    FEASIBILITY REPORTFORMULATION ANDINFRASTRUCTURE

    REQUIREMENT FORSUPER THERMAL

    POWER PROJECTS

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    2/27

    FEASIBILITY REPORT

    FORMULATION

    TECHNICAL

    ENVIRONMENTAL

    ISSUES

    POWERDEMAND-SUPPLY GAP

    COMMERCIAL

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    3/27

    STAGES OF PLANNINGCONSTRUCTION STAGE

    INVESTMENT DECISION

    STATUTORY CLEARANCES

    EVALUATION & APPRAISAL ENVIRONMENTAL

    TECHNO ECONOMIC

    COST ESTIMATE

    FEASIBILITY REPORT/ OTHER INPUTS

    DETAILED PROJ REPORT CIVIL, MECH, ELECT & C&I INPUTS

    BASIC ENGGSITE SPECIFIC STUDIES/INVESTIGATIONS

    PROJECT SITE SELECTION/PRE-FEASIBILITY STUDIES

    FEASIBLITY

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    4/27

    Broad Project Siting Criteria

    Proper siting of thermal power plants

    reduce the cost of project, cost of pollutioncontrol measures and also reduces the

    damage to natural and human environment.

    Due consideration needs to be given to

    topography, geology, hydrology,meteorology, fuel storage, ash disposal

    etc. in the selection of site.

    FEASIBILITY REPORT FORMULATION

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    5/27

    Siting of a New Project

    BasicInputs:-

    Land

    WaterFuel

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    6/27

    BASIC INPUTS

    WATERSource

    Requirement

    Quality ParametersDrawl point

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    7/27

    BASIC INPUTS

    LAND

    Location & Approach Requirement

    Site Specific Data

    Siting Criteria of MOEF Land Use Plan

    Land cost

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    8/27

    BASIC INPUTS

    FUEL Fuel source

    Quality Parameters

    Requirement

    Fuel Transportation

    Cost

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    9/27

    NEW PROJECT DEVELOPMENT

    FEASIBILITY

    REPORT

    IDENTIFICATION OF

    POTENTIAL SITES

    STATUTORY

    CLEARANCES/

    COMMITMENTS

    SITE SPECIFIC STUDIES

    / INVESTIGATION

    DETAILED SITE

    SELECTION &PRE-FR

    SITE CLEARANCE OF

    MOEF

    COST ESTIMATES &

    FINANCIAL ANALYSIS

    FINANCIAL

    APPRAISAL BY FIsINVESTMENT APPROVAL OF

    THE PROJECT

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    10/27

    TYPICAL STUDIES AND INVESTIGATIONS

    FR PREPARATION

    GEO-TECHNICAL

    INVESTIGATION

    HYDROLOGICAL& METEROLOGICAL

    STUDIES

    BATHYMETRIC

    SURVEY/

    OCEANOGRAPHIC

    STUDIES

    EIA

    STUDIES

    SEISMIC

    STUDIES

    MGR & RAILWAY

    SIDING STUDIES

    TOPOGRAPHICAL

    SURVEY

    AREA DRAINAGE

    STUDIES

    SOCIO-ECONOMICSTUDIES

    MODEL STUDIESFOR CW SYSTEM

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    11/27

    Statutory Clearances/

    Commitments

    Site Clearance from MOEF (pithead)

    Land Commitment (State Govt.)

    Water Commitment (State Govt.)

    Fuel Commitment (SLC-LT)

    Fuel Transportation Clearance (Min. ofRailways)

    Defence Clearance (Min. of Defence) Comfort Letters from Beneficiaries

    Resolution in Respective REB Meeting inrespect of Absorption of Power from theProject

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    12/27

    Statutory Clearances/ Commitments ApplicableFor A Typical New Project

    Associated Transmission System (ATS) Clearance

    NOC from Airports Authority of India

    Minutes of Public Hearing from SPCB

    Concurrence of Central Water Commission/ MOWR

    on Water Availability

    Environmental Clearance from Ministry of Env. and

    Forests

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    13/27

    FORMULATION OF FRs/ DPRs

    Tie-up of Basic Inputs

    Conduct Site Specific Studies/ Investigations

    Basic Engg./System Finalisation

    Technical Inputs (Write up, BOQ, Drawings)

    Inputs other than Technical

    Clearances / Commitment Financing Plan

    Cost Estimates

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    14/27

    FORMULATION OF FRs/ DPRs

    Financial Appraisal by FIs post FR/ DPR

    Finalisation TEC of CEA Pre and Post Electricity Act- 2003

    Scenario

    Development of Infrastructure

    Financial Appraisal by FIs prior to InvestmentDecision

    Statutory Clearances/ Commitments

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    15/27

    FEASIBILITY REPORT- CONTENTS

    Executive Summary

    Introduction

    Demand Analysis and Justification

    Feasibility Studies

    Layout Systems

    Civil Works Mechanical Systems

    Electrical Systems

    Control & Instrumentation Systems

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    16/27

    FEASIBILITY REPORT- CONTENTS

    Environmental Aspects

    Technical Data & Bill of Quantity

    Cost Estimate & Financial Analysis

    Project Implementation

    Manpower training & Placement

    Operation & Maintenance Philosophy Marketing Philosophy

    List of Annexure

    List of Exhibits

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    17/27

    INFRASTRUCTURE DEVELOPMENT

    Initiate activities for land acquisition underLand Acquisition Act

    Construction of Boundary Wall/ Fencing ofthe acquired land

    Construction of Site Office, Stores and othertemporary building to facilitate construction

    activities Site Levelling of Plant incl. Priority Area of

    Township Construction Power & Start-up Power

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    18/27

    INFRASTRUCTURE DEVELOPMENT

    Construction Water Scheme

    Communication & EDP facilities

    Training Centre, Public Information Centre

    and other R&R activities

    Primary Health Care

    Establishment of Security Complex

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    19/27

    INVESTMENT APPROVAL

    Availability of Infrastructure

    All clearances/ commitments in position PPAs signed with beneficiaries

    ATS finalised and would be implemented

    matching power project schedule.

