356804.103 Quick Start Guide Installation, Operation, Commissioning and Maintenance DC Power Supply System Integrated, Cabinetized and Outdoor Applications Miscellaneous Communication o CAN Bus Addressing and Termination ( 9) o Installing PowerSuite – PC software ( 9) AC Mains o External AC Fuses, Recommended Rating (10 ) o Identifying Power Shelves, 4AC or 2AC ( 11) o I. Mains Reconfiguration, Integrated Systems, 1U DC Distribution ( 11) o II. Mains Reconfiguration, AC Terminal Block (12) o III. Mains Reconfiguration, AC Terminal Block with OVP (13) o IV. Mains Reconfiguration, AC Connection Box (14-15) o About AC, DC Earthing Systems ( 15) o Mains Phases vs. Rectifier ID – Phase Balancing & Monitoring (16-17) Battery Monitoring o Battery Symmetry Connections ~ 48V Systems (18 ) o Battery Symmetry Connections ~ 24V Systems ( 19) o Terminals & Pin-out Location, Battery Interface Card ( 20) Alarms & Monitoring o Standard Alarm Relays & Digital Inputs – Connections ( 21) o Terminals & Pin-out Location, Alarm Interface Card ( 21) Internal Connections o Terminals & Pin-out Location, System Interface Card (22 ) o LVD Latching Contactors – Connections (22 ) Flatpack2 Integrated System, 2U o Location of Major Components ( 23) Introduction o The Smartpack based Product Range (2 ) o Brief System Description, Flatpack2 (2 ) Installation o Installing Smartpack and Rectifier Modules ( 3) o Installation steps; mechanical, electrical (4-5) Commissioning o Pre-start check (6 ) o Commissioning steps, Startup (6-7) Operation o Front keys and display ( 8) o Software Menus ( 8) Check Lists pullout forms o Installation Check List o Circuit Distribution List o Commissioning Procedure o Maintenance Procedure Flatpack2, PS System

Transcript of Flatpack2, PS System · 2020. 3. 21. · 2 Quick Start Guide Flatpack2 PS System 356804.103,...

  • 356804.103

    Quick Start Guide Installation, Operation, Commissioning and Maintenance

    DC Power Supply System Integrated, Cabinetized and Outdoor Applications

    Miscellaneous Communication o CAN Bus Addressing and Termination ( 9) o Installing PowerSuite – PC software ( 9) AC Mains o External AC Fuses, Recommended Rating (10 ) o Identifying Power Shelves, 4AC or 2AC ( 11) o I. Mains Reconfiguration, Integrated Systems, 1U DC Distribution ( 11) o II. Mains Reconfiguration, AC Terminal Block (12) o III. Mains Reconfiguration, AC Terminal Block with OVP (13) o IV. Mains Reconfiguration, AC Connection Box (14-15) o About AC, DC Earthing Systems ( 15) o Mains Phases vs. Rectifier ID – Phase Balancing & Monitoring (16-17) Battery Monitoring o Battery Symmetry Connections ~ 48V Systems (18 ) o Battery Symmetry Connections ~ 24V Systems ( 19) o Terminals & Pin-out Location, Battery Interface Card ( 20) Alarms & Monitoring o Standard Alarm Relays & Digital Inputs – Connections ( 21) o Terminals & Pin-out Location, Alarm Interface Card ( 21) Internal Connections o Terminals & Pin-out Location, System Interface Card (22 ) o LVD Latching Contactors – Connections (22 ) Flatpack2 Integrated System, 2U o Location of Major Components ( 23)

    Introduction o The Smartpack based Product Range (2 ) o Brief System Description, Flatpack2 (2 )

    Installation

    o Installing Smartpack and Rectifier Modules ( 3) o Installation steps; mechanical, electrical (4-5)

    Commissioning o Pre-start check (6 ) o Commissioning steps, Startup (6-7)

    Operation o Front keys and display ( 8) o Software Menus ( 8)

    Check Lists pullout forms o Installation Check List o Circuit Distribution List o Commissioning Procedure o Maintenance Procedure

    Flatpack2, PS System

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 2

    The Smartpack based Product Range Eltek Valere's Smartpack based product range utilizes the Smartpack controller, and Flatpack2 rectifiers, Powerpack rectifiers and Minipack rectifiers as building blocks for implementing effective DC power systems, suitable for a wide range of applications and power ratings.

    Cabinetized systems are suitable for indoor or outdoor applications. In addition to the power system and the distribution unit, the cabinet may also contain battery banks, additional distribution and other dedicated equipment. Integrated systems consist of the power system, which includes rectifiers and controller(s), and the distribution unit (1U or 4U high). Integrated systems are sold primarily for mounting in existing cabinets.

    Powerpack systems are suitable for large Central Office power plants, and use three-phase rectifier modules. Minipack systems are suitable as small, stand-alone battery chargers and DC power supplies.

    Brief System Description — Flatpack2 The Flatpack2 PS system is a compact, powerful and cost-effective DC power supply system, specifically developed for the telecom industry.

    Example of a typical Flatpack2 PS system for DC power supply of telecom equipment. The system is fed from an external AC mains supply, and consists of rectifiers in power shelves, a control unit and DC distribution unit. Battery banks, LVD contactors, etc. are typically also a part of the system.

    Introduction

    Flatpack2 Cabinetized

    Battery string #1

    AC mains supply selector

    SymmetryAlarm &

    Temp. Sensor

    LVLD

    LVBD

    Fuse Alarm

    AC Fuses, external

    (230VAC or 400VAC

    Telecom equipment

    AC Supply (Single- or

    three-phase)

    Alarm Outputs NC-C-NO Digital Inputs

    BatteryFuses

    Load Fuses & MCBs

    Smartpackctrl. unit

    Flatpack2rectifiers

    PowerSuiteApplication

    CAN Bus

    USB cable

    DC distribution

    DC Supply (24V, 48V or 60V*) *Available from 2007

    Remote Monitoring

    Flatpack2 System, Integrated4U and 1U Distributions

    Flatpack2 System, CabinetizedIndoor and Outdoor Cabinets

    Powerpack System Minipack System, Integrated

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 3

    Installing Smartpack and Rectifier Modules

    Installation

    Handle in unlocked position

    Flatpack2 rectifier

    Smartpack controller

    Handle in locked position

    Hole to release the handle’s spring mechanism

    Removing Blind Panels 1. Release the panel’s upper left and right corners by

    inserting a small screwdriver into the panel’s upper left gap and carefully press down and out to release the locking tabs. Repeat on the upper right gap.

    2. Remove the blind panel by using you hand to pull the panel loose

    Mounting Blind Panels 1. Insert the panel’s upper edge by

    pressing gently so that its upper locking tabs engage 2. Lock the panel’s lower edge by

    pressing with your hand so that the blind panel’s lower tabs lock into position.

    Screwdriver to release the locking tabs

    Blind panel’s upper locking tabs

    Electricshock

    Mounting or Removing Smartpack and Flatpack2 Modules Note that cables are plugged to the Smartpack’s rear panel. When mounting the controller, you must plug the cables before step 2. When removing it, unplug the cables during step 2.

    1. Unlock the handles by

    inserting a screwdriver into the holes to release the spring mechanism

    2. Insert or remove the module by sliding it fully into the power shelf, so that the module makes proper contact (for Smartpack, plug cables first) or using both handles to pull the module loose. Support from underneath before the unit is completely free. Unplug the cables, when removing the Smartpack module

    3. Lock the handles by pushing the handles up into their housings (locked position). Then, the module will be securely locked in the shelf, or ready for transport

    4. Mount blind panels in unused module locations

    Device hazard

    CAUTION: - The modules may be warm, but do not hand-carry them by their handles - Open the handles before inserting them into the power shelves (hot-pluggable)

    The rectifier incorporates a Mains fuse in each line. Double Pole / Neutral Fusing

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 4

    Installation Steps

    Installation

    Check off in the Installation Check List, that you find in the pullout section ofthis folder. Also, refer to the system’s specific drawings.

    Preparing the Installation Site

    Begin preparing the following:

    1 Organize the installation site o Min. clearances for cabinet access: 60 cm in front, 20 cm on top o Levelled surface able to support 600 kg (cabinetized systems) o Explosive atmospheres are to be avoided. Ensure suitable

    ventilation o 60V systems are only to be installed in Restricted Access

    Locations (RAL) 2 Prepare the installation tools

    o Use insulated tools suitable for telecom installations 3 Prepare AC Supply: AC input cable(s) and fuses

    o Correct type AC supply is available o External AC fuses have correct rating o AC input cable(s) are sized correctly

    EMCregard

    200 mm

    600 mm

    For external AC fuses and AC input cable ratings, refer to your site’s ACsupply specification. Read also our external AC fuse recommendationsin section “Miscellaneous”. In general, a site with better AC supplyquality (stable nominal voltage) may use smaller breakers.

    Mechanical Installation Power is OFF!

    Carry out the following: 4 Remove packaging and check equipment

    o Check you have received all the parts, correct cabinet, documentation, batteries (if applicable), etc.

    o Inspect the equipment for physical damage (report any damages) o Leave rectifier modules in their packaging or in the selves, if

    factory installed. To be installed under commissioning 5 Remove top cover and dummy front panels

    o Cable entry from the top. Connection terminals are located behind the upper dummy panels

    o Battery shelves (if any) are placed behind the lower panels 6 Position and fasten the cabinet or subassembly

    o Cabinets are floor-mounted on levelled surface. Adjust the legs if necessary. If the cabinet must be fastened, unscrew the legs and use suitable bolts to fasten it to the floor

    o Subassemblies are fastened in existing 19” or in ETSI cabinets, using brackets. Mount the support & heat deflecting plate under the lower power shelf

    7 Mount the batteries on the shelves o Start (if applicable) placing the batteries on the lower shelf first,

    and continue upwards o Do not terminate the battery cables yet!

