Fortnightly Report -...
-
Upload
vuongthien -
Category
Documents
-
view
232 -
download
1
Transcript of Fortnightly Report -...
All IDPs residing in Nahaqai and Danishkool camp have returned to their areas of origin. The
return of IDPs was managed and arranged by an experienced team of FDMA. The following
tables show the statistics of returns and registered IDPs.
Mohmand Agency
FATA DISASTERS MA NAGEMENT AUTH ORITY
Inside this issue
Bajaur Agency 2
Orakzai Agency
IDPs Return
2
SWA Updates 2
HUASP Account
Status
3
NSRF 3
Online NOC
tracking system
3
Shelter Distribu-
tion in SWA
4
ER Launching 5
25th Oct, 2011
Fortnightly Report
NAHAQAI CAMP DANISHKOOL CAMP
Total Registra-tion
Total Returned Balance
8,267 8,267 0
Total Registra-tion
Total Returned Balance
1830 1830 0
Kurram Agency
Registration and Return process is continued in Kurram Agency.
In phase-1 & phase-2 of return, a total of 114
families with 543individuals including 282
males, 261 females and 192 children’s re-
turned from the camp, while a total of 336
families with 1495 individuals including 858
males, 637 females and 684 children re-
turned from host community.
So far 2600 families have been registered
in the new durrani camp, having 13220
individuals including 7354 males, 5856
females and 13210 children, while registra-
tion of host families after complete verifica-
tion is also in progress at Eid-Gah point. So
far 10463 families have been registered,
consisting of 42449 individuals including
24767 males, 18069 females and 20942
children.
Registration: Returned:
Current Camp Registration after Return:
After the returns, camp registration has dropped down to 2482 with 12610 individuals in-
cluding 7064 males, 5543 females & 6003 children while host area registration has dropped
down to 10093 families with 41186 individual’s including 23871 males, 17315 females &
16492 children.
Number of activities are being carried out in Bajaur Agency that includes:
Bajaur Agency
25th Oct, 2011
Housing Uniform Subsidy Project:
HUASP is still in progress. According to the data-
base 3,125 houses are completely damaged while
5510 are partially damaged. In this regard regis-
tration of the 10 % remaining effectives has also
been completed. i.e. 644 Damaged houses have
been surveyed including 162 completely damaged
houses and 482 partially damaged houses. The
data entry of the second phase damaged houses
in the database is in progress.
Social Mobilization Sessions:
Social Mobilization, a key life restoring process
was carried out inside the Bajaur Agency as well
as in camps to address the compensation of dam-
aged houses and other problems of IDPS. So far
four sessions have being conducted for partici-
pants.
Facilitation and Coordination:
FDMA has a close coordination with Political Administration of tribal Agencies. With support of Political Ad-
ministration FDMA has undertaken a number of activities in Housing Compensation Process:
1. Facilitation/ Verification of Data
2. Issuance of tokens to beneficiaries
3. Help in opening of bank accounts
Orakzai Agency
Return Process is ongoing in Orakzai Agency. So far 10728 families have returned in phase-1 & 2 while the
12057 families returned in Phase-3 which is still continuing. Total of 22785 IDP families have returned so far
to their areas of origin.
South Waziristan Agency
In Phase-2, 1025 families have returned to their area of origin as the return process is in progress. Fol-
lowing table shows the summary of SWA IDPs:
Total Families Displaced Total Returned Balance
Tank DIK Others Totals
26,447 12854 2262 41653 6580 34983
25th Oct, 2011
National Single Reporting Format
On Oct 6th 2011, NSRF has been launched which is obligatory on all humanitarian organizations. All the re-
quired Project details/activities pertaining to the organization shall be reported on NSRF on regular basis.
In order to enhance capacities of the relevant personnel of humanitarian organizations on NSRF V 2.0, a train-
ing program has been organized whereby training sessions will be conducted weekly or bi-weekly.
Online NOC Tracking System
The Information Management Unit (iMMAP) created an online Tracking System for the management of NOC,s
for organizations working in the development sector in FATA. This will eliminate the hassle of time consuming
communications amongst authorities, it will facilitate the new applicants in applying for the NOC and the exist-
ing organizations to update their status. This online system is linked with SRF, which also enables all coordinat-
ing agencies to monitor the status of all stakeholders involved in the development sector.
HUASP (Bajaur & Mohmand Agency)
The verified cases were sent to PA Bajaur in order to inform beneficiaries for opening accounts in two dedicated
banks. i.e. Habib Bank Ltd and United Bank Ltd. The status of accounts opened in both the banks, to date, is
shown in the following table:
Opening Accounts—Bajaur Housing Survey
Name of Bank Accounts Opened
(Completely damaged
houses)
Accounts Opened (Partially Dam-
aged House)
Total Accounts Opened
Habib Bank Ltd 1699 3525 5284
United Bank Ltd 773 1249 976
Total 2472 3728 6260
Shelter Project South Waziristan Agency
Main purpose of this project was to provide immediate shelter support to the families returned and to make
the return process sustainable. After this project the returning families will have shelter.
Name of Population Planning
Group:
Shelter provided to 800 families (5600)
Age
Group
Male Female Total
in num-
bers
in % in numbers in % in numbers in %
0-4 524 18% 484 18% 1008 18
5-17 1223 42% 1129 42% 2352 42
18-59 1106 38% 1022 38% 2128 38
60 and > 58 2% 54 2% 112 2
Total: 2911 2689 5600 100
Major locations: Sarwakai Tehsil of South Waziristan
South Waziristan Shelter-Kit
So far FDMA along with two other implementing partners of UNHCR have distributed 2000 Shelters kits and
8,500 Related cash grant as follow:
Organization Shelter and cheques assign Cheques distributed Shelter distributed
FDMA 800 800 800
FRD 600 600 600
SRSP 600 600 600
Early Recovery Launching
FDMA & UNDP with the support of 13 UN Agencies launch the first ever Inter Agency Early Recovery Need As-
sessment (IAERNA) on 25th Oct, 2011. The assessment was formally launched by the Additional Chief Secretary
FATA Mr. Fazal Karim Khattak. The occasion was attended by a large number of FATA Secretariat Officers and
different heads of UN agencies and International NGOs.
Speaking on the occasion ACS FATA retrial his full support to all the UN agencies involve in the assessment.
They also informed the participants that this assessment will play a very important role in the future long term
development planning for the people of FATA.
DG FDMA Mr. Arshad Khan & Mr . Jean lue Deputy Country Director UNDP speaking on the occasion thank all
the participating UN agencies & assured their support for the reintegration of FATA IDP to areas of return.
Compiled & Edited by:
Shah Khalid
MIS Programmer, FDMA
Cell # 03459669009