JSC-48000-130 Flight Plan STS-130/20A (FDO 12+1+2 OCF Trajectory) Mission Operations Directorate Operations Division Basic October 2, 2009 Launch Date: Thursday, February 4, 2010 Launch Time: 035/11:26:19 GMT February 4, 06:26:19 EDT National Aeronautics and Space Administration Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html For the latest working copy of the Flight Plan, visit http://modspops.jsc.nasa.gov/mod/DO/DO4/Joint/130_20A/default.aspx

Transcript of Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130,...

Page 1: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

JSC-48000-130

Flight Plan

STS-130/20A (FDO 12+1+2 OCF Trajectory)

Mission Operations Directorate Operations Division

Basic October 2, 2009 Launch Date: Thursday, February 4, 2010 Launch Time: 035/11:26:19 GMT February 4, 06:26:19 EDT

National Aeronautics and Space Administration

Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html

For the latest working copy of the Flight Plan, visit http://modspops.jsc.nasa.gov/mod/DO/DO4/Joint/130_20A/default.aspx

Page 2: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints
Page 3: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints
Page 4: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints
Page 5: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

ii FLT PLN/130/BAS

Incorporates the following: 482#: FLT PLN-02077

AREAS OF TECHNICAL RESPONSIBILITY

Book Manager/Lead FAO DO4/M. Blanton 281-483-7728

Lead Timeliner DO4/G. Hansen 281-483-3817

Lead Pointer DO4/A. Rigas 281-483-2596

Lead Ops Planner DO4/S. Toschlog 281-483-7475

Lead RPE DO4/C. Rasnick 281-244-5716

Page 6: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

iii FLT PLN/130/BAS

FLIGHT PLAN STS-130

LIST OF EFFECTIVE PAGES

BASIC 10/02/09

Sign Off ........................... * 130/BAS ii....................................... * 130/BAS iii ...................................... * 130/BAS iv...................................... * 130/BAS v ...................................... * 130/BAS vi...................................... * 130/BAS 1-1 ................................... 130/BAS 1-2 ................................... 130/BAS 1-3 ................................... 130/BAS 1-4 ................................... 130/BAS 2-1 ................................... 130/BAS 2-2 ................................... 130/BAS 2-3 ................................... 130/BAS 2-4 ................................... 130/BAS 2-5 ................................... 130/BAS 2-6 ................................... 130/BAS 2-7 ................................... 130/BAS 2-8 ................................... 130/BAS 2-9 ................................... 130/BAS 2-10 ................................. 130/BAS 2-11 ................................. 130/BAS 2-12 ................................. 130/BAS 2-13 ................................. 130/BAS 2-14 ................................. 130/BAS 2-15 ................................. 130/BAS 2-16 ................................. 130/BAS 2-17 ................................. 130/BAS 2-18 ................................. 130/BAS 2-19 ................................. 130/BAS 2-20 ................................. 130/BAS 2-21 ................................. 130/BAS 2-22 ................................. 130/BAS 2-23 ................................. 130/BAS 2-24 ................................. 130/BAS 2-25 ................................. 130/BAS 2-26 ................................. 130/BAS 2-27 ................................. 130/BAS 2-28 ................................. 130/BAS 2-29 ................................. 130/BAS 2-30 ................................. 130/BAS 2-31 ................................. 130/BAS 2-32 ................................. 130/BAS 2-33 ................................. 130/BAS 2-34 ................................. 130/BAS 2-35 ................................. 130/BAS 2-36 ................................. 130/BAS 2-37 ................................. 130/BAS 2-38 ................................. 130/BAS

2-39 ................................. 130/BAS 2-40 ................................. 130/BAS 2-41 ................................. 130/BAS 2-42 ................................. 130/BAS 2-43 ................................. 130/BAS 2-44 ................................. 130/BAS 3-1 ................................... 130/BAS 3-2 ................................... 130/BAS 3-3 ................................... 130/BAS 3-4 ................................... 130/BAS 3-5 ................................... 130/BAS 3-6 ................................... 130/BAS 3-7 ................................... 130/BAS 3-8 ................................... 130/BAS 3-9 ................................... 130/BAS 3-10 ................................. 130/BAS 3-11 ................................. 130/BAS 3-12 ................................. 130/BAS 3-13 ................................. 130/BAS 3-14 ................................. 130/BAS 3-15 ................................. 130/BAS 3-16 ................................. 130/BAS 3-17 ................................. 130/BAS 3-18 ................................. 130/BAS 3-19 ................................. 130/BAS 3-20 ................................. 130/BAS 3-21 ................................. 130/BAS 3-22 ................................. 130/BAS 3-23 ................................. 130/BAS 3-24 ................................. 130/BAS 3-25 ................................. 130/BAS 3-26 ................................. 130/BAS 3-27 ................................. 130/BAS 3-28 ................................. 130/BAS 3-29 ................................. 130/BAS 3-30 ................................. 130/BAS 3-31 ................................. 130/BAS 3-32 ................................. 130/BAS 3-33 ................................. 130/BAS 3-34 ................................. 130/BAS 3-35 ................................. 130/BAS 3-36 ................................. 130/BAS 3-37 ................................. 130/BAS 3-38 ................................. 130/BAS 3-39 ................................. 130/BAS 3-40 ................................. 130/BAS 3-41 ................................. 130/BAS 3-42 ................................. 130/BAS

* – Omit from flight book

Page 7: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

iv FLT PLN/130/BAS

3-43 ................................. 130/BAS 3-44 ................................. 130/BAS 3-45 ................................. 130/BAS 3-46 ................................. 130/BAS 3-47 ................................. 130/BAS 3-48 ................................. 130/BAS 3-49 ................................. 130/BAS 3-50 ................................. 130/BAS 3-51 ................................. 130/BAS 3-52 ................................. 130/BAS 3-53 ................................. 130/BAS 3-54 ................................. 130/BAS 3-55 ................................. 130/BAS 3-56 ................................. 130/BAS 3-57 ................................. 130/BAS 3-58 ................................. 130/BAS 3-59 ................................. 130/BAS 3-60 ................................. 130/BAS 3-61 ................................. 130/BAS 3-62 ................................. 130/BAS 3-63 ................................. 130/BAS 3-64 ................................. 130/BAS 3-65 ................................. 130/BAS 3-66 ................................. 130/BAS 3-67 ................................. 130/BAS 3-68 ................................. 130/BAS 3-69 ................................. 130/BAS 3-70 ................................. 130/BAS 3-71 ................................. 130/BAS 3-72 ................................. 130/BAS 3-73 ................................. 130/BAS 3-74 ................................. 130/BAS 3-75 ................................. 130/BAS 3-76 ................................. 130/BAS 3-77 ................................. 130/BAS 3-78 ................................. 130/BAS 3-79 ................................. 130/BAS 3-80 ................................. 130/BAS 3-81 ................................. 130/BAS 3-82 ................................. 130/BAS 3-83 ................................. 130/BAS 3-84 ................................. 130/BAS 3-85 ................................. 130/BAS 3-86 ................................. 130/BAS 3-87 ................................. 130/BAS 3-88 ................................. 130/BAS 3-89 ................................. 130/BAS 3-90 ................................. 130/BAS 3-91 ................................. 130/BAS 3-92 ................................. 130/BAS 3-93 ................................. 130/BAS 3-94 ................................. 130/BAS 3-95 ................................. 130/BAS 3-96 ................................. 130/BAS 3-97 ................................. 130/BAS 3-98 ................................. 130/BAS

3-99 ................................. 130/BAS 3-100 ............................... 130/BAS 3-101 ............................... 130/BAS 3-102 ............................... 130/BAS 3-103 ............................... 130/BAS 3-104 ............................... 130/BAS 3-105 ............................... 130/BAS 3-106 ............................... 130/BAS 3-107 ............................... 130/BAS 3-108 ............................... 130/BAS 3-109 ............................... 130/BAS 3-110 ............................... 130/BAS 3-111 ............................... 130/BAS 3-112 ............................... 130/BAS 3-113 ............................... 130/BAS 3-114 ............................... 130/BAS 3-115 ............................... 130/BAS 3-116 ............................... 130/BAS 3-117 ............................... 130/BAS 3-118 ............................... 130/BAS 3-119 ............................... 130/BAS 3-120 ............................... 130/BAS 3-121 ............................... 130/BAS 3-122 ............................... 130/BAS 3-123 ............................... 130/BAS 3-124 ............................... 130/BAS 3-125 ............................... 130/BAS 3-126 ............................... 130/BAS 3-127 ............................... 130/BAS 3-128 ............................... 130/BAS 3-129 ............................... 130/BAS 3-130 ............................... 130/BAS 3-131 ............................... 130/BAS 3-132 ............................... 130/BAS 3-133 ............................... 130/BAS 3-134 ............................... 130/BAS 3-135 ............................... 130/BAS 3-136 ............................... 130/BAS 3-137 ............................... 130/BAS 3-138 ............................... 130/BAS 3-139 ............................... 130/BAS 3-140 ............................... 130/BAS 3-141 ............................... 130/BAS 3-142 ............................... 130/BAS

Page 8: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

v FLT PLN/130/BAS

CONTENTS PAGE

INTRODUCTION ............................................................................................................. vi

OVERVIEW TIMELINE .................................................................................................... 1-1

SUMMARY TIMELINE ..................................................................................................... 2-1

DETAILED TIMELINE ...................................................................................................... 3-1

Page 9: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

vi FLT PLN/130/BAS

INTRODUCTION

The STS-130 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines that are covered in the Ascent, Post Insertion, Deorbit Prep, and Entry Checklists. The detailed rendezvous and undocking timelines and procedures are contained in the Rendezvous Checklist. The detailed EVA task timelines and procedures are contained in the EVA Checklist. This Flight Plan satisfies the mission requirements specified in the following documents:

NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints NSTS-21549, ISS-20A Mission Integration Plan

The timeline formats used in this Flight Plan are based on JSC-19933, Timeline Format Definitions and Standard Notes, Rev C, May 1990. The STS-130 Flight Plan is based on a launch date of February 4, 2010, at 11:26:19 GMT (05:26:19 AM CDT). Orbiter inertial attitudes are expressed relative to a mean of 1950 (M50) reference frame. The following SCSC Exceptions have been submitted in order to meet Category 1 objectives:

None The Flight Plan and previously published, non-flown sections listed below are available on the following Space Shuttle Flight Planning web site:

http://modspops.jsc.nasa.gov/mod/DO/DO4/Joint/130_20A/default.aspx Non-flown sections that are no longer published:

ISS Commanding Pages Attitude Timeline Ku-Band Antenna Masking Plan Flight Plan Notes Flight Plan Walkthrough

Page 10: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

1-1 FLT PLN/130/BAS

OVE

RVI

EW

TIM

ELIN

E

OVERVIEW TIMELINE

Page 11: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

1-2 FLT PLN/130/BAS

OVE

RVI

EW

TIM

ELIN

E

This Page Intentionally Blank

Page 12: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

1-3 FLT PLN/130/BAS

Page 13: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

1-4 FLT PLN/130/BAS

This Page Intentionally Blank

Page 14: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

2-1 FLT PLN/130/BAS

SUM

MA

RY

TIM

ELIN

E

SUMMARY TIMELINE

Page 15: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

2-2 FLT PLN/130/BAS

SUM

MA

RY

TIM

ELIN

E

This Page Intentionally Blank

Page 16: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD01

ZAMKA

VIRTS

NC1Δ

ASSUMPTIONS:1. SSRMS Pre-launch C/O @ L-48hrs (MT @ WS4 with SSRMS on NODE 2 in Docking Position)2. ISS SAFER C/Os completed.3. ISS EMUs temp stowed in Node.

4. CBCS installed on NODE 1 Port Hatch Window to prepare for NODE 3 INSTL.

HIRE

PATRICK

BEHNKEN

ROBINSON

MNVR

2-3

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/04/10 (035) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR SLEEPPOST INSERTIONASCENT OMSBURN

PRESLEEP

-ZLV

-XVV

GRP B

PWRDN

RMS*

IMU

AFT C/O

ELV PRK

LOAD

DAPS

MCIU#

PMCA/G

PRESLEEP

APU*

WATCH

PLT SLEEPPOST INSERTIONASCENT OMSBURN PRE SLEEP

GRP B

PWRDN

P/TV01VIDEOSETUP

P/TV01

S/U

ET HH

VIDEO

D/L

APCU

ACT

WATCH

MS1 SLEEPPOST INSERTIONASCENT PRE SLEEP

RMS

POWERUP

RMS C/ORMS#

P/TV01 VIDEO SETUP

MS2 SLEEPPOST INSERTIONASCENT PRE SLEEPPGSC SETUPUMBWELLD/L

ETPHOTO

WLESACT

MS3 SLEEPPOST INSERTIONASCENT PRE SLEEP

RMS

POWERUP

RMS C/ORMS#

RMS*

GIRA INSTALL

OCAC

SETUP

WATCH

MS4 SLEEPPOST INSERTIONASCENT PRE SLEEPPGSC SETUP SEESETUP

TEPC ON

NLPVACACT1

MDDK CK

NLP

CELLS

ACT 1

DAY/NIGHTORBIT 2 3 4 5 6 7 8 9

TDRSWEZ

ASC BIAS -ZLV +YVV NC1 -ZLV -XVVORB ATT*ON-ORBIT INIT#FILTER CK

*RECONFIG#POWERDOWN

NOTES

2-3

FD01

ZAMKA

VIRTS

NC1Δ

ASSUMPTIONS:1. SSRMS Pre-launch C/O @ L-48hrs (MT @ WS4 with SSRMS on NODE 2 in Docking Position)2. ISS SAFER C/Os completed.3. ISS EMUs temp stowed in Node.

4. CBCS installed on NODE 1 Port Hatch Window to prepare for NODE 3 INSTL.

HIRE

PATRICK

BEHNKEN

ROBINSON

MNVR

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/04/10 (035) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR SLEEPPOST INSERTIONASCENT OMSBURN

PRESLEEP

-ZLV

-XVV

GRP B

PWRDN

RMS*

IMU

AFT C/O

ELV PRK

LOAD

DAPS

MCIU#

PMCA/G

PRESLEEP

APU*

WATCH

PLT SLEEPPOST INSERTIONASCENT OMSBURN PRE SLEEP

GRP B

PWRDN

P/TV01VIDEOSETUP

P/TV01

S/U

ET HH

VIDEO

D/L

APCU

ACT

WATCH

MS1 SLEEPPOST INSERTIONASCENT PRE SLEEP

RMS

POWERUP

RMS C/ORMS#

P/TV01 VIDEO SETUP

MS2 SLEEPPOST INSERTIONASCENT PRE SLEEPPGSC SETUPUMBWELLD/L

ETPHOTO

WLESACT

MS3 SLEEPPOST INSERTIONASCENT PRE SLEEP

RMS

POWERUP

RMS C/ORMS#

RMS*

GIRA INSTALL

OCAC

SETUP

WATCH

MS4 SLEEPPOST INSERTIONASCENT PRE SLEEPPGSC SETUP SEESETUP

TEPC ON

NLPVACACT1

MDDK CK

NLP

CELLS

ACT 1

DAY/NIGHTORBIT 2 3 4 5 6 7 8 9

TDRSWEZ

ORB ATT ASC BIAS -ZLV +YVV NC1 -ZLV -XVV

NOTES

*ON-ORBIT INIT#FILTER CK

*RECONFIG#POWERDOWN

Page 17: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD02

NC2Δ

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

(R1)

(R1)

(R1)

(R2)

(R2)

(R2)

(R3)

(R3)

(R3)

(R3)

2-4

STS-130

STS

02/05 01 02 03 04 05 06 07 08 09 10 11GMT 02/04/10 (035) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDR SLEEP MEALPOST SLEEP OMSBURN

NOSE CAPSURVEY

MNVR

STBD

MNVR

NOSE

EXERCISE

STBD WING SURVEY-ZLV

-XVV

IMU

WSB@

MCIU#

O2-I

O2-T

OMSPODSURV

GRP B

PWRUP

GRP B

PWRDN

-ZLV

-XVV

PORT

WING

LOG

POD*

PLT SLEEP MEALPOST SLEEP OMSBURN PORT WING SURVEY

MNVR

PORT

OBSSBERTH

NOSE CAPSURVEY

CRYOO2SNSRCK

FC PRG^

MIDDECK XFER PREP

GRP B

PWRUP

APCU 2*

GRP B

PWRDN

LOG

MS1 SLEEP MEALPOST SLEEP OBSS UNBERTH STBD WING SURVEY PORT WING SURVEY OBSSBERTH

MS2 SLEEP MEALPOST SLEEP NOSE CAPSURVEYEXERCISE

PORTWINGSURVEY

EMUPREPFORXFER

PGSC SETUP(PART II)

EMU*

PORT WING SURVEY

MS3 SLEEP MEALPOST SLEEP OBSS UNBERTH STBD WING SURVEYERGSETUP

EMUC/OPREP

EMU C/O

EMUPREPFORXFER

LOG

MS4 SLEEP MEALPOST SLEEP ERGSETUP EXERCISE

EMUC/OPREP

EMU C/O

EMUPREPFORXFER

H2OCWC

SETUP

GALLEY*

GALLEY*

MDDK CK

EMUDRNKBAGFILL

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16 17

TDRSWEZ

-ZLV -XVV NC2 -ZLV -XVV STBD SURVEY NOSE SURVEY PORT SURVEYORB ATT@CNTLR SWAP#FILTER CK

*A POD HTR RCNFG^MANUAL

*DISABLE PWR TO OBSS

*POWERUP & COMM CHECK*OVERNIGHT CONFIG*MORNING CONFIG

NOTES

2-4

FD02

NC2Δ

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

(R1)

(R1)

(R1)

(R2)

(R2)

(R2)

(R3)

(R3)

(R3)

(R3)

STS-130

STS

02/05 01 02 03 04 05 06 07 08 09 10 11GMT 02/04/10 (035) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDR SLEEP MEALPOST SLEEP OMSBURN

NOSE CAPSURVEY

MNVR

STBD

MNVR

NOSE

EXERCISE

STBD WING SURVEY-ZLV

-XVV

IMU

WSB@

MCIU#

O2-I

O2-T

OMSPODSURV

GRP B

PWRUP

GRP B

PWRDN

-ZLV

-XVV

PORT

WING

LOG

POD*

PLT SLEEP MEALPOST SLEEP OMSBURN PORT WING SURVEY

MNVR

PORT

OBSSBERTH

NOSE CAPSURVEY

CRYOO2SNSRCK

FC PRG^

MIDDECK XFER PREP

GRP B

PWRUP

APCU 2*

GRP B

PWRDN

LOG

MS1 SLEEP MEALPOST SLEEP OBSS UNBERTH STBD WING SURVEY PORT WING SURVEY OBSSBERTH

MS2 SLEEP MEALPOST SLEEP NOSE CAPSURVEYEXERCISE

PORTWINGSURVEY

EMUPREPFORXFER

PGSC SETUP(PART II)

EMU*

PORT WING SURVEY

MS3 SLEEP MEALPOST SLEEP OBSS UNBERTH STBD WING SURVEYERGSETUP

EMUC/OPREP

EMU C/O

EMUPREPFORXFER

LOG

MS4 SLEEP MEALPOST SLEEP ERGSETUP EXERCISE

EMUC/OPREP

EMU C/O

EMUPREPFORXFER

H2OCWC

SETUP

GALLEY*

GALLEY*

MDDK CK

EMUDRNKBAGFILL

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16 17

TDRSWEZ

ORB ATT -ZLV -XVV NC2 -ZLV -XVV STBD SURVEY NOSE SURVEY PORT SURVEY

NOTES

@CNTLR SWAP#FILTER CK*A POD HTR RCNFG^MANUAL

*DISABLE PWR TO OBSS

*POWERUP & COMM CHECK*OVERNIGHT CONFIG*MORNING CONFIG

Page 18: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD02

NC3Δ

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-5

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/05/10 (036) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR SLEEPPRE SLEEP+XRCSBURN

EXERCISE PMC

A/GPRE SLEEP

-ZLV

-XVV

FUT MVR

FILTERCLEANING

FD CONF

PLT SLEEPPRE SLEEP+XRCSBURN

EXERCISEOBSSBERTH

FCMSOPS

APCU 2*

MS1 SLEEPPRE SLEEPEXERCISEOBSSBERTH

RNDZ TOOLSC/O

CREWCHOICED/L

PRESLEEP

MS2 SLEEPPRE SLEEPLDRIDOWNLINK

RNDZ TOOLSC/O

EMUPREPFORXFER

PRE SLEEPWLES

OCA*

MS3 SLEEPPRE SLEEPEXERCISEEMU PREPFOR XFER

C/LCMRINSTL

DOCKING

RING

EXT

MS4 SLEEPPRE SLEEPEMU PREPFOR XFER

C/LCMRINSTL

DOCKING

RING

EXT

MDDK CK

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24 25

TDRSWEZ

-ZLV -XVV NC3 -ZLV -XVVORB ATT*REACT FOR N3 HTRS *D/L RATE 48M PL MAX

NOTES

2-5

FD02

NC3Δ

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/05/10 (036) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR SLEEPPRE SLEEP+XRCSBURN

EXERCISE PMC

A/GPRE SLEEP

-ZLV

-XVV

FUT MVR

FILTERCLEANING

FD CONF

PLT SLEEPPRE SLEEP+XRCSBURN

EXERCISEOBSSBERTH

FCMSOPS

APCU 2*

MS1 SLEEPPRE SLEEPEXERCISEOBSSBERTH

RNDZ TOOLSC/O

CREWCHOICED/L

PRESLEEP

MS2 SLEEPPRE SLEEPLDRIDOWNLINK

RNDZ TOOLSC/O

EMUPREPFORXFER

PRE SLEEPWLES

OCA*

MS3 SLEEPPRE SLEEPEXERCISEEMU PREPFOR XFER

C/LCMRINSTL

DOCKING

RING

EXT

MS4 SLEEPPRE SLEEPEMU PREPFOR XFER

C/LCMRINSTL

DOCKING

RING

EXT

MDDK CK

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24 25

TDRSWEZ

ORB ATT -ZLV -XVV NC3 -ZLV -XVV

NOTES

*REACT FOR N3 HTRS *D/L RATE 48M PL MAX

Page 19: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD03

NC4Δ TiΔ

DOCKING*

HARDMATE

ΔRPM

*DOCKING 01/20:59

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

^ MNVR NHΔ

2-6

STS-130

STS

ISS

02/06 01 02 03 04 05 06 07 08 09 10 11GMT 02/05/10 (036) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDR SLEEP ISS RNDZ OPS APPROACH T/LPOST SLEEP

GRP B

PWRUP

HATCHOPEN

WELCOME

SAFETY

BRIEF

IMU

MNVRTEA

GRP B

PWRDN

ATTH/O*

MCIU#

POSTDOCKEVAXFER

LOG

PLT SLEEP ISS RNDZ OPS APPROACH T/LPOST SLEEP

GRP B

PWRUP

HATCHOPEN

WELCOME

SAFETY

BRIEF

SRMS

MNVR

GRP B

PWRDN

SSPTS

VERIF

SSV-2

DOCK

AUDIO

LOG

POD*

MS1 SLEEP APPROACH T/LPOST SLEEP HATCHOPEN

WELCOME

SAFETY

BRIEF

SRMS

MNVR

ISS RNDZ OPSXFERUPDATE

HATCHLEAKCK

ODSPREPFORINGR

MS2 SLEEP ISS RNDZ OPS APPROACH T/LPOST SLEEP EXERCISE

WELCOME

SAFETY

BRIEF

SIMOINIT

SIMOTERM

POST SLEEPHATCHLEAKCK

POSTRNDZPGSCCNFG

POSTDOCKEVAXFER

O2-I

O2-T

OCA*

WLES

PCSS/U

POST

SLEEP

MS3 SLEEP POST SLEEP EXERCISE P/TV02 DOCK OPSP/TV02S/U

WELCOME

SAFETY

BRIEF

SSRMS

MNVR*

EMU

REMOVAL

ODSPREPFORINGR

P/TV04OPS

INGR/EGR

P/TV04S/U

LOG

MS4 SLEEP APPROACH T/LPOST SLEEP EXERCISE

WELCOME

SAFETY

BRIEF

POSTDOCKEVAXFER

EMU

REMOVAL

CONDCWCS/U

POSTRNDZPGSCCNFG

MDDK CK

PCSS/U

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32

TDRSWEZ

-ZLV -XVV -ZLV +YVV RNDZ DK BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

*TO ISS#FILTER CK*B POD HTR RCNFG

*D/L RATE 2M *TO OBSS

NOTES

2-6

FD03

NC4Δ TiΔ

DOCKING*

HARDMATE

ΔRPM

*DOCKING 01/20:59

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

^ MNVR NHΔ

STS-130

STS

ISS

02/06 01 02 03 04 05 06 07 08 09 10 11GMT 02/05/10 (036) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDR SLEEP ISS RNDZ OPS APPROACH T/LPOST SLEEP

GRP B

PWRUP

HATCHOPEN

WELCOME

SAFETY

BRIEF

IMU

MNVRTEA

GRP B

PWRDN

ATTH/O*

MCIU#

POSTDOCKEVAXFER

LOG

PLT SLEEP ISS RNDZ OPS APPROACH T/LPOST SLEEP

GRP B

PWRUP

HATCHOPEN

WELCOME

SAFETY

BRIEF

SRMS

MNVR

GRP B

PWRDN

SSPTS

VERIF

SSV-2

DOCK

AUDIO

LOG

POD*

MS1 SLEEP APPROACH T/LPOST SLEEP HATCHOPEN

WELCOME

SAFETY

BRIEF

SRMS

MNVR

ISS RNDZ OPSXFERUPDATE

HATCHLEAKCK

ODSPREPFORINGR

MS2 SLEEP ISS RNDZ OPS APPROACH T/LPOST SLEEP EXERCISE

WELCOME

SAFETY

BRIEF

SIMOINIT

SIMOTERM

POST SLEEPHATCHLEAKCK

POSTRNDZPGSCCNFG

POSTDOCKEVAXFER

O2-I

O2-T

OCA*

WLES

PCSS/U

POST

SLEEP

MS3 SLEEP POST SLEEP EXERCISE P/TV02 DOCK OPSP/TV02S/U

WELCOME

SAFETY

BRIEF

SSRMS

MNVR*

EMU

REMOVAL

ODSPREPFORINGR

P/TV04OPS

INGR/EGR

P/TV04S/U

LOG

MS4 SLEEP APPROACH T/LPOST SLEEP EXERCISE

WELCOME

SAFETY

BRIEF

POSTDOCKEVAXFER

EMU

REMOVAL

CONDCWCS/U

POSTRNDZPGSCCNFG

MDDK CK

PCSS/U

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32

TDRSWEZ

ORB ATT -ZLV -XVV -ZLV +YVV RNDZ DK BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

*TO ISS#FILTER CK*B POD HTR RCNFG

*D/L RATE 2M *TO OBSS

Page 20: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD03

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

DOCKING*

*DOCKING 01/20:59

2-7

ISS

EXP 22

STS

ISS

02/06 01 02 03 04 05 06 07 08 09 10 11GMT 02/05/10 (036) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001TDRS AVAIL

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32

TDRSWEZ

-ZLV -XVV -ZLV +YVV RNDZ DK BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SLEEP

REACT

POST SLEEP PWDPC CEVIS ARED

P/TVRPMVRFYS/U

MEALPREP

800MM

PHOTO

RPMDL

♣⊕

DOCK

AUDIO

HATCHOPEN

WELCOME

SAFETY

FE-1 SLEEP POST SLEEP PW PWDPC TVIS HYG VELO MEAL RS OPS RS OPS

WELCOME

SAFETY

FE-4 SLEEP POST SLEEP PW PWDPC VELO RS OPS RS OPS

P/TVRPMVRFYS/U

MEALPREP

400MM

PHOTO

TVIS HYG

WELCOME

SAFETY

FE-5 SLEEP

REACT

POST SLEEP PW PWDPC ♦ T2 MEAL

TIMER

TIMER

DOCK

VIDEO

® CEVIS HATCHOPEN

WELCOME

SAFETY

FE-6 SLEEP

REACT

POST SLEEP PW PWDPC T2 CEVISDCP*

IMMN^

MEAL

HATCHLEAKCK -ISS

CAM D

HDSU

HATCHOPEN

WELCOME

SAFETY

PAO

VID

SSRMS

MNVR*

♣C&T-DK SM ПА 3-CNFG⊕N2 XFER INIT

♦JPM/LAB-SHUTTER-CL

®ACS-PMA2-ARVL-THRSTR

*CABLE CONNECT^SALIVA SETUP

*TO OBSS

NOTES

2-7

FD03

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

DOCKING*

*DOCKING 01/20:59

ISS

EXP 22

STS

ISS

02/06 01 02 03 04 05 06 07 08 09 10 11GMT 02/05/10 (036) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001TDRS AVAIL

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32

TDRSWEZ

ORB ATT -ZLV -XVV -ZLV +YVV RNDZ DK BIAS -XLV -ZVVSSRMS POS

ISS CDR SLEEP

REACT

POST SLEEP PWDPC CEVIS ARED

P/TVRPMVRFYS/U

MEALPREP

800MM

PHOTO

RPMDL

♣⊕

DOCK

AUDIO

HATCHOPEN

WELCOME

SAFETY

FE-1 SLEEP POST SLEEP PW PWDPC TVIS HYG VELO MEAL RS OPS RS OPS

WELCOME

SAFETY

FE-4 SLEEP POST SLEEP PW PWDPC VELO RS OPS RS OPS

P/TVRPMVRFYS/U

MEALPREP

400MM

PHOTO

TVIS HYG

WELCOME

SAFETY

FE-5 SLEEP

REACT

POST SLEEP PW PWDPC ♦ T2 MEAL

TIMER

TIMER

DOCK

VIDEO

® CEVIS HATCHOPEN

WELCOME

SAFETY

FE-6 SLEEP

REACT

POST SLEEP PW PWDPC T2 CEVISDCP*

IMMN^

MEAL

HATCHLEAKCK -ISS

CAM D

HDSU

HATCHOPEN

WELCOME

SAFETY

PAO

VID

SSRMS

MNVR*

NOTES

♣C&T-DK SM ПА 3-CNFG⊕N2 XFER INIT

♦JPM/LAB-SHUTTER-CL

®ACS-PMA2-ARVL-THRSTR

*CABLE CONNECT^SALIVA SETUP

*TO OBSS

Page 21: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD03

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

NO EXERCISE[WHILE DOUBLE GRAPPLED]

2-8

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/06/10 (037) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR SLEEPPRE SLEEPEXERCISE PMCA/G

N2 XFERINIT PRE SLEEPMDDK XFER

FD CONF

PLT SLEEPPRE SLEEP

MRL RLS

GRPL

OPCU#

MNVR TO

N3 INST

MS1 SLEEPPRE SLEEP

MRL RLS

GRPL

XFER

TAGUP

XFER

BRIEF

MNVR TO

N3 INST

CREWCHOICED/L

PRE

SLEEP

MS2 SLEEPPRE SLEEP

P/TV05

SETUP

SODF

XFER

PLAYBACK

MDDKXFER

GLCR

P/TV09

MS3 SLEEPPRE SLEEPUNGRPL &MNVR

REBA*

REBAC/O

SSRMS

OBSS

UNBERTH

GRPL

E_LK PREP

MS4 SLEEPPRE SLEEP

REBA*

REBAC/O

SMPXFRRVW

NLP VAC

TERM 1

GLCRMLF20ASMPXFR

MDDK CK

NLP

CELLS

TERM 1

E_LK PREP

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

#ACT *INSTALL

NOTES

2-8

FD03

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

NO EXERCISE[WHILE DOUBLE GRAPPLED]

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/06/10 (037) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR SLEEPPRE SLEEPEXERCISE PMCA/G

