    Seoul FLNG Conference, 25 October 2011

    Philip Eystein Fjeld

    Chief Executive Officer

    FLEX LNG

    Collin F Visaggio

    Chief Financial Officer

    InterOil Corporation

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    2/39

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    3/39

    InterOils Vision

    Papua New GuineaPoised to Join the Ranks of Asian LNG Suppliers

    3

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    4/39

    InterOil A Trusted PNG Partner That Delivers

    InterOil is a domestic company (PNG Only)looking for long-term sustainable economicdevelopment for the nation, InterOil, and thecitizens of PNG.

    InterOil considers itself a partner with thecountry, its people, and government.

    InterOil acts in good faith, using best efforts forall stakeholders.

    4

    nter as a proven an a r trac recor .

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    5/39

    InterOil Vertically Located and Positioned for Growth

    5

    Exploration Portfolio3.9 million acres

    Midstream Portfolio - Refinery36, 500 bpd capacity

    Downstream DomesticDistribution

    MidstreamLNG Project

    Condensate Stripping ProjectGenerates Early Cash Flow

    and Revenue to AllStakeholders

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    6/39

    The World Woke Up: A World Record Rate of Over 700 MMCF/D

    6

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    7/39

    The Resource: 2010 Third Party Resource Estimate of Elk and AntelopeUnderpins a large LNG development with a 5% increase over 2009

    As at December 31, 2010 Case

    Low(C1)

    Best(C2)

    High(C3)

    Initial Recoverable Sales Gas(Tcf) 6.47 8.59 10.44

    Initial Recoverable Condensate (MMBbls) 105.3 128.9 151.4

    Initial Recoverable MMBOE 1,183.6 1,560.4 1,891.1

    Gross Contingent Resource Estimate for Gas and Condensate as of December 31, 2010

    An evaluation of the potentialresources of gas and condensate forthe Elk/Antelope field has been

    completed by GLJ PetroleumConsultants Ltd., an independentqualified reserves evaluator, as ofDecember 31, 2010

    The estimates presented are inaccordance with the definitions anduidelines in the COGE Handbook

    and Canadian NI 51-101

    Gas in place increased almost 1TCFfrom 2009 to 2010

    C1 enough to produce 8mtpa LNG, and C2 enough to produce 11 mtpa, for 15 years

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    8/39

    InterOil Has a Proven Track Record in Papua New Guinea

    InterOil was formed in 1997 - Vision to create an integrated energy company

    Exploration licenses signed under incentive program - 2003 Elk-1 discovery of Elk fault block 2006

    Antelope-1 discovery of Antelope reef 2008 Third-party certified contingent resources estimate 2009 over 3.8 Tcfe ~ 630 mmBOE* Third-party certified contingent resources estimate 2010 over 9.1 Tcfe ~ 1.52 BBOE* Third-party certified contingent resources estimate 2011 over 9.4 Tcfe ~ 1.56 BBOE* Potential for 2.5 Billion BOE

    8

    Refinery commissioned in 2004, Mechanical completion - 2006

    Completed refinery project agreement Secured land rights - harbor rights OPIC Financing

    Distribution asset acquisitions to vertically integrate with refinery - 2003/2005 Purchased distribution assets from BP and Shell in PNG

    InterOil Gulf LNG Project Current Activity Start-up configuration of:

    Condensate stripping plants 3 mtpa land-based, modular LNG plant 2 mtpa fixed floating LNG plant Gas and liquids pipeline to LNG plant and Jetty on the coast Ramp up LNG to 8 mtpa

    *

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    9/39

    Papua New Guinea is Now Poised to Emergeas a Global LNG Supplier

    Two LNG Project Agreements approved bythe PNG Government

    InterOil led Gulf LNG Project

    5 mtpa start-up capacity

    Expansion to 10.8 mtpa

    Exxon led PNG LNG Project

    9

    .

