FORM 1 & 1 A
For
PROPOSEDRESIDENTIALCUMCOMMERCIALPROJECT
At
VillageKole,Gharivali,KataiandMangaonTal:Kalyan,Dist:Thane
Maharashtra.
Proposed By
AANANT DEVELOPERS PVT. LTD.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20061
APPENDIX‐I
(Seeparagraph–6)FORM1
(I) BasicInformation
Sr.No. Item Details
1 Nameoftheproject/s ProposedResidentialcumCommercialProject
2 S.No.intheSchedule 8(b)
3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.
Proposed Unit
PlotArea 3,62,647.96 m2
FSIAreaproposed
6,90,387.20m2
NonFSIArea 4,83,270.8 m2
TotalConstructionArea
11,73,658m2
4 New/Expansion/Modernization NewProject
5 ExistingCapacity/Areaetc. NA
6 Categoryofprojecti.e.AorB BCategory
7 Doesitattractthegeneralcondition?ifyes,pleasespecify
No
8 Doesitattractthespecificcondition?Ifyes,pleasespecify
No
9 Location Village Kole, Gharivali, Katai andMangaonTal:Kalyan,Dist:Thane,Maharashtra.
Plot/Survey/KhasraNo. Plot bearing S.No. 17/1, 17/2, 17/3,21,22,23,24,25/1, 26/1,26/2, 26/3, 26/4, 27,32/1, 75, 76/P, 77, 79/1, 79/2, 79/4, 79/42,79/44&93ofVillageKole,S.No.25/P,26,27,31/1, 31/2, 31/3, 31/4, 31/5, 31/6, 32/1A,32/3, 33 & 34/12, 43, 46, 52, 53, 57, 59/1 &59/2ofVillageGharivali,S.No.58/1,58/2,59,60,61,62,99,120/5&132ofVillageKatai,S.No.71/1,72/1,72/2,72/3P&76/PofVillageMangaon,Maharashtra
Village VillageKole,Gharivali,KataiandMangaon
Tehsil Kalyan
District Thane
State Maharashtra
10 Nearestrailwaystation/portalongwithdistanceinkms.
DativaliRailwayStation
Distance:3.3kmapprox.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20062
Sr.No. Item Details
11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.
NearestCity:Dombivali
Thane
12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)
ApprovingAuthority:MMRDA
13 Nameoftheapplicant AanantDevelopersPvt.Ltd.PowerofAttorneyHolderForPremierAutomobilesLtd.
14 Registeredaddress 107‐108, 1st Floor, Sai Infotech, Patel Chowk,Ghatkopar(E),Mumbai.
15 Addressforcorrespondence: Lodha Excelus, Apollo Mills Compound, N.M.JoshiMarg,Mahalaxmi,Mumbai400011.
Name Mr.BharatNarasana
Designation(Owner/Partner/CEO) Director
Address Lodha Excelus, Apollo Mills Compound, N.M.JoshiMarg,Mahalaxmi,Mumbai400011.
Pincode 400011
E‐mail [email protected]
TelephoneNo. 02223024400
FaxNo. 02223000693
16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.
NotApplicable.
17 Interlinedprojects NotApplicable
18 Whetherseparateapplicationofinterlinkedprojecthasbeensubmitted?
No
19 Ifyes,dateofsubmission ‐
20 IfNo,Reason Standaloneconstructionproject
21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) TheForest(Conservation)Act,1980?
b) Thewildlife(protection)Act,1972?
c) TheCRZNotification,1991?
NA.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20063
Sr.No. Item Details
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
No
23 Forestlandinvolved(hectares) No
24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?
a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe
courtifanyanditsrelevancewiththeproposedproject.
Nosuchlitigationpendingagainsttheproject
Capacity corresponding to sectoral activity (such as production capacity for manufacturing,miningleaseareaandproductioncapacityformineralproduction,areaformineralexploration,lengthforlineartransportinfrastructure,generationcapacityforpowergenerationetc.,)
(II)Activity1. Construction, operation or decommissioning of the Project involving actions,
whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
No
LandreservedforResidentialDevelopment.