    Electricshock

    Devicehazard

    Flatpack2 PSS, batteries, Doc. Chart, Spec. Drawings, CD-ROM

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 5

    Installation

    —(-48V) Outer

    Terminal+

    0V OuterTerminal

    Link 2(DC Earth)

    Common DC Rail EG BatteryFuse

    Intercell Links

    BatteryCable S

    ymm

    etry

    1

    2-1

    Chassis

    Card Art.200576

    + -

    15 pins D-Sub (male)

    Tem

    p. s

    enso

    r Tem

    p. S

    enso

    r cab

    le 1

    Block1

    - ++ - + - + -

    Block4 Block3

    General Torque Recommended Ratings, FP2 Systems

    Application,

    Type & Size Torque (Nm)

    Circuit Breakers SIEMENS 18 mm,

    5SX2, 5SX5 3.5 SIEMENS 27 mm,

    5SX6, 5SX7, 5SP4 5.0

    MG, C60 25A 3.5 CBI 13 mm, QY, QF, QA 3.0

    Hex Nuts & Screws (Knife Fuses, general)

    M8.0 10.0 M10.0 16.0 M12.0 25.0

    AC Terminal Blocks WDU 1.5 0.5 WDU 2.5 0.5 WDU 4 0.6 WDU 10 2.0 WDU 16 3.0 WDU 35 4.0 WDU 70 10.0

    DC Rail Terminals AKG 16 3.0 AKG 35 3.5

    Note: General tolerance: ±10%. NEC/CEC Requirements

    Electrical Installation Power is OFF!

    Carry out the following: (Refer to the system’s specific drawings)

    8 Make the system completely voltage free o Switch OFF or remove all load fuses (MCB1, MCBx), battery

    fuses (Fb1, Fbx) and the AC supply fuses, in external fuse boards

    9 AC Connections o Check AC configuration: the AC terminals are correct configured

    to the external AC supply, otherwise reconfigure the terminals o Connect the AC Earth wire (PE) to the terminals AC Earth (PE) o Connect the AC input cable(s) to the terminals. Cable and

    terminal block labeling are to correspond 10 DC Connections ⎯ Load Circuits

    o Terminate DC Earth (TE), and check that the common DC Output Rail is connected to “Telecom Earth” (TE) at only one place (at the cabinet or at a central distribution point). Se chapter about AC, DC earthing systems

    o For each DC load, connect one of the cables to the common DC output rail, and the other directly to the MCB or load fuse

    11 DC Connections ⎯ Alarm & Signal Circuits o Refer to your system’s connection drawings and configuration, or

    to the “Miscellaneous, Alarms & Monitoring” section (Factory Settings)

    o Terminate Alarm Circuit cables to the relay output terminals o Terminate Signal Circuit cables to the digital input/output

    terminals 12 DC Connections ⎯ Battery Cables

    Careful! Use correct polarity. For 48V systems using the battery symmetry mid-point measurement, refer to the figure in this page. For other measurement methods and for 24V systems, refer to the Battery Symmetry Connections chapters in this guide’s Miscellaneous section. For each battery shelf:

    (In cabinetized systems, steps b, d and f are usually performed in factory)

    a Mount 3 intercell links to connect in series 4 battery blocks b-c Connect battery cables to fuses and common DC rail, and to

    the shelf’s outer terminals; black (+); blue (-) d-e Connect battery symmetry cables, if applicable, to the input

    terminals, and to the center terminal of the battery string (+) and to the -48V outer terminal. Deviation from factory settings requires Symmetry reconfiguration via PowerSuite

    f-g Connect the temperature sensor cable, if applicable, to the D-Sub plug or input terminal, and fix the temperature sensor (at the end of the cable) to a suitable place in the middle of the installed battery bank

    Electricshock

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 6

    The commissioning of Flatpack2 PS System consists of following stages:

    I. Perform a pre-start check before the PS system is switched ON II. Switch ON the system with disconnected load; adjust output voltage

    III. Adjust the nominal output voltage with connected batteries and load

    Pre-Start Check Power is OFF! Check off in the Commissioning Procedure, that you find in the pullout section of this folder.

    If you have just finished the system installation successfully and filled in the Installation Check List, jump over the Pre-Start Check and continue with stage II.

    Before you switch ON the Flatpack2 PS system, verify the following:

    1. System installation is completed o Ensure a correctly performed system installation, with correct polarity on all

    connections, has been carried out (Installation Check List filled in) o All cabling and copper bars are securely terminated and supported o All components, terminal blocks, MCBs/ fuses, etc. are clearly labeled

    2. Battery and load fuses are disconnected o Verify that all battery and load MCBs/ fuses are switched OFF or removed

    3. AC input cable(s) and AC Earth wire (PE) are terminated o Make sure that the AC input cable(s) are connected to correctly configured AC terminals o Verify that the AC input cable(s) and external AC fuses are sized and rated as specified o Check that AC Earth (PE) is terminated, and electrically connected to chassis (Link 1)

    4. Site specific parameters and settings are known o Read the system specific drawings and documentation

    5. AC supply and all MCBs, fuses are switched OFF o Make sure that all external AC fuses and internal MCBs/ fuses are switched OFF

    Commissioning Steps, Startup Check off in the Commissioning Procedure, that you find in the pullout section of this folder.

    After the ”Pre-start Check” is performed, you can begin with stage II. During the stage, you will switch ON the Flatpack2 PSS — while the batteries and load are disconnected ⎯ then measure the output voltage, and adjust it if required. Carry out the following:

    Startup and No-Load Adjustments Power is ON!

    1. Disconnect all rectifier modules, without removing them (keep original location) o Read how to install modules, on page 3 in this guide. Also, read about the correct

    rectifier position on page 17, and then, o If Flatpack2 rectifier modules are installed, unlock the handles and pull the

    modules partially out (fan housing visible), but do NOT physically remove them from the power shelves

    o If Flatpack2 rectifier modules are not yet mounted, release their handles and insert them partially into the correct position in the shelves

    2. Switch ON the system o Switch ON the AC input supply (external AC fuses) to the PS cabinet

    3. Measure and verify that the AC input voltage is correct o Measure the AC input voltage at the cabinet’s mains connection box o Verify the AC voltage is within range

    Commissioning

    Device hazard

    Device hazard

    I

    II

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 7

    4. Mount all Flatpack2 rectifier modules in the power shelves (keep original location)

    o Push all rectifiers firmly inwards ⎯ one module at a time, allowing a 2s delay ⎯ to plug them in the same shelf location. Lock their handles. Refer also to page 17

    o Mount blanking panels over unused positions

    5. Ensure that the Smartpack and all rectifier modules are working: LEDs are ON o Verify correct operation, by monitoring the modules’ LED lamps and display:

    No alarms are present on rectifiers; The Smartpack displays fuse alarms

    6. Connect a PC to the PS system (to facilitate operation) o Plug a standard USB A-B cable between the PC and the Smartpack controller o Start PowerSuite on the PC by selecting: Start > All Programs > Eltek > PowerSuite

    Refer to chapter “Installing PowerSuite ⎯ PC Application”, page 9, if required o On the toolbar, click the “Connect” button to establish connection

    7. Measure and adjust DC output voltage o Read the DC output voltage on the controller’s display o With a multi-meter, measure the DC output voltage at the most accessible point, e.g.

    between the common DC rail and the lower connection of one of the priority load MCBs o If required, adjust the voltage using the controller’s front keys or via PowerSuite

    8. Verify the alarm relays are working correctly (alarm relay test) o Run the alarm relay test using the controller’s front keys (refer to page 8) or via

    PowerSuite (select the menu Go > Output Test)

    9. Make sure the System Setup is in accordance with configuration o Verify system settings using the controller’s front keys or via PowerSuite o Use the opportunity to enter site related information, number of used AC phases,

    type of batteries, etc.

    Load Adjustments Power is ON! Now, you can begin with stage III, where you will adjust again the output voltage to the battery voltage, and connect the batteries and the load. Carry out the following:

    10. Adjust DC output voltage to equal measured battery voltage o Measure the battery voltage is within range (check connections have correct polarity) o Adjust DC output voltage — using the controller’s front keys (refer to page 8) or via

    PowerSuite— to equal the measured battery voltage. (Important adjustment to avoid arcing when connecting the batteries)

    11. Unplug all rectifiers but one, and connect the battery fuses /MCBs (CAUTION: Have only one rectifier connected, when switching ON the battery fuses. Thus, avoiding damaging all rectifiers, due to possible incorrect polarity connections, etc.)

    o Disconnect all rectifiers but one, by unlocking the handles and pulling them partially out (fan housing visible). Do NOT physically remove them from the power shelves

    o Switch ON all battery fuses or MCBs

    12. Adjust DC output voltage again to equal the nominal battery voltage o Adjust DC output voltage — using the controller’s front keys or via PowerSuite — to

    equal the nominal battery voltage (or the nominal load voltage, when not using batteries)

    13. Plug in again all rectifiers, and verify the rectifiers’ current sharing o Connect all rectifiers again by pushing them firmly inwards ⎯ Repeat step 4, in stage II o Wait for about 2 min., and check — using the PowerSuite application —that each of the

    rectifiers delivers the same output current. A deviation of 1A is acceptable.

    14. Connect the load breakers and verify that no alarms are displayed o Switch ON all load MCBs/ fuses o Verify correct operation: rectifiers and controller display no alarms

    Devicehazard

    Devicehazard

    III

    Commissioning

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 8

    Front Keys and display, menus, etc.

