(For Higg Users) 2020 Higg FEM Webinar

78
2020 Higg FEM Webinar (For Higg Users)

Transcript of (For Higg Users) 2020 Higg FEM Webinar

Page 1: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Webinar(For Higg Users)

Page 2: (For Higg Users) 2020 Higg FEM Webinar

Q&A Attendees are all muted during the presentation.

Please type your questions into the Q&A box at the bottom of the screen.

Page 3: (For Higg Users) 2020 Higg FEM Webinar

SummaryMembers are free to exchange or discuss publicly available information. However, Members should avoid any discussions or joint efforts regarding confidential competitive information such as non-public cost or price information, non-public volume information, strategic plans or other information that is not “reasonably necessary” to achieve SAC’s goals.

Antitrust Guidelines

3

Detailed Guidelines

3

Page 4: (For Higg Users) 2020 Higg FEM Webinar

4

Agenda

01. 2020 Higg FEM Cadence timeline

02. 2020 Higg FEM Content Change overview

03. 2020 Higg FEM Platform enhancement overview

04. Introduction to Facility Preview

05. Platform demo

06. Support for Higg users

07. Q&A

Page 5: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM cycleSep 2020

Purchase

Assessment

Posting

Verification

Higg FEM & Higg vFEM ends on Oct 31, 2021

2020 Higg FEM Launched

April 30, 2021Deadline for self-assessment with content locked for benchmarking

2020 Higg vFEM finalized and posted ends on December 31, 2021

* Unlimited posting / unposting One-time posting

Apr 2021Jan 2021Nov 2020 Dec 2021

Allow additional new facilities to complete and post

Note:*Once a facility begins to verify a module, the module cannot be unposted.*Unlimited posting/unposting DOES NOT apply to 2020 Higg vFEM at any time – verified modules can only be posted once.

Oct 2021

v. 2020-10-13

Page 6: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM What is new?

Page 7: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM changes

7

~50 Specific Content

~24%How-to-Higg FEM Guide

● Question Intent● Technical Guidance ● Quant Metric Guidance● Verification Guidance● Reference link

● New unscored primary questions● New unscored secondary

questions● Required documentation upload● Revised questions● Revised answer options● Splitting questions

~100Platform feature

● Facility Preview● OAR ID● CSV export file● Adoption tool

enhancement

Page 8: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Content change

Page 9: (For Higg Users) 2020 Higg FEM Webinar

Site Info & Permit

● Added new industry sector (i.e. Electronics, Toys, Hardgoods)● Introduced Product Categories, where applicable● Refined the list of Facility Processes and Facility Type● Align languages with Higg MSI / Product Module● Refined list of Materials Type● Added SAM (Standard Allowed Minutes) as an unit to Annual

Volume Units● Updated Question on Onsite Water treatment (previously

known as Pre-treatment for freshwater)● Allow multiple permit upload

Page 10: (For Higg Users) 2020 Higg FEM Webinar

EMS

● No Specific content change

Page 11: (For Higg Users) 2020 Higg FEM Webinar

Energy

● Revamped Unit of Measure for a few energy sources (e.g. Electricity, Purchased Steam, etc)

● Simplified overall Energy source (Q1)● Added new Energy source (i.e. Solar Thermal, Purchased

Renewables) (Q1)● Split questions for Energy reduction and GHG emissions (Q4

+ NEW)● Updated Energy table and GHG table (Q4 + NEW)● Updated table (Q6)● Added new question on SBTi in Level 3 (Q8)

Page 12: (For Higg Users) 2020 Higg FEM Webinar

Water

● Update table to include improvement percentage change (Q6)

Page 13: (For Higg Users) 2020 Higg FEM Webinar

Wastewater ● Added diagram to help facility understand industry wastewater

vs. domestic wastewater● Clarification on Zero-liquid discharge (ZLD)● Updated table to include additional questions on wastewater

discharge point (Q1)● Added new unscored question on prevent wastewater from

mixing with stormwater in the storm drain systems (No Q number)

● Added two new unscored secondary question on backup plan (Q3)

● Added new unscored question on facility confirming no leaking or bypassing of wastewater (No Q number)

● Added new secondary question to capture training element on hazardous sludge (Q4)