1.2 Clearance of existingland, vegetation andbuildings?
No Siteisvacant
1.3 Creation of new landuses?
No The land is reserved for residentialdevelopmentasperRegionalPlanof27village
1.4 Pre‐constructioninvestigations e.g. borehouses,soiltesting?
Yes Soilsamplestakenwithintheplotpremisesforgeotechnicalinvestigation
1.5 Constructionworks?
Yes Residential and Commercial Buildings will beconstructed.
1.6 Demolitionworks?
No Notapplicableasthesiteisvacant.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20064
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
No Localworkerswillbedeployedforconstructionworks.
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
Yes Excavation will be carried out for foundationpurpose.Mostoftheexcavatedsoilwillbeusedforbackfillingatprojectsiteonly.
1.9 Underground worksincluding mining ortunneling?
No
1.10 Reclamationworks? No
1.11 Dredging?
No
1.12 Offshorestructures? No
1.13 Productionandmanufacturingprocesses?
No Thisisaconstructionproject
1.14 Facilities for storage ofgoodsormaterials?
Yes Only construction material will be stored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Solid waste will be treated by mechanicalcompostingmethod(Ecobio‐compack).Sewage generated from the complex will betreated inSewage treatmentPlant. Theexcesstreated water will be directly disposed off inSewerLines.ThetreatedwaterwillbeusedforflushingandGardening.The dried sludge and compostwill be used asmanureforlandscaping.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
No
1.17 Newroad,railorseatrafficduringconstructionoroperation?
No Existing road network will be used duringconstructionandoperationphaseofproject.
1.18 New road, rail, airwaterborne or othertransport infrastructureincludingneworalteredroutes and stations,ports,airportsetc?
No Existing road will be used for the transportpurpose.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20065
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata
1.19 Closure or diversion ofexistingtransportroutesorinfrastructureleadingto changes in trafficmovements?
No
1.20 New or divertedtransmission lines orpipelines?
No
1.21 Impoundment,damming, culverting,realignment or otherchanges to thehydrology ofwatercourses oraquifers?
No
1.22 Streamcrossings? No
1.23 Abstraction or transfersofwaterformgroundorsurfacewaters?
No
1.24 Changesinwaterbodiesor the land surfaceaffecting drainage orrun‐off?
No Therewill not be any changes inwaterbodiesorthelandsurface.
1.25 Transport of personnelor materials forconstruction, operationordecommissioning?
Yes Construction workers and constructionmaterialduringconstructionphase
1.26 Long‐term dismantlingor decommissioning orrestorationworks?
No
1.27 Ongoing activity duringdecommissioning whichcouldhaveanimpactontheenvironment?
Yes Dust generation and increase in Noise levelsduringconstructionactivity.
1.28 Influx of people to anarea in eithertemporarily orpermanently?
Yes Construction workers during constructionphaseandadditionalresidentsduringoperationphase
1.29 Introduction of alienspecies?
No No introduction of alien species will occur asthisispurelyresidentialproject
1.30 Lossofnativespeciesorgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions?
No No
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20066
2 Use ofNatural resources for construction or operation of the Project (such asland, water, materials or energy, especially any resources which are non‐renewableorinshortsupply):
Sr.No. Information/checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates,whereverpossible)withsourceofinformationdata
2.1 Landespeciallyundevelopedoragriculturalland(ha)
No LandisreservedforResidentialDevelopment.
2.2 Water(expectedsource&competingusers)unit:KLD
Yes Source:MIDC
Proposed Unit
TotalWaterRequirement
1774 KLD
ThedetailedwaterbalanceforoperationphaseofprojectisattachedasAnnexureIV
2.3 Minerals(MT) NA 2.4 constructionmaterial–
stone,aggregates,sand/soil(expectedsource–MT)
Yes Stone,aggregates,sanddemandwillbemetfromlocalopenmarket
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)
2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes Source:MSEDCL
Proposed Unit
PowerRequirement
110 MW
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concerns aboutactualorperceivedriskstohumanhealth.
