FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

15
FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability www.euro4m.eu

Transcript of FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Page 1: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

FP7-SPACE:

Albert Klein Tank, KNMI

WP4Management, coordination, sustainability

www.euro4m.eu

Page 2: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Management structure

Albert Klein Tank, KNMI

Dale Barker, MO

Phil Jones, UEA

Roxana Bojariu, NMA-RO

Albert Klein Tank, KNMI

Karin van derSchaft, KNMI

Us

Page 3: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Advisory board1: André Jol (EEA)2: Stephan Bojinski (GCOS)3: ??? (Representative from a national environment agency)

Action items:

• EU-officer to decide on member 3

• Coordinator to send official invitation letters

Page 4: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Coordination with key third parties“Key third party participants who have indicated that they strongly endorse the project and with whom special arrangements will be set up (through letters of agreement or memorandums of understanding) include EEA, ECMWF, EUMETNET, and GCOS”

Action items:

• Coordinator to draft letters

Page 5: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

DeliverablesA total of 9 deliverables are due in the first 12-month period(5 x KNMI, 2 x DWD, 1 x NMA-RO, 1 x MF)

Action items:

• Partners to check the DoW (please inform the Coordinator in an early stage if any difficulties in meeting the deadline are foreseen!)

Page 6: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Who is involved in the project?Separate mailing lists will be set up for:- Those working in the project (based on the current email list and the initial list of members specified in the CA)- Financial administrators (based on the forms sent to each partner)- Persons that need to be updated on the project status on a regular basis

Action items:

• Coordinator to set up mailing lists

• All partners to check lists and send contact details of new staff to coordinator

Page 7: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Gender action plan

Action items:

• All partners to consider gender equality when appointing staff

• Coordinator to liaise with other projects for gender action plan

DoW describes how we will consider gender aspects

Page 8: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

DomainEuropean ECV output datasets from EURO4M will cover Europe in its entirety, which implies that they cover at least the NAE reanalyses domain

Action items:

• MO to send exact specifications of NAE domain

Page 9: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

ResolutionGridded datasets will be accompanied by a description of grid resolution, associated uncertainties and effective resolution

User-driven derived datasets (e.g. for river basins) used in the CIBs or presented as part of the CIBs may be based on higher resolution underlying data

Action items:

• Partners developing CIBs in WP3 will contact WP1 and 2 data providers for user driven data extractions required in the CIBs

Page 10: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Data dissemination to the outside worldECV output datasets from EURO4M (Table B.1.1.a) will be distributed mainly through existing systems (e.g. MARS archive, ECA&D archive, CM-SAF archive), which can be accessed from a dedicated EURO4M web-based data portal

A user-driven selection will be made available using more advanced methods (part of CIBs)

Action items:

• KNMI (WP3) to explore the use of OGC webservices, in particular for data that are part of the CIBs

Page 11: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Data requests to the outside worldRequests for cooperation on data with institutions outside the EURO4M consortium will be coordinated to avoid scattered and repeated contacts

Action items:

• WP1 and 2 leaders to make an inventory of data requests

• Coordinator (together with WP leaders) to draft a letter (and liaise with EUMETNET/ECSN where appropriate)

Page 12: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Data exchange within the projectExchange of data within the project is being discussed among the partners directly.

There is no central database foreseen.

The project website / data portal will “only” provide pointers to and contact points for each ECV dataset delivered in EURO4M.

Action items:

• Partners to contact each other for data requirements

Page 13: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Exchange of meeting presentationsAll powerpoints of the meeting presentations will be made available from the “partners-only” section of the EURO4M project website

Action items:

• KNMI to post powerpoints on project website

Page 14: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

MeetingsNext General Assembly (GA) will be held in ..., March 2011 (t.b.c.)Before that, smaller WP meetings, workshops, side events, phone conferences will be organised on the initiative of the WP-leaders when needed. The Coordinator and WP-leaders will hold a phone conference after 6 months.

Action items:

• Partner ... + Coordinator to explore organising GA in ...

• WP leaders to decide on required additional meetings and inform Coordinator; concrete suggestions are …

Page 15: FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability .

Questions?