    *-IncludesHiddenFailureDetectionProgram

    HiddenFailures:Thesearedefinedasthosewhosefunctionalfailureisnotknownunlessaskedtoperform.E.g.LiftingofReliefValve,Equipmentprotectivefunctions

    ReliabilityBasedMaintenanceBusinessProcess-SteadyStageOperations

    Proactive

    Maintenance

    PredictiveMaintenanceBreakdown

    Maintenance

    Reactive

    Maintenance

    Schedulebased

    Maintenance

    Observation

    Maintenance-LLF

    FailureAnalysis

    ConditionMonitoring/

    InspectionProgram

    LubricationProgram

    CorrectiveRepair

    Overhaul

    Maintenance

    ScheduledJob

    Preventive(non-invasive)

    Maintenance*

    ChangeOver

    Program

    ReliabilitybasedMaintenanceStrategy

    JobNotification

    SparePartsManagement

    Program

    JobExecution

    Monitor(KPI's,Metrics)/ReviewofJobs/

    Practices/Strategy

    Internal/ExternalAuditofJobs/

    Practices/Strategy

    Equipment/Process

    DesignChanges

    Contracts/Vendor

    ManagementProgram

    Documentation

    Systems

    Knowledge/Skill

    DevelopmentProgram

    Recommendations

    MIS

    OperatingWindow

    Monitoring

    UpdateScope/Practices/Strategy

    FMEA/RCM/RBI/

    HAZOPstudiesto

    reviewschedules/

    strategy

    A

    AA A A FieldChangeOrders

    FailureAnalysis

    Recommendations

    Safety/EnvironmentAuditRecomendations

  • 8/11/2019 Flow Charts (SWO)

    3/16

    JobPlanningandScheduling

    IdentifyJob

    No

    Yes

    CreateNotification:

    Canberaisedby:

    Opn.,Maint.,CES,CTS

    Yes

    No

    Emergencyjob?

    No

    Urgentjob?

    AppendittoMaintenanceBacklogActivities

    PMRoutines

    Statutory/SeasonalJobs

    RoutineJobsBacklog

    4Weeks-Advance

    IncludeActivitieson

    weeklyschedule

    JobValidation?

    ByMaint./Opn.

    RejectJob

    4Weeks-Advance

    PrepareJobScope

    PlanforMaterials+Resources

    EstimateJobCost/Duration3Weeks-Advance

    PrepareWorkOrders

    WOApproval

    OrderMaterials

    1Week-Advance

    ReceiveMaterials,BookResources

    FinalizeSchedule

    InformMaint.Sup,andOperations

    1day-Advance

    ApplyforPermit

    ConfirmMaterial/

    Resources

    ReleaseJob?

    ExecuteWork

    CloseNotification

    WorkClosureReport

    EquipmentHistorywithcostandduration

    Acceptedby

    Operations?

    ArrangeMaterialsand

    ResourcestoreachSite

    Yes

    No

    Yes

    Yes

    No

    10days-Advance

    PrepareSchedule

    Allresourcesavailable?

    Yes

    No

    AnyAction

    items?

    CorrectiveRepairKPI's

    No

    Yes

    Analyzedeviations-

    CorrectiveAction

  • 8/11/2019 Flow Charts (SWO)

    4/16

    CES:CentralEngineeringServices

    FIR:FailureInformationReport

    FAR:FailureAnalysisReport

    ObservationMaintenance-Look,ListenandFeel(L,L,F)

    L,L,FSchedule

    PlantOperator

    Maintenance

    Supervisor

    CES-Functional

    Engineer

    UnitEquipmentList

    Surprise

    Observation?

    FIRRequired?

    FARProcess

    Yes

    Yes

    No

    No

    EveryShift

    Weekly

    Fortnightly

    CorrectiveRepairRecordObservations

    KPI's

    Analyzedeviations-

    CorrectiveAction

  • 8/11/2019 Flow Charts (SWO)

    5/16

    PreventiveMaintenancejobsaredescribedasperiodicmaintenancetasksthatareprimarilynon-invasivew.r.ttheequipment.