Sr.No. Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes Used oil from DG set will be storedseparately and will be given to authorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)
No
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20067
Sr.No. Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No Notapplicable
3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,
Yes
There will be minor negative impact ofproposed development on Hospital andSchoolbuildingsetc.
3.5 Anyothercauses No
4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates,whereverpossible)withsourceofinformationdata
4.1 Spoil,overburdenorminewastes
No
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes MunicipalSolidWaste Proposed Unit
TotalSolidWaste
7433
kg/day
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
Yes Used oil from DG set will be given toauthorisedrecyclers
4.4 Otherindustrialprocesswastes
No No, This is a development of residentialbuildings
4.5 Surplusproduct No NotApplicable
4.6 Sewagesludgeorothersludgefromeffluenttreatment
Yes 17m3/dofsludgewillbeusedasmanure
4.7 Constructionordemolitionwastes
Yes Construction debris during constructionphase will be utilized in plot only for landlevelling.
4.8 Redundantmachineryorequipment
No
4.9 Contaminatedsoilsorothermaterials
No
4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)
Sr.No.Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20068
5.1 Emissionsfromcombustionoffossilfuelsfromstationaryormobilesources
Yes EmissionfromDGsetsduringpowerfailureandmovementofvehicleduringoperationphaseoftheproject
5.2 Emissionsfromproductionprocesses
No NotApplicable
5.3 Emissionsfrommaterialshandlingincludingstorageortransport
Yes Fugitiveemissionfromhandlingsuchassandandotherconstructionmaterial
5.4 Emissionsfromconstructionactivitiesincludingplantandequipment
Yes Transportationofconstructionmaterial&handlingofsand,aggregates,cement,DGsetsetc.Theemissionsfromconstructionmachinerywouldcontainparticulates,SOx,NOxandCO
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedustOdour from Solid waste management andsewage treatment plant area if not handled itproperly
5.6 Emissionsfromincinerationofwaste
No NotApplicable
5.7 Emissionsfromburningofwasteinopenair(e.g.slashmaterials,constructiondebris)
No NotApplicable
5.8 Emissionsfromanyothersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No.Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata
6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers
Yes Increase in noise levels due to operations ofconstructionequipments&vehicularmovement
6.2 From industrial orsimilarprocesses
No NotApplicable
6.3 Fromconstructionordemolition
Yes Increaseinnoiselevelsduringconstruction.
6.4 Fromblastingorpiling Yes Duringpilling6.5 Fromconstructionor
operationaltrafficYes Duringconstructionandoperationphaseof the
project.In theoperationphasetherewillbe increase inthe vehicular movement because of theresidentsandvisitors
6.6 Fromlightingorcooling No NotApplicable
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20069
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata
systems6.7 Fromanyothersources No NotApplicable
7. Risks of contamination of land or water from releases of pollutants into thegroundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
No The used oil from DG sets will be given toauthorisedrecyclers
7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)
No Sewage generated from the complex will betreatedinSewageTreatmentPlant. Therestofthe sewage & excess treated will be directlydisposedoffinSewerLines.ThetreatedSewagewillbeusedforflushingandGardening.
7.3 By deposition ofpollutantsemittedtoairinto the land or intowater
No NotApplicable
7.4 Fromanyothersources No NotApplicable
7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?
No NotApplicable
8. RiskofaccidentsduringconstructionoroperationoftheProject,which
couldaffecthumanhealthortheenvironment
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
Yes Spillageofusedoil fromDG setsandexplosioninDiesel storagearea.Adequate fireprotectionmeasureswillbetakenupasperthefireNOC.
8.2 Fromanyothercauses
Yes Accidents during construction phase (Slips,fallfromheight,fallingofobjects/materialonworkers, fire, cut and burns, electric shock
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200610
andcollapseofshuttering Fireduetoshortcircuiting Terrorism
8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
Yes The proposed structure is designed as perSeismicZoneIIIstandards.
