FOR LEASE OR SALE 75 14TH STREET

6
75 14TH STREET FOR LEASE OR SALE MISSION DISTRICT Corp. Lic. 01112906 www.tcpre.com www.zm-tcpre.com touchstone COMMERCIAL PARTNERS

Transcript of FOR LEASE OR SALE 75 14TH STREET

75 14TH STREETFOR LEASE OR SALE

MISSION DISTRICT

Corp. Lic. 01112906www.tcpre.com

www.zm-tcpre.com touchstoneC O M M E R C I A L P A R T N E R S

TOUCHSTONE COMMERCIAL PARTNERS, INC. // www.tcpre.com // www.zm-tcpre.com

75 14THSTREET

RENOVATION COMPLETE

ADDRESS 75 14th Street, San Francisco, CA 94103

AVAILABLE SPACE +/- 10,175 Square Feet

SALE PRICE Negotiable

RENTAL RATE High $50s / Square Foot / Year, Industrial Gross

ZONING PDR-1-G

READY FOROCCUPANCY

May 1, 2018

New Building Improvements

Roll-Up Door Installation

Four (4) Meeting Rooms

Two (2) Conference Rooms

Polished Concrete Floors

Two (2) Kitchenettes

Renovated Facade

New Electrical and Lighting

Mezzanine Installation

HVAC

Six (6) Restrooms

Sprinkler System

3-Phase, 400 Amp Electrical Service

Skylights

Sandblasted Entire Building

PROPERTYSUMMARY

TOUCHSTONE COMMERCIAL PARTNERS, INC. // www.tcpre.com // www.zm-tcpre.com

75 14THSTREET

BUILDINGPHOTOS

TOUCHSTONE COMMERCIAL PARTNERS, INC. // www.tcpre.com // www.zm-tcpre.com

75 14THSTREET

FLOORPLANS

GROUND FLOOR MEZZANINE

relocate (E)standpipe

PRODUCTION WORKSHOP

101

(E) fire riser

HALL102

UP

UP

(E) W4x, typ.,S.S.D.

(E) 8x8, typ.,S.S.D.

(E) brick bearingwall, S.S.D.

(E) HSS4x4, typ.,S.S.D.

1A3.2

1A2.1

1A3.1

1A3.1

2A3.1

1A3.2

2A3.1

14T

@11

"15

R @

6 1 2"

14T

@11

"15

R @

6 1 2"

upgrade (E) 400 amp servicein original location, providetwo separate meters

(E) steel moment frame

2A2.1

1A2.31

A2.2

5

4

relocate (E)roof drain

(N) roll-up door14'-034"

3'-8"

3'-8"

1'-0"min.,typ.

13

infill (E) fanopening in wall

w/ concrete

infill (E) scale opening inconcrete slab, (N)

concrete slab on grade

15

A

1 2 3 4

B

C

D

F

G

H

J

E

F.O.F

F.O.F

StrCL

F.O.F

F.O.F

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

24

28

30

DN

1:12

ram

p sl

ope

5'-0"min

3'-8"min

clear

101

PRODUCTIONPROTOYYPING EQUIP.

104

PRODUCTION WORKSHOP

103

(N) opening in (E)brick wall

ref.,N.I.C.

LUNCHROOM107

4'-0"V.I.F.

WH

(N) 1HR wall,UL DES U305

(E) slab to remain,repair as req'd

UNISEXRESTROOMS

105ADA

RESTROOM106

6'-958"

6'-538"

106

109 108 107

110 111 112

1A4.3

1A4.4

(N) 1 HR door,see schedule

OPENOFFICE

108

PATH

FO

R A

UTO

SPA

TH F

OR

AU

TOS

Ztyp.

4

1'-6"min

32

116

1'-0" +treaddepth

1'-6"min

102

103

1'-6"min

DN

1:12

ram

p sl

ope

DN

2T @ 11"3R @ 6"

5'-0" minclear

7'-0"

3

3'-0"min

clear

(N) removable bollards

105113

8'-0"

2 1

infill (E) openingw/ (N) 1HR wall

OPEN TOBELOW

PRESENTATIONS203

OPEN TOBELOW

DN

1A3.2

1A2.1

1A3.1

1A3.1

2A3.1

1A3.2

2A3.1

14T

@11

"15

R @

6 1 2"

A

1 2 3 4

B

C

D

F

G

H

J

E

F.O.F

F.O.F

StrCL

F.O.F

F.O.F

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

DN

14T

@11

"15

R @

6 1 2"

2A2.1

1A2.3

1A2.2

8

5

5

9

9

11

17'-038"

14'-034"

17'-038"

(E) skylight above,replace brokenglazing panels inkind, typ.