    PM(PreventiveMaintenance)Jobsshallalsoincludeprotectivefunctionchecksandcalibrationschedules

    *ESS:EquipmentServiceSheets

    PreventiveMaintenanceJobProcess

    PlanJob

    ReleaseJob?

    PlanResources

    PermittoWork

    ExecuteWork

    Feedback-

    Observations

    ClosePMOrder

    Feedback-

    JobFrequency

    RevisePM

    Frequency/

    Schedule

    Reschedule

    Job

    Surprise

    Observation?

    No

    Yes

    NotifyCompliance

    FIR

    Required?

    FARProcess

    Feedback-

    JobScope

    ReviseESS

    PMOrder

    Resources

    Available?

    Yes

    No

    Yes

    No

    No

    Yes

    EquipmentHistory

    EquipmentMasterList

    ListSemi-CriticalEquipment.Inst.that

    requirecalibration,ProtectiveFunction,

    Inst.Alarm+Tripslists

    EquipmentType

    EquipmentHistory

    Operating

    i i

    DecidePMFrequency

    andScope-byCES

    ESS

    Accept.-Functional

    HODs

    Input-CMMS

    GeneratePMSchedule

    IssuePMJobsListing

    A

    A

    CorrectiveRepairPractice

  • 8/11/2019 Flow Charts (SWO)

    6/16

    ChangeoverPractice

    StandbyEqupmentList

    ChangeoverFrequency(byCES)

    Acceptable?

    ReviewFequency

    (byOperationsandMaint.)

    PrepareScheduleconsideringPM

    schedule(byCES,Planning)

    ImplementSchedule

    (byOperations)

    Compliance?

    NotifyCompliance

    (byOperations)

    Problemwitheqpt.

    takenonline?

    UpdateChangeover

    Record

    Eqpt.cannotbetakenon

    lineduetoOpn.reasons?

    Stanbyequipment

    unavailable?

    Yes

    No

    No

    No

    Yes

    Isashortdurationtrial

    possibleinparallel?

    Yes

    TakeTrial

    Bartheequipment.Ensure

    freeness.

    Ifapplicable,conductstatic

    pressuretestwithprocessfluid

    Anuallydecoupleandtaketrial

    ofdriver

    No

    Recordobservationsand

    takerequiredaction

    Yes

    Reschedule

    Changeover

    Opn.toissuejustification

    Approvalby-Maint.and

    CES-HODs

    Reschedule

    Changeover

    No

    Yes

    Yes

    No

    Acceptable?

    (byOpn.)

    No

    Yes

    CorrectiveRepairPractice

  • 8/11/2019 Flow Charts (SWO)

    7/16

    *-BMP:BestMaintenancePractices

    TheseincludeObservation(LLF),Preventive,Predicitve,Overhaul,ChangeOver,LubricationMaintenancePractices

    AlsocoveredinthisflowchartarerecommendationsincludedinFARs.

    *SMP:StandardMaintenanceProcedures

    CorrectiveMaintenanceJobProcess

    PermittoWork

    ExecuteWork

    Feedback:

    RepairScope

    IssueReport

    Modify/Update

    SMP*

    Surprise

    Observation-

    Yes

    Corrective

    RepairNotification

    FIR

    Required?

    FARProcess

    Feedback-

    Observations

    No

    JobScope

    ArrangeResources

    Reschedule

    Job

    No

    Yes

    Resources

    Available?

    No

    Feedback:

    BMP

    Reviewand

    UpdateScope

    andFrequencyof

    BMPs

    Yes

    FeedbackfromBMPs*

    IssueActionItems

    No

    EquipmentHistory

    SMP

    PlanJob

    Yes

    ReleaseJob?

    ScheduleJob

  • 8/11/2019 Flow Charts (SWO)

    8/16

    SingleStreamEquipmentList+

    SpecificSemi-CriticalEquipment*

    OverhaulMaintenanceJobProcess

    *-Specificsemi-criticalequipmentmayincludeequipmentlikereciprocatingcompressors.