N2 XFERINIT PRE SLEEPMDDK XFER

FD CONF

PLT SLEEPPRE SLEEP

MRL RLS

GRPL

OPCU#

MNVR TO

N3 INST

MS1 SLEEPPRE SLEEP

MRL RLS

GRPL

XFER

TAGUP

XFER

BRIEF

MNVR TO

N3 INST

CREWCHOICED/L

PRE

SLEEP

MS2 SLEEPPRE SLEEP

P/TV05

SETUP

SODF

XFER

PLAYBACK

MDDKXFER

GLCR

P/TV09

MS3 SLEEPPRE SLEEPUNGRPL &MNVR

REBA*

REBAC/O

SSRMS

OBSS

UNBERTH

GRPL

E_LK PREP

MS4 SLEEPPRE SLEEP

REBA*

REBAC/O

SMPXFRRVW

NLP VAC

TERM 1

GLCRMLF20ASMPXFR

MDDK CK

NLP

CELLS

TERM 1

E_LK PREP

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

#ACT *INSTALL

Page 22: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD03

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

NO EXERCISE[WHILE DOUBLE GRAPPLED]

2-9

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/06/10 (037) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002TDRS AVAIL

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SMPXFRRVW

GLCRMLF20ASMPXFR

N2 XFERINIT E_LK PREP PSDPC PRE SLEEP-ISS

REACT

SLEEP

FE-1 RS OPS PW PS DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW PS DPC PRE SLEEP-ISS SLEEP

FE-5 MDDK XFERDCBAPCXUNPK

PW PS DPC PRE SLEEP-ISS

REACT

SLEEP

FE-6GRPL

SSRMS

OBSS

UNBERTH

UNGRPL &MNVR PW PS DPC PRE SLEEP-ISS

REACT

SLEEP

NOTES

2-9

FD03

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

NO EXERCISE[WHILE DOUBLE GRAPPLED]

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/06/10 (037) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002TDRS AVAIL

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR SMPXFRRVW

GLCRMLF20ASMPXFR

N2 XFERINIT E_LK PREP PSDPC PRE SLEEP-ISS

REACT

SLEEP

FE-1 RS OPS PW PS DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW PS DPC PRE SLEEP-ISS SLEEP

FE-5 MDDK XFERDCBAPCXUNPK

PW PS DPC PRE SLEEP-ISS

REACT

SLEEP

FE-6GRPL

SSRMS

OBSS

UNBERTH

UNGRPL &MNVR PW PS DPC PRE SLEEP-ISS

REACT

SLEEP

NOTES

Page 23: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD04

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-10

STS-130

STS

ISS

02/07 01 02 03 04 05 06 07 08 09 10 11GMT 02/06/10 (037) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR SLEEP MEALPOST SLEEP OFF DUTYPAO

CWC

INIT #1

CWC

TERM

CWC

XFER

MDDK XFERLOG

AREDMDDK XFER

PLT SLEEP MEALPOST SLEEP OFF DUTYPAOSTS O2 P/BCONFIG

IMU

MCIU*

MDDK XFEREXERCISE

P/TV06

S/UL

OG

MS1 SLEEP MEALPOST SLEEP OFF DUTYPAO

XFER

UPDATE

SPINAL

STAND

MDDKXFEREXERCISE MDDK XFER

MS2 SLEEP MEALPOST SLEEP OFF DUTYPAOEXERCISEMDDKXFER

SPINAL

STAND

EVATOOLCONFIG

MDDK XFER

MDDK CK

MS3 SLEEP MEALPOST SLEEP OFF DUTYPAOEXERCISEEVA TOOL CONFIG TOOLAUDIT

LOG

MS4 SLEEP MEALPOST SLEEP OFF DUTYPAOEVA TOOL CONFIG TOOLAUDIT ARED

DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

*FILTER CK

NOTES

2-10

FD04

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

ISS

02/07 01 02 03 04 05 06 07 08 09 10 11GMT 02/06/10 (037) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR SLEEP MEALPOST SLEEP OFF DUTYPAO

CWC

INIT #1

CWC

TERM

CWC

XFER

MDDK XFERLOG

AREDMDDK XFER

PLT SLEEP MEALPOST SLEEP OFF DUTYPAOSTS O2 P/BCONFIG

IMU

MCIU*

MDDK XFEREXERCISE

P/TV06

S/UL

OG

MS1 SLEEP MEALPOST SLEEP OFF DUTYPAO

XFER

UPDATE

SPINAL

STAND

MDDKXFEREXERCISE MDDK XFER

MS2 SLEEP MEALPOST SLEEP OFF DUTYPAOEXERCISEMDDKXFER

SPINAL

STAND

EVATOOLCONFIG

MDDK XFER

MDDK CK

MS3 SLEEP MEALPOST SLEEP OFF DUTYPAOEXERCISEEVA TOOL CONFIG TOOLAUDIT

LOG

MS4 SLEEP MEALPOST SLEEP OFF DUTYPAOEVA TOOL CONFIG TOOLAUDIT ARED

DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

*FILTER CK

Page 24: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD04

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD04

2-11

ISS

EXP 22

STS

ISS

02/07 01 02 03 04 05 06 07 08 09 10 11GMT 02/06/10 (037) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002TDRS AVAIL

DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SLEEPBISP

POST SLEEP PW DPC SPINAL S/U

STAND*

STS O2 P/BCONFIG

STAND

SPINAL

SPINAL DATA CLCTOPR

SPINAL

H/W

STOW HDSU

PAOPAO

MEAL OFF DUTY T2 ARED

FE-1 SLEEP POST SLEEP PW DPC RS OPS TVIS HYG MEAL OFF DUTYVELO

FE-4 SLEEP POST SLEEP PW DPC RS OPS VELO MEAL OFF DUTY TVIS

FE-5 SLEEPBISP

POST SLEEP PW DPC T2 EVA CAMERACNFG

SPNLDATACLCTOPR

STAND

SPINAL

MDDK XFER MEAL OFF DUTY OFFDUTYARED

FE-6 SLEEP

SALVA

POST SLEEP PW DPC ABRSREINIT

PHOTO

TAGES

REPLNT

MWASU

CAMBIUMLOOP

REPLNT2

STAND

SPINAL

ARED PAO MEAL OFF DUTY T2

*S/U

NOTES

2-11

FD04

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD04

ISS

EXP 22

STS

ISS

02/07 01 02 03 04 05 06 07 08 09 10 11GMT 02/06/10 (037) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002TDRS AVAIL

DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR SLEEPBISP

POST SLEEP PW DPC SPINAL S/U

STAND*

STS O2 P/BCONFIG

STAND

SPINAL

SPINAL DATA CLCTOPR

SPINAL

H/W

STOW HDSU

PAOPAO

MEAL OFF DUTY T2 ARED

FE-1 SLEEP POST SLEEP PW DPC RS OPS TVIS HYG MEAL OFF DUTYVELO

FE-4 SLEEP POST SLEEP PW DPC RS OPS VELO MEAL OFF DUTY TVIS

FE-5 SLEEPBISP

POST SLEEP PW DPC T2 EVA CAMERACNFG

SPNLDATACLCTOPR

STAND

SPINAL

MDDK XFER MEAL OFF DUTY OFFDUTYARED

FE-6 SLEEP

SALVA

POST SLEEP PW DPC ABRSREINIT

PHOTO

TAGES

REPLNT

MWASU

CAMBIUMLOOP

REPLNT2

STAND

SPINAL

ARED PAO MEAL OFF DUTY T2

NOTES

*S/U

Page 25: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD04

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS A/L Campout @ 10.2 psi10.2DPRS

BEHNKEN

FD04

2-12

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/07/10 (038) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDR SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY MASK P/B

CONFIG PRE SLEEPPMCA/G

FD CONF

PLT SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY

MS1 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY

XFER

TAGUP

XFER

BRIEF

CREW

CHOICE

D/LPS

MS2 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY

MDDK CK

MS3 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY MASK P/B

CONFIGPRESLEEP

MS4 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY MASK P/B

CONFIGPRESLEEP

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

NOTES

2-12

FD04

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS A/L Campout @ 10.2 psi10.2DPRS

BEHNKEN

FD04

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/07/10 (038) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDR SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY MASK P/B

CONFIG PRE SLEEPPMCA/G

FD CONF

PLT SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY

MS1 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY

XFER

TAGUP

XFER

BRIEF

CREW

CHOICE

D/LPS

MS2 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY

MDDK CK

MS3 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY MASK P/B

CONFIGPRESLEEP

MS4 SLEEPPRE SLEEPEVA 1 PROCREVIEWOFF DUTY MASK P/B

CONFIGPRESLEEP

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

Page 26: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD04

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD04

2-13

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/07/10 (038) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003TDRS AVAIL

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR ARED EVA 1 PROCREVIEW PW DPC PRE

SLEEP-ISSPRE

SLEEP-ISS♣ SLEEP

FE-1 VELO EVA 1 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-4 TVIS HYG EVA 1 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-5 OFF DUTY EVA 1 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-6 T2 EVA 1 PROCREVIEW PW

HAMDPC PRE SLEEP-ISS SLEEP

♣MASK P/B CONFIG

NOTES

2-13

FD04

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD04

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/07/10 (038) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003TDRS AVAIL

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR ARED EVA 1 PROCREVIEW PW DPC PRE

SLEEP-ISSPRE

SLEEP-ISS♣ SLEEP

FE-1 VELO EVA 1 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-4 TVIS HYG EVA 1 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-5 OFF DUTY EVA 1 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-6 T2 EVA 1 PROCREVIEW PW

HAMDPC PRE SLEEP-ISS SLEEP

NOTES

♣MASK P/B CONFIG

Page 27: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD05

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

10.2DPRS

14.7RPRS

EVA 1 (6:30)

NO EXERCISE[FROM UNBRTH & INSTL UNTIL A-BOLTS COMPLETE]

BEHNKENEV1

EV2

2-14

STS-130

STS

ISS

02/08 01 02 03 04 05 06 07 08 09 10 11GMT 02/07/10 (038) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

P/TV07 EVA OPS MEALPMCA/G

CWC

INIT #2

CWC

TERM

N2-I

N2-T

CWC

XFER

P/TV07 EVA OPS

PRLA*

♣LOG

ARED

PLT SLEEP POST SLEEPLIMP

BRAKE

P/TV07

EVA S/U

NODE 3 UNBRTHINSTL

HATCH

MEAL

INHBT

PAD NODE

3 GRPL

IMU

MDDK XFER MDDKXFER

NODE 3

UNBRTH

INSTL

LOG

ARED

MS1 SLEEP POST SLEEP

CBCS*

1STSTGCAP

LIMP

2NDSTGCAP

VERFY

BRAKE

NODE 3 UNBRTHINSTL MEALMDDK XFEREXERCISE

CBCS^

CBCS*

NODE3 GRPL

XFER

UPDATE

MDDKXFER

NODE3 LKCKS/U

NODE 3

UNBRTH

INSTL

NODE 3

VEST

ACCESS

MS2 SLEEP POST SLEEP IVA SUPPORT

P_DPS

EXERCISE MDDK XFEREVATOOLCHECK

MDDK CK

MS3 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

NODE 3 PREPUNBERTH

⊕NH3 BAGOPS OTP EARLY REMOVAL LTA CABLE

INSTL

EVAEGRS/SETUP

GETAHEAD

MS4 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

NODE 3 PREPUNBERTH

♦NH3 BAGOPS OTP EARLY REMOVAL AVIONICS CABLE

INSTL

EVAEGRS/SETUP

GET

AHEAD

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣P/TV07 EV⊕CLNUP & I♦CLNUP & I

*OPEN*POWER UP ^POWERDOWN

*TEMP STOWNOTES

2-14

FD05

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

10.2DPRS

14.7RPRS

EVA 1 (6:30)

NO EXERCISE[FROM UNBRTH & INSTL UNTIL A-BOLTS COMPLETE]

BEHNKENEV1

EV2

STS-130

STS

ISS

02/08 01 02 03 04 05 06 07 08 09 10 11GMT 02/07/10 (038) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

P/TV07 EVA OPS MEALPMCA/G

CWC

INIT #2

CWC

TERM

N2-I

N2-T

CWC

XFER

P/TV07 EVA OPS

PRLA*

♣LOG

ARED

PLT SLEEP POST SLEEPLIMP

BRAKE

P/TV07

EVA S/U

NODE 3 UNBRTHINSTL

HATCH

MEAL

INHBT

PAD NODE

3 GRPL

IMU

MDDK XFER MDDKXFER

NODE 3

UNBRTH

INSTL

LOG

ARED

MS1 SLEEP POST SLEEP

CBCS*

1STSTGCAP

LIMP

2NDSTGCAP

VERFY

BRAKE

NODE 3 UNBRTHINSTL MEALMDDK XFEREXERCISE

CBCS^

CBCS*

NODE3 GRPL

XFER

UPDATE

MDDKXFER

NODE3 LKCKS/U

NODE 3

UNBRTH

INSTL

NODE 3

VEST

ACCESS

MS2 SLEEP POST SLEEP IVA SUPPORT

P_DPS

EXERCISE MDDK XFEREVATOOLCHECK

MDDK CK

MS3 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

NODE 3 PREPUNBERTH

⊕NH3 BAGOPS OTP EARLY REMOVAL LTA CABLE

INSTL

EVAEGRS/SETUP

GETAHEAD

MS4 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

NODE 3 PREPUNBERTH

♦NH3 BAGOPS OTP EARLY REMOVAL AVIONICS CABLE

INSTL

EVAEGRS/SETUP

GET

AHEAD

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣P/TV07 EV⊕CLNUP & I♦CLNUP & I

*OPEN*POWER UP ^POWERDOWN

*TEMP STOW

Page 28: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD05

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD05

NO EXERCISE[FROM UNBRTH & INSTL UNTIL A-BOLTS COMPLETE]

2-15

ISS

EXP 22

STS

ISS

02/08 01 02 03 04 05 06 07 08 09 10 11GMT 02/07/10 (038) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003TDRS AVAIL

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

CEVIS MEAL

VERFY

1STSTGCAP

2NDSTGCAP

ARED

FE-1 SLEEP POST SLEEP PW DPC RS OPS RS OPSTVIS HYG VELO MEAL

FE-4 SLEEP POST SLEEP PW DPC RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP POST SLEEPTEST

PW ♣DPC ARED MDDK XFER MDDK XFER MDDK XFERMEAL

NS INS^

DCB CK

GLOVE

FE-6 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

ARED MEAL CEVIS

♣JPM/LAB-SHUTTER-CL ^MELFI

NOTES

2-15

FD05

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD05

NO EXERCISE[FROM UNBRTH & INSTL UNTIL A-BOLTS COMPLETE]

ISS

EXP 22

STS

ISS

02/08 01 02 03 04 05 06 07 08 09 10 11GMT 02/07/10 (038) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003TDRS AVAIL

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

CEVIS MEAL

VERFY

1STSTGCAP

2NDSTGCAP

ARED

FE-1 SLEEP POST SLEEP PW DPC RS OPS RS OPSTVIS HYG VELO MEAL

FE-4 SLEEP POST SLEEP PW DPC RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP POST SLEEPTEST

PW ♣DPC ARED MDDK XFER MDDK XFER MDDK XFERMEAL

NS INS^

DCB CK

GLOVE

FE-6 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

ARED MEAL CEVIS

NOTES

♣JPM/LAB-SHUTTER-CL ^MELFI

Page 29: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD05

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS EXTERNAL SURVEY

BEHNKEN

FD05

EV2

EV1

2-16

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/08/10 (039) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR SLEEPPRE SLEEP

P-RPS

C_LK

RPRS

POST EVA W/H20 BSAINIT PMC

A/G

FD CONF

P/TV07

EVA OPS

PS

PLT SLEEPPRE SLEEP

ILLUM-I

FLTR CLN- INSPECT

MDDKXFER

DAP

EDIT

MS1 SLEEPPRE SLEEP

N3VESTPRESSLK CK

FNLKCK

XFER

TAGUP

XFER

BRIEF

MDDKXFER

CREW

CHOICE

D/L

MS2 SLEEPPRE SLEEP

IVA

SUPPORT

P-RPS

MDDK XFER

MDDK CK

MS3 SLEEPPRE SLEEP

CLNUP &

INGRS

C_LK

RPRS

P-RPS

POST EVA W/H20

MS4 SLEEPPRE SLEEP

CLNUP &

INGRS

P-RPS

C_LK

RPRS

POST EVA W/H20

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

NOTES

2-16

FD05

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS EXTERNAL SURVEY

BEHNKEN

FD05

EV2

EV1

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/08/10 (039) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR SLEEPPRE SLEEP

P-RPS

C_LK

RPRS

POST EVA W/H20 BSAINIT PMC

A/G

FD CONF

P/TV07

EVA OPS

PS

PLT SLEEPPRE SLEEP

ILLUM-I

FLTR CLN- INSPECT

MDDKXFER

DAP

EDIT

MS1 SLEEPPRE SLEEP

N3VESTPRESSLK CK

FNLKCK

XFER

TAGUP

XFER

BRIEF

MDDKXFER

CREW

CHOICE

D/L

MS2 SLEEPPRE SLEEP

IVA

SUPPORT

P-RPS

MDDK XFER

MDDK CK

MS3 SLEEPPRE SLEEP

CLNUP &

INGRS

C_LK

RPRS

P-RPS

POST EVA W/H20

MS4 SLEEPPRE SLEEP

CLNUP &

INGRS

P-RPS

C_LK

RPRS

POST EVA W/H20

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

Page 30: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD05

ISS EXTERNAL SURVEY

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD05

2-17

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/08/10 (039) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004TDRS AVAIL

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR ARED

N3VESTPRESSLK CK

FNLKCK

DPC PRE SLEEP-ISS SLEEP

FE-1 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-5 ♣ CEVIS PWEVA*DPC PRE SLEEP-ISS SLEEP

FE-6

CEVIS

P-RPS

C_LK

RPRS

POST EVA W/H20 PRE SLEEP-ISS SLEEP

♣MDDK XFER *D/L

NOTES

2-17

FD05

ISS EXTERNAL SURVEY

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD05

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/08/10 (039) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004TDRS AVAIL

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR ARED

N3VESTPRESSLK CK

FNLKCK

DPC PRE SLEEP-ISS SLEEP

FE-1 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-5 ♣ CEVIS PWEVA*DPC PRE SLEEP-ISS SLEEP

FE-6

CEVIS

P-RPS

C_LK

RPRS

POST EVA W/H20 PRE SLEEP-ISS SLEEP

NOTES

♣MDDK XFER *D/L

Page 31: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD06

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

NO EXERCISE[DURING LCS IMAGING]

BEHNKEN

SSRMS BASE CHANGE

NODE 3 HATCH OPEN NODE 3 TO CUPOLA HATCH OPEN

2-18

STS-130

STS

ISS

02/09 01 02 03 04 05 06 07 08 09 10 11GMT 02/08/10 (039) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR SLEEP POST SLEEP FOCUSED INSPECTION MEAL

ILLUM-O

NODE 3 VO PART 2NODE 3 VO PART 2LOG

PLT SLEEP POST SLEEP

SSRMS

MNVR TO

FI

FOCUSED INSPECTION MEALIMU

N3 PORT CDC INSTALL

NODE 3

UNGRPL

SSRMS

WALKOFF

TO LAB

N3 PORT IMVCAP

LOG

N2 RLS &

MNVR

MS1 SLEEP POST SLEEP

SSRMS

WALKOFF

TO LAB

FOCUSED INSPECTION MEAL N3 PORT CDC INSTALL

MCIU*

NODE 3

UNGRPL

SSRMS

MNVR TO

FI

N3 PORT IMVCAP

N2 RLS &

MNVR

MS2 SLEEP POST SLEEP MEALNODE 3 VO PART 1 NODE 3 VO PART 2 NODE 3 VO PART 2EVATOOLCONFIG

MS3 SLEEP POST SLEEP MEAL EXERCISEEVA TOOL CONFIG E_LKPREPPAO

PLAYBACKOPS

ASPIRIN

TOOLAUDIT

QDFAMOPS

P/TV06

S/UL

OG

POST

SLEEP

MS4 SLEEP POST SLEEP MEALEXERCISE E_LKPREPEVA TOOL CONFIG PAO

CWC

INIT #3

CWC

TERM

PWRFILL#1

CWC

XFER

PWR

XFER

ASPIRIN

MDDK CK

TOOLAUDIT

QDFAMOPS

BSA-T

EMU-I

INSTL*

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

*FILTER CK *LIOH & BATTERY

NOTES

2-18

FD06

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

NO EXERCISE[DURING LCS IMAGING]

BEHNKEN

SSRMS BASE CHANGE

NODE 3 HATCH OPEN NODE 3 TO CUPOLA HATCH OPEN

STS-130

STS

ISS

02/09 01 02 03 04 05 06 07 08 09 10 11GMT 02/08/10 (039) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR SLEEP POST SLEEP FOCUSED INSPECTION MEAL

ILLUM-O

NODE 3 VO PART 2NODE 3 VO PART 2LOG

PLT SLEEP POST SLEEP

SSRMS

MNVR TO

FI

FOCUSED INSPECTION MEALIMU

N3 PORT CDC INSTALL

NODE 3

UNGRPL

SSRMS

WALKOFF

TO LAB

N3 PORT IMVCAP

LOG

N2 RLS &

MNVR

MS1 SLEEP POST SLEEP

SSRMS

WALKOFF

TO LAB

FOCUSED INSPECTION MEAL N3 PORT CDC INSTALL

MCIU*

NODE 3

UNGRPL

SSRMS

MNVR TO

FI

N3 PORT IMVCAP

N2 RLS &

MNVR

MS2 SLEEP POST SLEEP MEALNODE 3 VO PART 1 NODE 3 VO PART 2 NODE 3 VO PART 2EVATOOLCONFIG

MS3 SLEEP POST SLEEP MEAL EXERCISEEVA TOOL CONFIG E_LKPREPPAO

PLAYBACKOPS

ASPIRIN

TOOLAUDIT

QDFAMOPS

P/TV06

S/UL

OG

POST

SLEEP

MS4 SLEEP POST SLEEP MEALEXERCISE E_LKPREPEVA TOOL CONFIG PAO

CWC

INIT #3

CWC

TERM

PWRFILL#1

CWC

XFER

PWR

XFER

ASPIRIN

MDDK CK

TOOLAUDIT

QDFAMOPS

BSA-T

EMU-I

INSTL*

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

*FILTER CK *LIOH & BATTERY

Page 32: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD06

NO EXERCISE[DURING LCS IMAGING]

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD06

SSRMS BASE CHANGENODE 3 HATCH OPEN NODE 3 TO CUPOLA HATCH OPEN

2-19

ISS

EXP 22

STS

ISS

02/09 01 02 03 04 05 06 07 08 09 10 11GMT 02/08/10 (039) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004TDRS AVAIL

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SLEEP POST SLEEP DPC CEVIS

FNLKCKTRM

NODE 3 VO PART 1 ♣ NODE 3 VO PART 2 NODE 3 VO PART 2MEAL T2 ⊕

FE-1 SLEEP POST SLEEP DPC PW RS OPS TVIS HYG MEAL VELO

FE-4 SLEEP POST SLEEP DPC PW ARED XFERPREP VELO MEAL TVIS

HYG

FE-5 SLEEP POST SLEEP DPC PWD2XS

D2XS

ARED XFER PREP

HTC SU

NOD3-IMVSETUP

PEPSINSTALL

NPRV

INSPECT

♦ INSTLRACKH/W

T2 MEAL HDSU

ARED RACKXFER

PAO

ARS RACKXFER CEVIS

FE-6 SLEEP

SALVA

POST SLEEP DPC T2 SSRMS VIEW SUPPORT CEVIS MEAL ARED RACKXFER

ARS RACKXFER

CWCI

FILL 1

®

♣PPRV CAP ⊕EVA TOOL ♦HTC DEAC®NOD2-IMV

NOTES

2-19

FD06

NO EXERCISE[DURING LCS IMAGING]

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD06

SSRMS BASE CHANGENODE 3 HATCH OPEN NODE 3 TO CUPOLA HATCH OPEN

ISS

EXP 22

STS

ISS

02/09 01 02 03 04 05 06 07 08 09 10 11GMT 02/08/10 (039) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004TDRS AVAIL

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR SLEEP POST SLEEP DPC CEVIS

FNLKCKTRM

NODE 3 VO PART 1 ♣ NODE 3 VO PART 2 NODE 3 VO PART 2MEAL T2 ⊕

FE-1 SLEEP POST SLEEP DPC PW RS OPS TVIS HYG MEAL VELO

FE-4 SLEEP POST SLEEP DPC PW ARED XFERPREP VELO MEAL TVIS

HYG

FE-5 SLEEP POST SLEEP DPC PWD2XS

D2XS

ARED XFER PREP

HTC SU

NOD3-IMVSETUP

PEPSINSTALL

NPRV

INSPECT

♦ INSTLRACKH/W

T2 MEAL HDSU

ARED RACKXFER

PAO

ARS RACKXFER CEVIS

FE-6 SLEEP

SALVA

POST SLEEP DPC T2 SSRMS VIEW SUPPORT CEVIS MEAL ARED RACKXFER

ARS RACKXFER

CWCI

FILL 1

®

NOTES

♣PPRV CAP ⊕EVA TOOL ♦HTC DEAC®NOD2-IMV

Page 33: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD06

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS A/L Campout @ 10.2 psi10.2DPRS

BEHNKEN

FD06

2-20

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/09/10 (040) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR SLEEPEVA 2 PROCREVIEW PRE SLEEP MASK P/B

CONFIG PRE SLEEPPMCA/G

NODE3 VOPART2

FD CONF

PLT SLEEP

EVA 2

PROC

REVIEW

MNVRTOCPLA&

GRPL

PRE SLEEPPAO♣VAJFITCHK

MS1 SLEEPPRE SLEEP

EVA 2

PROC

REVIEW

MNVRTOCPLA&

GRPL

PAO⊕

CREW DL

PSVAJFITCHK

MS2 SLEEPPRE SLEEPEVA 2 PROCREVIEW EXERCISE

NODE3 VOPART2

MS3 SLEEPEVA 2 PROCREVIEWE_LK

PREP

PRESLEEP

MASK P/BCONFIGPRE SLEEP

MS4 SLEEPEVA 2 PROCREVIEWE_LK

PREP

PRESLEEP

MASK P/BCONFIGPRE SLEEP

MDDK CK

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣N2 RLS & MNVR⊕N2 RLS & MNVR

NOTES

2-20

FD06

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS A/L Campout @ 10.2 psi10.2DPRS

BEHNKEN

FD06

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/09/10 (040) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR SLEEPEVA 2 PROCREVIEW PRE SLEEP MASK P/B

CONFIG PRE SLEEPPMCA/G

NODE3 VOPART2

FD CONF

PLT SLEEP

EVA 2

PROC

REVIEW

MNVRTOCPLA&

GRPL

PRE SLEEPPAO♣VAJFITCHK

MS1 SLEEPPRE SLEEP

EVA 2

PROC

REVIEW

MNVRTOCPLA&

GRPL

PAO⊕

CREW DL

PSVAJFITCHK

MS2 SLEEPPRE SLEEPEVA 2 PROCREVIEW EXERCISE

NODE3 VOPART2

MS3 SLEEPEVA 2 PROCREVIEWE_LK

PREP

PRESLEEP

MASK P/BCONFIGPRE SLEEP

MS4 SLEEPEVA 2 PROCREVIEWE_LK

PREP

PRESLEEP

MASK P/BCONFIGPRE SLEEP

MDDK CK

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣N2 RLS & MNVR⊕N2 RLS & MNVR

Page 34: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD06

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD06

2-21

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/09/10 (040) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005TDRS AVAIL

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDREVATOOLSTOW

EVA 2 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-1 VELO EVA 2 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-4 HYG EVA 2 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-5 CEVIS PWHDSU

D2XSCAMR

DPCPAO

PRE SLEEP-ISS SLEEP

FE-6 ♣

CWCI

FILL 2

EVA 2PROCREVIEW

HAMPW DPC PRE SLEEP-ISS SLEEP

♣NOD2-IMV DUCT S/U

NOTES

2-21

FD06

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD06

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/09/10 (040) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005TDRS AVAIL

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87 88

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDREVATOOLSTOW

EVA 2 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-1 VELO EVA 2 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-4 HYG EVA 2 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-5 CEVIS PWHDSU

D2XSCAMR

DPCPAO

PRE SLEEP-ISS SLEEP

FE-6 ♣

CWCI

FILL 2

EVA 2PROCREVIEW

HAMPW DPC PRE SLEEP-ISS SLEEP

NOTES

♣NOD2-IMV DUCT S/U

Page 35: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD07

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

10.2DPRS

14.7RPRS

EVA 2 (6:30)

BEHNKEN

NODE 3 GROUND ACT

NO EXERCISE[FROM 3RD SET OF BOLTS UNTIL A-BOLTS COMPLETE]

~

EV2

EV1

2-22

STS-130

STS

ISS

02/10 01 02 03 04 05 06 07 08 09 10 11GMT 02/09/10 (040) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

MEAL P/TV07EVA OPS

P-RPS

♣PMCA/G

P/TV07 EVA OPSCWC

XFER

CWC

INIT #4

CWC

TERM

PRLA

CLOSE

EMU-T

LOG

EXERCISE

PLT SLEEP POST SLEEP

P/TV07

EVA S/U

INHBT

PAD

IMU

MCIU*

ISP 1 STOWAGE XFERCUPOLAVEST

DPRS P1

UNBERTH

DPRS P2

CUPOLAVESTDPRSP3

MEALISP 2 STOWAGE XFERLOG

EXERCISE

STBDOVRHDIMVC/O

MS1 SLEEP POST SLEEP ISP 1 STOWAGE XFERCUPOLAVEST

DPRS P1

CBCS

S/U

UNBERTH

CUPOLA CBMDEMATE

DPRS P2

CUPOLAVESTDPRSP3

MEALISP 2 STOWAGE XFERSTBD OVRHDIMV INSTL

N3 PPRV

CAP RMV

NODE3

PPRVCAPRMV

MS2 SLEEP POST SLEEP

P_DPS

IVA SUPPORT

P-RPS

EXERCISEEVATOOLCHECK

MDDK CK

MS3 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

CLNUP&

INGRS

P-RPS

⊕NH3 LOOP AJMPR INST

NODE3 NPVINSTL

EVAEGRS/SETUP

NH3 MLI INSTLSTBD

TRUN

NODE 3 OIHINSTL

PORTTRUNCVRINST

NH3 LOOPB JMPRINST

NH3MLI

INSTL

MS4 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

CLNUP&

INGRS

P-RPS

♦NH3 LOOP AJMPR INST

EVAEGRS/SETUP

NH3 MLI INSTL

KEEL

PIN CVR

NODE3

NADIRCBMOPS

GAP SPANNERINSTL

NH3 LOOPB JMPRINST

NH3MLI

INSTL

AFTTRUNCVRINSTL

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

*FILTER CK

NOTES

2-22

FD07

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

10.2DPRS

14.7RPRS

EVA 2 (6:30)

BEHNKEN

NODE 3 GROUND ACT

NO EXERCISE[FROM 3RD SET OF BOLTS UNTIL A-BOLTS COMPLETE]

~

EV2

EV1

STS-130

STS

ISS

02/10 01 02 03 04 05 06 07 08 09 10 11GMT 02/09/10 (040) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

MEAL P/TV07EVA OPS

P-RPS

♣PMCA/G

P/TV07 EVA OPSCWC

XFER

CWC

INIT #4

CWC

TERM

PRLA

CLOSE

EMU-T

LOG

EXERCISE

PLT SLEEP POST SLEEP

P/TV07

EVA S/U

INHBT

PAD

IMU

MCIU*

ISP 1 STOWAGE XFERCUPOLAVEST

DPRS P1

UNBERTH

DPRS P2

CUPOLAVESTDPRSP3

MEALISP 2 STOWAGE XFERLOG

EXERCISE

STBDOVRHDIMVC/O

MS1 SLEEP POST SLEEP ISP 1 STOWAGE XFERCUPOLAVEST

DPRS P1

CBCS

S/U

UNBERTH

CUPOLA CBMDEMATE

DPRS P2

CUPOLAVESTDPRSP3

MEALISP 2 STOWAGE XFERSTBD OVRHDIMV INSTL

N3 PPRV

CAP RMV

NODE3

PPRVCAPRMV

MS2 SLEEP POST SLEEP

P_DPS

IVA SUPPORT

P-RPS

EXERCISEEVATOOLCHECK

MDDK CK

MS3 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

CLNUP&

INGRS

P-RPS

⊕NH3 LOOP AJMPR INST

NODE3 NPVINSTL

EVAEGRS/SETUP

NH3 MLI INSTLSTBD

TRUN

NODE 3 OIHINSTL

PORTTRUNCVRINST

NH3 LOOPB JMPRINST

NH3MLI

INSTL

MS4 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

CLNUP&

INGRS

P-RPS

♦NH3 LOOP AJMPR INST

EVAEGRS/SETUP

NH3 MLI INSTL

KEEL

PIN CVR

NODE3

NADIRCBMOPS

GAP SPANNERINSTL

NH3 LOOPB JMPRINST

NH3MLI

INSTL

AFTTRUNCVRINSTL

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

*FILTER CK

Page 36: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD07

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD07

NODE 3 GROUND ACT

NO EXERCISE[FROM 3RD SET OF BOLTS UNTIL A-BOLTS COMPLETE]