    Expansion to ~ 10 mtpa

    Largest carbonate reef trend in Asia

    World-class exploration potential

    Active Highlands area

    Strong off-shore Gulf area

    A number of new Potential LNG players

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    10/39

    World Class Hydrocarbon Province InterOils 3.9 Million Acres

    10

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    11/39

    Attractive Economics Relative to Asia-Pacific LNG Projects

    Natural Gas Supply - InterOil

    High productivity reservoir >300 Mmcf/d Antelope flow

    tests

    Tests indicate 5-6% CO2

    InterOil field tested over 20 Bbls/MMcf of condensate

    Minimal pre-LNG processing requirements

    Favorable Geography

    Protected geographic region

    Onshore, near coast (115 Km)

    Close to largest global LNG market

    11

    Proposed Infrastructure CSP EPC bids in, Mitsui to optimise financing

    Mid-size LNG plant funded by EWC

    Fixed-floating FLNG plant funded by Samsung and FLEX LNG

    InterOil LNG plant and infrastructure costs well below competitiveproposals

    Fiscal Policy 30% flat tax rate

    Major project incentives and exemptions available from the State

    Government resource project protection

    Experienced LNG Management Team

    Marathon EGLNG Team Members now at InterOil and affiliates

    EG LNG project completed ahead of schedule and under budget

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    12/39

    InterOil Gulf LNG Development Map

    Upstream Gas ProjectPetroleum Development Licence

    Elk and Antelope Fields Elk Antelope fields, - 8.59 tcf Recoverable Sales Gas, and 129 mmbbls

    Condensate (2C resource) 7 to 12 wells producing up to 200 -400mmscfpd each (initial capacity) 1 water reinjection well and 1 surveillance well Compression facilities

    Condensate Stripping Facilities 12-14 Infield gas gathering pipelines

    Fields to CSP wet gas trunk line Condensate stripping plants - up to 1.8 BCF capacity Produced water re-injection pipeline from CSP to fields injection well

    Pipeline Licence CondensateCondensate Pipeline ~120km buried 12 3/4 condensate pipeline from CSP to condensate

    storage tanks at Gulf 100,000bbl condensate storage tank at the Gulf with plans to add

    additional tanks when needed

    Development Map

    PDL Elk AntelopePDL Elk Antelope

    12

    Midstream LNG ProjectPipeline License Gas

    Dry Gas Pipeline ~120km buried 32 dry gas pipeline from CSP to liquefaction plants at

    Gulf and a 12-20 pipeline to floating LNG at jetty export terminalfacilities

    Petroleum Processing Facilities Licences

    Liquefaction Facilities Liquefaction plants land based and fixed floating of 11 mtpa capacity LNG storage tanks 180,000 m3

    Pipeline connecting the LNG storage tanks to the export terminalloading facilities

    LNG loading facilities Return pipeline from loading facilities to liquefaction plants and LNG

    storage tanks (6000m x 0.5m)Export Terminal and Common Facilities ~6km breakwater, causeway, moorings and jetty Offices, warehouses and accommodation

    on ensa e recovery p pe ne rom que ac on p an s o con ensa estorage tanks

    Pipeline connecting condensate storage tanks to ship loading facilities Condensate ship loading facilities

    PPFL LandPPFL Land

    PPFL Fixed FloatingPPFL Fixed Floating

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    13/39

    Lessons from EGLNG and Others: US$1.2 Billion in Pre-FIDinvestments to maintain schedule 2014 LNG Start-Up

    Ordering up to $100 million of:

    Condensate Line Pipe

    Processed gas Line Pipe

    13

    Critical long lead infrastructure

    Purchased over $20 million inConstruction Equipment:

    Dump Trucks

    Bulldozers

    Excavators

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    14/39

    InterOils Gulf LNG Project Update and Future Milestones

    InterOil is moving ahead to reach FID

    LNG facilities increased from 2mtpa to 5mtpa withSamsung & FLEX LNG fixed floating proposal,targeting 8mtpa