    Operation

    Flatpack2 Rectifier Module — front panel Power LED is OFF (mains unavailable), Flashing (controller accessing information) or ON (powered). Warning LED is ON (derating or similar minor warning), Flashing (over-voltage mode) or OFF (OK) Alarm LED is ON (shutdown or similar major alarm) or OFF (OK, no alarm)

    Flatpack2 rectifier

    AlarmLED Lamp (red)

    PowerLED Lamp (green)

    WarningLED Lamp (yellow)

    Sof

    twar

    e M

    enus

    Smartpack Control Unit — front keys, display, etc Display: is in Status Mode (displays the system’s status) or in Menu Mode (displays the menu structure). Operation: Press on the key to change from Status Mode to Menu Mode. Press the or keys to scroll up or down and navigate to find menu options (function or parameter). Press then the key to select the function. Menus: When you “enter” Menu Mode (Level 1), you access the User Options. You may also scroll down to password protected Service Options. Default password should be changed.

    PowerLED Lamp (green)

    Warning LED Lamp (yellow)

    AlarmLED Lamp (red)

    GraphicalDisplay

    16 char. x 2 linesLCD display

    ”Up” arrow key ”Down” arrow key

    ”Enter” key

    USB0ype B port

    Smartpack control unit

    Service menu NomVolt ↓↑ BoostVolt ↓↑ LoBattMaj ↓↑

    VoltAdjustment LoBattMin ↓↑ HiBattMaj ↓↑ HiBattMin ↓↑ LVBD ↓↑ LVLD 1.1 ↓↑

    VoltCalibration VoltCal ↓↑ ChangePassword Password ↓↑ SetManBoostTime ↓↑ Start/StopBoost Auto Boost Conf. Enable/Disable ↓↑ & Threshold

    Nxt Test DateTime Date ↓↑ Time End Volt ↓↑

    Batt Test Setup MaxTestDur ↓↑ Test Int ↓↑ Guard Time ↓↑

    Start/Stop Test NoOfRects. ; nn Reset Charge Curr Lim. Enable/Disable ↓↑ & Max

    Battery Setup NumOfString ↓↑ CellCap Ah nn ↓↑

    Output Control VoltageCtrl / TempComp ↓ Change Date/Time Date ↓↑ Time ↓↑

    Alarm Output 1 ↑ RelayTest Alarm Output 2 ↑

    Batt Contactor ↑ Load Contactor ↑ Alarm Output nn ↑

    BattLifeTime Rst

    Level 2 Level 3

    Firm

    war

    e 40

    2073

    .003

    1v0

    0 S

    mar

    tpac

    k, D

    istri

    bute

    d

    User menu AlarmReset NomVolt BoostVolt LoBattMaj VoltageInfo LoBattMin HiBattMaj HiBattMin LVBD LVLD 1.1 DisplayMessages Message ↓↑ SoftwareInfo SerialNumber NoOfRects. nn RectCurrent Rectifier Info RectSerialNumber Rect.PrimaryVolt Rectifier Status Rectifier Temp Rect. OutputVolt Rectifier SW Ver

    NoOfPhases nn Mains Info Mains Status Mains Voltage Temp Level Info Level ↓↑ NoOfString Nn BattStringCurr ↓↑ Battery Info BattStringTemp ↓↑ BattBlockVolt ↓↑

    Level 2 Level 3

    Firm

    war

    e 40

    2073

    .003

    1v0

    0 S

    mar

    tpac

    k, D

    istri

    bute

    d

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 9

    CAN Bus Addressing and Termination Flatpack2 systems are shipped from factory with the CAN bus already terminated with 120Ω resistors.

    To ensure a correct bus communication and avoid data reflection, you must always terminate the CAN bus with two 120Ω resistors, one at each end of the line (60Ω bus impedance). The figure shows a Flatpack2 system communicating via the CAN bus.

    The Smartpack dynamically software-assigns ID numbers to rectifiers. The controller registers the rectifiers’ ID numbers, or CAN bus address (01, 02…), together with their Serial Numbers. The Smartpack’s ID numbers (1, 2…) are assigned by DIP switches on the controller’s side.

    The figure shows a Flatpack2 DC power system expanded with a slave controller to implement additional digital inputs, relay outputs or similar functionality.

    Installing PowerSuite ⎯ PC Application The PowerSuite software application enables you to configure and operate the Flatpack2 Power Supply System from a personal computer.

    Communication Miscellaneous

    120Ω

    Flatpack2 DC Power System

    End-of-Line Resistor

    01 02 3

    1 Smartpack controller Master 120Ω

    End-of-LineResistor

    n+1 n+2 m

    2 Smartpack controllerSlave 1

    Slave controllerDIP switch

    configuration

    ID (Switch #1 ON, the

    rest OFF)

    Master controllerDIP switch configuration

    ID (All switches OFF)

    Alarm OutputsNC-C-NO

    Digital Inputs

    Alarm OutputsNC-C-NO

    Digital Inputs

    4 n

    Controller ID #

    DIP Switch Position 1 ⎯ 2 ⎯ 3 ⎯ 4

    Master 1 OFF⎯OFF⎯OFF⎯OFF Slave 1 2 ON⎯OFF⎯OFF⎯OFF Slave 2 3 OFF⎯ ON⎯OFF⎯OFF Slave 3 4 ON⎯ ON⎯OFF⎯OFF Note that the controller’s ID # corresponds to the DIP switch’s binary value plus one.

    3. Wait for Windows to install USB driversFollow & accept the wizard default steps to automatically install the USB drivers; the wizard runs twice New hardware

    is ready to use 3

    If PowerSuite fails communicating via the standard COM port, find the COMx assigned to Smartpack (My Computer/ Properties / Hardware/Device Manager) and configure PowerSuite to communicate via this COMx (read the instructions in the installation CD).

    PowerSuite’s newest version is always available on our FTP server. Call your Eltek Valere’s contact person.

    Flatpack2 system configuration from a PC running MS Windows XP

    2. Switch Smartpack ON and plug USB cable (Part 202073)to Smartpack and to any available USB port in the PC 2

    1. Install PowerSuite Insert the CD in your PC drive, start the PowerSuite installation and follow & accept the wizard default steps 1

    4. Start PowerSuite and establish connection Select “Start > All Programs > Eltek > PowerSuite”. On the toolbar, click “Connect” button. On the Connection dialogue box, click the “Connect” button

    4

    CAN bus Addressing Eltek Valere’s CAN bus may address a maximum of 60 nodes. Among them, you may connect a maximum of 8 Smartpack controllers and or 50 rectifiers.

    120Ω

    Flatpack2 DC Power System

    End-of-Line Resistor

    End-of-LineResistor

    120Ω

    CAN bus (twisted-pair internal CAT5 cable) USB A-B cable

    (standard)

    01 02 n

    1

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 10

    External AC Fuses ⎯ Recommended Rating The site’s AC supply quality is of great impor-tance. In general, a site with better AC supply quality (stable nominal voltage) may use smaller breakers.

    Miscellaneous AC Mains

    Use the recommendations in the 205VAC table, if you are sure the available AC mains voltage will not drop below 205VAC.

    OR If you are unsure ⎯ or know that the voltage may drop below 205VAC ⎯ use the 185VAC table recommendations.

    Onl

    y di

    ffere

    nce

    betw

    een

    the

    205

    and

    the

    185V

    AC

    reco

    mm

    enda

    tion

    tabl

    es

    External AC Fuses Recommended Ratings

    1AC Feed to 1 Flatpack2 rectifier

    AC Mains Ext. Fuse Type Type FS=I FS=0

    185VAC 25A-D 13A-B 205VAC 25A-D 10A-B

    FS=I (Fuse Selectivity: Internal) which means that the Flatpack2 rectifier’s in-ternal fuse will trip before the external AC fuse. FS=0 (Fuse Selectivity: none) these fuse types may be used when it is irrelevant whether the internal or the external fuse trips first. 1A

    C F

    eed

    to 1

    Rec

    tifie

    r

    Note: Always replace a rectifier with blown internal AC fuse with a new module, and send the mal-functioning module for servicing.

    For installations in USA and Canada only

    • For external fuses above 50A, only the high current backplane can be used

    • External fuse rated 32A is replaced by 40A • External fuse rated 63A is replaced by 70A • The installation has to comply with the NEC/CEC

    requirements • Connection to AC Mains shall be in accordance

    with the number of power shelves in the tables. If number of shelves exceeds the numbers in the table, a combination of several AC Mains must be used instead

    NEC/CEC Requirements

    External AC Input Wires Recommended Ratings

    Current Wire Section Max. (A) (mm2) (AWG)

    6 0.75 18 10 1.00 16 13 1.25 16 16 1.50 14 25 2.50 12 32 4.00 10 40 6.00 8 63 10.00 6 80 16.00 4

    100 25.00 2 Note: The external terminal blocks must be rated to accept the actual wire section above.