Theprojectareadoesn’thavehistoryofflooding
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which
couldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
9.1
Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:
•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other
No
The proposed project is a Construction ofResidential cum Commercial Project. Theproposed site is located in an urbanised areaand hence the infrastructural facilities alreadyexist.
9.2 Leadtoafter‐useofthesite, which could havean impact on theenvironment
No NotApplicable
9.3 Set a precedent forlaterdevelopments
No NotApplicable
9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects
No At present there is no major ongoingconstructionprojectofsimilarintensity.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200611
(III)EnvironmentalSensitivity
Sr.No.Areas
Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18km
2 Areaswhichareimportantorsensitiveforecologicalreasons‐Wetlands,watercoursesorotherwaterbodies,coastalzone,biospheres,mountains,forests
Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18kmUlhasriver:3.6kmNiljeLake:1.4kmDesaiRiver:1.8km
3 Areasusedbyprotected,importantorsensitivespeciesoffloraorfaunaforbreeding,nesting,foraging,resting,overwintering,migration
Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18km
4 Inland,coastal,marineorundergroundwaters
Yes Ulhasriver:3.6kmNiljeLake:1.4kmDesaiRiver:1.8km
5 State,Nationalboundaries
No
6 Routesorfacilitiesusedbythepublicforaccesstorecreationorothertourist,pilgrimareas
No
7 Defenceinstallations No
8 Denselypopulatedorbuilt‐uparea
Yes Fullyurbanisedarea
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
Yes Hospitals,schools,communityfacilities,&placesofworshiparepresentnearsite.
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
Yes SanjayGandhiNationalPark:14kmTungareshwarWildlifeSanctuary:18kmUlhasriver:3.6kmNiljeLake:1.4kmDesaiRiver:1.8km
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200612
Sr.No.
Areas
Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
No
12 Areassusceptibletonaturalhazardwhichcouldcausetheprojecttopresentenvironmentalproblems(earthquakes,subsidence,landslides,erosion,floodingorextremeoradverseclimaticconditions)
No
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200613
(IV). ProposedTermsofReferenceforEIAstudies
AttachedIherebygivenundertaking that thedata& informationgiven in theapplication&enclosuresare true to thebest ofmyknowledge&belief& I amaware that if anypartof thedata andinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:30.05.2017 Place:Thane
Mr.BharatNarasanaDirector
AanantDevelopersPvt.Ltd.PowerofAttorneyHolder
ForPremierAutomobilesLtd.
Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:
1) The projects involving clearance under Coastal Regulation Zone Notification,1991shallsubmitwith theapplicationaC.R.Zmapdulydemarcatedbyoneoftheauthorizedagencies,showingtheprojectactivities,w.r.tC.R.Z(atthestageofTOR) and the recommendations of the State Coastal Zone managementAuthority(atthestageofEC).Simultaneousactionshallalsobetakentoobtaintherequisiteclearanceunder theprovisionsof theC.R.ZNotification,1991 fortheactivitiestobelocatedintheCRZ.
2) The projects to be located within 10 km of the national Parks, Sanctuaries,
BiosphereReserves,MigratoryCorridorsofWildAnimals,theprojectproponentshall submit themap duly authenticated by ChiefWildlifeWarden showingthese features vis‐avis the project location and the recommendations orcommentsofthechiefWildlifethereon.(atthestageofEC)
3) All correspondence with the ministry of Environment & Forests includingsubmission of application for TOR/Environmental Clearance, subsequentclarifications asmay be required from time to time, participation in the EACmeeting on behalf of the project proponent shall bemade by the authorisedsignatory only. The authorised signatory should also submit a document insupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200614
APPENDIX‐II
(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)
1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)
1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.
ProposeddevelopmentisinlinewithRegionalPlanof27village.Followingdocumentsareattachedassupportingdocuments.
1. ConceptualPlanandDetailedTenementstatementareattachedasANNEXUREII
2. LocationPlanisattachedasANNEXUREIII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
Proposed Unit
TotalPlotArea 3,62,647.96 m2
FSIProposed 6,90,387.20 m2
NonFSIArea 4,83,270.8 m2
TotalConstructionArea 11,73,658 m2
Waterconsumption
Proposed Unit
TotalWaterConsumption
1774 m3/day
EnergyConsumption
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200615
Proposed Unit
PowerRequirement 110 MW
ParkingProvided
FourWheeler 3778 Nos.
