Framework for Key Performance Indicator & Annual ...
Transcript of Framework for Key Performance Indicator & Annual ...
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [1]Private and Confidential Copyright © Prokhas Sdn Bhd. All rights reserved.
Framework for Key Performance Indicator &
Annual Performance Appraisal
15 October 2021
Private and Confidential
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [2]Private and Confidential
The establishment of individual KPI Report for 2021 shall serve as a guide and indicator to this year’s overall
progress for UJ and acts as a precedent for the years ahead.
The Scorecard is prepared to highlight the performance of the management team and each division at the Company
in meeting its key deliverables and as a basis to support the decision-making process of the Board of Directors to
determine the performance-based bonus/incentives for consideration.
Introduction & The Process
KPI Process Development and Timeline
Formulate Company
KPIs as part of Annual Business
Plan
Alignment of Headline KPIs and Divisional
KPIs
Submission to the Board as
part of the Business Plan
Board & MOF’s
approval
Cascading KPIs to every
individual
Perform Half Year Review &
Feedback
Annual Appraisal
Nov Nov Nov Dec Jan June March
Diagram 1:
Diagram 1 above illustrates the cycle for Annual Performance Appraisal moving forward.
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [3]Private and Confidential
KPI Process Cycle
• Formulate KPIs based on UJ’s Strategic Plan
• Account for feedbacks from the Board of Directors and Ministry of Finance Incorporated
• Align with the Company’s overall mandate by the government and the Company’s overriding strategies
Annual Business Plan & Budget
• Refinement of KPIs, taking into account stakeholders’ expectations
• Each Department/Division’s KPI is streamlined to ensure that it synchronizes with the Company’s KPI as approved by the Board and MOF
CEO Review
• Annual Communication
• Formalization of KPIs
• Half-year review
• Annual Review
Implementation
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [4]Private and Confidential
Ensure that you gather the following information before you start the journey:
Points for consideration: Gather Foundational Information
Prepare list of accomplishments
List down all your accomplishments, successes and challenges faced throughout the year as this will help both you and your
supervisor in getting a broader overview of your performance to avoid being biased by recent events, and to provide a clearer
picture on how to move forward
How to? IdentifyDon’t get
trapped
▪ Capture the "how" too and not
just "what" you accomplished.
▪ Identify any challenges that
limited your abilities to
accomplish the agreed goals.
Don't get caught in the trap of
focusing only on the last fewmonths of performance.
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [5]Private and Confidential
• Design a set of relevant performance indicators directly derived fromthe Company’s strategy
Design
• Be well defined, avoiding or reducing subjectivity
• Be both, actionable and measurable
• Ideally, measure outcomes rather than inputs
• Adopt SMART principle as outlined in page 4
Performance Indicators
• Performance indicators must be cascaded-down to lower levels of theorganisationCascading KPIs
• Selectively allow revision of targets in cases where the externalenvironment has fundamentally changedReview
• Performance benchmarked against peers of similar size FundManagement companiesBenchmark
Delivering Corporate KPIs Results
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [6]Private and Confidential
As a refresher, the following is UJ’s FY2021 Corporate Scorecard as approved by the Board of Directors in December 2020. This shall serve as
a guideline for the development of individual scorecard.
