FLOOR SLAB REPAIR AND RENOVATION WORK IRA JONES … · Sheet T-1.01. Index on Healy, Bender &...
Transcript of FLOOR SLAB REPAIR AND RENOVATION WORK IRA JONES … · Sheet T-1.01. Index on Healy, Bender &...
MATERIAL INDICATIONS
CMU
CONCRETE
EARTH
FACE BRICK
GRAVEL
INSULATION - RIGID BATT
METAL - LARGE BATT
WOOD - ROUGH FINISHED
FOR
PLAINFIELD, ILLINOIS
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOL
CERTIFICATION
GENERAL NOTES, DRAWINGS INDEX, CERTIFICATIONTITLE SHEET, ABBREVIATIONS AND SYMBOLS,
T-1.01
PLAINFIELD COMMUNITY CONSOLIDATED
SCHOOL DISTRICT 202
PLAINFIELD, WILL COUNTY, ILLINOIS
GENERAL DEMOLITION NOTES
4.
3.
2.
1.
WORK AND THE DISPOSAL OF MATERIALS INCIDENTAL TO THE WORK.
AS REQUIRED FOR A COMPLETE AND PROPER INSTALLATION OF NEW
PROPERLY DISPOSE OF DEMOLISHED MATERIALS AND OTHER OBSTACLES
SUCH AREA.
ADJACENT AREA, AND INTERRUPTIONS OF FREE PASSAGE TO AND FROM
PERSONS AND PROPERTY, AND INTERFERENCE WITH THE USE OF
DONE IN A CAREFUL AND ORDERLY MANNER TO AVOID HAZARDS TO
THE DRAWINGS WITH EXISTING SITE CONDITIONS. OPERATIONS SHALL BE
AND EXTENT OF DEMOLITION THAT WILL BE NECESSARY BY COMPARING
PERFORMED SHALL BE VERIFIED AT THE SITE. DETERMINE THE NATURE
EXACT EXTENT OF DEMOLITION AS SHOWN ON DRAWINGS AND TO BE
THE SOLE SOURCE OF EXISTING CONDITIONS TO BE DEMOLISHED.
ARE FOR REFERENCE PURPOSES ONLY. THEY ARE NOT INTENDED TO BE
DRAWINGS INDICATE THE GENERAL INTENT OF THE DEMOLITION WORK AND
FLOORING, WALL BASE, ETC.
NOT TO REMAIN IN USE, INCLUDING BUT NOT NECESSARILY LIMITED TO
INCLUDING THE REMOVAL AND PROPER DISPOSAL OF ITEMS WHICH ARE
PERFORM DEMOLITION WORK AS NECESSARY TO ACCOMPLISH THE WORK
GENERAL NOTES
OTHERWISE NOTED.
ADJACENT SURFACES AND FINISHES, WHETHER SHOWN OR NOT, UNLESS
PATCH EXISTING SURFACES AFFECTED BY THE WORK TO MATCH
MATERIALS, SOD, LANDSCAPING, ETC. MATCHING EXISTING.
ETC. REPLACE DISTURBED AND DAMAGED AREAS WITH NEW LIKE
NOT LIMITED TO, CONCRETE WALKS, CURBS, PAVING, GRASS, LANDSCAPING,
PROPERLY PROTECT EXISTING BUILDING AND SURFACES INCLUDING BUT
EXISTING ADJACENT SURFACES.
PROPER FINISHES. PROVIDE SPECIFIED PAINT FINISHES BLENDING WITH
TO EXISTING CONSTRUCTION AFFECTED BY THE WORK TO RECEIVE NEW
UNLESS OTHERWISE NOTED. PROVIDE NECESSARY PREPARATORY WORK
WHETHER OR NOT PATCH MATERIAL IS INDICATED ON DRAWINGS, TYP.,
WITH EXISTING CONSTRUCTION AND NEWLY EXPOSED CONSTRUCTION
CONSTRUCTION AFFECTED BY THE WORK WITH MATERIALS CONSISTENT
PATCH AND REPAIR EXISTING CONSTRUCTION AND NEWLY EXPOSED
MATCH EXISTING WALL OR FLOOR CONSTRUCTION.
WALL OR FLOOR TIGHT AROUND PENETRATION WITH MATERIALS TO
WHERE DEMOLITION HAS OCCURRED, CONTRACTOR SHALL RECONSTRUCT
WHERE NEW PENETRATIONS ARE MADE IN EXISTING WALLS, FLOORS, AND
OWNER PRIOR TO START OF THE WORK.
MOVING SCHEDULE WITH OWNER FOR LOOSE ITEMS TO BE REMOVED BY
SHALL BE REMOVED BY THE OWNER AS NECESSARY. COORDINATE
EXISTING LOOSE ITEMS INCLUDING FURNITURE, EQUIPMENT, AND SUPPLIES
THROUGH SUBSTANTIAL COMPLETION.
MAINTAIN EXITS FROM THE EXISTING BUILDINGS AND SITE ACCESS
ALLOW FOR OWNER'S REUSE.
ETC. ITEMS TO BE SALVAGED SHALL BE CAREFULLY REMOVED AS TO
INCLUDING BUT NOT NECESSARILY LIMITED TO MECHANICAL, ELECTRICAL,
VERIFY WITH OWNER ITEMS TO BE SALVAGED AND RETURNED TO OWNER,
ITEMS INDICATED AS EXISTING ARE TO REMAIN, UNLESS OTHERWISE NOTED.
QUANTITIES, ETC. REVIEW ANY DISCREPANCIES WITH ARCHITECT.
FIELD VERIFY AND COORDINATE ITEMS, DIMENSIONS, CONDITIONS, AND
WORK INCLUDED UNDER THE CONTRACT.
DIFFICULTIES AND RESTRICTIONS AFFECTING THE COMPLETION OF THE
AND LABOR SO THAT THEY MAY FULLY UNDERSTAND THE FACILITIES,
ACQUAINT THEMSELVES WITH CONDITIONS RELATING TO CONSTRUCTION
EACH BIDDER SHALL VISIT THE SITE OF PROPOSED WORK AND FULLY
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PROJECT COORDINATION
INC. DOCUMENTS DATED JANUARY 08, 2020.
WORK INDICATED IN THE WISS, JANNEY, ELSTNER ASSOCIATES,
COORDINATE THE WORK WITHIN THESE DOCUMENTS WITH THE
ABBREVIATIONS AND SYMBOLS
DIM.
DIA.
DF
DET.
D
CT
CPT.
CORR.
CONTR.
CONT.
CONST.
COND.
CONC.
COL.
CO
CMU
CLRM.
CLR.
CLO.
CL
CJ
CEIL.
CB
CAB.
B/
BUR
BTN.
BRG.
BOT.
BM.
BLKG.
BLK.
BLDG.
BIT.
BD.
BB
@
&
ALUM.
AISC
AFF
ADA
AC.T.
AC
AB
DIMENSION
DIAMETER
DRINKING FOUNTAIN
DETAIL
DEEP
CERAMIC TILE
CARPET
CORRIDOR
CONTRACTOR
CONTINUOUS
CONSTRUCTION
CONDITION
CONCRETE
COLUMN
CLEAN OUT
CONCRETE MASONRY UNIT
CLASSROOM
CLEAR
CLOSET
CENTERLINE
CONTROL JOINT
CEILING
CHALKBOARD
CABINET
BOTTOM OF
BUILT-UP ROOF
BETWEEN
BEARING
BOTTOM
BEAM
BLOCKING
BLOCK
BUILDING
BITUMINOUS
BOARD
BULLETIN BOARD
AT
AND
ALUMINUM
STEEL CONSTRUCTION
AMERICAN INSTITUTE OF
ABOVE FINISHED FLOOR
DISABILITIES ACT
AMERICANS WITH
ACOUSTICAL TILE
ACOUSTIC
ANCHOR BOLT
IF
HT.