TwoWheeler 11334 Nos.
Connectivity Proposedsiteisaccessibleby‐KalyanShilPhataRoadand30mwideDPRoad.LocationPlanisattachedasANNEXUREIII
1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
Theprojectbeingawell‐plannedactivitywill resultinorganizedopenspacesandgreenareas.Therewillbe minor negative impact on flora present in andaround the project site during construction phasemainlyduetodust.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themainreasonsforerosionareoverexploitationofgroundwater, instable slopes, landslides etc. Theproposedconstructionwillinvolvecuttingandfillingoperations. The projectwill involve construction ofroadsanddevelopmentofgreenareas,whichwouldreducethechancesoferosionandsubsidence.Subsidenceisnotanticipatedasgroundwaterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
No.Therewillnotbeanyalterationofnaturaldrainagesystem.Thelandisflat.ThenaturalslopeoftheareaistowardsSouthside.
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
Therewillnotbeanytransportoffillmaterialsfromoutside.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200616
1.7 Givedetailsregardingwatersupply,wastehandlingetc.duringtheconstructionperiod.
Supply Source: Water for Domestic consumptionwill be available from MIDC whereas forConstruction purposes Tanker water/treatedwaterfromnearbySTPwillbeused.Storage:Water for constructionwill be stored in atank constructed temporarily at site whereasDomesticwater fromMIDCwill be stored in HDPEtanks.
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
No wet lands and low‐lying areas on the site.Received
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazardisanticipated.
2. WATERENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreak‐upofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
TotalWaterrequirement:1774KLDDetailedwaterbalanceisenclosedasANNEXUREIV
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
TheproposedwaterdemandwillbemetfromMIDC
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
WatersupplyisfromMIDC
2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)
TreatedwaterfromSewagetreatmentPlantwillbeusedforflushingintoiletandgardening
TotalSewagegenerated 1673KLD
Treatedwaterrecycledforflushing
915KLD
Sludgeforcomposting 17KLD
HVACMakeup 526KLD
ExcessTreatedwater 0KLD
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200617
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total Sewage of about 1673 KLD will begenerated from the project. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment
Parameters Values Units
pH 7‐8 mg/l
BOD 250‐300 mg/l
COD 450‐600 mg/l
O&G/ABS 10‐20 mg/l
TSS 100‐200 mg/l
Mitigationmeasures:TheSewagewillbetreatedintheSewageTreatmentPlantswithtotalcapacity1750m3/day.Thetreatedwaterwillbereusedforflushingandgardening.
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
Rainwaterharvestingtankswillbeprovided
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
There will not be changes in land use as this isresidential development project. The stormwaterdrainsarepresentonsite.
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasMIDC.Thegroundwatertableisat3.0to4.0m.
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
Followingmeasureswillbetakenuptopreventthe
runofffrompollutinglandandgroundwater
Noexcavationduringmonsoonseason.
Catchdrainageallalongtheperipheryofplottopreventsurfacerunoff.
Useofsiltfenceandtrapstoreducetherunoff
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200618
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.
Thestormwaterdrainswillbeprovidedatgroundlevels. So there will not be problem of waterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No, thedeploymentof construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises. The unsanitary condition will beremoved by means of providing readymadeModulartoiletsSolidwastewillbedisposedoffinmunicipalwastedisposalsystem.
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
ConstructionPhase:Sewagewillbetreatedinseptictank.Theoverflowofseptictankisdischargedinsewerline.OperationPhase:The Sewage Treatment Plant is designed to treatthe sewage generated from the proposed project.The total capacity of Sewage treatment plants are1750m3/day.
2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.
Yes,Theproposeddevelopmentwillhavethedualplumbingsystemasthetreatedsewagewillbeusedforrecycling.