Co
mm
erc
ial K
PIs
En
ab
lin
g K
PIs
Parameter Target Weightage
(%)
Staff Retention Rate 80% 5%
Parameter Target Weightage
(%)
CSR programme 1 5%
Guided by the Company’s FY2021 Corporate Scorecard
Develop Strategies for Asset Enhancement and Optimisation
Parameter Target Weightage
(%)
Achieve Equity Net Asset Value (“NAV”) growth 3% 45%
Reduction of negative shareholders funds 5% 10%
Early Redemption of Sukuk RM1.5bn 5%
Strengthen Relationship with Stakeholders
Leverage on Human Capital to Chart the Future GrowthDevelop Workflows and Processes to Support Business Growth
Financial Stakeholder
Internal Business Process Innovation & Learning
Staff Satisfaction Environment and Community
60%
Create Positive Work Environment Through Staff Empowerment Create Social Awareness Among Employees
10%
5%
15%
5%
5%
Parameter TargetWeightage
(%)
Periodic reporting of progress update to the Board 4 times 5%
Periodic reporting of progress update to the
Investment Panel4 times 5%
Periodic reporting of progress update to the Ministry
of Finance1 5%
Parameter Target Weightage
(%)
Establishment of risk management framework 2Q2021 5%
Establishment of internal audit function 2H2021 5%
Parameter TargetWeightage
(%)
Staff Training3 days / person /
year5%
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [7]Private and Confidential
We have classified each department/division into the following buckets:
KPI Framework based on function
Business Drivers
• Investment Division
• Fixed Income
• Domestic Equities
• Global Equities
• Property Division
• Corporate Finance
Ancillary
• Operations
• Finance
Independent
• CEO’s Office
• Governance, Risk and Compliance
• Internal Audit
• Strategic Management
REVENUE
GENERATION SUPPORT MONITORING &
COORDINATION
Divisions in this bucket are expected to
have significant contributions to the
Financial Matrix
This bucket focuses on internal
business processes
An independent unit performs unique
sets of deliverables, with weights
distributed evenly in both internal
business process and stakeholders
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [8]Private and Confidential
KPI Matrix
The following KPI Matrix is for all staff in Business Drivers: Investment, Property & Corporate Finance
Quadrant
Total KPI weightage for each quadrant according to the job grade
L2 & above
(DGM &
above)
L4 to L3
(Manager to Senior Manager)
L6 to L5
(Sr Exec to Asst Manager)L7 – L9
(Exec & Support
Staff)
AllPeople
Manager
Individual
Contributor
People
Manager
Individual
Contributor All
FINANCIAL
(Target/Budget/Cost)50% 50% 50% 50% 50%
Staff
performance
will be based
on staff’s job
descriptions
accordingly.
STAKEHOLDER
(Stakeholder Management)20% 20% 25% 20% 25%
INTERNAL BUSINESS
PROCESS
(Risk/Compliance/Audit/Service
Excellence)
20% 15% 5% 10% 5%
INNOVATION AND LEARNING
(Learning Environment/
Increasing adaptability and
expertise)
2.5% 7.5% 12.5% 12.5% 12.5%
STAFF SATISFACTION
(Recognition/Retention/
Empowerment)5% 5% 5% 5% 5%
ENVIRONMENT &
COMMUNITY
(Community
Leadership/Collaboration)
2.5% 2.5% 2.5% 2.5% 2.5%
TOTAL 100% 100% 100% 100% 100% 100%
Notes:
a. Individual Contributor – staff without any subordinate
b. People Manager – staff with subordinate
c. All – applicable to all staff in that particular grade
People
Management
&
Development
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [9]Private and Confidential
The following KPI Matrix is for all staff in Ancillary Function: Finance and Operations
KPI Matrix (cont’d)
Notes:
a. Individual Contributor – staff without any subordinate
b. People Manager – staff with subordinate
c. All – applicable to all staff in that particular grade
Quadrant
Total KPI weightage for each quadrant according to the job grade
L2 & above
(DGM &
above)
L4 to L3
(Manager to Senior Manager)
L6 to L5
(Sr Exec to Asst Manager)L7 – L9
(Exec)
AllPeople
Manager
Individual
Contributor
People
Manager
Individual
Contributor All
FINANCIAL
(Target/Budget/Cost)25% 25% 20% 20% 20%
Staff
performance
will be
according to
staff job
descriptions.
