FORM 1 & 1 A For PROPOSED RESIDENTIAL CUM COMMERCIAL PROJECT At Village Kole, Gharivali, Katai and Mangaon Tal: Kalyan , Dist: Thane Maharashtra. Proposed By AANANT DEVELOPERS PVT. LTD. 

Transcript of Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See...

Page 1: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

FORM 1 & 1 A

For

PROPOSEDRESIDENTIALCUMCOMMERCIALPROJECT

At

VillageKole,Gharivali,KataiandMangaonTal:Kalyan,Dist:Thane

Maharashtra.

Proposed By

AANANT DEVELOPERS PVT. LTD. 

Page 2: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20061

APPENDIX‐I

(Seeparagraph–6)FORM1

(I) BasicInformation

Sr.No. Item Details

1 Nameoftheproject/s ProposedResidentialcumCommercialProject

2 S.No.intheSchedule 8(b)

3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.

Proposed Unit

PlotArea 3,62,647.96 m2

FSIAreaproposed

6,90,387.20m2

NonFSIArea 4,83,270.8 m2

TotalConstructionArea

11,73,658m2

4 New/Expansion/Modernization NewProject

5 ExistingCapacity/Areaetc. NA

6 Categoryofprojecti.e.AorB BCategory

7 Doesitattractthegeneralcondition?ifyes,pleasespecify

No

8 Doesitattractthespecificcondition?Ifyes,pleasespecify

No

9 Location Village Kole, Gharivali, Katai andMangaonTal:Kalyan,Dist:Thane,Maharashtra.

Plot/Survey/KhasraNo. Plot bearing S.No. 17/1, 17/2, 17/3,21,22,23,24,25/1, 26/1,26/2, 26/3, 26/4, 27,32/1, 75, 76/P, 77, 79/1, 79/2, 79/4, 79/42,79/44&93ofVillageKole,S.No.25/P,26,27,31/1, 31/2, 31/3, 31/4, 31/5, 31/6, 32/1A,32/3, 33 & 34/12, 43, 46, 52, 53, 57, 59/1 &59/2ofVillageGharivali,S.No.58/1,58/2,59,60,61,62,99,120/5&132ofVillageKatai,S.No.71/1,72/1,72/2,72/3P&76/PofVillageMangaon,Maharashtra

Village VillageKole,Gharivali,KataiandMangaon

Tehsil Kalyan

District Thane

State Maharashtra

10 Nearestrailwaystation/portalongwithdistanceinkms.

DativaliRailwayStation

Distance:3.3kmapprox.

Page 3: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20062

Sr.No. Item Details

11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.

NearestCity:Dombivali

Thane

12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)

ApprovingAuthority:MMRDA

13 Nameoftheapplicant AanantDevelopersPvt.Ltd.PowerofAttorneyHolderForPremierAutomobilesLtd.

14 Registeredaddress 107‐108, 1st Floor, Sai Infotech, Patel Chowk,Ghatkopar(E),Mumbai.

15 Addressforcorrespondence: Lodha Excelus, Apollo Mills Compound, N.M.JoshiMarg,Mahalaxmi,Mumbai400011.

Name Mr.BharatNarasana

Designation(Owner/Partner/CEO) Director

Address Lodha Excelus, Apollo Mills Compound, N.M.JoshiMarg,Mahalaxmi,Mumbai400011.

Pincode 400011

E‐mail [email protected]

[email protected]

TelephoneNo. 02223024400

FaxNo. 02223000693

16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.

NotApplicable.

17 Interlinedprojects NotApplicable

18 Whetherseparateapplicationofinterlinkedprojecthasbeensubmitted?

No

19 Ifyes,dateofsubmission ‐

20 IfNo,Reason Standaloneconstructionproject

21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven

a) TheForest(Conservation)Act,1980?

b) Thewildlife(protection)Act,1972?

c) TheCRZNotification,1991?

NA.

Page 4: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20063

Sr.No. Item Details

22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?

No

23 Forestlandinvolved(hectares) No

24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?

a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe

courtifanyanditsrelevancewiththeproposedproject.