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)
Thereisnosensitiveecosystempresentatsitethatwillbedisturbedbytheproject
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
Thetreescomingunderbuildinglinewillbecut
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
The green belt of 43016.27m2will be developedfor control of pollution and aesthetic view of thecomplex.Total2150treeswillbeplantedinthepremises.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200619
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
5. AIRENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
The Projectwill result inmarginal increase in theatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic. Theproposed activitywill not result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM, NOX and COemissions are expected due to fuel combustion ingeneratorsets.
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
Theprojectwillhaveproperentryandexitforthevehicles.TheprojectsiteisaccessedbyKalyan‐ShilPhataRoadand30mwideDProad.Therewillnotany traffic congestion due to project site. Inproposedprojectprovisionof3778(fourwheelers)parking spaces has been made. Two WheelerParkingProvidedis11334nos.
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinannegativeimpact.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200620
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Increase innoise levels are expected fromvariousconstructionequipmentandmachinery.
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganised open areas and landscaped areas are atthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Therewillnotbeanyadverseimpact
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites orartefactsarefoundnearthesitearea.
7. SOCIO‐ECONOMICASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majorityof the labourwillbe recruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.within5to6kmradiusofprojectsite.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Projectwill have positive impact on localcommunities.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200621
8. BUILDINGMATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)
Yesthebuildingmaterialswithhighembodiedenergywillbeused
8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill be used. Regularmaintenance ofthe equipment’s will be carried out. Theconstruction activities will be carried out duringthe daytime only. The constructionsmaterials/excavated soil/construction debris willbe carried thorough covered trucks. The workersexposed to high noise generating would beprovidedwithearplugs.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Flyashincementconcrete.Typically20‐25%offlyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration. Proposed UnitSolidwastegenerated
7433 kg/day
Thebiodegradablewaste4460kg/daywillbetreatedbymechanicalcompostingmethod
Thenon‐biodegradablewaste2973kg/daywillbedisposedoffthroughrecyclers.
9. ENERGYCONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.
Proposed Unit
PowerRequirement
110 MW
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200622
9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?
DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.DGSetrequirement:Total16,500kVA(D.G.SetprovisionismadeforemergencybackupofLift, Sewage Treatment Plant, water and FirePumps)Sourceofpowersupply:MSEDCL
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
DoubleglazedglassforResidentialbuildings
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such awaythatsolarlightcanbeutilisedmaximumfordaytime.
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas such asopenspaces,pathways,RGetc.
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Theproposedresidentialbuildingwillhaveshadingarrangement.
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes.Theroomswillbesodimensionedthateffectiveairconditioningcanbecarriedout.Publicareaswillbe cooled by natural ventilation. The design of thebuildingwill be such thatmaximumuse of naturalventilation can be achieved. The walls, roofs andopenings will be so designed that influx of heat isminimum.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200623
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaself‐assessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heat emission from the proposed construction canbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipment’s/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheat generatedwill not be significantandwill bedissipated in the lush greens andopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/K
Roof 0.47 Watts/hr/m2/K
Wall 0.57 Watts/hr/m2/K
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall compromise ofhydrant system and portable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteel firehosecabinet(weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.External firehydrantsshallbe locatedsuchthatnoportion of any building ismore than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat
thewindowsaresealed,willbeprovided. Summer cross section ventilation will be
maximum.
9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigation
EnclosedasAnnexureV
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200624
measuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200625
ANNEXUREI
AreaStatement
Details Area UnitPlotarea 3,62,647.96 m2FSIArea 6,90,387.20 m2NonFSIArea 4,83,270.8 m2TotalConstructionArea 11,73,658 m2
TENEMENTSTATEMENT
RESIDENTIALBUILDINGS
BLDGTYPE FLOORSNO.OFBLDGS
NoofFlats
Residential S+22Floors 14 1190COMMERCIALBUILDINGS
BLDGTYPE FLOORSNO.OFBLDGS
FSIAreaInSq.M.