HRT
HORIZ.
HM
HC
GYP. BD.
GL.
GFRG
GFRC
GFCI
GEN.
GC
GALV.
GA.
FTG.
FRT.
FRMG.
FR.
FLR.
FLEX.
FIN.
FEC
FE
FDN.
FD
FBO
EXT.
EXP.
EXIST.
EWC
EW
EQUIP.
EQ.
ELEV.
EL.
EIFS
EA.
DS
DRWG.
DR.
DN.
DL
INSIDE FACE
HEIGHT
HOMOGENEOUS RESILIENT TILE
HORIZONTAL
HOLLOW METAL
HOLLOW CORE
GYPSUM BOARD
GLASS
REINFORCED GYPSUM
GLASS FIBER
REINFORCED CONCRETE
GLASS FIBER
INTERRUPTER
GROUND FAULT CIRCUIT
GENERAL
GENERAL CONTRACTOR
GALVANIZED
GAUGE
FOOTING
FIRE RETARDANT TREATED
FRAMING
FRAME
FLOOR
FLEXIBLE
FINISHED
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FOUNDATION
FLOOR DRAIN
FURNISHED BY OTHERS
EXTERIOR
EXPANSION
EXISTING
ELECTRIC WATER COOLER
EACH WAY
EQUIPMENT
EQUAL
ELEVATION
ELEVATIONS (USGS)
FINISH SYSTEM
EXTERIOR INSULATED
EACH
DOWNSPOUT
DRAWING
DOOR
DOWN
DEAD LOAD
RAD.
R.
QT
/
PSI
PSF
PT
PL
PLAS.
PEWB
PEMB
PC
PART.
OPP.
OPG.
OH
OF
OD
OC
NS
NOM.
NO., #
NIC
MTD.
MTL.
MPH
MO
MISC.
MIN.
MFR.
MECH.
MB
MAX.
MATL.
MAS.
LVT
LL
LG.
LAV.
LAM.
L
JT.
JAN.
INT.
INSUL.
RADIUS
RISER
QUARRY TILE
PER
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
PORCELAIN TILE
PLATE
PLASTIC
WOOD BUILDING
PRE-ENGINEERED
METAL BUILDING
PRE-ENGINEERED
PRECAST
PARTITION
OPPOSITE
OPENING
OVERHEAD
OUTSIDE FACE
OUTSIDE DIAMETER
ON CENTER
NO SCALE
NOMINAL
NUMBER
NOT IN CONTRACT
MOUNTED
METAL
MILES PER HOUR
MASONRY OPENING
MISCELLANEOUS
MINIMUM
MANUFACTURER
MECHANICAL
MARKERBOARD
MAXIMUM
MATERIAL
MASONRY
LUXURY VINYL TILE
LIVE LOAD
LONG
LAVATORY
LAMINATE
LENGTH
JOINT
JANITOR
INTERIOR
INSULATION
WP
W/O
W/
WWF
WD.
WC
W
VIF
VEST.
VERT.
VCT
UON
T/
TYP.
TOIL.
TL
THK.
TEMP.
TB
T.
SY
SUSP.
SUPT.
STRUCT.
STOR.
STL.
SS
SQ.
SPEC.
SP.
SIM.
SHT.
SGT.
SF
SECT.
SCHED.
SC
ROW
RM.
REQD.
REINF.
RD
WORK POINT
WITHOUT
WITH
WELDED WIRE FABRIC
WOOD
WATER CLOSET
WIDTH
VERIFY IN FIELD
VESTIBULE
VERTICAL
TILE
VINYL COMPOSITION
NOTED
UNLESS OTHERWISE
TOP OF
TYPICAL
TOILET
TOTAL LOAD
THICK
TEMPERED
TACK BOARD
TREAD
SQUARE YARD
SUSPENDED
SUPPORT
STRUCTURAL
STORAGE
STEEL
STAINLESS STEEL
SQUARE
SPECIFICATION
SPACES
SIMILAR
SHEET
TILE
STRUCTURAL GLAZED
SQUARE FOOT
SECTION
SCHEDULE
SOLID CORE
RIGHT OF WAY
ROOM
REQUIRED
REINFORCING
ROOF DRAIN
Expiration Date: April 30, 2021
License Number: 184-000385
David G. Patton, Managing Agent
Healy, Bender & Associates, Inc.
Professional Design Firm - Architect Corporation
Signature:
License Expires: November 30, 2020
License Number: 001-011421
By: David G. Patton, AIA, LEED AP BD+C
HEALY, BENDER & ASSOCIATES, INC.
of Contents.
the the Healy, Bender & Associates, Inc. Project Manual Table
The Specifications consist of specification sections as listed in
Sheet T-1.01.
Index on Healy, Bender & Associates, Inc. drawing Title
The Drawings consist of drawings as listed in the Drawings
Education.
Code 180 as prepared and provided by the State Board of
2015 International Building Code and 23 Illinois Administrative
supervision and to the best of our knowledge comply with
Plainfield, Will County, Illinois were prepared under our
Plainfield Community Consolidated School District 202 in
located at 15320 Wallin Drive, Plainfield, Illinois 60544 for
Slab Repair and Renovation Work, Ira Jones Middle School,
dated January 08, 2020 for the construction of the Floor
We hereby certify that these Drawings and Specifications
Architect: HEALY, BENDER & ASSOCIATES, INC.
DRAWINGS INDEX
ARCHITECTURAL
GENERAL
TITLE
A-4.03
A-4.02
A-4.01
A-3.02
A-3.01
A-2.02
A-2.01
A-1.01
G-1.01
T-1.01
UNITS A & B - SECOND FLOOR - PAINT PLANS
UNIT C - FIRST FLOOR - PAINT PLAN
UNITS A & B - FIRST FLOOR - PAINT PLANS
UNIT C - FIRST FLOOR - VCT PATTERN PLAN
UNITS A & B - FIRST FLOOR - VCT PATTERN PLANS
UNIT C - FIRST FLOOR - FINISHES PLAN
UNITS A & B - FIRST FLOOR - FINISHES PLANS
COMPOSITE FLOOR PLANS
DOOR SCHEDULE, COURT MARKING DIAGRAM, DETAILS
GENERAL NOTES, DRAWINGS INDEX, CERTIFICATION
TITLE SHEET, ABBREVIATIONS AND SYMBOLS,
MARKING EXPLANATIONS
DOOR NUMBER
DOOR TYPE
NUMBER
DETAIL OR SECTION
APPEARS
DETAIL OR SECTION
SHEET WHERE
001-011421
PATTON
DAVID G.
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATED
SCHOOL DISTRICT 202
PROJ. NO.
10-917-43
DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
OF 1
A-
FE
C
FEC
DOOR SCHEDULE, COURT MARKING DIAGRAM, DETAILS
G-1.01
DOOR SCHEDULE
¼" = 1'-0"
0 1 2 4 8 12
SC WD.