~

2-23

ISS

EXP 22

STS

ISS

02/10 01 02 03 04 05 06 07 08 09 10 11GMT 02/09/10 (040) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005TDRS AVAIL

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SLEEP

REACT

POST SLEEP DPC PWNODE 31553

CONNECT

NODE 3IMV RTRNINST

T2 S&M-REMOVE ISP D5 MEAL S&M-REMOVE ISP D4

PL CK

CEVIS CUPOLA CBMDEMATE

FE-1 SLEEP POST SLEEP DPC PW RS OPS RS OPSTVIS HYG VELO MEAL

FE-4 SLEEP POST SLEEP DPC PW RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP

REACT

POST SLEEP DPC⊕TESTNOD3-IMVSETUP

NODE 3IMV RTRNINST

CEVIS S&M-REMOVE ISP D5 MEAL S&M-REMOVE ISP D4 T2 N3-LTL-SMPL TOOLINS

FE-6 SLEEP

REACT

POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

T2 NOD2-IMVDUCT S/U CEVIS MEAL

ARS RACKUMBILMATE

GLOVE

P-RPS

♣CUPOLA LK ⊕JPM/LAB-SHUTTER-CL♦C_LK RPRS

NOTES

2-23

FD07

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD07

NODE 3 GROUND ACT

NO EXERCISE[FROM 3RD SET OF BOLTS UNTIL A-BOLTS COMPLETE]

~

ISS

EXP 22

STS

ISS

02/10 01 02 03 04 05 06 07 08 09 10 11GMT 02/09/10 (040) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005TDRS AVAIL

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR SLEEP

REACT

POST SLEEP DPC PWNODE 31553

CONNECT

NODE 3IMV RTRNINST

T2 S&M-REMOVE ISP D5 MEAL S&M-REMOVE ISP D4

PL CK

CEVIS CUPOLA CBMDEMATE

FE-1 SLEEP POST SLEEP DPC PW RS OPS RS OPSTVIS HYG VELO MEAL

FE-4 SLEEP POST SLEEP DPC PW RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP

REACT

POST SLEEP DPC⊕TESTNOD3-IMVSETUP

NODE 3IMV RTRNINST

CEVIS S&M-REMOVE ISP D5 MEAL S&M-REMOVE ISP D4 T2 N3-LTL-SMPL TOOLINS

FE-6 SLEEP

REACT

POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

T2 NOD2-IMVDUCT S/U CEVIS MEAL

ARS RACKUMBILMATE

GLOVE

P-RPS

NOTES

♣CUPOLA LK ⊕JPM/LAB-SHUTTER-CL♦C_LK RPRS

Page 37: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD07

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

FD07

GROUND BOLTING

NO EXERCISE[FROM UNBERTH UNTIL A-BOLTS COMPLETE]

~

EV2

EV1

2-24

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/10/10 (041) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDR SLEEPPRE SLEEP♣ POST EVA W/H20 BSAINIT PMC

A/GPRE SLEEP

FD CONF

PLT SLEEPPRE SLEEP

CUPOLA

RELOC

ATE

LIMP

BRAKE

RELOC

MS1 SLEEPPRE SLEEP

CUPOLA

RELOC

ATE 1ST

STGCAP

2NDSTGCAP

VERFY

CREW

CHOICE

D/L

RELOC

LIMP

BRAKE

MS2 SLEEPPRE SLEEP

MDDK CK

CBCS^

MS3 SLEEPPRE SLEEP⊕ POST EVA W/H20

MS4 SLEEPPRE SLEEP♦ POST EVA W/H20

DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

^POWERDOWN

NOTES

2-24

FD07

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

FD07

GROUND BOLTING

NO EXERCISE[FROM UNBERTH UNTIL A-BOLTS COMPLETE]

~

EV2

EV1

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/10/10 (041) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDR SLEEPPRE SLEEP♣ POST EVA W/H20 BSAINIT PMC

A/GPRE SLEEP

FD CONF

PLT SLEEPPRE SLEEP

CUPOLA

RELOC

ATE

LIMP

BRAKE

RELOC

MS1 SLEEPPRE SLEEP

CUPOLA

RELOC

ATE 1ST

STGCAP

2NDSTGCAP

VERFY

CREW

CHOICE

D/L

RELOC

LIMP

BRAKE

MS2 SLEEPPRE SLEEP

MDDK CK

CBCS^

MS3 SLEEPPRE SLEEP⊕ POST EVA W/H20

MS4 SLEEPPRE SLEEP♦ POST EVA W/H20

DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

^POWERDOWN

Page 38: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD07

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD07

NO EXERCISE[FROM UNBERTH UNTIL A-BOLTS COMPLETE]

~

GROUND BOLTING

2-25

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/10/10 (041) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006TDRS AVAIL

DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR

CUPOLA

LK CK

S/UVERFY

1STSTGCAP

2NDSTGCAP

PW DPC PRE SLEEP-ISS

REACT

SLEEP

FE-1 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-5 ♣ MYCOPREP PW

EVA*DPC PRE SLEEP-ISS

REACT

SLEEP

FE-6 ⊕ POST EVA W/H20 PW DPC PRE SLEEP-ISS

REACT

SLEEP

♣N3-LTL-SMPL TOOL INS⊕C_LK RPRS *D/L

NOTES

2-25

FD07

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD07

NO EXERCISE[FROM UNBERTH UNTIL A-BOLTS COMPLETE]

~

GROUND BOLTING

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/10/10 (041) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006TDRS AVAIL

DAY/NIGHTORBIT 96 97 98 99 100 101 102 103

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR

CUPOLA

LK CK

S/UVERFY

1STSTGCAP

2NDSTGCAP

PW DPC PRE SLEEP-ISS

REACT

SLEEP

FE-1 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-5 ♣ MYCOPREP PW

EVA*DPC PRE SLEEP-ISS

REACT

SLEEP

FE-6 ⊕ POST EVA W/H20 PW DPC PRE SLEEP-ISS

REACT

SLEEP

NOTES

♣N3-LTL-SMPL TOOL INS⊕C_LK RPRS *D/L

Page 39: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD08

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-26

STS-130

STS

ISS

02/11 01 02 03 04 05 06 07 08 09 10 11GMT 02/10/10 (041) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR SLEEP POST SLEEP MEALEXERCISEIMU

FLTRCLN -

INSPECT

ATTH/O*

MNVR

DUMP

MNVR

TEA

SPLY

INIT

SPLY

TERM

CWC

INIT #5

CWC

TERM

CWC

INIT #6

CWC

TERM

N2-I

N2-T

WRS 2 RACKXFER

ATTH/O*

OGS RACKXFER

CWC

XFER

CWC

XFER

LOG

PLT SLEEP POST SLEEP MEAL

CPLA

UNGRPL

& MNVR

VEST JUMPERS

CDC

REMOVE

REMOVECPA

ACSS N3

RMV CUPOLABLANKET

CBCS

TRGT

MTL JUMPERS EXERCISE

CUPOLA

ELPS

ENABLE

LOG

MS1 SLEEP POST SLEEPCBCSDEACT& RMVL

MEAL

CDC

REMOVE

REMOVECPA

CBCS

TRGT

ACSS N3

MTL JUMPERS

CPLA

UNGRPL

& MNVR

VEST JUMPERSRMV CUPOLABLANKET EXERCISE

MS2 SLEEP POST SLEEP MEALWRS 1 RACKXFERWRS DEMATES

OGS RACKUMBILDMATE

OGS RACKXFER

OGS RACKUMBILMATE

TOCARMV

EDV RMV

EVATOOLCONFIG

STAND

SPINAL

WRS 1RK

UMBILMATE

WRS 2RK

UMBILMATE

MDDK CK

MS3 SLEEP POST SLEEP MEALEXERCISE E_LK PREPEVA TOOL CONFIG TOOLAUDIT

ASPIRIN

KABIN

REPLACE

STAND

SPINAL

PAO

GLCR

P/TV09

LOG

MS4 SLEEP POST SLEEP MEALEXERCISE E_LK PREPEVA TOOL CONFIG TOOLAUDIT

ASPIRIN

STAND

SPINAL

MLFGLCR20ASMPXFR

MDDK CK

BSA-T

EMU-I

INSTL*

DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

TDRSWEZ

BIAS -XLV -ZVV DUMPORB ATTTDRS AVAILSSRMS POS

♣CRAB RMV *TO STS *TO ISS*METOX & BATTERY

NOTES

2-26

FD08

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

ISS

02/11 01 02 03 04 05 06 07 08 09 10 11GMT 02/10/10 (041) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR SLEEP POST SLEEP MEALEXERCISEIMU

FLTRCLN -

INSPECT

ATTH/O*

MNVR

DUMP

MNVR

TEA

SPLY

INIT

SPLY

TERM

CWC

INIT #5

CWC

TERM

CWC

INIT #6

CWC

TERM

N2-I

N2-T

WRS 2 RACKXFER

ATTH/O*

OGS RACKXFER

CWC

XFER

CWC

XFER

LOG

PLT SLEEP POST SLEEP MEAL

CPLA

UNGRPL

& MNVR

VEST JUMPERS

CDC

REMOVE

REMOVECPA

ACSS N3

RMV CUPOLABLANKET

CBCS

TRGT

MTL JUMPERS EXERCISE

CUPOLA

ELPS

ENABLE

LOG

MS1 SLEEP POST SLEEPCBCSDEACT& RMVL

MEAL

CDC

REMOVE

REMOVECPA

CBCS

TRGT

ACSS N3

MTL JUMPERS

CPLA

UNGRPL

& MNVR

VEST JUMPERSRMV CUPOLABLANKET EXERCISE

MS2 SLEEP POST SLEEP MEALWRS 1 RACKXFERWRS DEMATES

OGS RACKUMBILDMATE

OGS RACKXFER

OGS RACKUMBILMATE

TOCARMV

EDV RMV

EVATOOLCONFIG

STAND

SPINAL

WRS 1RK

UMBILMATE

WRS 2RK

UMBILMATE

MDDK CK

MS3 SLEEP POST SLEEP MEALEXERCISE E_LK PREPEVA TOOL CONFIG TOOLAUDIT

ASPIRIN

KABIN

REPLACE

STAND

SPINAL

PAO

GLCR

P/TV09

LOG

MS4 SLEEP POST SLEEP MEALEXERCISE E_LK PREPEVA TOOL CONFIG TOOLAUDIT

ASPIRIN

STAND

SPINAL

MLFGLCR20ASMPXFR

MDDK CK

BSA-T

EMU-I

INSTL*

DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

TDRSWEZ

ORB ATT BIAS -XLV -ZVV DUMPTDRS AVAILSSRMS POS

NOTES

♣CRAB RMV *TO STS *TO ISS*METOX & BATTERY

Page 40: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD08

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD08

2-27

ISS

EXP 22

STS

ISS

02/11 01 02 03 04 05 06 07 08 09 10 11GMT 02/10/10 (041) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006TDRS AVAIL

DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

TDRSWEZ

BIAS -XLV -ZVV DUMPORB ATTSSRMS POS

ISS CDR SLEEP POST SLEEP DPC CEVIS VEST PRESS LK CK WRS 1 RACKXFER

WRS 2 RACKXFER T2 MEAL

CWCI

FILL 1

CWCI

FILL 2

MLFGLCR20ASMPXFR

SPINAL DATACLCT OPR

SPINALDATACLCTOPR

STAND

SPINAL

FE-1 SLEEP POST SLEEP DPC PW RS OPS RS OPSTVIS HYG VELO MEAL

FE-4 SLEEP POST SLEEP DPC PW RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP MYCOCLCT

INSPOST SLEEP POST

SLEEPDPCD2XS

D2XS

KABINREMOVE CEVIS ♣ T2 WHC RACK

XFER⊕ MEAL NODE 3 H2O BUS FILL

KABIN

REPLACE

STAND

SPINAL

FE-6 SLEEP

SALVA

MYCOCLCT POST SLEEP POST

SLEEPDPC PW KABINREMOVE T2 SPINAL

S/U

STAND*

WHCDEMATE

WHC RACKXFER

WHC

MATE

MEAL HAM INSTL HDSU

PAO

STAND

SPINAL

SPNLDATACLCTOPR

CEVIS

♣CEVIS-H/W-RMV ⊕CEVIS-H/W-INSTL*S/U

NOTES

2-27

FD08

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD08

ISS

EXP 22

STS

ISS

02/11 01 02 03 04 05 06 07 08 09 10 11GMT 02/10/10 (041) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006TDRS AVAIL

DAY/NIGHTORBIT 104 105 106 107 108 109 110 111

TDRSWEZ

ORB ATT BIAS -XLV -ZVV DUMPSSRMS POS

ISS CDR SLEEP POST SLEEP DPC CEVIS VEST PRESS LK CK WRS 1 RACKXFER

WRS 2 RACKXFER T2 MEAL

CWCI

FILL 1

CWCI

FILL 2

MLFGLCR20ASMPXFR

SPINAL DATACLCT OPR

SPINALDATACLCTOPR

STAND

SPINAL

FE-1 SLEEP POST SLEEP DPC PW RS OPS RS OPSTVIS HYG VELO MEAL

FE-4 SLEEP POST SLEEP DPC PW RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP MYCOCLCT

INSPOST SLEEP POST

SLEEPDPCD2XS

D2XS

KABINREMOVE CEVIS ♣ T2 WHC RACK

XFER⊕ MEAL NODE 3 H2O BUS FILL

KABIN

REPLACE

STAND

SPINAL

FE-6 SLEEP

SALVA

MYCOCLCT POST SLEEP POST

SLEEPDPC PW KABINREMOVE T2 SPINAL

S/U

STAND*

WHCDEMATE

WHC RACKXFER

WHC

MATE

MEAL HAM INSTL HDSU

PAO

STAND

SPINAL

SPNLDATACLCTOPR

CEVIS

NOTES

♣CEVIS-H/W-RMV ⊕CEVIS-H/W-INSTL*S/U

Page 41: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD08

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS A/L Campout @ 10.2 psi10.2DPRS

ISS EXTERNAL SURVEY

BEHNKEN

FD08

2-28

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/11/10 (042) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDR SLEEPEVA 3 PROCREVIEW PRE SLEEP MASK P/B

CONFIG PRE SLEEPPMCA/G

FD CONF

PAO

PLT SLEEPPRE SLEEPEVA 3 PROCREVIEW

ILLUM-I

PAO

MS1 SLEEPPRE SLEEPEVA 3 PROCREVIEW

♦CREWCHOICED/L

STAND

SPINAL

PRE

SLEEP

MS2 SLEEPPRE SLEEPEVA 3 PROCREVIEW EXERCISEPAO

MDDK CK

MS3 SLEEPEVA 3 PROCREVIEW PRE SLEEP MASK P/B

CONFIGPRESLEEP

MS4 SLEEPEVA 3 PROCREVIEW PRE SLEEP MASK P/B

CONFIGPRESLEEPPAO

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118 119

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣FLTR CLN - INSPECT⊕CPLA UNGRPL & MNVR♦CPLA UNGRPL & MNVRNOTES

2-28

FD08

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

ISS A/L Campout @ 10.2 psi10.2DPRS

ISS EXTERNAL SURVEY

BEHNKEN

FD08

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/11/10 (042) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDR SLEEPEVA 3 PROCREVIEW PRE SLEEP MASK P/B

CONFIG PRE SLEEPPMCA/G

FD CONF

PAO

PLT SLEEPPRE SLEEPEVA 3 PROCREVIEW

ILLUM-I

PAO

MS1 SLEEPPRE SLEEPEVA 3 PROCREVIEW

♦CREWCHOICED/L

STAND

SPINAL

PRE

SLEEP

MS2 SLEEPPRE SLEEPEVA 3 PROCREVIEW EXERCISEPAO

MDDK CK

MS3 SLEEPEVA 3 PROCREVIEW PRE SLEEP MASK P/B

CONFIGPRESLEEP

MS4 SLEEPEVA 3 PROCREVIEW PRE SLEEP MASK P/B

CONFIGPRESLEEPPAO

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118 119

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣FLTR CLN - INSPECT⊕CPLA UNGRPL & MNVR♦CPLA UNGRPL & MNVR

Page 42: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD08

ISS EXTERNAL SURVEY

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD08

2-29

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/11/10 (042) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007TDRS AVAIL

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118 119

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR ♣ EVA 3 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-1 RSOPS

EVA 3 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-4 RSOPS

EVA 3 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-5

SPINAL

PAO

SPINALH/WSTOW

D2XSCAMR

PW DPC PRE SLEEP-ISS SLEEP

FE-6 CEVIS EVA 3 PROCREVIEW PW

HAMDPC PRE SLEEP-ISS SLEEP

♣SPINAL DATA CLCT OPR

NOTES

2-29

FD08

ISS EXTERNAL SURVEY

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD08

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/11/10 (042) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007TDRS AVAIL

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118 119

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR ♣ EVA 3 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-1 RSOPS

EVA 3 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-4 RSOPS

EVA 3 PROCREVIEW PW DPC PRE SLEEP-ISS SLEEP

FE-5

SPINAL

PAO

SPINALH/WSTOW

D2XSCAMR

PW DPC PRE SLEEP-ISS SLEEP

FE-6 CEVIS EVA 3 PROCREVIEW PW

HAMDPC PRE SLEEP-ISS SLEEP

NOTES

♣SPINAL DATA CLCT OPR

Page 43: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD09

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

10.2DPRS

14.7RPRS

EVA 3 (6:30)

BEHNKEN

EV2

EV1

2-30

STS-130

STS

ISS

02/12 01 02 03 04 05 06 07 08 09 10 11GMT 02/11/10 (042) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

P/TV07 EVA OPS MEAL

P-RPS

♣PMCA/G

CWC

INIT #7

CWC

TERM

CWC

XFER

PWRFILL#2

PWR

XFER

EMU-T

LOG

EXERCISE

PLT SLEEP POST SLEEP

P/TV07

EVA S/U

INHBT

PAD

ILLUM-O

IMU

MCIU*

EXERCISE MEALMDDK XFERMTL SMPL TOOLINSTL MDDK XFER

WCS#

LOG

MS1 SLEEP POST SLEEP FSS S/UCUPOLA ATUINSTALL

FSSFILLEXERCISE MEAL

XFER

UPDATE

CUPOLAUOP

INSTALLCUPOLA PANEL INSTALL

MS2 SLEEP POST SLEEP IVA SUPPORT

P-RPS

P_DPS

EVATOOLCHECK

MDDK CK

MDDK XFER

MS3 SLEEP

P-RPS

⊕CLNUP&

INGRS

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYGBRK/PREBREATHE

POSTSLEEP CUPOLA MLI REMOVAL CUPOLA LL RELEASE

EVAEGRS/SETUP

PORT AX CBMCVR INST GETAHEAD

MS4 SLEEP ♦

P-RPS

CLNUP&

INGRS

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYGBRK/PREBREATHE

POSTSLEEP

OPENLOOPB QDS

CUPOLA MLI REMOVAL

NODELTACBLEDSCNCT

EVAEGRS/SETUP

OI WIF

INSTL

NODE 3 OIH INSTL GETAHEAD

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

*FILTER CK#COMPACT

NOTES

2-30

FD09

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

10.2DPRS

14.7RPRS

EVA 3 (6:30)

BEHNKEN

EV2

EV1

STS-130

STS

ISS

02/12 01 02 03 04 05 06 07 08 09 10 11GMT 02/11/10 (042) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

P/TV07 EVA OPS MEAL

P-RPS

♣PMCA/G

CWC

INIT #7

CWC

TERM

CWC

XFER

PWRFILL#2

PWR

XFER

EMU-T

LOG

EXERCISE

PLT SLEEP POST SLEEP

P/TV07

EVA S/U

INHBT

PAD

ILLUM-O

IMU

MCIU*

EXERCISE MEALMDDK XFERMTL SMPL TOOLINSTL MDDK XFER

WCS#

LOG

MS1 SLEEP POST SLEEP FSS S/UCUPOLA ATUINSTALL

FSSFILLEXERCISE MEAL

XFER

UPDATE

CUPOLAUOP

INSTALLCUPOLA PANEL INSTALL

MS2 SLEEP POST SLEEP IVA SUPPORT

P-RPS

P_DPS

EVATOOLCHECK

MDDK CK

MDDK XFER

MS3 SLEEP

P-RPS

⊕CLNUP&

INGRS

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYGBRK/PREBREATHE

POSTSLEEP CUPOLA MLI REMOVAL CUPOLA LL RELEASE

EVAEGRS/SETUP

PORT AX CBMCVR INST GETAHEAD

MS4 SLEEP ♦

P-RPS

CLNUP&

INGRS

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYGBRK/PREBREATHE

POSTSLEEP

OPENLOOPB QDS

CUPOLA MLI REMOVAL

NODELTACBLEDSCNCT

EVAEGRS/SETUP

OI WIF

INSTL

NODE 3 OIH INSTL GETAHEAD

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

*FILTER CK#COMPACT

Page 44: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD09

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD09

2-31

ISS

EXP 22

STS

ISS

02/12 01 02 03 04 05 06 07 08 09 10 11GMT 02/11/10 (042) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007TDRS AVAIL

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR SLEEP POST SLEEP PW DPC CEVIS T2 N3 AVIONICS RK OUTFT MEAL RAM INSTL FSS S/U FSSFILL

FE-1 SLEEP POST SLEEP PW DPC TVIS HYG VELO N3-LAUNCH BOLT-RMV N3-LAUNCH BOLT-RMVMEAL RS OPS

FE-4 SLEEP POST SLEEP PW DPC RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP POST SLEEPTEST

PW ♣DPC STBD DECK IMVINSTL

CCAA-AVMOUNT-INSTL MT-PPA LR-RMV MEAL LT-PPA LR-RMV T2

FE-6 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

T2 MEALN3

GUIDERING

CSA-CPACO

GLOVE

CEVIS

P-RPS

♣JPM/LAB-SHUTTER-CL ⊕C_LK RPRS

NOTES

2-31

FD09

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD09

ISS

EXP 22

STS

ISS

02/12 01 02 03 04 05 06 07 08 09 10 11GMT 02/11/10 (042) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007TDRS AVAIL

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR SLEEP POST SLEEP PW DPC CEVIS T2 N3 AVIONICS RK OUTFT MEAL RAM INSTL FSS S/U FSSFILL

FE-1 SLEEP POST SLEEP PW DPC TVIS HYG VELO N3-LAUNCH BOLT-RMV N3-LAUNCH BOLT-RMVMEAL RS OPS

FE-4 SLEEP POST SLEEP PW DPC RS OPS RS OPSVELO TVIS HYG MEAL

FE-5 SLEEP POST SLEEPTEST

PW ♣DPC STBD DECK IMVINSTL

CCAA-AVMOUNT-INSTL MT-PPA LR-RMV MEAL LT-PPA LR-RMV T2

FE-6 SLEEP POSTSLEEP

HYGBRK/PREBREATHE CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

P_DPS

T2 MEALN3

GUIDERING

CSA-CPACO

GLOVE

CEVIS

P-RPS

NOTES

♣JPM/LAB-SHUTTER-CL ⊕C_LK RPRS

Page 45: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD09

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

FD09

EV2

EV1

2-32

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/12/10 (043) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDR SLEEPPRE SLEEP♣ POST EVA W/H20

FD CONF

PMCOCA

PRESLEEP

PLT SLEEPPRE SLEEPO2 CONFIGTO XFER

O2 INIT

MDDKXFER

MS1 SLEEP

N3 CL/O

FSSFILL

XFER

TAGUP

XFER

BRIEF

PRE SLEEP

MS2 SLEEPPRE SLEEPEXERCISE

MDDK CK

MS3 SLEEPPRE SLEEP⊕ POST EVA W/H20

MS4 SLEEPPRE SLEEP♦ POST EVA W/H20

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRSNOTES

2-32

FD09

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

FD09

EV2

EV1

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/12/10 (043) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDR SLEEPPRE SLEEP♣ POST EVA W/H20

FD CONF

PMCOCA

PRESLEEP

PLT SLEEPPRE SLEEPO2 CONFIGTO XFER

O2 INIT

MDDKXFER

MS1 SLEEP

N3 CL/O

FSSFILL

XFER

TAGUP

XFER

BRIEF

PRE SLEEP

MS2 SLEEPPRE SLEEPEXERCISE

MDDK CK

MS3 SLEEPPRE SLEEP⊕ POST EVA W/H20

MS4 SLEEPPRE SLEEP♦ POST EVA W/H20

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣C_LK RPRS⊕C_LK RPRS♦C_LK RPRS

Page 46: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD09

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD09

2-33

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/12/10 (043) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008TDRS AVAIL

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR FSSFILL

O2 CONFIGTO XFER

O2 INIT

PRE SLEEP-ISS SLEEP

FE-1 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-5 CEVIS PWEVA*DPC PRE SLEEP-ISS SLEEP

FE-6 ♣ POST EVA W/H20 PRE SLEEP-ISS SLEEP

♣C_LK RPRS *D/L

NOTES

2-33

FD09

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD09

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/12/10 (043) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008TDRS AVAIL

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR FSSFILL

O2 CONFIGTO XFER

O2 INIT

PRE SLEEP-ISS SLEEP

FE-1 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-4 RS OPS PW DPC PRE SLEEP-ISS SLEEP

FE-5 CEVIS PWEVA*DPC PRE SLEEP-ISS SLEEP

FE-6 ♣ POST EVA W/H20 PRE SLEEP-ISS SLEEP

NOTES

♣C_LK RPRS *D/L

Page 47: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD10

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-34

STS-130

STS

ISS

02/13 01 02 03 04 05 06 07 08 09 10 11GMT 02/12/10 (043) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDR POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

EXERCISE

ATTH/O*

MNVR

REBOOST

REBOOST

CONFIG

3FARE

CWC

INIT #8

CWC

TERM

CWC

XFER

PWRFILL#3

PWRFILL#4

PWRXFER(2)

PFCOCA

LOG

PLT POST SLEEP HATCHCLOSE

OFF DUTYMEALCREWCONF

CREW

PHOTO

WELL

EXERCISEIMU

MCIU*

NOM H20

CNFG

COND

CHG/O

O2 SYSTEARDOWN

OBSS#

P/TV04S/U

O2 TERM

N2 XFERTERM

N2-I

POST SLEEP PFCOCA

OFF DUTYLOG

MS1 POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

FARE

EXERCISE

XFER

UPDATE

XFER

TAGUP

XFER

BRIEF

PRESLEEPMDDK XFER

PTV05

DEACT

PFCOCA

OFF DUTY

MS2 POST SLEEP HATCHCLOSE

OFF DUTYMEALCREWCONF

CREW

PHOTO

WELL

EXERCISE

OBSS#

N2-T

MDDK XFER PFCOCA

OFF DUTY

MS3 POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

FARE

EXERCISEEVA STOW

EMU

INSTALL

ASPIRIN

PFCOCA

OFF DUTYEVA RECONFIG & XFERLOG

MS4 POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

WELL

EVA STOW

EMU

INSTALL

FMK

DPLY

ASPIRIN

MDDK CK

NLP

CELLS

ACT 2

PFCOCA

EVA RECONFIG & XFER

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSWEZ

BIAS -XLV -ZVV REBOOSTORB ATTTDRS AVAILSSRMS POS

♣NLP VAC ACT 2*TO STS

*FILTER CK

#MNVR TO UNDOCKNOTES

2-34

FD10

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

ISS

02/13 01 02 03 04 05 06 07 08 09 10 11GMT 02/12/10 (043) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDR POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

EXERCISE

ATTH/O*

MNVR

REBOOST

REBOOST

CONFIG

3FARE

CWC

INIT #8

CWC

TERM

CWC

XFER

PWRFILL#3

PWRFILL#4

PWRXFER(2)

PFCOCA

LOG

PLT POST SLEEP HATCHCLOSE

OFF DUTYMEALCREWCONF

CREW

PHOTO

WELL

EXERCISEIMU

MCIU*

NOM H20

CNFG

COND

CHG/O

O2 SYSTEARDOWN

OBSS#

P/TV04S/U

O2 TERM

N2 XFERTERM

N2-I

POST SLEEP PFCOCA

OFF DUTYLOG

MS1 POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

FARE

EXERCISE

XFER

UPDATE

XFER

TAGUP

XFER

BRIEF

PRESLEEPMDDK XFER

PTV05

DEACT

PFCOCA

OFF DUTY

MS2 POST SLEEP HATCHCLOSE

OFF DUTYMEALCREWCONF

CREW

PHOTO

WELL

EXERCISE

OBSS#

N2-T

MDDK XFER PFCOCA

OFF DUTY

MS3 POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

FARE

EXERCISEEVA STOW

EMU

INSTALL

ASPIRIN

PFCOCA

OFF DUTYEVA RECONFIG & XFERLOG

MS4 POST SLEEP OFF DUTYMEALCREWCONF

CREW

PHOTO

WELL

EVA STOW

EMU

INSTALL

FMK

DPLY

ASPIRIN

MDDK CK

NLP

CELLS

ACT 2

PFCOCA

EVA RECONFIG & XFER

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSWEZ

ORB ATT BIAS -XLV -ZVV REBOOSTTDRS AVAILSSRMS POS

NOTES

♣NLP VAC ACT 2*TO STS

*FILTER CK

#MNVR TO UNDOCK

Page 48: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD10

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD10

2-35

ISS

EXP 22

STS

ISS

02/13 01 02 03 04 05 06 07 08 09 10 11GMT 02/12/10 (043) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008TDRS AVAIL

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSWEZ

BIAS -XLV -ZVV REBOOSTORB ATTSSRMS POS

ISS CDR POSTSLEEP

POSTSLEEP

BLDOPR DPC PW CEVIS T2 O2 SYS

TEARDOWNN2 XFERTERM

CREWCONF

CREW

PHOTO

MEAL OFF DUTY

CWCI

FILL 1

WELLHATCHCLOSE

FE-1 POST SLEEP DPC PW PWRS OPS TVIS HYG VELO CREWCONF

CREW

PHOTO

MEAL OFF DUTYWELL

FE-4 POST SLEEP DPC PW PWRS OPS VELO TVIS HYG CREWCONF

CREW

PHOTO

MEAL OFF DUTYWELL

FE-5 POST SLEEP DPC PW PWT2SAMS

DCBRVW

DCB PACK DCBXFR

CREWCONF

CREW

PHOTO

MEAL OFF DUTY CEVISWELL

FE-6

SALVA

DRYBLDSU

BLOOD

BLD STW

SLV STW

POSTSLEEP POST SLEEPDPC CEVIS DCB

RVWDCB PACK HD

SU

CREWCONF

CREW

PHOTO

PAO

MEAL OFF DUTY T2WELLHATCHCLOSE

NOTES

2-35

FD10

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD10

ISS

EXP 22

STS

ISS

02/13 01 02 03 04 05 06 07 08 09 10 11GMT 02/12/10 (043) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008TDRS AVAIL

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSWEZ

ORB ATT BIAS -XLV -ZVV REBOOSTSSRMS POS

ISS CDR POSTSLEEP

POSTSLEEP

BLDOPR DPC PW CEVIS T2 O2 SYS

TEARDOWNN2 XFERTERM

CREWCONF

CREW

PHOTO

MEAL OFF DUTY

CWCI

FILL 1

WELLHATCHCLOSE

FE-1 POST SLEEP DPC PW PWRS OPS TVIS HYG VELO CREWCONF

CREW

PHOTO

MEAL OFF DUTYWELL

FE-4 POST SLEEP DPC PW PWRS OPS VELO TVIS HYG CREWCONF

CREW

PHOTO

MEAL OFF DUTYWELL

FE-5 POST SLEEP DPC PW PWT2SAMS

DCBRVW

DCB PACK DCBXFR

CREWCONF

CREW

PHOTO

MEAL OFF DUTY CEVISWELL

FE-6

SALVA

DRYBLDSU

BLOOD

BLD STW

SLV STW

POSTSLEEP POST SLEEPDPC CEVIS DCB

RVWDCB PACK HD

SU

CREWCONF

CREW

PHOTO

PAO

MEAL OFF DUTY T2WELLHATCHCLOSE

NOTES

Page 49: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD10

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

FD10

2-36

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/13/10 (044) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDR SLEEPPRE SLEEP POSTSLEEPPMC