    205V

    AC In

    puts

    2AC

    Pow

    er S

    helv

    es

    2 A

    C in

    puts

    per

    she

    lf, e

    ach

    feed

    ing

    2 re

    ctifi

    ers

    AC Mains No of Power Current Max. (A) Ext. Fuse Type Shelves 2000W Rect. Type

    400VAC +N3 phase

    1 22.1 25A-D 2 44.1 50A-C 3 44.1 50A-C 4 66.1 80A-C

    230VAC 3 phase

    1 38.2 40A-C2 58.3 63A-C3 76.4 80A-C

    230VAC 1 phase

    1 44.1 50A-C 2 88.2 100A-C

    4AC

    Pow

    er S

    helv

    es

    4 A

    C in

    puts

    per

    she

    lf, e

    ach

    feed

    ing

    1 re

    ctifi

    er

    AC Mains No of Power Current Max. (A) Ext. Fuse Type Shelves 2000W Rect. Type

    400VAC +N3 phase

    1 22.1 25A-D 2 33.1 40A-C

    230VAC 3 phase

    1 29.2 32A-D2 57.3 63A-C

    230VAC 1 phase

    1 44.1 50A-C 2 88.2 100A-C

    185V

    AC In

    puts

    4AC

    Pow

    er S

    helv

    es

    4 A

    C in

    puts

    per

    she

    lf, e

    ach

    feed

    ing

    1 re

    ctifi

    er

    2AC

    Pow

    er S

    helv

    es

    2 A

    C in

    puts

    per

    she

    lf, e

    ach

    feed

    ing

    2 re

    ctifi

    ers

    AC Mains No of Power Current Max. (A) Ext. Fuse Type Shelves 2000W Rect. Type

    400VAC +N3 phase

    1 24.4 25A-D 2 36.7 40A-C

    230VAC 3 phase

    1 32.3 40A-C2 63.5 80A-C

    230VAC 1 phase

    1 48.9 50A-C 2 97.7 100A-C

    AC Mains No of Power Current Max. (A) Ext. Fuse Type Shelves 2000W Rect. Type

    400VAC +N3 phase

    1 24.4 25A-D 2 48.9 50A-C 3 48.9 50A-C 4 73.3 80A-C

    230VAC 3 phase

    1 42.3 50A-C2 64.6 80A-C3 84.6 100A-C

    230VAC 1 phase

    1 48.9 50A-C 2 97.7 100A-C

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 11

    Identifying Power Shelves, 4AC or 2AC Flatpack2 rectifiers are accommodated in one or several power shelves. Two types of power shelves are available:

    • 4AC Power Shelves, or single AC feed (4 AC inputs per shelf, each feeding 1 rectifier)

    • 2AC Power Shelves, or dual AC feed (2 AC inputs per shelf, each feeding 2 rectifiers)

    You can identify the type of power shelves used by your system by reading the shelf’s label, or by looking at the shape of the shelf’s AC mains terminals, at its rear. (Also viewable by removing the rectifier in the shelf’s 4th position)

    Mains Reconfiguration ~Integrated System 1U Distr. The AC mains terminals of Flatpack2 integrated systems with 1U DC distribution units are located on the power shelf’s rear.

    Find out whether your system is implemented with 4AC or 2AC powers shelves (read the Identifying Power Shelves section, page11) and terminate the AC mains cable according to the type of AC mains to be used, as shown in the actual example below.

    4AC

    Pow

    er S

    helv

    es

    Sin

    gle

    AC

    feed

    : 4 A

    C in

    puts

    per

    sh

    elf,

    each

    feed

    ing

    1 re

    ctifi

    er L1 L2 PE

    Υ MainsThree-phase & N, 400VAC

    L3 N

    PE(CON12) L1(CON11) L2(CON10) PE(CON15)L1(CON14)L2(CON13)

    PE(CON18) L1(CON17) L2(CON16) PE(CON21)L1(CON20)L2(CON19)

    L (L1) N (L2) PE

    Mains One-phase, 230VAC

    PE(CON12)L1(CON11)L2(CON10)PE(CON15)L1(CON14)L2(CON13)

    PE(CON18)L1(CON17)L2(CON16)PE(CON21)L1(CON20)L2(CON19)

    L1 L2

    Δ MainsThree-phase, 230VAC

    L3

    PE(CON12)L1(CON11)L2(CON10)PE(CON15)L1(CON14)L2(CON13)

    PE(CON18)L1(CON17)L2(CON16)PE(CON21)L1(CON20)L2(CON19)

    2AC

    Pow

    er S

    helv

    es

    Dua

    l AC

    feed

    : 2 A

    C in

    puts

    per

    sh

    elf,

    each

    feed

    ing

    2 re

    ctifi

    ers

    L (L1) N (L2) PE

    Mains One-phase, 230VAC

    CON13(PE)

    CON9(L1 1/2)

    CON11(L1 3/4)

    CON10(L2 1/2)

    CON12(L2 3/4)

    Power Shelf

    L1 L2 PE

    Υ MainsThree-phase & N, 400VAC

    L3 N

    CON13 (PE)

    CON9 (L1 1/2)

    CON11 (L1 3/4)

    CON10 (L2 1/2)

    CON12 (L2 3/4)

    Power Shelf Power Shelf

    CON13(PE)

    CON9(L1 1/2)

    CON11(L1 3/4)

    CON10(L2 1/2)

    CON12(L2 3/4)

    L1 L2 PE

    Δ MainsThree-phase, 230VAC

    L3

    2AC Power Shelves

    4AC Power Shelves

    Flatpack2 System, 1U DC Distr.

    AC Mains &PE terminals

    Power Shelf (rear view)

    AC Mains Miscellaneous

    I

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 12

    Mains Reconfiguration ~AC Terminal Block To reconfigure the AC mains feed of Flatpack2 DC power systems that use the AC Mains terminal block, you have to reconnect the AC mains wires and fish plates on the terminal block.

    1. Switch OFF the AC supply fuses in external fuse boards

    2. Check that your system is implemented with 4AC powers shelves (read the Identifying Power Shelves section, page 11). If your system utilizes 2AC power shelves, you can NOT reconfigure it as described in this section

    3. Connect the AC Mains wires to the AC terminal block, and mount the fish plates, according to the type of AC mains to be used, as shown in the actual example in this section

    II

    Miscellaneous AC Mains

    Configurable Mains Input Terminal Block 4AC Power Shelves (single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier)

    X:******

    Flatpack2 DC Power System

    (To internal connections for 2 power shelves)

    AC Mains Cable

    Υ Mains, TN Three-phase & N, 400VAC

    AC Mains wires

    1 fish plate

    AC Mains Terminal Block

    Cha

    ssis

    (1 Y Mains input will feed 2 power shelves)

    2009604, v7

    AC MainsCable

    Δ Mains, ITThree-phase, 230VAC

    Flatpack2 DC Power System

    (To internal connections for 2 power shelves)

    X:******

    AC Mains wires

    3 fish plates

    AC Mains Terminal Block

    (1 Δ Mains input will feed 2 power shelves)

    Cha

    ssis

    3 AC MainsCables

    Mains One-phase, 230VAC

    (3 Mains inputs will feed 2 power shelves)

    X:******

    Flatpack2 DC Power System

    (To internal connections for 2 power shelves)

    AC Mains wires

    0 fish plates

    AC Mains Terminal Block

    Cha

    ssis

    MainsOne-phase, 230VAC

    X:******(To internal connections for 2 power shelves)

    To rectifier 1

    Fixed Individual Mains Input Terminal Block 4AC Power Shelves (single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier)

    2009604, v7

    Cha

    ssis

    Torectifier 2

    Torectifier 3

    Torectifier 4

    Torectifier 5

    Torectifier 6

    Torectifier 7

    To rectifier 8

    8 AC MainsCables

    Flatpack2 DC Power System

    AC Mains wires

    0 fish platesAC Mains Terminal Block

    Mains reconfiguration isNOT possible when thesystem is shipped withfixed individual Mainsinput terminal blocks. Such systems have to beconfigured at the factoryprior to delivery.

  • PU

    LLOU

    T

    Check Lists Pu

    llout

    Pull o

    ut th

    e pag

    es with

    the g

    ray outer b

    and,

    and u

    se them

    as check lists

  • INSTALLATION CHECK LIST System Data Flatpack2 PS System Flatpack2 Power Supply System, type: Article No.:

    Site, name:

    Serial No.: Software, version No.: Rectifiers, type & number of:

    AC Input Voltage, measured: Battery Type: Battery Capacity: Installation carried out by, name:

    Site Preparations CARRY OUT FOLLOWING: OK 1. Organize the installation site

    o Check min. clearances for cabinet access: front access, 60cm, top access, 20cm o Check that the levelled surface is able to support 600 kg (cabinetized systems) o Ensure the installation site is suitably ventilated and in a non-explosive atmosphere. 60V systems in RAL areas

    2. Prepare the installation tools o Check that insulated tools suitable for telecom installations are used

    3. Prepare AC Supply: AC input cable(s) and fuses o Check the AC supply is the correct type, and that the external AC fuses and AC input cable(s) are suitably rated

    Mechanical Installation Power is OFF! CARRY OUT FOLLOWING: OK 4. Remove packaging and check equipment

    o Check you have received all the parts, correct cabinet, documentation, batteries (if applicable), etc o Inspect the equipment for physical damage (report any damages) o Leave rectifier modules in their packaging or in the selves, if factory installed. (commissioning task)

    5. Remove top cover and dummy front panels o Check that cable entry from the top is possible

    6. Position and fasten the cabinet or subassembly o Cabinets on levelled surface, adjust the legs. If necessary, unscrew the legs and fasten the cabinet to floor o Subassemblies in existing 19” or in ETSI cabinets, using brackets. Mount the support & heat deflecting plate

    7. Mount the batteries on the shelves o Start (if applicable) on the lower shelf first, and continue upwards o Do not terminate the battery cables yet!

