FM1 Instrument Suite Pre-Ship Review (PSR) INT-1 UCB September 21, 2005
THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR)
INTEGRATION AND TEST PLANSJeremy McCauley
University of California - Berkeley
FM1 Instrument Suite Pre-Ship Review (PSR) INT-2 UCB September 21, 2005
F1 Probe I&T Flow
Mount IDPU/ESA
Particles(ESA/SST)Functional
Mag BoomAlignment
InstrumentsThermal Blankets
Instl
Ship to JPL
Mount SST
EMI Signature
Mount EFI
Probe P1(Integrated Probewith Avionics from
Swales)
Unpacking/Receiving/
Inspection at UCB;GSE Set-Up
DeploymentSimulations (E&B)
InstrumentMagnetic Survey
Bus FunctionalTest
Mount Mag Booms(w/o Sensors)
Probe Self-Compatibility
EMI Signature
InstrumentHarness
Installation
Sep System
RF Compatibility toBGS
Probe CPT
EMI Signature
Mount FGM/SCMSensors on Booms
Probe LPT
Probe AT
Probe CPTMag BoomsClearance Checks
Solar PanelElectrical Systems
CheckoutMount
S/A Panels
EMI Signature
Swap out BAUEDU #2 w/ Flight
ACSClosed-Loop
HardwareCloseouts/Install
ThermalTreatments
Instl Probe intoShippingContainer
Inspection/Electrical
Checkout ofS/A Panels
Solar Panels fromCoI
Fields(EFI/FGM/SCM)
Functional
ESC CheckExposed Blankets
ESC Check ofCloseouts
ESC check ofS/A Panels
PER
Safe-to-MateCheck
IDPU/BAU SignalIntegrity
Verification
IDPU/BAUCommand&Telemetry
HAZARDOUS OP
HAZARDOUS OP
15 SAI/PTEGSE1Lifting SlingProbe Lifting FixtureProbe Stand
10,11,12 SAI/SHEGSE1
80 MBEGSE1
16 PBSpectrum AnalyzerCurrent Probe
20 PT28 ERTEGSE1
28 ERTEGSE1
28 ERTEGSE1
21 PT
121,131,132,141,142,152,162 CS 003 JB
16 PBSpectrum AnalyzerCurrent Probe
29 ERTEGSE1
22 PT 23 BD 26 PT 37,38 PTFaro Arm, D.ClarkStand (HESSI)
30 ERTEGSE1Mu Metal Cans
35 ERTEGSE1Mu Metal Cans
16 PBSpectrum AnalyzerCurrent Probe
10,11,12,32 SH/ERTEGSE1Mu Metal Cans
17 ERTEGSE1Mu Metal Cans
31 ERTEGSE1SPB SimulatorAXB ResistiveSimulatorFGB/SCB ResistiveSimulator
??? SAI
24,25 PT
To JPL Flow
10,11,13,33 SH/ERTEGSE1
10,11,14,34 SH/ERTEGSE1
16 PBSpectrum AnalyzerCurrent Probe
??? PT/CS ??? SAI/PTCovers
SAI-PROC-1431 ERTEGSE1Bright Lights - 500W
40 JBEGSE1
27 PTETU FGMETU SCM
10,11,12,32 SH/ERTEGSE1Mu Metal Cans
15 SAI/PTLifting SlingProbe Lifting FixtureProbe StandMag Shipping Cases
003 COI/JB ??? SAI/ERT
BlanketS/A Panels
??? SAI/PT
RCS MEOP Test(to BGS)
055 MSEGSE1
THEMIS FlightInstruments
121 ML
FM1 Instrument Suite Pre-Ship Review (PSR) INT-3 UCB September 21, 2005
F1 Probe I&T Flow
Mount IDPU/ESA
Particles(ESA/SST)Functional
Mag BoomAlignment
InstrumentsThermal Blankets
Instl
Mount SST
EMI Signature
Mount EFI
Probe P1(Integrated Probewith Avionics from
Swales)
Unpacking/Receiving/
Inspection at UCB;GSE Set-Up
InstrumentMagnetic Survey
Bus FunctionalTest
Mount Mag Booms(w/o Sensors)
EMI Signature
InstrumentHarness
Installation
Sep System
RF Compatibility toBGS
ACSClosed-Loop
Fields(EFI/FGM/SCM)
Functional
ESC CheckExposed Blankets
Safe-to-MateCheck