B
3'-0" x 7'-2" x 1¾"
SECOND GYMNASIUM C-119 - COURT MARKING DIAGRAM
⅛" = 1'-0"
1
G-1.01
NO
RT
H
39'-8"
VIF
VIF
1'-1
0"
4"
2'-8"
2"
8'-10"
2"
11
'-8"
2"
8'-10"
2"
2'-8"
4"
VIF
1'-1
0"
60'-0"
36'-0"
30
'-0
"
VIF
2'-0"
4"
3'-8"
2"
15'-0"
2"
4'-7"
2"
9'-10"
2"
9'-10"
2"
4'-7"
2"
15'-0"
2"
3'-8"
4"
VIF
2'-0"
72'-0" VIF
68'-0"
COURT MARKING NOTES:
6.
5.
4.
3.
2.
1.
WIDE CUT-IN VCT COURT MARKINGS.
EXCEPT FOR PERIMETER OF BASKETBALL COURT WHICH SHALL BE 4"
COURT MARKINGS SHALL BE 2" WIDE CUT-IN VCT COURT MARKINGS
SECONDARY COURT: VOLLEYBALL COURT - 60'-0" x 30'-0"
PRIMARY COURT: BASKETBALL COURT - 68'-0" x 36'-0"
DO NOT MEASURE FROM THIS PLAN, VERIFY DIMENSIONS IN FIELD.
PROVIDE COLOR SAMPLES FOR PROPER REVIEW AND FINAL SELECTION.
FLOORING INSTALLATION.
WITH THE OWNER AND EXISTING ATHLETIC EQUIPMENT PRIOR TO NEW
FIELD. EXACT LAYOUT AND LINE LOCATION TO BE VERIFIED IN FIELD
CONTRACTOR IS RESPONSIBLE FOR COORDINATING COURT LAYOUT IN THE
LEGEND: VINYL COMPOSITION TILE
NOTES:
- COLOR TO BE SELECTED.
RUBBER BASE: JOHNSONITE, BASEWORKS
REPRESENTATION.
REFER TO ACTUAL COLOR SAMPLES FOR ACCURATE COLOR
2.
1.
BASKETBALL COURT - TO BE SELECTED.
COURT MARKING COLOR 'D'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E2'
NEW VCT COLOR 'B'
(TARKETT EXPRESSIONS - 1340 WINDSOR BLUE - VIF)
EXISTING VCT TO REMAIN - COLOR 'E3'
(TARKETT EXPRESSIONS - 1326 PARCHMENT - VIF)
EXISTING VCT TO REMAIN - COLOR 'E1'
VOLLEYBALL COURT - TO BE SELECTED.
COURT MARKING COLOR 'E'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E3'
NEW VCT COLOR 'C'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E1'
NEW VCT COLOR 'A'
(TARKETT EXPRESSIONS - 1332 GRAY GREEN - VIF)
EXISTING VCT TO REMAIN - COLOR 'E2'
DOOR AND HARDWARE NOTES:
EXISTING FRAMES TO REMAIN AND BE REUSED.
DOOR DIMENSIONS TO BE VERIFIED IN FIELD. ADJUST NOTED DOOR SIZES
AS REQUIRED TO MEET EXISTING FRAME OPENING SIZES.
EXISTING HARDWARE TO BE CAREFULLY REMOVED, STORED, AND
REINSTALLED ON NEW DOORS. PROPERLY PREPARE NEW DOORS FOR
REINSTALLATION OF EXISTING HARDWARE.
1.
2.
3.
SC WD.
A
10"
9"8"
3'-6"
TEMP. GL.
¼" THK.
3'-0" x 7'-2" x 1¾"
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 1
1" TYP.
- BASKETBALL COURT
PRIMARY COURT LINE
COURT MARKING INTERSECTION2
G-1.01 ¾" = 1'-0"
0 1 2 4
1" TYP.
- VOLLEYBALL COURT
SECONDARY COURT LINE
0 1
TYP. CONC. SLAB CONST. JT.3
G-1.01 3" = 1'-0"
AT SLAB JOINT
VCT JOINT TO OCCUR
DOCUMENT REQUIREMENTS
SEALED MEETING CONTRACT
CONC. SLAB CONST. JT. TO BE NEW VCT FLOORING
EXIST. CONC. SLAB
TYP. CONC. SLAB CRACK4
G-1.01 3" = 1'-0"
REPAIRED SLAB CRACK
PROPERLY INSTALLED OVER
RECOMMENDED REINF. MESH
VCT FLOORING MANUFACTURER'S
NEW VCT FLOORING
EXIST. CONC. SLAB
TILE LAYOUT & ORIENTATION
WHEREVER APPROPRIATE W/
REPAIRED SLAB CRACK
VCT JOINT TO OCCUR AT
CONTRACT DOCUMENTS
AS INDICATED ON THE
EXIST. CRACK TO BE REPAIRED
0 1 2
EXIST. HM FR.
VA
RIE
S
- WHERE APPLICABLE
CMU BEYOND
CONC. SLAB
THE NEW WORK TO EXIST.
MATERIALS TO ACCOMMODATE
REMOVE EXIST. GROUT
SUPT. FOR THE FR.
FR. MULLIONS TO PROVIDE
DIRECTLY BELOW VERT. HM
SLAB, PROVIDE SHIMS LOCATED
COMPLETED AT EXIST. CONC.
AFTER NEW WORK IS
ADDITIONAL INFORMATION
STRUCT. DRAWINGS FOR
JANNEY, ELSTNER ASSOCIATES
NEW WORK - REFER TO WISS,
EXIST. CONC. SLAB TO RECEIVE
BACKER ROD BTN. SHIMS
BASE BOTH SIDES - PROVIDE
CONT. CAULK ALONG HM FR.
5
G-1.01 1½" = 1'-0"
FE
C
FE
C
LOCKER
FEC
LOCKER
FEC
LOCKER
FEC
LOCKER
FEC
FEC
UP
UP
UP
FEC
FE
C
FE
CF
EC
FE
C
FE
C
FE
CF
EC
LOCKER
FEC
LOCKER
FEC
LOCKER
FEC
LOCKER
FEC
FECFEC
DN
.
DN
.
DN
.
COMPOSITE FLOOR PLANS
A-1.01
1
A-2.01
1
A-3.01
1
A-4.01
2
A-2.01
2
A-3.01
2
A-4.01
1
A-2.02
1
A-3.02
1
A-4.02
1
A-4.03
2
A-4.03
NO
RT
H
COMPOSITE FIRST FLOOR PLAN
1" = 20'-0"
0 5 10 20 40 60
NO
RT
H1" = 20'-0"
COMPOSITE SECOND FLOOR PLAN
A-101 A-102 A-103 A-104 A-105 A-106
A-107
A-108
A-109A-110
A-111
A-112
A-113
A-114 A-115
A-116
A-117
A-118
A-119
A-120 A-121
A-122
A-123
A-124
A-125
A-126
A-127
A-128
A-129
A-130
A-131
A-132
A-132A
A-133 A-134
A-136
A-135 A-137
A-138
A-139 A-140
A-141
A-142
A-143
A-144
A-145
A-146
A-147
A-148
A-149
A-151
A-150
A-152
A-153
A-154
A-155
A-156
A-157
A-159
A-158
A-160
B-101 B-102 B-103 B-104 B-105 B-106
B-107
B-108
B-109
B-110
B-111
B-112 B-113 B-114
B-115
B-116
B-114A
B-209
B-207B-206B-205B-204B-203B-202B-201
B-208
C-201
A-201 A-202 A-203 A-204 A-205 A-206
A-207A
A-207B
A-208 A-209
A-210
A-211 A-212
A-215A-216
A-217
A-218
A-219A A-219B
A-220
A-220A
A-220B
A-221A-222
A-223
A-224
A-225
A-226 A-227 A-228
A-207 A-214
A-213
A-229
C-101 C-102
C-103
C-107
C-108
C-109
C-110
C-111
C-113 C-114
C-115C-116
C-117
C-118
C-119 C-120
C-121
C-122
C-123 C-124
C-125
C-126 C-127
C-129C-132
C-133
C-134
C-137
C-144C-145
C-147
C-148
C-149
C-150
C-151
C-152 C-153 C-155
C-156
C-157
C-158
C-159
C-106
C-104
C-105
C-112
C-130C-126AC-145 C-146C-154
C-128
C-131
C-139
C-143
C-138
C-140
C-135
C-141
C-136
C-142
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATED
SCHOOL DISTRICT 202
PROJ. NO.
