    RESPONSE 

    TO 

    QUERIES 

    FOR 

    TENDER 

    FOR 

    SUPPLY 

    AND 

    INSTA

    FLAP 

    GATE 

    BARRIERS 

    AND 

    TURNSTILES 

    FOR BUS STATIONS OF BUS RAPID TRANSIT SYSTEM (B

    IN AHMEDABAD CITY 

    DATE : 28TH JANUARY, 2010 

  • 8/19/2019 Flap Gates and Turnstiles Final

    2/77

     

    Response to Queries by the bidders for Flap Gate Barriers and Turnstiles:

    Sr. No. Query from Particulars Respons

    1. 

    Sivananda Electronics  For Flap Gate Barrier/Turnstiles:

    1.  Grade of Stainless steel. Finish either

    MAT or Mirror

    MAT Fin

    2.  Passenger Clearance (distance between

    two flap barrier) mentioned in tender is

    1000 mm. Normally in access control

    application distance between two boxes

    is maintained at 520mm for pedestrian

    movement and 900 for handicappedmovement. In case of 1000 mm

    distance two person can go. You can

     plan to have 520 mm passage lanes as

    required along with one 900 mm

     passage lane for handicapped.

    The vend

    opening

    type is n

     partially handicap

    retract fu

    Software

     provide

    differenttypes of c

    Sivananda Electronics 3.  What is the depth of flap barrier

    required? Width of box will depend on

     passage clearance. Height will be 1000

    mm and other dimension like depth isnot mentioned. Whether tailgate

    detection is required. Attached please

    find one such drawing of multi lane

    configuration.

    Minimum

    300MM.

    Total De

    1100MMTailgatin

    Tailgate

    Sivananda Electronics 4.  Aisle width asked as per tender is 910 910 MM

  • 8/19/2019 Flap Gates and Turnstiles Final

    3/77

    mm. normally for tripod maximum 500

    mm passage clearance and 50 mm gap

     between two tripods is suggested.

    Drawing attached for your reference.

    for whole

    Sivananda Electronics 5.  In case of tripod option, handicapped

    movement will not be possible as armswill be obstacles. You can think of P

    type motorized or manual swing gate.

    Detail attached.

    Other op

    Sivananda Electronics  6.  Damping mechanism is required for

    smooth rotation of tripod arms and

    avoids hitting users

    Required

    with Turn

    For RFID

    Sivananda Electronics 7. 

    Detail specs of RFID System, Softwarefeatures are not mentioned in the

    Tender.

    The procunits insmentione

     bidder sh

    the Systsoftware

    compone

    Sivananda Electronics 8.  Details of RFID token collector

    mechanism is not mentioned in the

    Tender.

    The Tok

    have a token. Th

    to either on the in

    The tokehave a bi

  • 8/19/2019 Flap Gates and Turnstiles Final

    4/77

      Sivananda Electronics 9.  Resident Engineer option is suggested

    for ON time required by you.

    Service L

    have beevendor n

    in-order

    obligatiowith ser

    vendor.

    Others

    Sivananda Electronics  10. Payment Terms: Some better payment

    is expected like 20% advance, 70% on

    delivery and 10% after installation.

    The paym

    tender do

    Sivananda Electronics 11. Tender submission date extension is

    requested by 15-20 days

    The tend per the te

    2 Kaizen Engineering Systems

    Pvt. Ltd.

    1. 

    Can we quote only for turnstiles? Is

    there any preference or greater points

    assigned to suppliers who can supply

    flapgates and turnstiles?

    The bidd

    well as preferenc

    who quot

    Kaizen Engineering Systems

    Pvt. Ltd.

    2.  The payment terms are very tough.

    Please relax these payment terms to

    allow for 90% against delivery and

    installation and balance against

    commissioning.

    The paymtender do

    Kaizen Engineering Systems

    Pvt. Ltd.

    3.  Please specify if the tokens to be used

    on the access gates are ISO 14443 type

    A?

    Yes

    Kaizen Engineering Systems

    Pvt. Ltd.

    4.  Can the Demand draft be taken from a

    scheduled bank also?

    The termDemand

    documen

  • 8/19/2019 Flap Gates and Turnstiles Final

    5/77

     

  • 8/19/2019 Flap Gates and Turnstiles Final

    6/77

    TENDER FOR THE SUPPLY AND INSTALLATION

    OF FLAP GATE BARRIERS AND TURNSTILES FOR BUS

    STATIONS OF BUS RAPID TRANSIT SYSTEM (BRTS)

    IN AHMEDABAD CITY

    AHMEDABAD MUNICIPAL CORPORATION

    January 2010

    Ahmedabad Municipal Corporation,

    Opposite Khamasa Gate,

    Sardar Patel Bhavan,Danapith, Ahmedabad

  • 8/19/2019 Flap Gates and Turnstiles Final

    7/77

    2

    Disclaimer

    Ahmedabad Municipal Corporation (herein after called the Authority) has prepared solely

    to assist prospective Bidders in making their decision of whether or not to bid. While

    Authority has taken due care in the preparation of information contained herein and

    believes it to be accurate, neither the Authority or any of its authorities or agencies nor

    any of their respective officers, employees, agents or advisors gives any warranty or

    make any representations, express or implied as to the completeness or accuracy of the

    information contained in this document or any information which may be provided in

    association with it.

    This information is not intended to be exhaustive and interested parties are required to

    make their own inquiries that it may require in order to submit this bid. The information

    is provided on the basis that it is non–binding on Authority, any of its authorities or

    agencies or any of their respective officers, employees, agents or advisors.

    Authority reserves the right not to proceed with the bidding process at any stage without

    assigning any reasons thereof, or to alter the timetable reflected in this document or to

    change the process or procedure to be applied. It also reserves the right to decline to

    discuss the bid further with any party submitting a bid.

    No reimbursement of cost of any type will be paid to persons or entities submitting the

    Bid.

  • 8/19/2019 Flap Gates and Turnstiles Final

    8/77

    3

    Tender Notice

    (Copy of the Advertisement Issued on _____________)

    AHMEDABAD MUNICIPAL CORPORATION

    TENDER FOR SUPPLY AND INSTALLATION OF FLAP GATE BARRIERS AND

    TURNSTILES FOR BRTS BUS STATIONS IN AHMEDABAD CITY

    Authority intends to seek duly qualified interested parties for above work.   Interested

    Parties may download details from A.M.C. website  www.egovamc.com   from   11-01-2010   to

    01-02-2010   and submit their tender in a sealed envelope as specified by   16:00 hrs Dt: 01-

    02-2010.   The Tender shall be submitted to Asst. Manager (Projects), Ahmedabad Municipal

    Corporation, 2nd

    Floor, Bank Building, Sardar Patel Bhavan, Danapith, Ahmedabad 380001.

    MUNICIPAL COMMISSIONER 

    http://www.egovamc.com/http://www.egovamc.com/

  • 8/19/2019 Flap Gates and Turnstiles Final

    9/77

    4

    Table of Contents

    1   PREAMBLE............................................................................................................................................................... 7

    2 DEFINITIONS........................................................................................................................................................ 8

    3 INTERPRETATION ............................................................................................................................................ 10

    4 BID SUMMARY.................................................................................................................................................... 12

    1. FINANCIAL  CAPABILITY:......................................................................................................................................13

    2. TECHNICAL CAPABILITY:.....................................................................................................................................13

    3. DEMONSTRATION AND PRESENTATION (TO BE HELD AT DISCRETION OF THE  AUTHORITY): ........................13

    5 SCOPE OF WORK............................................................................................................................................... 19

    5.1 SCOPE OF  WORK .................................................................................................................................................19

    6 INSTRUCTION TO BIDDERS ....................................................................................................................... 20

    6.1 DOCUMENTS  CONSTITUTING  TENDER................................................................................................................20

    6.2 BIDDING  FORMAT................................................................................................................................................20

    6.3 BID  SUBMISSION  FORMAT..................................................................................................................................20

    6.4 TENDER  OPENING  PROCESS...............................................................................................................................21

    6.5 SUBMISSION DOCUMENT CHECKLIST ................................................................................................................21

    6.6 BID  SECURITY AND TENDER FEE ........................................................................................................................22

    6.7 DISCHARGE OF  BID  SECURITY OF SUCCESSFUL  BIDDER .................................................................................23

    6.8 PERFORMANCE BANK GUARANTEE / PERFORMANCE SECURITY ........................................................................24

    6.9 TECHNICAL BID EVALUATION  CRITERIA ............................................................................................................24

    6.9.1 FINANCIAL  CAPABILITY...................................................................................................................................24

    6.9.2 TECHNICAL CAPABILITY ..................................................................................................................................246.10 FURTHER  INFORMATION..................................................................................................................................26

