FPSO Mooring & Offloading System Alternatives for Deepwater West Africa Deepwater West Africa Offshore West Africa Oil Show 21 March 2002 Oise Ihonde James Mattinson L.T. England Innovative Technologies, Creative Solutions

Transcript of FPSO Mooringgg & Offloading System Alternatives for ...

Page 1: FPSO Mooringgg & Offloading System Alternatives for ...

FPSO Mooring & Offloading g gSystem Alternatives for Deepwater West AfricaDeepwater West Africa

Offshore West Africa Oil Show21 March 2002

Oise IhondeJames Mattinson

L.T. England

Innovative Technologies, Creative Solutions

Page 2: FPSO Mooringgg & Offloading System Alternatives for ...

Innovative Technologies, Creative Solutions

Page 3: FPSO Mooringgg & Offloading System Alternatives for ...

Assumptions

• Deepwater 1,000m +

• FPSO 2.2 mm bbls storage

• Offloading Tanker 320,000 dwt Tanker of opportunityOffloading Tanker 320,000 dwt Tanker of opportunity

• Field Life 25/30 years

Oil Production Rate 200 000 bopd• Oil Production Rate 200,000 bopd

• Offloading Rate 50,000 bbs/hr

• Parcel Sizes 1 or 2 million bbls

Innovative Technologies, Creative Solutions

Page 4: FPSO Mooringgg & Offloading System Alternatives for ...

Design Criteria Factors

• Environmento e t• Field Characteristics• Production CriteriaProduction Criteria• Field Life• FlexibilityFlexibility• Operability• RiskRisk

Innovative Technologies, Creative Solutions

Page 5: FPSO Mooringgg & Offloading System Alternatives for ...

Available Options

FPSO Mooring:FPSO Mooring:

– Spread Mooring– Turret (Internal and External)

Innovative Technologies, Creative Solutions

Page 6: FPSO Mooringgg & Offloading System Alternatives for ...

Spread-Moored System

Turret System – Internal & E t lExternal

Innovative Technologies, Creative Solutions

Page 7: FPSO Mooringgg & Offloading System Alternatives for ...

Available Options

Oil OffloadingOil Offloading

– Tandem

– Remote CALM

Side by Side– Side by Side

Innovative Technologies, Creative Solutions

Page 8: FPSO Mooringgg & Offloading System Alternatives for ...

TandemRemote CALM

Side b SideSide by Side

Innovative Technologies, Creative Solutions

Page 9: FPSO Mooringgg & Offloading System Alternatives for ...

FPSO Mooring Systems Not Recommended for Deepwater West Africap

• External TurretExternal Turret– Riser Limitation

Innovative Technologies, Creative Solutions

Page 10: FPSO Mooringgg & Offloading System Alternatives for ...

Oil Offloading Systems Not Recommended for Deepwater West Africap

• Side by sideSide by side

• Spread Mooring in• Spread Mooring in Tandem

High collision risk– High collision risk

Innovative Technologies, Creative Solutions

Page 11: FPSO Mooringgg & Offloading System Alternatives for ...

Very Large Turret - VLT

Innovative Technologies, Creative Solutions

Page 12: FPSO Mooringgg & Offloading System Alternatives for ...

DESIGN BASISWATER DEPTH: 1,400mSERVICE LIFE: 30 years

VESSEL: 320,000 DWTSTORAGE: 2 200 000 BBLsSTORAGE: 2,200,000 BBLsMAXIUM OFFLOADING PARCEL: 2,000,000 BBLsOIL PRODUCTION: 200,000 BOPDGAS PRODUCTION (MAX): 270 MMsfdPRESSURE at VESSEL: 85-200 BARSPRESSURE at VESSEL: 85-200 BARSOFFLOADING RATE: 50,000 BBLs/hr - min.

CASE - RISERS

6" PRODUCTION: 224" GAS LIFT: 22UMBILICALS: 28FUTURE: 8

Total: 80 + 8 Spares

INCLUDES COST OF HEADERS & PULL-IN EQUIPMENT FOR SPREAD MOORING & TURRET SYSTEMS

INCLUDES COST OF PUMPING CRUDE THRU BUOY FROM SPREAD MOORING SYSTEM

Innovative Technologies, Creative Solutions

SPREAD MOORING SYSTEM

Page 13: FPSO Mooringgg & Offloading System Alternatives for ...

