Overview
� Brabant Water, Netherlands
� Westland Infra, Netherlands
Util
ity C
ase
Stu
dies
� EDB, Belgrade, Serbia
� PBE, Belgium
Util
ity C
ase
Stu
dies
Company Structure
Dr. Thomas Englert
20%
Util
ity C
ase
Stu
dies
Dr. Thomas Englert
Shareholder
50%
30%51% 50%
Strategic Partner
International
Business Partner
Network
Werner Lück
AED-SYNERGIS
50%
Util
ity C
ase
Stu
dies
AED-SICAD: Key Facts
� One of the biggest GIS-Software Application Companies in Europe
� German Company (Offices Sites in Bonn, Munich and Berlin)
� More then 200 employees in AED-SICAD AG
� Employees with more than 20 years of experience
Util
ity C
ase
Stu
dies
� More than 10.000 licenses and >2000 customers all over the world
� > 40 000 GByte of data are managed by AED-SICAD software
� Financial situation
� Debt-free
� High liquidity
� Profitable
Util
ity C
ase
Stu
dies
ArcFM UT: Product Structure
UT Web
UT View
UT Alpha
UT Editor
Ele
ctr
icit
y
Ga
s
Wa
ter
He
ati
ng
Sew
ag
e
Te
lco
Util
ity C
ase
Stu
dies
UT Base
Extensions
UT Integrator
UT Designer
UT Reader
UT Mobile
Ele
ctr
icit
y
Ga
s
Wa
ter
He
ati
ng
Sew
ag
e
Te
lco
Util
ity C
ase
Stu
dies
AED-SICAD ArcFM™ UT and ESRI ArcGISU
tility
Cas
e S
tudi
es
Util
ity C
ase
Stu
dies
Successes - Overview ArcFM UT Customers
� 65 large
international utilities
have decided for
ArcFM UT since first
release
Util
ity C
ase
Stu
dies
� From the top 5
German Utilities, 3
are using ArcFM UT
� Most customers full
Enterprise
Implementations
Util
ity C
ase
Stu
dies
Brabant Water, Netherlands
� Main pipeline system 17.000 km
� House connections 1.100.000
� Inhabitants 2.4 million
� GIS ArcFM UT users
� 20 data editors
� 115 field employees: mobile users
Util
ity C
ase
Stu
dies
� 115 field employees: mobile users
� 175 geo data viewers in office
� 10 spatial analysts
� IT Staff
� 5 application developers
� 6 application operational management & service
Util
ity C
ase
Stu
dies
Brabant Water : Objectives
� Future proof solution: Long term perspective
� Water pipeline data management, viewing and analyzing:
� ArcFM UT Editor
� ArcFM UT Web (and GIS Portal)
� ArcFM UT Mobile
� ArcView
� 100% data conversion from
Util
ity C
ase
Stu
dies
� 100% data conversion from
old system
� Integration with billing/customer
system
� Trained internal IT staff
� Avoid custom development
Util
ity C
ase
Stu
dies
Brabant Water: TracingU
tility
Cas
e S
tudi
es
Util
ity C
ase
Stu
dies
Brabant Water: Importing DXFU
tility
Cas
e S
tudi
es
Util
ity C
ase
Stu
dies
Brabant Water: Importing DXFU
tility
Cas
e S
tudi
es
Util
ity C
ase
Stu
dies
Westland Infra
� Supply of Western Netherlands with electricity, gas and CO2
� Year 2008: splitting of the company into two private limited companies:
� (a) Trade & Supply
� (b) Regional Grid Operator
� Networks: Electricity and Gas.
� 2.600 km of cables – 1.400 high voltage stations.
� Highly branched network because the region is dense building structure
Util
ity C
ase
Stu
dies
� Highly branched network because the region is dense building structure
Util
ity C
ase
Stu
dies
Westland Infra: IT Infra Structure, Tasks
� Editors: 9 / Viewers: about 50
� Project Phases:
� Phase 1: Electricity
� Phase 2: Migration of Gas, Telecom and Protective Tubes.
