for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this...

23
LISE ++ for S 3 with version 9.10.100 from 05/22/15 1. Introduction 2. Segmented configurations 3. Extended: Geometry, Corrections 4. Optimization 5. S 3 acceptances 6. Outlook 1 Using Spectrometer description & Beam optics studies for the operation of S3” (draft) and LISE ++ files by Bertrand Jacqout and Omar Kamalou OT, 05-June-2015, Caen Initially the plans were to develop LISE ++ configurations for S3, but Bertrand and Omar have made the main construction part Some insignificant updates and corrections, benchmarks The presentation will be updated this weekend and then distributed including LISE ++ files Modified 09/11/2015 for the LISE ++ package v.9.10.176

Transcript of for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this...

Page 1: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

LISE++ for S3

with version 9.10.100from 05/22/15

1. Introduction

2. Segmented configurations

3. Extended: Geometry, Corrections

4. Optimization

5. S3 acceptances

6. Outlook

1

Using “Spectrometer description & Beam optics studies

for the operation of S3” (draft) and LISE++ files

by Bertrand Jacqout and Omar Kamalou

OT, 05-June-2015, Caen

• Initially the plans were to develop LISE++ configurations for S3,

but Bertrand and Omar have made the main construction part

• Some insignificant updates and corrections, benchmarks

• The presentation will be updated this weekend

• and then distributed including LISE++ filesModified 09/11/2015 for

the LISE++ package

v.9.10.176

Page 2: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

GANIL in-house LISE++ files

2OT, 05-June-2015, Caen

50% extended - 50% segmented

Configurations

Quads are implemented,

But B- & E-dipoles by LISE++

In the LISE++ package

v.9.10.176

there are two files :

Corresponds to

eS3_dispersive v4_5fit.lpp

in this presentation

Page 3: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Beam settings and Reaction for Segmented configurations

3OT, 05-June-2015, Caen

Page 4: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Segmented configurations optics

4OT, 05-June-2015, Caen

dispersive

converging

x/x

y/y

x/x

y/y

x/t

y/p

x/t

y/p

x/d

y/d

x/d

y/d

Page 5: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Segmented configurations transmissions

5OT, 05-June-2015, Caen

dispersive

converging

Page 6: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Monte Carlo segmented configuration transmissions

6OT, 05-June-2015, Caen

Dispersive, 1st order . X/T @ F4 bis

Page 7: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

In-house Extended dispersive configuration

7OT, 05-June-2015, Caen

Dispersive, 1st order . @ F4 bis

Page 8: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

In-house Extended dispersive configuration

8OT, 05-June-2015, Caen

Good @ F2

Bad @ F4 bis

apertures

Page 9: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Extended: Geometry, Corrections

9OT, 05-June-2015, Caen

Tuning dipole

Page 10: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Extended: Geometry, Corrections

10OT, 05-June-2015, Caen

Quad fields have been checked, Sext fields been entered

Page 11: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Extended: Geometry, Corrections

11OT, 05-June-2015, Caen

Quad fields have been checked, Sext fields been entered

Page 12: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Extended: Geometry, Corrections

12OT, 05-June-2015, Caen

Second triplet parameters

have been modified

Final File for fitting after updates and modifications: eS3_dispersive v4.lpp

Page 13: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Extended: Geometry, Corrections

13OT, 05-June-2015, Caen

Effective lengths

Should be

around 0.5-1.0

Wrong geometrical

values in the

document

Page 14: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Optimization

14OT, 05-June-2015, Caen

2nd

step

Page 15: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Optimization

15OT, 05-June-2015, Caen

Init

FinalShort optimization test

Dispersive, 1st order . @ F4 bis

A lot of improvement and optimization

should be done more in the LISE++

optimization process !!!!

Page 16: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Optimization

16OT, 05-June-2015, Caen

Init

FinalShort optimization test

Page 17: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Optimization

17OT, 05-June-2015, Caen

Segmented

Extended Final

Short optimization test

Page 18: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Optimization

18OT, 05-June-2015, Caen

Init Final

Short optimization test

File: eS3_dispersive v4_5fit.lppFile: eS3_dispersive v4.lpp

Page 19: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Optimization

19OT, 05-June-2015, Caen

Page 20: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

S3 angular acceptances (example with the previous configuration)

20OT, 05-June-2015, Caen

1st order 2nd order

Short optimization test only for demonstration!!!

File: eS3_dispersive v4_5fit acc.lpp

Page 21: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

S3 momentum acceptance

21OT, 05-June-2015, Caen

Short optimization test only for demonstration!!!

File : eS3_dispersive v4_5fit mom.lpp

Page 22: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

S3 acceptances : envelope

22OT, 05-June-2015, Caen

Main cut @ the triplet after the E-dipole

Short optimization test only for demonstration!!!

Page 23: for S - LISE++lise.nscl.msu.edu/9_10/S3config.pdf · • The presentation will be updated this weekend • and then distributed including LISE++ files Modified 09/11/2015 for the

Outlook

• Update of extended configurations

Based on LISE++ calculations (2nd order) -- possibility to optimize

Based on other sophisticated codes – 5 order for aberrations

observations

• Update of user (segmented) configurations

• Effective lengths issue is a main key

• Multipole calibrations

23OT, 05-June-2015, Caen