Foundation checkpoints TL
2
Foundation Drawing Excavation Leveling of pit PCC reinforcement binding dimension of pit Stub & cover block Dimension of Steel Chair rods Qty of steel back to back Diagnoal Cement stacking mixing of concrete Aggregate s water used Slump cone Cube Curing Form box& Chimney box Black oil application Usage of Chutes vibrators honey combs Backfilling coping Checklist
-
Upload
r1a2g3h4u5 -
Category
Documents
-
view
215 -
download
0
Transcript of Foundation checkpoints TL
Foundation
Drawing
Excavation
Leveling of pit
PCC
reinforcement binding
dimension of pit
Stub & cover block
Dimension of Steel
Chair rods
Qty of steel
back to back
Diagnoal
Cement stacking
mixing of concrete
Aggregates
water used
Slump cone
Cube
Curing
Form box& Chimney box
Black oil application
Usage of Chutes
vibrators
honey combs
Backfilling
coping
Checklist
others
Tower erection
Missing nuts & bolts
Undersize & oversize
Nuts & Bolts hand tightning
Missing redundants
Spring washer & packwasher
Strained members
belting & bracing
Nuts facing out side oftower
Projected threads
damaged bolts
Punching
tack welding & slagcleaning
others
Housekeeping
Loose nuts & bolts
Earthing
Connection
TFR
Stringing
Drum schedule
PTP