STAKEHOLDER
(Stakeholder Management)20% 20% 30% 20% 25%
INTERNAL BUSINESS
PROCESS
(Risk/Compliance/Audit/Service
Excellence)
40% 40% 40% 40% 40%
INNOVATION AND LEARNING
(Learning Environment/
Increasing adaptability and
expertise)
7.5% 7.5% 2.5% 10% 7.5%
STAFF SATISFACTION
(Recognition/Retention/
Empowerment)5% 5% 5% 5% 5%
ENVIRONMENT &
COMMUNITY
(Community
Leadership/Collaboration)
2.5% 2.5% 2.5% 2.5% 2.5%
TOTAL 100% 100% 100% 100% 100% 100%
People
Management
&
Development
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [10]Private and Confidential
KPI Matrix (cont’d)
The following KPI Matrix is for all staff in Independent Function: CEO’s Office, Risk and Compliance, Internal Audit, and Strategic Management
Notes:
a. Individual Contributor – staff without any subordinate
b. People Manager – staff with subordinate
c. All – applicable to all staff in that particular grade
Quadrant
Total KPI weightage for each quadrant according to the job grade
L2 & above
(DGM &
above)
L4 to L3
(Manager to Senior Manager)
L6 to L5
(Sr Exec to Asst Manager)L7 – L9
(Exec – Support
Staff)
AllPeople
Manager
Individual
Contributor
People
Manager
Individual
Contributor All
FINANCIAL
(Target/Budget/Cost)10% 10% 10% 10% 10%
Staff
performance
will be
according to
staff job
descriptions.
STAKEHOLDER
(Stakeholder Management)35% 35% 30% 35% 30%
INTERNAL BUSINESS
PROCESS
(Risk/Compliance/Audit/Service
Excellence)
35% 35% 30% 30% 30%
INNOVATION AND LEARNING
(Learning Environment/
Increasing adaptability and
expertise)
12.5% 12.5% 22.5% 17.5% 22.5%
STAFF SATISFACTION
(Recognition/Retention/
Empowerment)5% 5% 5% 5% 5%
ENVIRONMENT &
COMMUNITY
(Community
Leadership/Collaboration)
2.5% 2.5% 2.5% 2.5% 2.5%
TOTAL 100% 100% 100% 100% 100% 100%
People
Management
&
Development
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [11]Private and Confidential
Rating DefinitionIllustrative
achievement levelDescription
5 Exceeds Expectations > 106%Performance has exceeded targets or requirements. It is regarded as
a superior job done i.e. very strong performer.
4 Meet Expectations 95% - 105%Performance is within range of targets or requirements between +-
5%. It is regarded as a good job done.
3 Partially Meets
Expectations
80% - 94%Performance has partially met targets or requirements by falling short of
5-20%. It indicates there is scope for improvement on the job.
2Does Not Meet
Expectations51 - 79%
Does not fulfill performance requirements i.e. by falling short of more
than 20%. It is regarded as a poor job done.
1Poor
Performance< 50%
Significant sub-par performance which requires immediate attention.
Sample Proposed Performance Assessment Scale
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [12]Private and Confidential
Introduction of Functional and Shared KPI
FUNCTIONAL
SHARED
Shared KPI explicitly used to embed
cross-functional
accountability and collaborations
Distinctly unique and driven primarily by
the incumbent/departmentNATURE
HOW IT WORKS
The identified deliverables will be the
inherent responsibility of the
person/department
e.g. Increase tenancy of Platinum
East Tower - Property Management
The weight assigned is shouldered by
the incumbent and/or team
Company’s KPI cascaded, owned and
shared by all departments on overall
scheme
e.g. Staff Satisfaction
The responsibility on staff retention falls
on all personnel and the achievement is
aggregated, and not on individual basis.