● Added new secondary question to capture training element on non-hazardous sludge (Q5)

Page 14: (For Higg Users) 2020 Higg FEM Webinar

Wastewater

● Rephrase Septic question to fit the correct intent (Q6)● Added new secondary question to capture training element

on managing septic waste (Q6)● Allow multi-select on reporting wastewater standard (Q7)● Update table to include “Frequency of Sampling” (Q7)● Added new table on ZDHC Table 2A-N data (Q7)● Fix scoring guidance - 50% or more = full point ; No Partial

point on this question (Q9)

Page 15: (For Higg Users) 2020 Higg FEM Webinar

Air Emissions

● Added a new question on “Does your facility monitor air emissions?” (Applicability)

● Revise questions to report all air emission from operations and production processes (Q1 and Q2)

● Remove the reporting on quantity of air emissions (Q1 and Q2)

● Update table to include additional questions on air pollutant and emission test reports (Q1 and Q2)

● Added secondary question on overall tracking refrigerant use and emissions (Q3)

● Rephrase question to fit better with intent (Q4 and Q5)

Page 16: (For Higg Users) 2020 Higg FEM Webinar

Waste ● Added an overall non-hazardous waste stream tracking question

(Q1)● Added an overall hazardous waste stream tracking question

(Q2)● Rephrase question to include element on hazardous waste

storage container (Q4)● Added 7 new requirements on managing hazardous waste

storage area and storage container (Q4)● Rephrase question to include element on non-hazardous waste

storage container (Q5)● Added 3 new requirements on managing hazardous waste

storage area and storage container (Q5)● Added question to capture more information regarding employee

training (i.e. number of employees trained and frequency of training) (Q7)

● Update table to include improvement percentage change (Q13)

Page 17: (For Higg Users) 2020 Higg FEM Webinar

Chemicals ● Added “reactants and additives” in type of chemicals to add

more relevance clarity to the chemical manufacturing (Q1)● Added question to capture more information regarding

employee training (i.e. number of employees trained and frequency of training) (Q3)

● Added question to capture more information regarding employee training (i.e. number of employees trained and frequency of training) (Q4)

● Added question to capture more information on specific training topics and employee training (i.e. number of employees trained and frequency of training) (Q10)

● Rephrase question to add clarity to the intent (Q11, Q12)● Added new secondary question on RSL failure resolution

process (Q11)● Allow facility’s Parent / Corporate Group management of RSL

and MRSL as an option for documentation review during verification (Q11, Q12)

Page 18: (For Higg Users) 2020 Higg FEM Webinar

Chemicals

● Corrected percentage to be able to answer Yes or Partial Yes between various applicability (50% as threshold for Chemicals in Production Processes vs. 10% as threshold for Chemicals in Facility toolings and/or operation) (Q16)

● For those questions that required large number of document, add clarity that facility do not need to upload all document, but some, and the rest must be available for review during verification

Page 19: (For Higg Users) 2020 Higg FEM Webinar

Summary of Update

https://howtohigg.org/fem-landing/summary-of-updates-to-how-to-higg-guide-v14/

Page 20: (For Higg Users) 2020 Higg FEM Webinar

2020 How-to-Higg FEM Guide

https://howtohigg.org/fem-landing/facility-site-information-permits-2020/

Page 21: (For Higg Users) 2020 Higg FEM Webinar

2020 How-to-Higg FEM Guide

Quantitative Metrics Guidance● Added guidance for answering quantitative

metrics based questions within the How To Higg Guide.

● Helps users to complete questions which require input of quantitative metrics within the Higg FEM, such as questions with absolute resource consumption, waste generation, baselines, targets and improvements.

● This guidance adapts principles of reporting and data quality from the GHG Protocol Corporate Accounting & Reporting Standard.

Where will you find it?Site Info & Permits, Energy, Water, Waste Water, Waste, Air Emissions sections

How to utilise this guidance?● Higg users should refer to this

guidance before inputting quantitative metrics

● Verifiers should refer to this guidance while verifying respective questions

Page 22: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Translation

Page 23: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Translation

How-to-Higg FEM Guide Higg.org

Bengali | English | Chinese (Simplified) | Italian

Japanese | Portuguese | Spanish

Turkish | Vietnamese

(Available now)(Available by phrases)

Page 24: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Translation Change Request

howtohigg.org/request

Page 25: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Platform Guide

Page 26: (For Higg Users) 2020 Higg FEM Webinar

26

2020 Higg FEM Platform Update Highlights

● Module purchasing options

● 100% of completion rate for all

scored questions to post the

module.

