesto laborersand

    mechanicsata ratenot less than theminimumwages specified inawagedetermination

    madebytheSecretaryofLabor.Inaddition,contractorsshallberequiredtopaywagesnot

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    38/40

    38

    less than once aweek. The recipient shall place a copy of the current prevailingwage

    determination issuedby theDepartmentofLabor ineach solicitationand theawardofa

    contractshallbeconditionedupontheacceptanceofthewagedetermination.Therecipient

    shallreportallsuspectedorreportedviolationstotheDepartmentofCommerceoperating

    unit.

    (g) ContractWorkHoursandSafetyStandardsAct(40U.S.C.327333)

    Whereapplicable,allcontractsawardedbyrecipientsexceeding$100,000forconstruction

    contracts and for other contracts that involve the employment ofmechanics or laborers

    shall includeaprovision for compliancewithSections102and107of theContractWork

    Hoursand Safety StandardsAct (40U.S.C.327333),as supplementedbyDepartmentof

    Labor regulations (29CFRPart5).UnderSection102of theAct,eachcontractor shallbe

    required tocompute thewagesofeverymechanicand laboreronthebasisofastandard

    workweekof40hours.Work inexcessofthestandardworkweek ispermissibleprovided

    thattheworkeriscompensatedatarateofnotlessthan112 mesthebasicrateofpayfor

    allhoursworkedinexcessof40hoursintheworkweek.Section107oftheActisapplicable

    toconstructionworkandprovidesthatnolaborerormechanicshallberequiredtoworkin

    surroundingsorunderworking conditionswhichareunsanitary,hazardousordangerous.

    These requirements do not apply to the purchases of supplies or materials or articles

    ordinarilyavailableontheopenmarket,orcontracts fortransportationortransmissionof

    intelligence.

    (h) RightstoInventionsMadeUnderaContractorAgreement

    Contractsoragreementsfortheperformanceofexperimental,developmental,orresearch

    work shall provide for the rights of the Federal Government and the recipient in any

    resulting invention in accordancewith 37 CFR part 401, Rights to InventionsMade by

    NonprofitOrganizationsandSmallBusinessFirmsUnderGovernmentGrants,Contractsand

    Cooperative Agreements, and any implementing regulations issued by the awarding

    agency.

    (i) CleanAirAct (42U.S.C. 7401 et seq.) and the FederalWater Pollution ControlAct (33U.S.C.1251etseq.),asamended

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    39/40

    39

    Contracts and subgrantsof amounts in excessof $100,000 shall contain a provision that

    requirestherecipienttoagreetocomplywithallapplicablestandards,ordersorregulations

    issuedpursuanttotheCleanAirAct(42U.S.C.7401etseq.)andtheFederalWaterPollutionControl Act as amended (33 U.S.C. 1251 et seq.). Violations shall be reported to theDepartment of Commerce operating unit and the Regional Office of the Environmental

    ProtectionAgency(EPA).

    (j) ByrdAntiLobbyingAmendment(31U.S.C.1352)

    Contractors who apply or bid for an award exceeding $100,000 shall file the required

    certification.Each tiercertifies to the tierabove that itwillnotandhasnotusedFederal

    appropriated funds to pay any person or organization for influencing or attempting to

    influenceanofficeroremployeeofanyagency,amemberofCongress,officeroremployee

    ofCongress,oranemployeeof amemberofCongress in connectionwithobtaining any

    Federalcontract,grantoranyotherawardcoveredby31U.S.C.1352.Eachtiershallalso

    discloseany lobbyingwithnonFederalfundsthattakesplaceinconnectionwithobtaining

    anyFederalaward. Suchdisclosuresareforwardedfromtiertotieruptotherecipient.

    (k) DebarmentandSuspension(E.O.s12549and12689)

    Nocontractshallbemadetoparties listedontheGeneralServicesAdministrationsListof

    Parties Excluded from Federal Procurement orNonprocurement Programs in accordancewith E.O.s 12549 and 12689, Debarment and Suspension as implemented by DOC

    regulationsat15CFRpart26.This listcontainsthenamesofpartiesdebarred,suspended,

    orotherwiseexcludedbyagencies,andcontractorsdeclared ineligibleunder statutoryor

    regulatoryauthorityotherthanE.O.12549.

    3. Compliance with Applicable State and Federal Regulations. By its execution of this

    Agreement, Seller agrees that it will complywith the following State and Federal Regulations (the

    ApplicableRegulations)ifandtotheextentthattheyapplytoSellerandthisAgreement:

    o AwardSpecificSpecialAwardConditionsforAward#NT10BIX5570122o AmericanRecoveryandReinvestmentActof2009o Noticeoffundsavailability,issuedJanuary22,2010

  • 8/4/2019 FRBA Request for Bid, RFP-2011-02, Tower Attachments and Steel

    40/40

    By itsexecutionof thisagreement, theSellerandallofSellers subcontractors,agree that theyhave

    readandwillcomplywithallprovisionsand termsandconditionsofaward#NT10BIX5570122andall

    applicablefederalandstatestatutes,including,butarenotlimitedto,thefollowing AwardDocuments:

    DepartmentofCommerceFinancialAssistanceStandardTermsandConditions AwardSpecificSpecialAwardConditions 15CFRPart14OMBCircularA122OMBCircularA133DOCAmericanRecoveryActAwardTerms74FR33104,74FR41676,74FR42644 AmericanRecoveryandReinvestmentActof2009 2CFRPart1326,SubpartCGovernmentwideDebarmentandSuspensions 15CFRPart28,NewRestrictionsonLobbying CopelandAntiKickbackActDavisBaconAct Sections103and107oftheContractWorkhoursandSafetyStandardsActNoticeofFundsAvailability,January22,2010,75FR3792NoticeofLimitedWaiverofSection1605(BuyAmericanRequirement),July1,2009,74FR31402 73FR7696

    Inaddition,thefollowingrequirementswillbemet,asapplicable:

    Seller shall provide any information needed for FRBAs reporting to the NTIA, to meet allreporting deadlines. Failure to provide the information on a timely basis could impact the

    approvalofanypendingpayrequests.

    All procurement is to be conducted in compliance with state and federal procurementregulations.

    AllEquipmenttobeprovidedbySellerundertheAgreementtobepaidfromgrantproceedsshallbeeligibleforpaymentwithfederalfundsasspecifiedintheAwardDocuments

    PaymentoffundstoSellerunderthisAgreementissolelycontingentonthereceiptofgrantfunds

    as

    disbursed

    and

    made

    available

    to

    FRBA

    in

    the

    form

    of

    grant

    draws.

    Any past, present or potential conflicts of interest,whether real or in appearance shall beavoidedasprovidedin15CFRPart14.