Nosuchlitigationpendingagainsttheproject

Capacity corresponding to sectoral activity (such as production capacity for manufacturing,miningleaseareaandproductioncapacityformineralproduction,areaformineralexploration,lengthforlineartransportinfrastructure,generationcapacityforpowergenerationetc.,)

(II)Activity1. Construction, operation or decommissioning of the Project involving actions,

whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)

Sr.No.

Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata

1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)

No

LandreservedforResidentialDevelopment.

1.2 Clearance of existingland, vegetation andbuildings?

No Siteisvacant

1.3 Creation of new landuses?

No The land is reserved for residentialdevelopmentasperRegionalPlanof27village

1.4 Pre‐constructioninvestigations e.g. borehouses,soiltesting?

Yes Soilsamplestakenwithintheplotpremisesforgeotechnicalinvestigation

1.5 Constructionworks?

Yes Residential and Commercial Buildings will beconstructed.

1.6 Demolitionworks?

No Notapplicableasthesiteisvacant.

Page 5: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20064

Sr.No.

Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata

1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?

No Localworkerswillbedeployedforconstructionworks.

1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations

Yes Excavation will be carried out for foundationpurpose.Mostoftheexcavatedsoilwillbeusedforbackfillingatprojectsiteonly.

1.9 Underground worksincluding mining ortunneling?

No

1.10 Reclamationworks? No

1.11 Dredging?

No

1.12 Offshorestructures? No

1.13 Productionandmanufacturingprocesses?

No Thisisaconstructionproject

1.14 Facilities for storage ofgoodsormaterials?

Yes Only construction material will be stored intemporarystoragesite

1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?

Yes Solid waste will be treated by mechanicalcompostingmethod(Ecobio‐compack).Sewage generated from the complex will betreated inSewage treatmentPlant. Theexcesstreated water will be directly disposed off inSewerLines.ThetreatedwaterwillbeusedforflushingandGardening.The dried sludge and compostwill be used asmanureforlandscaping.

1.16 Facilitiesforlongtermhousingofoperationalworkers?

No

1.17 Newroad,railorseatrafficduringconstructionoroperation?

No Existing road network will be used duringconstructionandoperationphaseofproject.

1.18 New road, rail, airwaterborne or othertransport infrastructureincludingneworalteredroutes and stations,ports,airportsetc?

No Existing road will be used for the transportpurpose.

Page 6: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20065

Sr.No.

Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata

1.19 Closure or diversion ofexistingtransportroutesorinfrastructureleadingto changes in trafficmovements?

No

1.20 New or divertedtransmission lines orpipelines?

No

1.21 Impoundment,damming, culverting,realignment or otherchanges to thehydrology ofwatercourses oraquifers?

No

1.22 Streamcrossings? No

1.23 Abstraction or transfersofwaterformgroundorsurfacewaters?

No

1.24 Changesinwaterbodiesor the land surfaceaffecting drainage orrun‐off?

No Therewill not be any changes inwaterbodiesorthelandsurface.

1.25 Transport of personnelor materials forconstruction, operationordecommissioning?

Yes Construction workers and constructionmaterialduringconstructionphase

1.26 Long‐term dismantlingor decommissioning orrestorationworks?

No

1.27 Ongoing activity duringdecommissioning whichcouldhaveanimpactontheenvironment?

Yes Dust generation and increase in Noise levelsduringconstructionactivity.

1.28 Influx of people to anarea in eithertemporarily orpermanently?

Yes Construction workers during constructionphaseandadditionalresidentsduringoperationphase

1.29 Introduction of alienspecies?

No No introduction of alien species will occur asthisispurelyresidentialproject

1.30 Lossofnativespeciesorgeneticdiversity?

No Nothreatofspecieslosswilloccur

1.31 Anyotheractions?

No No

Page 7: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20066

2 Use ofNatural resources for construction or operation of the Project (such asland, water, materials or energy, especially any resources which are non‐renewableorinshortsupply):

Sr.No. Information/checklistconfirmation

Yes/No Details thereof (with approximatequantities/rates,whereverpossible)withsourceofinformationdata

2.1 Landespeciallyundevelopedoragriculturalland(ha)

No LandisreservedforResidentialDevelopment.