IDPU/BAU SignalIntegrity
Verification
IDPU/BAUCommand&Telemetry
HAZARDOUS OP
15 SAI/PTEGSE1Lifting SlingProbe Lifting FixtureProbe Stand
10,11,12 SAI/SHEGSE1
80 MBEGSE1
16 PBSpectrum AnalyzerCurrent Probe
20 PT28 ERTEGSE1
28 ERTEGSE1
28 ERTEGSE1
21 PT
121,131,132,141,142,152,162 CS 003 JB
16 PBSpectrum AnalyzerCurrent Probe
29 ERTEGSE1
22 PT 23 BD 26 PT 37,38 PTFaro Arm, D.ClarkStand (HESSI)
30 ERTEGSE1Mu Metal Cans
35 ERTEGSE1Mu Metal Cans
THEMIS FlightInstruments
121 ML
FM1 Instrument Suite Pre-Ship Review (PSR) INT-4 UCB September 21, 2005
F1 Probe I&T Flow
Ship to JPL
DeploymentSimulations (E&B)
Probe Self-Compatibility
Probe CPT
EMI Signature
Mount FGM/SCMSensors on Booms
Probe LPT
Probe AT
Probe CPTMag BoomsClearance Checks
Solar PanelElectrical Systems
CheckoutMount
S/A Panels
EMI Signature
Swap out BAUEDU #2 w/ Flight
HardwareCloseouts/Install
ThermalTreatments
Instl Probe intoShippingContainer
Inspection/Electrical
Checkout ofS/A Panels
Solar Panels fromCoI
ESC Check ofCloseouts
ESC check ofS/A Panels
PER
HAZARDOUS OP
16 PBSpectrum AnalyzerCurrent Probe
10,11,12,32 SH/ERTEGSE1Mu Metal Cans
17 ERTEGSE1Mu Metal Cans
31 ERTEGSE1SPB SimulatorAXB ResistiveSimulatorFGB/SCB ResistiveSimulator
??? SAI
24,25 PT
To JPL Flow
10,11,13,33 SH/ERTEGSE1
10,11,14,34 SH/ERTEGSE1
16 PBSpectrum AnalyzerCurrent Probe
??? PT/CS ??? SAI/PTCovers
SAI-PROC-1431 ERTEGSE1Bright Lights - 500W
40 JBEGSE1
27 PTETU FGMETU SCM
10,11,12,32 SH/ERTEGSE1Mu Metal Cans
15 SAI/PTLifting SlingProbe Lifting FixtureProbe StandMag Shipping Cases
003 COI/JB ??? SAI/ERT
BlanketS/A Panels
??? SAI/PT
RCS MEOP Test(to BGS)
055 MSEGSE1
FM1 Instrument Suite Pre-Ship Review (PSR) INT-5 UCB September 21, 2005
F1 Probe I&T Facility
FM1 Instrument Suite Pre-Ship Review (PSR) INT-6 UCB September 21, 2005
F1 Probe I&T Facility
FM1 Instrument Suite Pre-Ship Review (PSR) INT-7 UCB September 21, 2005
Doc Number Description Rev StatusMission Integration and Test Proceduresthm-mint-proc-010 THEMIS Probe Power On Procedure Modify SAI-1526
thm-mint-proc-011 THEMIS Probe Power Off Procedure Modify SAI-1526
thm-mint-proc-012 THEMIS Bus CPT Procedure Modify SAI-XXX
thm-mint-proc-013 THEMIS Bus LPT Procedure Modify SAI-1527
thm-mint-proc-014 THEMIS Bus AT Procedure Modify SAI-XXX
thm-mint-proc-015 THEMIS Probe Loading and Unloading Procedure Modify SAI-1377
thm-mint-proc-016 THEMIS Probe EMC/EMI Signatures Draft In Progress
thm-mint-proc-017 THEMIS Probe Self Compatibility Modify SYS-009
thm-mint-proc-020 THEMIS Instrument Harness Installation Draft In Progress
thm-mint-proc-021 THEMIS IDPU/ESA Mechanical Integration Procedure Initial Rev Released
thm-mint-proc-022 THEMIS SST Mechanical Integration Procedure Draft Released
thm-mint-proc-023 THEMIS SPB Instrument Mechanical Integration Procedure
Initial Rev Released
thm-mint-proc-024 THEMIS FGM Sensor Mechanical Integration Procedure