    CSP facilities re-engineered for increased

    production volumes are nearing completion & readyfor bid

    Pipelines for natural gas and condensate have beendesigned to handle the capacities required for ourtarget LNG volumes

    14

    LNG with Energy World is almost complete

    Continuing LNG pre-investment to lower bidderrisks and secure lower project costs

    LNG off-take HOA was signed with Noble Group for1 mtpa for 10 years, in addition to the 300,000tonnes per annum dedicated to the PhilippinesPower Project

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    15/39

    InterOils #1 Priority is Achieving CSP and LNG Project FIDs

    Making good progress on early development requirements

    Increasing local employment, InterOil is already one of the largest employers in PNG

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    16/39

    The LNG Plants: EWC LNG & FLEX LNG /Samsung Project Partnerships

    On February 2, 2011, InterOil and PACLNG and Energy WorldCorporation completed final documentation for a 3 mtpa plant.

    The initial 3 mtpa modular LNG plant is expected to process anestimated 2.25 Tcf of natural gas over 15 years.

    On April 11, 2011, InterOil and Pacific LNG Operationsexecuted agreements with FLEX LNG LTD and SamsungHeavy Industries for a floating liquefaction project in PapuaNew Guinea with targeted start of LNG production in 2014.

    The FLNG vessel will be moored alongside the jetty and have a

    16

    . -

    LNG per annum.Samsung provides the construction financing and allperformance guarantees for the FLNG vessel

    ,agreed deductions and premiums, 14.5%of the proceeds from the sale of LNG bythe upstream partners from the FLNGvessel for an initial 15-year period.

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    17/39

    InterOil Engages Advisors on Sale of Interest in Resource and Exploration

    InterOil has retained Morgan Stanley, Macquarie and UBS as jointfinancial advisors to assist InterOil with its evaluation ofproposals from potential strategic partners in the liquefied naturalgas project

    Obtain an internationally recognized LNG operating partner

    Accelerate the LNG capacity to 7.6 mtpa or more

    Partial sale of an interest in the Elk and Antelope fields

    Possible LNG off-take

    Possible participation in InterOils exploration tenements in Papua

    17

    The timing is right for engaging in partnering process

    Strengthening Asian LNG market, >$17/mcf spot prices

    Company has received proposals from internationally recognizedLNG operators

    Increased interest in exploration and investment in PNG

    Third annual Elk and Antelope resourse estimate supports LNGproject

    Substantial progress in LNG project engineering and design

    Opportunity to book proven reserves on declaration of FID

    Spudding of Triceratops 2 well this quarter.

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    18/39

    In Summary

    Papua New Guinea was an under-discovered frontier, with world class assetsstrategically located on the doorstep of LNG Asia: Ignored and bushed aside bymost majors

    The world awoke to PNGs LNG Value as Spot Prices near US$19/mmbtu

    Quality gas for the Asian LNG Buyers, with diversification from Qatar and Australia

    Vast exploration and resources to ensure reserves for all stakeholders

    Modular LNG can build 20 to 30 mtpa of LNG capacity in PNG

    nd

    18

    ,

    InterOil has a significant F&D advantage, and early cashflow with Modular and FLNGdevelopment

    15 years in PNG with the best track record in PNG Exploration

    The only PNG refinery operator providing operator advantages for LNG

    Bottom line: PNG passed the turning point for LNG; and is now on the path to beinga Major Supplier of clean energy as a portfolio including FLNG with Korea

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    19/39

    InterOil: Working with all stakeholders and the future of Papua New

    Guinea

    19

    An Energy Company With Innovated LNGDevelopment and Loyalty to PNG

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    20/39

    Gulf LNG ProjectThe Worlds First FLNG Project

    London, 30th July 20109th May 2011

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    21/39

    FLEX LNG Ltd Brief introduction

    FLEX LNG is a pure-play developer of floating liquefaction projects

    Lump-sum, turnkey EPCIC for entire unit (hull and topsides)