    Electrical Installation Power is OFF! CARRY OUT FOLLOWING: OK 8. Make the system completely voltage free

    o Switch OFF or remove all load fuses (MCB1, MCBx), battery fuses (Fb1, Fbx) and external AC supply fuses 9. AC Connections

    o Check AC configuration: The AC terminals are correct configured to the external AC supply o Connect the AC Earth wire (PE) to the terminals AC Earth (PE) o Connect the AC input cable(s) to the terminals. Cable and terminal block labeling are to correspond

    10. DC Connections ⎯ Load Circuits o Terminate DC Earth (TE): Common DC Output Rail is connected to TE at only one place o For each DC load, connect one of the cables to the common DC output rail, and the other directly to the MCB

    11. DC Connections ⎯ Alarm & Signal Circuits o Refer to your system’s connection drawings and configuration, or to the Factory Settings in the Quick Start Guide o Terminate Alarm Circuit cables to the relay output terminals o Terminate Signal Circuit cables to the digital input/output terminals

    12. DC Connections ⎯ Battery Cables Careful! Use correct polarity. For each battery shelf,

    o Mount 3 intercell links to connect in series 4 battery blocks, (In 24V systems: 1 link and 2 blocks) o Connect battery cables to fuses and common DC rail, and to the shelf’s outer terminals; black (+); blue (-) o Connect battery symmetry cables, if applicable, to the input terminals o Connect the temperature sensor cable, if applicable, to the D-Sub plug or input terminal, and fix the sensor (at the

    end of the cable) to a suitable place in the middle of the installed battery bank

    Approval Responsible of installation, sign.: Date: Approved by customer, sign.:

    EMC regard

    Electric shock

    Device hazard

    Electric shock

    Form 173-gb-v3-C

    01_356804-103_qstart_flatpack2-pssyst_5v0ev.doc_mfm

    _2007-11-01

    www.eltekvalere.com

    Headquarters: Eltek Valere 1303 E. Arapaho Rd, Richardson, TX. 75081, USA Phone: +1 (469) 330-9100 Fax: +1 (469) 330-9101

    Eltek ValereGråterudv. 8, PB 2340 Strømsø, 3003 Drammen, Norway

    Phone: +47 32 20 32 00 Fax: +47 32 20 32 10

  • CIRCUIT DISTRIBUTION LIST System Data Flatpack2 PSS, type: Article No.:

    Site, name:

    CIRC. NO. FUSE

    KNIFE TYPE

    MCB LVLD

    CONTROLLED DESCRIPTION FUSE

    AMPERECABLE

    mm2

    Fb1 Fb2 Fb3 Fb4 Fb5 Fb6 F1 F2 F3 F4 F5 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30.

    Continue

    LOA

    D

    BA

    TT.

    Form 172-gb-v3-C

    01_356804-103_qstart_flatpack2-pssyst_5v0ev.doc_mfm

    _2007-11-01

    www.eltekvalere.com

    Headquarters: Eltek Valere 1303 E. Arapaho Rd, Richardson, TX. 75081, USA Phone: +1 (469) 330-9100 Fax: +1 (469) 330-9101

    Eltek ValereGråterudv. 8, PB 2340 Strømsø, 3003 Drammen, Norway

    Phone: +47 32 20 32 00 Fax: +47 32 20 32 10

  • www.eltekvalere.com

    Headquarters: Eltek Valere 1303 E. Arapaho Rd, Richardson, TX. 75081, USA Phone: +1 (469) 330-9100 Fax: +1 (469) 330-9101

    Eltek ValereGråterudv. 8, PB 2340 Strømsø, 3003 Drammen, Norway

    Phone: +47 32 20 32 00 Fax: +47 32 20 32 10

    CIRCUIT DISTRIBUTION LIST

    CIRC. NO. FUSE KNIFE

    TYPE MCB

    LVLD CONTROLLED

    DESCRIPTION FUSE AMPERE

    CABLE mm

    2

    1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36.

    LOA

    D

    Form 172-gb-v3-C

    01_356804-103_qstart_flatpack2-pssyst_5v0ev.doc_mfm

    _2007-11-01

  • Form 171-gb-v3-C

    01_356804-103_qstart_flatpack2-pssyst_5v0ev.doc_mfm

    _2007-11-01

    www.eltekvalere.com

    Headquarters: Eltek Valere 1303 E. Arapaho Rd, Richardson, TX. 75081, USA Phone: +1 (469) 330-9100 Fax: +1 (469) 330-9101

    Eltek ValereGråterudv. 8, PB 2340 Strømsø, 3003 Drammen, Norway

    Phone: +47 32 20 32 00 Fax: +47 32 20 32 10

    MAINTENANCE PROCEDURE System Data Flatpack2 PS System Flatpack2 Power Supply System, type: Article No.:

    Site, name:

    Serial No.: Software, version No.: Rectifiers, type & number of:

    AC Input Voltage, measured: Battery Type: Battery Capacity: Maintenance carried out by, name:

    System Inspection Power is ON! CARRY OUT FOLLOWING: OK 1. Site specific parameters and settings are known.

    User manuals and site specific connection & arrangement drawings are available.

    2. The battery bank has been fully charged in advance. At least for 12 hours since start-up or mains failure. Enables correct measurements & calibration

    3. The equipment is free from damage, dust or dirt; verify. Carefully vacuum clean or remove any accumulation of dust, corrosion or dirt.

    4. All cabling and copper bars are securely terminated and supported. Correct any loose connections, excessive cable temperature, defective insulation, etc.

    5. The Smartpack & all rectifier modules are ON, no alarm present; verify. Otherwise, correct and put the PS system in normal mode of operation.

    6. All rectifier’s functionality & Smartpack’s keys and display work OK; verify Correct possible abnormalities before continuing.

    7. Connect the PS system to a PC (install the PowerSuite application if required) The PowerSuite program in the PC enables system configuration from the PC.

    8. Rectifiers’ load current sharing; verify. Use the PowerSuite PC application to check all rectifiers output the same amount of current (±1A)

    9. Display the stored log of Alarm Messages. Using the keypad on the Smartpack controller or from the PC.

    System Adjustment CARRY OUT FOLLOWING: OK 1. DC Output Voltage Calibration; ensure correct display readings.

    If measured DC output voltage at the load terminals deviates more than ±1% from the display reading, calibrate the output voltage from the Smartpack’s keypad or the PC.

    2. Load & Battery Current Calibration; verify correct display readings. Measure with a clip-on ammeter the battery current & every load circuit current. Calculate the total load & battery current. If the calculated total values deviate more than ±1% from the display readings, calibrate the current from the PC (calibration value>50% of system’s max. capacity)

    3. DC Output Voltage Adjustment; measure and adjust. Measure and, if required, adjust the output voltage to the nominal voltage recommended by the battery manufacturer. (Voltage measurements to be done at the DC rail, with little load current)

    4. Alarm Relay Test; verify all alarm relays are working correctly. From the Smartpack’s keypad or PC use the Relay Test function; verify activation of external equipment

    5. Battery bank control; measure and verify battery specifications. Follow the recommendations of the actual battery manufacturer.

    Approval Responsible of maintenance control, sign.: Date: Approved by customer, sign.:

    WARNING: Maintenance work on live equipment is only to be performed by authorized and qualified persons using insulated tools. Hazardous voltages inside may cause terminal injury. Electric

    shock

  • PU

    LLOU

    T

  • www.eltekvalere.com

    Headquarters: Eltek Valere 1303 E. Arapaho Rd, Richardson, TX. 75081, USA Phone: +1 (469) 330-9100 Fax: +1 (469) 330-9101

    Eltek ValereGråterudv. 8, PB 2340 Strømsø, 3003 Drammen, Norway

    Phone: +47 32 20 32 00 Fax: +47 32 20 32 10

    Form 170-gb-v5-C

    01_356804-103_qstart_flatpack2-pssyst_5v0ev.doc_mfm

    _2007-11-01

    COMMISSIONING PROCEDURE System Data Flatpack2 PS System Supplier’s Order No.: Flatpack2 Power Supply System, type: Article No.:

    Site, name:

    Serial No.: Software, version No.: Rectifiers, type & number of:

    AC Input Voltage, measured: Battery Type: Battery Capacity: Commissioning carried out by, name:

    Pre-Start Check Power is OFF! CHECK FOLLOWING: OK 1. Flatpack2 system installation is completed; The Flatpack2 Installation Check List is filled in.

    All cabling is securely terminated with correct polarity 2. All battery and load MCBs/ fuses are disconnected

    3. AC input cable(s) and AC earth wire (PE) are terminated

    4. Site specific parameters and settings are known

    5. AC supply and all MCBs/ fuses are switched OFF

    Start-up, No-Load & Load Adjustments Power is ON! CARRY OUT FOLLOWING: OK 1. Disconnect all rectifier modules, without removing them (keep original location)

    2. Switch ON the system (external AC fuses ON)

    3. AC input voltage is correct; Measure and verify

    4. Insert all Flatpack2 rectifiers in their original locations in the power shelves

    5. The Smartpack and all rectifier modules are working, LEDs are ON; Verify

    6. Connect a PC to the PS system Install the PowerSuite software, if required

    7. DC output voltage; Measure and adjust

    8. Alarm relay test; Verify all alarm relays are working correctly 9. System Setup is in accordance with configuration Enter site spec. info in PowerSuite 10. Adjust DC output voltage to equal measured battery voltage Check correct polarity! 11. Unplug all rectifiers but one, and connect all battery fuses/ MCBs 12. Adjust DC output voltage to equal nominal battery or load voltage 13. Plug in again all rectifiers, and verify the rectifiers’ current sharing 14. Connect all load MCBs/ fuses, and verify no alarms are displayed

    Approval Responsible of commissioning, sign.: Date: Approved by customer, sign.:

    Device hazard

    I

    II

    Device hazard

    III

    Device hazard

  • PU

    LLOU

    T

    Check Lists Pu

    llout

    Pull o

    ut th

    e pag

    es with

    the g

    ray outer b

    and,

    and u

    se them

    as check lists

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 13

    Mains Reconfiguration ~AC Terminal Block with OVP Mains reconfiguration is NOT possible when Flatpack2 DC power systems are shipped with AC terminal blocks with OVP1 surge arrestors. Such systems have to be configured at the factory prior to delivery.

    1 Over Voltage Protection, OVP

    III

    AC Mains Miscellaneous

    NON Configurable Mains Input Terminal Block with OVP 4AC Power Shelves (single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier)

    2009604, v7Flatpack2 DC Power System

    Υ Mains, TNThree-phase & N, 400VAC(1 Y Mains input will feed 2 power shelves)

    X:******

    AC Mains wires

    4 fish platesAC Mains Terminal Block

    (To internal connections for 2 power shelves)

    Δ Mains, ITThree-phase, 230VAC

    (1 Δ Mains input will feed 2 power shelves)

    NON Configurable Mains Input Terminal Block with OVP 4AC Power Shelves (single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier)

    2009604, v7Flatpack2 DC Power System

    X:******

    AC Mains wires

    4 fish platesAC Mains Terminal Block

    (To internal connections for 2 power shelves)

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 14

    Mains Reconfiguration ~AC Connection Box To reconfigure the AC mains feed of Flatpack2 DC power systems that use the Erico AC Mains connection box, you have to reconnect the AC mains wires and rewire the internal cables of the connection box.