    6.11 PRICE BID OPENING .......................................................................................................................................26

    6.12 VALIDITY PERIOD ............................................................................................................................................27

    6.13 EXTENSION OF PERIOD OF VALIDITY.............................................................................................................27

    6.14 MODIFICATION AND WITHDRAWAL OF BID...................................................................................................27

    7 OBLIGATIONS AND UNDERTAKINGS.................................................................................................... 28

    7.1 GENERAL  OBLIGATIONS OF THE SUPPLIER........................................................................................................28

    7.2 OBLIGATIONS OF THE  AUTHORITY .....................................................................................................................30

    8 SYSTEM INSTALLATION, COMMISSIONING, WORK COMPLETION AND INSURANCE32

    8.1 MONITORING AND SUPERVISION .......................................................................................................................32

    8.2 PROJECT COMPLETION ........................................................................................................................................32

    8.3 MAINTENANCE......................................................................................................................................................33

    8.4 INSURANCE...........................................................................................................................................................34

    8.4.1 INSURANCE DURING THE WARRANTY  PERIOD AND AMC  PERIOD ............................................................... 34

    8.4.2 APPLICATION OF  INSURANCE  PROCEEDS ......................................................................................................35

  • 8/19/2019 Flap Gates and Turnstiles Final

    10/77

    5

    8.4.3 VALIDITY OF THE I NSURANCE COVER............................................................................................................35

    9 COMMERCIAL AND PAYMENT TERMS.................................................................................................... 36

    9.1 PAYMENT FOR SUPPLY .........................................................................................................................................36

    9.2 PAYMENT FOR ANNUAL MAINTENANCE  CONTRACT ...........................................................................................37

    10 GENERAL TENDER CONDITIONS.............................................................................................................. 38

    10.1 LETTER OF ACCEPTANCE  & AGREEMENT .......................................................................................................38

    10.2 WORK  ORDER..................................................................................................................................................38

    10.3 LEAD TIME AND LIQUIDATED DAMAGES........................................................................................................38

    10.4 QUANTITY VARIATION.....................................................................................................................................38

    10.5 TAX LIABILITY..................................................................................................................................................38

    10.6 CHANGE M ANAGEMENT PROCEDURE .............................................................................................................39

    10.7 TERMINATION OF CONTRACT AND TERMINATION PAYMENT.........................................................................39

    10.8 DISPUTE RESOLUTION....................................................................................................................................40

    10.9 EVENTS OF DEFAULT AND  TERMINATION ......................................................................................................40

    10.9.1 EVENT OF DEFAULT.....................................................................................................................................40

    10.9.2 TERMINATION DUE TO EVENT OF DEFAULT AND  TERMINATION  PAYMENT .............................................42

    10.9.3 RIGHTS OF  AUTHORITY ON  TERMINATION................................................................................................43

    10.9.4 TERMINATION PAYMENTS ...........................................................................................................................43

    10.10 INTELLECTUAL  PROPERTY ...............................................................................................................................44

    10.11 LIABILITY .........................................................................................................................................................44

    10.12 INDEMNITY .......................................................................................................................................................44

    10.13 FORCE  MAJEURE ..............................................................................................................................................45

    10.14 INDEPENDENT  CONTRACTOR ..........................................................................................................................45

    10.15 NO ASSIGNMENT .............................................................................................................................................46

    10.16 NO CONSORTIUM ............................................................................................................................................46

    10.17 TENDER DISQUALIFICATION CRITERIA..........................................................................................................46

    10.18 UNDERSTANDING OF TERMS...........................................................................................................................47

    10.19 CONFLICT OF INTEREST ..................................................................................................................................47

    10.20 AUTHORITY’ S RIGHT TO ACCEPT ANY PROPOSAL AND TO REJECT ANY PROPOSAL ...................................... 47

    10.21 NOTIFICATION OF AWARD ..............................................................................................................................47

    10.22 SIGNING OF  AGREEMENT................................................................................................................................47

    10.23 FAILURE TO AGREE WITH THE TERMS AND CONDITIONS ..............................................................................48

    10.24 SEVERABILITY AND  WAIVER...........................................................................................................................48

    10.25 REPRESENTATIONS AND WARRANTIES, DISCLAIMER ................................................................48

    10.25.1 REPRESENTATIONS AND WARRANTIES OF THE SUPPLIER .......................................................................48

    10.25.2 DISCLAIMER ................................................................................................................................................50

    10.25.3 REPRESENTATIONS AND WARRANTIES OF  AUTHORITY ............................................................................5010.25.4 GOVERNING  L AW AND JURISDICTION .......................................................................................................51

    10.25.5 SURVIVAL ....................................................................................................................................................51

    10.25.6 AMENDMENTS ..............................................................................................................................................51

    10.25.7 NO PARTNERSHIP ........................................................................................................................................51

    10.26 MISCELLANEOUS ..............................................................................................................................................51

    10.26.1 LANGUAGE ...................................................................................................................................................51

  • 8/19/2019 Flap Gates and Turnstiles Final

    11/77

    6

    10.26.2 OWNERSHIP AND PROTECTION OF  PROPERTY ..........................................................................................52

    LIST OF ANNEXURES

    ANNEXURE  1: FORWARDING LETTER ..................................................................................................................................53

    ANNEXURE  2: FORMAT FOR POWER OF ATTORNEY OF BIDDER APPOINTING DESIGNATED REPRESENTATIVE  .............55

    ANNEXURE  3: FORMAT FOR TECHNICAL BID......................................................................................................................56

    3.1 CAPABILITY STATEMENT ...............................................................................................................................................56

    3.2: FORMAT FOR PROVIDING REFERENCES......................................................................................................................57

    3.3: QUALITY AND  TECHNICAL SOLUTION.........................................................................................................................58

    ANNEXURE  4: FORMAT FOR PRICE BID ..............................................................................................................................59

    ANNEXURE  5: FORMAT FOR PERFORMANCE  BANK GUARANTEE ........................................................................................61

    ANNEXURE  6: TECHNICAL SPECIFICATIONS AND SERVICE L EVEL CONDITIONS FOR FLAP GATES AND TURNSTILES ..63

    (1) FLAP G ATES / FLAP BARRIER .......................................................................................................................................63

    (2) TURNSTILES ..................................................................................................................................................................66

  • 8/19/2019 Flap Gates and Turnstiles Final

    12/77

    7

    1 PREAMBLE

    Ahmedabad Municipal Corporation invites Technical Bids and Price Bids from interested

    Bidders for supply of Flap gates and Turnstiles for bus stations for Bus Rapid Transit

    System (BRTS) in Ahmedabad city. The broad scope of work for Bidder includes supply

    and installation of the above mentioned Flap gates and Turnstiles.

    The Bids shall be prepared in English and all entries must be typed and written in blue /

    black ink. Initials of the authorized representative of the Bidder must attest all erasures

    and alterations made while filling the Bids. Over-writing of figures in Price Bid is not

    permitted. Failure to comply with any of these conditions may render the Bid invalid. A

    copy of this tender document with all pages signed by the Bidder’s authorized

    representative shall accompany the bid.

    Authority shall not be responsible for any costs or expenses incurred by the Bidders in

    connection with the preparation and delivery of bids, including costs and expenses

    related to visits to the sites. Authority reserves the rights to cancel, terminate, change

    or modify this process and/or requirements of bidding stated in the Tender, without

    assigning any reason or providing any notice and without accepting any liability for the

    same.

    The bid evaluation process is detailed in instruction to Bidders in Tender. The Capability

    Statement would be evaluated based on the criteria set forth in Tender.   Only those

    firms/companies who qualify based on the evaluation of their Technical Bids

    will be qualified Bidders for the purpose of opening of price bids and its

    evaluation.

    The date of opening of Price Bids will be communicated in writing to such Bidders at a

    later date.

  • 8/19/2019 Flap Gates and Turnstiles Final

    13/77

    8

    2 DEFINITIONS

    ‘Ahmedabad Municipal Corporation’   or   ‘Authority’   shall mean the company

    established in July 1950 under the Bombay Provincial Corporation Act, 1949, responsible

    for the civic infrastructure and administration of the city of   Ahmedabad.

    ‘Annual Maintenance Contract or AMC’   shall mean the comprehensive contract for

    maintenance of the supplied units in force after the Warranty Period to be signed at the

    discretion of the Authority and for which the Bidder is required to quote in his bid.

    ‘Agreement’ shall mean the Agreement entered into between the Authority and the

    Successful Bidder for the currency of this contract.

    ‘Bid’   or  ‘Detailed Bid’   or   ‘Tender’   shall mean the detailed Bid submitted by the Bidder

    in response to this tender including clarifications and/or amendments, if any.