The weightage however differs for the
head of department and the staff
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [13]Private and Confidential
Sample Scorecard - Investments
# KPI Category Key Result Areas Indicators Description Unit Weight
1Financial
Performance
• NAV Growth
• Budget/Cost
• Percentage growth of NAV
• Performance benchmark
against KLCI
• EFMs meet target
• Measures the NAV growth against established
benchmark
%
Notes
2 StakeholderStakeholder
Management
• Government &
Stakeholder
Relationships
• Other indicators
• No. of annual/quarterly meetings with stakeholders (%
Shared Function for FY2021)
• EFM Engagements
#
3Internal
Process
Investment
Evaluation • Cycle time for Investment
Evaluation
• Average time taken produce a completed investment
evaluation report Days
4-6
People
Management &
Development
Innovation &
Learning• Trainings/Conference
• # of trainings attended at least 24 hours annually#
Staff SatisfactionDivisional Retention Rate • Shared function for staff retention #
Environment &
Community
CSR Programme• Shared function for CSR Programme
%
Notes: as indicated in the KPI Matrix section
Legend
Fully Shared function for FY2021
Must consist of an element of shared function i.e. Quarterly Presentation to the Board
Fully Functional or mixture of Functional and Shared
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [14]Private and Confidential
Sample Scorecard – Property Management
# KPI Category Key Result Areas Indicators Description Unit Weight
1Financial
Performance
• Occupancy Rate
• Budget/Cost
• Occupancy rate
• Operating expenditure
• Measures the % increase in occupancy rate
• Formulation of budget with no more than 10% variance in
operationalization of assets
%
%
Notes
2 StakeholderStakeholder
Management
• Government &
Stakeholder
Relationships
• Other indicators
• No. of annual/quarterly meetings with stakeholders (%
Shared Function for FY2021)
• Clientele/Prospective tenant engagement
#
3 Internal
Process
Portfolio
Management
• Number of projects successfully
executed/implemented
• Property administration
• Tender process/Disposal Exercise/Divestment
• Effective management of Property & Facilities
Manager (PFM) and/or marketing agent(s) with
quantifiable outcome
#
#
4-6
People
Management &
Development
Innovation &
Learning• Trainings/Conference
• # of trainings attended at least 48 hours#
Staff SatisfactionDivisional Retention Rate
• Shared function for staff retention
%
Environment &
Community
CSR Programme• Shared function for CSR Programme
%
Notes: as indicated in the KPI Matrix section
Legend
Fully Shared function for FY2021
Must consist of an element of shared function i.e. Quarterly Presentation to the Board
Fully Functional or mixture of Functional and Shared
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [15]Private and Confidential
Sample Scorecard - Operations
# KPI Category Key Result Areas
Indicators Description Unit Weight
1Financial
Performance
Financial
Management
• Operating cost
• Treasury Income
• A measure of the amount of cash spent for
operating the business
• Income earned by the treasury function in
managing the firm’s liquidity (cash from equities)
RM
RM
Notes
2 Stakeholder Stakeholder
Management
• Government &
Stakeholder
Relationships
• Other indicators
• No. of annual/quarterly meetings with stakeholders
(% Shared Function for FY2021)
• Engagement with Custodian/Vendors etc
#
3Internal
Process
Trade
Settlement
• Efficient & precise execution of trade settlement
• No. of trade settlement as percentage of totalsubmissions, in a year, that had material errors
%
Administration &
Procurement• Office Administration • Measures the fulfilment of administration needs
• Measures the timeliness of execution of procurement activities in number of days
Days
Portfolio
Monitoring &
Management/
Reporting
• Performance evaluation of
External Fund Managers
& Internally managed fund
• Measures the accuracy of performance evaluation
report on External Fund Managers and Internally
Managed funds
#
4 - 6 People
Management &
Development
Innovation and
Learning/• Number of trainings/courses
completed
• Number of trainings/courses, can be classroom or
online, completed in a year. Measures effort put
into self development
#
Staff SatisfactionDivisional Retention Rate • Shared function for staff retention #
Environment &