A/G

ODS LEAKCHECK

♣MNVR

TEA

ATTH/O*

LOG

PLT SLEEPPRE SLEEP POSTSLEEP

⊕ RNDZ TOOLSC/OPS

NOM H20

LOG

MS1 SLEEPPRE SLEEP POSTSLEEP

RNDZ TOOLSC/O

PRE

SLEEP

MS2 SLEEPPRE SLEEP POSTSLEEP

♦ ODS LEAKCHECKPS

WLES

MS3 SLEEPPRE SLEEP POSTSLEEP

EXERCISE

C/LCAMINSTUNDK

LOG

MS4 SLEEPPRE SLEEP POSTSLEEPEXERCISE

MDDK CK

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAILSSRMS POS

♣REBOOST CONFIG 3⊕HATCH CLOSE♦HATCH CLOSE

*TO ISSNOTES

2-36

FD10

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

FD10

STS-130

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/13/10 (044) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDR SLEEPPRE SLEEP POSTSLEEPPMC

A/G

ODS LEAKCHECK

♣MNVR

TEA

ATTH/O*

LOG

PLT SLEEPPRE SLEEP POSTSLEEP

⊕ RNDZ TOOLSC/OPS

NOM H20

LOG

MS1 SLEEPPRE SLEEP POSTSLEEP

RNDZ TOOLSC/O

PRE

SLEEP

MS2 SLEEPPRE SLEEP POSTSLEEP

♦ ODS LEAKCHECKPS

WLES

MS3 SLEEPPRE SLEEP POSTSLEEP

EXERCISE

C/LCAMINSTUNDK

LOG

MS4 SLEEPPRE SLEEP POSTSLEEPEXERCISE

MDDK CK

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAILSSRMS POS

NOTES

♣REBOOST CONFIG 3⊕HATCH CLOSE♦HATCH CLOSE

*TO ISS

Page 50: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD10

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD10

2-37

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/13/10 (044) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009TDRS AVAIL

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150

TDRSWEZ

BIAS -XLV -ZVVORB ATTSSRMS POS

ISS CDR ♣

CWCI

FILL 2

PW DPC PRE SLEEP-ISS SLEEPBISP

REACT

POST

SLEEP

FE-1 PW DPC PRE SLEEP-ISS SLEEP POSTSLEEP

FE-4 PW DPC PRE SLEEP-ISS SLEEP POSTSLEEP

FE-5 PW DPC PRE SLEEP-ISS SLEEPBISP

REACT

POST

SLEEP

FE-6 ♣ PW DPC PRE SLEEP-ISS SLEEP

REACT

POSTSLEEP

♣HATCH CLOSE

NOTES

2-37

FD10

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

FD10

ISS

EXP 22

STS

ISS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/13/10 (044) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009TDRS AVAIL

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150

TDRSWEZ

ORB ATT BIAS -XLV -ZVVSSRMS POS

ISS CDR ♣

CWCI

FILL 2

PW DPC PRE SLEEP-ISS SLEEPBISP

REACT

POST

SLEEP

FE-1 PW DPC PRE SLEEP-ISS SLEEP POSTSLEEP

FE-4 PW DPC PRE SLEEP-ISS SLEEP POSTSLEEP

FE-5 PW DPC PRE SLEEP-ISS SLEEPBISP

REACT

POST

SLEEP

FE-6 ♣ PW DPC PRE SLEEP-ISS SLEEP

REACT

POSTSLEEP

NOTES

♣HATCH CLOSE

Page 51: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD11

UNDOCK*

*UNDOCK 09/14:54

SEP1^ SEP2^

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

(R1)

(R1)

(R1)

(R2)

(R2)

(R2)

(R3)

(R3)

(R3)

2-38

STS-130

STS

ISS

02/14 01 02 03 04 05 06 07 08 09 10 11GMT 02/13/10 (044) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR POST SLEEP UNDOCKOPS MEAL

MNVR

STBD

MNVR

NOSE

MNVR

PORT

EXERCISE NOSE CAPSURVEY PORT WING SURVEY PS

MNVR

DUMP

GRP B

PWRDN

ATTH/O*

MNVRUNDOCK FLYAROUND SEP

-ZLV

-XVV

RCS*

PLT POST SLEEP UNDOCKOPS MEAL NOSE CAP

SURVEY PORT WING SURVEYEXERCISEIMU

MCIU#

OBSS BERTH

GRP B

PWRUP

GRP B

PWRDN

POSTSLEEP

COMM 1

UNDKPLAYBACK

FLYAROUND SEP

MS1 POST SLEEP UNDOCKOPS MEAL NOSE CAP

SURVEY EXERCISESTBD WING SURVEY LDRID/L

SSV-3

POSTSLEEP

SSOR

DEACT

FLYAROUND SEP

SSV-4

OIU

DEACT

MS2 POST SLEEP UNDOCKOPS MEAL STBD WING SURVEY PORT WING SURVEYEXERCISE OBSS BERTHSIMO

INITSIMOTERM

GRP B

PWRUP

OPCU^

POSTSLEEP

CAB T*

HTR B

FLYAROUND SEP

MNVR

FLT FLD

MS3 POST SLEEP P/TV03UNDOCKS/U

P/TV03 UNDOCK OPS MEAL STBD WING SURVEY EXERCISE

P/TV03

UNDOCK

DEACT

MNVR

FLT FLD

MS4 POST SLEEP UNDOCKOPS MEAL EXERCISE

POSTRNDZPGSCCNFG

COND

CWC T/D

FLYAROUND SEP

MDDK CK

MDDK CK

WLES

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSWEZ

BIAS -XLV -ZVV UNDOCK/FLYAROUND/SEP DUMP STBD SURVEY NOSE PORT SURVEYORB ATTTDRS AVAILSSRMS POS

*TO STS *REG RCNFG#FILTER CK

^DEACT*CNTL RECONFIG

NOTES

2-38

FD11

UNDOCK*

*UNDOCK 09/14:54

SEP1^ SEP2^

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

(R1)

(R1)

(R1)

(R2)

(R2)

(R2)

(R3)

(R3)

(R3)

STS-130

STS

ISS

02/14 01 02 03 04 05 06 07 08 09 10 11GMT 02/13/10 (044) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR POST SLEEP UNDOCKOPS MEAL

MNVR

STBD

MNVR

NOSE

MNVR

PORT

EXERCISE NOSE CAPSURVEY PORT WING SURVEY PS

MNVR

DUMP

GRP B

PWRDN

ATTH/O*

MNVRUNDOCK FLYAROUND SEP

-ZLV

-XVV

RCS*

PLT POST SLEEP UNDOCKOPS MEAL NOSE CAP

SURVEY PORT WING SURVEYEXERCISEIMU

MCIU#

OBSS BERTH

GRP B

PWRUP

GRP B

PWRDN

POSTSLEEP

COMM 1

UNDKPLAYBACK

FLYAROUND SEP

MS1 POST SLEEP UNDOCKOPS MEAL NOSE CAP

SURVEY EXERCISESTBD WING SURVEY LDRID/L

SSV-3

POSTSLEEP

SSOR

DEACT

FLYAROUND SEP

SSV-4

OIU

DEACT

MS2 POST SLEEP UNDOCKOPS MEAL STBD WING SURVEY PORT WING SURVEYEXERCISE OBSS BERTHSIMO

INITSIMOTERM

GRP B

PWRUP

OPCU^

POSTSLEEP

CAB T*

HTR B

FLYAROUND SEP

MNVR

FLT FLD

MS3 POST SLEEP P/TV03UNDOCKS/U

P/TV03 UNDOCK OPS MEAL STBD WING SURVEY EXERCISE

P/TV03

UNDOCK

DEACT

MNVR

FLT FLD

MS4 POST SLEEP UNDOCKOPS MEAL EXERCISE

POSTRNDZPGSCCNFG

COND

CWC T/D

FLYAROUND SEP

MDDK CK

MDDK CK

WLES

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSWEZ

ORB ATT BIAS -XLV -ZVV UNDOCK/FLYAROUND/SEP DUMP STBD SURVEY NOSE PORT SURVEYTDRS AVAILSSRMS POS

NOTES

*TO STS *REG RCNFG#FILTER CK

^DEACT*CNTL RECONFIG

Page 52: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD11

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

*UNDOCK 09/14:54

UNDOCK*

2-39

ISS

EXP 22

STS

ISS

02/14 01 02 03 04 05 06 07 08 09 10 11GMT 02/13/10 (044) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009TDRS AVAIL

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSWEZ

BIAS -XLV -ZVV UNDOCK/FLYAROUND/SEP DUMP STBD SURVEY NOSE PORT SURVEYORB ATTSSRMS POS

ISS CDR POST SLEEP DPC FSS CLEANUP

PMA2

DEPART

CONFIG

PMA2-DEPRS

LK-CK

MEAL ISP 3 STOWAGE XFER T2 CEVIS

FE-1 POST SLEEP DPC RS OPS TVIS HYG VELO MEAL

FE-4 POST SLEEP DPC RS OPS VELO TVIS HYG MEAL

FE-5 POST SLEEP DPC ♣

UNDK

VIDEO

BPSMU

STOW

T2 MEAL CEVIS

FE-6 POST SLEEP DPC FSS CLEANUP

PMA2

DEPART

CONFIG

MEAL ISP 3 STOWAGE XFER CEVIS T2

♣PH-FOREST-CULT

NOTES

2-39

FD11

WILLIAMS

SURAEV

KOTOV

CREAMER

NOGUCHI

*UNDOCK 09/14:54

UNDOCK*

ISS

EXP 22

STS

ISS

02/14 01 02 03 04 05 06 07 08 09 10 11GMT 02/13/10 (044) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009TDRS AVAIL

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSWEZ

ORB ATT BIAS -XLV -ZVV UNDOCK/FLYAROUND/SEP DUMP STBD SURVEY NOSE PORT SURVEYSSRMS POS

ISS CDR POST SLEEP DPC FSS CLEANUP

PMA2

DEPART

CONFIG

PMA2-DEPRS

LK-CK

MEAL ISP 3 STOWAGE XFER T2 CEVIS

FE-1 POST SLEEP DPC RS OPS TVIS HYG VELO MEAL

FE-4 POST SLEEP DPC RS OPS VELO TVIS HYG MEAL

FE-5 POST SLEEP DPC ♣

UNDK

VIDEO

BPSMU

STOW

T2 MEAL CEVIS

FE-6 POST SLEEP DPC FSS CLEANUP

PMA2

DEPART

CONFIG

MEAL ISP 3 STOWAGE XFER CEVIS T2

NOTES

♣PH-FOREST-CULT

Page 53: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD11

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-40

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/14/10 (045) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDR SLEEPPRE SLEEP POST SLEEPPMCA/G

PS

RMS

PWRDN

PRESLEEP

FD CONF

LOG

PLT SLEEPPRE SLEEP POST SLEEP♣LOG

MS1 SLEEPPRE SLEEP POST SLEEP

RMS

PWRDN

PS

CREW

CHOICE

D/L

MS2 SLEEP POST SLEEP⊕ PRE SLEEPPRESLEEP

OCA*

MS3 SLEEPPRE SLEEP POST SLEEPLOG

MS4 SLEEPPRE SLEEP POST SLEEP

DAY/NIGHTORBIT 159 160 161 162 163 164 165 166

TDRSWEZ

-ZLV -XVVORB ATT♣OBSS BERTH⊕OBSS BERTH

*D/L RATE 48M PL MAXNOTES

2-40

FD11

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/14/10 (045) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDR SLEEPPRE SLEEP POST SLEEPPMCA/G

PS

RMS

PWRDN

PRESLEEP

FD CONF

LOG

PLT SLEEPPRE SLEEP POST SLEEP♣LOG

MS1 SLEEPPRE SLEEP POST SLEEP

RMS

PWRDN

PS

CREW

CHOICE

D/L

MS2 SLEEP POST SLEEP⊕ PRE SLEEPPRESLEEP

OCA*

MS3 SLEEPPRE SLEEP POST SLEEPLOG

MS4 SLEEPPRE SLEEP POST SLEEP

DAY/NIGHTORBIT 159 160 161 162 163 164 165 166

TDRSWEZ

ORB ATT -ZLV -XVV

NOTES

♣OBSS BERTH⊕OBSS BERTH

*D/L RATE 48M PL MAX

Page 54: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD12

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-41

STS 130

STS

02/15 01 02 03 04 05 06 07 08 09 10 11GMT 02/14/10 (045) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR POST SLEEP FCS C/O

RCS HOT

FIRE PILOT OPS

D/OPREPBRIEF

MEALEXERCISE CABINSTOWPAO PRE

SLEEPFILTERCLEANING

FES-I

FES-T

L-1COMMCHK

L-1COMMCHK

CABIN STOWCABIN STOWPOSTSLEEP

PLT POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALFCS C/O

RCS HOT

FIRE PILOT OPSEXERCISE CABIN STOWPAO

IMU

COMM 2

ENTRY#

SSV

DEACT

CABIN STOW

MADS*

W/B

MS1 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALEXERCISE CABIN STOW CABIN STOWPAO

ENTRY

VIDEO

SETUP

FCSC/OP/TV

CABIN STOW

PAO

SETUP -

DIGITAL

MS2 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALFCS C/O

RCS HOT

FIRE PILOT OPSEXERCISE

KU STOW

PAO CABIN STOW

WLES

DEACT

PGSCSTOWPARTI

CABINSTOW

CABINSTOW

OCA*

OCA*

WLES

MS3 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALEXERCISECABIN STOW CABINSTOW

ERGSTOW CABIN STOWPAOCABIN STOW

MS4 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALEXERCISECABIN STOW CABIN STOW CABIN STOWPAOERGSTOW

MDDK CK

MDDK CK

NLP

CELLS

TERM 2

DAY/NIGHTORBIT 166 167 168 169 170 171 172 173 174

TDRSWEZ

GND WSS WSSDFR DFR

MLA

-ZLV -XVVATTITUDE♣NLP VAC TERM 2

#COOLING CNFG*POWER ON

*HEATER ACT *D/L RATE 48M PL MAX*D/L RATE 2MNOTES

2-41

FD12

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS 130

STS

02/15 01 02 03 04 05 06 07 08 09 10 11GMT 02/14/10 (045) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR POST SLEEP FCS C/O

RCS HOT

FIRE PILOT OPS

D/OPREPBRIEF

MEALEXERCISE CABINSTOWPAO PRE

SLEEPFILTERCLEANING

FES-I

FES-T

L-1COMMCHK

L-1COMMCHK

CABIN STOWCABIN STOWPOSTSLEEP

PLT POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALFCS C/O

RCS HOT

FIRE PILOT OPSEXERCISE CABIN STOWPAO

IMU

COMM 2

ENTRY#

SSV

DEACT

CABIN STOW

MADS*

W/B

MS1 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALEXERCISE CABIN STOW CABIN STOWPAO

ENTRY

VIDEO

SETUP

FCSC/OP/TV

CABIN STOW

PAO

SETUP -

DIGITAL

MS2 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALFCS C/O

RCS HOT

FIRE PILOT OPSEXERCISE

KU STOW

PAO CABIN STOW

WLES

DEACT

PGSCSTOWPARTI

CABINSTOW

CABINSTOW

OCA*

OCA*

WLES

MS3 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALEXERCISECABIN STOW CABINSTOW

ERGSTOW CABIN STOWPAOCABIN STOW

MS4 POST SLEEP PRESLEEP

D/OPREPBRIEF

MEALEXERCISECABIN STOW CABIN STOW CABIN STOWPAOERGSTOW

MDDK CK

MDDK CK

NLP

CELLS

TERM 2

DAY/NIGHTORBIT 166 167 168 169 170 171 172 173 174

TDRSWEZ

GNDATTITUDE -ZLV -XVV

NOTES♣NLP VAC TERM 2

#COOLING CNFG*POWER ON

*HEATER ACT *D/L RATE 48M PL MAX*D/L RATE 2M

Page 55: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD12

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-42

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/15/10 (046) 011/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 011

CDR SLEEPPRE SLEEP POST SLEEPPMCA/G

PRESLEEP PMC

A/G

FD CONF

LOG

PLT SLEEPPRE SLEEP POST SLEEPLOG

MS1 SLEEPPRE SLEEP POST SLEEP

MS2 SLEEPPRE SLEEP POST SLEEP

MS3 SLEEPPRE SLEEP POST SLEEPLOG

MS4 SLEEPPRE SLEEP POST SLEEP

DAY/NIGHTORBIT 174 175 176 177 178 179 180 181 182

TDRSWEZ

-ZLV -XVVORB ATT

NOTES

2-42

FD12

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 02/15/10 (046) 011/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 011

CDR SLEEPPRE SLEEP POST SLEEPPMCA/G

PRESLEEP PMC

A/G

FD CONF

LOG

PLT SLEEPPRE SLEEP POST SLEEPLOG

MS1 SLEEPPRE SLEEP POST SLEEP

MS2 SLEEPPRE SLEEP POST SLEEP

MS3 SLEEPPRE SLEEP POST SLEEPLOG

MS4 SLEEPPRE SLEEP POST SLEEP

DAY/NIGHTORBIT 174 175 176 177 178 179 180 181 182

TDRSWEZ

ORB ATT -ZLV -XVV

NOTES

Page 56: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

FD13

DEORBIT

BURN

KSC

LANDING

DEORBIT TIG LANDING (11/18:00) (11/19:04)

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

2-43

STS-130

STS

02/16 01 02 03 04 05 06 07 08 09 10 11GMT 02/15/10 (046) 12 13 14 15 16 17 18 19 20 21 22 23 012/00

MET Day 011

CDR DEORBIT PREPPOST SLEEP

GRP B

PWRUP

IMUALIGN& VERIF

TRK

-XSI

WATCH

PLT POST SLEEP DEORBIT PREP

GRP B

PWRUP

MADS*

SAMPL

POST

SLEEP

WATCH

MS1 POST SLEEP DEORBIT PREP

MS2 POST SLEEP DEORBIT PREPPGSCSTOWPARTII

MS3 POST SLEEP DEORBIT PREPOCAC

STOW

GIRA

STOW

WATCH

MS4 POST SLEEP DEORBIT PREP

TEPC

PWRDN

MDDK CK

DAY/NIGHTORBIT 182 183 184 185 186 187 188 189 190

TDRSWEZ

-ZLV -XVV IMU -XSI COMM ENTRYORB ATT*POWER ON

NOTES

2-43

FD13

DEORBIT

BURN

KSC

LANDING

DEORBIT TIG LANDING (11/18:00) (11/19:04)

ZAMKA

VIRTS

HIRE

PATRICK

ROBINSON

BEHNKEN

STS-130

STS

02/16 01 02 03 04 05 06 07 08 09 10 11GMT 02/15/10 (046) 12 13 14 15 16 17 18 19 20 21 22 23 012/00

MET Day 011

CDR DEORBIT PREPPOST SLEEP

GRP B

PWRUP

IMUALIGN& VERIF

TRK

-XSI

WATCH

PLT POST SLEEP DEORBIT PREP

GRP B

PWRUP

MADS*

SAMPL

POST

SLEEP

WATCH

MS1 POST SLEEP DEORBIT PREP

MS2 POST SLEEP DEORBIT PREPPGSCSTOWPARTII

MS3 POST SLEEP DEORBIT PREPOCAC

STOW

GIRA

STOW

WATCH

MS4 POST SLEEP DEORBIT PREP

TEPC

PWRDN

MDDK CK

DAY/NIGHTORBIT 182 183 184 185 186 187 188 189 190

TDRSWEZ

ORB ATT -ZLV -XVV IMU -XSI COMM ENTRY

NOTES

*POWER ON

Page 57: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

2-44 FLT PLN/130/BAS

This Page Intentionally Blank

Page 58: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

3-1 FLT PLN/130/BAS

DET

AIL

ED

TIM

ELIN

E

DETAILED TIMELINE

Page 59: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

01

ACTIVITIES PRIOR TO 00/02:30 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS. THE ORBITER SHOULD BE IN A -ZLV +YVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

FD01 EZ ACTIVITIES: PCS 1(2) CONFIG (ORB OPS, ECLS) Config to PCS 2 with 14.7 CAB REG INLET SYS 2 VLV - CL LAMP TEST (ORB OPS, EPS) SMOKE DETN CKT TEST (ORB OPS, ECLS) CSA-CP BATTERY CHANGEOUT(ORB OPS, CSA-CP) CSA-CP CHECKOUT AND ZERO CALIBRATION OPS (ORB OPS, CSA-CP) DATE/TIME SET (P/TV, D2Xs) VTR CLOCK SET (P/TV, DTV) if not performed for PLBD rec

PRIORITY PWRDN GRP B See Page 3-4

PRIORITY PWRDN GRP B See Page 3-4

UPLINKβ21 + Mask

3-2

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/04(035)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

~ ~

D/N

ORB

2

3

ASC

BIAS -ZLV +YVV

NC1

~

STS ATT

CDR

POST INSERTION

ASCENT

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC1 TIG (03:35)

MNVR -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN Init TRK

~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

STS-130 DAP CONFIG (ORB OPS, DAP TABLES)

L17 Check MCIU filter screen

PLT

POST INSERTION

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC1 TIG (03:35)

~

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

MS1

POST INSERTION

ASCENT

RMS POWERUP (PDRS, RMS POWERUP) ~

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

UPDATEORBITAL MNVR PAD

Notes

3-2

ZAMKA VIRTS HIRE

01

ACTIVITIES PRIOR TO 00/02:30 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS. THE ORBITER SHOULD BE IN A -ZLV +YVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

FD01 EZ ACTIVITIES: PCS 1(2) CONFIG (ORB OPS, ECLS) Config to PCS 2 with 14.7 CAB REG INLET SYS 2 VLV - CL LAMP TEST (ORB OPS, EPS) SMOKE DETN CKT TEST (ORB OPS, ECLS) CSA-CP BATTERY CHANGEOUT(ORB OPS, CSA-CP) CSA-CP CHECKOUT AND ZERO CALIBRATION OPS (ORB OPS, CSA-CP) DATE/TIME SET (P/TV, D2Xs) VTR CLOCK SET (P/TV, DTV) if not performed for PLBD rec

PRIORITY PWRDN GRP B See Page 3-4

PRIORITY PWRDN GRP B See Page 3-4

UPLINKβ21 + Mask

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/04(035)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

D/N

ORB

2

3

STS ATT

ASC

BIAS -ZLV +YVV

NC1

~

CDR

POST INSERTION

ASCENT

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC1 TIG (03:35)

MNVR -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN Init TRK

~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

STS-130 DAP CONFIG (ORB OPS, DAP TABLES)

L17 Check MCIU filter screen

PLT

POST INSERTION

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC1 TIG (03:35)

~

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

MS1

POST INSERTION

ASCENT

~RMS POWERUP (PDRS, RMS POWERUP)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

Notes

UPDATEORBITAL MNVR PAD

Page 60: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

01

3-3

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/04(035)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

~ ~

D/N

ORB

2

3

ASC

BIAS -ZLV +YVV

NC1

~

STS ATT

MS2

POST INSERTION

ASCENT

PGSC ACTPGSC NETWORK (A. SETUP)PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRINTER UNSTOW & ASSEMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

~

MS3

POST INSERTION

ASCENT

RMS POWERUP (PDRS, RMS POWERUP) ~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

GIRA INSTALLATION (ORB OPS, ECLS)

OCAC SETUP (ORB OPS, CREW SYS)

MS4

POST INSERTION

ASCENT

PGSC ACTPGSC NETWORK (A. SETUP)PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRINTER UNSTOW & ASSEMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

NLP Activation (ASSY OPS, P/L) Activate GAPs A-J

~

Notes

3-3

ROBINSON PATRICK BEHNKEN

01STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/04(035)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

D/N

ORB

2

3

STS ATT

ASC

BIAS -ZLV +YVV

NC1

~

MS2

POST INSERTION

ASCENT

~

PGSC ACTPGSC NETWORK (A. SETUP)PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRINTER UNSTOW & ASSEMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

MS3

POST INSERTION

ASCENT

~RMS POWERUP (PDRS, RMS POWERUP)

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

GIRA INSTALLATION (ORB OPS, ECLS)

OCAC SETUP (ORB OPS, CREW SYS)

MS4

POST INSERTION

ASCENT

PGSC ACTPGSC NETWORK (A. SETUP)PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRINTER UNSTOW & ASSEMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

~

NLP Activation (ASSY OPS, P/L) Activate GAPs A-J

Notes

Page 61: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

01

CREW WAKE AT 00/14:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

3-4

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/04(035)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

3

4

5

6

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

AFT CONTROLLER C/O (ORB OPS, GNC)ELEVON PARK (ORB OPS, GNC)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

APU FD1 RECONFIGR2 BLR PWR(three)-OFFA12 APU HTR GG/FU PMP(three)-A AUTO

DON ACTIWATCH (ORB OPS, SDBI)

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) ET HANDHELD VIDEO D/L KU TDRE: 04:32-04:54

SSPTS APCU ACTA15 APCU 1,2 OUTPUT(two) - ON APCU 1,2 CONV(two) - ON

DON ACTIWATCH (ORB OPS, SDBI)

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS POWERUP (PDRS, RMS POWERUP)

~

RMS CHECKOUT (PDRS, RMS C/O)

RMS POWERDOWN(PDRS, RMS POWERDOWN)Step 1

Notes

3-4

ZAMKA VIRTS HIRE

01

CREW WAKE AT 00/14:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/04(035)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

D/N

ORB

3

4

5

6

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

AFT CONTROLLER C/O (ORB OPS, GNC)ELEVON PARK (ORB OPS, GNC)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

APU FD1 RECONFIGR2 BLR PWR(three)-OFFA12 APU HTR GG/FU PMP(three)-A AUTO

DON ACTIWATCH (ORB OPS, SDBI)

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) ET HANDHELD VIDEO D/L KU TDRE: 04:32-04:54

SSPTS APCU ACTA15 APCU 1,2 OUTPUT(two) - ON APCU 1,2 CONV(two) - ON

DON ACTIWATCH (ORB OPS, SDBI)

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~RMS POWERUP (PDRS, RMS POWERUP)RMS CHECKOUT (PDRS, RMS C/O)

RMS POWERDOWN(PDRS, RMS POWERDOWN)Step 1

Notes

Page 62: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

01

ROBINSON PATRICK BEHNKEN

CREW WAKE AT 00/14:00

PGSC ACT See Page 3-3

NLP Activation (ASSY OPS, P/L) Activate GAPs A-J

3-5

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/04(035)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

3

4

5

6

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

UMBILICAL WELL TPS CAMERA IMAGERY D/L (ORB OPS, PGSC)

IMAGE FILE TRANSFER (P/TV,D2Xs) ET HANDHELD PHOTO

WLES ACTIVATION & CHECKOUT (ORB OPS, WLE SENSORS)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS POWERUP (PDRS, RMS POWERUP)

~

RMS CHECKOUT (PDRS, RMS C/O)

RMS POWERDOWN(PDRS, RMS POWERDOWN)Step 1

DON ACTIWATCH (ORB OPS, SDBI)

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SHUTTLE EMERGENCY EYEWASH (SEE) Unstow, attach on or near galley Fill one drink container, label "FOR EYE RINSE ONLY" Attach on or near galley SEE stowed in MA9N

TISSUE EQUIVALENT PROPORTIONAL COUNTER(TEPC) (ORB OPS, CREW SYSTEMS) Power On

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

NLP Activation (ASSY OPS, P/L) Activate GAPs 1-8

Notes

3-5

01

ROBINSON PATRICK BEHNKEN

CREW WAKE AT 00/14:00

PGSC ACT See Page 3-3

NLP Activation (ASSY OPS, P/L) Activate GAPs A-J

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/04(035)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

D/N

ORB

3

4

5

6

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

UMBILICAL WELL TPS CAMERA IMAGERY D/L (ORB OPS, PGSC)

IMAGE FILE TRANSFER (P/TV,D2Xs) ET HANDHELD PHOTO

WLES ACTIVATION & CHECKOUT (ORB OPS, WLE SENSORS)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~RMS POWERUP (PDRS, RMS POWERUP)RMS CHECKOUT (PDRS, RMS C/O)

RMS POWERDOWN(PDRS, RMS POWERDOWN)Step 1

DON ACTIWATCH (ORB OPS, SDBI)

MS4

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SHUTTLE EMERGENCY EYEWASH (SEE) Unstow, attach on or near galley Fill one drink container, label "FOR EYE RINSE ONLY" Attach on or near galley SEE stowed in MA9N

TISSUE EQUIVALENT PROPORTIONAL COUNTER(TEPC) (ORB OPS, CREW SYSTEMS) Power On

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

NLP Activation (ASSY OPS, P/L) Activate GAPs 1-8

Notes

Page 63: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

01

3-6

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/04(035)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

6

7

8

9

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-6

ZAMKA VIRTS HIRE

01STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/04(035)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

D/N

ORB

6

7

8

9

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 64: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

01

ROBINSON PATRICK BEHNKEN

3-7

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/04(035)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

6

7

8

9

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-7

01

ROBINSON PATRICK BEHNKEN

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/04(035)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

D/N

ORB

6

7

8

9

STS ATT~

~

-ZLV -XVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 65: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

02

FD02 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

3-8

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/04(035)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

9

10

11

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-8

ZAMKA VIRTS HIRE

02

FD02 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/04(035)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

D/N

ORB

9

10

11

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 66: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

02

3-9

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/04(035)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

9

10

11

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-9

ROBINSON PATRICK BEHNKEN

02STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/04(035)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

D/N

ORB

9

10

11

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 67: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

02

OBSS UNBERTH(PDRS, OBSS OPERATIONS)

P/TV08 EXTERNAL SURVEY (PHOTO/TV, SCENES) OMS POD SURVEY SETUP, Step 1 OPS, Item 1

A A14 RCS/OMS HTR L POD A - OFF B - AUTO R POD A - OFF B - AUTO

PRIOR PWRUP GRP B(ORB PKT, PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Dual G2),5

O2 REPRESS TERM on MCC GO C5 DIRECT O2 vlv - CL

3-10

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/05(036)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

11

12

13

14

~

NC2

-ZLV -XVV

~

STBD SURVEY

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC2 TIG (17:09)

MNVR (TRK) BIAS +YSI (STBD SURVEY)TGT=4 BV=5 P=0 Y=43 OM=217A14/AUTO/VERN, Init TRKOBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

~

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN, Init TRK

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

R2 BLR CNTLR/HTR (three) - B

L17 Check MCIU filter screen

O2 REPRESS INIT C5 DIRECT O2 vlv - OP

PRIOR PWRUP GRP B(ORB PKT, PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Dual G2),5

PRIOR PWRDN GRP B(ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12,IMU 2 STBY)

RCS/OMS POD HTR RECONFIG A

PLT

MEAL

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC2 TIG (17:09)

CRYO 02 TANK HEATER SENSOR CHECK (ORB OPS, EPS)

FC PURGE - MANUAL (ORB OPS, EPS)

MIDDECK TRANSFER PREP Ref. MSG XXX

APCU 2: Disable Power to OBSS A15 APCU 2 CONV - OFF

PRIOR PWRDN GRP B(ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12,IMU 2 STBY)

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

~

UPDATEORBITAL MNVR PAD

Notes

3-10

ZAMKA VIRTS HIRE

02

OBSS UNBERTH(PDRS, OBSS OPERATIONS)

P/TV08 EXTERNAL SURVEY (PHOTO/TV, SCENES) OMS POD SURVEY SETUP, Step 1 OPS, Item 1

A A14 RCS/OMS HTR L POD A - OFF B - AUTO R POD A - OFF B - AUTO

PRIOR PWRUP GRP B(ORB PKT, PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Dual G2),5

