Project development tips
For the “JCM Model Project” Financing Programme
by the Ministry of the Environment, Japan
A r y a n i e A m e l l i n a
I n s t i t u te f o r G l o ba l En v i ro n m e n t a l St r a te g i e s
S e m i na r on t h e J C M i n I nd one s i a , F E B R U A RY 2 0 1 9
1
General selection criteria for JCM Model Project Financing Programme (excerpt)
2
Technology superiority and
inadequate utilization in Indonesia
Apply as international consortium
(participants from Japan and Indonesia)
Contributes to sustainable
development
Not receive other financial grant from the Government of
Japan
Robustness of project implementation
(40%)
Emission reductions amount and cost-
effectiveness (40%)
Potential of technology
dissemination (10%)
Concept for developing JCM
methodology and monitoring (10%)
More information: http://gec.jp/jcm/jp/wp-content/uploads/2018/08/tentative2018_Guidelines_for_Submitting_Proposals_2nd_Call.pdf
• Grants up to 50% initial investment costs
• Projects that reduce energy-related CO2 emissions
• Budget for financing is approx. USD 99 million in total for 2019-2021
• Project can collaborate with JICA or other government-affiliated financial institute
JCM Model Project
Selected projects will also receive technical support throughout project cycle
3
Project development and
consultations
Application for financial support
Methodology development
Project Design Document
+ Sustainable Development
Implementation Plan
Validation
Verification
+ Sustainable Development
Implementation Report
Credit Issuance
Governments Companies
MRV: Monitoring, Reporting, Verification
IGES supports participants of selected projects to develop methodologies, project design document, monitoring reports, issuance of credits
Technologies applied by JCM Model Projects
4
Source: MOEJ, as of 3 December 2018
(26)
Energy efficiency52%• Boiler
• Air Conditioning
• Refrigeration
• Chiller
• Looms
• Transformer
• Gas Co-generation
• LED Lighting
Renewable energy40%• Solar
• Micro hydro
• Wind
• Biomass
REDD+ 2%
• Controlling slash and burn
Transport 2%
• Digital Tachographs
• Modal Shift
• CNG-Diesel Hybrid
Waste 2%
• Waste to Energy
F-gas 2%
• Recovery & Destruction
Indonesia remains as a top choice for investment
5
While ensuring transparency and community engagement
6
Local stakeholders consultation and use of
mass media
Projects are open for public comments through
JCM website
Joint Committee decisions are published on JCM
websites
JCM Registry system is adopted by Japan and Indonesia
Issued credits are shown on JCM website
Q&A
tCO2
And contributing to sustainable development
7
• Private sector will mobilize direct financial investments to Indonesia for the installation, dissemination, and operation of an environmentally sound technology promoted by the project.
• Private investments will benefit from public funding support under the JCM public-private partnership, which can contribute to SDG 17 particularly its Target 17.3, 17.7, and 17.17.
Example: Contribution from solar power project to sustainable development measured by SDG targets
• Sustainable Development Implementation Plan and Report sets out a plan, andachievement of the plan, of the JCM project to contribute to sustainabledevelopment.
• JCM projects also contribute to SDGs.
8
ConditionEligible JCM financial support
(% of investment cost)Example projects
New projectNo project using similar technology are already selected in Indonesia
Up to 50%
Air compressor, wind power, waste-to-energy, amorphous
transformers, etc. (open for proposal)
1-3 projects using similar technology are already selected in Indonesia
Up to 40%
Boiler, biomass power plant, LED street lighting, hydropower, solar power plant with battery,
etc.
More than 3 projects using similar technology are already selected in Indonesia
Up to 30% Solar power plant, chiller.
New types of project in Indonesia can get more support
New types of project in Indonesia can get more support
9
LED street lighting system with wireless network control (e.g. MinebeaMitsumi)
Solar power and storage battery system for commercial facility(e.g. Itochu, AEON Mall, etc.)
Amorphous transformers(e.g. Hitachi Materials, Yuko-Keiso)
Wind Farm(e.g. Kyuden International Corporation)
Documents to be prepared for proposal
Project Idea Note
Bidding Application Form
Declaration by Representative Participant
Company information (e.g. brochure) and certificate of incorporation
Project Implementation Plan
Budget
Audited financial statements
Draft international consortium agreement
Agreement on the Allocation of JCM Credits
Other supporting documents
10
Tips
Aim for new type of technologies to get more benefits
Contact Japanese companies based in Indonesia
Focus on cost-effectiveness (cost per tCO2 reduced)
Suggested size of a JCM model project is USD 500,000 – 20 million in financial support
Consult with Indonesia JCM Secretariat onon domestic procedures
11
12
Invest in sustainable future
Call for Proposal on the GEC website: http://gec.jp/jcm/kobo/