10-917-43
DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
ROOM INDEX
UNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
UNIT B - FIRST FLOOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
B-106
B-105
B-104
B-103
B-102
B-101
B-112
B-111
B-110
B-109
B-108
B-107
CLASSROOM
CORRIDOR
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
STAIRS
VESTIBULE
STORAGE
SPECIAL PURPOSE
CLASSROOM
B-116
B-115
B-114A
B-114
B-113
ROOM INDEX
UNIT A - SECOND FLOOR UNIT B - SECOND FLOOR
B-209
B-208
B-207
B-206
B-205
B-204
B-203
B-202
B-201
STAIRS
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SPECIAL PURPOSE
SPECIAL PURPOSE / STORAGE
A-229
A-228
A-227
A-226
A-225
A-224
A-223
A-222
A-221
A-220B
A-220A
A-220
A-219B
A-219A
A-218
A-217
A-216
STAIRS
ELECTRICAL
PASSAGE
BOYS
GIRLS
UPPER LEARNING RESOURCE CENTER
GIRLS
BOYS
PASSAGE
SPECIAL PURPOSE / STORAGE
ELECTRICAL
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-215
A-214
A-213
A-212
A-211
A-210
A-209
A-208
A-207B
A-207A
A-207
A-206
A-205
A-204
A-203
A-202
A-201
TOILET
SPECIAL PURPOSE / STORAGE
MECHANICAL
MECHANICAL
SCIENCE
PREP.
CUSTODIAL CLOSET
SCIENCE
STAIRS
CLASSROOM
CORRIDOR
OFFICE
CLASSROOM
CLASSROOM
TOILET
OFFICE
CORRIDOR
UNIT C - SECOND FLOOR
C-201 MECHANICAL LOFT
C103
A
C105
B
A143
A
C131
A
C129
A
FE
C
FE
C
FE
C
LOCKER
FEC
LOCKER
FEC
LOCKER
FEC
UP
UP
LOCKER
FEC
UP
UNITS A & B - FIRST FLOOR - FINISH PLANS
1
A-2.01
0 2 4 8 16 24
⅛" = 1'-0"
NO
RT
H
UNIT A - FIRST FLOOR - FINISH PLAN
2
A-2.01 ⅛" = 1'-0"
NO
RT
H
UNIT B - FIRST FLOOR - FINISH PLAN
C-103 C-108 C-110 C-113 C-158
GAPS, PILLOWING, OR EXCESSIVE WIDTH.
TOOLED AND UNIFORM WITH MONOLITHIC APPEARANCE, WITHOUT
FRAMES, STEEL COLUMNS, ETC. CAULKED JOINT TO BE NEATLY
CAULK ALONG VCT AT HOLLOW METAL DOOR AND SIDELIGHT
GENERAL CAULKING NOTE:
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
A-2.01
LEGEND: FLOOR FINISH TYPE
HOMOGENEOUS RESILIENT TILE FLOORING
SEE SHEET A-3.01 FOR ADDITIONAL INFORMATION
VINYL COMPOSITION TILE -
NOTES:
2.
1.
- COLOR TO BE SELECTED BY ARCHITECT.
RUBBER TRANSITION EDGING: JOHNSONITE
- COLOR TO BE SELECTED BY ARCHITECT.
RUBBER BASE: JOHNSONITE, BASEWORKS
QUARRY TILE
12
2
2
2 2
1 1
1
3
3
3
3
33
4
2
1
FINISHES PLAN KEYNOTES :--
DETAIL 5/G-1.01
BASE OF BOTH SIDES OF HOLLOW METAL FRAME. REFER TO
BACKER ROD BETWEEN SHIMS. PROVIDE CONTINUOUS CAULK AT
DIRECTLY BELOW EACH VERTICAL MULLION ONLY AND PROVIDE
THE FLOOR SLAB, PROPERLY SHIM BASE OF HOLLOW METAL FRAME
COMPLETED, AT LOCATIONS WHERE THE FRAME IS NOT RESTING ON
THE STRUCTURAL DRAWINGS. AFTER STRUCTURAL WORK HAS BEEN
WORK TO BE PREFORMED TO THE FLOOR SLAB IN THIS AREA PER
BASE OF HOLLOW METAL FRAME AS REQUIRED BY THE STRUCTURAL
REMOVE EXISTING CAULK AND GROUT PACK, WHERE PRESENT, ALONG
- REFER TO G-1.01 FOR ADDITIONAL INFORMATION.
EXISTING DOOR TO BE REPLACED.
JOINT LINE.
EXISTING FLOORING TO BE REMOVED ALONG EXISTING FLOORING
FLOORING REPLACEMENT IN FIELD.
FLOOR SLAB LEVELING REPAIR - VERIFY EXACT EXTENTS OF
AREA OF EXISTING FLOORING TO BE REMOVED TO ACCOMMODATE
REPLACEMENT IN FIELD.
FLOOR SLAB CRACK REPAIR - VERIFY EXACT EXTENTS OF FLOORING
AREA OF EXISTING FLOORING TO BE REMOVED TO ACCOMMODATE
3
4
5
5
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
ROOM INDEXUNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
UNIT B - FIRST FLOOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
B-106
B-105
B-104
B-103
B-102
B-101
B-112
B-111
B-110
B-109
B-108
B-107
CLASSROOM
CORRIDOR
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
STAIRS
VESTIBULE
STORAGE
SPECIAL PURPOSE
CLASSROOM
B-116
B-115
B-114A
B-114
B-113
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
C103
A
A143
A
A-132AA-158
A-101 A-102 A-103 A-104 A-105 A-106
A-107
A-108
A-109A-110
A-112
A-113
A-114 A-115
A-116
A-117
A-118
A-119
A-120 A-121
A-122
A-123
A-125
A-126
A-127
A-128
A-129
A-130
A-131
A-132 A-133 A-134
A-135
A-136
A-138
A-139 A-140
A-141
A-142
A-143
A-144
A-145
A-146
A-147
A-148
A-149
A-150
A-151
A-152
A-153
A-154
A-155
A-156
A-157
A-159
A-111 A-124
A-137
A-160
B-101
C-101
C-102
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = HRT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
B-114A
A-160
B-101 B-102 B-103 B-104 B-105 B-106
B-107
B-109
B-110
B-111
B-112 B-113 B-114
B-115
B-116
B-108
FE
C
FE
CF
EC
FE
C
FE
C
FE
CF
EC
FEC
FE
C
FE
C
FEC
UP
A-2.02
0 2 4 8 16 24
⅛" = 1'-0"
1
A-2.02
NO
RT
H UNIT C - FIRST FLOOR - FINISHES PLAN
UNIT C - FIRST FLOOR - FINISHES PLAN
A-144A-141 A-155 A-127 A-160A-140
GAPS, PILLOWING, OR EXCESSIVE WIDTH.