Case Study

Case 1 – Very Large Turret (VLT) MooringCase 1 Very Large Turret (VLT) Mooring System with Tandem Offloading

Case 2 – Spread Moor (Remote Offloading) Near Surface Termination of Offloading Flowlines

Case 3 – Spread Moor (Remote Offloading) Mid p ( g)Water Termination of Offloading Flowlines

Innovative Technologies, Creative Solutions

Page 14: FPSO Mooringgg & Offloading System Alternatives for ...

Case 1 – Very Large Turret (VLT) Mooring System with Tandem Offloadingy g

ANCHOR LEGS: 8ANCHOR LEGS: 8TOP CHAIN - 88mm R4 STUDLESS: 150mWIRE - 88mm SPR2 + UNSHEATHED: 2,200mBOTTOM CHAIN - 88mm R4 STUDLESS: 150mPRETENSION : 120mtPRETENSION : 120mtPULL-IN WINCH (es): 150mt

SUCTION PILE: 8MAX INTACT LOAD 300 tMAX. INTACT LOAD 300mtMAX. DAMAGED LOAD 425mtFORCE ANGLE FROM HORIZONTAL: 28 DEGREES

CHAIN STOPPERS: 8

CALM BUOY: Not Required

OFFLOADING LINES1 X 20" OFFLOADING HOSE SYSTEM from FPSO 520m

Innovative Technologies, Creative Solutions

Page 15: FPSO Mooringgg & Offloading System Alternatives for ...

Case 1 – Very Large Turret (VLT) Mooring Systemwith Tandem Offloading

Dual Grommet Mooring Hawser(520 )

Part Time Medium Tug

(520m)

Dedicated Large Tug

Tanker of opportunity

FPSO (320,000 dwt) with 8 Wire

Tanker of opportunity (max 320,000 dwt)

2 x 20” Offloading Floating Hose( )Mooring Lines

2 x 20 Offloading Floating Hose System

Note: Assumed no weather related production downtime all systems

Innovative Technologies, Creative Solutions

Page 16: FPSO Mooringgg & Offloading System Alternatives for ...

Case 1 - Comparison Summary

DisadvantagesTurretTandem offloading requires heavy tug assistanceLimits flexibility in number of risers

AdvantagesTurretWeathervaning allows Tandem offloadingRi h th 360ºRisers can approach thru 360º

Fewer and less heavy anchor legsGood motion characteristics

Innovative Technologies, Creative Solutions

Page 17: FPSO Mooringgg & Offloading System Alternatives for ...

Case 2 – Spread Moor (Remote Offloading) Near Surface Termination of Offloading Flowlines

ANCHOR LEGS: 15TOP CHAIN - 119mm R4 STUDLESS: 150mWIRE - 119mm SPR2 + UNSHEATHED: 2,200mBOTTOM CHAIN - 114mm R4 STUDLESS: 150m

CALM BUOY: 25m x 10mANCHOR LEGS: 7TOP CHAIN - 78MM R4 STUDLESS: 180mWIRE - 70mm SPR2 + UNSHEATHED: 1,345mBOTTOM CHAIN 78 R4 STUDLESS 50PRETENSION (Varies) : 140mt

PULL-IN WINCH (es): 200mt

SUCTION PILE: 15MAX. INTACT LOAD 475mtMAX DAMAGED LOAD 575mt

BOTTOM CHAIN - 78mm R4 STUDLESS: 50mPRETENSION: 150mtPULL-IN CHAIN JACK: 180mt

SUCTION PILE: 7MAX INTACT LOAD 260mtMAX. DAMAGED LOAD 575mt

FORCE ANGLE FROM HORIZONTAL: 28 DEGREES

CHAIN STOPPERS: 15

MAX. INTACT LOAD 260mtMAX. DAMAGED LOAD 350mtFORCE ANGLE FROM HORIZONTAL: 28 DEGREES

OFFLOADING LINES2 X 22" RIGID FLOWLINES FPSO to CALM 2,000m

2 X 20" OFFLOADING HOSE SYSTEM from CALM 360m

Innovative Technologies, Creative Solutions

Page 18: FPSO Mooringgg & Offloading System Alternatives for ...