● Change “Reopen to ASI” to

“Reopen/Unpost Assessment”

● Beemer notification

● Facility Preview in FEM 2020

● Facility Preview cadence in the

Adoption tool

● Allow multiple file uploads in

the Site Info & Permits section

● CSV export files

● FEM 2020 cadence in the

Adoption tool

● Data roll forward

● OAR ID integration

Page 27: (For Higg Users) 2020 Higg FEM Webinar

27

2020 Higg FEM Platform Update

Module Purchasing Option

Module Type Original Price Current Discount Notes

Higg FEM + vFEM 2020 Bundle with Communication Toolkit

$445.99 18% off (until Nov 30, 2020)

The FEM toolkit may only be used by facilities that complete on-site verification by a third party.

FEM 2020 + FSLM bundle $396 25% off (until Nov 30, 2020)

FSLM + vFSLM $396 20% off (until Nov 30, 2020)

Single FEM 2020 or vFEM 2020 $198 15% off (until Nov 30, 2020)

vFEM 2020 purchasing option will be on the FEM dashboard after you have a FEM 2020

Single FSLM or vFSLM $198 15% off (until Nov 3o, 2020)

vFSLM purchasing option will be on the FSLM dashboard after you have a FSLM

Page 28: (For Higg Users) 2020 Higg FEM Webinar

28

2020 Higg FEM Platform Update

Posting rule change

Before FEM 2020 Cadence

As long as the completion rate is over 95%, the module can be posted.

All required questions must be answered before posting the assessment. If the module completion rate is less than 100%, it won’t be allowed to post.

*all required questions have been marked in dark blue in the FEM 2020.

Page 29: (For Higg Users) 2020 Higg FEM Webinar

29

2020 Higg FEM Platform Update

Module unposting

Before FEM 2020 Cadence

On the FEM dashboard, it is called as “Reopening to ASI”

On the FEM dashboard, it is called as “Reopening/Unposting Assessment”

Page 30: (For Higg Users) 2020 Higg FEM Webinar

30

2020 Higg FEM Platform Update

Multiple files uploading in FEM 2020 Site Info & Permit section

Before FEM 2020 Cadence

Facilities only can upload one file for Facility Environment Permit question.

Facilities can upload multiple files for Facility Environment Permit question.

Page 31: (For Higg Users) 2020 Higg FEM Webinar

31

2020 Higg FEM Platform Update

CSV export file

Before FEM 2020 Cadence

CSV V1: Single CSV1 (2017/2018/2019) and bulk CSV1 (2017-2019)CSV V2: Single CSV2 (2017/2018/2019) and bulk CSV2 (2017-2019)

CSV V1: CSV V1 will be retired from Higg.org platform on January 1, 2021.Single CSV1 for 2017/2018/2019 but not available for FEM 2020Bulk CSV1 (FEM 2017-2019)

CSV V2: FEM 2017-2019 (Bulk CSV V2) FEM 2020 (single CSV V2)

Page 32: (For Higg Users) 2020 Higg FEM Webinar

32

2020 Higg FEM Platform Update

Beemer Notification

In-platform notification center to announce platform release notifications and other important notifications to Higg users

Page 33: (For Higg Users) 2020 Higg FEM Webinar

33

2020 Higg FEM Platform Update

FEM 2020 cadence in the Higg adoption tool

FEM 2020 default cadence will be available in the Higg adoption tool from November 20, 2020.

Page 34: (For Higg Users) 2020 Higg FEM Webinar

34

2020 Higg FEM Platform Update

OAR Integration

In partnership with the Open Apparel Registry (OAR), Higg Co is integrating facility name and address data via API across the Higg and OAR platforms, streamlining facility data records for the apparel industry. The benefits of having this integration:

● Saves users’ time● Collates disparate facility data into one central location● Mitigates the risk of inaccurate data sharing

OAR Website: https://openapparel.org/

Page 35: (For Higg Users) 2020 Higg FEM Webinar

35

2020 Higg FEM Platform Update

What is OAR ID?

