FOSTEr in MED pilot projects conference 28/06/2016: the pilot project in Aqaba, Jordan

19
1/## Jordan Pilot Project

Transcript of FOSTEr in MED pilot projects conference 28/06/2016: the pilot project in Aqaba, Jordan

Page 1: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

1/##

Jordan Pilot Project

Page 2: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

The University of Jordan-Aqaba is located inAqaba city -South ofJordan within thelatitude and longitude of29˚ 35’04”N, 35˚ 10’ 26”E

Location

Page 3: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Site Pictures

Page 4: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

LargeSky

Light

SmallSky

LightSmallSky

Light

South

Page 5: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

• BIPV (Building-Integrated Photovoltaic) system with a size of 17.08 kilowatt-peak installed on the skylights of the University of Jordan-Aqaba.

• The system generates 34 MWh/yr and the allocated area for each kWp is 12 sq.m.

Project Description

Page 6: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Area Name Location Area

(m2)

Skylight #1 First roof main skylight 151

Skylight #2 First roof wing A-B 27

Skylight #3 First roof wing D-F 27

Brick area #1 First roof wing A 117

Brick area #2 First roof wing B 117

Brick area #3 First roof wing D 117

Brick area #4 First roof wing F 117

Available AreasOverall Area of the skylights = 204 m2

Page 7: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Skylights at JU-Aqaba Building Before Replacement

Skylight 1 Top and Bottom View

Skylights 2 and 3 Top and Bottom View

Page 8: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Month

Solar radiation on

Horizontal

surface (GHI)

(kWh/ m2.day)

Ambient Temperature

(oC)

Jan 3.382 12.3

Feb 4.767 15.4

Mar 6.162 22.8

Apr 7.085 25.7

May 7.787 27.7

Jun 8.254 32.5

Jul 8.216 33.5

Aug 7.302 33.9

Sep 6.35 31.3

Oct 5.052 25.6

Nov 4.238 21.5

Dec 3.585 17.3

Yearly Average 6.015 25.0

Monthly Solar Radiation and Temperature in Aqaba

Reference: RSS Solar radiation measurements in Aqaba (2004-2010)

Page 9: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

• Procurement of custom-made BIPV modules from VIDURGLASS-Spain.

• Application for grid connection to local distribution company & having their approval.

• Steel structure study.

• Removal of existing glass panels.

• Installation of BIPV modules on skylights.

• Electrical connections.

• Application for commissioning with the local distribution company.

• Final commissioning and start-up of the system.

Pilot Project Implementation Process

Page 10: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

• Main Obstacle: Lack of experience in BIPV in theregion and the small capacity and investment for thesuggested BIPV system, which resulted in thefollowing:– First local tender release - No success

– Second local tender release - No success

– Competitive negotiated procedure for the procurementand installation of BIPV panels – No success

– Competitive negotiated procedure for the procurement ofBIPV panels – Successful

– Soliciting offers for the installation - Successful

Obstacles and Challenges

Page 11: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Installation Process

Page 12: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan
Page 13: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Skylight 1

Page 14: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Skylight 2Skylight 2

Page 15: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Skylight 3

Page 16: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan
Page 17: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan

Pilot Launching 26/6/2016

Page 18: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan
Page 19: FOSTEr in MED pilot projects conference  28/06/2016: the pilot project in Aqaba, Jordan