2.2 Water(expectedsource&competingusers)unit:KLD

Yes Source:MIDC

Proposed Unit

TotalWaterRequirement

1774 KLD

ThedetailedwaterbalanceforoperationphaseofprojectisattachedasAnnexureIV

2.3 Minerals(MT) NA 2.4 constructionmaterial–

stone,aggregates,sand/soil(expectedsource–MT)

Yes Stone,aggregates,sanddemandwillbemetfromlocalopenmarket

2.5 Forestsandtimber(source–MT)

Yes Onlydoorframes(ifsoplanned)

2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)

Yes Source:MSEDCL

Proposed Unit

PowerRequirement

110 MW

2.7 Anyothernaturalresources(useappropriatestandardunits)

No

3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concerns aboutactualorperceivedriskstohumanhealth.

Sr.No. Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)

Yes Used oil from DG set will be storedseparately and will be given to authorisedrecyclers

3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)

No

Page 8: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20067

Sr.No. Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?

No Notapplicable

3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,

Yes

There will be minor negative impact ofproposed development on Hospital andSchoolbuildingsetc.

3.5 Anyothercauses No

4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates,whereverpossible)withsourceofinformationdata

4.1 Spoil,overburdenorminewastes

No

4.2 Municipalwaste(domesticandorcommercialwastes)

Yes MunicipalSolidWaste Proposed Unit

TotalSolidWaste

7433

kg/day

4.3 Hazardouswastes(asperHazardousWasteManagementRules)

Yes Used oil from DG set will be given toauthorisedrecyclers

4.4 Otherindustrialprocesswastes

No No, This is a development of residentialbuildings

4.5 Surplusproduct No NotApplicable

4.6 Sewagesludgeorothersludgefromeffluenttreatment

Yes 17m3/dofsludgewillbeusedasmanure

4.7 Constructionordemolitionwastes

Yes Construction debris during constructionphase will be utilized in plot only for landlevelling.

4.8 Redundantmachineryorequipment

No

4.9 Contaminatedsoilsorothermaterials

No

4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable

5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)

Sr.No.Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata

Page 9: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20068

5.1 Emissionsfromcombustionoffossilfuelsfromstationaryormobilesources

Yes EmissionfromDGsetsduringpowerfailureandmovementofvehicleduringoperationphaseoftheproject

5.2 Emissionsfromproductionprocesses

No NotApplicable

5.3 Emissionsfrommaterialshandlingincludingstorageortransport

Yes Fugitiveemissionfromhandlingsuchassandandotherconstructionmaterial

5.4 Emissionsfromconstructionactivitiesincludingplantandequipment

Yes Transportationofconstructionmaterial&handlingofsand,aggregates,cement,DGsetsetc.Theemissionsfromconstructionmachinerywouldcontainparticulates,SOx,NOxandCO

5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste

Yes Transportation, loading and unloading ofmaterialwillgeneratedustOdour from Solid waste management andsewage treatment plant area if not handled itproperly

5.6 Emissionsfromincinerationofwaste

No NotApplicable

5.7 Emissionsfromburningofwasteinopenair(e.g.slashmaterials,constructiondebris)

No NotApplicable

5.8 Emissionsfromanyothersources

No NotApplicable

6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:

Sr.No.Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata

6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers

Yes Increase in noise levels due to operations ofconstructionequipments&vehicularmovement

6.2 From industrial orsimilarprocesses

No NotApplicable

6.3 Fromconstructionordemolition

Yes Increaseinnoiselevelsduringconstruction.

6.4 Fromblastingorpiling Yes Duringpilling6.5 Fromconstructionor

operationaltrafficYes Duringconstructionandoperationphaseof the

project.In theoperationphasetherewillbe increase inthe vehicular movement because of theresidentsandvisitors

6.6 Fromlightingorcooling No NotApplicable

Page 10: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20069

Sr.No.

Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata

systems6.7 Fromanyothersources No NotApplicable

7. Risks of contamination of land or water from releases of pollutants into thegroundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:

Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible) withsourceofinformationdata

7.1 Fromhandling,storage,useorspillageofhazardousmaterials

No The used oil from DG sets will be given toauthorisedrecyclers

7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)

No Sewage generated from the complex will betreatedinSewageTreatmentPlant. Therestofthe sewage & excess treated will be directlydisposedoffinSewerLines.ThetreatedSewagewillbeusedforflushingandGardening.

7.3 By deposition ofpollutantsemittedtoairinto the land or intowater

No NotApplicable

7.4 Fromanyothersources No NotApplicable

7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?

No NotApplicable

8. RiskofaccidentsduringconstructionoroperationoftheProject,which

couldaffecthumanhealthortheenvironment

Sr.No. Information/Checklistconfirmation

Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata

8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances

Yes Spillageofusedoil fromDG setsandexplosioninDiesel storagearea.Adequate fireprotectionmeasureswillbetakenupasperthefireNOC.

8.2 Fromanyothercauses

Yes Accidents during construction phase (Slips,fallfromheight,fallingofobjects/materialonworkers, fire, cut and burns, electric shock

Page 11: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200610

andcollapseofshuttering Fireduetoshortcircuiting Terrorism

8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?

Yes The proposed structure is designed as perSeismicZoneIIIstandards.

Theprojectareadoesn’thavehistoryofflooding

9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which

couldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality

Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible) withsourceofinformationdata

9.1

Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:

•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other

No

The proposed project is a Construction ofResidential cum Commercial Project. Theproposed site is located in an urbanised areaand hence the infrastructural facilities alreadyexist.

9.2 Leadtoafter‐useofthesite, which could havean impact on theenvironment

No NotApplicable

9.3 Set a precedent forlaterdevelopments

No NotApplicable

9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects

No At present there is no major ongoingconstructionprojectofsimilarintensity.

Page 12: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200611

(III)EnvironmentalSensitivity

Sr.No.Areas

Name/Identity

Aerialdistance(within15km.)Proposedprojectlocationboundary

1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue

Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18km

2 Areaswhichareimportantorsensitiveforecologicalreasons‐Wetlands,watercoursesorotherwaterbodies,coastalzone,biospheres,mountains,forests

Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18kmUlhasriver:3.6kmNiljeLake:1.4kmDesaiRiver:1.8km

3 Areasusedbyprotected,importantorsensitivespeciesoffloraorfaunaforbreeding,nesting,foraging,resting,overwintering,migration

Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18km

4 Inland,coastal,marineorundergroundwaters

Yes Ulhasriver:3.6kmNiljeLake:1.4kmDesaiRiver:1.8km

5 State,Nationalboundaries

No

6 Routesorfacilitiesusedbythepublicforaccesstorecreationorothertourist,pilgrimareas

No

7 Defenceinstallations No

8 Denselypopulatedorbuilt‐uparea

Yes Fullyurbanisedarea

9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)

Yes Hospitals,schools,communityfacilities,&placesofworshiparepresentnearsite.

10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)

Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18kmUlhasriver:3.6kmNiljeLake:1.4kmDesaiRiver:1.8km

Page 13: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200612

Sr.No.

Areas

Name/Identity

Aerialdistance(within15km.)Proposedprojectlocationboundary

11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)

No

12 Areassusceptibletonaturalhazardwhichcouldcausetheprojecttopresentenvironmentalproblems(earthquakes,subsidence,landslides,erosion,floodingorextremeoradverseclimaticconditions)

No

Page 14: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200613

(IV). ProposedTermsofReferenceforEIAstudies

AttachedIherebygivenundertaking that thedata& informationgiven in theapplication&enclosuresare true to thebest ofmyknowledge&belief& I amaware that if anypartof thedata andinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:30.05.2017 Place:Thane

Mr.BharatNarasanaDirector

AanantDevelopersPvt.Ltd.PowerofAttorneyHolder

ForPremierAutomobilesLtd.

Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:

1) The projects involving clearance under Coastal Regulation Zone Notification,1991shallsubmitwith theapplicationaC.R.Zmapdulydemarcatedbyoneoftheauthorizedagencies,showingtheprojectactivities,w.r.tC.R.Z(atthestageofTOR) and the recommendations of the State Coastal Zone managementAuthority(atthestageofEC).Simultaneousactionshallalsobetakentoobtaintherequisiteclearanceunder theprovisionsof theC.R.ZNotification,1991 fortheactivitiestobelocatedintheCRZ.

2) The projects to be located within 10 km of the national Parks, Sanctuaries,

BiosphereReserves,MigratoryCorridorsofWildAnimals,theprojectproponentshall submit themap duly authenticated by ChiefWildlifeWarden showingthese features vis‐avis the project location and the recommendations orcommentsofthechiefWildlifethereon.(atthestageofEC)

3) All correspondence with the ministry of Environment & Forests includingsubmission of application for TOR/Environmental Clearance, subsequentclarifications asmay be required from time to time, participation in the EACmeeting on behalf of the project proponent shall bemade by the authorisedsignatory only. The authorised signatory should also submit a document insupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.

Page 15: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200614

APPENDIX‐II

(Seeparagraph6)

FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)

CHECKLISTOFENVIRONMENTALIMPACTS

(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand

submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)

1. LANDENVIRONMENT

(Attachpanoramicviewoftheprojectsiteandthevicinity)

1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.

Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.

ProposeddevelopmentisinlinewithRegionalPlanof27village.Followingdocumentsareattachedassupportingdocuments.

1. ConceptualPlanandDetailedTenementstatementareattachedasANNEXUREII

2. LocationPlanisattachedasANNEXUREIII

1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.

Proposed Unit

TotalPlotArea 3,62,647.96 m2

FSIProposed 6,90,387.20 m2

NonFSIArea 4,83,270.8 m2

TotalConstructionArea 11,73,658 m2

Waterconsumption

Proposed Unit

TotalWaterConsumption

1774 m3/day

EnergyConsumption

Page 16: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200615

Proposed Unit

PowerRequirement 110 MW

ParkingProvided

FourWheeler 3778 Nos.

TwoWheeler 11334 Nos.

Connectivity Proposedsiteisaccessibleby‐KalyanShilPhataRoadand30mwideDPRoad.LocationPlanisattachedasANNEXUREIII

1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).

Theprojectbeingawell‐plannedactivitywill resultinorganizedopenspacesandgreenareas.Therewillbe minor negative impact on flora present in andaround the project site during construction phasemainlyduetodust.

1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).

Themainreasonsforerosionareoverexploitationofgroundwater, instable slopes, landslides etc. Theproposedconstructionwillinvolvecuttingandfillingoperations. The projectwill involve construction ofroadsanddevelopmentofgreenareas,whichwouldreducethechancesoferosionandsubsidence.Subsidenceisnotanticipatedasgroundwaterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.

1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)

No.Therewillnotbeanyalterationofnaturaldrainagesystem.Thelandisflat.ThenaturalslopeoftheareaistowardsSouthside.

1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)

Therewillnotbeanytransportoffillmaterialsfromoutside.

Page 17: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200616

1.7 Givedetailsregardingwatersupply,wastehandlingetc.duringtheconstructionperiod.

Supply Source: Water for Domestic consumptionwill be available from MIDC whereas forConstruction purposes Tanker water/treatedwaterfromnearbySTPwillbeused.Storage:Water for constructionwill be stored in atank constructed temporarily at site whereasDomesticwater fromMIDCwill be stored in HDPEtanks.

1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)

No wet lands and low‐lying areas on the site.Received

1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)

Nohealthhazardisanticipated.

2. WATERENVIRONMENT

2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreak‐upofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.

TotalWaterrequirement:1774KLDDetailedwaterbalanceisenclosedasANNEXUREIV

2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?