    Financial Appraisal by FIs prior to

    Investment Decision

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    20/27

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    21/27

    SCHEDULE FOR PROJECT FORMULATION ACTIONSThermalZero Date - Project Initiation and Identification of Potential Sites

    Main Plant Award related

    activities (Month from zero date)

    Green Field Expn.

    ProjectInvestment Approval

    activities (Month from

    zero date)

    Green

    Field

    Expn.

    Project

    Specs. Preparation 10 7

    Site Selection/Pre FR 3 0

    FSC for Main Plant 13 10

    FR Preparation 12 9

    Studies/Investigations

    and Statutory Clearances

    10 7

    Financial Appraisal 12 9

    FR Finalisation 13 10

    Public Hearing (SPCB) 15 12

    NIT 14 11

    Environmental Clearance 19 16

    OBD 17 14

    Financial Appraisal 18 15

    Main Plant Package Award 20 17 Investment Approval 19 16

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    22/27

    XI PLAN PROJECTS THERMAL-COAL)Project Name Capacity

    (MW)Location Capacity

    Addition (MW)

    Sipat-I 1980 Bilaspur (Chhattisgarh) 1980

    Barh-I 1980 Patna (Bihar) 1980

    Bhilai JV 500 Bhilai (Chhattisgarh) 500

    Korba-III 500 Korba (Chhattisgarh) 500

    Farakka-III 500 Murshidabad (W. B.) 500

    TNEB JV 1000 Thiruvallur (Tamil Nadu) 1000

    NCTPP-II 980 Gautam Budh Nagar (U. P.) 980

    Simhadri-II 1000 Visakhapatnam (A. P.) 1000

    Bongaigaon 750 Kokhrajhar (Assam) 750

    North Karanpura 1980 Chatra & Hazaribagh(Jharkhand)

    1980

    Barh-II 1320 Patna (Bihar) 660Nabinagar JV 1000 Aurangabad (Bihar) 1000

    Darlipali 3200 Sundargarh (Orissa) 800

    Mauda 1000 Nagpur (Maharashtra) 500

    Ultra Mega Project 4000 Allocation on tariff basedbidding

    800

    Total 21,690 14,930

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    23/27

    XI PLAN PROJECTS (THERMAL-GAS)

    Project Name Capacity(MW) Location CapacityAddition(MW)

    Kawas CCPP, Stage-II* 1300 Surat (Gujarat) 1300

    J. Gandhar CCPP, Stage-II* 1300 Bharuch (Gujarat) 1300

    Rajiv Gandhi (Kayamkulam)CCPP, Stage-II**

    1950 Alappuzha(Kerala)

    1950

    Total 4,550 4,550

    * To be taken up after fuel availability is ascertained.

    ** Fuel and make-up water availability is to be ascertained.

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    24/27

    XI PLAN PROJECTS (HYDRO)

    Project Name Capacity(MW) Location CapacityAddition(MW)

    Koldam 800 Bilaspur (H.P.) 800

    Loharinag Pala 600 Uttarkashi (Uttaranchal) 600

    Tapovan Vishnugad 520 Chamoli (Uttaranchal) 520

    Lata Tapovan 171 Chamoli (Uttaranchal) 171

    Rammam-III 120 Darjeeling (W.B.) 120

    Total 2,211 2,211

    Grand Total 28,771 21,851

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    25/27

    PROJECTS UNDER CONSIDERATIONProject Name Location Capacity

    (MW)

    Thermal

    Badarpur-III Badarpur (NCT Delhi) 980

    Cheyyur/ Marakkanam Kanchipuram (Tamil Nadu) 1980

    JV Project in Haryana (Siteunder finalisation)-Jhajjar

    Haryana 1500

    Rihand-III 500

    Integrated Project inTalcher Area (JV with CIL)

    Talcher Area (Orissa) 3200

    Lara Integrated Project Raigarh (Chhattisgarh) 4000

    Tanda-II Ambedkar Nagar (U.P.) 1000

    Nuclear 2000

    Total 20,160

  • 8/13/2019 Fr Formulation&Infrastructure for Ets

    26/27

    PROJECTS UNDER CONSIDERATION

    Project Name Location Capacity

    (MW)HYDRO

    Rupsiabagar

    Khasiabara

    Uttaranchal 260

    Kalai-I Ar. Pradesh 1450

    Kalai-II Ar. Pradesh 1200

    Hutong-I Ar. Pradesh 588

    Hutong-II Ar. Pradesh 1250

    Etalin Ar. Pradesh 4000

    Attunli Ar. Pradesh 500

    Total 9248