TOOLED AND UNIFORM WITH MONOLITHIC APPEARANCE, WITHOUT
FRAMES, STEEL COLUMNS, ETC. CAULKED JOINT TO BE NEATLY
CAULK ALONG VCT AT HOLLOW METAL DOOR AND SIDELIGHT
GENERAL CAULKING NOTE:
LEGEND: FLOOR FINISH TYPE
HOMOGENEOUS RESILIENT TILE FLOORING
SEE SHEET A-3.01 FOR ADDITIONAL INFORMATION
VINYL COMPOSITION TILE -
NOTES:
2.
1.
- COLOR TO BE SELECTED BY ARCHITECT.
RUBBER TRANSITION EDGING: JOHNSONITE
- COLOR TO BE SELECTED BY ARCHITECT.
RUBBER BASE: JOHNSONITE, BASEWORKS
QUARRY TILE
2
1
FINISHES PLAN KEYNOTES :--
- REFER TO G-1.01 FOR ADDITIONAL INFORMATION.
EXISTING DOOR TO BE REPLACED.
JOINT LINE.
EXISTING FLOORING TO BE REMOVED ALONG EXISTING FLOORING
FLOORING REPLACEMENT IN FIELD.
FLOOR SLAB LEVELING REPAIR - VERIFY EXACT EXTENTS OF
AREA OF EXISTING FLOORING TO BE REMOVED TO ACCOMMODATE
REPLACEMENT IN FIELD.
FLOOR SLAB CRACK REPAIR - VERIFY EXACT EXTENTS OF FLOORING
AREA OF EXISTING FLOORING TO BE REMOVED TO ACCOMMODATE
3
4
2
3
2
3
1
1
1
4
4
4
4
2
3
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
ROOM INDEXUNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
WALLS = EXIST.
BASE = QT
FLOORING = QT
WALLS = EXIST.
BASE = QT
FLOORING = QT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = RUBBER
FLOORING = VCT
WALLS = EXIST.
BASE = EXIST.
FLOORING = EXIST.
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
C103
A
C105
B
A143
A
C131
A
C129
A
C-106C-105
C-112
C-121
A-158
C-149
C-150
C-151
C-152 C-153
C-154
C-155
C-157
C-158
C-159
C-126A
C-130
C-156
A-143 A-145
A-147
A-148
A-151
A-153
A-154
A-156
A-159
C-101
C-102
C-103
C-104
C-107
C-108
C-109
C-110
C-111
C-113
C-114
C-115C-116
C-117
C-118
C-119 C-120
C-122
C-123 C-124
C-125
C-126 C-127
C-128C-129
C-131
C-132
C-133
C-134
C-135 C-136
C-137
C-138 C-139
C-140 C-141
C-142 C-143
C-144
C-145C-146
C-147
C-148
UP
UP
UP
1
A-3.01
0 2 4 8 16 24
⅛" = 1'-0"
NO
RT
H
UNIT A - FIRST FLOOR - VCT PATTERN PLAN
2
A-3.01 ⅛" = 1'-0"
NO
RT
H
UNIT B - FIRST FLOOR - VCT PATTERN PLAN
A-3.01
UNITS A & B - FIRST FLOOR - VCT PATTERN PLANS
2
1
VCT PATTERN PLAN KEYNOTES :--
EXISTING ACCENT AREA - COLOR 'E3' - TO REMAIN INTACT.
EXISTING ACCENT AREA - COLOR 'E2' - TO REMAIN INTACT.
1
2
LEGEND: VINYL COMPOSITION TILE
NOTES:
- COLOR TO BE SELECTED.
RUBBER BASE: JOHNSONITE, BASEWORKS
REPRESENTATION.
REFER TO ACTUAL COLOR SAMPLES FOR ACCURATE COLOR
PATTERN INFORMATION ONLY.
THIS SHEET IS FOR VINYL COMPOSITION FLOOR TILE COLOR AND
3.
2.
1.
BASKETBALL COURT - TO BE SELECTED.
COURT MARKING COLOR 'D'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E2'
NEW VCT COLOR 'B'
(TARKETT EXPRESSIONS - 1340 WINDSOR BLUE - VIF)
EXISTING VCT TO REMAIN - COLOR 'E3'
(TARKETT EXPRESSIONS - 1326 PARCHMENT - VIF)
EXISTING VCT TO REMAIN - COLOR 'E1'
VOLLEYBALL COURT - TO BE SELECTED.
COURT MARKING COLOR 'E'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E3'
NEW VCT COLOR 'C'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E1'
NEW VCT COLOR 'A'
(TARKETT EXPRESSIONS - 1332 GRAY GREEN - VIF)
EXISTING VCT TO REMAIN - COLOR 'E2'
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
ROOM INDEXUNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
UNIT B - FIRST FLOOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
B-106
B-105
B-104
B-103
B-102
B-101
B-112
B-111
B-110
B-109
B-108
B-107
CLASSROOM
CORRIDOR
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
STAIRS
VESTIBULE
STORAGE
SPECIAL PURPOSE
CLASSROOM
B-116
B-115
B-114A
B-114
B-113
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
1'-4" VIF
8'-0"
3'-0"
52'-4" VIF
3'-0"
8'-0"
3'-0"
33'-10" VIF
3'-0"
8'-0"
8'-0"
8'-0"
VIF
4'-3"
EQ
.8'-0"
EQ
.
L
PATTERN
CORR., & FLR.
LIGHT FIXTURE,
DOORWAY, SQ. C
L
PATTERN
& FLR.
FIXTURE,
SQ. LIGHTC
L
& FLR. PATTERN
FIXTURE, CORR.
SQ. LIGHTC
2'-0" VIF
2'-0" VIF
EQ
.
8'-0
" V
IF
EQ
.
3'-0" VIF 20'-0" VIF3'-0"8'-0"3'-0"30'-6" VIF1'-2" VIF
A-132AA-158
A-101 A-102 A-103 A-104 A-105 A-106
A-107
A-108
A-109A-110
A-112
A-113
A-114 A-115
A-116
A-117
A-118
A-119
A-120 A-121
A-122
A-123
A-125
A-126
A-127
A-128
A-129
A-130
A-131
A-132 A-133 A-134
A-135
A-136
A-138
A-139 A-140
A-141
A-142
A-143
A-144
A-145
A-146
A-147
A-148
A-149
A-150
A-151
A-152
A-153
A-154
A-155
A-156
A-157
A-159
A-111 A-124
A-137
A-160
B-101
C-101
C-102
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
3'-0" VIF
ALIGN VCT FIELD AREAS TYP.
ALIGN VCT FIELD AREAS TYP.
8'-0
" V
IF
L
FLR. PATTERN
SQ. LIGHT FIXTURE,
CMU WALL, C
EQ
.
8'-0
" V
IF
EQ
.
20'-0" VIF3'-0"8'-0"3'-0"30'-6" VIF1'-2" VIF
B-114A
A-160
B-101 B-102 B-103 B-104 B-105 B-106
B-107
B-109
B-110
B-111
B-112 B-113 B-114
B-115
B-116
B-108
FE
C
FE
CF
EC
FE
C
FE
C
FE
CF
EC
FEC
FE
C
FE
C
FEC
UP
A-3.02
UNIT C - FIRST FLOOR - VCT PATTERN PLAN
UNIT C - FIRST FLOOR - VCT PATTERN PLAN
0 2 4 8 16 24
⅛" = 1'-0"
1
A-3.02
NO
RT
H
A-144A-141 A-155 A-127 A-160A-140
1
2
2
1
VCT PATTERN PLAN KEYNOTES :--
REFER TO SHEET G-1.01 FOR COURT MARKING DIAGRAM.