    ‘Bid Security’   or  ‘EMD’  shall mean the Security furnished by the Bidder, as part of the

    Detailed Bid.

    “Completion or Project Completion “with respect to each unit shall mean the

    successful installation and demonstration of each supplied unit as per specifications.

    ‘Due Date’   shall mean the last date for submission of bid by the Bidders.

    ‘Firm’  shall mean a single legal entity, which is a registered body, Government agency

    or statutory body.

    ‘Letter of Intent’   or ‘Letter of Acceptance”   shall mean the letter to be issued by

    Authority to the Preferred Bidder indicating the acceptance of his offer in accordance

    with the conditions of this Tender document.

    ‘Performance Security’ or   ‘Performance Bank Guarantee’   shall mean the Bank

    Guarantee furnished by the successful Bidder as per the terms and conditions of this

    tender.

    http://en.wikipedia.org/wiki/Ahmedabadhttp://en.wikipedia.org/wiki/Ahmedabad

  • 8/19/2019 Flap Gates and Turnstiles Final

    14/77

    9

     “Project Site”   shall mean the site of the Bus Stations where the supplied units are to

    be installed.

    ‘Supplier’  shall mean the successful Bidder who has been selected by Authority for the

    currency of this contract.

    ‘System’  means the Flap gate/ Turnstile units being purchased by the Authority as per

    the scope and terms of this Tender.

    ‘Taxes and Duties’   shall mean all taxes, duties, fees etc. payable as per applicable

    laws in India in connection with the procurement, development, installation, operation,

    maintenance and management of Work.

    ‘Work’   or  ‘Works’   shall mean Supply and installation of Flap gates and/ or Turnstiles

    for bus stations with 3 (three) years Warranty Period, with 4 more years of Annual

    Maintenance at the option of Authority for Bus Rapid Transit System (BRTS) in

    Ahmedabad city.

     ‘Work Order’  will have reference to the LoA or LoI for this Work

  • 8/19/2019 Flap Gates and Turnstiles Final

    15/77

    10

    3 INTERPRETATION

    In the interpretation of this Tender, unless the context otherwise requires:

      The singular of any defined term includes the plural and vice versa, and any word or

    expression defined in the singular has the corresponding meaning used in the plural

    and vice versa;

      A reference to any gender includes the other gender;

      Unless otherwise stated, a reference to a Clause, Sub-Clause, Paragraph,

    Subparagraph, Annex, Exhibit, Attachment, Schedule or Recital is a reference to a

    Clause, Sub-Clause, Paragraph, Subparagraph, Annex, Exhibit, Attachment, Schedule

    or Recital of this Tender.

      A reference to any agreement is a reference to that agreement and all annexes,

    attachments, exhibits, schedules, appendices and the like incorporated therein, as

    the same may be amended, modified, supplemented, waived, varied, added to,

    substituted, replaced, renewed or extended, from time to time, in accordance with

    the terms thereof;

      The terms “include” and “including” shall be deemed to be followed by the words

     “without limitation”, whether or not so followed;

      Any reference to a person shall include such person’s successors and permitted

    assignees;

      A reference to a “writing” or “written” includes printing, typing, lithography and other

    means of reproducing words in a visible form;

      Any date or period set forth in this Tender shall be such date or period as may be

    extended pursuant to the terms of this Tender ;

  • 8/19/2019 Flap Gates and Turnstiles Final

    16/77

    11

      A reference to “month” shall mean a calendar month, and a reference to “day” shall

    mean a calendar day, unless otherwise specified.

      The terms “hereof, “herein”, “hereto”, “hereunder” or similar expressions used in this

    Tender mean and refer to this Tender and not to any particular Article,

      The terms “Article”, “Clause”, “Paragraph” and “Schedule” mean and refer to the

    Article, Clause, Paragraph and Schedule of this Tender so specified;

      In case of inconsistency between the terms mentioned in the Bid Summary and

    detailed description, the terms of the Bid Summary shall prevail.

  • 8/19/2019 Flap Gates and Turnstiles Final

    17/77

    12

    4 BID SUMMARY

    Sr.

    No.

    Key

    Information

    Details

    1   Tender for   Supply and Installation of Flap gates and Turnstiles for

    Bus Stations for Bus Rapid Transit System (BRTS) in

    Ahmedabad city.

    - The Bidder may quote the price per unit in the Price

    Bid for both the items.

    - The Authority shall select the final Bidder for one or a

    combination of both items for Flap Gates/ Turnstiles.

    Final decision regarding the same shall vest with the

    Authority.

    - The price of the item that will be lower will get a

    preference.

    2   Numbers of  

    units to be

    quoted for

    175 units of Flap gates

    175 units of Turnstiles

    In the event of additional units asked for by the

    Authority, they shall be provided at the same ratequoted in this bid and no incremental cost per unit shall

    be provided on such additional units.

    3   Nodal

    Department

    Ahmedabad Municipal Corporation

    4   Project Site/

    Work Site

    Ahmedabad

    5   Tender

    Submission

    Format

    a) Envelope 1: Bid Security and Tender fee,

    b) Envelope 2:   Forwarding Letter, Technical Bid as per

    Annexure 3 and the Tender Document signed on each

    page by the Bidder’s authorized representative,

    Signatory’s authorization.

  • 8/19/2019 Flap Gates and Turnstiles Final

    18/77

    13

    c) Envelope 3:  Price Bid

    6   Tender

    Evaluation

    a)   Envelope 1:   Test of Responsiveness of the bid based

    on Pass/Fail for Bid Security and Tender fee and timely

    submission, marking and sealing.

    b)  Envelope 2:  Evidence of meeting necessary eligibility

    and qualifications criteria as Eligibility and Qualification

    Criteria, Authorization of signatory in the form of Board

    Resolution/ Partner’s Resolution or Power of Attorney, as

    applicable.

    c) Envelope 3:  Price Bid

    7   Evaluation

    Criteria

    1. Financial Capability:

    Bidder’s annual audited turnover for the last Financial

    year shall be more than Rs. 2 Crore (from the business

    in India only).

    2. Technical Capability:

    Based on percentile marking System with 60 as

    qualifying marks.

    1)   No of Units supplied / commissioned in Public Transit

    System during the last 3 years from the due date of 

    tender. (30% weightage)

    2)   No of Units supplied / commissioned during the last 3

    years from the due date of tender (30%)

    3)   The extent to which the Bidder has local resources,

    presence or tie-up. (15%)

    4)   Quality Assurance Program for executing the Works in

    place. (15%)

    5)   Project management capabilities (10%)

    3. Demonstration and presentation (to be held at

    discretion of the Authority):

    1. Bidders meeting financial and technical capability

    criteria would be called for a demonstration of the

  • 8/19/2019 Flap Gates and Turnstiles Final

    19/77

    14

    prototype.

    2. The purpose of the demonstration would be to ensure

    that there are no significant deviations from the

    technical specifications

    Bidders would finally be declared qualified if there are no

    deviations in technical specifications which cannot be

    permitted.

    8   Tender Validity   The tender shall be valid for period of 180 Days from the

    Due Date of Bid Submission.

    9   Time Limit   1. Total time limit for the whole work shall be 365 days

    2. Time limit for the installation for an individual unit

    shall be 15 days from the day of handing over of thesite from the Authority to the supplier.

    10   Bid Security   Rs. 2,50,000/- (Rs. Two lakh fifty thousand only) in the

    form of a demand draft from a Nationalized Bank drawn

    in favour of “Municipal Commissioner” and payable at

    Ahmedabad.

    11   Performance

    Security

    Within 30 (thirty) days of receipt of Letter of Acceptance,

    the successful Bidder shall furnish a Performance

    Security to Authority, for an amount equal to 5% of the

    Bid Value (excluding cost of AMC) and payable in the

    form of a Bank Guarantee from any Nationalized Bank.

    The general format of the bank guarantee for

    Performance Security is set forth in Annexure 5 of this

    Tender.

    The Performance Security shall be valid up to the end of 

    warranty period and an additional period of 90 (ninety)

    days thereafter.

    12   Non- refundable

    Tender Fee

    Rs. 10,000 (Rs Ten Thousand Only) in the form of 

    Demand Draft in favor of “Municipal Commissioner”, and

  • 8/19/2019 Flap Gates and Turnstiles Final

    20/77

    15

    payable at Ahmedabad.

    13   Supply/

    Installation of 

    Flap gates and

    Turnstiles

    The Flap gate/ Turnstile units shall be supplied against

    Request for Supply by Authority. Such request shall be in

    writing, indicating the number to be supplied, and the

    supply and installation must be completed within 15

    days of the date of request. Such requests shall be

    continued to be made until the order is exhausted.