The Open Apparel Registry (OAR) is an open source map and database of global apparel facilities,

their affiliations and unique OAR IDs assigned to each facility.

The Higg platform now allows each Higg Facility account to be associated with the corresponding unique facility in the OAR. Use the OAR ID to:

❏ Update and standardize facility names and addresses against the database❏ Understand affiliations of current and prospect facilities to identify opportunities for collaboration❏ Find potential new suppliers, listed with their credentials and affiliations❏ Leverage the OAR ID as a unique and shared ID across software systems and databases

Page 36: (For Higg Users) 2020 Higg FEM Webinar

36

2020 Higg FEM Platform Update

What this data integration means for facility users:

● If a facility is in the apparel, footwear, accessories, or textile categories, they can update their Higg profile to integrate with the OAR.

● If a facility is new to the OAR, they can use the Higg platform to create an OAR ID through their account profile and add their facility to the OAR open data platform.

● Easily maintain their OAR and Higg profile records on one platform and trust that the data they share with business partners is current and accurate.

Page 37: (For Higg Users) 2020 Higg FEM Webinar

37

2020 Higg FEM Platform Update

What this data integration means for non-facility users:

● Use facility OAR IDs to find Higg assessments.● Contribute the facility list to the OAR if you have.● Encourage the facilities to claim their profiles and add additional data points, including parent company,

worker numbers and percentage of female workers.

Page 38: (For Higg Users) 2020 Higg FEM Webinar

38

2020 Higg FEM Platform Update

Once the OAR ID is linked in a facility’s account, the OAR ID can be used/found on Higg.org platform at these places below:

● Facility FEM and FSLM dashboards● FEM and FSLM module pages● Share or Request a Module: account searching● Facility’s account profile ● FEM and FSLM CSV files● Adoption tool (cadence list table, CSV export and account searching) ● Analytics tool (CSV export)● API

Page 39: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Facility Preview

Page 40: (For Higg Users) 2020 Higg FEM Webinar

Introduction to Facility Preview

● Facility Preview is a way for manufacturers, brands, retailers, sourcing agents to quickly evaluate the environmental performance of their manufacturing facilities at a foundational level.

● A tool for onboarding new facilities, providing an entry point to the Higg Facility Tools

● Designed to scale to adjacent industries

● Streamlines the collection of sustainability data, and increases data accountability in the industry.

● Available on the Higg Platform

Page 41: (For Higg Users) 2020 Higg FEM Webinar

Benefits of Facility Preview

Facilities

● Reduce duplication of assessments

● Increase resource efficiency ● Quickly evaluate & share with

value chain partners foundational environmental performance

Brands, Retailers, Sourcing Agents

● Replace proprietary assessment tool

● Increase resource efficiency● Quick onboarding of Facilities to

supply chain ● Identify opportunities and hotspots

in their extended value chain.

Page 42: (For Higg Users) 2020 Higg FEM Webinar

Facility Preview (Use cases)

01 (for companies that has an existing assessment tool) replace proprietary tool to assess manufacturing facilities on their foundational environmental sustainability performance

02 (for companies that are beginning to assess value chain) use this tool without developing a separate tool to assess manufacturing facilities on their foundational environmental sustainability performance

03 (for companies that are beginning to assess extended value chain) use this tool without developing a separate tool to assess manufacturing facilities on their foundational environmental sustainability performance

04 (for companies planning to roll out Higg FEM to other industries, but feel the current version of Higg FEM does not fully apply) use this tool to assess manufacturing facilities on their foundational environmental sustainability performance using the Higg.org platform

Page 43: (For Higg Users) 2020 Higg FEM Webinar

Facility Preview Content ❖ Mirror all questions as in 2020 Higg FEM

❖ Mirror 4 questions (Level 1) + 1 question (Level 2) as in 2020 Higg FEM.

❏ Include 1 new unique question.❖ Mirror Level 1 question as in 2020 Higg FEM❏ Include 1 new unique secondary question.

❖ Mirror Level 1 question as in 2020 Higg FEM❏ Include 1 new unique secondary question.