EXISTING ACCENT AREA - COLOR 'E3' - TO REMAIN INTACT.
EXISTING ACCENT AREA - COLOR 'E2' - TO REMAIN INTACT.
3
3
LEGEND: VINYL COMPOSITION TILE
NOTES:
- COLOR TO BE SELECTED.
RUBBER BASE: JOHNSONITE, BASEWORKS
REPRESENTATION.
REFER TO ACTUAL COLOR SAMPLES FOR ACCURATE COLOR
PATTERN INFORMATION ONLY.
THIS SHEET IS FOR VINYL COMPOSITION FLOOR TILE COLOR AND
3.
2.
1.
BASKETBALL COURT - TO BE SELECTED.
COURT MARKING COLOR 'D'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E2'
NEW VCT COLOR 'B'
(TARKETT EXPRESSIONS - 1340 WINDSOR BLUE - VIF)
EXISTING VCT TO REMAIN - COLOR 'E3'
(TARKETT EXPRESSIONS - 1326 PARCHMENT - VIF)
EXISTING VCT TO REMAIN - COLOR 'E1'
VOLLEYBALL COURT - TO BE SELECTED.
COURT MARKING COLOR 'E'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E3'
NEW VCT COLOR 'C'
MATCH AS CLOSE AS POSSIBLE TO COLOR 'E1'
NEW VCT COLOR 'A'
(TARKETT EXPRESSIONS - 1332 GRAY GREEN - VIF)
EXISTING VCT TO REMAIN - COLOR 'E2'
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
ROOM INDEXUNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
1'-0
"
3'-0"
1'-0
"
3'-0"
1'-0
"
3'-0"
6'-6"
6'-6"
3'-0"
1'-0
"
3'-0"
1'-0
"
3'-0"
1'-0
"
6'-0"
1'-0"
6'-0"
6"6"
6"
6"
1'-4" VIF
8'-0"
3'-0"
52'-4" VIF
3'-0"
8'-0"
3'-0"
33'-10" VIF
3'-0"
8'-0"
8'-0"
8'-0"
VIF
4'-3"
EQ
.8'-0"
EQ
.
L
PATTERN
CORR., & FLR.
LIGHT FIXTURE,
DOORWAY, SQ. C
EQ
.8'-0"
EQ
.
6'-0"
1'-0"
6'-0"
1'-0
"
3'-0"
1'-0
"
3'-0"
1'-0
"
3'-0"
6'-6"
6'-6"
3'-0"
1'-0
"
3'-0"
1'-0
"
3'-0"
1'-0
"
6"6"
6"
6"
1'-0
"
3'-0"
1'-0
"
3'-0"
1'-0
"
5'-0"
4'-6"
4'-6"
5'-0"
1'-0
"
3'-0"
1'-0
"
3'-0"
1'-0
"
4'-0"
1'-0"
4'-0"
L
PATTERN
& FLR.
DOORWAYC
L
& FLR. PATTERN
FIXTURE, CORR.
SQ. LIGHTC
L
PATTERN
& FLR.
FIXTURE,
SQ. LIGHTC
L
PATTERN
& FLR.
FIXTURE,
SQ. LIGHTC
1'-3" VIF
90'-9" VIF
3'-0"
8'-0"
3'-0"
33'-10" VIF
3'-0"
8'-0"
8'-0"
8'-0"
VIF
4'-3"
L
PATTERN
& FLR.
FIXTURE,
SQ. LIGHTC
EQ.
7'-0"
EQ.
EQ
.15'-0"
EQ
.
L
PATTERN
& FLR.
CORR. C
L
PATTERN
& FLR.
DOORWAY C
L
& FLR. PATTERN
FIXTURE, CORR.
SQ. LIGHTC
L& FLR. PATTERN
DOORWAY, ROOM,C
EQ.
8'-0"
EQ.
1'-0
"28'-6"
5'-1
"
L& FLR. PATTERN
DOORWAY, CORR. C
2'-0
" V
IF
ALIG
N V
CT
FIE
LD
AR
EA
S T
YP
.
3'-0" VIF
3'-0
" V
IF
C-106C-105
C-112
C-121
A-158
C-149
C-150
C-151
C-152 C-153
C-154
C-155
C-157
C-158
C-159
C-126A
C-130
C-156
A-143 A-145
A-147
A-148
A-151
A-153
A-154
A-156
A-159
C-101
C-102
C-103
C-104
C-107
C-108
C-109
C-110
C-111
C-113
C-114
C-115C-116
C-117
C-118
C-119 C-120
C-122
C-123 C-124
C-125
C-126 C-127
C-128C-129
C-131
C-132
C-133
C-134
C-135 C-136
C-137
C-138 C-139
C-140 C-141
C-142 C-143
C-144
C-145C-146
C-147
C-148
FE
C
FE
C
FE
C
LOCKER
FEC
LOCKER
FEC
LOCKER
FEC
UP
UP
LOCKER
FEC
UP
UNITS A & B - FIRST FLOOR - PAINT PLANS
1
A-4.01
0 2 4 8 16 24
⅛" = 1'-0"
NO
RT
H
UNIT A - FIRST FLOOR - FINISH PLAN
2
A-4.01 ⅛" = 1'-0"
NO
RT
H
UNIT B - FIRST FLOOR - PAINT PLAN
A-4.01
VESTIBULES.
PROVIDE EPOXY PAINT IN TOILET ROOMS, CORRIDORS, STAIRS, AND
NEW WORK.
LIMITED TO WALLS, SOFFITS, AND ADDITIONAL SURFACES AFFECTED BY
PROVIDE NEW PAINT FINISH AS NOTED ON PLANS INCLUDING BUT NOT
DO NOT PAINT RUBBER WALL BASE.
WIREMOLD IF NOT PREVIOUSLY PAINTED.
WIREMOLD IF PREVIOUSLY FIELD PAINTED. DO NOT PAINT PRE-FINISHED
EXPOSED ELECTRICAL CONDUIT AND ELECTRICAL BOXES. PAINT
HORNS, VISUAL DEVICES, SMOKE AND HEAT DETECTORS, ETC. PAINT
DEVICES, SAFETY DEVICES, FIRE ALARM EQUIPMENT INCLUDING PULLS,
DO NOT PAINT ELECTRICAL FIXTURES, HOUSINGS, ELECTRICAL WALL
PROVIDE PREPARATION AS NECESSARY PRIOR TO PAINTING WORK.
SWITCHES, OUTLETS, AND EMERGENCY AND OTHER SAFETY DEVICES.
TREATMENT, LOOSE FURNITURE AND EQUIPMENT, ELECTRICAL FIXTURES,
WINDOWS, HANDRAILS AND GUARDRAILS, CERAMIC TILE, ACOUSTICAL WALL
INCLUDING BUT NOT LIMITED TO FLOORING MATERIALS, FACE BRICK,
PROPERLY PROTECT EXISTING ITEMS DURING CLEANING AND PAINTING
6.
5.
4.
3.
2.
1.
GENERAL PAINTING NOTES
2 1
2
1
2
1
2
11
2
2
1
1
1
2
1
2
1
1
2
1
2
1
2
2
1 1
1
2 1 1
2
1
1
1 2
2
1
1
1
2
1
1 1 1 1 1
2
1 1
2
1
2
2
1
PAINT PLAN KEYNOTES :--
PAINT NEW SEALANT - MATCH EXISTING ADJACENT AREAS.
OF EXPOSED ROOF DECK), AND FROM CORNER TO CORNER.
