Flowsheet HIDRO

2
1 S Loaded Organic Refinate Pregnant Leaching Solution Spent Organic Rich Electrolyte tank Spent Electrolyte tank Copper Cathodes 99.99% Cu Refinate E Waste Primary Crushing 50 x 65 Stockpile Secondary Crushing 2 H 6000 Third Crushing 5 H 6000 Sulphuric Acid Water Agglomerate 2 Drums Leaching Solvent Extraction 2 Train Electrowinning 284 Cells Pilas From Calama 68 km . From Encuentro 90 km . Electric Energy 2 Ponds 1 Pond Stacker S Loaded Organic Refinate Pregnant Leaching Solution Spent Organic Rich Electrolyte tank Spent Electrolyte tank Copper Cathodes 99.99% Cu Refinate E Waste Chancador Primario (Giratorio Svedala) 50 x 65 (1270 x 1651) Stockpile Secondary Crushing 2 H 6000 Third Crushing 5 H 6000 Sulphuric Acid Water Agglomerate 2 Drums Leaching Solvent Extraction 2 Train Electrowinning 284 Cells Pilas From Calama 68 km . From Encuentro 90 km . Electric Energy 2 Ponds 1 Pond Stacker

description

hidro flujo

Transcript of Flowsheet HIDRO

Page 1: Flowsheet HIDRO

1

S

Loaded Organic Refinate

Pregnant Leaching Solution Spent Organic

Rich Electrolyte tank

Spent Electrolyte tank

Copper Cathodes

99.99% Cu

Refinate

E

Waste

Primary Crushing

50 x 65

Stockpile

Secondary Crushing

2 H 6000

Third Crushing

5 H 6000

Sulphuric Acid

Water

Agglomerate

2 Drums

Leaching

Solvent

Extraction

2 Train

Electrowinning

284 Cells

Pilas

From

Calama 68 km .

From

Encuentro 90 km .

Electric Energy

2 Ponds

1 Pond

Stacker

S

Loaded Organic Refinate

Pregnant Leaching Solution Spent Organic

Rich Electrolyte tank

Spent Electrolyte tank

Copper Cathodes

99.99% Cu

Refinate

E

Waste

Chancador Primario (Giratorio Svedala)

50 x 65 (1270 x 1651)

Stockpile

Secondary Crushing

2 H 6000

Third Crushing

5 H 6000

Sulphuric Acid

Water

Agglomerate

2 Drums

Leaching

Solvent

Extraction

2 Train

Electrowinning

284 Cells

Pilas

From

Calama 68 km .

From

Encuentro 90 km .

Electric Energy

2 Ponds

1 Pond

Stacker

Page 2: Flowsheet HIDRO

2