FOR LEASE OR PURCHASE HIGH PERFORMANCE FPSOfiles.zetta.no/ · FOR LEASE OR PURCHASE HIGH...
Transcript of FOR LEASE OR PURCHASE HIGH PERFORMANCE FPSOfiles.zetta.no/ · FOR LEASE OR PURCHASE HIGH...
FOR LEASE OR PURCHASE
HIGH PERFORMANCE FPSO
Disconnectable, Turret Moored FPSO for benign waters
Application:Gas/condensate/oil fieldGas export and reinjectionPossibility for water injection module installation
Available from: 2019
Oil/water/total fluid: 60 000/60 000/80 000 bbl/d
Gas: 9 Mill Sm3/d
Storage: 1 300 000 bbl
Conversion to FPSO: 2008
New built (Suezmax, Polar Alaska): 1979
Current Status: In operation at East Coast of India as Dhirubhai-1
Owner: Aker Floating Production AS,a company in the Aker Group
Topsides Processing CapacitiesOil production: 60 000 bbl/d
Water production: 20 000 bbl/d, provisions for 60 000 bbl/d
Total liquids: 80 000 bbl/d
Gas processing and dehydration capacity: 9 Mill Sm3/d
Gas export compression capacity: 3 Mill Sm3/d (39.5barg - 111barg) (1 x 100%)
Gas injection compression capacity: 3 Mill Sm3/d (110barg - 390barg) (2 x 50%)
Re-compression capacity: 0.3 Mill Sm3/d (1 - 40barg) (1 x 100%)
Slug capacity: 40 m3
First stage inlet pressure: 110 / 140 barg
Topside inlet operating temperature: 10-80 °C
Product oil specification: 0.5% BS&W
Product Reid Vapour Pressure: 10 psia
Product True Vapour Pressure: 0.97 bara
Sand limitation: 0.5 lbs/Mill Sm3 gas, 5 lbs/1000 bbl oil
Max. emergency flaring: 15 Mill Sm3/d
Max HP continuous flaring: 3.3 Mill Sm3/d
Max LP continuous flaring: 60 000 kg/hr
Process Expansion Capacities
Export compression expansion: 6 Mill Sm3/d - gas injection compressor systemsmodification
Water injection possibilities: 60 000 bbl/d @ 100barg WI - new module on spare module slot
Hull and Marine Capacities
Class notation: DNVX1A1 Ship Shaped Oil Production and Storage Unit, HELDK-S, PROD, POSMOOR
Oil storage capacity: 1.3 Mill bbl
Hs / Tp: 11.5m / 14.3m (Cyclonic)
Offloading capacity: 1 Mill bbl in 26.5hrs at 6000m3/h
Accommodation capacity: 104 beds
Lifesaving capacity: Freefall lifeboats for 104 persons each side2 x 64 persons + 2 x 40 persons
Helideck: Stern helideck - rated for Super Puma
Deck cranes: 2 x Electro-hydraulic offshore deck cranesSWL 10T@46m / 25T@36m
Steam: 2 main boilers, total capacity 88 tonnes/h superheated to 510°C @ 60 barg
Power generation:
3 x 4 MW from gas turbine generators 3 x 5 MW from steam turbine generators 2 x 1 MW from engine room steam generators 750 kW emergency generator 2 x 100% UPS
For additional information please contact:Managing Director Havard Garseth
+47 900 74 [email protected]
For additional information please contact:
Managing Director Havard Garseth+47 900 74 131
Cost Efficient OrganisationLocation Number of personnel
FPSO Dhirubhai-1: 100 (on rotation 1:1)
Shorebase India: 12 (logistics, local purchase)
Head office Oslo, Norway: 13 (management, administration, support)
Mooring and Swivel CapacitiesMooring type: Turret moored disconnectable STP buoy
Mooring lines: 9 lines (chain, polyester and wire)
Swivel:
4 x 10” production paths2 x 10” spare paths 4 x 8” gas export paths2 x 6” injection paths 9 x 10000 psi utility paths19 x 5000 psi utility paths
Operation & Maintenance 2008 – 2016
AFP FPSO is managed by Aker Floating Production AS in Norway and by highly qualified offshore teams.A robust design alongside analytical and proactive operations and maintenance provides a high performance
FPSO. Maintained for continued service beyond 2018.
No LTI since 02.04.2009 Uptime since 1st July 2009: 99.4%
FPSO UPTIME - INCLUDING PLANNED / UNPLANNED SHUTDOWNAND REDUCED PRODUCTION