HEIGHT FROM FLOOR TO CEILING INCLUDING SOFFITS (OR BOTTOM
MATERIALS. PAINT ENTIRE WALL RECEIVING REPAIR WORK FULL
PROPERLY CLEAN AND PREPARE THE AREAS TO RECEIVE PAINT
MATERIALS AND COLOR TO MATCH EXISTING ADJACENT AREAS.
PAINT THE REPAIRED AREAS AFFECTED BY THE WORK WITH
2
1
2
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
ROOM INDEXUNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
UNIT B - FIRST FLOOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
B-106
B-105
B-104
B-103
B-102
B-101
B-112
B-111
B-110
B-109
B-108
B-107
CLASSROOM
CORRIDOR
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
STAIRS
VESTIBULE
STORAGE
SPECIAL PURPOSE
CLASSROOM
B-116
B-115
B-114A
B-114
B-113
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
A-132AA-158
A-101 A-102 A-103 A-104 A-105 A-106
A-107
A-108
A-109A-110
A-112
A-113
A-114 A-115
A-116
A-117
A-118
A-119
A-120 A-121
A-122
A-123
A-125
A-126
A-127
A-128
A-129
A-130
A-131
A-132 A-133 A-134
A-135
A-136
A-138
A-139 A-140
A-141
A-142
A-143
A-144
A-145
A-146
A-147
A-148
A-149
A-150
A-151
A-152
A-153
A-154
A-155
A-156
A-157
A-159
A-111 A-124
A-137
A-160
B-101
C-101
C-102
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
B-114A
A-160
B-101 B-102 B-103 B-104 B-105 B-106
B-107
B-109
B-110
B-111
B-112 B-113 B-114
B-115
B-116
B-108
FE
C
FE
CF
EC
FE
C
FE
C
FE
CF
EC
FEC
FE
C
FE
C
FEC
UP
A-4.02
UNIT C - FIRST FLOOR - PAINT PLAN
0 2 4 8 16 24
⅛" = 1'-0"
1
A-4.02
NO
RT
H UNIT C - FIRST FLOOR - PAINT PLAN
A-144A-141 A-155 A-127 A-160A-140
1
2
2
1
1
2
1
1
2
2
1
2
1
2
1
1
1
2
1
1
2
1
2
1
2
2
1
2
2
1
2
1
2
1
2
1
2
11
1
2
1
PAINT PLAN KEYNOTES :--
PAINT NEW SEALANT - MATCH EXISTING ADJACENT AREAS.
OF EXPOSED ROOF DECK), AND FROM CORNER TO CORNER.
HEIGHT FROM FLOOR TO CEILING INCLUDING SOFFITS (OR BOTTOM
MATERIALS. PAINT ENTIRE WALL RECEIVING REPAIR WORK FULL
PROPERLY CLEAN AND PREPARE THE AREAS TO RECEIVE PAINT
MATERIALS AND COLOR TO MATCH EXISTING ADJACENT AREAS.
PAINT THE REPAIRED AREAS AFFECTED BY THE WORK WITH
6.
5.
4.
3.
2.
1.
GENERAL PAINTING NOTES
SECOND GYMNASIUM.
PAINT UP TO 10'-0" ABOVE FINISHED FLOOR AT THE GYMNASIUM AND
SHOWERS, STAIRS, TOILET ROOMS, AND VESTIBULES. PROVIDE EPOXY
KITCHEN OFFICE, KITCHEN STORAGE, LOBBY, LOCKER ROOMS, SERVING,
PROVIDE EPOXY PAINT IN CAFETORIUM, CORRIDORS, KILN, KITCHEN,
NEW WORK.
LIMITED TO WALLS, SOFFITS, AND ADDITIONAL SURFACES AFFECTED BY
PROVIDE NEW PAINT FINISH AS NOTED ON PLANS INCLUDING BUT NOT
DO NOT PAINT RUBBER WALL BASE.
IF NOT PREVIOUSLY PAINTED.
IF PREVIOUSLY FIELD PAINTED. DO NOT PAINT PRE-FINISHED WIREMOLD
EXPOSED ELECTRICAL CONDUIT AND ELECTRICAL BOXES. PAINT WIREMOLD
HORNS, VISUAL DEVICES, SMOKE AND HEAT DETECTORS, ETC. PAINT
DEVICES, SAFETY DEVICES, FIRE ALARM EQUIPMENT INCLUDING PULLS,
DO NOT PAINT ELECTRICAL FIXTURES, HOUSINGS, ELECTRICAL WALL
PROVIDE PREPARATION AS NECESSARY PRIOR TO PAINTING WORK.
SWITCHES, OUTLETS, AND EMERGENCY AND OTHER SAFETY DEVICES.
TREATMENT, LOOSE FURNITURE AND EQUIPMENT, ELECTRICAL FIXTURES,
WINDOWS, HANDRAILS AND GUARDRAILS, CERAMIC TILE, ACOUSTICAL WALL
INCLUDING BUT NOT LIMITED TO FLOORING MATERIALS, FACE BRICK,
PROPERLY PROTECT EXISTING ITEMS DURING CLEANING AND PAINTING
1
2
2
1
2
1
1
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT C - FIRST FLOOR
C-120
C-119
C-118
C-117
C-116
C-115
C-114
C-113
C-112
C-111
C-110
C-109
C-108
C-107
C-106
C-105
C-104
C-103
C-102
C-101
GIRLS
SECOND GYMNASIUM
CORRIDOR
PASSAGE
STORAGE
MECHANICAL
VESTIBULE
CAFETORIUM
KITCHEN OFFICE
SERVING
KITCHEN STORAGE
KITCHEN
STORAGE
RECEIVING
WOMEN
MEN
PASSAGE
STAFF DINING
CORRIDOR
VESTIBULE
C-139
C-138
C-137
C-136
C-135
C-134
C-133
C-132
C-131
C-130
C-129
C-128
C-127
C-126A
C-126
C-125
C-124
C-123
C-122
C-121
SHOWER
TOILET
P.E. OFFICE
BOYS SHOWERS
BOYS TOILETS
BOYS LOCKER ROOM
CORRIDOR
TECHNICAL EDUCATION
BOOTH
PRACTICE
OFFICE
PRACTICE
BAND
TOILET
INSTRUMENTS
CHORAL
OFFICE
STORAGE
BOYS
CORRIDOR
C-159
C-158
C-157
C-156
C-155
C-154
C-153
C-152
C-151
C-150
C-149
C-148
C-147
C-146
C-145
C-144
C-143
C-142
C-141
C-140
STORAGE
LOBBY
ELECTRICAL EQUIPMENT
STAIRS
ART
KILN
HOME ECONOMICS - SEWING
HOME ECONOMICS - COOKING
GYMNASIUM
GYMNASIUM STORAGE
GIRLS LOCKER ROOM
VESTIBULE
CAREER EDUCATION CLASSROOM
VESTIBULE
CORRIDOR
P.E. OFFICE
SHOWER
TOILET
GIRLS SHOWERS
GIRLS TOILETS
ROOM INDEXUNIT A - FIRST FLOOR
A-121
A-120
A-119
A-118
A-117
A-116
A-115
A-114
A-113
A-112
A-111
A-110
A-109
A-108
A-107
A-106
A-105
A-104
A-103
A-102
A-101
TEAM CENTER / SPECIAL PURPOSE
TECHNOLOGY CENTER
A.V. STORAGE
CONFERENCE
LEARNING RESOURCE CENTER
CIRCULATION
WORKROOM
MMI CLASSROOM
TEAM CENTER
OFFICE
TOILET
OFFICE
VESTIBULE
BOYS
GIRLS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-160
A-159
A-158
A-157
A-156
A-155
A-154
A-153
A-152
A-151
A-150
A-149
A-148
A-147
A-146
A-145
A-144
A-143
A-142
CLASSROOM
ASSISTANT PRINCIPAL
WAITING
PRINCIPAL
WAITING
ADMINISTRATION
DEAN
VAULT
WORKROOM
STAIRS
ELEVATOR EQUIPMENT
CORRIDOR
NURSE
BOOK STORAGE
SOCIAL WORKER
TOILET
COUNSELOR
WORKROOM
SOCIAL WORKER
CORRIDOR
CLASSROOM
SCIENCE
PREP. ROOM
CUSTODIAL CLOSET
SCIENCE
CORRIDOR
CLASSROOM
CLASSROOM
STORAGE
SPECIAL PURPOSE
STAIRS
VESTIBULE
BOYS
GIRLS
CORRIDOR
VESTIBULE
OFFICE
TOILET
OFFICE
TEAM CENTER
A-141
A-140
A-139
A-138
A-137
A-136
A-135
A-134
A-133
A-132A
A-132
A-131
A-130
A-129
A-128
A-127
A-126
A-125
A-124
A-123
A-122
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
C-106C-105
C-112
C-121
A-158
C-149
C-150
C-151
C-152 C-153
C-154
C-155
C-157
C-158
C-159
C-126A
C-130
C-156
A-143 A-145
A-147
A-148
A-151
A-153
A-154
A-156
A-159
C-101
C-102
C-103
C-104
C-107
C-108
C-109
C-110
C-111
C-113
C-114
C-115C-116
C-117
C-118
C-119 C-120
C-122
C-123 C-124
C-125
C-126 C-127
C-128C-129
C-131
C-132
C-133
C-134
C-135 C-136
C-137
C-138 C-139
C-140 C-141
C-142 C-143
C-144
C-145C-146
C-147
C-148
LOCKER
FEC
LOCKER
FEC
FECFEC
DN
.