    Thesemaybeinstalledwithreadystand-by.

    Overhaul

    Scheduleand

    Scope(byCES)

    Accept.-Opn./

    Maint.HODsReschedule

    PlanJob

    ArrangeResources

    Specialist

    Requirement

    SparesAdequacy&

    Availability

    SpecialTooling

    SMPs

    ExecuteWork

    IssueReport

    No

    Yes

    Feedback:

    RepairScope

    Modify/Update

    SMP*

    SurpriseObservations

    Unattended?

    Yes

    FIR

    Required?

    FARProcess

    No

    Feedback-

    Observations

    PermittoWork

    ReleaseJob?

    Reschedule

    Job

    Resources

    Available?No

    IssueActionItems

    IssueActionItems

    No

    EquipmentHistory

    Yes

    YesNo

    ScheduleJob

    EquipmentHistory

    SingleStreamEquipmentList+

    SpecificSemi-CriticalEquipment

    Cranes+Rigging

  • 8/11/2019 Flow Charts (SWO)

    9/16

    *-BMP:BestMaintenancePractices

    TheseincludeObservation(LLF),Preventive,Predicitve,Overhaul,LubricationMaintenancePractices

    AlsocoveredarerecommendationsincludedinFARs.

    ConditionMonitoringProgram

    Eqpt.MonitoringList

    Critical Semi-Critical

    ConditionMonitoring/Inspection

    Parameters&FrequencyCES

    CMEquipment/Routes/

    Schedule/DataStorage

    Accept.-

    Maint.HODs

    CriticalityCriteria

    PublishCMProgram

    ImplementCMProgram

    Failureccurrence

    Detected?

    ReviseConditionMonitoring/

    InspectionParameters&Frequency

    OtherInputs-FAR,BMPs

    PublishAnalysisReportJobScope

    CorrectiveRepair

    No

    No Yes

    Yes

    Program

    Compliance?

    Reason:

    CMProgramScheduleEquip.MonitoringList

    CMEquipment

    Manpower

    YesNo

    PublishCompliance

    Report

    EquipmentMasterList

    Feedbackof

    Analysis

  • 8/11/2019 Flow Charts (SWO)

    10/16

    LubricationProgram

    EquipmentMasterList

    CESGuidelines:

    Procurement,Storage,

    Dispensing,Disposal

    Accept.-

    Maint.HODs

    LubricationMaster

    LubeTypesandQuantity

    (asperOEM)

    PublishLubr.Program

    ImplementLubr.Program

    No

    Yes

    Lubrication

    FailureEvent?

    ReviewLubricant,Schedule,

    Dispensing,Condition

    Monitoring

    CloseLubricationOrder

    NoYes

    Program

    Compliance?

    ReviewLub.Program

    Schedule

    Equip.MonitoringList

    Organization

    YesNo

    PrepareSchedules:

    LubricationOilandWearParticleAnalysis

    (basedoncriticalityofeqpt.)

    OptimizeLubeVarietyand

    Quantity

    Feedback-

    Observations

    LubeCondition

    Bad/Particles?

    FIR

    Required?

    FARProcess

    Yes

    Yes

    LubeandWear

    ParticleAnalysis

    Reports-Abnormal?

    FIR

    Required?

    FARProcess

    No

    No

    Yes

    EquipmentHistoryPublishCompliance

    Report

    No

    Yes

    EquipmentHistory

    No

    CorrectiveRepair

    AnnualProgramEffectiveness

    Review-ValidateRequirement,

    FrequencyandScope

    FARProcess

    CorrectiveRepair

  • 8/11/2019 Flow Charts (SWO)

    11/16

    BMP:BestMaintenancePractices

    FIR:FailureInformationReport

    FAR:FailureAnalysisReport

    CES:CentralEngineeringServices

    CTS:CentralTechnologyServices

    HOD:HeadofDepartment

    Repr.:Representative

    Opn.:Operations

    Maint.:Maintenance

    FailureAnalysisReportingProcess

    UnhealthySymptom/

    FailureOccurence

    Unsafecondition

    ProductionLoss?