    14   Completion

    Certificate

    The Authority/ its authorized representative shall issue a

    Completion Certificate upon successful installation and

    demonstration to the satisfaction of Authority.

    15   Warranty

    Period

    Each unit supplied shall have a warranty period of three

    (3) years commencing from the date of issue of 

    Completion Certificate. During the warranty period, any

    complain will be required to be attended to as per

    specified service levels.

    16   Annual

    Maintenance

    Contract

    Beginning from the end of the Warranty Period, the

    Authority may, at its sole discretion, require the supplier

    to provide maintenance for a further period of fours (4)

    years under an Annual Maintenance Contract. The termsof the maintenance contract are part of this tender

    document. The Bidder is required to quote annual fees

    separately in the Price Bid for maintenance beyond the

    specified warranty period. Price Bids without quote for

    AMC shall be summarily rejected.

    Payment during the Maintenance period shall be made

    annually at the end of each year after issue of  

    Satisfactory Service Certificate for the tenure from the

    Authority.

    17   Payment Terms   Order to be placed according to quantities required.

  • 8/19/2019 Flap Gates and Turnstiles Final

    21/77

    16

    Installation shall be done by the Supplier in 15 days of 

    written order.

    50% of the invoiced amount shall be paid upon

    successful installation and demonstration of 

    operation only. 40% of the amount shall be paid

    on 3 months satisfactory operations of the System

    and the balance 10% on 6 months satisfactory

    operations of the System of the concerned units.

    Payment can be made as per batch wise orders placed.

    Payment shall be made within 30 days of invoice.

    If the successful installation and commissioning of the

    units is delayed as per Specifications, the Authority shallbe entitled, by reasonable notice, to forfeit the

    Performance Security.

    18   Signing of  

    Agreement

    Agreement shall be signed between Authority and

    Supplier incorporating the terms of the tender as

    directed by Authority.

    19   Pre-Bid Meeting   Pre-bid meeting shall be held at   13.00   hrs on   22-01-

    2010   in the office of Authority.

    Bidders are required to send their queries for pre-bid

    meeting in MS Word format only through email to

    [email protected]   and

    [email protected]  on or before  21-01-2010

    by 17.00 hours.

    20   Due Date of  

    Tenders

    On   01-02-2010   Upto   16.00 hrs   in the office of  

    Authority at Asst. Manager (Projects), Ahmedabad

    Municipal Corporation, 2nd Floor, Bank Building, Sardar

    Patel Bhavan, Danapith, Ahmedabad.

    21   Date of opening

    of Tenders

    At   17.00 hrs   on   01- 2-2010   in the office of Authority

    at Asst. Manager (Projects), Ahmedabad Municipal

    Corporation, 2nd Floor, Bank Building, Sardar Patel

  • 8/19/2019 Flap Gates and Turnstiles Final

    22/77

    17

    Bhavan, Danapith, Ahmedabad.

    22   Liquidated

    Damages/

    Penalty

    In the event of the units of Flap Gates/ turnstiles not

    being supplied/ installed in time in operable condition as

    per its specifications, Authority, at its own discretion,

    reserves the right to charge liquidated damages of 0.5%

    of value of delayed units per every week of delay in

    successful installation and commissioning as per the

    specifications. Such LDs will not exceed 10% of the

    value of the units.

    23   Taxes   The amount quoted in the price bid shall have to be all-

    inclusive, including service tax and all other taxes,

    cesses and charges.

    24   Storage/

    Godown Facility

    The Supplier shall have to make his own arrangement

    for the storage of the materials required for this work.

    The Authority shall have no responsibility to provide for

    any such storage facility to the Supplier.

    25   Insurance   The Supplier shall, at its cost and expense, purchase and

    maintain during the Implementation period, Warranty

    period and AMC period such insurances as arenecessary, including but not limited to the following:

    (a) Supplier’s all risk insurance;

    (b) Comprehensive third party liability insurance

    including injury or death to personnel of Persons who

    may enter the Project Site;

    (c) Workmen’s compensation insurance;

    (d) Any other insurance that may be necessary to

    protect the Supplier, its employees and its assets

    (against loss, damage or destruction at replacement

    value) including all Force Majeure Events that are

    insurable and not otherwise covered in items (a) to (c).

  • 8/19/2019 Flap Gates and Turnstiles Final

    23/77

    18

    The Supplier shall, from time to time, provide to the

    Authority copies of all insurance policies (or appropriate

    endorsements, certifications or other satisfactory

    evidence of insurance) obtained by the Supplier in

    accordance with this Tender.

    The Supplier shall pay the premium payable on such

    insurance policy(ies) so as to keep the policy(ies) in

    force and valid throughout the Period of Warranty and

    AMC Period and furnish copies of the same to the

    Authority.

  • 8/19/2019 Flap Gates and Turnstiles Final

    24/77

    19

    5 SCOPE OF WORK

    5.1 Scope of Work

    The Authority seeks suppliers for supply and installation of Flap gates and Turnstiles of 

    given specifications for the Bus Rapid Transit Project System Project in Ahmedabad. The

    specifications for both the items are given in Annexure 6 of this Tender Document.

    The prospective Bidders are free to seek clarifications regarding the specifications or any

    tender conditions in the pre-bid meeting or earlier in writing at the address for

    submission of this tender through e-mail/letter.

    The Scope of the work for this particular Contract shall mean and include the following:

    (a) Supply and Installation of Flab Gates and Turnstiles as per number mentioned in

    the Bid Summary and Specifications in Annexure 6 of this Tender document, at

    BRTS Bus stations as indicated by the Authority with a warranty period as

    mentioned in the Bid Summary of this Tender Document.

    (b) Maintenance of the above items during the Warranty Period and Annual

    Maintenance Contract period as specified in the Bid Summary to ensure the

    availability of the System in excess of 99% in accordance with the provisions of this

    Tender and Guidelines and Specifications as may be stipulated herein.

    (c) Performance and fulfillment of all other obligations incidental to and supporting the

    above.

  • 8/19/2019 Flap Gates and Turnstiles Final

    25/77

    20

    6 INSTRUCTION TO BIDDERS

    6.1 Documents Constituting Tender

    The Tender documents comprise the following and are to be read together:

    (i) This tender document, and

    (ii) Other documents constituting the Tender and acceptance thereof and shall be

    deemed to include any amendments, modifications to the tender document or its

    constituent document.

    6.2 Bidding Format

    The Bidding is a two stage process comprising the Technical Bid and the Price Bid. The

    purpose of the Technical Bid is to ensure the technical and financial capability of the

    Bidder to supply the products and services as required. Price Bids of only those Bidders

    qualifying in the Technical Bid would be opened.

    6.3 Bid Submission Format

    The Bidders will submit the Bid in three sealed envelopes, the details for which are

    specified below. The title of the envelope shall be super scribed on the sealed envelope.

    Envelope 1

    (1) Bid Security and (2) Tender fee in the form of Demand Draft from Nationalized Bank

    in favour of “Municipal Commissioner”, and payable at Ahmedabad. The envelope shall

    be titled  “Envelope 1 – Tender Fee and Bid Security”.

    Envelope 2

    a) Cover Letter as per Annexure 1.

    b) Copy of tender document signed on every page by the Authorized representative

    of the Bidder.

  • 8/19/2019 Flap Gates and Turnstiles Final

    26/77

    21

    c) Also, the Authorization of signatory in the form of Board Resolution/ Partner’s

    Resolution or Power of Attorney, as applicable shall also be provided in this

    Envelope.

    d) Technical Bid as per Annexure 3.

    The envelope shall be titled  “Envelope 2 – Technical Bid“

    Envelope 3

    a) Price Bid

    The envelope shall be titled  “Envelope 3 – Price Bid“

    6.4 Tender Opening Process

    On the day of tender opening, Envelope 1 would be opened first and the Bid Security

    and Tender fee would be verified.

    On successful verification of the same, Envelope 2 would be opened.

    The Bidder would be awarded points for the technical bid as per Clause 6.9.2 of this

    tender document. Also, the evaluation shall be done on the basis of the contents of 

    Envelope 2 as against the criteria specified in the Tender document.

    Envelope 3 shall be opened of only those Bidders who satisfy the Technical evaluation

    criteria.

    The formats and checklists for each submission have been explained in the Tender.

    6.5 Submission Document Checklist

    Bidders would be required to submit the following documents. The formats for these

    documents where applicable are placed as Annexure.

    Envelope

    No,

    Documents   Relevant Annexure

    for format/guidelines

    1     Tender fee and Bid Security in the form of 

  • 8/19/2019 Flap Gates and Turnstiles Final

    27/77

    22

    demand draft in favour of “Municipal

    Commissioner”, and payable at Ahmedabad.