O2 REPRESS TERM on MCC GO C5 DIRECT O2 vlv - CL

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/05(036)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

D/N

ORB

11

12

13

14

STS ATT~

NC2

-ZLV -XVV

~

STBD SURVEY

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC2 TIG (17:09)

MNVR (TRK) BIAS +YSI (STBD SURVEY)TGT=4 BV=5 P=0 Y=43 OM=217A14/AUTO/VERN, Init TRK

~

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN, Init TRK

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

R2 BLR CNTLR/HTR (three) - B

L17 Check MCIU filter screen

O2 REPRESS INIT C5 DIRECT O2 vlv - OP

PRIOR PWRUP GRP B(ORB PKT, PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Dual G2),5

PRIOR PWRDN GRP B(ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12,IMU 2 STBY)

RCS/OMS POD HTR RECONFIG A

PLT

~

MEAL

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ON-ORBIT OMS BURN (ORB OPS, OMS) < NC2 TIG (17:09)

CRYO 02 TANK HEATER SENSOR CHECK (ORB OPS, EPS)

FC PURGE - MANUAL (ORB OPS, EPS)

MIDDECK TRANSFER PREP Ref. MSG XXX

APCU 2: Disable Power to OBSS A15 APCU 2 CONV - OFF

PRIOR PWRDN GRP B(ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12,IMU 2 STBY)

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

Notes

UPDATEORBITAL MNVR PAD

Page 68: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

02

3-11

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/05(036)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

~

~

~

D/N

ORB

11

12

13

14

~

NC2

-ZLV -XVV

~

STBD SURVEY

STS ATT

MS2

MEAL

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

PGSC SETUP (PART II) Setup the following: PGSC NETWORK (ORB OPS, PGSC) Setup remaining PGSCs PGSC HARD DISK LATE UPDATE (ORB OPS, PGSC) Update remaining PGSCs

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS UNBERTH(PDRS, OBSS OPERATIONS)

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

~

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

EXERCISE

SHUTTLE/ISS H20 CONTAINER FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

GALLEY OVERNIGHT CONFIG (ORB OPS,ECLS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-11

ROBINSON PATRICK BEHNKEN

02STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/05(036)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

D/N

ORB

11

12

13

14

STS ATT~

NC2

-ZLV -XVV

~

STBD SURVEY

MS2

~

MEAL

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

PGSC SETUP (PART II) Setup the following: PGSC NETWORK (ORB OPS, PGSC) Setup remaining PGSCs PGSC HARD DISK LATE UPDATE (ORB OPS, PGSC) Update remaining PGSCs

MS3

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS UNBERTH(PDRS, OBSS OPERATIONS)

~

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

MS4

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

EXERCISE

SHUTTLE/ISS H20 CONTAINER FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

GALLEY OVERNIGHT CONFIG (ORB OPS,ECLS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 69: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

02

In step 3 of OBSS LDRI/IDC RCC SURVEY-PORTMNVR (TRK) BIAS -YSI (PORT SURVEY)TGT=4 BV=5 P=0 Y=323 OM=45A/AUTO/VERN, Init TRK

3-12

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/05(036)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

~

~ ~

~

D/N

ORB

14

15

16

17

~

NOSE SURVEY

PORT SURVEY

~

STS ATT

CDR

MEAL

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)TGT=4 BV=5 P=331 Y=0 OM=80A14/AUTO/VERN, Init TRK

EXERCISE

~

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

~

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/ALT, Init TRK

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PLT

MEAL

~

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

MS1

MEAL

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

~

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

Notes

3-12

ZAMKA VIRTS HIRE

02

In step 3 of OBSS LDRI/IDC RCC SURVEY-PORTMNVR (TRK) BIAS -YSI (PORT SURVEY)TGT=4 BV=5 P=0 Y=323 OM=45A/AUTO/VERN, Init TRK

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/05(036)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

D/N

ORB

14

15

16

17

STS ATT~

NOSE SURVEY

PORT SURVEY

~

CDR

MEAL

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)TGT=4 BV=5 P=331 Y=0 OM=80A14/AUTO/VERN, Init TRK

~

EXERCISE

~OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/ALT, Init TRK

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PLT

~

MEAL

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

MS1

MEAL

~OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

Notes

Page 70: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

02

√All EVA drink bag fills complete,THEN:GALLEY MORNING CONFIG (ORB OPS,ECLS)

3-13

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/05(036)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

~

~ ~

~

D/N

ORB

14

15

16

17

~

NOSE SURVEY

PORT SURVEY

~

STS ATT

MS2

MEAL

~

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

~

EMU CHECKOUT (EVA, CHECKOUTS) EMU POWERUP AND COMM CHECK,Steps 19-23OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

MS3

MEAL

OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

~

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS)

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

~

MS4

MEAL

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS)

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

~

DIDB FILL Fill 2 DIDBs from galley Remove gas Dispose of fill tool in wet trash

Notes

3-13

ROBINSON PATRICK BEHNKEN

02

√All EVA drink bag fills complete,THEN:GALLEY MORNING CONFIG (ORB OPS,ECLS)

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/05(036)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

D/N

ORB

14

15

16

17

STS ATT~

NOSE SURVEY

PORT SURVEY

~

MS2

~

MEAL

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS) EMU POWERUP AND COMM CHECK,Steps 19-23OBSS LDRI RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

MS3

MEAL

~OBSS LDRI RCC SURVEY - STBD(PDRS, OBSS OPERATIONS)

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS)

~

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

MS4

MEAL

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS)

~

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

DIDB FILL Fill 2 DIDBs from galley Remove gas Dispose of fill tool in wet trash

Notes

Page 71: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

02

FUTURE LOADED MNVR -ZLV -XVVTGT=2 BV=3 OM=270A/AUTO/VERN (14:05) Init TRKPRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-14

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/05(036)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

~

~

~

~

D/N

ORB

17

18

19

~

-ZLV -XVV

NC3

~

-ZLV -XVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT +X RCS BURN (ORB OPS, RCS) < NC3 TIG (02:02)

EXERCISE

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN Init TRK

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

FLIGHT DIRECTOR CONFERENCE

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT +X RCS BURN (ORB OPS, RCS) < NC3 TIG (02:02)

EXERCISE

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

FC MONITORING SYS (FCMS) OPS (ORB OPS, EPS)

APCU 2: React for Node 3 Heaters A15 APCU 2 CONV - ON

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRE: 02:51-03:45

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TFL 192

TFL 188

Notes

3-14

ZAMKA VIRTS HIRE

02

FUTURE LOADED MNVR -ZLV -XVVTGT=2 BV=3 OM=270A/AUTO/VERN (14:05) Init TRKPRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/05(036)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

D/N

ORB

17

18

19

STS ATT~

-ZLV -XVV

NC3

~

-ZLV -XVV

CDR

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ON-ORBIT +X RCS BURN (ORB OPS, RCS) < NC3 TIG (02:02)

~

EXERCISE

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN Init TRK

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

FLIGHT DIRECTOR CONFERENCE

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ON-ORBIT +X RCS BURN (ORB OPS, RCS) < NC3 TIG (02:02)

EXERCISE

~OBSS BERTH (PDRS, OBSS OPERATIONS)

FC MONITORING SYS (FCMS) OPS (ORB OPS, EPS)

APCU 2: React for Node 3 Heaters A15 APCU 2 CONV - ON

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~OBSS BERTH (PDRS, OBSS OPERATIONS)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRE: 02:51-03:45

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

TFL 192

TFL 188

Page 72: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

02

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit step 4)

3-15

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/05(036)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

~

~

~

~

D/N

ORB

17

18

19

~

-ZLV -XVV

NC3

~

-ZLV -XVV

STS ATT

MS2

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS KU TDRE (01:12-02:07) Gimbal Flip 01:42

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WLES RNDZ TOOLS C/O PREP(ORB OPS,WLE SENSORS)

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

TFL 192

TFL 188

Notes

3-15

ROBINSON PATRICK BEHNKEN

02

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit step 4)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/05(036)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

D/N

ORB

17

18

19

STS ATT~

-ZLV -XVV

NC3

~

-ZLV -XVV

MS2

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS KU TDRE (01:12-02:07) Gimbal Flip 01:42

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

WLES RNDZ TOOLS C/O PREP(ORB OPS,WLE SENSORS)

MS3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

MS4

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EMU PREP FOR ISS TRANSFER (EVA, AIRLOCK CONFIG)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

TFL 192

TFL 188

Page 73: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

02

CREW WAKE AT 01/13:30

3-16

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/05(036)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

19

20

21

22

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-16

ZAMKA VIRTS HIRE

02

CREW WAKE AT 01/13:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/05(036)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

D/N

ORB

19

20

21

22

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 74: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

02

CREW WAKE AT 01/13:30

3-17

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/05(036)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

19

20

21

22

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-17

ROBINSON PATRICK BEHNKEN

02

CREW WAKE AT 01/13:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/05(036)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

D/N

ORB

19

20

21

22

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 75: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

02

3-18

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/05(036)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

22

23

24

25

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-18

ZAMKA VIRTS HIRE

02STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/05(036)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

D/N

ORB

22

23

24

25

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 76: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

02

3-19

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/05(036)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

22

23

24

25

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-19

ROBINSON PATRICK BEHNKEN

02STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/05(036)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

D/N

ORB

22

23

24

25

STS ATT~

~

-ZLV -XVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 77: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

03

FD03 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

Transition to RNDZ C/L at MET 1/15:20

RNDZ PET 00:00 (Ti) at MET 1/18:21

< FUTURE MNVR INIT (SIMO DUMP)

A A14 RCS/OMS HTR L POD B - OFF A - AUTO R POD B - OFF A - AUTO

3-20

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/05(036)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

25

26

27

~

-ZLV -XVV

-ZLV +YVV

STS ATT

CDR

SLEEP

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Triple G2),5

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screen

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Triple G2),5

SLEEP LOGBOOK (ORB OPS, SDBI)

RCS/OMS POD HTR RECONFIG A

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

TRANSFER UPDATE Ref. Transfer List & MSG XXX

Notes

3-20

ZAMKA VIRTS HIRE

03

FD03 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

Transition to RNDZ C/L at MET 1/15:20

RNDZ PET 00:00 (Ti) at MET 1/18:21

< FUTURE MNVR INIT (SIMO DUMP)

A A14 RCS/OMS HTR L POD B - OFF A - AUTO R POD B - OFF A - AUTO

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/05(036)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

D/N

ORB

25

26

27

STS ATT~

-ZLV -XVV

-ZLV +YVV

CDR

~

SLEEP

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Triple G2),5

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screen

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,6 (Triple G2),5

SLEEP LOGBOOK (ORB OPS, SDBI)

RCS/OMS POD HTR RECONFIG A

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

TRANSFER UPDATE Ref. Transfer List & MSG XXX

Notes

Page 78: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

03

3-21

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/05(036)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

25

26

27

~

-ZLV -XVV

-ZLV +YVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-21

ROBINSON PATRICK BEHNKEN

03STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/05(036)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

D/N

ORB

25

26

27

STS ATT~

-ZLV -XVV

-ZLV +YVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 79: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

03

< NH TIG (16:13)

< Ti TIG (18:21)

< NC4 TIG (16:49)

UPLINKβ21 + MaskBox 30

3-22

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/06(037)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

27

28

29

30

~

RNDZ

STS ATT

CDR

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (RNDZ, CUE CARD)

~

PLT

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (RNDZ, CUE CARD)

~

MS1

APPROACH (RNDZ, CUE CARD)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

Notes

3-22

ZAMKA VIRTS HIRE

03

< NH TIG (16:13)

< Ti TIG (18:21)

< NC4 TIG (16:49)

UPLINKβ21 + MaskBox 30

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/06(037)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

D/N

ORB

27

28

29

30

STS ATT

~

RNDZ

CDR

~RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (RNDZ, CUE CARD)

PLT

~RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (RNDZ, CUE CARD)

MS1

~

APPROACH (RNDZ, CUE CARD)

~RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

Notes

Page 80: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

03

B √MCC prior to configuring: RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS,PGSC)Part D then A(Omit step 4)

3-23

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/06(037)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

27

28

29

30

~

RNDZ

STS ATT

MS2

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

APPROACH (RNDZ, CUE CARD)

~

EXERCISE

O2 REPRESS INIT C5 DIRECT O2 vlv - OP

O2 RPRS TERM on MCC GO: C5 DIRECT O2 vlv - CLRECONFIGURE OCA DOWNLINK RATE B

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

P/TV02 DOCK (PHOTO/TV, SCENES) Perform OPS

~

P/TV02 DOCK (PHOTO/TV, SCENES) Perform SETUP

EMU REMOVAL (EVA, AIRLOCK CONFIG)

MS4

APPROACH (RNDZ, CUE CARD)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

EMU REMOVAL (EVA, AIRLOCK CONFIG)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-23

ROBINSON PATRICK BEHNKEN

03

B √MCC prior to configuring: RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS,PGSC)Part D then A(Omit step 4)

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/06(037)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

D/N

ORB

27

28

29

30

STS ATT

~

RNDZ

MS2

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (RNDZ, CUE CARD)

EXERCISE

O2 REPRESS INIT C5 DIRECT O2 vlv - OP

O2 RPRS TERM on MCC GO: C5 DIRECT O2 vlv - CLRECONFIGURE OCA DOWNLINK RATE B

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

P/TV02 DOCK (PHOTO/TV, SCENES) Perform OPS

P/TV02 DOCK (PHOTO/TV, SCENES) Perform SETUP

EMU REMOVAL (EVA, AIRLOCK CONFIG)

MS4

~

APPROACH (RNDZ, CUE CARD)

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

EMU REMOVAL (EVA, AIRLOCK CONFIG)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 81: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

03

< DOCKING(1/20:59)RETURN TO FLIGHT PLAN

UPLINKβ21 + MaskBox 20,21,22

PRIOR PWRDN GRP B (ORB PKT,PRIOR PWRDN) Steps 5,6( C ) & 12 (In Step 12,IMU 2 STBY) O6 S TRK PWR -Z - OFF

PRIOR PWRDN GRP B (ORB PKT,PRIOR PWRDN) Steps 5,6( C ) & 12 (In Step 12,IMU 2 STBY) O6 S TRK PWR -Z - OFF

C Single G2 - after MNVR complete Step 3: √MCC or pause ~ 3 min (DAP settling) DAP: as req'd

3-24

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/06(037)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

~

~ ~

~

D/N

ORB

30

31

32

~

RNDZ

DK

~

BIAS -XLV -ZVV

STS ATT

CDR

APPROACH (RNDZ, CUE CARD)

~

JOINT OPS: 2.104 HATCH OPENING ANDSHUTTLE/ISS DUCT INSTALL Perform steps 2-11, 14, & 15 √MCC-H complete with step 1

WELCOME

SAFETY BRIEFING

MNVR (TRK) BIAS -XLV -ZVVTGT=2 BV=5 P=163 Y=0 OM=167Init TRK, DAP:FREE > 2 sec, thenDAP: A12/AUTO/VERN

When ISS Go for ATT CNTRL, DAP:FREE

POST-DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

PLT

APPROACH (RNDZ, CUE CARD)

~

JOINT OPS: 2.104 HATCH OPENING ANDSHUTTLE/ISS DUCT INSTALL Perform steps 2-11, 14, & 15 √MCC-H complete with step 1

WELCOME

SAFETY BRIEFING

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 1-2

SSPTS ODS CONNECTOR VERIF A15 ODS MATE X1,X2 (two) - ON √MCC then - OFF

SSV OUTRATE - 2

JOINT OPS: 6.109 HARDLINE ICOM AUDIO Steps 1,5,6

MS1

APPROACH (RNDZ, CUE CARD)

~

JOINT OPS: 2.104 HATCH OPENING ANDSHUTTLE/ISS DUCT INSTALL Perform steps 2-11, 14, & 15 √MCC-H complete with step 1

WELCOME

SAFETY BRIEFING

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 1-2

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

AIRLOCK PREP FOR INGRESS -AIRLOCK FAN ACTIVE (RNDZ, APDS)

TFL 184

Notes

3-24

ZAMKA VIRTS HIRE

03

< DOCKING(1/20:59)RETURN TO FLIGHT PLAN

UPLINKβ21 + MaskBox 20,21,22

PRIOR PWRDN GRP B (ORB PKT,PRIOR PWRDN) Steps 5,6( C ) & 12 (In Step 12,IMU 2 STBY) O6 S TRK PWR -Z - OFF

PRIOR PWRDN GRP B (ORB PKT,PRIOR PWRDN) Steps 5,6( C ) & 12 (In Step 12,IMU 2 STBY) O6 S TRK PWR -Z - OFF

C Single G2 - after MNVR complete Step 3: √MCC or pause ~ 3 min (DAP settling) DAP: as req'd

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/06(037)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

D/N

ORB

30

31

32

STS ATT~

RNDZ

DK

~

BIAS -XLV -ZVV

CDR

~APPROACH (RNDZ, CUE CARD)

JOINT OPS: 2.104 HATCH OPENING ANDSHUTTLE/ISS DUCT INSTALL Perform steps 2-11, 14, & 15 √MCC-H complete with step 1

WELCOME

SAFETY BRIEFING

MNVR (TRK) BIAS -XLV -ZVVTGT=2 BV=5 P=163 Y=0 OM=167Init TRK, DAP:FREE > 2 sec, thenDAP: A12/AUTO/VERN

When ISS Go for ATT CNTRL, DAP:FREE

POST-DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

PLT

~APPROACH (RNDZ, CUE CARD)

JOINT OPS: 2.104 HATCH OPENING ANDSHUTTLE/ISS DUCT INSTALL Perform steps 2-11, 14, & 15 √MCC-H complete with step 1

WELCOME

SAFETY BRIEFING

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 1-2

SSPTS ODS CONNECTOR VERIF A15 ODS MATE X1,X2 (two) - ON √MCC then - OFF

SSV OUTRATE - 2

JOINT OPS: 6.109 HARDLINE ICOM AUDIO Steps 1,5,6

MS1

~APPROACH (RNDZ, CUE CARD)

JOINT OPS: 2.104 HATCH OPENING ANDSHUTTLE/ISS DUCT INSTALL Perform steps 2-11, 14, & 15 √MCC-H complete with step 1

WELCOME

SAFETY BRIEFING

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 1-2

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

AIRLOCK PREP FOR INGRESS -AIRLOCK FAN ACTIVE (RNDZ, APDS)

Notes

TFL 184

Page 82: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

03

RETURN TO FLIGHT PLAN< DOCKING(1/20:59)

P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) P/TV02 Deact Step 2 FD steps only Airlock Prep steps as shown P/TV02 Deact Step 2 ODS steps P/TV04 Setup

3-25

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/06(037)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

~

~ ~

~

D/N

ORB

30

31

32

~

RNDZ

DK

~

BIAS -XLV -ZVV

STS ATT

MS2

APPROACH (RNDZ, CUE CARD)

~

WELCOME

SAFETY BRIEFING

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

POST RNDZ PGSC CONFIG Configure PGSCs per usage chart

POST-DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

WLES DOCK/UNDK RECOVERY(ORB OPS,WLE SENSORS)JOINT OPS: 6.107 PCS SETUP-SHUTTLE

MS3

P/TV02 DOCK (PHOTO/TV, SCENES) Perform OPS

~

WELCOME

SAFETY BRIEFING

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 1-2

AIRLOCK PREP FOR INGRESS -AIRLOCK FAN ACTIVE (RNDZ, APDS)

P/TV04 INGRESS/EGRESS(PHOTO/TV, SCENES) Perform OPS

MS4

APPROACH (RNDZ, CUE CARD)

~

WELCOME

SAFETY BRIEFING

POST-DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

POST RNDZ PGSC CONFIG Configure PGSCs per usage chart

JOINT OPS: 6.107 PCS SETUP-SHUTTLE

Notes

3-25

ROBINSON PATRICK BEHNKEN

03

RETURN TO FLIGHT PLAN< DOCKING(1/20:59)

P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) P/TV02 Deact Step 2 FD steps only Airlock Prep steps as shown P/TV02 Deact Step 2 ODS steps P/TV04 Setup

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/06(037)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

D/N

ORB

30

31

32

STS ATT~

RNDZ

DK

~

BIAS -XLV -ZVV

MS2

~APPROACH (RNDZ, CUE CARD)

WELCOME

SAFETY BRIEFING

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

POST RNDZ PGSC CONFIG Configure PGSCs per usage chart

POST-DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

WLES DOCK/UNDK RECOVERY(ORB OPS,WLE SENSORS)JOINT OPS: 6.107 PCS SETUP-SHUTTLE

MS3

~P/TV02 DOCK (PHOTO/TV, SCENES) Perform OPS

WELCOME

SAFETY BRIEFING

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 1-2

AIRLOCK PREP FOR INGRESS -AIRLOCK FAN ACTIVE (RNDZ, APDS)

P/TV04 INGRESS/EGRESS(PHOTO/TV, SCENES) Perform OPS

MS4

~APPROACH (RNDZ, CUE CARD)

WELCOME

SAFETY BRIEFING

POST-DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

POST RNDZ PGSC CONFIG Configure PGSCs per usage chart

JOINT OPS: 6.107 PCS SETUP-SHUTTLE

Notes

Page 83: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

03

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) √ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

D SSPTS OPCU ACT On MCC GO:A15 OPCU 1,2 CONV(two) - ON R1 MN BUS TIE B - ON(tb-ON) C - ON(tb-ON)

3-26

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/06(037)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

~ ~

~

D/N

ORB

33

34

35

~

~

BIAS -XLV -ZVV

STS ATT

CDR

~

EXERCISE

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

JOINT OPS: 3.102 NITROGEN TRANSFER INIT Verify MCC-H complete with Step 2, then perform Steps 3-4.5,5.1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

MIDDECK TRANSFER Ref. Transfer List

FLIGHT DIRECTOR CONFERENCE

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 3-5

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 6-8 EXER CONST

SSPTS OPCU ACT D

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 9-10

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 3-5

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 6-8 EXER CONST

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 9-10

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 02:42-03:13

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-26

ZAMKA VIRTS HIRE

03

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) √ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

D SSPTS OPCU ACT On MCC GO:A15 OPCU 1,2 CONV(two) - ON R1 MN BUS TIE B - ON(tb-ON) C - ON(tb-ON)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/06(037)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

D/N

ORB

33

34

35

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

EXERCISE

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

JOINT OPS: 3.102 NITROGEN TRANSFER INIT Verify MCC-H complete with Step 2, then perform Steps 3-4.5,5.1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

MIDDECK TRANSFER Ref. Transfer List

FLIGHT DIRECTOR CONFERENCE

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 3-5

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 6-8 EXER CONST

SSPTS OPCU ACT D

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 9-10

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 3-5

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 6-8 EXER CONST

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

OBSS GRAPPLE FROM SSRMS (PDRS, OBSS NOMINAL) Steps 9-10

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 02:42-03:13

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 84: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

03

EVA SYSTEMS: 1.307 REBA INSTALLATION Verify EMU battery & LiOH S/Ns with MCC Ref.STS-130 Consumables Tracking CC(EVA)

EVA SYSTEMS: 1.307 REBA INSTALLATION Verify EMU battery & LiOH S/Ns with MCC Ref.STS-130 Consumables Tracking CC(EVA)

3-27

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/06(037)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

~ ~

~

D/N

ORB

33

34

35

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

P/TV05 ISS INTERNAL OPS (HC) (PHOTO/TV, SCENES) Perform SETUP

SODF TRANSFER Ref. Transfer List & MSG XXX

PLAYBACK (DIGITAL) DOCKING (PHOTO/TV, CUE CARD) KU TDRW: (01:03-01:23)

MIDDECK TRANSFER Ref. Transfer List

P/TV09 GLACIER (PHOTO/TV, SCENES) Perform SETUP & OPS

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 7-9 EXERCISE CONSTRAINT

EVA SYSTEMS: 1.403 REBA POWERED HARDWARECHECKOUT

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 4.3-6

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 3-4.2

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Steps 1-3 already complete

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: 1.403 REBA POWERED HARDWARECHECKOUT

SAMPLE TRANSFER REVIEW REVIEW ONLY Ref. MSG XXX

NLP TERMINATION (ASSY OPS, P/L) Terminate GAPs A-J

ASCENT SAMPLE TRANSFER FROM GLACIER TOMELFI Ref. MSG XXX

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

NLP TERMINATION (ASSY OPS, P/L) Terminate GAPs 1-8

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Steps 1-3 already complete

Notes

3-27

ROBINSON PATRICK BEHNKEN

03

EVA SYSTEMS: 1.307 REBA INSTALLATION Verify EMU battery & LiOH S/Ns with MCC Ref.STS-130 Consumables Tracking CC(EVA)

EVA SYSTEMS: 1.307 REBA INSTALLATION Verify EMU battery & LiOH S/Ns with MCC Ref.STS-130 Consumables Tracking CC(EVA)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/06(037)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

D/N

ORB

33

34

35

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

P/TV05 ISS INTERNAL OPS (HC) (PHOTO/TV, SCENES) Perform SETUP

SODF TRANSFER Ref. Transfer List & MSG XXX

PLAYBACK (DIGITAL) DOCKING (PHOTO/TV, CUE CARD) KU TDRW: (01:03-01:23)

MIDDECK TRANSFER Ref. Transfer List

P/TV09 GLACIER (PHOTO/TV, SCENES) Perform SETUP & OPS

MS3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 7-9 EXERCISE CONSTRAINT

EVA SYSTEMS: 1.403 REBA POWERED HARDWARECHECKOUT

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 4.3-6

ROBO: 1.110 OBSS UNBERTH AND HANDOFF Steps 3-4.2

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Steps 1-3 already complete

MS4

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.403 REBA POWERED HARDWARECHECKOUT

SAMPLE TRANSFER REVIEW REVIEW ONLY Ref. MSG XXX

NLP TERMINATION (ASSY OPS, P/L) Terminate GAPs A-J

ASCENT SAMPLE TRANSFER FROM GLACIER TOMELFI Ref. MSG XXX

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

NLP TERMINATION (ASSY OPS, P/L) Terminate GAPs 1-8

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Steps 1-3 already complete

Notes

Page 85: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

03

CREW WAKE AT 02/13:00

3-28

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/06(037)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

~ ~

~

D/N

ORB

35

36

37

38

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) √ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-28

ZAMKA VIRTS HIRE

03

CREW WAKE AT 02/13:00

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/06(037)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

D/N

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) √ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 86: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

03

CREW WAKE AT 02/13:00

3-29

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/06(037)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

~ ~

~

D/N

ORB

35

36

37

38

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-29

ROBINSON PATRICK BEHNKEN

03

CREW WAKE AT 02/13:00

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/06(037)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

D/N

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 87: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

03

3-30

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/06(037)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

~ ~

~ ~

D/N

ORB

38

39

40

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-30

ZAMKA VIRTS HIRE

03STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/06(037)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

D/N

ORB

38

39

40

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 88: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

03

3-31

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/06(037)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

~ ~

~ ~

D/N

ORB

38

39

40

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-31

ROBINSON PATRICK BEHNKEN

03STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/06(037)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

D/N

ORB

38

39

40

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 89: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

04

FD04 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

3-32

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/06(037)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~ ~

D/N

ORB

41

42

43

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER UPDATE Ref. Transfer List & MSG XXX

~

Notes

3-32

ZAMKA VIRTS HIRE

04

FD04 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/06(037)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

D/N

ORB

41

42

43

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER UPDATE Ref. Transfer List & MSG XXX

Notes

Page 90: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

04

3-33

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/06(037)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~ ~

D/N

ORB

41

42

43

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-33

ROBINSON PATRICK BEHNKEN

04STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/06(037)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

D/N

ORB

41

42

43

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 91: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

04

NO EXERCISEWHILE DOUBLEGRAPPLED

TRANSFER UPDATE Ref. Transfer List & MSG XXX

3-34

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/07(038)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~

~ ~

D/N

ORB

43

44

45

46

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #1 Ref MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

MIDDECK TRANSFER Ref. Transfer List

ARED

MIDDECK TRANSFER Ref. Transfer List

PLT

MEAL~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

JOINT OPS: 3.120 PREBREATHE USING SHUTTLEO2 SETUP Steps 2-6, Ground will perform steps 2.4 and 6.14

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screen

MIDDECK TRANSFER Ref. Transfer List

EXERCISE

P/TV06 ROBOTICS OPERATIONS (PHOTO/TV, SCENES) Perform SETUP

MS1

MEAL~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

~

SPINAL ELONG CREW DATA CLCT Ref. MSG XXXSPINAL STAND HEIGHT SUBJECT Ref. MSG XXX

MIDDECK TRANSFER Ref. Transfer List

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

Notes

3-34

ZAMKA VIRTS HIRE

04

NO EXERCISEWHILE DOUBLEGRAPPLED

TRANSFER UPDATE Ref. Transfer List & MSG XXX

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/07(038)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

D/N

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV -ZVV

CDR

~MEAL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #1 Ref MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

MIDDECK TRANSFER Ref. Transfer List

ARED

MIDDECK TRANSFER Ref. Transfer List

PLT

~MEAL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

JOINT OPS: 3.120 PREBREATHE USING SHUTTLEO2 SETUP Steps 2-6, Ground will perform steps 2.4 and 6.14

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screen

MIDDECK TRANSFER Ref. Transfer List

EXERCISE

P/TV06 ROBOTICS OPERATIONS (PHOTO/TV, SCENES) Perform SETUP

MS1

~MEAL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

~

SPINAL ELONG CREW DATA CLCT Ref. MSG XXXSPINAL STAND HEIGHT SUBJECT Ref. MSG XXX

MIDDECK TRANSFER Ref. Transfer List

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

Notes

Page 92: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

04

NO EXERCISEWHILE DOUBLEGRAPPLED

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-35

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/07(038)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~

~ ~

D/N

ORB

43

44

45

46

~

~

BIAS -XLV -ZVV

STS ATT

MS2

MEAL~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

SPINAL ELONG CREW DATA CLCT Ref. MSG XXXSPINAL STAND HEIGHT SUBJECT Ref. MSG XXX

EVA 1 TOOL CONFIG (EVA, TIMELINES)

MIDDECK TRANSFER Ref. Transfer List

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

MEAL~

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

EXERCISE

EVA 1 TOOL CONFIG (EVA, TIMELINES)

EVA TOOL AUDIT Ref. EVA 1 TOOL CONFIG (EVA, TIMELINES)

MS4

MEAL~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

EVA 1 TOOL CONFIG (EVA, TIMELINES)

EVA TOOL AUDIT Ref. EVA 1 TOOL CONFIG (EVA, TIMELINES)

ARED

Notes

3-35

ROBINSON PATRICK BEHNKEN

04

NO EXERCISEWHILE DOUBLEGRAPPLED

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/07(038)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

D/N

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV -ZVV

MS2

~MEAL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

SPINAL ELONG CREW DATA CLCT Ref. MSG XXXSPINAL STAND HEIGHT SUBJECT Ref. MSG XXX

EVA 1 TOOL CONFIG (EVA, TIMELINES)

MIDDECK TRANSFER Ref. Transfer List

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

~MEAL

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

EXERCISE

EVA 1 TOOL CONFIG (EVA, TIMELINES)

EVA TOOL AUDIT Ref. EVA 1 TOOL CONFIG (EVA, TIMELINES)

MS4

~MEAL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 19:21-19:57

EVA 1 TOOL CONFIG (EVA, TIMELINES)

EVA TOOL AUDIT Ref. EVA 1 TOOL CONFIG (EVA, TIMELINES)

ARED

Notes

Page 93: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

04

3-36

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/07(038)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~

~ ~

~

D/N

ORB

46

47

48

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

~

OFF DUTY

~

PLT

MEAL

~

OFF DUTY

~

MS1

MEAL

~

OFF DUTY

~

Notes

3-36

ZAMKA VIRTS HIRE

04STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/07(038)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

D/N

ORB

46

47

48

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

MEAL

~

OFF DUTY

PLT

~

MEAL

~

OFF DUTY

MS1

~

MEAL

~

OFF DUTY

Notes

Page 94: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

04

3-37

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/07(038)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~

~ ~

~

D/N

ORB

46

47

48

~

~

BIAS -XLV -ZVV

STS ATT

MS2

MEAL

~

OFF DUTY

~

MS3

MEAL

~

OFF DUTY

~

MS4

MEAL

~

OFF DUTY

~

Notes

3-37

ROBINSON PATRICK BEHNKEN

04STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/07(038)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