DN
.
LOCKER
FEC
LOCKER
FEC
DN
.
UNITS A & B - SECOND FLOOR - PAINT PLANS
1
A-4.03
0 2 4 8 16 24
⅛" = 1'-0"
NO
RT
H
UNIT A - FIRST FLOOR - FINISH PLAN
2
A-4.03 ⅛" = 1'-0"
NO
RT
H
UNIT B - FIRST FLOOR - PAINT PLAN
A-4.03
VESTIBULES.
PROVIDE EPOXY PAINT IN TOILET ROOMS, CORRIDORS, STAIRS, AND
NEW WORK.
LIMITED TO WALLS, SOFFITS, AND ADDITIONAL SURFACES AFFECTED BY
PROVIDE NEW PAINT FINISH AS NOTED ON PLANS INCLUDING BUT NOT
DO NOT PAINT RUBBER WALL BASE.
WIREMOLD IF NOT PREVIOUSLY PAINTED.
WIREMOLD IF PREVIOUSLY FIELD PAINTED. DO NOT PAINT PRE-FINISHED
EXPOSED ELECTRICAL CONDUIT AND ELECTRICAL BOXES. PAINT
HORNS, VISUAL DEVICES, SMOKE AND HEAT DETECTORS, ETC. PAINT
DEVICES, SAFETY DEVICES, FIRE ALARM EQUIPMENT INCLUDING PULLS,
DO NOT PAINT ELECTRICAL FIXTURES, HOUSINGS, ELECTRICAL WALL
PROVIDE PREPARATION AS NECESSARY PRIOR TO PAINTING WORK.
SWITCHES, OUTLETS, AND EMERGENCY AND OTHER SAFETY DEVICES.
TREATMENT, LOOSE FURNITURE AND EQUIPMENT, ELECTRICAL FIXTURES,
WINDOWS, HANDRAILS AND GUARDRAILS, CERAMIC TILE, ACOUSTICAL WALL
INCLUDING BUT NOT LIMITED TO FLOORING MATERIALS, FACE BRICK,
PROPERLY PROTECT EXISTING ITEMS DURING CLEANING AND PAINTING
6.
5.
4.
3.
2.
1.
GENERAL PAINTING NOTES
2
1
PAINT PLAN KEYNOTES :--
PAINT NEW SEALANT - MATCH EXISTING ADJACENT AREAS.
OF EXPOSED ROOF DECK), AND FROM CORNER TO CORNER.
HEIGHT FROM FLOOR TO CEILING INCLUDING SOFFITS (OR BOTTOM
MATERIALS. PAINT ENTIRE WALL RECEIVING REPAIR WORK FULL
PROPERLY CLEAN AND PREPARE THE AREAS TO RECEIVE PAINT
MATERIALS AND COLOR TO MATCH EXISTING ADJACENT AREAS.
PAINT THE REPAIRED AREAS AFFECTED BY THE WORK WITH
1
2
2 2 1
2
1
2
2
2
1
22
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
2 2 2 2
2
1
2
2
1
2
A-216
COPYRIGHT C HEALY, BENDER & ASSOCIATES, INC.2020
FLOOR SLAB REPAIR AND RENOVATION WORK
IRA JONES MIDDLE SCHOOLPLAINFIELD, ILLINOIS
FOR
PLAINFIELD, WILL COUNTY, ILLINOIS
PLAINFIELD COMMUNITY CONSOLIDATEDSCHOOL DISTRICT 202
PROJ. NO.
10-917-43DRAWN BY
DATE
REVISIONS
01-08-2020
LCB
SHEET NO.
A-OF 8
UNIT A UNIT B
UNIT C
NO SCALE
NO
RT
H
KEY PLAN
ROOM INDEXUNIT A - SECOND FLOOR UNIT B - SECOND FLOOR
B-209
B-208
B-207
B-206
B-205
B-204
B-203
B-202
B-201
STAIRS
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SPECIAL PURPOSE
SPECIAL PURPOSE / STORAGE
A-229
A-228
A-227
A-226
A-225
A-224
A-223
A-222
A-221
A-220B
A-220A
A-220
A-219B
A-219A
A-218
A-217
A-216
STAIRS
ELECTRICAL
PASSAGE
BOYS
GIRLS
UPPER LEARNING RESOURCE CENTER
GIRLS
BOYS
PASSAGE
SPECIAL PURPOSE / STORAGE
ELECTRICAL
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A-215
A-214
A-213
A-212
A-211
A-210
A-209
A-208
A-207B
A-207A
A-207
A-206
A-205
A-204
A-203
A-202
A-201
TOILET
SPECIAL PURPOSE / STORAGE
MECHANICAL
MECHANICAL
SCIENCE
PREP.
CUSTODIAL CLOSET
SCIENCE
STAIRS
CLASSROOM
CORRIDOR
OFFICE
CLASSROOM
CLASSROOM
TOILET
OFFICE
CORRIDOR
UN
IT 'A
'U
NIT
'C'
UN
IT 'A
'U
NIT
'C'
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
A-201 A-202 A-203 A-204 A-205 A-206
A-207
A-207A
A-208 A-209A-207B
A-210
A-211 A-212
A-214
A-215
A-216
A-217A-220
A-219BA-219A
A-218A-223
A-221A-222
A-220B
A-220A
A-225
A-224
A-226 A-228A-227
A-229 A-213
B-201 B-202
UNIT 'B'UNIT 'A'
UNIT 'B'UNIT 'A'
A-214
A-213
B-201 B-202 B-203 B-204 B-205 B-206 B-207
B-208
B-209