    2 Technical Bid :

      Forwarding Letter

      Capability statement

      Audited Financial Statements for last 3

    years/ additional documents indicating

    turnover from business in India only

      List of References / work completed along

    with Work orders / Satisfactory Completion

    Certificates

      Quality and Technical Solution Literature   Any quality certifications

      Copy of tender document signed on every

    page by the Bidder’s authorized

    representative.

      Authorization of signatory in the form of 

    Board Resolution/ Partner’s Resolution or

    Power of Attorney, as applicable.

    Annexure 1,2 3

    3     Price Bid Annexure 4

    6.6 Bid Security and Tender fee

    Tender submitted in response to the Tender Document shall be accompanied by Tender

    Fee and Bid Security as mentioned in the Bid Summary of this tender document.

    (1) The bid security furnished by the successful Bidder shall be refunded after the

    acceptance of Performance Security.

    (2) Bids not accompanied with requisite Bid security shall be summarily rejected.

    (3) The bid security shall be returned to the Bidder –

    (a) Whose bid has not been accepted by the Authority.

  • 8/19/2019 Flap Gates and Turnstiles Final

    28/77

    23

    (b) Whose bid has been accepted by the Authority but after receipt of Performance

    security.

    (c) If the Bid Security is not from a Nationalized Bank.

    (4) Bid security is a non interest bearing deposit.

    6.7 Discharge of Bid Security of successful Bidder

    The Bid Security of a Successful Bidder shall be discharged only after the Performance

    Security is furnished by the Bidder as per the requirement. The Successful Bidder’s Bid

    Security shall not be adjusted against the Performance Security.

    Bid security shall stand forfeited in the following situations:

    (1) In case of unclear offer and/or conditional offer, such tender is not acceptable and

    so the bid security shall be forfeited.

    (2) In case of revision and/or modification of terms of bid or withdrawal of bid during

    the validity period.

    (3) In case of Bidder demands transfer of contract before acceptance of offer or after

    acceptance of offer.

    (4) For the successful Bidder, if the performance security is not deposited within the

    time period as mentioned in the Bid Summary of this tender document.

    (5) If the Agreement is not executed within the time period specified in the LoA or as

    specified by the Authority, even though performance security has been paid. (In

    this case, both Bid Security and Performance Security will be forfeited and LoA will

    be cancelled).

    (6) In the event, Bidder, after the issue of communication of acceptance of his bid by

    the Authority, fails/refuses to start/execute the work as herein the Bidder shall be

    deemed to have abandoned the work/contract and such an act shall amount to

    and be construed as the Bidder’s calculated and willful breach of contract, the costand consequences of which shall be to the sole account of the Bidder and in such

    an event the Authority shall have full right to claim damages thereof in addition to

    the forfeiture of the Bid security deposited in terms of this bid documents.

  • 8/19/2019 Flap Gates and Turnstiles Final

    29/77

    24

    6.8 Performance Bank Guarantee/ Performance Security

    The Successful Bidder shall be required to furnish a Performance Security as per the

    terms set forth in the Bid Summary of this tender document. The Bid security shall be

    returned back to the Supplier on the receipt of Performance Security. The general

    format of the bank guarantee for Performance Security is set forth in Annexure 5 of this

    Tender document.

    Provided that if the contract is terminated for reasons other that that which can be

    attributable to the Supplier, the Performance Security, shall, subject to the Authority’s

    right to receive amounts, if any, due from the Supplier under this contract, be duly

    discharged and released to the Supplier.

    Performance Guarantee in the form of a bank guarantee shall be irrevocable and valid

    for the installation and Warranty Period and an additional period of 90 (ninety) days

    thereafter. The performance guarantee shall not be released in part for different units

    despite exhaustion of warranty period for some of the units. However, Authority retains

    its absolute discretion to release performance guarantee in parts if they are satisfied

    that the warranty period exhaustion for different units is very far apart.

    6.9 Technical Bid Evaluation Criteria

    6.9.1 Financial Capability

    Bidder’s annual turnover of the last financial year for which audited results are available

    should be more than Rs. 2 Crores (from the business in India only) in order to be

    technically qualified under this bid. Annual Audited reports for the last 3 years should be

    submitted along with the technical bid.

    6.9.2 Technical Capability

    The following is an outline of the criteria that Authority would use for evaluation of the

    technical capability of the Bidder along with the weightage that would be used for each

    criterion. Evidence in the form of supporting documents should be submitted along with

    the Technical Tender. The points for the criteria shall be calculated separately for the

    Flap Gates and Turnstiles.

  • 8/19/2019 Flap Gates and Turnstiles Final

    30/77

    25

    Sr.No Description Points

    1 No of Units of Flap gates/ Turnstiles supplied / commissioned

    during the last 3 years from the due date of tender

    0-25

    2 No of Units of Flap gates/ Turnstiles supplied / commissioned

    in Public Transit System during the last 3 years from the due

    date of tender. (these units shall not be included in category

    1 in order to avoid duplication)

    0-35

    3 The extent to which the proposed Bidder has local resources,

    presence or tie-up.

    0-10

    4 Quality Assurance Programme for executing the Works in

    place.

    0-20

    5 Project management capabilities of large scale system

    integration in terms of number of large systems to which

    Bidder has supplied Flap gates and Turnstiles worth more

    than INR 1 Crore.

    0-10

    The Bidder shall produce all necessary documents in support of each of the category

    listed in the following table applicable to its bid. The supporting documents shall include,

    but not be limited by, the following:

    (1) Certificates from the customers regarding numbers of units supplied, cost of the

    project and project duration etc. attested by the statutory auditors.

    (2) Satisfactory supply and installation certificates from the clients

    (3) Quality Assurance Certificates/Programs (Such as ISO etc.)

    (4) Certificate from statutory auditors regarding value of work done in last year

    (5) Evidence of local presence/ tie up.

    (6) Other documents as necessary.

    Based on the above, the Evaluation committee appointed by the Authority or Authority

    itself will carry out its evaluation applying the evaluation criteria and point system

    specified above to each responsive bid.   Any Bidder scoring above 60, and meeting

  • 8/19/2019 Flap Gates and Turnstiles Final

    31/77

    26

    the financial criteria shall be declared eligible. Authority’s decision in this

    regard shall be final.

    Eligible Bidders, at the sole discretion of the Authority, would be required to make a

    demonstration/presentation to the Authority, indicating:

    a) The demonstration of the prototype to evidence that the unit proposed to be

    supplied is according to the Tender Specifications and what are the deviations, if 

    there are any, from the requirements.

    b) Any other relevant information/ details as might be required.

    The demonstration / presentation would serve as a platform for the Authority to betterevaluate the functioning of the units System proposed to be supplied by the bidder and

    understand whether there are any deviations that cannot be permitted.

    Based on the demonstration / presentation of the eligible Bidders, (or if the same is

    deemed not to be required, without the presentation) the Authority would qualify the

    eligible Bidders for the next stage.

    6.10Further Information

    Authority retains the right to ask for any further information that may be required from

    the Bidder for evaluation purposes.

    6.11Price Bid Opening

    After the evaluation of technical bids, the Authority shall notify qualifying Bidders,

    indicating the date and time set for opening the Price Bids.

    The Price Bid shall be opened in the presence of the qualified Bidder’s representatives

    who choose to attend. The name of the Bidder’s and the proposed price shall be read

    loudly and recorded when the Price Bid is opened.

  • 8/19/2019 Flap Gates and Turnstiles Final

    32/77

    27

    The Evaluation committee will determine whether the Price Bid is complete and will

    correct any computational error.

    The Bidder’s qualified in the technical bid and who quotes the lowest in the Price bid will

    be qualified as Preferred Bidder. Authority may hold further negotiations with the

    Preferred Bidder before the assignment of Letter of Acceptance.

    6.12Validity Period

    Bids shall remain valid for a period as mentioned in the Bid Summary of this Tender

    document. The Authority reserves the right to reject a Bid as non-responsive if such Bid

    is valid for a period which is less than specified and Authority shall not be liable to send

    an intimation of any such rejection to such Bidder.

    6.13Extension of Period of Validity

    In exceptional circumstances, the Authority may solicit the Bidder’s consent for an

    extension of the period of Bid validity. Any such request by the Authority and the

    response thereto shall be made in writing and such extension of Bid validity period by

    the Bidder should be unconditional. A Bidder may refuse Authority’s request for such

    extension without forfeiting the Bid Security. A Bidder accepting the request of Authority

    shall not be permitted to modify its Bid.

    6.14Modification and Withdrawal of Bid

    No bid may be withdrawn in the interval between the deadline for submission of bid and

    the expiration of the bid validity period and if a Bidder withdraws its bid, then the bid

    security shall be forfeited.