TheproposedwaterdemandwillbemetfromMIDC

2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)

WatersupplyisfromMIDC

2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)

TreatedwaterfromSewagetreatmentPlantwillbeusedforflushingintoiletandgardening

TotalSewagegenerated 1673KLD

Treatedwaterrecycledforflushing

915KLD

Sludgeforcomposting 17KLD

HVACMakeup 526KLD

ExcessTreatedwater 0KLD

Page 18: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200617

2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)

Nodiversionisanticipated

2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)

The total Sewage of about 1673 KLD will begenerated from the project. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment

Parameters Values Units

pH 7‐8 mg/l

BOD 250‐300 mg/l

COD 450‐600 mg/l

O&G/ABS 10‐20 mg/l

TSS 100‐200 mg/l

Mitigationmeasures:TheSewagewillbetreatedintheSewageTreatmentPlantswithtotalcapacity1750m3/day.Thetreatedwaterwillbereusedforflushingandgardening.

2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.

Rainwaterharvestingtankswillbeprovided

2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?

There will not be changes in land use as this isresidential development project. The stormwaterdrainsarepresentonsite.

2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)

In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasMIDC.Thegroundwatertableisat3.0to4.0m.

2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)

Followingmeasureswillbetakenuptopreventthe

runofffrompollutinglandandgroundwater

Noexcavationduringmonsoonseason.

Catchdrainageallalongtheperipheryofplottopreventsurfacerunoff.

Useofsiltfenceandtrapstoreducetherunoff

Page 19: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200618

2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)

Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.

Thestormwaterdrainswillbeprovidedatgroundlevels. So there will not be problem of waterloggingduetothisproject.

2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)

No, thedeploymentof construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises. The unsanitary condition will beremoved by means of providing readymadeModulartoiletsSolidwastewillbedisposedoffinmunicipalwastedisposalsystem.

2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)

ConstructionPhase:Sewagewillbetreatedinseptictank.Theoverflowofseptictankisdischargedinsewerline.OperationPhase:The Sewage Treatment Plant is designed to treatthe sewage generated from the proposed project.The total capacity of Sewage treatment plants are1750m3/day.

2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.

Yes,Theproposeddevelopmentwillhavethedualplumbingsystemasthetreatedsewagewillbeusedforrecycling.

3. VEGETATION

3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)

Thereisnosensitiveecosystempresentatsitethatwillbedisturbedbytheproject

3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)

Thetreescomingunderbuildinglinewillbecut

3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)

The green belt of 43016.27m2will be developedfor control of pollution and aesthetic view of thecomplex.Total2150treeswillbeplantedinthepremises.

Page 20: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200619

4. FAUNA

4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.

No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals

4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.

No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.

4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna

SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant

5. AIRENVIRONMENT

5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)

The Projectwill result inmarginal increase in theatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic. Theproposed activitywill not result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.

5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.

Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM, NOX and COemissions are expected due to fuel combustion ingeneratorsets.

5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.

Theprojectwillhaveproperentryandexitforthevehicles.TheprojectsiteisaccessedbyKalyan‐ShilPhataRoadand30mwideDProad.Therewillnotany traffic congestion due to project site. Inproposedprojectprovisionof3778(fourwheelers)parking spaces has been made. Two WheelerParkingProvidedis11334nos.

5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.

Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex

5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.

Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinannegativeimpact.

Page 21: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200620

5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.

DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Increase innoise levels are expected fromvariousconstructionequipmentandmachinery.

6. AESTHETICS

6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?

Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganised open areas and landscaped areas are atthecentresothatallcanenjoythegreenareas.

6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?

Therewillnotbeanyadverseimpact

6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.

The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.

6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.

No anthropological or archaeological sites orartefactsarefoundnearthesitearea.

7. SOCIO‐ECONOMICASPECTS

7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.

No.Majorityof the labourwillbe recruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.

7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.

The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.within5to6kmradiusofprojectsite.

7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?

No. The Projectwill have positive impact on localcommunities.

Page 22: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200621

8. BUILDINGMATERIALS

8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)

Yesthebuildingmaterialswithhighembodiedenergywillbeused

8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?

Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill be used. Regularmaintenance ofthe equipment’s will be carried out. Theconstruction activities will be carried out duringthe daytime only. The constructionsmaterials/excavated soil/construction debris willbe carried thorough covered trucks. The workersexposed to high noise generating would beprovidedwithearplugs.

8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?

Flyashincementconcrete.Typically20‐25%offlyashissubstitutedincement.

8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.

Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration. Proposed UnitSolidwastegenerated

7433 kg/day

Thebiodegradablewaste4460kg/daywillbetreatedbymechanicalcompostingmethod

Thenon‐biodegradablewaste2973kg/daywillbedisposedoffthroughrecyclers.

9. ENERGYCONSERVATION

9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?

Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.

Proposed Unit

PowerRequirement

110 MW

Page 23: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200622

9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?

DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.DGSetrequirement:Total16,500kVA(D.G.SetprovisionismadeforemergencybackupofLift, Sewage Treatment Plant, water and FirePumps)Sourceofpowersupply:MSEDCL

9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?

DoubleglazedglassforResidentialbuildings

9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.

The building structure will be designed in such awaythatsolarlightcanbeutilisedmaximumfordaytime.

9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.

Solar street lights are proposed in areas such asopenspaces,pathways,RGetc.

9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?

Theproposedresidentialbuildingwillhaveshadingarrangement.

9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.

Yes.Theroomswillbesodimensionedthateffectiveairconditioningcanbecarriedout.Publicareaswillbe cooled by natural ventilation. The design of thebuildingwill be such thatmaximumuse of naturalventilation can be achieved. The walls, roofs andopenings will be so designed that influx of heat isminimum.

Page 24: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200623

9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaself‐assessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?

Heat emission from the proposed construction canbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipment’s/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheat generatedwill not be significantandwill bedissipated in the lush greens andopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.

9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.

UvalueinWatts/hr/m2/K

Roof 0.47 Watts/hr/m2/K

Wall 0.57 Watts/hr/m2/K

9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.

The fire fighting system shall compromise ofhydrant system and portable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteel firehosecabinet(weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.External firehydrantsshallbe locatedsuchthatnoportion of any building ismore than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.

9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.

NotApplicable

9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.

Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat

thewindowsaresealed,willbeprovided. Summer cross section ventilation will be

maximum.

9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.

NotApplicable

10. EnvironmentManagementPlan

TheEnvironmentManagementPlanwouldconsistofallmitigation

EnclosedasAnnexureV

Page 25: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200624

measuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.

Page 26: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200625

ANNEXUREI

AreaStatement

Details Area UnitPlotarea 3,62,647.96 m2FSIArea 6,90,387.20 m2NonFSIArea 4,83,270.8 m2TotalConstructionArea 11,73,658 m2

TENEMENTSTATEMENT

RESIDENTIALBUILDINGS

BLDGTYPE FLOORSNO.OFBLDGS

NoofFlats

Residential S+22Floors 14 1190COMMERCIALBUILDINGS

BLDGTYPE FLOORSNO.OFBLDGS

FSIAreaInSq.M.

Commercial G+11floors 5 212287.56

Page 27: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200626

ANNEXUREIICONCEPTUALPLAN

 

Page 28: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200627

ANNEXUREIIILOCATIONPLAN

Project Site

Page 29: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200628

ANNEXUREIV

WATERBALANCESTATEMENT

ParticularsNoofFlats

/rooms/CarsOccupancy

TotalPopulation

TotalWaterRequirement/

person

WaterDemandKLD

Domestic Flushing

ResidentialBuildings

1,190 5 5,950 90 45 135 803

Commercialarea212287.56

1person/10m2 21,229 15 30 45 955

Floatingpopulation

1,060.00 5 10 15 16

Total 28,239 1,774

SewageGeneration

1,673

Sludge1%ofSewageGeneration

17

RecyclingforFlushing

ResidentialBuildings

1,190 5 5,950 45 45 268

Commercialarea 2,12,288 1person/10m2 21,229 30 30 637

Floatingpopulation

1,060 10 10 11

Total 28,239 915

Gardening 43,016 5l/m2 215

HVACMakeup 526

ExcessTreated

WatertoSewer

Lines

WaterRequirementBasis(inlpcd)*

90%ofFreshand100%ofFlushingWaterRequirement

Page 30: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200629

ANNEXUREVEnvironmentalManagementPlanduringConstructionPhase

Sr.No.

