FLOOR LAYOUT SECTIONAL ELEVATION...Timber ledged braced and battened door 500mm eaves projection...

4
SCALE DATE DRAWN BY : DRAWING TITLE : DRAWING N O : PROJECT N O : SHEET N O : REVIEWED BY: APPROVED BY: PROJECT. DEC . 2018 DESIGNED BY: W.D SHEET TITLE: PROPOSED BELETHAWA WATER SYSTEM REHAB DRAWINGS W.D 168 900 1,091 1,000 1,241 4,400 150 3,300 150 2,159 1,000 1,241 150 4,100 150 3,600 ROOM FLOOR LAYOUT smooth cement f.f 150 3,300 150 500 300 150 2,400 400 3,050 400 300 150 1,100 1,000 150 150 1,134 3,984 Roof Details Roof slope 23 o Half round G.I ridge cap on, GCI sheets on, 50x50mm purlins on, 100x50mm softwood rafters on , 100x50mm tie beam on, 100x50mm wall plate 100x50mm collar 80x80mm king post ROOM 100mm concrete slab 1000x1200 aluminium sliding window 900x2100 timber door Mud blocks walling Timber ledged braced and battened door 500mm eaves projection SECTIONAL ELEVATION Floor details 150 mm thick compacted hardcore fill on, Levelled compacted formation level with anti-termite treatment Rubble stone foundation walling; see S.E. details. VRC Lintol VRC Ground Beam Foundation depth to be determined on site CARTAKERS ROOM

Transcript of FLOOR LAYOUT SECTIONAL ELEVATION...Timber ledged braced and battened door 500mm eaves projection...

Page 1: FLOOR LAYOUT SECTIONAL ELEVATION...Timber ledged braced and battened door 500mm eaves projection SECTIONAL ELEVATION Floor details 150 mm thick compacted hardcore fill on, Levelled

SCALE

DATE

DRAWN BY :

DRAWING TITLE :

DRAWING N O:

PROJECT NO:

SHEET NO:

REVIEWED BY:

APPROVED BY:

PROJECT.DEC . 2018

DESIGNED BY: W.D

SHEET TITLE:

PROPOSED BELETHAWA WATERSYSTEM REHAB DRAWINGS

W.D

168900 1,091 1,000 1,241

4,400

150

3,30

015

0

2,159 1,000 1,241

1504,100

150

3,60

0

ROOM

FLOOR LAYOUT

smooth cement f.f

150 3,300 150

500

300

150

2,40

0

400 3,050 400

300

150

1,10

01,

000

150

150

1,13

4

3,98

4

Roof DetailsRoof slope 23o

Half round G.I ridge cap on,GCI sheets on,50x50mm purlins on,100x50mm softwood rafters on,100x50mm tie beam on,100x50mm wall plate100x50mm collar80x80mm king post

ROOM

100mm concrete slab

1000x1200 aluminiumsliding window

900x2100 timber door

Mud blocks walling

Timber ledged bracedand battened door

500mm eavesprojection

SECTIONAL ELEVATION

Floor details150 mm thick compacted hardcore fill on,Levelled compacted formation levelwith anti-termite treatment

Rubble stone foundationwalling; see S.E. details.

VRC Lintol

VRC Ground Beam

Foundation depthto be determinedon site

CARTAKERS ROOM

Page 2: FLOOR LAYOUT SECTIONAL ELEVATION...Timber ledged braced and battened door 500mm eaves projection SECTIONAL ELEVATION Floor details 150 mm thick compacted hardcore fill on, Levelled

SCALE

DATE

DRAWN BY :

DRAWING TITLE :

DRAWING N O:

PROJECT NO:

SHEET NO:

REVIEWED BY:

APPROVED BY:

PROJECT.DEC . 2018

DESIGNED BY: W.D

SHEET TITLE:

PROPOSED BELETHAWA WATERSYSTEM REHAB DRAWINGS

W.D

2,159 1,000 1,241

SOUTH ELEVATION

1,241 1,000 1,091 900 168

NORTH ELEVATION

EAST ELEVATION

WEST ELEVATION

CARTAKERS ROOM

Page 3: FLOOR LAYOUT SECTIONAL ELEVATION...Timber ledged braced and battened door 500mm eaves projection SECTIONAL ELEVATION Floor details 150 mm thick compacted hardcore fill on, Levelled

SCALE

DATE

DRAWN BY :

DRAWING TITLE :

DRAWING N O:

PROJECT NO:

SHEET NO:

REVIEWED BY:

APPROVED BY:

PROJECT.DEC . 2018

DESIGNED BY: W.D

SHEET TITLE:

PROPOSED BELETHAWA WATERSYSTEM REHAB DRAWINGS

W.D

PROPOSED SHALLOWWELL/INFILTRATION TANK

35m

dee

p

Page 4: FLOOR LAYOUT SECTIONAL ELEVATION...Timber ledged braced and battened door 500mm eaves projection SECTIONAL ELEVATION Floor details 150 mm thick compacted hardcore fill on, Levelled

SCALE

DATE

DRAWN BY :

DRAWING TITLE :

DRAWING N O:

PROJECT NO:

SHEET NO:

REVIEWED BY:

APPROVED BY:

PROJECT.DEC . 2018

DESIGNED BY: W.D

SHEET TITLE:

PROPOSED BELETHAWA WATERSYSTEM REHAB DRAWINGS

W.D

SITE PHOTOS

ELEVATED TANKS TO BE REHABILITATED WATER KIOSK TO BE REHABILITATED

EXSITING SOLAR POWER SYSTEMS TO BE RE-OREINTED AND RE-INSTALLED

POWER CONTROL CENTRE GENERATOR ROOM TO BE REHABILITATED