D/N

ORB

46

47

48

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

MEAL

~

OFF DUTY

MS3

~

MEAL

~

OFF DUTY

MS4

~

MEAL

~

OFF DUTY

Notes

Page 95: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

04

3-38

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/07(038)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~

~

~

D/N

ORB

48

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

FLIGHT DIRECTOR CONFERENCE

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRZ: 02:38-02:55

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-38

ZAMKA VIRTS HIRE

04STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/07(038)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

D/N

ORB

48

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

~

OFF DUTY

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

FLIGHT DIRECTOR CONFERENCE

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

~

OFF DUTY

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

~

OFF DUTY

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRZ: 02:38-02:55

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 96: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

04

3-39

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/07(038)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~

~

~

D/N

ORB

48

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

~

Notes

3-39

ROBINSON PATRICK BEHNKEN

04STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/07(038)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

D/N

ORB

48

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

~

OFF DUTY

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

~

OFF DUTY

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 1 BRIEFING CARD (EVA, TIMELINES)

~

OFF DUTY

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

Notes

Page 97: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

04

CREW WAKE AT 03/13:00

3-40

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/07(038)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

~

~

~

D/N

ORB

51

52

53

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-40

ZAMKA VIRTS HIRE

04

CREW WAKE AT 03/13:00

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/07(038)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

D/N

ORB

51

52

53

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 98: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

04

CREW WAKE AT 03/13:00

3-41

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/07(038)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

~

~

~

D/N

ORB

51

52

53

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

SLEEP

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-41

ROBINSON PATRICK BEHNKEN

04

CREW WAKE AT 03/13:00

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/07(038)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

D/N

ORB

51

52

53

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 99: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

04

3-42

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/07(038)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

~

~ ~

~

D/N

ORB

54

55

56

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-42

ZAMKA VIRTS HIRE

04STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/07(038)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

D/N

ORB

54

55

56

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 100: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

04

3-43

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/07(038)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

~

~ ~

~

D/N

ORB

54

55

56

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-43

ROBINSON PATRICK BEHNKEN

04STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/07(038)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

D/N

ORB

54

55

56

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 101: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

05

FD05 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

3-44

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/07(038)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

56

57

58

59

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-44

ZAMKA VIRTS HIRE

05

FD05 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/07(038)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

D/N

ORB

56

57

58

59

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

~

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 102: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

05

3-45

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/07(038)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

56

57

58

59

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

Notes

3-45

ROBINSON PATRICK BEHNKEN

05STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/07(038)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

D/N

ORB

56

57

58

59

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

~

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

MS4

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

~

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

Notes

Page 103: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

05

NO EXERCISEFROM UNBERTH & INSTLUNTIL A-BOLTS COMPLETE

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 1-5; on MCC go, perform step 6

N2 REPRESS TERM (On MCC GO) B

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) on MCC go, perform steps 7-12

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-46

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/08(039)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

~

~ ~

~

D/N

ORB

59

60

61

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

N2 REPRESS INIT A

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 4-7 EXERCISE CONSTRAINTS

PLT

~

P/TV07 EVA (PHOTO/TV, SCENES) Perform SETUP

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

~

EVA 1 INHIBIT PAD (EVA, TIMELINES)

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

MIDDECK TRANSFER Ref. Transfer List

ARED

MS1

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps 10,11.3-11.5

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

~

MIDDECK TRANSFER Ref. Transfer List

EXERCISE

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

TRANSFER UPDATE Ref. Transfer List & MSG XXX

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CHECK (ASSY OPS, ACT&C/O) Steps 1-5

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Step 1.1

Notes

3-46

ZAMKA VIRTS HIRE

05

NO EXERCISEFROM UNBERTH & INSTLUNTIL A-BOLTS COMPLETE

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 1-5; on MCC go, perform step 6

N2 REPRESS TERM (On MCC GO) B

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) on MCC go, perform steps 7-12

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/08(039)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

D/N

ORB

59

60

61

STS ATT~

~

BIAS -XLV -ZVV

CDR

~EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

N2 REPRESS INIT A

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 4-7 EXERCISE CONSTRAINTS

PLT

~

P/TV07 EVA (PHOTO/TV, SCENES) Perform SETUP

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

EVA 1 INHIBIT PAD (EVA, TIMELINES)

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

MIDDECK TRANSFER Ref. Transfer List

ARED

MS1

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps 10,11.3-11.5

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

MIDDECK TRANSFER Ref. Transfer List

EXERCISE

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

TRANSFER UPDATE Ref. Transfer List & MSG XXX

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CHECK (ASSY OPS, ACT&C/O) Steps 1-5

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Step 1.1

Notes

Page 104: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

05

NO EXERCISEFROM UNBERTH & INSTLUNTIL A-BOLTS COMPLETE

3-47

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/08(039)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

~

~ ~

~

D/N

ORB

59

60

61

~

~

BIAS -XLV -ZVV

STS ATT

MS2

IVA SUPPORT FOR EVA

~

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EXERCISE

~

MIDDECK TRANSFER Ref. Transfer List

EVA TOOL CHECK Ref. EVA 1 TOOL CONFIG (EVA, TIMELINES)

MS3

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

NH3 BAG OPS

~

EVA 1 SETUP

MS4

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

NH3 BAG OPS

~

EVA 1 SETUP

Notes

3-47

ROBINSON PATRICK BEHNKEN

05

NO EXERCISEFROM UNBERTH & INSTLUNTIL A-BOLTS COMPLETE

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/08(039)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

D/N

ORB

59

60

61

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

IVA SUPPORT FOR EVA

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

~

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

EVA TOOL CHECK Ref. EVA 1 TOOL CONFIG (EVA, TIMELINES)

MS3

~EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

~

NH3 BAG OPS

EVA 1 SETUP

MS4

~EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

~

NH3 BAG OPS

EVA 1 SETUP

Notes

Page 105: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

05

NO EXERCISEFROM UNBRTH & INSTLUNTIL A-BOLTS COMPLETE

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTALL Steps 17-18 EXERCISE CONSTRAINT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 17-18 EXERCISE CONSTRAINT

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS Steps 5-endEXERCISE CONSTRAINT

C 1. Verify Node 1 Port Ratchet in LATCH position. 2. Engage Crank Handle. 3. Turn Crank Handle in LATCH direction until fully latched. 4. Stow Crank Handle.

3-48

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/08(039)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

~ ~

~

D/N

ORB

62

63

64

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #2 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

~

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS ~

ARED

PLT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 16EXERCISE CONSTRAINT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

~

N1P HATCH LATCH C

MEAL

MIDDECK TRANSFER Ref. Transfer List

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 15EXERCISE CONSTRAINTS

MS1

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS Steps 1-4EXERCISE CONSTRAINT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 16 EXERCISE CONSTRAINT

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

~

MEAL

S&M:1.403 CBCS INSTL/RMVL-GENSteps12.1-12.2

S&M:1.403 CBCS INSTL/RMVL-GEN Step 13.2 Do not demate cables. Stow near N1P Hatch.MIDDECK TRANSFER Ref. Transfer List

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 15EXERCISE CONSTRAINTS

Notes

3-48

ZAMKA VIRTS HIRE

05

NO EXERCISEFROM UNBRTH & INSTLUNTIL A-BOLTS COMPLETE

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTALL Steps 17-18 EXERCISE CONSTRAINT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 17-18 EXERCISE CONSTRAINT

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS Steps 5-endEXERCISE CONSTRAINT

C 1. Verify Node 1 Port Ratchet in LATCH position. 2. Engage Crank Handle. 3. Turn Crank Handle in LATCH direction until fully latched. 4. Stow Crank Handle.

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/08(039)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

D/N

ORB

62

63

64

STS ATT~

~

BIAS -XLV -ZVV

CDR

MEAL

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #2 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

~P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

~P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

ARED

PLT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 16EXERCISE CONSTRAINT

~ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

N1P HATCH LATCH C

MEAL

~

MIDDECK TRANSFER Ref. Transfer List

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 15EXERCISE CONSTRAINTS

MS1

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS Steps 1-4EXERCISE CONSTRAINT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 16 EXERCISE CONSTRAINT

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS

~ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Steps 1-14EXERCISE CONSTRAINTS

MEAL

S&M:1.403 CBCS INSTL/RMVL-GENSteps12.1-12.2

S&M:1.403 CBCS INSTL/RMVL-GEN Step 13.2 Do not demate cables. Stow near N1P Hatch.

~

MIDDECK TRANSFER Ref. Transfer List

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL Step 15EXERCISE CONSTRAINTS

Notes

Page 106: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

05

NO EXERCISEFROM UNBRTH & INSTLUNTIL A-BOLTS COMPLETE

3-49

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/08(039)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

~ ~

~

D/N

ORB

62

63

64

~

~

BIAS -XLV -ZVV

STS ATT

MS2

IVA SUPPORT FOR EVA

~

~

MS3

EVA CLEANUP & INGRESS~

NH3 BAG OPS

~

OTP EARLY REMOVAL

LTA CABLE INSTALL

GETAHEAD

MS4

EVA CLEANUP & INGRESS~

NH3 BAG OPS

~

OTP EARLY REMOVAL

AVIONICS CABLE INSTALL

GETAHEAD

Notes

3-49

ROBINSON PATRICK BEHNKEN

05

NO EXERCISEFROM UNBRTH & INSTLUNTIL A-BOLTS COMPLETE

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/08(039)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

D/N

ORB

62

63

64

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

IVA SUPPORT FOR EVA

MS3

~EVA CLEANUP & INGRESS

~

NH3 BAG OPS

OTP EARLY REMOVAL

LTA CABLE INSTALL

GETAHEAD

MS4

~EVA CLEANUP & INGRESS

~

NH3 BAG OPS

OTP EARLY REMOVAL

AVIONICS CABLE INSTALL

GETAHEAD

Notes

Page 107: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

05

3-50

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/08(039)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

~ ~

~

D/N

ORB

64

65

66

67

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

FLIGHT DIRECTOR CONFERENCE

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS ON - ALL

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

MIDDECK TRANSFER Ref. Transfer List

~

After NODE 3 INSTALL:√A/FREE/VERNDAP Permanent Edit: A12:CA=7, B12:CA=7

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Verify Node 1 Port Hatch Latched, then:1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK (ASSY OPS, ACT&C/O) Steps 6-8

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK (ASSY OPS, ACT&C/O) Steps 9-10TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

MIDDECK TRANSFER Ref. Transfer List

~

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 02:00-02:30

Notes

3-50

ZAMKA VIRTS HIRE

05STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/08(039)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

D/N

ORB

64

65

66

67

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

FLIGHT DIRECTOR CONFERENCE

~P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS ON - ALL

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

~MIDDECK TRANSFER Ref. Transfer List

After NODE 3 INSTALL:√A/FREE/VERNDAP Permanent Edit: A12:CA=7, B12:CA=7

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Verify Node 1 Port Hatch Latched, then:1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK (ASSY OPS, ACT&C/O) Steps 6-8

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK (ASSY OPS, ACT&C/O) Steps 9-10TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

~MIDDECK TRANSFER Ref. Transfer List

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 02:00-02:30

Notes

Page 108: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

05

3-51

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/08(039)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

~ ~

~

D/N

ORB

64

65

66

67

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

IVA SUPPORT FOR EVA

~

EVA SYSTEMS: PRE REPRESS (CC)MIDDECK TRANSFER Ref. Transfer List

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA CLEANUP & INGRESS

~

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA CLEANUP & INGRESS

~

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

Notes

3-51

ROBINSON PATRICK BEHNKEN

05STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/08(039)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

D/N

ORB

64

65

66

67

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

IVA SUPPORT FOR EVA

EVA SYSTEMS: PRE REPRESS (CC)MIDDECK TRANSFER Ref. Transfer List

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA CLEANUP & INGRESS

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

MS4

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

Notes

Page 109: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

05

CREW WAKE AT 04/12:30

3-52

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/08(039)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

~ ~

~ ~

D/N

ORB

67

68

69

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-52

ZAMKA VIRTS HIRE

05

CREW WAKE AT 04/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/08(039)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

D/N

ORB

67

68

69

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 110: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

05

CREW WAKE AT 04/12:30

3-53

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/08(039)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

~ ~

~ ~

D/N

ORB

67

68

69

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-53

ROBINSON PATRICK BEHNKEN

05

CREW WAKE AT 04/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/08(039)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

D/N

ORB

67

68

69

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 111: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

05

3-54

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/08(039)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

~

~ ~

D/N

ORB

69

70

71

72

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-54

ZAMKA VIRTS HIRE

05STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/08(039)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

D/N

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 112: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

05

3-55

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/08(039)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

~

~ ~

D/N

ORB

69

70

71

72

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-55

ROBINSON PATRICK BEHNKEN

05STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/08(039)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

D/N

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 113: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

06

FD06 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

NO EXERCISEDURING LCS IMAGING

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

3-56

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/08(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

~

~ ~

D/N

ORB

72

73

74

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS OFF - ALL

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 4-6

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)ROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 1-3

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

L17 Check MCIU filter screenROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 1-3ROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 4-6

Notes

3-56

ZAMKA VIRTS HIRE

06

FD06 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

NO EXERCISEDURING LCS IMAGING

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/08(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

D/N

ORB

72

73

74

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS OFF - ALL

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 4-6

~

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)ROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 1-3

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

L17 Check MCIU filter screenROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 1-3ROBO: 2.310 SSRMS NODE 3 RELEASE AND MNVRTO FI SUPPORT Steps 4-6

Notes

Page 114: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

06

NO EXERCISEDURING LCS IMAGING

3-57

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/08(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

~

~ ~

D/N

ORB

72

73

74

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 1.5-7

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

P/TV06 ROBOTICS OPERATIONS (PHOTO/TV, SCENES) Perform SETUP

SLEEP LOGBOOK (ORB OPS, SDBI)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-57

ROBINSON PATRICK BEHNKEN

06

NO EXERCISEDURING LCS IMAGING

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/08(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

D/N

ORB

72

73

74

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 1.5-7

MS3

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

P/TV06 ROBOTICS OPERATIONS (PHOTO/TV, SCENES) Perform SETUP

SLEEP LOGBOOK (ORB OPS, SDBI)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 115: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

06

NO EXERCISEDURING LCS IMAGING

3-58

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/09(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

~

~ ~

~

D/N

ORB

75

76

77

~

~

BIAS -XLV -ZVV

STS ATT

CDR

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

PLT

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

MEAL

~

MS1

OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

MEAL

~

Notes

3-58

ZAMKA VIRTS HIRE

06

NO EXERCISEDURING LCS IMAGING

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/09(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

D/N

ORB

75

76

77

STS ATT~

~

BIAS -XLV -ZVV

CDR

~OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

PLT

~OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

MEAL

MS1

~OBSS FOCUSED INPSECTIONRef. MSG XXXEXERCISE CONSTRAINT

~

MEAL

Notes

Page 116: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

06

NO EXERCISEDURING LCS IMAGING

3-59

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/09(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

~

~ ~

~

D/N

ORB

75

76

77

~

~

BIAS -XLV -ZVV

STS ATT

MS2

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 1.5-7

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

EVA 2 TOOL CONFIG (EVA, TIMELINES)

MS3

EVA 2 TOOL CONFIG (EVA, TIMELINES)

EVA TOOL AUDIT Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

QD FAM OPS (EVA, TIMELINES) Ref. STS-130 Consumables Tracking CC(EVA)

MS4

EXERCISE

~

EVA 2 TOOL CONFIG (EVA, TIMELINES)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #3 Ref. MSG XXX

EVA TOOL AUDIT Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

QD FAM OPS (EVA, TIMELINES) Ref. STS-130 Consumables Tracking CC(EVA)

Notes

3-59

ROBINSON PATRICK BEHNKEN

06

NO EXERCISEDURING LCS IMAGING

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/09(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

D/N

ORB

75

76

77

STS ATT~

~

BIAS -XLV -ZVV

MS2

~1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 1.5-7

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

EVA 2 TOOL CONFIG (EVA, TIMELINES)

MS3

EVA 2 TOOL CONFIG (EVA, TIMELINES)

EVA TOOL AUDIT Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

QD FAM OPS (EVA, TIMELINES) Ref. STS-130 Consumables Tracking CC(EVA)

MS4

~

EXERCISE

EVA 2 TOOL CONFIG (EVA, TIMELINES)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #3 Ref. MSG XXX

EVA TOOL AUDIT Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

QD FAM OPS (EVA, TIMELINES) Ref. STS-130 Consumables Tracking CC(EVA)

Notes

Page 117: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

06

3-60

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/09(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

~

~

~

D/N

ORB

77

78

79

80

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

PLT

MEAL

~

1.116 NODE 3 PORT CBM CNTR DISC CVR INSTL (ASSY OPS, ACT&C/O)

ROBO: 2.315 SSRMS MNVR FROM FI SUPPORTTO LAB PDGF

1.114 NODE 3 PORT AFT IMV CAP INSTALL (ASSY OPS, ACT&C/O)

1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

~

MS1

ROBO: 2.315 SSRMS MNVR FROM FI SUPPORTTO LAB PDGF

MEAL

~

1.116 NODE 3 PORT CBM CNTR DISC CVR INSTL (ASSY OPS, ACT&C/O)

1.114 NODE 3 PORT AFT IMV CAP INSTALL (ASSY OPS, ACT&C/O)

1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

~

Notes

3-60

ZAMKA VIRTS HIRE

06STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/09(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

D/N

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV -ZVV

CDR

MEAL

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

PLT

~

MEAL

1.116 NODE 3 PORT CBM CNTR DISC CVR INSTL (ASSY OPS, ACT&C/O)

ROBO: 2.315 SSRMS MNVR FROM FI SUPPORTTO LAB PDGF

1.114 NODE 3 PORT AFT IMV CAP INSTALL (ASSY OPS, ACT&C/O)

~

1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

MS1

ROBO: 2.315 SSRMS MNVR FROM FI SUPPORTTO LAB PDGF

~

MEAL

1.116 NODE 3 PORT CBM CNTR DISC CVR INSTL (ASSY OPS, ACT&C/O)

1.114 NODE 3 PORT AFT IMV CAP INSTALL (ASSY OPS, ACT&C/O)

~

1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

Notes

Page 118: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

06

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

EMU LIOH & BATTERY INSTALL A Ref. EVA SYS: 1.515 EMU METOX/LIOH/BATTERY REPLACEMENT

3-61

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/09(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

~

~

~

D/N

ORB

77

78

79

80

~

~

BIAS -XLV -ZVV

STS ATT

MS2

MEAL

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

MS3

MEAL

EXERCISE

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 22:10-22:38

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) KU TDRW (21:37-21:54) (21:57-22:04) (22:04-22:17) Gimbal Flip: 22:04

MS4

MEAL

EXERCISE

~

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 22:10-22:38

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #1 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

CWC TRANSFER Transfer CWC to ISS

PWR TRANSFER Transfer PWR to ISS

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE AEVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE A

Notes

3-61

ROBINSON PATRICK BEHNKEN

06

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

EMU LIOH & BATTERY INSTALL A Ref. EVA SYS: 1.515 EMU METOX/LIOH/BATTERY REPLACEMENT

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/09(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

D/N

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV -ZVV

MS2

MEAL

~1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

MS3

MEAL

EXERCISE

~

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

PUBLIC AFFAIRS EVENTISS KU AVAIL: 22:10-22:38

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) KU TDRW (21:37-21:54) (21:57-22:04) (22:04-22:17) Gimbal Flip: 22:04

MS4

MEAL

~

EXERCISE

~

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

PUBLIC AFFAIRS EVENTISS KU AVAIL: 22:10-22:38

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #1 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

CWC TRANSFER Transfer CWC to ISS

PWR TRANSFER Transfer PWR to ISS

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE AEVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE A

Notes

Page 119: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

06

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-62

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/09(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

~

~

~

D/N

ORB

80

81

82

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

FLIGHT DIRECTOR CONFERENCE

PLT

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

ROBO: 1.410 SSRMS MNVR TO CUPOLA & GRAPPLE Steps 1-4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: 01:20-01:58

1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

~

X.XXX VACUUM ACCESS JUMPER FIT CHECK

MS1

~

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

ROBO: 1.410 SSRMS MNVR TO CUPOLA & GRAPPLE Steps 1-4

PUBLIC AFFAIRS EVENTISS KU AVAIL: 01:20-01:58

1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

~

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRZ: 01:55-02:13

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

X.XXX VACUUM ACCESS JUMPER FIT CHECK

Notes

3-62

ZAMKA VIRTS HIRE

06

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/09(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

D/N

ORB

80

81

82

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

FLIGHT DIRECTOR CONFERENCE

PLT

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

ROBO: 1.410 SSRMS MNVR TO CUPOLA & GRAPPLE Steps 1-4

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PUBLIC AFFAIRS EVENTISS KU AVAIL: 01:20-01:58

~1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

X.XXX VACUUM ACCESS JUMPER FIT CHECK

MS1

~

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

ROBO: 1.410 SSRMS MNVR TO CUPOLA & GRAPPLE Steps 1-4

PUBLIC AFFAIRS EVENTISS KU AVAIL: 01:20-01:58

~1.320 SSRMS NODE2 RELEASE & MNVR TOOVERNIGHT PARK

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRZ: 01:55-02:13

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

X.XXX VACUUM ACCESS JUMPER FIT CHECK

Notes

Page 120: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

06

3-63

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/09(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

~

~

~

D/N

ORB

80

81

82

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

~

MS3

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

~

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-63

ROBINSON PATRICK BEHNKEN

06STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/09(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

D/N

ORB

80

81

82

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

~1.104 VESTIBULE OUTFITTING NOD1 TO NOD3 (ASSY OPS, ACT&C/O) Steps 8-20

MS3

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

~EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

EVA PROCEDURE REVIEW Ref. EVA 2 BRIEFING CARD (EVA, TIMELINES)

~EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 121: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

06

CREW WAKE AT 05/12:30

3-64

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/09(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

~

~

~

D/N

ORB

82

83

84

85

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-64

ZAMKA VIRTS HIRE

06

CREW WAKE AT 05/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/09(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

D/N

ORB

82

83

84

85

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 122: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

06

CREW WAKE AT 05/12:30

3-65

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/09(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

~

~

~

D/N

ORB

82

83

84

85

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-65

ROBINSON PATRICK BEHNKEN

06

CREW WAKE AT 05/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/09(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

D/N

ORB

82

83

84

85

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 123: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

06

3-66

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/09(040)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

~

~

D/N

ORB

85

86

87

88

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-66

ZAMKA VIRTS HIRE

06STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/09(040)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

D/N

ORB

85

86

87

88

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 124: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

06

3-67

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/09(040)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

~

~

D/N

ORB

85

86

87

88

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-67

ROBINSON PATRICK BEHNKEN

06STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/09(040)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

D/N

ORB

85

86

87

88

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 125: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

07

FD07 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

3-68

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/09(040)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

88

89

90

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 INHIBIT PAD (EVA, TIMELINES)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screen

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

1.118 NOD3 STBD NPRV RMVL & IMV VLV INSTL (ASSY OPS, ACT&C/O) Steps 1-5,7-end for Stbd Ovhd Valve

~

Notes

3-68

ZAMKA VIRTS HIRE

07

FD07 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/09(040)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

D/N

ORB

88

89

90

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 2 INHIBIT PAD (EVA, TIMELINES)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screen

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

1.118 NOD3 STBD NPRV RMVL & IMV VLV INSTL (ASSY OPS, ACT&C/O) Steps 1-5,7-end for Stbd Ovhd Valve

Notes

Page 126: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

07

3-69

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/09(040)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

88

89

90

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA TOOL CHECK Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

~

Notes

3-69

ROBINSON PATRICK BEHNKEN

07STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/09(040)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

D/N

ORB

88

89

90

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA TOOL CHECK Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

MS3

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

MS4

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

Notes

Page 127: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

07

3-70

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/10(041)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

90

91

92

93

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: 1.220 EMU PURGE~

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

~

PRLA CLOSE (ORB OPS, PRLA)

EXERCISE

PLT

P/TV07 EVA (PHOTO/TV, SCENES) Perform SETUP

ISP STOWAGE TRANSFER Ref. Transfer List

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

~

ISP STOWAGE TRANSFER Ref. Transfer List

MS1

ISP STOWAGE TRANSFER Ref. Transfer List

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

~

ISP STOWAGE TRANSFER Ref. Transfer List

1.118 NOD3 STBD NPRV RMVL & IMV VLV INSTL (ASSY OPS, ACT&C/O) Steps 1-5,7-end for Stbd Ovhd Valve

~

Notes

3-70

ZAMKA VIRTS HIRE

07STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/10(041)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

D/N

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV -ZVV

CDR

~EVA SYSTEMS: 1.220 EMU PURGEEVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

~

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

PRLA CLOSE (ORB OPS, PRLA)

EXERCISE

PLT

P/TV07 EVA (PHOTO/TV, SCENES) Perform SETUP

ISP STOWAGE TRANSFER Ref. Transfer List

~

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

ISP STOWAGE TRANSFER Ref. Transfer List

MS1

ISP STOWAGE TRANSFER Ref. Transfer List

~

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

ISP STOWAGE TRANSFER Ref. Transfer List

~1.118 NOD3 STBD NPRV RMVL & IMV VLV INSTL (ASSY OPS, ACT&C/O) Steps 1-5,7-end for Stbd Ovhd Valve

Notes

Page 128: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

07

3-71

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/10(041)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

90

91

92

93

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

IVA SUPPORT FOR EVA

~

EXERCISE

EVA TOOL CHECK Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

EVA SYSTEMS: 1.220 EMU PURGE~

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NH3 LOOP A JUMPER INSTALL

EVA 2 SETUP

NH3 MLI INSTALL

MS4

EVA SYSTEMS: 1.220 EMU PURGE~

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NH3 LOOP A JUMPER INSTALL

EVA 2 SETUP

NH3 MLI INSTALL

Notes

3-71

ROBINSON PATRICK BEHNKEN

07STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/10(041)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

D/N

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

~

IVA SUPPORT FOR EVA

EXERCISE

~EVA TOOL CHECK Ref. EVA 2 TOOL CONFIG (EVA, TIMELINES)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

~EVA SYSTEMS: 1.220 EMU PURGEEVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NH3 LOOP A JUMPER INSTALL

EVA 2 SETUP

NH3 MLI INSTALL

MS4

~EVA SYSTEMS: 1.220 EMU PURGEEVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NH3 LOOP A JUMPER INSTALL

EVA 2 SETUP

NH3 MLI INSTALL

Notes

Page 129: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

07

NO EXERCISEFROM 3RD SET OFBOLTS UNTIL A-BOLTS COMPLETE

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

3-72

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/10(041)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

93

94

95

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

~

CWC TRANSFER Transfer CWC to ISS

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #4 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE A

PLT

~

ROBO: 1.410 SSRMS CUPOLA GRPL & UNBRTH Steps 5-6 EXERCISE CONSTRAINT

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Step 6

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 7-9

MEAL

EXERCISE

1.118 NODE 3 STBD NPRV RMVL & IMV VLV INSTL (ASSY OPS, ACT&C/O) Step 6 for Node 3 Stbd Ovhd Valve

MS1

~

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps 8,10,11.3-11.5

ROBO: 1.410 SSRMS CUPOLA GRPL & UNBRTH Steps 5-6 EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Step 1

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Step 6

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 7-9

MEAL

1.120 NODE 3 PPRV SAMPLE PORT CAP RMVL (ASSY OPS, ACT&C/O)

1.120 NODE 3 PPRV SAMPLE PORT CAP RMVL (ASSY OPS, ACT&C/O)

Notes

3-72

ZAMKA VIRTS HIRE

07

NO EXERCISEFROM 3RD SET OFBOLTS UNTIL A-BOLTS COMPLETE

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 1-5

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/10(041)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

D/N

ORB

93

94

95

STS ATT~

~

BIAS -XLV -ZVV

CDR

MEAL

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

EVA SYSTEMS: PRE REPRESS (CC)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

CWC TRANSFER Transfer CWC to ISS

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #4 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE A

PLT

~

ROBO: 1.410 SSRMS CUPOLA GRPL & UNBRTH Steps 5-6 EXERCISE CONSTRAINT

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Step 6

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 7-9

MEAL

EXERCISE

1.118 NODE 3 STBD NPRV RMVL & IMV VLV INSTL (ASSY OPS, ACT&C/O) Step 6 for Node 3 Stbd Ovhd Valve

MS1

~

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps 8,10,11.3-11.5

ROBO: 1.410 SSRMS CUPOLA GRPL & UNBRTH Steps 5-6 EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Step 1

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Step 6

1.172 CUPOLA VEST DEPRESS (NODE 3 PORT) (ASSY OPS, ACT&C/O) Steps 7-9

MEAL

1.120 NODE 3 PPRV SAMPLE PORT CAP RMVL (ASSY OPS, ACT&C/O)

1.120 NODE 3 PPRV SAMPLE PORT CAP RMVL (ASSY OPS, ACT&C/O)

Notes

Page 130: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

07

NO EXERCISEFROM 3RD SET OFBOLTS UNTIL A-BOLTS COMPLETE

3-73

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/10(041)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

93

94

95

~

~

BIAS -XLV -ZVV

STS ATT

MS2

IVA SUPPORT FOR EVA

~

EVA SYSTEMS: PRE REPRESS (CC)

MS3

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~

NODE 3 NPV INSTALL

STBD TRUNION COVER INSTALL

NODE 3 OIH INSTALL

PORT TRUNION COVER INSTALL

NH3 LOOP B JUMPER INSTALL

NH3 MLI INSTALL

MS4

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~

KEEL PIN COVER INSTALL

NODE 3 NADIR CBM OPS

GAP SPANNER INSTALL

NH3 LOOP B JUMPER INSTALL

NH3 MLI INSTALL

AFT TRUNION COVER INSTALL

Notes

3-73

ROBINSON PATRICK BEHNKEN

07

NO EXERCISEFROM 3RD SET OFBOLTS UNTIL A-BOLTS COMPLETE

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/10(041)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

D/N

ORB

93

94

95

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

IVA SUPPORT FOR EVA

EVA SYSTEMS: PRE REPRESS (CC)

MS3

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

NODE 3 NPV INSTALL

STBD TRUNION COVER INSTALL

NODE 3 OIH INSTALL

PORT TRUNION COVER INSTALL

NH3 LOOP B JUMPER INSTALL

NH3 MLI INSTALL

MS4

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

KEEL PIN COVER INSTALL

NODE 3 NADIR CBM OPS

GAP SPANNER INSTALL

NH3 LOOP B JUMPER INSTALL

NH3 MLI INSTALL

AFT TRUNION COVER INSTALL

Notes

Page 131: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

07

NO EXERCISEFROM UNBERTHUNTIL A-BOLTSCOMPLETE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBO:1.420 SSRMS CUP RELOC Step 5 EXER CONST

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 6 EXERCISE CONSTRAINT

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 7 EXERCISE CONSTRAINT

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 01:12-01:47

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 7 EXERCISE CONSTRAINT

3-74

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/10(041)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

~ ~

~ ~

D/N

ORB

96

97

98

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

PLT

~

ROBO: 1.420 SSRMS CUPOLA RELOCATE Steps 1-4EXERCISE CONSTRAINT

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 5 EXERCISE CONSTRAINT

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBO: 1.420 SSRMS CUPOLA RELOCATE Steps 1-4EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Steps 4.1-4.4 EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Steps 4.5-4.8EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Step 3

ROBO:1.420 SSRMS CUP RELOC Step 6 EXER CONST

Notes

3-74

ZAMKA VIRTS HIRE

07

NO EXERCISEFROM UNBERTHUNTIL A-BOLTSCOMPLETE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBO:1.420 SSRMS CUP RELOC Step 5 EXER CONST

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 6 EXERCISE CONSTRAINT

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 7 EXERCISE CONSTRAINT

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 01:12-01:47

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 7 EXERCISE CONSTRAINT

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/10(041)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

D/N

ORB

96

97

98

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

PLT

~

ROBO: 1.420 SSRMS CUPOLA RELOCATE Steps 1-4EXERCISE CONSTRAINT

ROBO: 1.420 SSRMS CUPOLA RELOCATE Step 5 EXERCISE CONSTRAINT

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBO: 1.420 SSRMS CUPOLA RELOCATE Steps 1-4EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Steps 4.1-4.4 EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Steps 4.5-4.8EXERCISE CONSTRAINT

S&M: 1.539 CBM CUPOLA RELOCATE:NODE 3 PORT TO NODE 3 NADIR Step 3

ROBO:1.420 SSRMS CUP RELOC Step 6 EXER CONST

Notes

Page 132: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

07

NO EXERCISEFROM UNBERTHUNTIL A-BOLTSCOMPLETE

3-75

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/10(041)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

~ ~

~ ~

D/N

ORB

96

97

98

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBAS&M:1.403 CBCS INSTL/RMVL-GEN Steps 12.1-12.2

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

Notes

3-75

ROBINSON PATRICK BEHNKEN

07

NO EXERCISEFROM UNBERTHUNTIL A-BOLTSCOMPLETE

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/10(041)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

D/N

ORB

96

97

98

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBAS&M:1.403 CBCS INSTL/RMVL-GEN Steps 12.1-12.2

MS3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

MS4

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

Notes

Page 133: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

07

CREW WAKE AT 06/12:30

3-76

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/10(041)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

~

~ ~

D/N

ORB

98

99

100

101

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-76

ZAMKA VIRTS HIRE

07

CREW WAKE AT 06/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/10(041)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

D/N

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 134: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

07

CREW WAKE AT 06/12:30

3-77

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/10(041)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

~

~ ~

D/N

ORB

98

99

100

101

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-77

ROBINSON PATRICK BEHNKEN

07

CREW WAKE AT 06/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/10(041)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

D/N

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 135: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

07

3-78

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/10(041)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

~

~ ~

D/N

ORB

101

102

103

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-78

ZAMKA VIRTS HIRE

07STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/10(041)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

D/N

ORB

101

102

103

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 136: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

07

3-79

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/10(041)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

~

~ ~

D/N

ORB

101

102

103

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-79

ROBINSON PATRICK BEHNKEN

07STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/10(041)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

D/N

ORB

101

102

103

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 137: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

08

FD08 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-7(RPOP2),& OCA ROUTER.