    Repititive

    /Premature?

    RaiseFIR

    AttendFailure

    ConfirmFIR.

    RecommendFAR

    (byHOD-InitiatorDept.)

    FailureModedecidesFAR

    teamleader

    Approval?

    Maint.HOD

    ImplementRecommendations.

    Review/UpdateScope&

    FequencyofBMP

    Comlpetetionof

    Recommendations

    InformandCloseFAR

    TargetDate

    Exceeded?

    PendingFARList

    (withCES)

    Yes

    No

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    No

    No

    No

    ReviewandResolve

    theconstraint

    Concurrence-

    DisciplineHeads

    NoAnalysis+Recommendations

    No

    EquipmentHistory

    EquipmentHistory

    ConfirmFAR

    requirement?

    (byCES-HOD)

    RejectFARRequest

    Leader:

    Functional

    Specialist-CES

    Maint.Repr.

    Opn.Repr.

    CTS

    Approval?

    Opn.HOD

    Approval?

    CTS.HOD

    Approval?

    CES.HOD

    No

    No

    Yes

    Yes

    Yes

  • 8/11/2019 Flow Charts (SWO)

    12/16

    SparePartsManagement

    SparePartsClassification

    Consumables InsuranceSpares EquipmentSpares(Durables)

    Establishstocklevelsbasedonconsumption

    (byStores)

    Establishstocklevelsbasedonequipmentcriticalityand

    behaviour

    (byMaint.concurredbyCES)

    OrderSpares(byStores)

    ReviewConsumption

    (atleast3turnsPA)/Non

    movingformorethan2

    years/Stockouts(not

    morethan5%of

    consumbles)

    (byStores)

    ORDER:

    SparesspecifictotheUnit-

    byMaint.concurredby

    CES

    Sparescommonbetween

    Units-byCESconcurred

    byUnitMaint.

    Reviewtotalconsumption

    (atleast0.5turnsPA)/Non-

    Movingformorethan4years

    /Stockouts(notmorethan1

    %ofdurables)

    (byMaint.)

    Establishstocklevelsbasedoncriticalityandbehaviour

    (byMaint.andconcurredby

    CES)

    Listofsparesbelow

    reorderlevel

    (issuedbyStores)Deciderefurbishment/

    replenishmentofspares

    (byCESconcurredby

    .

    ReviewUsage

    (typical0.1turnsPA)/

    Stockouts(none)

    (byMaint.)

    Listofsparesbelow

    minimumlevel/

    Stockout

    (issuedbyStores)

    Refurbish/OrderSpares

    (byMaint.)

    Reportindicatingstockouts

    /requirements

    Approval

    FollowUp(byStores)

    Emergency?

    RaisePRImmediately

    InspectiononReceipt-

    (byIndentInitiator)

    Accept?

    ClearGRN

    Consumables:MonthlyPR

    Durables:QuarterlyPR

    NoYes

    Yes

    No

    ReleasePO

    MonthlyReport

    MaterialInventoryList

    CESGuidelines

    PreservationofSpares

    IncludeinStock

    NotifyReceipt

    StockinBinsafter

    preservation

    PartNumber,Description,

    Quantity,Location,

    Qnty-Reservedfor.

    ExpectedDeliveryDate

    AnnualReviewSparePartsCondition?

    AnnualReview

    PreservationProcedure

    Adequate?

    Bad

    No

    Yes

    Good

    AvailableStock

    AnnualSpares

    Requirementbased

    onAnnualMaint.

    Plan

  • 8/11/2019 Flow Charts (SWO)

    13/16

    ContractsManagement

    JobsIdentifiedforOutsourcing

    -Classification

    JobScopeandFrequencyFixed

    (AnnualMaint.Contract)

    JobScopeknown-OneTime

    (Outage/ProjectJobs)

    ScopeandFrequency

    Variable

    EstimateJob

    IdentifyContractors

    ObtainBids

    PrepareScope+Identify

    ResourcesandSkill

    Requirements

    Technically

    Acceptable?