Case 2 – Spread Moor (Remote Offloading) Near Surface Termination of Offloading Near Surface Termination of Offloading Flowlines

25m x 10m CALM Buoy with 7 Wire Mooring Lines

Dual Grommet Mooring Hawser (360m)

2 22” Ri id S b d

FPSO (320,000 dwt) with 15 Wire Mooring Lines

2 x 22” Rigid Submerged Offloading Flowlines

(2,200m)Tanker of opportunity

(max 320,000 dwt)

2 x 20” Offloading Floating Hose System

Note: Assumed no weather related production downtime all systems

Dedicated Maintenance Boat 2x Dedicated Line Boats

Innovative Technologies, Creative Solutions

Note: Assumed no weather related production downtime all systems

Page 19: FPSO Mooringgg & Offloading System Alternatives for ...

Case 3 – Spread Moor (Remote Offloading) Mid Water Termination of Offloading FlowlinesWater Termination of Offloading Flowlines

ANCHOR LEGS: 15 SUCTION PILE: 6ANCHOR LEGS: 15TOP CHAIN - 119mm R4 STUDLESS: 150mWIRE - 119mm SPR2 + UNSHEATHED: 2,200mBOTTOM CHAIN - 119mm R4 STUDLESS: 150mPRETENSION (Varies) : 140mtPULL-IN WINCH (es): 200mt

SUCTION PILE: 6MAX. INTACT LOAD 260mtMAX. DAMAGED LOAD 350mtFORCE ANGLE FROM HORIZONTAL: 28 DEGREES

SUBMERGED FTB: 3 TANKS, 9

SUCTION PILE: 15MAX. INTACT LOAD 475mtMAX. DAMAGED LOAD 575mtFORCE ANGLE FROM HORIZONTAL: 28 DEGREES

SUBMERGED FTB: COMPARTMENTSANCHOR LEGS: 4TOP CHAIN - 58MM R4 STUDLESS: 100mWIRE - 62mm SPR2 + UNSHEATHED: 1,075mBOTTOM CHAIN - 58mm R4 STUDLESS: 20m

CHAIN STOPPERS & FAIRLEADS: 15

CALM BUOY: 14.5m x 6.3mANCHOR LEGS: 6TOP CHAIN - 58MM R4 STUDLESS: 180m

SUCTION PILE: 4MAX. INTACT LOAD 260mtMAX. DAMAGED LOAD 350mtFORCE ANGLE FROM HORIZONTAL: 28 DEGREES

TOP CHAIN 58MM R4 STUDLESS: 180mWIRE - 111mm POLYESTER ROPE: 1,345mBOTTOM CHAIN - 58mm R4 STUDLESS: 50mPRETENSION: 45mtPULL-IN WINCH: 66mt

OFFLOADING LINES2 X 22" RIGID FLOWLINES FPSO to FTB 2,000m2 X 24" SUBSEA HOSES FTB to CALM 400m2 X 20" OFFLOADING HOSE SYSTEM from CALM 420m

Innovative Technologies, Creative Solutions

Page 20: FPSO Mooringgg & Offloading System Alternatives for ...

Flowline Termination Buoy (FTB)

Innovative Technologies, Creative Solutions

Page 21: FPSO Mooringgg & Offloading System Alternatives for ...

Case 3 – Spread Moor (Remote Offloading) Mid W t T i ti f Offl di Fl liWater Termination of Offloading Flowlines

14.5m x 6.3 CALM Buoy with 2 x 24” Offloading Subsea 6 Wire Mooring Lines

Dual Grommet Mooring Hawser

2 x 24 Offloading SubseaHose Systems

2 22” Ri id S b d

FPSO (320,000 dwt) with 15 Wire Mooring Lines

2 x 22” Rigid Submerged Offloading Flowlines

(2,200m)Tanker of opportunity

(max 320,000 dwt)

2 x 20” Offloading Floating Hose System

Submerged FlowlineTermination Buoy withTermination Buoy with

Polyester Mooring Lines

Dedicated Maintenance Boat 2x Dedicated Line Boats

Note: Assumed no weather related production downtime all systems

Innovative Technologies, Creative Solutions

Note: Assumed no weather related production downtime all systems

Page 22: FPSO Mooringgg & Offloading System Alternatives for ...