❖ Mirror 8 questions (Level 1) + 1 question (Level 2) as in 2020 Higg FEM.

❖ Mirror 4 questions (Level 1) as in 2020 Higg FEM.

❖ Mirror 6 questions (Level 1) + 1 question (Level 3) as in 2020 Higg FEM.

❏ Include 2 new unique secondary questions❏ Added new unique requirement on 1 question (Level 1)

❖ Mirror 13 questions (Level 1) as in 2020 Higg FEM.

Page 44: (For Higg Users) 2020 Higg FEM Webinar

Facility Preview Specific Content

EMS Primary question: Does your facility have documented procedures that enable workers to report environmental emergencies/violations and protects them from retaliation?

Secondary Question: Does your facility have a robust process in place to ensure data accuracy and integrity?➢ Apply to Energy Q1, Water Q1, Waste Q1, Waste Q2

Waste Q6:“reword question to include additional requirement”: Does your facility forbid all irresponsible waste disposal actions including open burning, open dumping, burying and storage tank leaks?

Page 45: (For Higg Users) 2020 Higg FEM Webinar

Key takeaway for Facility Preview

01 It is a new feature that complements Higg FEM

02 It is a quick look at a facility’s foundational environmental performance prior to completing a full assessment

03

What it is:

01It does not provide a comprehensive view of value

chain performance. So it does not replace the Higg FEM assessment

02SAC does not offer verification for individual Facility Preview section submission before posting the full 2020 Higg FEM

03 Does not offer scoring

04 Not accessible for benchmarking feature

What it is not:

04For 2020 Higg FEM cadence, companies must subscribe to the Advanced Adoption Services tier to unlock the feature and have access to the support needed to manage it

Not all facilities will have accessibility to this feature in 2020 Higg FEM cadence.

Page 46: (For Higg Users) 2020 Higg FEM Webinar

Implementing Facility Preview in 2020 Higg FEM cadence

Self-Assessment

● Only module in NS and ASI status can be allocated.

Special scenarios:❏ Module in ASC status - contact the

manufacturing facility to unpost module, status change to ASI, feature can be allocated.

❏ Module in VRP, VRC, VRF - feature cannot be allocated.

Verification

● Questions in Facility Preview will be verified in addition to the Higg FEM

Reminder:❏ SAC does not offer verification for

individual Facility Preview section submission before posting the full 2020 Higg FEM

Page 47: (For Higg Users) 2020 Higg FEM Webinar

Facility Preview Adoption Tool Workflow

Page 48: (For Higg Users) 2020 Higg FEM Webinar

48

Data BlocksHow to Access Facility Preview

Advanced Service TierFor the 2020 cadence, companies must be subscribed to the Advanced Service Plan, to utilize the Adoption Tool’s Custom Cadence feature and to receive the support needed to manage it.

Opt-inFacility Preview is optional at the Advanced Service level, so companies will also need to opt-in to participate. Higg Co will then enable the Facility Preview cadence feature in the Adoption Tool, which is used to directly invite facilities to participate in Facility Preview.

Page 49: (For Higg Users) 2020 Higg FEM Webinar

49

Data BlocksHow to Invite Facilities

Adoption Tool Workflow● Create a new custom cadence● Select FEM 2020● Two new sub-options appear:

○ Enable Facility Preview○ Enable Facility Preview Submission

● Select options and create cadence.*● Add nominated facilities to this

Preview-enabled cadence● Added facilities will then see Facility Preview

*Facility Preview cadence settings cannot be changed once created.

Enable Facility Preview must be selected to Enable Preview Submission

Page 50: (For Higg Users) 2020 Higg FEM Webinar

50

Data BlocksAccess Facility Preview Data

Adoption Dashboard - Cadence Overview Table

● New Column: Facility Preview● Values: Yes, No

● No special Facility Preview module status.

Page 51: (For Higg Users) 2020 Higg FEM Webinar

51

Data BlocksAccess Facility Preview Data

Adoption Tool Cadence Details - Accounts Table

● New Column: Facility Preview Submitted● Values: Yes, No

Page 52: (For Higg Users) 2020 Higg FEM Webinar

52

Data BlocksAccess Facility Preview Data

FEM - Modules Table

● New Columns: Facility Preview; Facility Preview Submitted● Values: Yes, No

Page 53: (For Higg Users) 2020 Higg FEM Webinar

53

Data BlocksFacilities in Multiple Cadences

Cadence overlap is a possibility.