    Long-standing partnership with Samsung Heavy Industries

    Pure FLNG Provider

    Firm orders

    Strong SHI support

    21

    Strong shareholder base (K-Line and InterOil among the largest

    shareholders)

    Offering an advanced and mature FLNG design

    LNG Producer offers great adaptability for different applications

    Gulf LNG project being developed together with InterOil Corp. andpartners for an at-shore FLNG project in Papua New Guinea

    Strong shareholder base

    Mature FLNG concept

    Large adaptability

    Delivery in 2014

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    22/39

    Gulf LNG Project FLNG Scope and Interfaces

    Samsung Heavy Industries

    FLNG FEED for Gulf LNG Project

    FLNG vs Onshore Development Costs

    Summary

    22

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    23/39

    Gulf LNG Project- FLEX LNG interfaces and battery limits

    FLEX LNG Scope

    23

    Includes the LNG FPSO + LNGoffloading-arms.

    Excludes breakwater, FSU, LNGC

    Battery limits:-Feed gas loading arms-LNG jettyhead manifold-Mooring lines & fender dolphins

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    24/39

    Main Particulars LNG FPSO Gulf LNG Project

    Main particulars (preliminary)Length overall (approx) 276 m

    Breadth, moulded (approx) 50.0 m

    Depth to upper deck, moulded (approx) 32 m

    Full load draught (approx) 13 m

    LNG Storage Capacity (approx) 170 000 m3

    Condensate Storage Capacity (approx) 5 000 m3

    LNG Production Capacity (approx) 2 mtpa

    24

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    25/39

    Offshore Marine Infrastructure

    The offshore marine infrastructure willbe located 6-7 km from the shoreline inapproximately 15 m water depth

    The offshore marine infrastructure willconsist of the following:

    A breakwater

    A single LNG FPSO jetty berth consistingof a single jetty head, and anarrangement of mooring dolphins, fenderdolphins and a HP feed gas transfer

    system A dual berth for the LNG offtake vessel

    and a Floating Storage Unit comprising ofa dual jetty head and an arrangement ofmooring dolphins, fender dolphins andLNG loading arms

    Tug berth

    25

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    26/39

    LNG FPSO Mooring to Jetty- Top view and side view

    The LNG FPSO mooring system will bedesigned according to offshore rules -DNV-OS-E301 Position Mooring

    The mooring system is to be designedfor the site specific 100 year returnwind, wave, current conditions(resulting wave and current conditionsbehind the breakwater)

    Top View

    26

    The offshore design philosophyrequires redundancy in the mooringlines and fenders at the 100 yearreturn metocean conditions

    The mooring arrangement will consist

    of between 18 to 20 mooring linesdeployed from the LNG FPSO tomooring dolphins

    Side View

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    27/39

    Ship to Jetty LNG and Gas Transfer

    Four 16 marine loading arms will beinstalled on the LNG FPSO midships

    Two loading arms will be dedicated forLNG, one loading arm will be a hybrid arm

    (capable of either LNG or vapour returntransfer) and one will be dedicated forvapour return

    The total LNG transfer flowrate will be10,000 m3/hr

    Gas transfer from the jetty head to the LNGPwill be performed by CNG gas loading arms

    This method of CNG transfer is proven froma number of operating jetty moored

    FSRU/Gas Port projects ie Pecem, GuanabaraBay (Brazil), Bahai Blanca (Argentina),Teeside (UK), Mina Al-Ahmadi (Kuwait)

    A single CNG loading can provide a gasflowrate equivalent to the maximum LNG

    27

    Production rate (310 mscfd) at 65 barg.