Community
CSR Programme• Shared function for CSR Programme
%
Notes:
as indicated in the KPI Matrix section
Legend
Fully Shared function for FY2021
Must consist of an element of shared function i.e. Quarterly Presentation to the Board
Fully Functional or mixture of Functional and Shared
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [16]Private and Confidential
Sample Scorecard - Finance
# KPI Category Key Result Areas
Indicators Description Unit Weight
1Financial
Performance
Financial
Management
• Operating cost excluding staffexpense and depreciation
• Treasury Income
• A measure of the amount of cash spent for
operating the business (excluding staff expenses
and depreciation)
• Income earned by the treasury function in
managing the firm’s liquidity
RM
RM
Notes
2 Stakeholder Stakeholder
Management
• Government &
Stakeholder
Relationships
• Other indicators
• No. of annual/quarterly meetings with stakeholders
(% Shared Function for FY2021)
• Other identified engagements
#
3Internal
Process
Financial
Reporting
• Submission of Management Accounts/ PortfolioReporting/GroupReporting/BOD Paper/GroupReporting Pack
• No. of submissions as percentage of totalsubmissions, in a year, that were overdue by morethan 3 days or had material errors
%
#
Budgeting• No. of days late for the
circulation of budget memo• No. of revisions required to
budget before BOD approval
• Measures the timeliness of the budgeting process
• Measures the accuracy of the budgeting process
#
#
Portfolio
Monitoring&
Management
• No. of Finance projects
successfully completed
• TBD by head of department
#
4 - 6 People
Management &
Development
Innovation and
Learning/• Number of trainings/courses
completed
• Number of trainings/courses, can be classroom or
online, completed in a year. Measures effort put
into self development
#
Staff SatisfactionDivisional Retention Rate • Shared function for staff retention #
Environment &
Community
CSR Programme• Shared function for CSR Programme
%
Notes:
as indicated in the KPI Matrix section
Legend
Fully Shared function for FY2021
Must consist of an element of shared function i.e. Quarterly Presentation to the Board
Fully Functional or mixture of Functional and Shared
Copyright © Urusharta Jamaah Sdn Bhd. All rights reserved. [17]Private and Confidential
Sample Scorecard – Governance & Risk Management
# KPI Category Key Result Areas Indicators Description Unit Weight
1Financial
PerformanceOperational loss
• Value of operational loss from
unidentified
risks
• Measuring the value of operational losses from risks not
identified by Risk Management that occurred over a
certain period of time
RM
Notes
2 Stakeholder Stakeholder
Management
• Stakeholder
Relationships
• Other indicators
• No. of annual/quarterly meetings with stakeholders (%
Shared Function for FY2021)
• Consultants/Government Agencies/Authority/Regulators
#
3
Internal
Process
Corporate
Governance
Framework
• Percentage of processes
reviewed & updated within
timelines
• No. of processes as a percentage reviewed, and updated
where required, successfully within the defined timeframe
%
Risk Management
Framework
• Number of gaps identified and fixedwithin timelines while reviewing theprudent risk assessment framework
• Time necessary to perform risk evaluation and assessment
• Number of gaps identified and fixed (as a %) within
timelines while reviewing the prudent risk assessment
framework
• Measuring the efficiency of the risk evaluation and
assessment process
%
Days
Investment
Evaluation
• No. of risk assessment reports
produced within timelines, for each
proposed investment & divestment
• Measures the risk assessment support offered to the
investments team while both evaluating as well as exiting
an investment
#
4 –
6
People
Management &
Development
Innovation and
Learning• Number of trainings/courses completed
• Number of trainings/courses, can be classroom or online,
completed in a year. Measures effort put into self
development
#
Staff SatisfactionDivisional Retention Rate • Shared function for staff retention #
Environment &
Community
CSR Programme• Shared function for CSR Programme
%
Notes:
as indicated in the KPI Matrix section
Legend
Fully Shared function for FY2021
Must consist of an element of shared function i.e. Quarterly Presentation to the Board
Fully Functional or mixture of Functional and Shared