    1. Switch OFF the AC supply fuses in external fuse boards

    2. Find out whether your system is implemented with 4AC or 2AC powers shelves (read the Identifying Power Shelves section, page 11).

    3. Connect the AC Mains wires, and rewire then the internal cables of your system’s AC Mains connection box, according to the type of AC mains to be used, as shown in the actual example in this section.

    Miscellaneous AC Mains

    AC MainsConnection Box

    PS1:C

    ON

    20P

    S1:C

    ON

    19PS

    1:CO

    N17

    PS

    1:CO

    N16

    PS1:C

    ON

    14P

    S1:C

    ON

    13PS

    1:CO

    N11

    PS

    1:CO

    N10

    PS

    2:CO

    N19

    PS

    2:CO

    N16

    PS

    2:CO

    N13

    PS

    2:CO

    N10

    PS2:C

    ON

    20PS

    2:CO

    N17

    PS2:C

    ON

    14PS

    2:CO

    N11

    Rewire the internal cables

    For externalAC Mains

    cable

    For external AC Mains cable

    Internal connection point (power shelf # and connector #) for each cable

    IV

    4AC Power Shelves Single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier

    L3

    X:******

    Flatpack2 DC Power System

    (To internal connections)

    AC Mains Cable

    Chassis

    L1 L2 PE

    Υ Mains, TN Three-phase & N, 400VAC

    PS1:C

    ON

    20P

    S1:C

    ON

    19PS

    1:CO

    N17

    PS

    1:CO

    N16

    PS1:C

    ON

    14P

    S1:C

    ON

    13PS

    1:CO

    N11

    PS

    1:CO

    N10

    PS

    2:CO

    N19

    PS

    2:CO

    N16

    PS

    2:CO

    N13

    PS

    2:CO

    N10

    PS2:C

    ON

    20PS

    2:CO

    N17

    PS2:C

    ON

    14PS

    2:CO

    N11

    AC

    Mai

    ns

    conn

    ectio

    n bo

    x

    Rewirethe box

    as shown

    N

    X:******

    Flatpack2 DC Power System

    (To internal connections)

    AC MainsCable

    Chassis

    PE

    Δ Mains, ITThree-phase, 230VAC

    PS1:C

    ON

    20P

    S1:C

    ON

    19PS

    1:CO

    N17

    PS

    1:CO

    N16

    PS1:C

    ON

    14P

    S1:C

    ON

    13PS

    1:CO

    N11

    PS

    1:CO

    N10

    PS

    2:CO

    N19

    PS

    2:CO

    N16

    PS

    2:CO

    N13

    PS

    2:CO

    N10

    PS2:C

    ON

    20PS

    2:CO

    N17

    PS2:C

    ON

    14PS

    2:CO

    N11

    AC

    Mai

    ns

    conn

    ectio

    n bo

    x

    Rewirethe box

    as shown

    L3 L1 L2A

    C M

    ains

    co

    nnec

    tion

    box

    X:******

    Flatpack2 DC Power System

    (To internal connections)

    AC MainsCable

    Chassis

    PE L (L1) N (L2)

    MainsOne-phase, 230VAC

    PS1:C

    ON

    20P

    S1:C

    ON

    19PS

    1:CO

    N17

    PS

    1:CO

    N16

    PS1:C

    ON

    14P

    S1:C

    ON

    13PS

    1:CO

    N11

    PS

    1:CO

    N10

    PS

    2:CO

    N19

    PS

    2:CO

    N16

    PS

    2:CO

    N13

    PS

    2:CO

    N10

    PS2:C

    ON

    20PS

    2:CO

    N17

    PS2:C

    ON

    14PS

    2:CO

    N11

    Rewirethe box

    as shown

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 15

    About AC, DC Earthing Systems To prevent the risk of electric shock, all cabinet’s chassis are to be electrically connected to AC Earth (PE). Also, it is a common practice for telecom equipment to have its common DC output rail (+ or -) connected to a separate “Telecom Earth” (TE) or DC Earth.

    Earth connections are in particular important where frequent lightning might induce high voltage levels in AC supply and in battery and load cables.

    AC Earth (PE) and DC Earth (TE) are connected to chassis via “Link 1” and “Link 2”. Remove the links (“floating earth”) for compliance with other local earthing systems.

    Refer to your system’s specific drawings to identify how these links are implemented in your DC power system.

    Common Positive DC Output Rail is usual in 48 and 60V DC supply systems: Negative DC Distribution. Common Negative DC Output Rail is usual in 24V systems: Positive DC Distribution.

    AC Mains Miscellaneous

    PE (Protective Earth) TE (Telecom Earth) EG (Exchange Ground)

    Common DC Rail —

    DC

    Loa

    d w

    ires

    +

    +

    + +

    Positive DC Distribution

    ——

    Negative DCDistribution

    Common DC Rail +

    DC

    Loa

    d w

    ires

    2AC Power Shelves Dual AC feed: 2 AC inputs per shelf, each feeding 2 rectifiers

    L3 L1 L2

    PS1:C

    ON

    11P

    S1:C

    ON

    12P

    S1:C

    ON

    9P

    S1:C

    ON

    10PS

    2:CO

    N11

    PS

    2:CO

    N12

    PS

    2:CO

    N9

    PS

    2:CO

    N10

    PS3:C

    ON

    11P

    S3:C

    ON

    12P

    S3:C

    ON

    9P

    S3:C

    ON

    10PS

    4:CO

    N11

    PS

    4:CO

    N12

    PS

    4:CO

    N9

    PS

    4:CO

    N10

    X:******

    Flatpack2 DC Power System

    (To internal connections)

    AC Mains Cable

    Chassis

    PE

    Υ Mains, TN Three-phase & N, 400VAC

    N

    AC

    Mai

    ns

    conn

    ectio

    n bo

    x

    Rewirethe box

    as shown

    X:******

    Flatpack2 DC Power System

    (To internal connections)

    AC MainsCable

    Chassis

    PE

    Δ Mains, ITThree-phase, 230VAC

    L1

    N

    L3

    L2

    AC

    Mai

    ns

    conn

    ectio

    n bo

    x

    Rewirethe box

    as shown

    L3 L1 L2

    X:******

    Flatpack2 DC Power System

    (To internal connections)

    AC MainsCable

    Chassis

    PE L (L1)

    MainsOne-phase, 230VAC

    PS

    1:CO

    N11

    PS

    1:CO

    N12

    PS

    1:CO

    N9

    PS

    1:CO

    N10

    PS

    2:CO

    N11

    PS

    2:CO

    N12

    PS

    2:CO

    N9

    PS

    2:CO

    N10

    PS

    3:CO

    N11

    PS

    3:CO

    N12

    PS

    3:CO

    N9

    PS

    3:CO

    N10

    PS

    4:CO

    N11

    PS

    4:CO

    N12

    PS

    4:CO

    N9

    PS

    4:CO

    N10

    AC

    Mai

    ns

    conn

    ectio

    n bo

    x

    Rewirethe box

    as shown

    N (L2)

    CabinetPE

    AC Mains Common DC Rail EG

    .

    AC

    Mai

    ns In

    put

    (L1,

    L2,L

    3,N

    )

    DC Load Circuit

    Link 2(DC Earth)

    Link 1 (AC Earth)

    TE

    Chassis

    Chassis

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 16

    Mains Phases versus Rectifier ID Phase Balancing & Monitoring When Flatpack2 systems are fed with a 3-phase AC Mains input circuit, each rectifier is internally connected to the 230VAC phases, in such a pattern that loads the 3 phases evenly.

    The distribution of rectifiers among the phases is implemented both via internal wiring to the power shelves, and how the shelf’s back-wiring card routes the phases to each rectifier position. There are two types of shelves: 4AC and 2AC power shelves. Read also the Identifying Power Shelves section, page11.

    Plug-and-Play Rectifiers versus Phase Monitoring

    When a rectifier is hot plugged in a power shelf for the first time, the Smartpack controller assigns the next available ID number to the rectifier, starting with “01”. The controller registers the rectifier’s Serial Number and ID number.

    When a previously installed (hot plugged) Flatpack2 rectifier is inserted in a power shelf, the Smartpack controller “recognizes” the module, and assigns the same ID to the rectifier. In other words, the controller and the rectifier “remember” the assigned ID number, even after removing and reinserting the rectifier in the shelf.

    To achieve a more controlled ID assignment, you should always insert & hot-plug new Flatpack2 rectifiers in the indicated power shelf position, one module at a time, starting with ID number 1, 2, 3, and so on. The sequence is indifferent after ID number 6. You find more information on page 17.

    This position-versus-ID number relationship is very important for the correct monitoring of the mains three phases, as the Smartpack controller always uses rectifier ID01, 02 and 03 to monitor the Mains phase 1, 2 and 3 respectively. If these rectifiers malfunction, rectifier ID 04, 05 and 06 will automatically take over.

    For example: accidentally inserting a rectifier with ID02 in a power shelf position internally connected to mains phase 1, will cause the controller to monitor phase 1 “thinking“ it monitors phase 2. Then a phase 1 fault will be alarmed as a phase 2 fault.

