Fish Testing Flow Tank TeamFish Testing Flow Tank Team
Team MembersTeam Members Matt MalynowskiMatt Malynowski Todd NylundTodd Nylund Tim WieseTim Wiese Brian EggelstonBrian Eggelston
Capstone AdvisorCapstone Advisor Dr. Lemmy MeekishoDr. Lemmy Meekisho
SponsorSponsor Randy ZelickRandy Zelick
Customer: Dr. Randy ZelickCustomer: Dr. Randy Zelick
Dr. Zelick, has asked us to design a flow tank for testing fish reactions to changes in direction and velocity in simulated stream flow.
PSU Biology Dept.
CONTINUITYCONTINUITY System response → The System response → The WEIRWEIR
*Maintaining Constant Channel Volume and the Loss*Maintaining Constant Channel Volume and the Loss
Channel Channel velocity adjustmentvelocity adjustment & static & static datum • • Initially the WEIR retains water for pre-test treatmentInitially the WEIR retains water for pre-test treatment•• Incremented scale measures WEIR location and experimentalIncremented scale measures WEIR location and experimental data provides empirical relationship with flow velocity data provides empirical relationship with flow velocity
Gate Valve provides pressure differential and adjustabilityGate Valve provides pressure differential and adjustability•• Slight volume decrease occurs when WEIR descends. Control of gateSlight volume decrease occurs when WEIR descends. Control of gate
satisfies volumetric flow needed to maintain channel volumetric datumsatisfies volumetric flow needed to maintain channel volumetric datum
RECIRCULATION OF TEST HRECIRCULATION OF TEST H22OO
Operating Pt.Operating Pt.→→ Q=50gpmQ=50gpm
Tank Head → 8ftTank Head → 8ft 1½ inch Plastic Pipe (22.8-ft)1½ inch Plastic Pipe (22.8-ft)
- Schedule 80- Schedule 80
Six 90° Fittings @VSix 90° Fittings @Vavg avg = 2.25-ft/s= 2.25-ft/s
Neglect Pump LossNeglect Pump Loss
Total Loss Total Loss
Pipe of 100
Loss Head 16
ft
ft
Fitting90
Loss Head 0.4ft
PUMP vs. SPECIFICATIONPUMP vs. SPECIFICATION
Total Piping LossTotal Piping Loss
ftft
ftft
ft
ftft 8
100
16
Fitting
4Fittings 90 6
100
168.22
= 15.5 ft Head Loss
Design PumpDesign Pump Ideal PumpIdeal Pump
33.3gpm33.3gpm 50gpm50gpm
Minutes to Fill 50-galMinutes to Fill 50-gal
1.51.5 11
Scale of Resolution Scale of Resolution Flow meter or bucket & clock Flow meter or bucket & clock
CONSERVATION of Mass
Re < 2300 for Laminar Flow
Reynolds Number
Flow Rate (cm/s)
0
5
10
15
20
25
13 14 15 16 17
String Length (cm)
Vel
ocity
(cm
/s)
Flow Rate(cm/s)
Qin = Qout
Where Q = Ai * Vi
The Iterative ProcessThe Iterative Process Experiments using a removable semi-Experiments using a removable semi-circular wooden weir with 2” rectangular cut from center initially circular wooden weir with 2” rectangular cut from center initially started empirical process. Clear plastic inserts enabled variable started empirical process. Clear plastic inserts enabled variable speed experimentation with steady channel volume to occur. speed experimentation with steady channel volume to occur. Results considered with admiral promise as adjustable-weir Results considered with admiral promise as adjustable-weir design targets in on specifications.design targets in on specifications.
Validating The DesignValidating The Design Empirical Process
Volume(gal)
Time(Seconds)
Flow-Rate(gal/sec)
Unit Conversion(m^3/sec)
Velocity (cm/s)
String Length(in)
30 43.24 0.6938 0.002626 20.4 6.4375
30 44.93 0.6677 0.002527 19.6 6.25
30 47.58 0.6305 0.002387 18.5 6.15625
20 31.7 0.6309 0.002388 18.5 6.125
30 300 0.1 0.000379 2.9 5.75
EXPERIMENTAL FLOWEXPERIMENTAL FLOW
Experimental velocities ranged from Experimental velocities ranged from
approximately ~3cm/s to ~20cm/s.approximately ~3cm/s to ~20cm/s.
