Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC...

12
Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002

Transcript of Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC...

Page 1: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

Forward arm concepts for A-A running with the EIC detector

S. Manly

University of Rochester

EIC workshop

BNL, Sept. 19, 2002

Page 2: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

v2 vs. and energy

Preliminary v2200

Final v2130

PHOBOS Au-Au

130 GeV result: nucl-ex/0205021, submitted to PRL

v 2

200 130

<Npart>~190

Page 3: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

EIC detector from white paper

Page 4: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

EIC detector from white paper

=2.1

=2.8

Page 5: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

Coverage one wants: Phobos coverage out to roughly =5.4

Page 6: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

EIC detector from white paper

Page 7: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

TPC’s

Extend coilRemove lepton side endcap emcal

PID

Keep hadron side flux return the same thickness

Add si ring tracker to cover intermediate region

Offset collision point

Mods to EIC detector to optimize for AA forward region

Page 8: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

Tracking with p determination and PID to 3.8

Page 9: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

For coverage to higher h, put annular rings (a la PHOBOS or current white paper concept?) out to z=9m

Page 10: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.

-1.1m

1.1m2.3m

-2.3m

5.0m

-5.0m

• || < 5.5 (, 0 (

Interaction Point

PHOBOS Octagon, vertex and ring detectors

Ring counter

Change ring design to groups of three annular rings with smaller pad size so one can form three point tracklets to cut down on background

Page 11: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.
Page 12: Forward arm concepts for A-A running with the EIC detector S. Manly University of Rochester EIC workshop BNL, Sept. 19, 2002.