● Facilities will likely be added to multiple adoption cadences for both FEM2020 and Facility Preview, for different company accounts.

● Facilities may share Facility Preview assessments with multiple customers.

● If a facility has been added to at least one Cadence that is Facility Preview Enabled, then all accounts that receive a share from the facility will see Facility Preview data provided by the facility.

Page 54: (For Higg Users) 2020 Higg FEM Webinar

Facility Preview Platform Guide For Facilities

Page 55: (For Higg Users) 2020 Higg FEM Webinar

55

Facility Workflow

Purchase the Higg FEM2020

Notified by customers

Step 1

The facility will receive the

notification from their

customers about the FEM

2020 cadence requirements

including Facility Preview

requirements

Step 2

The facility will purchase the

FEM 2020 in their Higg

account

Complete the module

Step 3

Option 1: complete the FEM 2020 only

Option 2: complete and submit the facility

preview only

Option 3: complete the facility preview +

FEM 2020

Option 4: complete and submit the facility

preview + FEM 2020

Page 56: (For Higg Users) 2020 Higg FEM Webinar

56

Facility Preview Platform Guide for Facilities

Option 1: facilities need to complete and post the FEM 2020 only

Won’t see Facility Preview section in their FEM 2020

Complete 100% to post the module to ASC status

Page 57: (For Higg Users) 2020 Higg FEM Webinar

57

Facility Preview Platform Guide for Facilities Option 2 & 4: facilities need to complete and submit the Facility Preview only or complete

the Facility Preview with submission + complete the FEM 2020

Receive a message to submit the Facility Preview on the top

Page 58: (For Higg Users) 2020 Higg FEM Webinar

58

Facility Preview Platform Guide for Facilities Option 2 & 4: facilities need to complete and submit the Facility Preview only or complete

the Facility Preview with submission + complete the FEM 2020

The submission button will be shown once the completion rate of Facility Preview is 100%. Then facilities will submit it.

The submission is not going to make the FEM 2020 status become ASC. The status will still remain as ASI.

FEM 2020 sections questions are open to facilities. The facilities can go ahead to complete the full FEM 2020 if they are required to do it.

Page 59: (For Higg Users) 2020 Higg FEM Webinar

59

Facility Preview Platform Guide for Facilities

Option 2 & 4: facilities need to complete and submit the Facility Preview or complete the Facility Preview with submission + complete FEM 2020

Receive a message after submitting the Facility Preview

The answers completed in Facility Preview section will be pre-answered accordingly with the corresponding duplicate answer in the other part of the assessment

The status will become ASC after the full FEM 2020 is completed and posted.

Page 60: (For Higg Users) 2020 Higg FEM Webinar

60

Facility Preview Platform Guide for Facilities

Option 3: facilities need to complete Facility Preview + FEM 2020 without submitting the Facility Preview

The facility will complete both Facility Preview and FEM 2020 and post the FEM 2020 to make the module status become ASC.

The answers completed in Facility Preview section will be pre-answered accordingly with the corresponding duplicate answer in the other part of the assessment

Page 61: (For Higg Users) 2020 Higg FEM Webinar

61

Facility Preview Other Features

1. Module sharing ● Sharing will work identically to the current FEM

workflow.● Facilities must share their assessment with other

accounts in order for those accounts to receive either submitted Facility Preview section data only or the Posted full FEM 2020 with Facility Preview data.

2. Translation ● Chinese will come soon and other languages as well

Page 62: (For Higg Users) 2020 Higg FEM Webinar

62

Facility Preview Other Features

3. Facility Preview data export

● Offline excel for Facility Preview is available for participating facilities to download and import the data.

● Facilities will be able to download the excel file or FEM 2020 (CSV V2) to review their Facility Preview data only or FEM 2020 data + Facility Preview data.