� Near future - interfacing:
Util
ity C
ase
Stu
dies
� Near future - interfacing:
� (1) Maintenance system for network components and
� (2) Connect GIS to SCADA system data
� Implementation approach
� Use of default ArcFM UT data model & functions
� Small project team
� Customization is limited, no dll’s, no coding.
� Conversion: FME and standard ESRI tools
Util
ity C
ase
Stu
dies
Westland Infra: First Data Results from Migration
� Migration from
Microstation
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
ELECTRIC POWER DISTRIBUTION BELGRADE - EDB
� Service points 700.000
� Underground lines 6.500 km
� Overhead lines 9.500 km
� Transformer substations MV/LV 6000
� Total employed 1700
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
EDB: Status Before Project Start
� Graphical data
� CAD drawings
� Raster maps
� IT subsystems
� Control
� Technical
� Business
Util
ity C
ase
Stu
dies
� Business
Util
ity C
ase
Stu
dies
EDB: Project Goals
� Need for GIS
� One database
� One data entry
� Web access
Util
ity C
ase
Stu
dies
� Decision for ArcFM UT
� ESRI – leading GIS software
� AED-SICAD – leading European GIS solution
� Easy integration with external IS (SCADA, NCS, CIS,SAP...)
Util
ity C
ase
Stu
dies
EDB: GPS Data Import
� Handheld GPS used
� 20 field teams collecting data of overhead MV network
� 25.000 collected poles (one year work)
� 35.000 total number of poles
� Data model expanded for GPS meta data
� FME data conversions
� Automatic construction
Util
ity C
ase
Stu
dies
� Automatic construction
of power lines
Util
ity C
ase
Stu
dies
EDB: 3D Scanning of Power Plants
� External documents in ArcFM UT
� Analysis of 3D scanning technology
� Providing technical documentation of electric power plants
� Alpha data in GIS
� Hierarchical vector data
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
EDB: Next Steps
� Continuous data entry
� ArcFM UT – graphics & alpha data
� UT Web – alpha data
� Continuous education of users
� Integration with other (sub)systems
� CRM
� Network control system
Util
ity C
ase
Stu
dies
� Network control system
� Contact
� EDB – www.edb.rs
� Livona – www.livonagis.co.rs
� Project managers:
� EDB – Miladin Tanasković[email protected]
� Livona –Ljubiša Adžemović[email protected]
EDB Project Team
Util
ity C
ase
Stu
dies
PBE in Belgium
� PBE Business
� Distribution area: See map
� Electricity (4721 km)
� Cable TV (1705 km) and telecommunication (287 km, fiber)
� Public lighting
� Turnover 2008:
~ 50 Mio EUR
Util
ity C
ase
Stu
dies
~ 50 Mio EUR
Util
ity C
ase
Stu
dies
PBE: Trigger for New GIS
� PBE has the same network documentation needs as other large utilities
� Trouble in the drawing room :
the current CAD solution does not suffice
� No multi-user editing file locking
� Difficult organisation and re-organistion of data use
� No integrated solution for asset management
� Difficult reporting
Util
ity C
ase
Stu
dies
� Difficult reporting
� ….
� PBE needs a geobase - oriented solution
� Know-how often still in engineer’s mind and not in the database
� Regulatory requirements
� Plotting requirements
Util
ity C
ase
Stu
dies
PBE: Project Scope
� ArcFM UT
� ArcFM UT desktop (Editor) for Electricity and Cable TV
� ArcFM UT desktop (View)
� GIS Portal and ArcFM UT Web
� ArcFM UT Integrator
� Professional IT Services
Util
ity C
ase
Stu
dies
� Professional IT Services
� Projectmanagement
� Data Modelling
� Configuration
� Integration with AS400
� Integration with network calculation prorgam
� Specific plotting, reporting requests
� Specific Cable TV functions
Util
ity C
ase
Stu
dies
Thank you for your attentionU
tility
Cas
e S
tudi
es
Florian Brandi-Dohrn
AED-SICAD AG
Lilienthalstraße 7
D - 85579 Neubiberg / Germany
Tel.: +49-89-45 026 - 217