26

26

3'-8"

4'-434"

4'-334"

3'-8"

3'-8"

3'-8"

7A5.1

27

27

OPEN TOBELOW

3'-8"cut (N) opening in (E)brick wall, 3'-8" x 7'-4"OFFICE

204

201

29'-8916"

OFFICE205

11'-1138"

14'-378"

14'-378"

1'-0"

4'-6"

2

1

2

1

CONFERENCEROOM

201

202

203

204

2

1

10

10

2

1

PRODUCT &MATERIALS

202

2

2311 Fillmore StreetSan Francisco CA 94115tel : 415. 655 9722fax : 415. 236 6070e-mail : siolstudios.com

PAGE #

ISSUE

BY

DATE

SCALE

TITLE

A N

I N

T

E

G

R

A

L

D

E S

I

G

N

P

R

A

C

T

I

C

E

14th

Str

eet

75 1

4th

St

San

Fra

ncis

co, C

A 94

103

Proposed FloorPlans

1/8" = 1'-0"

19 Apr 2016

JC

A1.12'0 8'4'

Proposed First Floor Plan 12'0 8'4'Proposed Mezzanine Plan 2 NN

Keyed Notes

1

2

3 (N) steel railing w/ oak caps

4 (N) C.I.P. concrete ramp

5 (N) steel staircase, deferred submittal, wood treads

6

8 relocate (E) roof hatch, provide (N) pull down steps

9 (N) mezzanine framing, by others, independent of (E) structure, deferred submittal

10

11 (N) 42" H steel & cable guardrail

General Notes

1. 100% of mixed debris must be transported by a registered hauler to a registered facilityand be processed for recycling, in compliance with the San Francisco Construction &Demolition Debris Ordinance.2. Provide adequate space and equal access for storage, collection, and loading ofcompostable, recyclable and landfill materials. - See administrative Bulletin 088.3. Demonstrate compliance with California Energy Code, Title 24 Part 6 (2013).4. Reduce use of potable water for newly installed fixtures and fittings summarized inCalGreen Table 5.303.2.2 and 5.303.2.3 (See “Indoor Water Efficiency” at left.) Replace allnoncompliant fixtures in project area.5. Limit use of permanent HVAC during construction to conditioning necessary for materialand equipment installation. If permanent HVAC is used during construction, install MERV-8filters on returns, and replace all filter immediately prior to occupancy, or, if the building isoccupied during alteration, at the conclusion of construction.6. Comply with VOC limits in SCAQMD Rule 1168 VOC limits and California Code ofRegulations Title 17 for aerosol adhesives.7. Comply with VOC limits in the Air Resources Board Architectural Coatings SuggestedControl Measure and California Code of Regulations Title 17 for aerosol paints.8. Prohibit smoking within 25 feet of building entries, outdoor air intakes, and operablewindows.9. Provide at least MERV-8 filters in regularly occupied spaces of mechanically ventilatedbuildings10. Wall and roof-ceilings STC 50, exterior windows STC 30, party walls and floor-ceilingsSTC 4011. Do not install equipment that contains CFCs or Halons. (CalGreen 5.508.1)

Permit Set 29 July 2016

13

14 Not Used

15 paint (E) structural steel & sprinkler system to match mezzanine color

Permit Set 29 Aug 2016

(N) PDR = 6729 sqft

Revisions 14 Nov 2016

(N) Accessory Office = 2196 sqft

24

25 Not Used

26 (N) 12" x 16" mechanical shaft, S.M.D.

Revisions 14 Dec 2016

Proposed Tenant

27

Permit Revs 06 Mar 2017

28 (E) back flow preventer & cold water supply, replace steel line from meter w/(N) copper line

12 Not Used

29

30 (N) gas meter in alcove w/ access panel

Revisions 18 Sep 2017

31 *all electrical outlets/receptacles provided by tenant

32 provide (N) removable handrail w/ steel sleeves cast into concrete ramp

32 *all exposed steel to be painted to match mezzanine color

Base Building 31 Oct 2017

(N) 30 gallon gas fired water heater, vent through roof

(N) Class I bicycle parking spaces

(N) kitchen, 34" counter height max, typ.