  • 8/19/2019 Flap Gates and Turnstiles Final

    33/77

    28

    7 OBLIGATIONS AND UNDERTAKINGS

    In addition to and not in derogation or substitution of any of the obligations set out

    elsewhere in this Tender and the subsequent Agreement, the Parties shall agree and

    undertake as under:

    7.1 General Obligations of the Supplier

    The Supplier shall at its own cost and expense:

    (a) Supply, install, and commission the Systems at BRTS bus stations/ locations

    decided by Authority in required quantity at stipulated price within specified time

    limit in accordance with the provisions of this Tender, Good Industry Practice and

    Applicable Laws.

    (b) Repair and maintain the System in full operational condition as per the terms of the

    Service Level Conditions included in Annexure 6 during the Warranty and Annual

    Maintenance Contract Period, if required through changing the Spare Parts.

    (c) Obtain all Applicable Permits in conformity with the Applicable Laws and be in

    compliance with thereof at all times for execution of its obligations.

    (d) Ensure compatibility of the System with the various softwares/ protocols of other

    components/ systems of BRTS.

    (e) Procure and maintain in full force and effect, as necessary, appropriate proprietary

    rights, licenses, agreements and permissions for materials, methods, processes and

    Systems used in or incorporated into the System.

    (f) Allow and entitle the Authority or a nominee of the Authority to step into this

    Contract at the Authority’s discretion, in place and substitution of the Supplier in

    the event of Termination pursuant to the provisions of this Tender;

    (g) Provide all assistance to the Authority or its representative as they may reasonably

    require for the performance of their duties and services under this Tender;

    (h) Provide to the Authority reports on a regular basis during the Warranty Period and

    AMC period on the progress of the project as may be demanded by the Authority.

  • 8/19/2019 Flap Gates and Turnstiles Final

    34/77

    29

    (i) Ensure and provide full cooperation and assistance to the other vendors and to the

    Authorities to ensure that the System is compatible with other components of the

    BRTS.

    (j) Make efforts to maintain harmony and good industrial relations among the

    personnel employed in connection with the performance of the Supplier’s

    obligations under this Tender.

    (k) Develop, implement and administer a Surveillance and Safety Program for the

    System and the users thereof and the Contractors personnel engaged in the

    provision of any services including correction of safety violations and deficiencies,

    and taking of all other actions necessary to provide a safe environment in

    accordance with Applicable Laws and Good Industry Practice;

    (l) Take all reasonable precautions for the prevention of accidents on or about the

    System Installation Site/ Facility.

    (m) Not to place or create nor to permit any Contractor or other person claiming

    through or under the Supplier to create or place any Encumbrance over all or any

    part of the Project Assets, or on any rights of the Supplier therein, save and except

    as expressly set forth in this Tender;

    (n) Be responsible for safety, soundness and durability of the System including all

    structures forming part thereof and their compliance with the Specifications and

    Standards set forth in this Tender through out the warranty period and the AMC

    period.

    (o) Remove promptly upon installation and according to Good Industry Practice, from

    the Installation/Project Site, all surplus installation machinery and materials, waste

    materials, rubbish and other debris and keep the site in a neat and clean condition

    and in conformity with the Applicable Laws and Applicable Permits.

    (p) Have requisite organization and designate and appoint suitably qualified officers/

    representatives as it may deem appropriate to supervise the implementation of its

    obligations under this Tender and to deal with the Authority or its representative

  • 8/19/2019 Flap Gates and Turnstiles Final

    35/77

    30

    and to be responsible for all necessary exchange of information required pursuant

    to this Tender;

    (q) Undertake, do and perform all such acts, deeds and things as may be necessary or

    required to adhere to Project Completion under and in accordance with this Tender;

    (r) Make available for inspection by Authority or any authorized person of the

    Authority, copies of Tender, subsequent Agreement, Maintenance Manual and

    copies of all documents relating to safety and its safety standards free of charge.

    (s) The Supplier shall be responsible for ensuring that any existing utility on, under,

    above, adjacent, adjoining or near the Project Site is kept in continuous satisfactory

    use, if necessary, by the use of suitable temporary or permanent diversions with

    prior approval of the Authority.

    7.2 Obligations of the Authority

    The Authority shall:

    (a) Permit the Supplier to work on the project site to execute its obligations.

    (b) Grant or where appropriate provide necessary assistance to the Supplier in securing

    Applicable Permits;

    (c) Grant in a timely manner all such approvals, permissions and authorizations whichthe Supplier may require or is obliged to seek from the Authority in connection with

    implementation of the Project and the performance of the Supplier’s obligations as

    per the tender;

    (d) Ensure peaceful use of the Site by the Supplier without any let or hindrance from

    the Authority or persons claiming through or under it;

    (e) Upon written request from the Supplier, assist the Supplier in obtaining access to

    necessary infrastructure facilities and utilities, including water, electricity andtelecommunication facilities at rates and on terms no less favorable to the Supplier

    than those generally available to other contractors/ suppliers of the Authority

    supplying substantially similar equivalent facilities/utilities. This provision shall not

  • 8/19/2019 Flap Gates and Turnstiles Final

    36/77

    31

    entitle the Supplier to be excused from its obligations under the Tender for the

    Authority being unable to supply such assistance.

    (f) Ensure that no barriers are erected or placed by the Authority or any Governmental

    Agency on the Site, except on account of any law and order situation or upon

    national security considerations;

    (g) Make payments in timely manner for work completed in a satisfactory manner as

    per the payment terms.

  • 8/19/2019 Flap Gates and Turnstiles Final

    37/77

    32

    8 SYSTEM INSTALLATION, COMMISSIONING, WORK

    COMPLETION AND INSURANCE

    8.1 Monitoring and Supervision

    During the Warranty Period and AMC Period, the Supplier shall furnish to the Authority

    periodic reports on actual progress of the Flap gate/ Turnstile works and furnish any

    other relevant information as may reasonably be required by the Authority.

    8.2 Project Completion

    (a) The Flap gate/ Turnstile units shall be supplied against each request for supply by

    the Authority. Such request shall be in writing, indicating the number of units to be

    supplied and locations (Sites) where they are to be installed. Such requests shall becontinued to be made until the full order is exhausted.

    (b) Upon getting the Request for Supply order, the supplier shall promptly and as soon

    as possible but in any case not later than 15 days from the date of Request,

    complete the supply, installation and commissioning of the System at the stated

    site.

    (c) After successful supply, installation and commissioning of required units of Flap

    gates/ Turnstiles, the Supplier shall inform Authority/ its authorized representative

    who shall conduct demonstration / testing of the System installed to test their

    conformity to Supply Specifications. The system shall be checked for full

    functionality in an integrated environment. Upon satisfaction, Authority/ its

    authorized representative shall issue a Completion Certificate. No certificate shall be

    issued against only delivery, partial installation or incomplete commissioning of any

    individual unit.

    (d) The supply shall be deemed to be complete only when the Completion Certificate is

    issued by the Authority in accordance with the provisions set forth in this Tender

    Document. Such certificate may be supplied individually for each Flap gate/

    Turnstile unit of the System or for batches.

  • 8/19/2019 Flap Gates and Turnstiles Final

    38/77

    33

    (e) If the Completion is delayed beyond the stipulated time for any reason other than

    Force Majeure or reasons attributable to the Authority, the Authority shall be

    entitled, by Encashment notice to forfeit the Performance Security to recover the

    liquidated damages payable.

    (f) For delay in Completion beyond 90 days, the Authority shall subject to the

    provisions of this Tender Document relating to excuse from performance of the

    Supplier’s obligations hereunder, be entitled to terminate the contract in

    accordance with the provisions for termination.

    8.3 Maintenance

    During the Warranty and the Maintenance Contract Period, the Supplier shall maintain

    the System, modify, repair or otherwise make improvements to the Project/ Project

    Facility to comply with Tender Specifications, Good Industry Practice, Applicable Laws

    and Applicable Permits, and manufacturer’s guidelines and instructions. More

    specifically, the Supplier shall be responsible for:

    (a)Ensuring smooth and uninterrupted access to the facility in normal operating

    conditions;

    (b)Undertaking routine maintenance

    (c) Adherence to the Safety Standards commensurate with the project size and function.

    (d)Repair/ replacement of all faults during the warranty period and AMC Period arising

    out of manufacturer’s defects and wear and tear of the unit within design limits. In such

    circumstances the Supplier shall repair/replace the unit to restore full functionality.

    Maintenance shall also include the replacement of spare parts damaged due to normal

    wear and tear and defects.

    Damages due to physical attack by passengers (vandalism), tampering of equipment by

    passengers, Authority’s staff or any external party shall be the liability of the Authority.

