flujo1 - Complete.pdf

12
Location: Engineer: Study Case: LF 12.5.0E Page: 1 SN: ESPELTGAEC Filename:  practica1 Project:  ETAP Contract:  Date: 04-21-2014 Revision: Base Config.:  Normal  None Load Diversity Factor: Design Generation Category (1): Design Loading Category (1): Load Flow Analysis Electrical Transient Analyzer Program  Number of Buses:  Number of Branches:  1 0 2 3  1 0 0 1 0 0 2 Total Load V-Control XFMR2 Total Tie PD Impedance Line/Cable Reactor XFMR3 Swing Maximum No. of Iteration: System Frequency: Unit System: Project Filename: Output Filename: Precision of Solution: Method of Solution: Adaptive Newton-Raphson Method 99 0.0001000 60.00 Hz English  practica1 C:\Users\labctr\Desktop\flacal\practica1\flujo1.lfr 

Transcript of flujo1 - Complete.pdf

Page 1: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 1/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 1

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

 NoneLoad Diversity Factor:

DesignGeneration Category (1):

DesignLoading Category (1):

Load Flow Analysis

Electrical Transient Analyzer Program

 Number of Buses:

 Number of Branches:

 1 0 2 3

 1 0 0 1 0 0 2

TotalLoadV-Control

XFMR2 TotalTie PDImpedanceLine/CableReactor XFMR3

Swing

Maximum No. of Iteration:

System Frequency:

Unit System:

Project Filename:

Output Filename:

Precision of Solution:

Method of Solution: Adaptive Newton-Raphson Method

99

0.0001000

60.00 Hz

English

 practica1

C:\Users\labctr\Desktop\flacal\practica1\flujo1.lfr 

Page 2: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 2/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 2

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Adjustments

Transformer Impedance:

Reactor Impedance:

Tolerance

Overload Heater Resistance:

Transmission Line Length:

Cable Length:

Temperature Correction

Transmission Line Resistance:

Cable Resistance:

Apply

Adjustments /Global

Individual

Percent

Apply

Adjustments

Individual

/Global Degree C

Individual

Individual

Individual

Individual

Yes

Yes

 No

 No

 No

Yes

Yes

Page 3: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 3/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 3

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Bus Input Data

Sub-sys

GenericConstant IConstant ZConstant kVAInitial VoltageBus

Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

Load

Bus1 1 0.0115.000 100.0

Bus2 1 0.013.200 100.0

Bus3 1 0.013.200 100.0 9.000 0.000

 0.0000.000 9.000Total Number of Buses:  3  0.000 0.000 0.000 0.000 0.000

ID kV

Generation Bus

Sub-sysType

Voltage

 % Mag. Angle MW Mvar Max Min

Generation Mvar Limits

% PF

Bus1 1Swing 0.0115.000 100.0

 0.000 0.000

Page 4: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 4/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 4

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Line/Cable Input Data

ID Library Size T (°C)

Line/Cable

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Adj. (ft) #/Phase% Tol.

Length

YR X

Cable1 15NCUS3 3/0 328.1 1 0.089655 0.036000750.0

Line / Cable resistances are listed at the specified temperatures.

Page 5: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 5/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 5

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

 2-Winding Transformer Input Data

ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.

Transformer % Tap Setting

% Tol.

Rating Z Variation

+ 5% - 5%

Phase Shift

Type Angle% Z

Adjusted

Phase

T1 4.80 23.70 0 000 0 0.0004.80003-Phase Dyn25.000 115.000 13.200

Page 6: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 6/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 6

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Branch Connections

ID From Bus To Bus R X ZType

CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

 Y

T1 Bus1 0.81 19.18 19.20Bus22W XFMR 

Cable1 Bus2 1.69 0.68 1.82Bus3Cable

Page 7: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 7/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 7

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

LOAD FLOW REPORT

Bus

ID kV

Voltage

Ang.% Mag.