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 1-5; on MCC go, perform step 6

3-80

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/10(041)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

~

~ ~

~

D/N

ORB

104

105

106

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #5 Ref. MSG XXX

N2 REPRESS INIT A

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

1.105 CBM CENTER DISC COVER REMOVAL (ASSY OPS, ACT&C/O)

S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN ~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps 12-14

1.105 CBM CENTER DISC COVER REMOVAL (ASSY OPS, ACT&C/O)

S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN ~

Notes

3-80

ZAMKA VIRTS HIRE

08

FD08 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-7(RPOP2),& OCA ROUTER.

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 1-5; on MCC go, perform step 6

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/10(041)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

D/N

ORB

104

105

106

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #5 Ref. MSG XXX

N2 REPRESS INIT A

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

1.105 CBM CENTER DISC COVER REMOVAL (ASSY OPS, ACT&C/O)

~S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps 12-14

1.105 CBM CENTER DISC COVER REMOVAL (ASSY OPS, ACT&C/O)

~S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN

Notes

Page 138: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

08

3-81

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/10(041)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

~

~ ~

~

D/N

ORB

104

105

106

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

S&M: X.XXX WRS DEMATES

~

X.XXX CRAB REMOVAL (ASSY OPS, ACT&C/O)X.XXX EDV REMOVAL (ASSY OPS, ACT&C/O)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg) SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

Notes

3-81

ROBINSON PATRICK BEHNKEN

08STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/10(041)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

D/N

ORB

104

105

106

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

S&M: X.XXX WRS DEMATES

X.XXX CRAB REMOVAL (ASSY OPS, ACT&C/O)X.XXX EDV REMOVAL (ASSY OPS, ACT&C/O)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg) SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

EVA CREW: TAKE 1 ASPIRIN (325mg)

Notes

Page 139: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

08

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) on MCC go, perform steps 7-12

3-82

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/11(042)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

~

~

~

D/N

ORB

106

107

108

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

~

EXERCISE

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #6 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

N2 REPRESS TERM (On MCC GO) B

1.150 WRS RACK TRANSFER (ASSY OPS, ACT&C/O)

CWC TRANSFER Transfer CWC to ISS

CWC TRANSFER Transfer CWC to ISS

PLT

MEAL

~

X.XXX VESTIBLE JUMPER INSTALL (ASSY OPS, ACT&C/O)

S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN

~

X.XXX REMOVE CUPOLA BLANKET (ASSY OPS, ACT&C/O)

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps X-X

MS1

MEAL

~

S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN

~

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps X-X

X.XXX VESTIBLE JUMPER INSTALL (ASSY OPS, ACT&C/O)

X.XXX REMOVE CUPOLA BLANKET (ASSY OPS, ACT&C/O)

Notes

3-82

ZAMKA VIRTS HIRE

08

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) on MCC go, perform steps 7-12

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/11(042)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

D/N

ORB

106

107

108

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

MEAL

EXERCISE

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #6 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

N2 REPRESS TERM (On MCC GO) B

1.150 WRS RACK TRANSFER (ASSY OPS, ACT&C/O)

CWC TRANSFER Transfer CWC to ISS

CWC TRANSFER Transfer CWC to ISS

PLT

~

MEAL

X.XXX VESTIBLE JUMPER INSTALL (ASSY OPS, ACT&C/O)

~S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN

X.XXX REMOVE CUPOLA BLANKET (ASSY OPS, ACT&C/O)

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps X-X

MS1

~

MEAL

~S&M: 1.101 CBM CONTROL PANEL ASSEMBLYREMOVAL - GEN

S&M: 1.403 CBCS INSTALL/REMOVAL-GEN Steps X-X

X.XXX VESTIBLE JUMPER INSTALL (ASSY OPS, ACT&C/O)

X.XXX REMOVE CUPOLA BLANKET (ASSY OPS, ACT&C/O)

Notes

Page 140: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

08

3-83

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/11(042)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

~

~

~

D/N

ORB

106

107

108

~

~

BIAS -XLV -ZVV

STS ATT

MS2

MEAL~

1.150 WRS RACK TRANSFER (ASSY OPS, ACT&C/O)

S&M: X.XXX WRS DEMATES~

X.XXX TOCA REMOVAL (ASSY OPS, ACT&C/O)

EVA 3 TOOL CONFIG (EVA, TIMELINES)

S&M: 1.341 WRS 1 RACK UMBILICAL MATE

S&M: 1.342 WRS 2 RACK UMBILICAL MATE

MS3

MEAL~

EXERCISE

EVA 3 TOOL CONFIG (EVA, TIMELINES)

MS4

MEAL~

EXERCISE

~

EVA 3 TOOL CONFIG (EVA, TIMELINES)

Notes

3-83

ROBINSON PATRICK BEHNKEN

08STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/11(042)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

D/N

ORB

106

107

108

STS ATT~

~

BIAS -XLV -ZVV

MS2

~MEAL

1.150 WRS RACK TRANSFER (ASSY OPS, ACT&C/O)

~S&M: X.XXX WRS DEMATES

X.XXX TOCA REMOVAL (ASSY OPS, ACT&C/O)

EVA 3 TOOL CONFIG (EVA, TIMELINES)

S&M: 1.341 WRS 1 RACK UMBILICAL MATE

S&M: 1.342 WRS 2 RACK UMBILICAL MATE

MS3

~MEAL

EXERCISE

EVA 3 TOOL CONFIG (EVA, TIMELINES)

MS4

~MEAL

~

EXERCISE

EVA 3 TOOL CONFIG (EVA, TIMELINES)

Notes

Page 141: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

08

When ISS Go for ATT CNTRL, DAP:FREE

3-84

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/11(042)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

~

~

~

D/N

ORB

109

110

111

~

BIAS -XLV -ZVV

DUMP

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

~

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

~

H/O ATT CONTROL CMG TA to ORB: √MCC for DAPMNVR (TRK) BIAS -XLV +YVV (SIMO DUMP)TGT=2 BV=5 P=164 Y=0 OM=193A12/AUTO/VERN Init TRK

MNVR (TRK) TEATGT=2 BV=5 P=164 Y=0 OM=167A12/AUTO/VERN Init TRK

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply Dump

1.154 OGS RACK TRANSFER (ASSY OPS, ACT&C/O)

PLT

MEAL

~

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

~

X.XXX ACCESS NODE 3 (ASSY OPS, ACT&C/O)

X.XXX MTL JUMPERS (ASSY OPS, ACT&C/O)

EXERCISE

X.XXX CUPOLA ELPS ENABLE (ASSY OPS, ACT&C/O)

MS1

MEAL

~

X.XXX ACCESS NODE 3 (ASSY OPS, ACT&C/O)

X.XXX MTL JUMPERS (ASSY OPS, ACT&C/O)

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

~

EXERCISE

UPDATEH2O SPLY DUMPQTY TK A & B

Notes

3-84

ZAMKA VIRTS HIRE

08

When ISS Go for ATT CNTRL, DAP:FREE

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/11(042)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

D/N

ORB

109

110

111

STS ATT~

BIAS -XLV -ZVV

DUMP

~

BIAS -XLV -ZVV

CDR

~

MEAL

~

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

H/O ATT CONTROL CMG TA to ORB: √MCC for DAPMNVR (TRK) BIAS -XLV +YVV (SIMO DUMP)TGT=2 BV=5 P=164 Y=0 OM=193A12/AUTO/VERN Init TRK

MNVR (TRK) TEATGT=2 BV=5 P=164 Y=0 OM=167A12/AUTO/VERN Init TRK

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply Dump

1.154 OGS RACK TRANSFER (ASSY OPS, ACT&C/O)

PLT

~

MEAL

~

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

X.XXX ACCESS NODE 3 (ASSY OPS, ACT&C/O)

X.XXX MTL JUMPERS (ASSY OPS, ACT&C/O)

EXERCISE

X.XXX CUPOLA ELPS ENABLE (ASSY OPS, ACT&C/O)

MS1

~

MEAL

X.XXX ACCESS NODE 3 (ASSY OPS, ACT&C/O)

X.XXX MTL JUMPERS (ASSY OPS, ACT&C/O)

~

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

EXERCISE

Notes

UPDATEH2O SPLY DUMPQTY TK A & B

Page 142: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

08

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

3-85

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/11(042)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

~

~

~

D/N

ORB

109

110

111

~

BIAS -XLV -ZVV

DUMP

~

BIAS -XLV -ZVV

STS ATT

MS2

MEAL

~

S&M: X.XXX OGS RACK UMBILICAL DEMATE

1.154 OGS RACK TRANSFER (ASSY OPS, ACT&C/O)

S&M: 1.325 OGS RACK UMBILICAL MATE

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

MS3

MEAL

~

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

EVA TOOL AUDIT Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

S&M: 1.280 WHC KABIN DISASSEMBLE/REASSEMBLE Steps 5-8

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

PUBLIC AFFAIRS EVENTISS KU AVAIL: 22:20-22:54

P/TV09 GLACIER (PHOTO/TV, SCENES) Perform SETUP & OPS

MS4

MEAL

~

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

EVA TOOL AUDIT Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

DECENT SAMPLE TRANSFER FROM MELFI TOGLACIER Ref. MSG XXX

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE A

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE A

EMU METOX & BATTERY INSTALL A Ref.EVA SYS:1.515 EMU METOX/LIOH/BATT REPLACE

Notes

3-85

ROBINSON PATRICK BEHNKEN

08

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/11(042)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

D/N

ORB

109

110

111

STS ATT~

BIAS -XLV -ZVV

DUMP

~

BIAS -XLV -ZVV

MS2

~

MEAL

S&M: X.XXX OGS RACK UMBILICAL DEMATE

1.154 OGS RACK TRANSFER (ASSY OPS, ACT&C/O)

S&M: 1.325 OGS RACK UMBILICAL MATE

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

MS3

~

MEAL

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

EVA TOOL AUDIT Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

S&M: 1.280 WHC KABIN DISASSEMBLE/REASSEMBLE Steps 5-8

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

PUBLIC AFFAIRS EVENTISS KU AVAIL: 22:20-22:54

P/TV09 GLACIER (PHOTO/TV, SCENES) Perform SETUP & OPS

MS4

~

MEAL

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP Fill 2 Drink Bags (1 per EVA crew member)

EVA TOOL AUDIT Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

DECENT SAMPLE TRANSFER FROM MELFI TOGLACIER Ref. MSG XXX

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE A

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE INITIATE A

EMU METOX & BATTERY INSTALL A Ref.EVA SYS:1.515 EMU METOX/LIOH/BATT REPLACE

Notes

Page 143: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

08

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters & clean as necessary

3-86

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/11(042)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

~

~

~

D/N

ORB

111

112

113

114

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~

FLIGHT DIRECTOR CONFERENCE

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

~

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS ON - ALL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

~

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 01:39-02:14

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-86

ZAMKA VIRTS HIRE

08

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

ROBO: 1.430 SSRMS CUPOLA RELEASE AND MNVRTO UNDOCK

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters & clean as necessary

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/11(042)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

D/N

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Steps 1-16 Ref. STS-130 Consumables Tracking CC(EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~

FLIGHT DIRECTOR CONFERENCE

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

~

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS ON - ALL

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

~

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRW: 01:39-02:14

SPINAL STAND HEIGHT SUBJECT Ref. MSG XXX SPINAL ELONG CREW DATA CLCT Ref. MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 144: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

08

3-87

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/11(042)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

~

~

~

D/N

ORB

111

112

113

114

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

MS4

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

Notes

3-87

ROBINSON PATRICK BEHNKEN

08STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/11(042)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

D/N

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

MS4

EVA PROCEDURE REVIEW Ref. EVA 3 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASKPREBREATHE Ref. STS-130 Consumables Tracking CC(EVA)

PUBLIC AFFAIRS EVENTISS KU AVAIL: 23:53-00:34

Notes

Page 145: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

08

CREW WAKE AT 07/12:30

3-88

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/11(042)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

~

~

~

D/N

ORB

114

115

116

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-88

ZAMKA VIRTS HIRE

08

CREW WAKE AT 07/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/11(042)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

D/N

ORB

114

115

116

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 146: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

08

CREW WAKE AT 07/12:30

3-89

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/11(042)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

~

~

~

D/N

ORB

114

115

116

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-89

ROBINSON PATRICK BEHNKEN

08

CREW WAKE AT 07/12:30

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/11(042)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

D/N

ORB

114

115

116

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 147: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

08

3-90

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/11(042)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

~

~ ~

~

D/N

ORB

117

118

119

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-90

ZAMKA VIRTS HIRE

08STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/11(042)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

D/N

ORB

117

118

119

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 148: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

08

3-91

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/11(042)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

~

~ ~

~

D/N

ORB

117

118

119

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-91

ROBINSON PATRICK BEHNKEN

08STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/11(042)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

D/N

ORB

117

118

119

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 149: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

09

FD09 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

3-92

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/11(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

D/N

ORB

119

120

121

122

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.220 EMU PURGE

~

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA 3 INHIBIT PAD (EVA, TIMELINES)

~

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS OFF - ALLIMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screenWCS COMPACTOR OPS (DUAL-VANE) (ORB OPS, CUE CARD)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

TRANSFER UPDATE Ref. Transfer List & MSG XXX

Notes

3-92

ZAMKA VIRTS HIRE

09

FD09 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/11(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

D/N

ORB

119

120

121

122

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

~

EVA SYSTEMS: 1.220 EMU PURGE

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA 3 INHIBIT PAD (EVA, TIMELINES)

TV (ILLUMINATOR OPS) (PHOTO/TV, CC) ILLUMINATORS OFF - ALLIMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screenWCS COMPACTOR OPS (DUAL-VANE) (ORB OPS, CUE CARD)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

TRANSFER UPDATE Ref. Transfer List & MSG XXX

Notes

Page 150: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

09

3-93

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/11(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

D/N

ORB

119

120

121

122

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA TOOL CHECK Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

~

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

SLEEP

~

EVA SYSTEMS: 1.220 EMU PURGE

~

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

SLEEP

~

EVA SYSTEMS: 1.220 EMU PURGE

~

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-93

ROBINSON PATRICK BEHNKEN

09STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/11(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

D/N

ORB

119

120

121

122

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA TOOL CHECK Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

~

SLEEP

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.216 10.2 PSIA CAMPOUT EVAPREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 151: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

09

EVA 3 INHIBIT PAD (EVA, TIMELINES)

3-94

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/12(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

122

123

124

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: 1.220 EMU PURGE~

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

~

PLT

P/TV07 EVA (PHOTO/TV, SCENES) Perform SETUP

~

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

~

1.128 NODE 3 ITCS SAMPLING ADAPTER INSTALL-MTL (ASSY OPS, ACT&C/O)

MS1

1.162 CUPOLA ATU INSTALL (ASSY OPS, ACT&C/O)

EXERCISE

~

1.158 CUPOLA UTILITY OUTLET PANEL INSTALL (ASSY OPS, ACT&C/O)

1.168 CUPOLA CORNER PANEL INSTALL (ASSY OPS, ACT&C/O)

~

Notes

3-94

ZAMKA VIRTS HIRE

09

EVA 3 INHIBIT PAD (EVA, TIMELINES)

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/12(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

D/N

ORB

122

123

124

STS ATT~

~

BIAS -XLV -ZVV

CDR

~EVA SYSTEMS: 1.220 EMU PURGEEVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

~

P/TV07 EVA (PHOTO/TV, SCENES) Perform OPS

PLT

P/TV07 EVA (PHOTO/TV, SCENES) Perform SETUP

~

EXERCISE

~

MIDDECK TRANSFER Ref. Transfer List

1.128 NODE 3 ITCS SAMPLING ADAPTER INSTALL-MTL (ASSY OPS, ACT&C/O)

MS1

1.162 CUPOLA ATU INSTALL (ASSY OPS, ACT&C/O)

~

EXERCISE

1.158 CUPOLA UTILITY OUTLET PANEL INSTALL (ASSY OPS, ACT&C/O)

~

1.168 CUPOLA CORNER PANEL INSTALL (ASSY OPS, ACT&C/O)

Notes

Page 152: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

09

3-95

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/12(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

122

123

124

~

~

BIAS -XLV -ZVV

STS ATT

MS2

IVA SUPPORT FOR EVA

~

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA TOOL CHECK Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

~

MIDDECK TRANSFER Ref. Transfer List

MS3

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHEEVA SYSTEMS: 1.220 EMU PURGE

~

CUPOLA MLI REMOVAL

~

EVA 3 SETUP

PORT AXIAL CBM COVER INSTALL

MS4

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHEEVA SYSTEMS: 1.220 EMU PURGE

~

OPEN LOOP B QDS

CUPOLA MLI REMOVAL

~

NODE LTA CABLE DISCONNECT

EVA 3 SETUP

Notes

3-95

ROBINSON PATRICK BEHNKEN

09STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/12(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

D/N

ORB

122

123

124

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

IVA SUPPORT FOR EVA

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

~EVA TOOL CHECK Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

MIDDECK TRANSFER Ref. Transfer List

MS3

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

~EVA SYSTEMS: 1.220 EMU PURGE

~

CUPOLA MLI REMOVAL

EVA 3 SETUP

PORT AXIAL CBM COVER INSTALL

MS4

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

~EVA SYSTEMS: 1.220 EMU PURGE

OPEN LOOP B QDS

~

CUPOLA MLI REMOVAL

NODE LTA CABLE DISCONNECT

EVA 3 SETUP

Notes

Page 153: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

09

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

P/TV07 EVA(PHOTO/TV, SCENES)Perform OPS

3-96

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/12(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

D/N

ORB

125

126

127

~

~

BIAS -XLV -ZVV

STS ATT

CDR

~

MEAL

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #7 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #2 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

PWR TRANSFER Transfer PWR to ISS

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE A

EXERCISE

PLT

MEAL

MIDDECK TRANSFER Ref. Transfer List

~

MIDDECK TRANSFER Ref. Transfer List

~

MS1

X.XXX FSS SETUP (ASSY OPS, ACT&C/O)

X.XXX FSS FILL (ASSY OPS, ACT&C/O)

~

MEAL

1.168 CUPOLA CORNER PANEL INSTALL (ASSY OPS, ACT&C/O)

~

Notes

3-96

ZAMKA VIRTS HIRE

09

A Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

P/TV07 EVA(PHOTO/TV, SCENES)Perform OPS

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/12(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

D/N

ORB

125

126

127

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

MEAL

EVA SYSTEMS: PRE REPRESS (CC)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #7 Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #2 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

PWR TRANSFER Transfer PWR to ISS

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE TERMINATE A

EXERCISE

PLT

MEAL

~MIDDECK TRANSFER Ref. Transfer List

~

MIDDECK TRANSFER Ref. Transfer List

MS1

X.XXX FSS SETUP (ASSY OPS, ACT&C/O)

~

X.XXX FSS FILL (ASSY OPS, ACT&C/O)

MEAL

~1.168 CUPOLA CORNER PANEL INSTALL (ASSY OPS, ACT&C/O)

Notes

Page 154: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

09

3-97

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/12(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

D/N

ORB

125

126

127

~

~

BIAS -XLV -ZVV

STS ATT

MS2

IVA SUPPORT FOR EVA

~

EVA SYSTEMS: PRE REPRESS (CC)

MS3

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~

EVA CLEANUP & INGRESS

CUPOLA MLI REMOVAL

~

CUPOLA LL RELEASE

GETAHEAD

MS4

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: PRE REPRESS (CC)

EVA CLEANUP & INGRESS

CUPOLA MLI REMOVAL

~

NODE 3 OI WIF INSTALL

NODE 3 OIH INSTALL

GETAHEAD

Notes

3-97

ROBINSON PATRICK BEHNKEN

09STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/12(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

D/N

ORB

125

126

127

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

IVA SUPPORT FOR EVA

EVA SYSTEMS: PRE REPRESS (CC)

MS3

EVA SYSTEMS: PRE REPRESS (CC)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA CLEANUP & INGRESS

~

CUPOLA MLI REMOVAL

CUPOLA LL RELEASE

GETAHEAD

MS4

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)EVA SYSTEMS: PRE REPRESS (CC)

EVA CLEANUP & INGRESS

~

CUPOLA MLI REMOVAL

NODE 3 OI WIF INSTALL

NODE 3 OIH INSTALL

GETAHEAD

Notes

Page 155: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

09

CREW WAKE AT 08/12:00

A Omit steps 1,2,3 Use A/G2 for audio Inform MCC of which PGSC will be used

3-98

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/12(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

~

~ ~

~

D/N

ORB

127

128

129

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

FLIGHT DIRECTOR CONFERENCENETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Medical Conference KU TDRZ (02:08-02:23) A Gimbal Flip: 02:06

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

JOINT OPS: 3.123 O2 TRANSFER SETUP (POSTPREBREATHE USING SHUTTLE O2) Steps 2-5.8,Ground will perform steps 2.5 and 5.6

JOINT OPS:3.116 HIGH PRESS TANK O2 XFER Steps 2 & 3

MIDDECK TRANSFER Ref. Transfer List

~

MS1

X.XXX NODE 3 CLOSEOUT (ASSY OPS, ACT&C/O)

X.XXX FSS FILL (ASSY OPS, ACT&C/O)

~

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-98

ZAMKA VIRTS HIRE

09

CREW WAKE AT 08/12:00

A Omit steps 1,2,3 Use A/G2 for audio Inform MCC of which PGSC will be used

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/12(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

D/N

ORB

127

128

129

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

FLIGHT DIRECTOR CONFERENCENETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Medical Conference KU TDRZ (02:08-02:23) A Gimbal Flip: 02:06

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

JOINT OPS: 3.123 O2 TRANSFER SETUP (POSTPREBREATHE USING SHUTTLE O2) Steps 2-5.8,Ground will perform steps 2.5 and 5.6

JOINT OPS:3.116 HIGH PRESS TANK O2 XFER Steps 2 & 3

~MIDDECK TRANSFER Ref. Transfer List

MS1

X.XXX NODE 3 CLOSEOUT (ASSY OPS, ACT&C/O)

~X.XXX FSS FILL (ASSY OPS, ACT&C/O)

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 156: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

09

CREW WAKE AT 08/12:003-99

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/12(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

~

~ ~

~

D/N

ORB

127

128

129

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)~

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

Notes

3-99

ROBINSON PATRICK BEHNKEN

09

CREW WAKE AT 08/12:00

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/12(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

D/N

ORB

127

128

129

STS ATT~

~

BIAS -XLV -ZVV

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA With H2O Recharge Ref. STS-130 Consumables Tracking CC(EVA) Ref. STS-130 Battery Recharge Plan (EVA)

Notes

Page 157: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

09

3-100

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/12(043)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

130

131

132

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

Notes

3-100

ZAMKA VIRTS HIRE

09STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/12(043)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

D/N

ORB

130

131

132

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PLT

~

SLEEP

MS1

~

SLEEP

Notes

Page 158: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

09

3-101

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/12(043)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

130

131

132

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

Notes

3-101

ROBINSON PATRICK BEHNKEN

09STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/12(043)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

D/N

ORB

130

131

132

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

MS3

~

SLEEP

MS4

~

SLEEP

Notes

Page 159: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

09

3-102

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/12(043)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

~

~ ~

~

D/N

ORB

132

133

134

135

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

Notes

3-102

ZAMKA VIRTS HIRE

09STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/12(043)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

D/N

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PLT

~

SLEEP

MS1

~

SLEEP

Notes

Page 160: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

09

3-103

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/12(043)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

~

~ ~

~

D/N

ORB

132

133

134

135

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

Notes

3-103

ROBINSON PATRICK BEHNKEN

09STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/12(043)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

D/N

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

MS3

~

SLEEP

MS4

~

SLEEP

Notes

Page 161: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

10

FD10 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 1-5; on MCC go, perform step 6

3-104

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/12(043)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

~

~

~

D/N

ORB

135

136

137

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #8 Ref. MSG XXX

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screenNOMINAL H20 CONFIG (ORB OPS, ECLS) FES Pri A req'dSHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform CHANGEOUT

N2 REPRESS INIT APOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER UPDATE Ref. Transfer List & MSG XXX

MIDDECK TRANSFER Ref. Transfer List

~

Notes

3-104

ZAMKA VIRTS HIRE

10

FD10 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 1-5; on MCC go, perform step 6

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/12(043)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

D/N

ORB

135

136

137

STS ATT~

~

BIAS -XLV -ZVV

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Init Fill #8 Ref. MSG XXX

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screenNOMINAL H20 CONFIG (ORB OPS, ECLS) FES Pri A req'dSHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform CHANGEOUT

N2 REPRESS INIT APOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER UPDATE Ref. Transfer List & MSG XXX

~

MIDDECK TRANSFER Ref. Transfer List

Notes

Page 162: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

10

3-105

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/12(043)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

~

~

~

D/N

ORB

135

136

137

~

~

BIAS -XLV -ZVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MIDDECK TRANSFER Ref. Transfer List

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBAPOST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

~

Notes

3-105

ROBINSON PATRICK BEHNKEN

10STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/12(043)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

D/N

ORB

135

136

137

STS ATT~

~

BIAS -XLV -ZVV

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MIDDECK TRANSFER Ref. Transfer List

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

~

POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

~

POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

Notes

Page 163: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

10

JOINT OPS: 3.116 O2 XFER to HIGHPRESSURE TANK (Term) Step 3

3-106

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/13(044)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

~

~

~

D/N

ORB

138

139

140

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

~

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EXERCISE

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #3 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #4 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

PWR TRANSFER Transfer 2 PWRs to ISS

PLT

MEAL

~

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EXERCISE

~

JOINT OPS: 3.118 O2 TRANSFER TEARDOWN Steps 1-6.5,Ground will perform steps 1.5 and 4.5

JOINT OPS: 3.103 NITROGEN TRANSFER TERM

MS1

MEAL

~

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EXERCISE

MIDDECK TRANSFER Ref. Transfer List

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Perform DEACTIVATION, Steps 2 and 3

Notes

3-106

ZAMKA VIRTS HIRE

10

JOINT OPS: 3.116 O2 XFER to HIGHPRESSURE TANK (Term) Step 3

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/13(044)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

D/N

ORB

138

139

140

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

MEAL

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

~

EXERCISE

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer CWC to ISS

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #3 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #4 Fill SN TBS (Barcode #TBS) Fill dur ~30 min

PWR TRANSFER Transfer 2 PWRs to ISS

PLT

~

MEAL

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

~

EXERCISE

JOINT OPS: 3.118 O2 TRANSFER TEARDOWN Steps 1-6.5,Ground will perform steps 1.5 and 4.5

JOINT OPS: 3.103 NITROGEN TRANSFER TERM

MS1

~

MEAL

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EXERCISE

~MIDDECK TRANSFER Ref. Transfer List

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Perform DEACTIVATION, Steps 2 and 3

Notes

Page 164: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

10

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) on MCC go, perform steps 7-12

3-107

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/13(044)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

~

~

~

D/N

ORB

138

139

140

~

~

BIAS -XLV -ZVV

STS ATT

MS2

MEAL

~

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EXERCISE

N2 REPRESS TERM (On MCC GO) B

MIDDECK TRANSFER Ref. Transfer List

~

MS3

MEAL

~

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EVA STOW (EVA, AIRLOCK CONFIG)

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

~

MS4

MEAL

~

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EVA STOW (EVA, AIRLOCK CONFIG)

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

~

Notes

3-107

ROBINSON PATRICK BEHNKEN

10

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) on MCC go, perform steps 7-12

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/13(044)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

D/N

ORB

138

139

140

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

MEAL

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EXERCISE

N2 REPRESS TERM (On MCC GO) B

~MIDDECK TRANSFER Ref. Transfer List

MS3

~

MEAL

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EVA STOW (EVA, AIRLOCK CONFIG)

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

~POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

MS4

~

MEAL

CREW CONFERENCEISS KU AVAIL: 18:12-18:49

CREW PHOTO

EVA STOW (EVA, AIRLOCK CONFIG)

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

~POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

Notes

Page 165: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

10

A Omit steps 1,2,3 Use A/G2 for audio Inform MCC of which PGSC will be used

3-108

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/13(044)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

~

~ ~

~

D/N

ORB

140

141

142

143

~

BIAS -XLV -ZVV

~

REBOOST

STS ATT

CDR

OFF DUTY

MEAL

~

H/O ATT CONTROL CMG TA to ORB: √MCC for DAPMNVR REBOOSTTGT=2 BV=5 P=175 Y=0 OM=172A12/AUTO/VERN Init TRK

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

FAREWELL

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRw (20:11-20:27) A

PLT

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

~

OFF DUTY

MEAL

~

FAREWELL

OBSS MNVR TO UNDOCK (PDRS, OBSS NOMINAL)P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Perform SETUP

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRZ (20:14-20:44) A

OFF DUTY

MS1

OFF DUTY

MEAL

~

FAREWELL

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NETMEETING VIDEO CONFERENCING(ORB OPS,PGSC) Private Family Conference KU TDRZ (20:14-20:44) A

OFF DUTY

Notes

3-108

ZAMKA VIRTS HIRE

10

A Omit steps 1,2,3 Use A/G2 for audio Inform MCC of which PGSC will be used

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/13(044)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

D/N

ORB

140

141

142

143

STS ATT~

BIAS -XLV -ZVV

~

REBOOST

CDR

OFF DUTY

~

MEAL

H/O ATT CONTROL CMG TA to ORB: √MCC for DAPMNVR REBOOSTTGT=2 BV=5 P=175 Y=0 OM=172A12/AUTO/VERN Init TRK

~

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

FAREWELL

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRw (20:11-20:27) A

PLT

~

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

OFF DUTY

~

MEAL

FAREWELL

OBSS MNVR TO UNDOCK (PDRS, OBSS NOMINAL)P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Perform SETUP

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRZ (20:14-20:44) A

OFF DUTY

MS1

OFF DUTY

~

MEAL

FAREWELL

TRANSFER TAGUPCoordinate with transfer counterpart

TRANSFER BRIEFCall down status to MCC

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NETMEETING VIDEO CONFERENCING(ORB OPS,PGSC) Private Family Conference KU TDRZ (20:14-20:44) A

OFF DUTY

Notes

Page 166: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

10

A Omit steps 1,2,3 Use A/G2 for audio Inform MCC of which PGSC will be used

3-109

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/13(044)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