Draft Released
thm-mint-proc-025 THEMIS SCM Sensor Mechanical Integration Procedure
Draft Released
F1 Probe I&T Documentation
FM1 Instrument Suite Pre-Ship Review (PSR) INT-8 UCB September 21, 2005
Doc Number Description Rev StatusMission Integration and Test Proceduresthm-mint-proc-026 THEMIS Mag Boom Mechanical Integration and
Alignment # Assigned
thm-mint-proc-027 THEMIS Mag Boom Mechanical Clearance Verification # Assigned
thm-mint-proc-028 THEMIS IDPU Electrical Integration Procedure Modify SAI-1563
thm-mint-proc-029 THEMIS Particles Electrical Integration Test Initial Rev Released
thm-mint-proc-030 THEMIS Fields Electrical Integration Test Initial Rev Released
thm-mint-proc-031 THEMIS Deployment Verification Test Draft Released
thm-mint-proc-032 THEMIS Instrument CPT Procedure Modify SYS-005
thm-mint-proc-033 THEMIS Instrument LPT Procedure Modify SYS-006
thm-mint-proc-034 THEMIS Instrument AT Procedure Modify SYS-007
thm-mint-proc-035 THEMIS Closed Loop ACS Test Procedure # Assigned
thm-mint-proc-036 THEMIS SST Connector Plate Alignment Procedure Draft Released
thm-mint-proc-038 THEMIS Mag Boom Restow Procedure # Assigned
thm-mint-proc-039 THEMIS Instrument Closeout Procedure # Assigned
thm-mint-proc-120 THEMIS Facility and MGSE Magnetic Test Procedures Draft Released
thm-mint-proc-121 THEMIS Component Magnetic Test Procedure Draft In Progress
F1 Probe I&T Documentation
FM1 Instrument Suite Pre-Ship Review (PSR) INT-9 UCB September 21, 2005
Doc Number Description Rev StatusMission Integration and Test Proceduresthm-mint-proc-122 THEMIS ESA/SST Purge Hookup Procedure Initial Rev Released
thm-mint-proc-040 THEMIS Probe ESC Test Procedures # Assigned
thm-mint-proc-041 THEMIS Probe EMC Test Procedure # Assigned
thm-mint-proc-042 THEMIS Probe Magnetics Test Procedure # Assigned
thm-mint-proc-043 THEMIS Probe Vibration Test Procedure Draft Released
thm-mint-proc-044 THEMIS Probe Pair Vibration Test Procedure # Assigned
thm-mint-proc-045 THEMIS Probe Vibration Test Electrical Configuration # Assigned
thm-mint-proc-046 THEMIS Probe TV Test Procedure # Assigned
thm-mint-proc-047 THEMIS Probe Pair TV Test Procedure # Assigned
thm-mint-proc-048 THEMIS Probe TV Functional # Assigned
thm-mint-proc-049 THEMIS Probe Spin Balance Procedure # Assigned
thm-mint-proc-050 THEMIS Probe CTV RF Compatibility Test Procedure # Assigned
thm-mint-proc-051 THEMIS Probe Fueling/Defueling Procedure # Assigned
thm-mint-proc-052 THEMIS Probe Pre-TV Closeout Procedure # Assigned
thm-mint-proc-053 THEMIS Probe Pre-Launch Closeout Procedure # Assigned
thm-mint-proc-054 THEMIS Probe Battery Ops Procedure # Assigned
F1 Probe I&T Documentation
FM1 Instrument Suite Pre-Ship Review (PSR) INT-10 UCB September 21, 2005
Doc Number Description Rev StatusMission Integration and Test Proceduresthm-mint-proc-055 THEMIS Probe RCS Pressure Test and Leak Check # Assigned