    CommerciallyAcceptable?

    ReviewEstimate

    AwardContract

    JobQuality/ScheduleComplianceAcceptable?

    ExecuteJob

    RejectBid

    RejectBid

    ContractRecords

    Contractor'sFault?

    JobCompletionCertificate

    CloseOrder

    ApprovePayment

    DerateContractor

    CloseContract

    ReviewScope/Resources

    CallforRe-bids

    No

    Yes

    No

    Yes

    Yes

    No

    No

    Yes

    PrepareInitialScope+

    OptionalScope.Identify

    ResourcesandSkill

    Requirements

    Estimateforfixedscope+

    OptionalScope

    IdentifyContractors

    ObtainBids

    Technically

    Acceptable?

    Commercially

    Acceptable?

    RejectBid

    RejectBid

    No

    Yes

    No

    Yes

    ReviewEstimate

    AwardContract

    ExecuteJob

    ContractRecords

    JobVariation?

    Coveredin

    OptionalScope?

    ExecuteAdditionalScopeObtainquotefrom

    Minm.2contractorsfor

    additionalscope

    Negotiate

    AwardVariation

    Yes

    Yes

    No

    No

  • 8/11/2019 Flow Charts (SWO)

    14/16

    ShutdownManagementProcess

    PlanandSchedule

    JobsandActivities

    (PlanningDept.)

    ApprovalofJobsand

    Scheduleby-Opn.,Maint.

    HODs

    Review

    MicroPlanning-24thwkfrom0wk

    ArrangeResources

    No

    Yes

    List-CompilationofShutdownJobs-

    30thweekfrom0week(wk)

    ShutdownJobs

    PlantUpgrades

    ProjectActivities

    ApprovalofSchedule

    andBudget-TMC

    SpecialistRequirements

    SparesRequirements

    SpecialToolsandtackles

    AdministrationRequirementsPublishListofawaitedresources-

    8thweekfrom0wk

    No

    Yes

    PublishIntermediate

    Schedule-

    4thwkfrom0wk

    ScheduleApproved-S/TMC?

    Review

    PublishFinalSchedule-2ndwkfrom0wk

    ResourceMobilization

    InitiateJobsExecution

    PublishScheduleCompliance-Daily

    PublishListofLaggingJobs-Daily

    IdentifyResourseConstraints&Mobilize

    JobsCompletion

    ReviewJobswithPlan

    PrepareDocumentation

    Planning/SchedulingvsActual

    Expenditure-ActualvsBudget

    ResourceConstraints

    ConsumptionofSpares

    ActionItems

    ImprovementSuggestions

    Within4wks

    ReportonBenefitsderivedfrom

    Shutdownjobs/Projectsvs

    expectedgains.-24weeksaftercompletion

    WorkScopes/Manpower/

    Supervisors

    OrganizationStructure

    HeavyLiftingEquipment

    PublishandRecordinHistory

    PlanandScheduleAdditionalJobs-

    4thwk-2ndwkfrom0wk

    ReviewResourceAvailability-4thweekfrom0wk

    No

    Yes

  • 8/11/2019 Flow Charts (SWO)

    15/16

    TUTORIAL

    (secondoption)

    HiddenFailures:Thesearedefinedasthosewhosefunctionalfailureisnotknownunlessaskedtoperform.E.g.LiftingofReliefValve,Equipmentprotectivefunctions

    ProactiveTask:TheseincludethebestpracticesofLLF,Lubrication,PredictiveMaintenance,PreventiveMaintenance,CorrectiveMaintenance,OverhaulMaintenanceandSparesPartsManagement

    Itcouldalsoincludeamaintenanceactivitythatisacombinationoftheabovepractices.

