    Submitted by:Roll no: 2011-CH-05

    2011-CH-372011-CH-532011-CH-89

    Submitted to: Sir Usman

    ASSIGNMENT

    FLUID DYNAMICS& MASS

    TRANFER LAB MAINTENANCE

  • 8/12/2019 fluid engineer

    2/8

    Fluid Dynamics Lab

    SrNo.

    EquipmentName

    MaintenanceSuggestion

    Maintenance TypeRoutine Non-

    Routine

    1

    Compressibleflow batch

    Lubrication of the mechanical parts Change of motor(rotary part) oil

    Check the supply line Check erosion and corrosion on the

    surface

    Check cracks or any damage Check electrical connection

    Check working of motor (rotary part)

    2 HydraulicBench

    Check all electrical supply andconnection

    Clean the hydraulic bench with anyreagent to remove the adhesive

    particles.

    Flow meter calibration Check all the valve for leakage Check cracks or any damage

    Check the lubrication of the pump (rotarypart)

    Check pump sound

    3OsborneApparatus

    Check if there are any cracks Check discharge, inlet pipes and valves

    for possible leakage

    Dye injection point should not beblocked

  • 8/12/2019 fluid engineer

    3/8

    SrNo.

    Equipment Maintenance Suggestion Maintenance TypeRoutine Non-

    Routine

    4

    Orifice

    &Jet Apparatus

    Check possible leakage ifany

    Check utilities supply lines Check valves

    Cleaning of the vessel

    5Fixed

    &Fluidized Bed

    Calibration of flow meter Check pump Check motor

    Check electricity supply andconnections

    6 Flow meterdemonstration

    Check all the valve forleakage

    Check all the pipes

    Check pump

    7 Sedimentation Cleaning of the vessel Check for cracks on thetubes

    8 Fermenter Cleaning Check Corrosion and erosion

    9 Dead weight calibrator Check Rusting of weights(Stationary)

    10 Distilling apparatus Tube cleaning (Stationary) Cleaning from outside

    (Stationary)

    Check scaling and rusting ofcylinder (Stationary)

    Sr

  • 8/12/2019 fluid engineer

    4/8

    No. Equipment Maintenance Suggestion Maintenance TypeRoutine Non-

    Routine

    11Bio sorption

    Check Plastic tube scaling(Stationary)

    Pump maintenance(Stationary)

    Motor maintenance (rotary)

    12Bernoullis apparatus Scaling of tube (Stationary)

    13 Hydrostatic pressureapparatus )

    Wooden Block Maintenance(Stationary

    14Burner

    Maintenance oftubes(Stationary)

    Maintenance of burner flamefilament (Stationary)

    Valves (Stationary)

    Digital meter (Stationary)

    15 Centrifugal compressordemonstration unit

    Compressor MaintenanceWires (Stationary)

    16Centrifugal fan

    demonstration unit

    Maintenance ofFan (rotary)

    Wires (Stationary) Connectors (Stationary)

  • 8/12/2019 fluid engineer

    5/8

    SAFETY AND BUILDING POINTS:

    Proper Ventilation must be ensured Light should be appropriate

    Equipment must be placed at safe distance Emergency exit should be there Fire Extinguishers and first aid kit must be available

  • 8/12/2019 fluid engineer

    6/8

    Mass Transfer Lab

    Sr.No

    Equipment Maintenance Suggestion Routine Non-Routine

    1

    Tray Dryer

    Power supply Electric Connections

    Weigh Balance calibration Support stand

    2 Liquid LiquidExtraction

    Tubes cleaning.

    Cleaning of inlet discharge points Packing should be cleaned

    Check cracks or any damage Vessel must be impurities free

    Glass tower cracks

    Flow meter Calibration

    Trays condition should be checked

    3

    Batch andContinuousDistillationColumn

    Valves Temperature sensors must be checked

    Insulation must be checked

  • 8/12/2019 fluid engineer

    7/8

    SrNo.

    Equipment Maintenance Suggestion Maintenance TypeRoutine Non-

    Routine

    3

    Vaccum valve calibration

    Trays wear and tear

    4Ion Exchanger

    Apparatus

    Regeneration of the resins Regents must be replaced

    Conductivity metre should bechecked after some time

    Flow meter calibration

    Corrosion check

    5

    Reverse Osmosis

    Flow meter check andcalibration

    Pressure gauge andcalibration

    Membrane cleaning andreplacement

    Control Circuit

    6

    Fruit Concentrator

    Short wiring (pump) Filter check

    Pressure gauge calibration Filter replacement

    7

    Cyclone Separator

    Pressure gauge calibration Electrical pump Corrosion check

  • 8/12/2019 fluid engineer

    8/8

    8

    Spiral wound Reverse

    Osmosis

    5 micron centrifuge filtercheck

    Cleaning of filter Pressure gauge calibration

    Flow meter calibration

    9

    CNG Engine

    Engine oil should bechanged

    Petrol pump must be wellcalibrated

    CO ratio must be check Cracks and damage to the

    CNG cylinder

    Scaling in the regulator mustbe removed

    Wiring must be checked

    SAFETY AND BUILDING POINTS: Proper Ventilation must be ensured Light should be appropriate Equipment must be placed at safe distance Emergency exit should be there Fire Extinguishers and first aid kit must be available