    Miscellaneous AC Mains

    Δ Mains Three-phase, 230VAC

    L1

    L2 L3 230VAC

    AC Mains

    02

    05

    08

    n

    Phase 2

    03 06 09 n Pha

    se 3

    01 04 07 n Pha

    se 1

    Flatpack2 rectifier

    Υ Mains Three-phase & N, 400VAC

    ID number (Assigned CAN bus address)

    230V

    AC

    L1

    L2

    L3

    Mains400VAC, 3ph+N

    N 01 04 07 n Pha

    se 1

    030609nPha

    se 3

    Pha

    se 2

    02 05 08 n

    Load Balancing of Mains Phases Even distribution of Flatpack2 rectifiers on the Mains phases

    Mains One-phase, 230VAC

    01 02 03 n N(L2)

    230VAC

    AC Mains

    L(L1)

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 17

    Correct Rectifier Positions in Power Shelves

    Flatpack2 DC power systems are normally shipped from factory with empty power shelves. The rectifier modules are shipped in separate packaging, and you have to install the modules in the correct position in the power shelves, with respect to their ID number (or CAN bus address). Do not relocate already pre-installed rectifiers.

    For first time installations of rectifiers in Flatpack2 systems, follow the scheme below:

    1. Find out your system’s power shelf type, by reading the Identifying Power Shelves section, page11

    2. Find out if your system’s AC mains feed is or

    3. Insert & hot-plug the rectifiers in the indicated power shelf positions, one module at a time, allowing a 2s delay between them and starting with ID number 1, 2, 3, and so on. (indifferent after ID# 6) Follow one of the four figures below:

    AC Mains Miscellaneous

    Phase 1 Phase 2 Phase 3

    Smartpack Located in Distribution Shelf Correct Rectifier Position in 4AC Power Shelves

    Single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier Δ Mains

    Three-phase, 230VAC Υ Mains

    Three-phase & N, 400VACand

    01 02

    05 06

    --- ---

    03 04

    --- ---

    --- --- --- --- --- ---

    Position 1

    Position 4

    ID number (Assigned CAN bus address)

    Flatpack2rectifier

    Position 8

    Position 9

    Smartpackcontroller

    Correct Rectifier Position in 2AC Power Shelves Dual AC feed: 2 AC inputs per shelf, each feeding 2 rectifiers

    Δ MainsThree-phase, 230VAC

    Υ MainsThree-phase & N, 400VAC

    and

    01 04

    03 06

    --- ---

    02 05

    --- ---

    --- --------- --- ---

    Position 1

    Position 4

    Flatpack2rectifier

    Position 8

    Position 9

    Smartpackcontroller

    ID number (Assigned CAN bus address)

    Smartpack Located in Power Shelf

    Correct Rectifier Position in 4AC Power Shelves Single AC feed: 4 AC inputs per shelf, each feeding 1 rectifier

    Δ Mains Three-phase, 230VAC

    Υ Mains Three-phase & N, 400VAC

    and

    02

    05 06

    --- ---

    03 01

    04 ---

    --- --- --- --- --- ---

    Position 1 Position 8

    Smartpackcontroller

    Position 9 ID number (Assigned CAN bus address)

    Flatpack2rectifier

    Position 4

    Correct Rectifier Position in 2AC Power Shelves Dual AC feed: 2 AC inputs per shelf, each feeding 2 rectifiers

    Δ MainsThree-phase, 230VAC

    Υ MainsThree-phase & N, 400VAC

    and

    01

    03 06

    --- ---

    02 05

    04 ---

    --- --------- --- --- ID number

    (Assigned CAN bus address)

    Position 1

    Position 4

    Flatpack2rectifier

    Position 8

    Position 9

    Smartpackcontroller

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 18

    Battery Symmetry Connections ⎯ 48V Systems Each Smartpack controller is equipped with 8 battery symmetry inputs (on connectors CON4 and CON3), enabling symmetry measurement of:

    • 8 battery strings using the Mid-Point Measurement Method

    • 4 battery strings using the more accurate Double Mid-Point Measurement Method

    • 2 battery strings using the even more accurate Block Measurement Method

    You can implement any of these methods using one or two Battery Connection Kits (refer to the illustration on page 20) and the appropriate number of Battery Symmetry Kits, which contain a single wire with suitable cable lugs, etc.

    Battery Terminology

    Battery Block, Battery String and Battery Bank

    48V Battery Bank

    Battery String #1 (48V)Batt.

    Battery Block (12V)

    Battery String #2 (48V)

    Notice that, if you open the serial switches in card, Art.200576 ⎯ setting all to OFF (up) ⎯ you have to connectthe + and – wires of every symmetry input.

    Miscellaneous Battery Monitoring

    Battery Symmetry Block Measurement

    Four measurements per string (Serial measurement)

    —(-48V) Outer

    Terminal+

    0V OuterTerminal

    Intercell Links

    X:****

    Block1

    - + + - +-+-

    Block4 Block3

    Card, Art. 200576Serial Switches

    Set all 4 switches ON (down)

    7

    Sym

    met

    ry 4

    +

    2-1

    Sym

    met

    ry 1

    +-

    5

    Sym

    met

    ry 3

    +

    3

    Sym

    met

    ry 2

    +

    Battery Symmetry Double-point Measurement

    Two measurements per string, from the middle to the outer terminals

    —(-48V) Outer

    Terminal+

    0V Outer Terminal

    Intercell Links

    X:****Card, Art. 200576 Serial Switches

    Set all 4 switches ON

    (down)

    3

    Sym

    met

    ry 2

    +

    2-1

    Sym

    met

    ry 1

    + -

    Block1

    - + + - + -+-

    Block4 Block3

    Bat

    t. S

    ymm

    etry

    Kit,

    Art.

    200

    830

    Cable Lugs

    Sin

    gle

    Wire

    Exam

    ples

    of B

    atte

    ry S

    ymm

    etry

    Con

    nect

    ions

    48

    V D

    C S

    uppl

    y S

    yste

    ms

    Battery Symmetry Mid-point Measurement

    One measurement per string

    —(-48V) Outer

    Terminal+

    0V Outer Terminal

    Intercell Links

    2-1X:****

    Sym

    met

    ry 1

    + -

    Card, Art. 200576 Serial Switches

    Set all 4 switches OFF (up)

    Block1

    - + + - + -+-

    Block4Block3

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 19

    Battery Symmetry Connections ⎯ 24V Systems Each Smartpack controller is equipped with 8 battery symmetry inputs (on connectors CON4 and CON3), enabling symmetry measurement of 8 battery strings using the Mid-Point or Block Measurement Method2. You use one or two Battery Connection Kits (refer to the illustration on page 20) and the appropriate number of Battery Symmetry Kits, which contain a single wire with suitable cable lugs, etc.

    2 The Mid-Point and the Block Measurement Methods are identical in 24V systems.

    Battery Monitoring Miscellaneous B

    att.

    Sym

    met

    ry K

    it, A

    rt. 2

    0083

    0

    Cable Lugs

    Sin

    gle

    Wire

    Exam

    ple

    of B

    atte

    ry S

    ymm

    etry

    Con

    nect

    ions

    24

    V D

    C S

    uppl

    y S

    yste

    ms

    Battery Terminology

    Battery Block, Battery String and Battery Bank

    24V Battery Bank

    BatteryString #1 (24V)

    BatteryBlock (12V)

    BatteryString #2 (24V)

    Battery Symmetry Mid-point or Block Measurement

    One measurement per string

    —0V OuterTerminal

    +24V Outer Terminal

    Intercell Link

    2-1 X:****

    Sym

    met

    ry 1

    + -

    Card, Art. 200576 Serial Switches

    Set all 4 switches OFF (up)

    Block1

    + - + -

    Block2

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 20

    Terminals & Pin-out Location, Battery Interface Card The Smartpack controller’s battery monitoring signals are accessible on D-Sub connectors CON4 and CON3, on the controller’s rear panel.

    Using the Battery Connection Kit ⎯ which consists of a Battery Interface Card (Art. 200576) and a standard 15 pins D-Sub cable ⎯ you can make the signals on CON4 accessible at any suitable location inside your system, e.g. near the battery blocks.

    When extra battery monitoring signals are required, you can use an extra Battery Connection Kit connected to the controller’s CON3.

    For detailed information about the card’s pin-out location and terminal block connections, refer to the figures in this section.

    For temperature monitoring of the battery compartment, we recommend the use of the Temperature Sense Kit, instead of connecting the sensor cable directly to the terminals, pin 9-10.

    The Temperature Sense Kit is connected to the Battery Interface Card (Art. 200576), or directly to the controller’s CON3 or CON4, if unused.

    15 pins D-Sub cable

    Card Art.200576

    Battery Connection Kit

    Temp. sensor

    Temp. Sensor cable

    Temperature Sense Kit

    In

    1.5 mm2, max.wire section

    Battery Connections (Internal) Configurable monitoring digital inputs

    FUNCTION SIGNAL PIN-OUT

    (Internal Connections)

    4 3 2 1

    5

    9 8 7 6

    10

    14 13 12 11

    X:**** Batt. Symmetry 1 +−

    +−+−+−

    Batt. Symmetry 2

    Batt. Symmetry 3

    Batt. Symmetry 4

    (Fro

    m in

    tern

    al

    batte

    ries)

    (Fro

    m a

    rea

    with

    in

    tern

    al b

    atte

    ries)

    Temperaturesensor

    +−Temperature Sense 1

    (NA)

    (NA)

    (Fro

    m a

    rea

    with

    in

    tern

    al b

    atte

    ries)

    Temperature sensor

    15-pins D-Sub female

    (Alternative use of Temp. Sense Kit, instead of connecting to X:****, 9-10)

    Temperature Sense 1

    X**/X*15-pins D-Sub male

    1 5

    11 15

    Card Art.200576

    To S

    mar

    tpac

    k,C

    ON

    4

    CON3A or CON4A 15-pins D-Sub female

    1 11

    5 15

    In

    1.5 mm2, max.wire section

    Battery Connections (Internal) Configurable monitoring digital inputs

    FUNCTION SIGNAL PIN-OUT

    (Internal Connections)

    4 3 2 1

    5

    9 8 7 6

    10

    14 13 12 11

    X:*** +−+−+−+−

    (Fro

    m in

    tern

    al

    batte

    ries)

    (Fro

    m a

    rea

    with

    in

    tern

    al b

    atte

    ries)

    Temperaturesensor

    +−

    (Fro

    m a

    rea

    with

    in

    tern

    al b

    atte

    ries)

    Temperature sensor

    15-pins D-Sub female

    (Alternative use of Temp. Sense Kit, instead of connecting to X:***, 9-10)

    Temperature Sense 2

    X**/X*15-pins D-Sub male

    1 5

    11 15

    Card Art.200576

    To S

    mar

    tpac

    k,C

    ON

    3

    CON3A or CON4A 15-pins D-Sub female

    1 11

    5 15

    The Temperature Sense Kits may also be connected directly to the Smartpack controller’s CON3 or CON4, if these connectors are unused.