Case 2 and 3Comparison SummaryComparison SummaryDisadvantagesSpread MoorAdditional anchor legs and mooring points on vesselFixed orientation increases mooring loads and vessel motionsFixed orientation increases mooring loads and vessel motionsIssues regarding offloading flowlines in deepwater

- Fatigue (steel)- Flow assuranceFlow assurance

AdvantagesSpread MoorHigh flexibility for additional risers

Advantages

g yRemote location of offloading terminal mitigates FPSO/Tanker collision riskHigher weather tolerance than tandem for offloading

Innovative Technologies, Creative Solutions

Page 23: FPSO Mooringgg & Offloading System Alternatives for ...

CAPEX SummaryCAPEX - CASE WEST AFRICA

DESIGN BASIS - 200,000 bopd 80 Risers + 8 Spares

LAR

S

Services & AdministrativeMooring & Riser InstallationOffloading & Riser System

US

DO

LL Offloading & Riser System Hull Systems Fluid Transfer SystemsMooring Systems

CASE 1 - VERY LARGE TURRET (VLT)MOORING SYSTEM w/ TANDEN

OFFLOADING

CASE 2 - SPREAD MOOR (REMOTEOFFLOADING) NEAR SURFACE

TERMINATION OF REMOTEOFFLOADING FLOWLINES

CASE 3 - SPREAD MOOR (REMOTEOFFLOADING) MID WATERTERMINATION OF REMOTEOFFLOADING FLOWLINES

Innovative Technologies, Creative Solutions

OFFLOADING FLOWLINES OFFLOADING FLOWLINES

Page 24: FPSO Mooringgg & Offloading System Alternatives for ...

OPEX SummaryOPEX

COST COMPARSIONAVERAGE OVER FIELD LIFE

Pilots + Marine Assistance

RS

PER

R

Pilots + Marine Assistance

Hawsers

CALM, FTB & Offloading Flowlines

US

DO

LLA

RYE

AR

Offloading Hose System (6 Yrs)Submerged (8 Yrs)Tugs,Dedicated Line/MaintenanceBoats - Daily RatesDemurrage g

CASE 1 - VERY LARGE TURRET (VLT)MOORING SYSTEM w / TANDEN

OFFLOADING

CASE 2 - SPREAD MOOR (REMOTEOFFLOADING) NEAR SURFACE

TERMINATION OF REMOTE OFFLOADINGFLOWLINES

CASE 3 - SPREAD MOOR (REMOTEOFFLOADING) MID WATER TERMINATIONOF REMOTE OFFLOADING FLOWLINES

Innovative Technologies, Creative Solutions

Page 25: FPSO Mooringgg & Offloading System Alternatives for ...

Case Oil Production - West Africa200,000 BOPD Over 30 Years200,000 BOPD Over 30 Years

250,000

200,000

150,000

BO

PD

50 000

100,000

B

-

50,000

1Yr:2Yr:3Yr:4Yr:5Yr:6Yr:7Yr:8Yr:9Yr:10Y

r:11Y

r:12Y

r:13Y

r:14Y

r:15Y

r:16Y

r:17Y

r:18Y

r:19Y

r:20Y

r:21Y

r:22Y

r:23Y

r:24Y

r:25Y

r:26Y

r:27Y

r:28Y

r:29Y

r:30Y

r:

YEARS

ESTIMATED OIL PRODUCTION/YR:

Innovative Technologies, Creative Solutions

Page 26: FPSO Mooringgg & Offloading System Alternatives for ...

Present Value SummaryCASE - WEST AFRICA

S D

OLL

ARS

OPEX CAPEX

US

CASE 1 VERY LARGE TURRET (VLT) MOORED CASE 2 SPREAD MOOR (REMOTE OFFLOADING) CASE 3 SPREAD MOOR (REMOTE OFFLOADING)CASE 1- VERY LARGE TURRET (VLT) MOOREDSYSTEM w/ TANDEN OFFLOADING

CASE 2 - SPREAD MOOR (REMOTE OFFLOADING)NEAR SURFACE TERMINATION OF REMOTE

OFFLOADING FLOWLINES

CASE 3 - SPREAD MOOR (REMOTE OFFLOADING)MID WATER TERMINATION OF REMOTE

OFFLOADING FLOWLINES

PRESENT VALUE COST AT FIRST OIL

OPPORTUNITY COST OF CAPITAL 10.5%

Innovative Technologies, Creative Solutions