    In such an event, the Authority shall request the Supplier to repair/replace the damaged

    unit and reinstall the same. All costs towards the same shall be reimbursed by the

    Authority to the Supplier.

  • 8/19/2019 Flap Gates and Turnstiles Final

    39/77

    34

    Upon completion of the Project, the Supplier shall submit to the Authority for approval a

    detailed manual for maintenance (the Maintenance Manual) incorporating a detailed

    preventive and breakdown maintenance regime including frequency, type and methods

    of maintenance interventions. Upon approval, such the maintenance regime shall be

    followed strictly. The Manual shall not conflict with provisions of the Tender Document/

    subsequent Agreement.

    If the repair of a unit is likely to take substantial time, then Authority may request the

    supplier to temporarily replace the unit until the original unit is repaired and replaced,

    failing which the Authority shall reserve the right to claim damages.

    8.4 Insurance

    8.4.1 Insurance during the entire period

    The Supplier shall, at its cost and expense, purchase and maintain during the

    Implementation Period, Warranty Period and the AMC period, such insurances as are

    necessary, including but not limited to the following:

    (a) Supplier’s all risk insurance;

    (b) Comprehensive third party liability insurance including injury or death to

    personnel of Persons who may enter the Project Site;

    (c) Workmen’s compensation insurance;

    (d) Any other insurance that may be necessary to protect the Supplier, its employees

    and its assets (against loss, damage or destruction at replacement value)

    including all Force Majeure Events that are insurable and not otherwise covered in

    items (a) to (c).

    The Supplier shall, from time to time, provide to the Authority copies of all insurance

    policies (or appropriate endorsements, certifications or other satisfactory evidence of 

    insurance) obtained by the Supplier in accordance with this Tender.

  • 8/19/2019 Flap Gates and Turnstiles Final

    40/77

    35

    8.4.2 Application of Insurance Proceeds

    (a) All moneys received under insurance policies shall be promptly applied by the

    Supplier towards repair or renovation or restoration or substitution of the supplied

    units or any work related to it or any part thereof which may have been damaged

    or destroyed.

    (b) The Supplier shall carry out such repair or renovation or restoration or

    substitution to the extent possible in such manner that the supplied units or any

    part thereof, shall, after such repair or renovation or restoration or substitution be

    as far as possible in the same condition as they were before such damage or

    destruction, normal wear and tear excepted.

    8.4.3 Validity of the Insurance Cover

    The Supplier shall pay the premium payable on such insurance policy(ies) so as to keep

    the policy(ies) in force and valid throughout the Period of Warranty and AMC period and

    furnish copies of the same to the Authority. Each insurance policy shall provide that the

    same shall not be cancelled or terminated unless 10 Days' clear notice of cancellation is

    provided to the Authority in writing. If at any time the Supplier fails to purchase and

    maintain in full force and effect any and all of the insurances required under this

    tender/subsequent agreement, the Authority may at its option purchase and maintain

    such insurance and all sums incurred by the Authority therefore shall be reimbursed by

    the Supplier forthwith on demand, failing which the same shall be recovered by the

    Authority by exercising right of set off or otherwise.

  • 8/19/2019 Flap Gates and Turnstiles Final

    41/77

    36

    9 COMMERCIAL AND PAYMENT TERMS

    9.1 Payment for Supply

    Upon successful Project Completion or its part thereof depending on the work order, the

    Authority undertakes to pay the Supplier 50% of the invoiced amount upon successful

    installation and demonstration of operations within 30 days of the delivery of the Invoice

    to it, provided such obligation is not delayed on account of events beyond the control of 

    the Authority such as Force Majeure and further provided that the invoice is presented

    along with Completion Certificate for the units represented in the invoice. 40% of the

    amount shall be paid on 3 months satisfactory operations of the System and the balance

    10% shall be paid on 6 months of satisfactory operations of the concerned units.

    Payment can be made as per batch wise orders placed.

    If the successful installation and commissioning of the units is delayed as per

    Specifications, the Authority shall be entitled, by reasonable notice, to forfeit the

    Performance Security.

    Liquidated Damages for delay in supply and complete installation shall apply as specified

    in the Bid Summary.

    The rate approved by the Authority shall be valid for a period as specified in the bid

    summary.

    The payments shall be made, subject to the Authority’s right to deduct payments if any,

    towards any damages, unsatisfactory services etc as per the provisions of the Tender.

    No payment shall be made for part supply, part installation or part commissioning of any

    individual units of the Flap gates/ Turnstiles. While payment can be invoiced for one or

    more units, a completion certificate corresponding to each of the units represented in

    the invoice must be submitted.

  • 8/19/2019 Flap Gates and Turnstiles Final

    42/77

    37

    9.2 Payment for Annual Maintenance Contract

    Payment during the Annual Maintenance Contract period shall be made annually at the

    end of each such year of the contract after issue of Satisfactory Service Certificate for

    the payment tenure from the Authority.

    The total amount payable for Annual Maintenance Contract of each supplied unit for a

    period mentioned in the Bid Summary shall be quoted in the Price Bid.

  • 8/19/2019 Flap Gates and Turnstiles Final

    43/77

    38

    10 GENERAL TENDER CONDITIONS

    10.1 Letter of Acceptance & Agreement

    As the first step for the assignment, the Authority shall issue the successful Bidder a

    Letter of Acceptance. This letter will refer to the proposal and confirm its acceptance.

    The parties agree to enter into an agreement in due course which shall consist of these

    Terms and Conditions- as mutually agreed between the parties and the additional terms

    that the Authority finds suitable for the execution of this Contract.

    10.2Work Order

    Work Order once placed by the Authority cannot be cancelled or amended in normal

    circumstances. But in case of any emergency situations it can be amended on mutual

    consent in writing.

    10.3 Lead Time and Liquidated Damages

    The successful Bidder will be given a Request for Supply of certain number of units of 

    Flap gates/ Turnstiles. Such units will be required to be supplied and installed within the

    time as mentioned in the Bid Summary of this tender document. The liquidated damages

    in case of non-compliance would be as per the Bid Summary.

    10.4Quantity Variation

    In case of variation in quantity purchased, no claim shall be entertained or become

    payable for price variation of supplied units.

    10.5Tax liability

    The Prices mentioned in the Price Bid should include all taxes applicable as on the date

    of submission of the Tender. Any deviations due to change in the rate of taxes and

    duties or any introduction of new taxes and duties would be adjusted at actual with

    mutual consent from the Supplier and the Authority. The Authority shall be entitled to

    deduct tax at source as may be applicable. The TDS certificate(s) shall be submitted as

    per the due date specified in the Income Tax Act.

  • 8/19/2019 Flap Gates and Turnstiles Final

    44/77

    39

    10.6 Change Management Procedure

    Any changes having technical or commercial implications will have to be mutually agreed

    upon in advance, prior to making the change. In case of situations, that the impact is

    not dependent on one or both parties’ agreement, the revised commercials will be

    effective from the date of impact.

    For avoidance of doubt, the parties expressly agree that:

    a) Change Request shall not be effective and binding unless agreed in writing and

    signed by both Authority and supplier.

    b) The payment of any additional cost agreed under a Change Request shall be in

    addition to the payments agreed upon under the Tender between the two parties.

    c) Upon a Change Request becoming effective, the Works Schedule shallautomatically stand adjusted by the additional time required for implementing the

    Change Request.

    10.7Termination of Contract and Termination payment

    This Contract may be terminated by either party:

    1) By mutual agreement or by either party for its convenience by giving four week

    written notice, or

    2) In case of breach by one party of the terms and conditions of this tender and its

    failure to remedy such breach within a period of four weeks from date of receipt

    of a default notice in this regard from the non breaching party to the breaching

    party, or

    3) in case of the filing by or against the other Party in any court of competent

     jurisdiction of a petition in bankruptcy or insolvency, or for a scheme of 

    rearrangement (reorganization) with creditors, for the appointment of a receiver

    or trustees; or the making of an assignment for the benefit of creditors.

    In case of issue of termination notice, the Authority will pay Supplier all payments due

    as of the termination date stated in the notice, including those for the proportion of work

    completed in the on-going stage, until termination.

  • 8/19/2019 Flap Gates and Turnstiles Final

    45/77

    40

    10.8Dispute Resolution

    In the event of a dispute or difference of any nature whatsoever between the Supplier

    and the Authority during the course of the Works, the same shall be referred to the

    Municipal Commissioner for resolution. The decision of the Municipal Commissioner shall

    be final and binding on both the parties.

    10.9 Events of Default and Termination

    10.9.1 Event of Default

    Event of Default means the Supplier Event of Default or the Authority Event of Default or

    both as the context may admit or require.