    Batt. Symmetry 5

    Batt. Symmetry 6

    Batt. Symmetry 7

    Batt. Symmetry 8

    Temperature Sense 2

    Batt Current 2

    Batt Fuse Fail 2

    Miscellaneous Battery Monitoring

    Terminals & Pin-out Location

    Battery Interface Card, Art. 200576 14

    1

    Serial Switch

    For Temp. Sense Kit

    CON3A or CON4A

    X***/X****X**/X*

    1

    Alarm Outputs & Digital Inputs Card, Art. 105954

    System Connections Card, Art. 200625

    Smartpack

    Battery ConnectionsCard, Art. 200576

    Battery ConnectionsCard, Art. 200576

    CO

    N3A

    CON3CON4

    CO

    N4A

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 21

    Standard Alarm Relays & Digital Inputs Connections

    The alarm outputs in Flatpack2 systems use the Fail-Safe Operation Mode (relay coils energized in the system’s normal operation mode). When the system is in alarm mode, the alarm relay coils are de-energized.

    The figure shows the position of the relay contacts when the relay coils are de-energized (PS system in alarm mode)

    In order to implement monitored fail-safe digital inputs circuits, the external relay coil must be energized and the contacts closed in the system’s normal mode of operation.

    Terminals & Pin-out Location, Alarm Interface Card The Smartpack controller’s alarm and digital input monitoring signals are accessible from the controller’s rear panel, on mini power connector CON1 (2 outputs & 2 inputs) and on D-Sub connector CON2 (4 outputs & 4 inputs).

    Using the Alarm Interface Card (Art. 105954) and two interface cables, you can make the signals on CON1 & 2 accessible at any suitable location inside your system.

    For detailed information about the card’s pin-out location and terminal block connections, refer to the figures in this section.

    The figure shows the position of the relay contacts when the relay coils are de-energized (PS system in alarm mode. Factory Settings in bold)

    Standard Relays & Digital Inputs

    Correct Use of Digital Inputs (example)

    Normal ModeExternal Relay Y(Energized coil)

    +—

    Digital Input X (Normal mode)

    Alarm ModeExternal Relay Y

    (De-energized coil) +

    —Digital Input X (Activated)

    Flatpack2 PS System

    Correct Use of Alarm Outputs (example) Flatpack2 PS System

    +

    NC

    NOCom

    Normal ModeRelay X

    (Energized coil)

    +—

    Alarm Mode

    Relay X(De-energized coil) NC

    NOCom

    4 3 2 1

    5

    9 8 7 6

    10

    X:*

    (Customer Connections)

    Input Circuit 1

    Input Circuit 2

    Alarm Circuit 1

    Alarm Circuit 2

    Out In

    (To

    and

    from

    ex

    tern

    al e

    quip

    men

    t)

    1.5 mm2, max.wire section

    Relay 2Mains Alarm

    Relay 1Common Alarm

    +−

    NOCOM

    NC

    NOCOM

    NC

    +−

    Digital Input 1

    Digital Input 2

    Alarm Outputs & Digital InputsVoltage free relay outputs and Configurable monitoring digital inputs

    FUNCTION SIGNAL PIN-OUT

    Input Circuit 3

    Alarm Circuit 3

    Input Circuit 4

    Input Circuit 5

    Input Circuit 6

    Alarm Circuit 4

    Alarm Circuit 5

    Alarm Circuit 6

    4 3 2 1

    5

    9 8 7 6

    10

    14 13 12 11

    15

    X:**

    16 17 18 19 20

    +−

    +−

    +−

    +−

    NOCOM

    NC

    NOCOM

    NC

    NOCOM

    NC

    NOCOM

    NC

    Digital Input 3

    Digital Input 4

    Digital Input 5

    Digital Input 6

    Relay 3Fuse Alarm

    Load & Battery

    Relay 5Low Battery Alarm

    Relay 6Rectifier Alarm

    (To

    exte

    rnal

    equ

    ipm

    ent)

    (Fro

    m e

    xter

    nal e

    quip

    men

    t)

    Card Art.105954 1

    To S

    mar

    tpac

    k,C

    ON

    25

    To S

    mar

    tpac

    k,C

    ON

    19

    Relay 4High Battery Alarm

    Alarms & Monitoring Miscellaneous

    Terminals & Pin-out Location

    Alarm Outputs & Digital Inputs Card, Art. 105954(or Art. 200916 when X** and CON2A are not mounted)

    CON2A CON1A

    1 10 20 1

    X* X**

    Alarm Outputs & Digital Inputs Card, Art. 105954

    System Connections Card, Art. 200625

    Smartpack

    Battery Connections Card, Art. 200576

    Battery Connections Card, Art. 200576

    CON1A

    CON2A

    CON2

    CO

    N1

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 22

    Terminals & Pin-out Location, System Interface Card Flatpack2 systems are shipped from factory with the CON5 signals already connected.

    Some of the Smartpack controller’s internal system signals are accessible on D-Sub connector CON5, on the controller’s rear panel.

    Using the System Interface Card (Art. 200625) and a standard 15 pins D-Sub cable, the signals on CON5 may be accessible at any suitable location inside your system.

    For detailed information about the card’s pin-out location and terminal block connections, refer to the figures in this section.

    LVD Latching Contactors Connections

    Flatpack2 systems’ LVBD and LVLD3 functionality is implemented by the Smartpack controlling magnetically latching contactors.

    The coil of latching contactors is not energized in any state. They change state from open to close, or vice versa, when a reversed pulse is applied to the coil.

    3 LVBD, Low Voltage Battery Disconnect; LVLD, Low Voltage Load Disconnect

    Latching Contactors, LVD1 & LVD2

    A latching contactor changes state only when a reversed pulse voltage is applied to its coil

    + Pulse

    ON

    - Pulse

    OFF

    Correct Use of Latching Contactors (example)

    PCB Art. 200625

    10

    8 9

    X:*****

    +

    LVD1A

    LVD2A LVD Common

    Smartpack Unit

    Flatpack2 PS System (internal)

    11

    LVD Common

    Latching Contactor LVD2

    Y

    X

    Latching Contactor LVD1

    Y

    X

    +

    4 3 2 1

    5

    9 8 7 6

    10 11

    X:***** Power Input

    −+−+−

    10156

    712

    139+, Neg.D.

    11−,Pos.D.1+/−3+/−

    2+/−

    Batt. Fuse Fail 1Load Fuse Fail 1

    Batt. Current 1

    LVD1A LVD Common LVD1

    OutIn

    Term

    inal

    Boa

    rd, A

    rt. 2

    0062

    5 (T

    o S

    mar

    tpac

    k, C

    ON

    5)

    (Internal Connections)

    Syst

    em C

    onne

    ctio

    ns

    JP2

    LVD2ALVD Common LVD2(To latching contactors LVD1 & LVD2)

    Miscellaneous Internal Connections

    JP1 and JP2 are used to configure thesystem for Negative DC distribution (48 and60V systems) or Positive DC distribution(24V systems)

    System Connections Card, Art. 200625111 CON5A

    JP1 JP2

    X*****

    Terminals & Pin-out Location

    JP1

    2 3

    1 JP2

    21

    3

    Neg. Distr.Pos. Distr.

    Neg. Distr.Pos. Distr.

    Alarm Outputs & Digital Inputs Card, Art. 105954

    System Connections Card, Art. 200625

    Smartpack

    Battery Connections Card, Art. 200576

    Battery Connections Card, Art. 200576

    CO

    N5A

    CON5

    Latching Contactor

    Y

    X

    Bidirectional diode

    Warning! The bidirectional diode must always be mounted to avoid dam-aging the controller.

  • Quick Start Guide Flatpack2 PS System 356804.103, v5-2006-11 23

    Location of Major Components Generic Overview Refer to the specific drawings included with your Flatpack2 PS system, for information regarding the exact location of components in your system

    Flatpack2 Integrated System, 2U Miscellaneous

    Load Fuses Battery Fuses

    Front view

    1U

    1U

    Power shelf (1U high) with 4 Flatpack2 rectifiers

    DC Distribution (1U high) with built-in Smartpackcontroller, load fuses and MCBs

    USB 2.0 type B portPC connection, etc

    Rear view

    AC Terminals

    Interface I/O Terminals

    CAN bus

    SmartpackControl Unit

    Common BatteryConnections

    DC LoadTerminals

    (+, −)

    Supply Battery Connections

    Bus Bars

    LVBD

    LVLD position(not displayed)

    Load Fuses Battery Fuses

  • This product is CE marked andcomplies with all current requirementsfor relevant standards and directives.

    Copyright © Eltek Valere, 2007This document may be changed without notice

    Art. No. 356804.103, Issue 5ev, 2006 NovPublished 2006-11-25

    www.eltekvalere.com

    Headquarters: Eltek Valere 1303 E. Arapaho Rd, Richardson, TX. 75081, USA Phone: +1 (469) 330-9100 Fax: +1 (469) 330-9101

    Eltek ValereGråterudv. 8, Pb 2340 Strømsø, 3003 Drammen, Norway

    Phone: +47 32 20 32 00 Fax: +47 32 20 32 10