The flow has nice continuous motion with no strong eddy currents disrupting the dye streamers
Good velocity profile showing nice orientation and the minimal frictional effects of circular geometries.
BudgetBudgetBill of Materials (BOM)
Part Description Qty Unit Cost Total Cost
6" ABS Basin Extsn 2 $ 14.54 $ 29.08
Flex Cplg (6" to 4") 1 $ 7.60 $ 7.60
ABS Reducer (4" to 3") 1 $ 3.42 $ 3.42
ABS Adptr (Male 2") 4 $ 1.31 $ 5.24
ABS Adptr 1 $ 8.37 $ 8.37
Sump Pump 1 $ 179.00 $ 179.00
Teflon Tape 1 $ - $ -
Weather Stripping 1 $ 3.57 $ 3.57
5 gal Bucket 1 $ 2.34 $ 2.34
ABS Reducer (5" to 3") 1 $ 8.37 $ 8.37
Adapter (sight glass) 2 $ 2.37 $ 4.74
ABS Adptr Elbows (2") 4 $ 1.33 $ 5.32
Gate Valve 2" 1 $ 28.99 $ 28.99
Hose Clamp 6" 2 $ 0.85 $ 1.70
Hose Clamp 3" 2 $ 2.29 $ 4.58
Turn Table 5" 1 $ 2.75 $ 2.75
10 ft. Hose (2") 1 $ 9.48 $ 9.48
Garden Hose 1 $ - $ -
Sight glass tubing 1 $ - $ -
5' X 2" PVC Piping 1 $ 9.90 $ 9.90
Rope 1 $ 2.49 $ 2.49
Cutting Board 4 $ 2.19 $ 8.76
Ring Hanger 1 $ 1.31 $ 1.31
Calking Adhesive 2 $ 5.99 $ 11.98
Duct tape 2 $ 3.99 $ 7.98
ABS Reducer (4" to 2") 1 $ 3.42 $ 3.42
1 1/2" to 2" ABS adapter 2 $ 1.64 $ 3.28
Grand Total Cost $ 353.67
Budget $ 600.00
Surplus $ 246.33
Project Design Specification Project Design Specification AdherenceAdherence
Specification Priority Metric Target Satisfaction of CompletionFrequency Interference *** yes/no no ***Fluid Flow Profile *** yes/no yes ***Minimum Flow Velocity * cm/s 0 ***Maximum Flow Velocity (min) *** cm/s 10 ***Test Duration ** s 60 ***Resistant To Oxidation * yes/no yes ***Cost To Produce ** $ 600 ***Fish Holding Tank Depth (static flow) *** cm ~7.5 ***
Rotation of Tank *Angle (positive or negative degrees) +/-15 *
Off-The-Shelf Parts * yes/no yes ***Ease of Repair * People Required to Fix 1 ***Durable * yes/no yes **Fits on Existing Air Table ** yes/no yes **Spatial Interference with Testing Equipment ** yes/no no **Allows Visual Observation of Fish *** yes/no yes ***Fluid Containment ** yes/no yes **User Ergonomic Safety *** yes/no yes **Specimen Safety ** yes/no yes ***Structure Bio-Compatible ** yes/no yes ***Visually Aesthetic * yes/no yes *
Special ThanksSpecial Thanks
The F23T team would like to thank: The F23T team would like to thank: Dr. Lemmy Meekisho for his support Dr. Lemmy Meekisho for his support
throughout the last 2 terms.throughout the last 2 terms. Dr. Randy Zelick for the opportunity to allow Dr. Randy Zelick for the opportunity to allow
us to design this flow channelus to design this flow channel
QuestionsQuestions