    (a) Supplier Event of Default

    Any of the following events shall constitute an event of default by the Supplier unless

    such event has occurred as a result of Authority Event of Default or a Force Majeure

    Event;

    (1) The Supplier fails to commence the supply and installation works within specified

    Lead Time.

    (2) The Supplier fails to achieve Project Completion beyond permitted time as per the

    Bid Summary of this Tender Document.

    (3) Any representation made or warranties given by the Supplier under this tender is

    found to be false or misleading.

    (4) The Supplier creates any Encumbrance on the designated site, save and except as

    otherwise expressly permitted under this Contract.

    (5) The Supplier is in breach of Maintenance Requirements as per the Warranty terms

    and maintenance manual.

    (6) The Performance Security has been encased and appropriated in accordance with

    clause and Supplier fails to replenish or provide fresh Performance Security within

    Cure Period of 15 (fifteen) days.

  • 8/19/2019 Flap Gates and Turnstiles Final

    46/77

    41

    (7) The Supplier failed to make any payment to Authority within the Period specified in

    the Tender.

    (8) The Supplier submits to the Authority any statement which is false in material

    particulars and which has a material effect on Authority’s right, obligations orinterests.

    (9) The transfer, pursuant to law of either (a) the rights and/or obligations of the

    Supplier under any of the Project Agreements, or (b) all or material part of the

    Supplier except where such transfer in the reasonable opinion of Authority does not

    affect the ability of the Supplier to perform, and the Supplier has the financial and

    technical capability to perform, its material obligations under the Project

    Agreements.

    (10) A resolution is passed by the shareholders of the Supplier Company for the

    voluntary winding up of the Supplier Company.

    (11) Any petition for winding up of the Supplier firm/company is admitted by a court of 

    competent jurisdiction or the Supplier is ordered to be wound up by Court except

    for the purpose of amalgamation or reconstruction, provided that, as part of such

    amalgamation or reconstruction, the property, assets and undertaking of the

    Supplier are transferred to the amalgamated or reconstructed entity and that the

    amalgamated or reconstructed entity has unconditionally assumed the obligations

    of the Supplier under this Contract, and provided that:

    (a) the amalgamated or reconstructed entity has the technical capability and

    operating experience necessary for the performance of its obligations under

    this Contract.

    (b) the amalgamated or reconstructed entity has the financial standing to perform

    its obligations under this Supplier and has a credit worthiness at least as good

    as that of the Supplier as at date of LOI; and

    (c) each of the Contracts remains in full force and effect.

  • 8/19/2019 Flap Gates and Turnstiles Final

    47/77

    42

    (12) The Supplier suspends or abandons the operations of the Project without the prior

    consent of Authority, provided that the Supplier shall be deemed not to have

    suspended/ abandoned operation if such suspension/ abandonment was as a result

    of Force Majeure Event and is only for the period such Force Majeure is continuing,

    (13) The Supplier repudiates the Contract or otherwise evidences an intention not to be

    bound by it.

    (14) The Supplier is otherwise in Material Breach of the Contract or commits a default in

    complying with any other provision of the tender document.

    (b) Authority Event of Default

    The following events shall constitute events of default by Authority (each an “Authority

    Event of Default”), unless any such an event has occurred as a result of Supplier Event

    of Default or due to a Force Majeure Event:

    (1) Authority repudiates this Contract or otherwise evidences an intention not to be

    bound by it.

    (2) Authority or any Governmental Agency has by an act of commission or commission

    created circumstances that have a Material Adverse Effect on the performance of its

    obligations by the Supplier and has failed to cure the same within thirty (30) days

    of notice thereof by the Supplier.

    10.9.2 Termination due to Event of Default and Termination Payment

    (a) Termination for Supplier Event of Default

    (1) Without prejudice to any other right or remedy which Authority may have in respect

    thereof under the Tender, upon the occurrence of a Supplier Event of Default,

    Authority shall, subject to the provisions of the Contract, be entitled to terminate

    this Contract by issuing a Termination Notice of 30 days to the Supplier, provided

    that before issuing the Termination Notice, Authority shall by a notice in writing

    inform the Supplier of its intention to issue the Termination Notice (the “Preliminary

    Notice”). In case the underlying breach/default is not cured within a period of 7

    (seven) days from the date of the Preliminary Notice (Cure Period) Authority shall

  • 8/19/2019 Flap Gates and Turnstiles Final

    48/77

    43

    be entitled, to terminate this Contract by issuing the Termination Notice. Provided

    further, that

    a. If the default is not cured within 7 (seven) days of the Preliminary Notice,

    Authority shall be entitled to encash the Performance Security with a notice tothe Supplier (Encashment Notice),

    b. If the default is not cured within 7 (seven) days of the Encashment Notice and a

    fresh Performance Security is not furnished within the same period, Authority

    shall be entitled to issue the Termination Notice.

    c. Upon Termination the Authority shall be entitled for any legal remedies for

    compensation as may be prescribed by law.

    (b) Termination for Authority Event of Default

    The Supplier may, upon the occurrence and continuation of any of Authority Event of 

    Default may terminate the Contract by issuing Termination Notice of 30 days to

    Authority.

    10.9.3 Rights of Authority on Termination

    Upon Termination of this Contract for any reason whatsoever, Authority shall have the

    power and authority to:

    (1) Retain possession and control of Project Assets forthwith;

    (2) Prohibit the Supplier and any person claiming through or under the Supplier from

    entering upon the Project Assets/dealing with or any part thereof;

    (3) Appoint another party or Supplier that may carry of the remaining obligations of 

    the Supplier.

    10.9.4 Termination Payments

    In case of termination, the Authority shall pay Bidder payments due as of the

    termination date stated in the notice, for the proportion of work fully completed. The

    Authority may, at its sole discretion, also pay termination compensation it may decide to

    be reasonable in the circumstances.

  • 8/19/2019 Flap Gates and Turnstiles Final

    49/77

    44

    10.10Intellectual Property

    The Intellectual Property Rights (IPR) in all the deliverables and documentation

    associated therewith and developed or upgraded hereunder and ownership of tools,

    processes, utilities, and methodology including any Supplier proprietary products or

    components thereof used in the provision of services or development of deliverables and

    all new ideas, inventions, innovations, or developments conceived, developed or made

    by Supplier or its Consultants/Employees while providing services hereunder shall

    remain the absolute property of Supplier.

    10.11Liability

    In no event shall the Supplier or the Authority be liable, one to the other, for special or,

    indirect damages in connection with or arising out of the furnishing, performance or use

    of the services or deliverables provided by Supplier under the terms of this tender

    proposal.

    10.12Indemnity

    The Supplier shall, during the term of the whole contract, indemnify and hold the

    Authority harmless from any loss, claim or damage, third party suit, proceedings,

     judgments, cost and expenses (including reasonable attorney fees) relating to any

    infringement claim by a third party if the same is based on any Supplier materialsprovided to Authority by or on behalf of Supplier or the access and use by Authority of 

    any Supplier provided software or materials in connection with Supplier’s performance of 

    Services hereunder without breaching the terms of the Tender.

    Supplier will defend, indemnify and hold harmless Authority from and against any third-

    party suit, proceeding, judgment, costs and expenses (including, reasonable attorney

    fees) to the extent such action or claim is based on allegation that the Services or

    Deliverables as provided to Authority by Supplier and the use thereof by Authority as

    stated in the Tender constitutes an infringement of or misappropriation of the copyright,

    patent, trademark or trade secret rights of any third party.

  • 8/19/2019 Flap Gates and Turnstiles Final

    50/77

    45

    10.13Force Majeure

    Should either Party be prevented from performing any of its responsibilities (as detailed

    in this proposal) by reason caused by an Act of God or any cause beyond its reasonable

    control including but not limited to work stoppages, fires, riots, terrorist strikes,

    accidents, explosions, floods, cyclones, storms wars, revolutions, acts of public enemies,

    blockages, embargos any laws, orders, proclamations, ordinances, demands or

    requirements for any government or authority or representative of any such government

    including restrictive trade practices or regulations strikes, shutdowns, labor disputes

    which are not instigated for the purpose of avoiding obligations herein failures and/or

    fluctuations in electric power, light, telecommunications or air-conditioning equipment

    the time for performance shall be extended until the operation or such cause has

    ceased, provided the party affected gives prompt notice to the other of any such factorsor inability to perform, resumes performance as soon as such factors disappear or are

    circumvented. Under this clause, if either party is excused performance of any obligation

    for a continuous period of 30 days, then the other party may at any time thereafter

    while such performance continues to be excused, terminate the Contract without

    liability, by notice in writing to the other. However, the aforementioned reasons do not

    include lack of personnel and non-performance of third parties hired.

    The Supplier shall not be entitled to any termination payment from the Authority in case

    of force majeure, including termination of contract due