Commercial G+11floors 5 212287.56
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200626
ANNEXUREIICONCEPTUALPLAN
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200627
ANNEXUREIIILOCATIONPLAN
Project Site
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200628
ANNEXUREIV
WATERBALANCESTATEMENT
ParticularsNoofFlats
/rooms/CarsOccupancy
TotalPopulation
TotalWaterRequirement/
person
WaterDemandKLD
Domestic Flushing
ResidentialBuildings
1,190 5 5,950 90 45 135 803
Commercialarea212287.56
1person/10m2 21,229 15 30 45 955
Floatingpopulation
1,060.00 5 10 15 16
Total 28,239 1,774
SewageGeneration
1,673
Sludge1%ofSewageGeneration
17
RecyclingforFlushing
ResidentialBuildings
1,190 5 5,950 45 45 268
Commercialarea 2,12,288 1person/10m2 21,229 30 30 637
Floatingpopulation
1,060 10 10 11
Total 28,239 915
Gardening 43,016 5l/m2 215
HVACMakeup 526
ExcessTreated
WatertoSewer
Lines
‐
WaterRequirementBasis(inlpcd)*
90%ofFreshand100%ofFlushingWaterRequirement
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200629
ANNEXUREVEnvironmentalManagementPlanduringConstructionPhase
Sr.No.
EnvironmentalComponents Predicted
Impacts
ProbablesourceofImpact
MitigationMeasures Remarks
CONSTRUCTIONPHASE
1.AmbientAirQuality
Negativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipment’s
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise Negativeimpactnearnoise
Useofwellmaintainedequipment.
generationsourcesinside
Noisegeneratedfrom
Heavyconstructionactivitylimitedtoday‐
Temporaryimpactsduring
premises.Nosignificantimpacton
constructionactivitiesandoperationofconstruction
timehoursonly.Useofnoisemufflersinandconstructionvehicle.
constructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.
ambientnoiselevelsinthe
equipmentandDGsets
surroundingarea.
Useofearplugs/muffsbyconstructionstaff.
3. WaterNosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,waste
Reutilizationandrecyclingofconstructiondebris
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200630
Sr.No.
EnvironmentalComponents Predicted
Impacts
ProbablesourceofImpact
MitigationMeasures Remarks
fromlabourcamp.
Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. AestheticsMinornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200631
EnvironmentalManagementPlanduringFunctionalPhase
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures Remarks
FUNCTIONALPHASE
1.AmbientAirQuality
MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
Useoflowsulphur
goodfuel
Periodic
maintenanceofDG
sets
UseofCNG/LPGas
afuelshouldbe
encouraged.
DGsetswillbeused.
2. Noise
Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsets
inbuildingswith
appropriate
acoustics.
Traffic
management
measuresto
reducenoise
Appropriatetrees
whichwillactas
noisesbarriers
willbeplantedin
thepremisesand
alongroadside.
‐‐
3. Water
Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater
Sewagewaterwill
betreatedand
recycled.
Rainwater
harvestingand
rechargeof
groundwater
aquiferis
proposed.
Good
housekeepingand
stormwater
managementwill
befollowed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. LandNonegativeimpact
Storageanddisposalofsolid
Treatmentand
reuseofsewageSegregationofdryandwet
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200632
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures Remarks
wastes.Dischargeofsewage.Fuelandmaterialspills.
water.
Integratedwaste
managementand
spillcontrolplan
Drygarbagewill
besentfor
recyclingandwet
garbagewillbe
composted.
garbagebeforewillbedonebeforedisposal.
5. BiologicalOverallPositiveimpact
Habitat
disturbance
Greenspaces
insidethe
premiseswillhelp
tocompensatethe
earliereffectfrom
vegetation.
Landscapingand
extensive
plantationinthe
premises.
Landscapingwill
helpinreducing
anyadverse
impactsonair
andnoise
quality.
6.Socio‐economic
Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐Positiveandlongtermimpact‐
FUNCTIONALPHASE
7.TrafficPattern
NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
Traffic
Management
practiseswillbe
employed.
Adequateparking
spacewillbe
providedinthe
premises.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialcumCommercialProjectatKalyan
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200633
CONCEPTUALPLANATTACHED