FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos1 Alignment and Calibrations...
-
date post
20-Dec-2015 -
Category
Documents
-
view
219 -
download
0
Transcript of FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos1 Alignment and Calibrations...
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 1
Alignment and Calibrations Konstantin GoulianosThe Rockefeller University
Forward Physics at the LHCManchester, UK, 8-12 Dec 2007
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 2
The Forward Detectors of CDF
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 3
The MiniPlugs @ CDF
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 4
MiniPlug Construction
About 1500 wavelength shifting fibers of 1 mm dia. are ‘strung’ through holesdrilled in 36x¼” lead plates sandwiched between reflective Al sheets and guided
into bunches to be viewed individually by multi-channel photomultipliers.
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 5
Measurements w/the MiniPlugs
ADC counts in MiniPlug towersin a pbar-p event at 1960 GeV.• “jet” indicates an energy cluster and may be just a hadron.• 1000 counts ~ 1 GeVMultiplicity of SD and ND events
ENERGY
MP TOWER
STRUCTURE
MULTIPLICITY
@ POSITION
NIM A 430 (1999)
NIM A 496 (2003)
NIM A 518 (2004)
s
eEΣξ
iηiTiCAL
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 6
RPS Tracking Calibration
withRPS
tracking
0.055<
ξRPS<0.060 slice
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 7
Diffractive Dijet Signal
s
eEΣξ
iηiTiCAL
Low InstLum ~0.5E302002-2003 data: <InstL> ~1.5E31
constantlogξd
dσ
ξ
1
dξ
dσ
BG ND dijet + soft SD
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 8
Dynamic Alignment of RPS DetectorsMethod: iteratively adjust the RPS X and Y offsets from the nominal beam axis until a maximum in the b-slope is obtained @ t=0.
Limiting factors
1-statistics2-beam size3-beam jitter
@ CDF W/lowlum data μm30
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 9
PL Balance MW
TEmissingν
Tp
calL
pbeam
pξ)(1νLp
S/iηe
iTEiΣξ
CAL
MW
MW - data vs. expectation
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 10
ETjet Calibration
Calibrate Etjet or , as you
wish!
use RPS information to check jet energy corrections
FP@LHC, UK 8-12 Dec 2007 Alignment and Calibrations K. Goulianos 11
thank you