Submitted by:Roll no: 2011-CH-05
2011-CH-372011-CH-532011-CH-89
Submitted to: Sir Usman
ASSIGNMENT
FLUID DYNAMICS& MASS
TRANFER LAB MAINTENANCE
-
8/12/2019 fluid engineer
2/8
Fluid Dynamics Lab
SrNo.
EquipmentName
MaintenanceSuggestion
Maintenance TypeRoutine Non-
Routine
1
Compressibleflow batch
Lubrication of the mechanical parts Change of motor(rotary part) oil
Check the supply line Check erosion and corrosion on the
surface
Check cracks or any damage Check electrical connection
Check working of motor (rotary part)
2 HydraulicBench
Check all electrical supply andconnection
Clean the hydraulic bench with anyreagent to remove the adhesive
particles.
Flow meter calibration Check all the valve for leakage Check cracks or any damage
Check the lubrication of the pump (rotarypart)
Check pump sound
3OsborneApparatus
Check if there are any cracks Check discharge, inlet pipes and valves
for possible leakage
Dye injection point should not beblocked
-
8/12/2019 fluid engineer
3/8
SrNo.
Equipment Maintenance Suggestion Maintenance TypeRoutine Non-
Routine
4
Orifice
&Jet Apparatus
Check possible leakage ifany
Check utilities supply lines Check valves
Cleaning of the vessel
5Fixed
&Fluidized Bed
Calibration of flow meter Check pump Check motor
Check electricity supply andconnections
6 Flow meterdemonstration
Check all the valve forleakage
Check all the pipes
Check pump
7 Sedimentation Cleaning of the vessel Check for cracks on thetubes
8 Fermenter Cleaning Check Corrosion and erosion
9 Dead weight calibrator Check Rusting of weights(Stationary)
10 Distilling apparatus Tube cleaning (Stationary) Cleaning from outside
(Stationary)
Check scaling and rusting ofcylinder (Stationary)
Sr
-
8/12/2019 fluid engineer
4/8
No. Equipment Maintenance Suggestion Maintenance TypeRoutine Non-
Routine
11Bio sorption
Check Plastic tube scaling(Stationary)
Pump maintenance(Stationary)
Motor maintenance (rotary)
12Bernoullis apparatus Scaling of tube (Stationary)
13 Hydrostatic pressureapparatus )
Wooden Block Maintenance(Stationary
14Burner
Maintenance oftubes(Stationary)
Maintenance of burner flamefilament (Stationary)
Valves (Stationary)
Digital meter (Stationary)
15 Centrifugal compressordemonstration unit
Compressor MaintenanceWires (Stationary)
16Centrifugal fan
demonstration unit
Maintenance ofFan (rotary)
Wires (Stationary) Connectors (Stationary)
-
8/12/2019 fluid engineer
5/8
SAFETY AND BUILDING POINTS:
Proper Ventilation must be ensured Light should be appropriate
Equipment must be placed at safe distance Emergency exit should be there Fire Extinguishers and first aid kit must be available
-
8/12/2019 fluid engineer
6/8
Mass Transfer Lab
Sr.No
Equipment Maintenance Suggestion Routine Non-Routine
1
Tray Dryer
Power supply Electric Connections
Weigh Balance calibration Support stand
2 Liquid LiquidExtraction
Tubes cleaning.
Cleaning of inlet discharge points Packing should be cleaned
Check cracks or any damage Vessel must be impurities free
Glass tower cracks
Flow meter Calibration
Trays condition should be checked
3
Batch andContinuousDistillationColumn
Valves Temperature sensors must be checked
Insulation must be checked
-
8/12/2019 fluid engineer
7/8
SrNo.
Equipment Maintenance Suggestion Maintenance TypeRoutine Non-
Routine
3
Vaccum valve calibration
Trays wear and tear
4Ion Exchanger
Apparatus
Regeneration of the resins Regents must be replaced
Conductivity metre should bechecked after some time
Flow meter calibration
Corrosion check
5
Reverse Osmosis
Flow meter check andcalibration
Pressure gauge andcalibration
Membrane cleaning andreplacement
Control Circuit
6
Fruit Concentrator
Short wiring (pump) Filter check
Pressure gauge calibration Filter replacement
7
Cyclone Separator
Pressure gauge calibration Electrical pump Corrosion check
-
8/12/2019 fluid engineer
8/8
8
Spiral wound Reverse
Osmosis
5 micron centrifuge filtercheck
Cleaning of filter Pressure gauge calibration
Flow meter calibration
9
CNG Engine
Engine oil should bechanged
Petrol pump must be wellcalibrated
CO ratio must be check Cracks and damage to the
CNG cylinder
Scaling in the regulator mustbe removed
Wiring must be checked
SAFETY AND BUILDING POINTS: Proper Ventilation must be ensured Light should be appropriate Equipment must be placed at safe distance Emergency exit should be there Fire Extinguishers and first aid kit must be available