Page 63: (For Higg Users) 2020 Higg FEM Webinar

63

Facility Preview Other Features

4. Data Roll forward

● Facilities that have Posted FEM 2019 and will be completing FEM 2020 with Facility Preview can roll their data forward when they first access their FEM 2020.

● Corresponding RefIDs will roll forward like the other FEM 2020 assessments. In some cases where the RefIDs are duplicated the Facility Preview section will included roll forwarded data.

Page 64: (For Higg Users) 2020 Higg FEM Webinar

64

Guidance and Support

Getting Started Step-by-step Instructions

FAQ

Platform update guidance support: https://howtohigg.org/fem-landing/

Page 65: (For Higg Users) 2020 Higg FEM Webinar

65

Guidance and Support

Submit a ticket to Higg Index support team through howtohigg.org/request if you have any questions or issues

Page 66: (For Higg Users) 2020 Higg FEM Webinar

Platform Demo● OAR ID

Page 67: (For Higg Users) 2020 Higg FEM Webinar

2020 Higg FEM Communication Toolkit

Page 68: (For Higg Users) 2020 Higg FEM Webinar

Higg FEM Communication Toolkit

Total score achieved by facility

Indication of progress – facility’s score compared to 100

● Empower manufacturers to show

sustainability leadership

● Enable manufacturers to

voluntarily communicate Higg

FEM performance

● Increase value chain

transparency

● Stimulate storytelling around Higg

FEM

● Increase awareness of Higg FEM

Page 69: (For Higg Users) 2020 Higg FEM Webinar

Higg FEM Communication

Toolkit (2020 Higg FEM)

• The Higg FEM Communication Toolkit (Beta version) is

still available for free of charge for 2018 Higg vFEM and

2019 Higg vFEM

• Higg FEM Communication Toolkit is eligible for posted

2018 Higg vFEM and/or 2019 Higg vFEM, with

third-party onsite verification

• The Higg FEM Communication Toolkit will be available

for eligiable module for 2020 Higg vFEM, at USD49.99

Page 70: (For Higg Users) 2020 Higg FEM Webinar

Support on 2020 Higg FEM

Page 71: (For Higg Users) 2020 Higg FEM Webinar

SAC Approved Trainers

SAC Approved Training Providers bring in a wealth of experience and expertise

Learners can get a chance to ask questions and get their technical queries understood in local language

Find and contact trainershowtohigg.org/trainers

Page 72: (For Higg Users) 2020 Higg FEM Webinar

SAC Approved Trainers

https://www.sumerra.com/programs/sac/sac-fem-training-program/sac-fem-trainer-body-list/

Page 73: (For Higg Users) 2020 Higg FEM Webinar

Register now! (https://www.tickettailor.com/events/sacevents )

APAC Nov 25 & 26○ With Mandarin, Bengali, Vietnamese, Japanese simultaneous interpretation

AMER Dec 1 & Dec 2 ○ With Spanish and Portuguese simultaneous interpretation

● Looking Towards 2021 and Beyond - Equip better for upcoming cadence by looking into 2020 Higg FEM, Higg FSLM, verification and various deep-dive topics

● Last Manufacturer Forums of 2020

Page 74: (For Higg Users) 2020 Higg FEM Webinar

Next Step

Page 75: (For Higg Users) 2020 Higg FEM Webinar

Next step

❏ Start reviewing 2020 Higg FEM Content, platform, guidance

❏ Purchasing module if you haven’t, while promotion price still lasts

❏ Get your tickets to SAC Manufacturer Forum, to learn about the best practices and have a dialogue with SAC.

❏ Contact Sally and Stefanie if you are interested on using Facility Preview feature in 2020 Higg FEM cadence ([email protected] ; [email protected] )

❏ Post your 2019 Higg FEM and/or 2019 Higg vFEM before Dec 31, 2020, if you haven’t yet, as the full cadence will end on that day.

Page 76: (For Higg Users) 2020 Higg FEM Webinar

7676

Q&A

Page 77: (For Higg Users) 2020 Higg FEM Webinar

7777

Thanks!

Page 78: (For Higg Users) 2020 Higg FEM Webinar

7878

Let’s StayIn Touch

www.apparelcoalition.org

/apparelcoalition

@apprlcoalition

@apprlcoalition

Follow us on LinkedIn

Check us out on YouTube