~

~ ~

~

D/N

ORB

140

141

142

143

~

BIAS -XLV -ZVV

~

REBOOST

STS ATT

MS2

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

~

OFF DUTY

MEAL

~

FAREWELL

OBSS MNVR TO UNDOCK (PDRS, OBSS NOMINAL)

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRW (21:25-22:19) A

OFF DUTY

MS3

OFF DUTY

MEAL

~

FAREWELL

EXERCISE

~

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRW (21:25-22:19) A

OFF DUTY

MS4

OFF DUTY

MEAL

~

FAREWELLFORMALDEHYDE MONITOR KIT (ORB OPS,CREW SYS) Perform Steps 1-6

NLP-CELLS-1 ACTIVATION (ASSY OPS, P/L)Activate GAPs K-PNLP-CELLS-1 ACTIVATION (ASSY OPS, P/L) Activate GAPs 9-16

NETMEETING VIDEO CONFERENCING(ORB OPS,PGSC) Private Family Conference KU TDRZ (22:47-23:08) A

Notes

3-109

ROBINSON PATRICK BEHNKEN

10

A Omit steps 1,2,3 Use A/G2 for audio Inform MCC of which PGSC will be used

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/13(044)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

D/N

ORB

140

141

142

143

STS ATT~

BIAS -XLV -ZVV

~

REBOOST

MS2

~

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

OFF DUTY

~

MEAL

FAREWELL

OBSS MNVR TO UNDOCK (PDRS, OBSS NOMINAL)

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRW (21:25-22:19) A

OFF DUTY

MS3

OFF DUTY

~

MEAL

FAREWELL

~

EXERCISE

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Family Conference KU TDRW (21:25-22:19) A

OFF DUTY

MS4

OFF DUTY

~

MEAL

FAREWELLFORMALDEHYDE MONITOR KIT (ORB OPS,CREW SYS) Perform Steps 1-6

NLP-CELLS-1 ACTIVATION (ASSY OPS, P/L)Activate GAPs K-PNLP-CELLS-1 ACTIVATION (ASSY OPS, P/L) Activate GAPs 9-16

NETMEETING VIDEO CONFERENCING(ORB OPS,PGSC) Private Family Conference KU TDRZ (22:47-23:08) A

Notes

Page 167: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

10

CREW WAKE AT 09/11:30

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

JOINT OPS: 4.104 ODS VEST/PMA DPRS AND HATCH LEAK CHECK

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

3-110

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/13(044)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

143

144

145

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) √ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~

DAP A to A12MNVR (TRK) TEATGT=2 BV=5 P=164 Y=0 OM=167A12/AUTO/VERN Init TRK

When ISS Go for ATT CNTRL, DAP:FREE

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOMINAL H20 CONFIG(ORB OPS,ECLS) FES Pri A

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-110

ZAMKA VIRTS HIRE

10

CREW WAKE AT 09/11:30

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

JOINT OPS: 4.104 ODS VEST/PMA DPRS AND HATCH LEAK CHECK

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/13(044)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

D/N

ORB

143

144

145

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) √ HUM SEP FOR H2O ACCUMULATION Perform Air Quality Report

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~

DAP A to A12MNVR (TRK) TEATGT=2 BV=5 P=164 Y=0 OM=167A12/AUTO/VERN Init TRK

When ISS Go for ATT CNTRL, DAP:FREE

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOMINAL H20 CONFIG(ORB OPS,ECLS) FES Pri A

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 168: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

10

CREW WAKE AT 09/11:30

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

3-111

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/13(044)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

143

144

145

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

JOINT OPS: 4.104 ODS VEST/PMA DPRS AND HATCH LEAK CHECK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)WLES RNDZ TOOLS C/O PREP (ORB OPS,WLE SENSORS)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

~

C/L CAMR INSTALL (PHOTO/TV,C/L CAMR) Perform step 1 only

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-111

ROBINSON PATRICK BEHNKEN

10

CREW WAKE AT 09/11:30

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

JOINT OPS: 4.102 SHUTTLE/ISS DUCT REMOVAL & HATCH CLOSING Ground will perform Steps 2-3

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/13(044)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

D/N

ORB

143

144

145

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~

JOINT OPS: 4.104 ODS VEST/PMA DPRS AND HATCH LEAK CHECK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)WLES RNDZ TOOLS C/O PREP (ORB OPS,WLE SENSORS)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

C/L CAMR INSTALL (PHOTO/TV,C/L CAMR) Perform step 1 only

MS4

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 169: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

10

3-112

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/13(044)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

~

~ ~

~

D/N

ORB

145

146

147

148

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-112

ZAMKA VIRTS HIRE

10STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/13(044)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

D/N

ORB

145

146

147

148

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 170: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

10

3-113

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/13(044)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

~

~ ~

~

D/N

ORB

145

146

147

148

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-113

ROBINSON PATRICK BEHNKEN

10STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/13(044)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

D/N

ORB

145

146

147

148

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 171: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

11

3-114

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/13(044)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

D/N

ORB

148

149

150

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-114

ZAMKA VIRTS HIRE

11STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/13(044)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

D/N

ORB

148

149

150

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 172: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

11

3-115

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/13(044)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

D/N

ORB

148

149

150

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-115

ROBINSON PATRICK BEHNKEN

11STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/13(044)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

D/N

ORB

148

149

150

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 173: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

11

FD11 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

A Triple G2 Step 4: √MCC or pause ~ 3 min(DAP settling) DAP: as req'd

UPLINKβ21 + MaskBox 30

3-116

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/13(044)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

151

152

153

~

BIAS -XLV -ZVV

~

UNDOCK/FLYAROUND/SEP

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

H/O ATT CNTRL CMG TA to ORB:√MCC for DAPMNVR UNDOCK -ZLV -XVVTGT=2 BV=3 P=180 Y=0 OM=0A12/AUTO/VERN Init TRK

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screenPRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 6 ( A ),5POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

SSV OUTRATE - 3POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

TFL 192

Notes

3-116

ZAMKA VIRTS HIRE

11

FD11 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

A Triple G2 Step 4: √MCC or pause ~ 3 min(DAP settling) DAP: as req'd

UPLINKβ21 + MaskBox 30

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/13(044)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

D/N

ORB

151

152

153

STS ATT~

BIAS -XLV -ZVV

~

UNDOCK/FLYAROUND/SEP

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

H/O ATT CNTRL CMG TA to ORB:√MCC for DAPMNVR UNDOCK -ZLV -XVVTGT=2 BV=3 P=180 Y=0 OM=0A12/AUTO/VERN Init TRK

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)L17 Check MCIU filter screenPRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 6 ( A ),5POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

SSV OUTRATE - 3POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

Notes

TFL 192

Page 174: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

11

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

MIDDECK STATUS CHECK (ASSY OPS, P/L)

A Triple G2 Step 4: √MCC or pause ~ 3 min(DAP settling) DAP: as req'd

B SSPTS OPCU DEACT On MCC GO: A15 OPCU 1,2 CONV(two) - OFF R1 MN BUS TIE B - OFF(tb-OFF) C - OFF(tb-OFF)

3-117

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/13(044)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

151

152

153

~

BIAS -XLV -ZVV

~

UNDOCK/FLYAROUND/SEP

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 6 ( A ),5

SSPTS OPCU DEACT BPOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

P/TV03 UNDOCK (PHOTO/TV, SCENES) Perform SETUP

P/TV03 UNDOCK (PHOTO/TV, SCENES) Setup

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

Notes

3-117

ROBINSON PATRICK BEHNKEN

11

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

MIDDECK STATUS CHECK (ASSY OPS, P/L)

A Triple G2 Step 4: √MCC or pause ~ 3 min(DAP settling) DAP: as req'd

B SSPTS OPCU DEACT On MCC GO: A15 OPCU 1,2 CONV(two) - OFF R1 MN BUS TIE B - OFF(tb-OFF) C - OFF(tb-OFF)

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/13(044)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

D/N

ORB

151

152

153

STS ATT~

BIAS -XLV -ZVV

~

UNDOCK/FLYAROUND/SEP

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Step 12 (In step 12, Recover IMU 2), 6 ( A ),5

SSPTS OPCU DEACT BPOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MS3

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

P/TV03 UNDOCK (PHOTO/TV, SCENES) Perform SETUP

~

P/TV03 UNDOCK (PHOTO/TV, SCENES) Setup

MS4

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

Notes

Page 175: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

11

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

UPLINKβ21 + Mask

3-118

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/14(045)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

D/N

ORB

153

154

155

156

~

DUMP

~

STBD SURVEY

STS ATT

CDR

MEAL

MNVR (TRK) BIAS +YSI (STBD SURVEY)TGT=4 BV=5 P=0 Y=30 OM=110A14/AUTO/VERN, Init TRK

EXERCISE

~

MNVR -XLV +YVV (SIMO DUMP)TGT=2 BV=3 OM=270A1/AUTO/VERN Init TRKPRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

RCS REGULATOR RECONFIG (ORB OPS, RCS)

PLT

MEAL

EXERCISE

~

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) KU TDRZ (18:15-19:07) Gimbal Flip: 18:24

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MS1

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

JOINT OPS: 6.106 SSOR DEACTIVATION

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

SSV OUTRATE - 4OIU DEACTIVATIONSSP1 OIU PWR - OFF (tb-bp)Expect S62 BCE BYP PSP1

TFL 188

Notes

3-118

ZAMKA VIRTS HIRE

11

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

UPLINKβ21 + Mask

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/14(045)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

D/N

ORB

153

154

155

156

STS ATT~

DUMP

~

STBD SURVEY

CDR

MEAL

MNVR (TRK) BIAS +YSI (STBD SURVEY)TGT=4 BV=5 P=0 Y=30 OM=110A14/AUTO/VERN, Init TRK

~

EXERCISE

MNVR -XLV +YVV (SIMO DUMP)TGT=2 BV=3 OM=270A1/AUTO/VERN Init TRKPRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

RCS REGULATOR RECONFIG (ORB OPS, RCS)

PLT

MEAL

~

EXERCISE

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12 (In Step 12, IMU 2 STBY)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) KU TDRZ (18:15-19:07) Gimbal Flip: 18:24

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MS1

MEAL

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

JOINT OPS: 6.106 SSOR DEACTIVATION

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

SSV OUTRATE - 4OIU DEACTIVATIONSSP1 OIU PWR - OFF (tb-bp)Expect S62 BCE BYP PSP1

Notes

TFL 188

Page 176: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

11

3-119

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/14(045)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

D/N

ORB

153

154

155

156

~

DUMP

~

STBD SURVEY

STS ATT

MS2

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

CABIN TEMP CONTROLLER RECNFG 2(1) (ORB OPS, ECLS)

HEATER RECONFIG-CONFIG B(ORB OPS, EPS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

OBSS MNVR TO FLAT FIELD (PDRS, OBSS NOMINAL)

MS3

P/TV03 UNDOCK (PHOTO/TV, SCENES) Setup

~

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

P/TV03 UNDOCK (DEACT) (PHOTO/TV, SCENES) Step 2

OBSS MNVR TO FLAT FIELD (PDRS, OBSS NOMINAL)

MS4

MEAL

POST RNDZ PGSC CONFIG Configure PGSCs per usage chart

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

WLES DOCK/UNDK RECOVERY(ORB OPS,WLE SENSORS)

Notes

3-119

ROBINSON PATRICK BEHNKEN

11STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/14(045)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

D/N

ORB

153

154

155

156

STS ATT~

DUMP

~

STBD SURVEY

MS2

MEAL

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

CABIN TEMP CONTROLLER RECNFG 2(1) (ORB OPS, ECLS)

HEATER RECONFIG-CONFIG B(ORB OPS, EPS)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

OBSS MNVR TO FLAT FIELD (PDRS, OBSS NOMINAL)

MS3

~P/TV03 UNDOCK (PHOTO/TV, SCENES) Setup

MEAL

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

P/TV03 UNDOCK (DEACT) (PHOTO/TV, SCENES) Step 2

OBSS MNVR TO FLAT FIELD (PDRS, OBSS NOMINAL)

MS4

MEAL

POST RNDZ PGSC CONFIG Configure PGSCs per usage chart

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

WLES DOCK/UNDK RECOVERY(ORB OPS,WLE SENSORS)

Notes

Page 177: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

11

In step 3 of OBSS LDRI/IDC RCC SURVEY-PORTMNVR (TRK) BIAS -YSI (PORT SURVEY)TGT=4 BV=5 P=0 Y=323 OM=248A14/AUTO/VERN, Init TRK

3-120

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/14(045)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

~

~ ~

D/N

ORB

156

157

158

~

NOSE

PORT SURVEY

~

-ZLV -XVV

STS ATT

CDR

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)TGT=4 BV=5 P=331 Y=0 OM=290A14/AUTO/VERN, Init TRK

EXERCISE~

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN Init TRK

PLT

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

EXERCISE

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

MS1

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

EXERCISE

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS KU TDRE (22:30-23:29)

Notes

3-120

ZAMKA VIRTS HIRE

11

In step 3 of OBSS LDRI/IDC RCC SURVEY-PORTMNVR (TRK) BIAS -YSI (PORT SURVEY)TGT=4 BV=5 P=0 Y=323 OM=248A14/AUTO/VERN, Init TRK

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/14(045)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

D/N

ORB

156

157

158

STS ATT~

NOSE

PORT SURVEY

~

-ZLV -XVV

CDR

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)TGT=4 BV=5 P=331 Y=0 OM=290A14/AUTO/VERN, Init TRK

~EXERCISE

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MNVR (TRK) -ZLV -XVVTGT=2 BV=3 OM=0A/AUTO/VERN Init TRK

PLT

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

EXERCISE

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

MS1

OBSS LDRI RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

EXERCISE

~OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS KU TDRE (22:30-23:29)

Notes

Page 178: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

11

3-121

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/14(045)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

~

~ ~

D/N

ORB

156

157

158

~

NOSE

PORT SURVEY

~

-ZLV -XVV

STS ATT

MS2

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

EXERCISE

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

MS3

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

EXERCISE

MS4

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-121

ROBINSON PATRICK BEHNKEN

11STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/14(045)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

D/N

ORB

156

157

158

STS ATT~

NOSE

PORT SURVEY

~

-ZLV -XVV

MS2

~OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

EXERCISE

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

MS3

~OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

EXERCISE

MS4

EXERCISE

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 179: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

11

CREW WAKE AT 10/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-122

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/14(045)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

~

~

D/N

ORB

159

160

161

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS PWRDN (PDRS, RMS PWRDN)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

PLT

SLEEP

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRE: 00:11-01:06 Gimbal Flip: 00:37

Notes

3-122

ZAMKA VIRTS HIRE

11

CREW WAKE AT 10/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/14(045)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

D/N

ORB

159

160

161

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)RMS PWRDN (PDRS, RMS PWRDN)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

PLT

~

SLEEP

~OBSS BERTH (PDRS, OBSS OPERATIONS)

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CREW CHOICE DOWNLINK (CUE CARD, PLAYBACK) KU TDRE: 00:11-01:06 Gimbal Flip: 00:37

Notes

Page 180: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

11

CREW WAKE AT 10/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit step 4)

3-123

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/14(045)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

~

~

D/N

ORB

159

160

161

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

3-123

ROBINSON PATRICK BEHNKEN

11

CREW WAKE AT 10/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit step 4)

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/14(045)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

D/N

ORB

159

160

161

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

~OBSS BERTH (PDRS, OBSS OPERATIONS)PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 181: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

11

3-124

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/14(045)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

161

162

163

164

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-124

ZAMKA VIRTS HIRE

11STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/14(045)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

D/N

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 182: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

11

3-125

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/14(045)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

161

162

163

164

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-125

ROBINSON PATRICK BEHNKEN

11STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/14(045)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

D/N

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 183: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

12

FD12 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

3-126

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/14(045)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

164

165

166

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-126

ZAMKA VIRTS HIRE

12

FD12 EZ ACTIVITIES: √OCAC FILTER TEPC (STATUS CHECK) (ORB OPS, CREW SYS) HARD REBOOT ALL PGSCs EXCEPT: STS-6(WLES),STS-5(RPOP2),& OCA ROUTER.

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/14(045)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

D/N

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 184: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

12

3-127

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/14(045)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

164

165

166

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-127

ROBINSON PATRICK BEHNKEN

12STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/14(045)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

D/N

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 185: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

12

ZAMKA VIRTS HIRE

3-128

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/14(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

166

167

168

169

~

~

-ZLV -XVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

CABIN CONFIG/STOW

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)~

CABIN CONFIG/STOW

W/B STEAM VENT HTR ACTR2 √BLR CNTLR/HTR(three) -B PWR (three) -ON

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

FCS C/O P/TV SURVEY (PHOTO/TV, REF PROC)Perform SETUP

CABIN CONFIG/STOW

Notes

3-128

12

ZAMKA VIRTS HIRE

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/14(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

D/N

ORB

166

167

168

169

STS ATT~

~

-ZLV -XVV

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

~

CABIN CONFIG/STOW

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

~COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

CABIN CONFIG/STOW

W/B STEAM VENT HTR ACTR2 √BLR CNTLR/HTR(three) -B PWR (three) -ON

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

FCS C/O P/TV SURVEY (PHOTO/TV, REF PROC)Perform SETUP

CABIN CONFIG/STOW

Notes

Page 186: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

12

ROBINSON PATRICK BEHNKEN

A √MCC prior to configuring: RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS,PGSC)Part D then A(Omit step 4)

2-129

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/14(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

166

167

168

169

~

~

-ZLV -XVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

CABIN CONFIG/STOW

CABIN CONFIG/STOW

RECONFIGURE OCA DOWNLINK RATE A

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

CABIN CONFIG/STOW

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

~

CABIN CONFIG/STOW

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

2-129

12

ROBINSON PATRICK BEHNKEN

A √MCC prior to configuring: RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS,PGSC)Part D then A(Omit step 4)

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/14(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

D/N

ORB

166

167

168

169

STS ATT~

~

-ZLV -XVV

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

CABIN CONFIG/STOW

CABIN CONFIG/STOW

RECONFIGURE OCA DOWNLINK RATE A

MS3

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

EXERCISE

CABIN CONFIG/STOW

MS4

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EXERCISE

CABIN CONFIG/STOW

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 187: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

12

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

3-130

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/15(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

~

~ ~

~

D/N

ORB

169

170

171

~

~

-ZLV -XVV

STS ATT

CDR

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (ORB OPS, PGSC)

DEORBIT PREP BRIEFING

MEAL

CABIN CONFIG/STOW

~

PLT

DEORBIT PREP BRIEFING

MEAL

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (ORB OPS, PGSC)

~

MS1

DEORBIT PREP BRIEFING

MEAL

CABIN CONFIG/STOW

FCS C/O P/TV SURVEY (PHOTO/TV, REF PROC)Perform SETUP

HD CC DNLK (PHOTO/TV, CANON G1)

TFL 161

TFL 188

Notes

3-130

ZAMKA VIRTS HIRE

12

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/15(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

D/N

ORB

169

170

171

STS ATT~

~

-ZLV -XVV

CDR

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (ORB OPS, PGSC)

DEORBIT PREP BRIEFING

MEAL

~CABIN CONFIG/STOW

PLT

DEORBIT PREP BRIEFING

MEAL

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (ORB OPS, PGSC)

~

MS1

DEORBIT PREP BRIEFING

MEAL

CABIN CONFIG/STOW

FCS C/O P/TV SURVEY (PHOTO/TV, REF PROC)Perform SETUP

HD CC DNLK (PHOTO/TV, CANON G1)

Notes

TFL 161

TFL 188

Page 188: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

12

3-131

STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/15(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

~

~ ~

~

D/N

ORB

169

170

171

~

~

-ZLV -XVV

STS ATT

MS2

DEORBIT PREP BRIEFING

MEAL

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (ORB OPS, PGSC)

WLES RNDZ TOOLS C/O PREP(ORB OPS,WLE SENSORS)

MS3

DEORBIT PREP BRIEFING

MEAL

CABIN CONFIG/STOW

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

CABIN CONFIG/STOW

MS4

DEORBIT PREP BRIEFING

MEAL

EXERCISE

~

CABIN CONFIG/STOW

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

TFL 161

TFL 188

Notes

3-131

ROBINSON PATRICK BEHNKEN

12STS-130 FD

04:00

05:00

06:00

07:00

GMT

Date02/15(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

D/N

ORB

169

170

171

STS ATT~

~

-ZLV -XVV

MS2

DEORBIT PREP BRIEFING

MEAL

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (ORB OPS, PGSC)

WLES RNDZ TOOLS C/O PREP(ORB OPS,WLE SENSORS)

MS3

DEORBIT PREP BRIEFING

MEAL

CABIN CONFIG/STOW

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

CABIN CONFIG/STOW

MS4

DEORBIT PREP BRIEFING

MEAL

~

EXERCISE

CABIN CONFIG/STOW

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

Notes

TFL 161

TFL 188

Page 189: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

12

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

B R12 √VPU PWR - OFF(LED-off) Minimize use of P/TV equipment Dim cabin lighting to 25%

3-132

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/15(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

~ ~

~

D/N

ORB

172

173

174

~

~

-ZLV -XVV

STS ATT

CDR

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

~

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Step 1

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES reqd

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

CABIN CONFIG/STOW

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

ENTRY COOLING CONFIG B

SSV DEACTIVATION (PHOTO/TV, SSV)

A6L MADS STRAIN GAGE - ON

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

ENTRY VIDEO SETUP (PHOTO/TV, MINI-CAM)

TFL 161

Notes

3-132

ZAMKA VIRTS HIRE

12

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

B R12 √VPU PWR - OFF(LED-off) Minimize use of P/TV equipment Dim cabin lighting to 25%

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/15(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

D/N

ORB

172

173

174

STS ATT~

~

-ZLV -XVV

CDR

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

~

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Step 1

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES reqd

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

LANDING-1 COMM C/O (ORB OPS, COMM/INST)

CABIN CONFIG/STOW

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

ENTRY COOLING CONFIG B

SSV DEACTIVATION (PHOTO/TV, SSV)

A6L MADS STRAIN GAGE - ON

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

ENTRY VIDEO SETUP (PHOTO/TV, MINI-CAM)

Notes

TFL 161

Page 190: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

12

RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit step 4)

3-133

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/15(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

~ ~

~

D/N

ORB

172

173

174

~

~

-ZLV -XVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

KU-BD ANT STOW(ORB OPS, COMM/INST) Deactivate CCTV

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

CABIN CONFIG/STOW

DEACTIVATION AND TEARDOWN (ORB OPS, WLE SENSORS)

PGSC NETWORK (B.TEARDOWN)COLOR PRINTER STOW (ORB OPS, PGSC) Stow color printer and all STS PGSCs

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

NLP TERMINATION (ASSY OPS, P/L)Terminate GAPs K-PNLP TERMINATION (ASSY OPS, P/L) Terminate GAPs 9-16

Notes

3-133

ROBINSON PATRICK BEHNKEN

12

RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit step 4)

STS-130 FD

08:00

09:00

10:00

11:00

GMT

Date02/15(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

D/N

ORB

172

173

174

STS ATT~

~

-ZLV -XVV

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

KU-BD ANT STOW(ORB OPS, COMM/INST) Deactivate CCTV

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

CABIN CONFIG/STOW

DEACTIVATION AND TEARDOWN (ORB OPS, WLE SENSORS)

PGSC NETWORK (B.TEARDOWN)COLOR PRINTER STOW (ORB OPS, PGSC) Stow color printer and all STS PGSCs

MS3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

MS4

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

CABIN CONFIG/STOW

PUBLIC AFFAIRS EVENT KU TDRE: 19:38-20:35 Gimbal Flip: 20:06

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

NLP TERMINATION (ASSY OPS, P/L)Terminate GAPs K-PNLP TERMINATION (ASSY OPS, P/L) Terminate GAPs 9-16

Notes

Page 191: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

12

CREW WAKE AT 11/10:30

3-134

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/15(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

~ ~

~

D/N

ORB

174

175

176

177

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT DIRECTOR CONFERENCE

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-134

ZAMKA VIRTS HIRE

12

CREW WAKE AT 11/10:30

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/15(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

D/N

ORB

174

175

176

177

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 192: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

12

CREW WAKE AT 11/10:30

3-135

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/15(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

~ ~

~

D/N

ORB

174

175

176

177

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-135

ROBINSON PATRICK BEHNKEN

12

CREW WAKE AT 11/10:30

STS-130 FD

12:00

13:00

14:00

15:00

GMT

Date02/15(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

D/N

ORB

174

175

176

177

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 193: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

12

3-136

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/15(046)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

~ ~

~

D/N

ORB

177

178

179

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

Notes

3-136

ZAMKA VIRTS HIRE

12STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/15(046)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

D/N

ORB

177

178

179

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

MS1

~

~

SLEEP

Notes

Page 194: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

12

3-137

STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/15(046)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

~ ~

~

D/N

ORB

177

178

179

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

Notes

3-137

ROBINSON PATRICK BEHNKEN

12STS-130 FD

16:00

17:00

18:00

19:00

GMT

Date02/15(046)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

D/N

ORB

177

178

179

STS ATT~

~

-ZLV -XVV

MS2

~

~

SLEEP

MS3

~

~

SLEEP

MS4

~

~

SLEEP

Notes

Page 195: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

13

FD13 EZ ACTIVITIES BEFORE LEAVING FLIGHT PLAN: √OCAC FILTER Stow CSA-CP TEPC (STATUS CHECK) (ORB OPS, CREW SYS) FLUID LOADING PREP Fill Drink Containers per MSG XXX.

3-138

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/15(046)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

~

~

D/N

ORB

180

181

182

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-138

ZAMKA VIRTS HIRE

13

FD13 EZ ACTIVITIES BEFORE LEAVING FLIGHT PLAN: √OCAC FILTER Stow CSA-CP TEPC (STATUS CHECK) (ORB OPS, CREW SYS) FLUID LOADING PREP Fill Drink Containers per MSG XXX.

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/15(046)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

D/N

ORB

180

181

182

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIVATE MEDICAL CONFERENCEL9 PAYLOAD STATION A/G (two) - OFF Perform via A/G2

SLEEP LOGBOOK (ORB OPS, SDBI)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 196: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

13

3-139

STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/15(046)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

~

~

D/N

ORB

180

181

182

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-139

ROBINSON PATRICK BEHNKEN

13STS-130 FD

20:00

21:00

22:00

23:00

GMT

Date02/15(046)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

D/N

ORB

180

181

182

STS ATT~

~

-ZLV -XVV

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 197: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ZAMKA VIRTS HIRE

13

GO TO DEORBIT PREP @ 11/14:00

3-140

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/15(046)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

~

~ ~

D/N

ORB

182

183

184

185

~

-ZLV -XVV

IMU

~

-XSI

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIORITY PWRUP GRP B(ORB PKT,PRI PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,7,6 (Dual G2),5, & 2

MNVR IMU STAR ALIGN ATT A (pg 3-139) A/AUTO/VERN Init MNVR (13:10)IMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-139) B/AUTO/PRI Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) -XSI ATT TG=4 BV=3 P=184 Y=0 OM=90 A/AUTO/VERN (13:44) Init TRK

DOFFING ACTIWATCH (ORB OPS, SDBI)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRIORITY PWRUP GRP B(ORB PKT,PRI PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,7,6 (Dual G2),5, & 2

A6L MADS STRAIN GAGE - PCM ENAAIR SAMPLE Record MET & location on bottle

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DOFFING ACTIWATCH (ORB OPS, SDBI)

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

Notes

3-140

ZAMKA VIRTS HIRE

13

GO TO DEORBIT PREP @ 11/14:00

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/15(046)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

D/N

ORB

182

183

184

185

STS ATT~

-ZLV -XVV

IMU

~

-XSI

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIORITY PWRUP GRP B(ORB PKT,PRI PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,7,6 (Dual G2),5, & 2

MNVR IMU STAR ALIGN ATT A (pg 3-139) A/AUTO/VERN Init MNVR (13:10)IMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-139) B/AUTO/PRI Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) -XSI ATT TG=4 BV=3 P=184 Y=0 OM=90 A/AUTO/VERN (13:44) Init TRK

DOFFING ACTIWATCH (ORB OPS, SDBI)

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRIORITY PWRUP GRP B(ORB PKT,PRI PWRDN) Step 12 (In step 12, Recover IMU 2), 10,9,7,6 (Dual G2),5, & 2

A6L MADS STRAIN GAGE - PCM ENAAIR SAMPLE Record MET & location on bottle

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DOFFING ACTIWATCH (ORB OPS, SDBI)

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Notes

Page 198: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

ROBINSON PATRICK BEHNKEN

13

GO TO DEORBIT PREP @ 11/14:00

3-141

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/15(046)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

~

~ ~

D/N

ORB

182

183

184

185

~

-ZLV -XVV

IMU

~

-XSI

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PGSC NETWORK (B.TEARDOWN) (ORB OPS, PGSC) Stow remaining PGSCs

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OCAC STOWAGE (ORB OPS, CREW SYS)

GIRA STOWAGE (ORB OPS, ECLS)

DOFFING ACTIWATCH (ORB OPS, SDBI)

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TISSUE EQUIVALENT PROPORTIONAL COUNTER (TEPC) (ORB OPS, CREW SYSTEMS) Powerdown

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

3-141

ROBINSON PATRICK BEHNKEN

13

GO TO DEORBIT PREP @ 11/14:00

STS-130 FD

00:00

01:00

02:00

03:00

GMT

Date02/15(046)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

D/N

ORB

182

183

184

185

STS ATT~

-ZLV -XVV

IMU

~

-XSI

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PGSC NETWORK (B.TEARDOWN) (ORB OPS, PGSC) Stow remaining PGSCs

MS3

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OCAC STOWAGE (ORB OPS, CREW SYS)

GIRA STOWAGE (ORB OPS, ECLS)

DOFFING ACTIWATCH (ORB OPS, SDBI)

MS4

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TISSUE EQUIVALENT PROPORTIONAL COUNTER (TEPC) (ORB OPS, CREW SYSTEMS) Powerdown

MDDK STATUS CK(ASSY OPS,P/L)GLACIER & CGBA

Notes

Page 199: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

FLT PLN/130/BAS

A IMU STAR ALIGN PAD

ID: -Y: 57 ACAMAR MET (011/13:24 TO 11/14:13)

-Z: 57 ALPHA ARAE MET (011/13:13 TO 11/14:07)

ANG DIFF: 83.7

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 57 -Y: 84 R 237 R 34 309 P 149 P 317 196 Y 33 Y 9 333

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

ΔX ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔY ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔZ ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

EXECUTION TIME: ____/___:___:___MET

B IMU VERIFICATION STAR ALIGN PAD

ID: -Y: 54 DIPHDA MET (011/13:15 TO 011/14:04)

-Z: 68 REGOR MET (011/13:36 TO 011/14:25)

ANG DIFF: 90.5

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 54 -Y: 68

R 93 R 13 205 P 293 P 282 265 Y 57 Y 43 62

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

ΔX ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔY ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔZ ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

If any ΔX, ΔY, OR ΔZ > 0.1 Check MCC

EXECUTION TIME: ____/___:___:___MET

3-1423-142

A IMU STAR ALIGN PAD

ID: -Y: 57 ACAMAR MET (011/13:24 TO 11/14:13)

-Z: 57 ALPHA ARAE MET (011/13:13 TO 11/14:07)

ANG DIFF: 83.7

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 57 -Y: 84 R 237 R 34 309 P 149 P 317 196 Y 33 Y 9 333

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

ΔX ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔY ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔZ ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

EXECUTION TIME: ____/___:___:___MET

B IMU VERIFICATION STAR ALIGN PAD

ID: -Y: 54 DIPHDA MET (011/13:15 TO 011/14:04)

-Z: 68 REGOR MET (011/13:36 TO 011/14:25)

ANG DIFF: 90.5

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 54 -Y: 68

R 93 R 13 205 P 293 P 282 265 Y 57 Y 43 62

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

ΔX ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔY ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

ΔZ ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

If any ΔX, ΔY, OR ΔZ > 0.1 Check MCC

EXECUTION TIME: ____/___:___:___MET

Page 200: Flight Plan - NASA...NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-130, STS-130 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints

Flight Cover (trim bottom to expose tabs)

JSC-48000-130 BASIC

FLIGHT PLAN STS

130