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    28/39

    Gulf LNG Project FLNG Scope and Interfaces

    Samsung Heavy Industries

    FLNG FEED for Gulf LNG Project

    FLNG vs Onshore Development Costs

    Summary

    28

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    29/39

    Benefits of Constructing in a Controlled Environment- SHI is arguably the best qualified yard to construct an LNG FPSO

    The FLNG unit is constructed in a highly efficient shipyard, utilizing existingproduction facilities and infrastructire. This results in better control overfactors such as:

    Samsung Marine Samsung Offshore

    Construction Schedule -known workshop capacity / production rates

    Quality Control -constructed in a clean, sheltered environment

    HSE Performance -mainly using the yards regular workforce

    CAPEX -benefits from existing, highly efficient infrastructure

    29

    FLEX LNG Producer

    scope

    Hull and Marine

    systems

    Topsides and

    Integration

    Production Capacity 5,400,000 GT/yr 160,000 mt/yr

    Products

    Crude Oil Tankers,Container Vessels,Cruiser & Ferries,

    Gas Carriers(LNG,LPG),FPSO, Drill ships, etc.

    Offshore Platforms,Drill ship, FPSO, FLNGTopsides,TLP, Semi Rig,

    Material HandlingEquipment,Desalination Plant

    Production (2009) 61 Vessels 12 Offshore Units

    Samsung Heavy Industries, Geoje - Korea

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    30/39

    EPCIC Contract With Samsung Heavy Industries- SHI takes the single-point responsibility for the entire LNG FPSO

    Contract Structure

    Single, lump-sum, turnkey EPCIC

    Hull and Topsides aligned under Umbrella contract

    Final lump-sum conversion after field-specific FEEDPerformance Guarantees and LDs

    Production capacity

    Fuel efficiency

    Plant reliability

    Defect rectification liability

    Contract Particulars

    30

    Technology risk mitigation

    Minimise risk for cost overruns

    Minimise risk for delays

    Minimise integration risks

    Favourable performance guarantees & LDs

    Engineering flexibility to adapt the design

    Optimised to Satisfy Lenders & LNG Offtaker

    Interests/Requirements Contract structure (i.e. single, lump-sum, turnkey)

    Risk allocation (Cost, Schedule, Performance, Integration)

    Alignment of interests Owner & Contractor

    Project Benefits: Favourable Risk Profile and Risk Allocation

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    31/39

    Gulf LNG Project FLNG Scope and Interfaces

    Samsung Heavy Industries

    FLNG FEED for Gulf LNG Project

    FLNG vs Onshore Development Costs

    Summary

    31

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    32/39

    Gulf LNG FEED Contract

    FEED period and resources

    May 2011 Nov 2011

    Currently more than 150 engineers mobilised to complete FEED for Gulf LNG project

    Main objectives Adapt the generic hull and topside design to match the field-specific requirements of the Gulf

    LNG project

    Provide a sound basis for lump sum based execution contracts (EPCIC contract and SBC)

    Prepare to start EPCIC works immediately following Final Investment Decision in December

    Hull FEED scope is executed by SHI shipbuilding division, Geoje, S. Korea

    Subcontractor IHI undertaking SPB tank design in Japan

    Topside FEED scope is subcontracted to WorleyParsons (WP) and is carried out atWPs office in London

    WP has teamed up with Kanfa Aragon, Costain Group, and NLI Engineering, which were allinvolved in the development of the generic design

    SHI is present at the WP office with a resident engineering team to control the FEED works

    32

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    33/39

    FLEX LNG

    Samsung Heavy Industries

    Project Execution- Contractor structure

    Lump sum turn key contract

    Overall project mgm. and interface mgm.

    FLEX LNG technical and commercial team manages SHI- Provide design basis and project specifications- Interface management towards InterOil (jetty, feed gas,etc.)