(N) commercial grade carpet throughout mezzanine

TI: (N) glass & aluminum doors & windows, provide w/ insulated glazing

(N) birch veneer S.C. doors, typ.

(N) clear anodized aluminum storefront, typ.

TI: Framed partition wall

Permit Revs 06 Feb 2018

5

relocate (E)standpipe

PRODUCTION WORKSHOP

101

(E) fire riser

HALL102

UP

UP

(E) W4x, typ.,S.S.D.

(E) 8x8, typ.,S.S.D.

(E) brick bearingwall, S.S.D.

(E) HSS4x4, typ.,S.S.D.

1A3.2

1A2.1

1A3.1

1A3.1

2A3.1

1A3.2

2A3.1

14T

@11

"15

R @

6 1 2"

14T

@11

"15

R @

6 1 2"

upgrade (E) 400 amp servicein original location, providetwo separate meters

(E) steel moment frame

2A2.1

1A2.31

A2.2

5

4

relocate (E)roof drain

(N) roll-up door14'-034"

3'-8"

3'-8"

1'-0"min.,typ.

13

infill (E) fanopening in wall

w/ concrete

infill (E) scale opening inconcrete slab, (N)

concrete slab on grade

15

A

1 2 3 4

B

C

D

F

G

H

J

E

F.O.F

F.O.F

StrCL

F.O.F

F.O.F

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

24

28

30

DN

1:12

ram

p sl

ope

5'-0"min

3'-8"min

clear

101

PRODUCTIONPROTOYYPING EQUIP.

104

PRODUCTION WORKSHOP

103

(N) opening in (E)brick wall

ref.,N.I.C.

LUNCHROOM107

4'-0"V.I.F.

WH

(N) 1HR wall,UL DES U305

(E) slab to remain,repair as req'd

UNISEXRESTROOMS

105ADA

RESTROOM106

6'-958"

6'-538"

106

109 108 107

110 111 112

1A4.3

1A4.4

(N) 1 HR door,see schedule

OPENOFFICE

108

PATH

FO

R A

UTO

SPA

TH F

OR

AU

TOS

Ztyp.

4

1'-6"min

32

116

1'-0" +treaddepth

1'-6"min

102

103

1'-6"min

DN

1:12

ram

p sl

ope

DN

2T @ 11"3R @ 6"

5'-0" minclear

7'-0"

3

3'-0"min

clear

(N) removable bollards

105113

8'-0"

2 1

infill (E) openingw/ (N) 1HR wall

OPEN TOBELOW

PRESENTATIONS203

OPEN TOBELOW

DN

1A3.2

1A2.1

1A3.1

1A3.1

2A3.1

1A3.2

2A3.1

14T

@11

"15

R @

6 1 2"

A

1 2 3 4

B

C

D

F

G

H

J

E

F.O.F

F.O.F

StrCL

F.O.F

F.O.F

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

StrCL

DN

14T

@11

"15

R @

6 1 2"

2A2.1

1A2.3

1A2.2

8

5

5

9

9

11

17'-038"

14'-034"

17'-038"

(E) skylight above,replace brokenglazing panels inkind, typ.

26

26

3'-8"

4'-434"

4'-334"

3'-8"

3'-8"

3'-8"

7A5.1

27

27

OPEN TOBELOW

3'-8"cut (N) opening in (E)brick wall, 3'-8" x 7'-4"OFFICE

204

201

29'-8916"

OFFICE205

11'-1138"

14'-378"

14'-378"

1'-0"

4'-6"

2

1

2

1

CONFERENCEROOM

201

202

203

204

2

1

10

10

2

1

PRODUCT &MATERIALS

202

2

2311 Fillmore StreetSan Francisco CA 94115tel : 415. 655 9722fax : 415. 236 6070e-mail : siolstudios.com

PAGE #

ISSUE

BY

DATE

SCALE

TITLE

A N

I N

T

E

G

R

A

L

D

E S

I

G

N

P

R

A

C

T

I

C

E

14th

Str

eet

75 1

4th

St

San

Fra

ncis

co, C

A 94

103

Proposed FloorPlans

1/8" = 1'-0"

19 Apr 2016

JC

A1.12'0 8'4'