thm-mint-proc-056 THEMIS Probe Rollover Procedure # Assigned
thm-mint-proc-058 THEMIS Probe Lift in Rollover Fixture Procedure # Assigned
thm-mint-proc-059 THEMIS Probe Thermal Vac Chamber Loading Procedure
# Assigned
thm-mint-proc-140 THEMIS Probe Thermal Closeout Procedure # Assigned
thm-mint-proc-060 THEMIS PCA Vibration Test Procedure # Assigned
thm-mint-proc-061 THEMIS PCA Acoustics Test Procedure # Assigned
thm-mint-proc-062 THEMIS PCA LV Mate Procedure # Assigned
thm-mint-proc-063 THEMIS PCA LV Electrical Test Procedure # Assigned
thm-mint-proc-064 THEMIS PCA Pre Encapsulation Closeout Proc # Assigned
thm-mint-proc-065 THEMIS PCA Launch Tower Electrical Test Procedure # Assigned
thm-mint-proc-066 THEMIS PCA Pre Launch Closeout Proc # Assigned
thm-mint-proc-067 THEMIS PCA Spin Balance Procedure # Assigned
thm-mint-proc-080 THEMIS Probe End-to-End with MOC/SOC Draft In Progress
thm-mint-proc-081 THEMIS Launch & Early Orbit Simulations # Assigned
F1 Probe I&T Documentation
FM1 Instrument Suite Pre-Ship Review (PSR) INT-11 UCB September 21, 2005
Doc Number Description Rev StatusMission Integration and Test Proceduresthm-mint-proc-082 THEMIS Contingency Procedures # Assigned
thm-mint-proc-083 THEMIS UCB Ground Station RF System Sensitivity Test
Draft In Progress
Mission Integration and Test Procedures - Swales DocumentsSAI-PROC-1373 1373-Probe Assembly Procedure
SAI-PROC-1404 1404-Side Solar Array Installation Procedure
SAI-PROC-1417 1417-BAU and Transponder Mechanical Installation
SAI-PROC-1418 1418-Sun Sensor Mechanical Installation
SAI-PROC-1421 1421-Battery Mechanical Installation Procedure
SAI-PROC-1427 1427-BAU Electrical Integration Procedure
SAI-PROC-1428 1428-IRU Electrical Integration Procedure
SAI-PROC-1429 1429-MSSS Electrical Integration Procedure
SAI-PROC-1430 1430-AEB Electrical Integration Procedure
SAI-PROC-1431 1431-S/A Electrical Integration Procedure
SAI-PROC-1432 1432-Battery Electrical Integration Procedure
SAI-PROC-1433 1433-RCS Electrical Integration Procedure
F1 Probe I&T Documentation
FM1 Instrument Suite Pre-Ship Review (PSR) INT-12 UCB September 21, 2005
Doc Number Description Rev StatusMission Integration and Test Procedures - Swales DocumentsSAI-PROC-1435 1435-Transponder/Antenna Electrical Integration
Procedure
SAI-PROC-1461 1461-Electrical Test Set (ETS) Inspectrion and Functional Test
SAI-PROC-1377 1377-Probe Ground Lifting and Handling Procedure
SAI-PROC-1351 1351-PCA Assembly Procedure
SAI-PROC-1398 1398-Sep System Installation Procedure
SAI-PROC-1434 1434-Probe Carrier Electrical Integration Procedure
SAI-PROC-1406 1406-PCA Lifting and Handling Procedure
SAI-PROC-XXX Probe Container Lifting Procedure
SAI-PROC-XXX Delivery Inspection of SA Panels
SAI-PROC-XXX P1 ETU BAU Removal and Flight BAU Installation
SAI-PROC-XXX S/A Mechanical Integration Procedure
F1 Probe I&T Documentation