EnvironmentalComponents Predicted

Impacts

ProbablesourceofImpact

MitigationMeasures Remarks

CONSTRUCTIONPHASE

1.AmbientAirQuality

Negativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.

Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.

Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipment’s

Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.

2. Noise Negativeimpactnearnoise

Useofwellmaintainedequipment.

generationsourcesinside

Noisegeneratedfrom

Heavyconstructionactivitylimitedtoday‐

Temporaryimpactsduring

premises.Nosignificantimpacton

constructionactivitiesandoperationofconstruction

timehoursonly.Useofnoisemufflersinandconstructionvehicle.

constructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.

ambientnoiselevelsinthe

equipmentandDGsets

surroundingarea.

Useofearplugs/muffsbyconstructionstaff.

3. WaterNosignificantnegativeimpact.

Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.

Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.

Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe

4. Land Minornegativeimpact

Excavation,Constructiondebris,waste

Reutilizationandrecyclingofconstructiondebris

Page 31: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200630

Sr.No.

EnvironmentalComponents Predicted

Impacts

ProbablesourceofImpact

MitigationMeasures Remarks

fromlabourcamp.

Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.

5. AestheticsMinornegativeimpacts

ConstructionactivitiesandExcavation

Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.

Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.

Page 32: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200631

EnvironmentalManagementPlanduringFunctionalPhase

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbableSourceOfImpact

MitigationMeasures Remarks

FUNCTIONALPHASE

1.AmbientAirQuality

MinorNegativeimpact

ParticulateandgaseousemissionsfromDGsetsandvehiclemovement

Useoflowsulphur

goodfuel

Periodic

maintenanceofDG

sets

UseofCNG/LPGas

afuelshouldbe

encouraged.

DGsetswillbeused.

2. Noise

Minornegativeimpactinsidepremises.

Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.

HousingofDGsets

inbuildingswith

appropriate

acoustics.

Traffic

management

measuresto

reducenoise

Appropriatetrees

whichwillactas

noisesbarriers

willbeplantedin

thepremisesand

alongroadside.

‐‐

3. Water

Nosignificantadverseimpact

Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater

Sewagewaterwill

betreatedand

recycled.

Rainwater

harvestingand

rechargeof

groundwater

aquiferis

proposed.

Good

housekeepingand

stormwater

managementwill

befollowed.

Recycledwaterwillbeusedforgardeningandflushingpurpose.

4. LandNonegativeimpact

Storageanddisposalofsolid

Treatmentand

reuseofsewageSegregationofdryandwet

Page 33: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200632

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbableSourceOfImpact

MitigationMeasures Remarks

wastes.Dischargeofsewage.Fuelandmaterialspills.

water.

Integratedwaste

managementand

spillcontrolplan

Drygarbagewill

besentfor

recyclingandwet

garbagewillbe

composted.

garbagebeforewillbedonebeforedisposal.

5. BiologicalOverallPositiveimpact

Habitat

disturbance

Greenspaces

insidethe

premiseswillhelp

tocompensatethe

earliereffectfrom

vegetation.

Landscapingand

extensive

plantationinthe

premises.

Landscapingwill

helpinreducing

anyadverse

impactsonair

andnoise

quality.

6.Socio‐economic

Overallpositiveimpact

Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.

‐‐Positiveandlongtermimpact‐

FUNCTIONALPHASE

7.TrafficPattern

NosignificantImpact

Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.

Traffic

Management

practiseswillbe

employed.

Adequateparking

spacewillbe

providedinthe

premises.

Page 34: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the

ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200633

CONCEPTUALPLANATTACHED

Page 35: Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/Online/TOR/30_May_2017_200426447O5QUX0Q1...(See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the