Proposed First Floor Plan 12'0 8'4'Proposed Mezzanine Plan 2 NN

Keyed Notes

1

2

3 (N) steel railing w/ oak caps

4 (N) C.I.P. concrete ramp

5 (N) steel staircase, deferred submittal, wood treads

6

8 relocate (E) roof hatch, provide (N) pull down steps

9 (N) mezzanine framing, by others, independent of (E) structure, deferred submittal

10

11 (N) 42" H steel & cable guardrail

General Notes

1. 100% of mixed debris must be transported by a registered hauler to a registered facilityand be processed for recycling, in compliance with the San Francisco Construction &Demolition Debris Ordinance.2. Provide adequate space and equal access for storage, collection, and loading ofcompostable, recyclable and landfill materials. - See administrative Bulletin 088.3. Demonstrate compliance with California Energy Code, Title 24 Part 6 (2013).4. Reduce use of potable water for newly installed fixtures and fittings summarized inCalGreen Table 5.303.2.2 and 5.303.2.3 (See “Indoor Water Efficiency” at left.) Replace allnoncompliant fixtures in project area.5. Limit use of permanent HVAC during construction to conditioning necessary for materialand equipment installation. If permanent HVAC is used during construction, install MERV-8filters on returns, and replace all filter immediately prior to occupancy, or, if the building isoccupied during alteration, at the conclusion of construction.6. Comply with VOC limits in SCAQMD Rule 1168 VOC limits and California Code ofRegulations Title 17 for aerosol adhesives.7. Comply with VOC limits in the Air Resources Board Architectural Coatings SuggestedControl Measure and California Code of Regulations Title 17 for aerosol paints.8. Prohibit smoking within 25 feet of building entries, outdoor air intakes, and operablewindows.9. Provide at least MERV-8 filters in regularly occupied spaces of mechanically ventilatedbuildings10. Wall and roof-ceilings STC 50, exterior windows STC 30, party walls and floor-ceilingsSTC 4011. Do not install equipment that contains CFCs or Halons. (CalGreen 5.508.1)

Permit Set 29 July 2016

13

14 Not Used

15 paint (E) structural steel & sprinkler system to match mezzanine color

Permit Set 29 Aug 2016

(N) PDR = 6729 sqft

Revisions 14 Nov 2016

(N) Accessory Office = 2196 sqft

24

25 Not Used

26 (N) 12" x 16" mechanical shaft, S.M.D.

Revisions 14 Dec 2016

Proposed Tenant

27

Permit Revs 06 Mar 2017

28 (E) back flow preventer & cold water supply, replace steel line from meter w/(N) copper line

12 Not Used

29

30 (N) gas meter in alcove w/ access panel

Revisions 18 Sep 2017

31 *all electrical outlets/receptacles provided by tenant

32 provide (N) removable handrail w/ steel sleeves cast into concrete ramp

32 *all exposed steel to be painted to match mezzanine color

Base Building 31 Oct 2017

(N) 30 gallon gas fired water heater, vent through roof

(N) Class I bicycle parking spaces

(N) kitchen, 34" counter height max, typ.

(N) commercial grade carpet throughout mezzanine

TI: (N) glass & aluminum doors & windows, provide w/ insulated glazing

(N) birch veneer S.C. doors, typ.

(N) clear anodized aluminum storefront, typ.

TI: Framed partition wall

Permit Revs 06 Feb 2018

5

TOUCHSTONE COMMERCIAL PARTNERS, INC. // www.tcpre.com // www.zm-tcpre.com

FOLS

OM

STR

EET

14TH STREET

LOCATIONOVERVIEW

MISSION DISTRICTSAN FRANCISCO, CA

75 14TH STREET

75 14TH STREET

ZACH HAUPERTdirect (415) 539-1121 // cell (415) [email protected] // BRE # 01822907

MICHAEL SANBERGdirect (415) 539-1103 // cell (415) [email protected] // BRE # 01930041

TREVOR GUDIMdirect (415) 539-1122 // cell (858) [email protected] // BRE # 01979980

The information presented has been secured from sources we believe to be reliable but we make no representations or warranties, expressed or implied, as to the accuracy of the information. Lessee must verify the information and bears all risk for any inaccuracies.

Corp. Lic. 01112906www.tcpre.com

www.zm-tcpre.com touchstoneC O M M E R C I A L P A R T N E R S