 Generation

MW Mvar  

Load

MW Mvar  

Load Flow

MW Mvar AmpID %PF

XFMR 

%Tap

Bus1*  115.000 0.0100.000 0.1608.977 Bus2 8.977 0.160 45.1 100.00 0

Bus2 13.200 -1.099.911 Bus3 8.970 0.005 392.7 100.00 0 0 0

Bus1 -8.970 -0.005 392.7 100.0

Bus3 13.200 -1.099.760 0.0008.957 Bus2 -8.957 0.000 392.7 100.00 0

 *

 #  Indicates a bus with a load mismatch of more than 0.1 MVA

Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)

Page 8: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 8/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 8

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Bus Loading Summary Report

ID

Bus

kV

Directly Connected Load

MW Mvar MVA % PF AmpRated Amp LoadingMW Mvar MW Mvar  

Constant kVA Constant Z Constant IPercent

Generic

MW Mvar  

Total Bus Load

Bus1 115.000 8.978 45.1100.00 0 0 0 0 0 0 0

Bus2 13.200 8.970 392.7100.00 0 0 0 0 0 0 0

Bus3 13.200 8.957 392.7100.00 0 8.957 0 0 0 0 0

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

Page 9: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 9/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 9

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Branch Loading Summary Report

ID Type

Loading

Amp %

Capability

(MVA) MVA %

Loading (output)

CKT / Branch Cable & Reactor

Transformer

Loading (input)

%MVA

Ampacity

(Amp)

Cable1 Cable 210.17 392.70 186.85*

T1 Transformer 25.000 8.978 35.9 8.970 35.9

*  Indicates a branch with operating load exceeding the branch capability.

Page 10: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 10/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 10

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Branch Losses Summary Report

ID MW Mvar MW Mvar kW kvar From To

CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage% Drop

Vd

in Vmag

 6.5 154.6 100.0 99.9 0.09T1 8.977 0.160 -8.970 -0.005

 13.6 5.5 99.9 99.8 0.15Cable1 8.970 0.005 -8.957 0.000

 20.1 160.1

Page 11: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 11/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 11

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

Alert Summary Report

Cable  95.0100.0

Bus

MarginalCritical

 95.0100.0

Loading

% Alert Settings

 95.0100.0

 95.0100.0

 95.0100.0

Line

Transformer 

Reactor 

Panel

 95.0100.0

 95.0 98.0

 102.0105.0

 95.0100.0

 95.0100.0

 95.0100.0

100.0

Generator Excitation

Bus Voltage

UnderExcited (Q Min.)

OverExcited (Q Max.)

UnderVoltage

OverVoltage

Protective Device

Generator 

Inverter/Charger   100.0 95.0

Critical Report

Device ID Type Rating/LimitCondition Unit Operating % Operating Phase Type

 186.9 3-PhaseOverloadCable1 Cable Amp210,17 392,70

Page 12: flujo1 - Complete.pdf

7/18/2019 flujo1 - Complete.pdf

http://slidepdf.com/reader/full/flujo1-completepdf 12/12

Location:

Engineer:Study Case:  LF

12.5.0E

Page: 12

SN: ESPELTGAEC

Filename:  practica1

Project:  ETAP

Contract:  

Date: 04-21-2014 

Revision: Base

Config.:  Normal

 0.0000.0000.000

 0.0000.0000.000

Lagging100.008.957

Total Generic Load:

Total Constant I Load:

 0.0000.000

 0.1600.020

 Number of Iterations: 3

System Mismatch:

Apparent Losses:

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

 0.000

Lagging

Lagging

 0.0008.957

 0.0000.000

 99.988.9780.1608.977

 0.0000.0000.000

 99.988.9780.1608.977

% PFMVAMvarMW

Total Static Load:

Total Motor Load:

Total Demand:

Source (Non-Swing Buses):

Source (Swing Buses):