    Offshore Division

    Topside EPCTopside & Hull IntegrationTopside Commissioning

    Shipbuilding Division

    Hull EPCHull CommissioningGas & Sea Trials

    33

    Engineering & ProcurementSubcontrractor

    SHI resident engineering team to manage subcontractor

    Subcontractor to be nominatedOption: WorleyParsons

    SHIs specialised organisations & yard,Geoje, S. Korea

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    34/39

    Gulf LNG Project FLNG Scope and Interfaces

    Samsung Heavy Industries

    FLNG FEED for Gulf LNG ProjectFLNG vs Onshore Development Costs

    Summary

    34

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    35/39

    The Benefits of the FLNG are NumerousLow cost, early LNG, construction risk mitigation, and flexibility

    Work closely with the yard to ensure constructability of design

    -

    Maximize LNG production capacity within a standard LNG hull-size

    MinimizeCAPEX

    Modularisation

    Maximise use of proven technology and existing equipment ranges.Simplify the design and complexity

    Select inherently safe and robust technologies. Design for safety

    Minimize

    projectexecutionschedule

    Minimizetechnology

    andoperational

    risks

    35

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    36/39

    LNG Projects Are More Costly Than Ever to Develop- FLNG reduces CAPEX and has significant schedule advantages

    CAPEX/ton of installed liquefactioncapacity has during the last decademade a permanent shift from anaverage figure below 500 USD/ton toa typical range of range of 1500

    3000 USD/ton

    The IHS CERA Upstream Capital CostsIndex (UCCI) shows more than adoublin of costs in the oil and as

    Onshore LNG Development Costs Continue toIncrease

    210

    230

    210

    202

    201 207

    120

    140

    160

    180

    200

    220

    240

    UCCIInd

    ex

    industry. However, due to the

    uniqueness often attributed todeveloping LNG projects, current LNGdevelopment costs exceed theaverage for the oil and gas industry

    Traditional onshore liquefaction

    projects continue to overshoot onschedule and cost

    36

    Source: IHS Cambridge Energy Research Associates (IHS CERA)

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    0 2 4 6 8 10 12 14 16

    USD/tonliqu

    efaction

    capacity

    Annual LNG liquefaction capacity (mtpa)

    Source: FLEX LNG, Tri-Zen, Industry Reports

    FLEX LNG(2014)

    ALNG(Trinidad 2003)

    Gorgon LNG(late 2014)

    Pluto LNG(2011)

    Angola(late 2012)

    PNG LNG(2014)

    QCLNG(2014)

    GLNG(2014)

    Nov

    2005

    May

    2006

    Nov

    2006

    May

    2007

    Nov

    2007

    May

    2008

    Nov

    2008

    May

    2009

    Nov

    2009

    May

    2010

    Nov

    2010

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    37/39

    Gulf LNG Project FLNG Scope and Interfaces

    Samsung Heavy Industries

    FLNG FEED for Gulf LNG ProjectFLNG vs Onshore Development Costs

    Summary

    37

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    38/39

    FLNG is Revolutionising the LNG Industry.... and combined with the Gulf LNG Project offers an unique value proposition for PNG

    LNG FPSOs offer compelling arguments.....

    Lead time less than 50% of a traditional liquefaction project

    Unit CAPEX of less than 50% of cost of traditional onshore liquefaction capacity

    Strategic and commercial independence

    Increased revenue/taxation for host governments compared to traditionalonshore developments

    Considerably reduced environmental impact compared to a traditional onshoredevelopment

    .....and as the first FLNG units are deployed the industry will see thefollowing changes:

    LNG supply projects can be developed in 2-3 years

    LNG supply projects will appear in locations unimaginable today (i.e. liquefyingpipeline gas supplied from existing grid)

    Onshore liquefaction projects will have to innovate and become more cost

    effective to remain competitive Traditional end-users of LNG will integrate upstream and take control over their

    own LNG supply destiny

    Companies with no previous affiliation to the LNG industry will becomesubstantial LNG suppliers

    38

  • 8/3/2019 For Web FLEX LNG and InterOil Presentation at Seoul FLNG Conference 25 October 2011

    39/39

    Questions?

    Collin F Visaggio

    Chief Financial Officer

    InterOil Corporation

    Philip Eystein Fjeld

    Chief Executive Officer

    FLEX LNG