    PMTask:Thisisascheduledbasedmaintenanceactivity.-InRCMdefinition,thisisalreadyincludedasaPROACTIVEtask.Itistreatedseparatelyforsimplerunderstandinginourorganization.

    NoScheduledMaintenance:RuntoFailure

    (secondoption)

    As Defined by J.Moubray : These are tasks undertaken before a failure occurs, in order to prevent the item from getting into a failed state. They embrace what is traditionally

    known as 'predictive' and 'preventive' maintenance.

    CLASSICALRELIABILITYCENTEREDMAINTENANCETASKSELECTIONFLOWCHART

    FunctionalFailureConsequence

    HiddenFailure?

    Cananyproactivetaskreducetherisk?

    Cananyscheduled

    basedfaultfinding

    taskreducetherisk?

    EstablishPMprogram:

    ScopeandFrequency

    DefineandImplement

    ProactiveTask

    Operational

    Consequences?

    Isthereaproactive

    taskwithcostless

    thanconsequences?

    Isthereascheduled

    PMtaskwithcostless

    thanconsequences?

    NoScheduled

    Maintenance

    Redesignthe

    Process

    EstablishPMprogram:

    ScopeandFrequency

    DefineandImplement

    ProactiveTask

    UnsafeCondition?

    Cananyproactive

    taskreducetherisk?

    Cananyscheduled

    basedPMtask

    reducetherisk?

    EstablishPMprogram:

    ScopeandFrequency

    DefineandImplement

    ProactiveTask

    Non-Operational

    Consequences?

    Isthereaproactive

    taskwithcostlessthanconsequences?

    NoScheduled

    Maintenance

    Redesignthe

    Process

    DefineandImplement

    ProactiveTask

    NoScheduled

    Maintenance

    NoYes

    No

    NoNo Yes

    Cantheprocess

    beredesigned?

    Changethe

    Process

    Redesignthe

    Process

    No Yes

    Yes

    NoYes

    No

    No

    Cantheprocess

    beredesigned?

    Changethe

    Process

    Redesignthe

    Process

    YesNo

    Yes

    Yes

    Yes No

    No

    No

    Yes

    Yes

    Yes

    Yes

    No

    No

    FunctionalFMEA

  • 8/11/2019 Flow Charts (SWO)

    16/16

    RISKBASEDINSPECTIONSTRATEGY

    TUTORIAL

    Rev-1

    SelectPlantUnit

    DefineCorrosionLoops

    TeamFormation

    C&I,CTS,Opn.-FullTime

    FDC,Maint.,HSE-PartTime

    Basedon:

    Pressure,Temperature,Velocity,pH.MOC

    ListLoopComponents

    BasedonFailureProbability:

    e.g.ColumnTop,Colm.Bottom,HExShell.HEx

    Tubes

    IdentifyPotentialFailure

    Mechanisms&Occurence

    Basedon:

    Generic-Literature,Experienceatother

    locations

    Licensor'sRecommendations

    PrepareRiskRankingMatrix

    DecideInspectionFrequency DecideProcessParametersfor

    Monitoring,SetLimits

    FixSchedule&Responsibility

    MonitordefinedParametersSources:

    DCS,IP21,LIMS,Field

    DeviationfromOperating

    Windowisbeyondsetlimits?

    DecideInspectionAreas

    General,Localised,

    Internal,External

    DecideInspectionTypeInvasive,Online

    PrepareInspectionChecklist

    PrepareInspectionSchedule

    CarryOutInspection

    Arefindingsconsistentwithpredictedprobabilityof

    deterioration?

    AnyUnexpected

    Failures?

    RevisitCorrosionLoop

    Definition

    No

    Yes

    Yes

    No

    Regulations

    FARrequired?

    FARProcess CorrectiveRepair

    No

    No

    Yes

    A

    Yes

    AdoptionofRiskMitigation

    Measures

    -ReduceProcessInventory

    -ModifyProcess

    -EmergencyIsolation

    -Eqpt.Redesigning

    -Eqpt.Repair/Replacement

    -AnyOther