FIRST QUANTUM MINERALS TSX: FM May 2017 A Great Time To Be Building New Mines LATIN AMERICA DOWN UNDER – MAY 2017 Mike Christie : Director Exploration

Transcript of FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building...

Page 1: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

FIRST QUANTUM MINERALS

TSX: FM May 2017

A Great Time To BeBuilding New Mines

LATIN AMERICA DOWN UNDER – MAY 2017Mike Christie : Director Exploration

Page 2: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

Some of the statements contained in the following material areforward-looking statements and not statement of facts. Suchstatements are based on the current beliefs of management, as wellas assumptions based on management information currentlyavailable.

Forward-looking statements are subject to various risks,uncertainties and other factors that could cause actual results todiffer materially from expected results.

Readers must rely on their own evaluation of these uncertainties.

Note: all dollar amounts in US dollars unless otherwise indicated

Disclaimer

Page 3: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

‹#›

3

Core Strength in Developing Projects Efficiently and Cost-Effectively

Operations (8)

Development Projects (5)

Global Portfolio

Page 4: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

0

10

20

30

40

50

60

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Mt

con

tain

edC

u

FQM resources and reserves over time:Total contained Cu

Resources (M,I & I)

Reserves

Growth Of Our Cu Resource Base

KansanshiAcquisition

Divestedpart ofMopani

TridentAcquisition

DiscoveredFrontier

KansanshiResourceExpansion

KMTAcquisition

HaquiraAcquisition

DiscoveredLonshi

FrontierReserveDefined

SentinelReserveDefined

GuelbMoghrein

Acquisition

InmetAcquisition

Taca TacaAcquisition

Greenfield (Lonshi & Frontier) - 2.5 Mt CuBrownfield (all sites inc. Kansanshi & Sentinel) - 15.0 Mt CuAcquisition – Cobre Panama, Haquira, Taca Taca - 37.0Mt Cu

All resource/reserves as perpublished company AIFstatements 2001-2016

Page 5: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

A Strong Year For First Quantum

DELIVERED ON OUR OBJECTIVES

Achieved record copper production (540kt Cu)

Ramped up & started commercial production at

Sentinel (Zambia)

Successful first full year of commercial production

from the Kansanshi smelter (Zambia)

Lowered unit production costs• C1 - $1.03/lb

• AISC - $1.41/lb

Strengthened our financial position

• Generated $964M comparative EBITDA

• Protected cash flows in a weak copper price market

• Refinanced long term debt raising $2.2B in senior notes

• Sold the non-core Kevitsa mine for $732M

Page 6: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Entering A Period Of Significant Production Growth

-

100.0

200.0

300.0

400.0

500.0

600.0

700.0

800.0

900.0

1,000.0

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Ktp

a

First Quantum Cu Production

Cobre Panama

Sentinel

VMS (PMO + CB I + CLC)

Kevitsa

Guelb Moghrein

Kansanshi

Bwana/Lonshi & Frontier

FORECAST

Page 7: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Sentinel mine began commercialproduction in November 2016

Cobre Panama project on track forphased commissioning in 2018

1 First Quantum excludes the sold Kevitsa mine

2020F assumes flat year-over-year production plus

an estimated 300K tonnes of production from Cobre Panama

2019E Copper Production1(million tonnes)

1.61

1.421.35

1.24

0.980.91

0.59 0.57 0.520.44 0.42 0.38

0.30 0.26

0.610.54

0.31

Coldeco

Freeport-M

cMoR

an

Glencore

BH

PB

illiton

Southern

Copper

FirstQ

uantum2020F

(includingC

obreP

anama)

Rio

Tinto

KG

HM

Antofagasta

Vale

Anglo

Am

erican

Norilsk

KA

ZM

inerals

Teck

Resources

FirstQ

uantum2019F

(2019G

uidance)

FirstQ

uantum2016A

FirstQ

uantum2012A

Unrivalled Growth In Copper Production

Page 8: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

FQM In Latin America

Page 9: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Population: ~3.75m

US Dollar economy

GDP $82.18 billion (2015 est.)

GDP per capita $20,900 (2015est.)

80% of the economy is services

4 existing pillars:

1.Panama canal;

2.Banking & financial services;

3.Colon free trade zone; and

4.Aviation & tourism

Government new to mining butsupportive

Investment in Panama

Mining reports to the Ministry of Commerce – no mining code Law 9, 1997 (Cobre Panama project):

20 year term renewable twice (60 years in total 1997-2057)

Establishes royalty regime and expatriate labour concessions

Change in law requires consent of both MPSA and the government

Mining Regulatory Framework

Panama CityCobre Panama

Page 10: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

COBRE PANAMA PROJECT HIGHLIGHTS

TimetableOrebody

M&I resources of3,695mt @ 0.37%Cu

Reserves 3,182mt @0.38%Cu

Average ore feedfirst 10yrs = 0.43 %Cu

Strip ratio 1:1

40+ year mine life

Project

US$5.48 billiontotal capex

$1.78 billion remaining

50% constructioncomplete April 2017

Plant ramp-upfrom 2018

TimetableOrebody Project

Project Expenditure Managed To Suit Market Conditions

2016

• $650m capex• FQM $390m

2017

• $1,060m capex• FQM $640m

2018

• $830m capex• FQM $500m

2019

• $110m capex*• FQM ($90m)

* Third Party contribution $200m

Page 11: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

MINE LAYOUT

3 Resource: 3.7 Bt @ 0.37% Cu (M&I) = 13.6Mt Cu + 8Moz Au

Average ore feed grade for first 10 years = 0.43%Cu

Page 12: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

• Mining concession extended for a

second 20-year term to February

2037

• Port & power station at peak

construction

• Mine site & process plant areas

moving towards construction peak in

2H 2017

• Priority given to the power station and

associated infrastructure

• Expect first commercial power in Q4

2017 from the first 150MW unit

• 2nd 150MW unit expected to follow

into operation in the 1H 2018

Cobre Panama – Development on Track

Cobre Panama Power Station and Port – April 2017

Page 13: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Total Construction >50% complete

• Detailed Engineering and design 85%

• 230Kv Power line 100%

• Power Station – pre-commissioning

• Pre strip 55%

• Tailings (TMF) 64%

All 7 mills and their drives should be

fully installed by the mid-2017

Commissioning of entire operation

planned to begin in 2018

Target 60 Mtpa throughput rate in

December 2018,

Further ramp to 75Mtpa in 2019

(320ktpa Cu)

COBRE PANAMA DEVELOPMENT ON TRACK

Port

TransmissionLine

Coast Road

TailingsManagementFacility

2km

Process Plant

Plant SiteFacilities

Mine Pits

Power Plant

Page 14: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.
Page 15: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Cobre Panama - Progress

Economic impact of Cobre Panama: ~7000+ construction jobs

~ 2500 operations jobs 40+ years ~ $2b exports/year for 40+ years ~ 4% of Panamanian GDP

Page 16: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

FQM in Latin America

Page 17: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Large scale porphyry copper project in southern Peru

M&I resource of 3.7 million tonnes of contained copper equivalent plus an inferredresource of 2.4 million tonnes of copper equivalent

569 million tonnes at 0.56 % Cu M&I + 406 million tonnes at 0.52% Cu Inferred

Priorities are to complete an environmental impact assessment plus conclude accessand relocation agreements with surface rights holders

Potato PatchHaquira East

Haquira West

Haquira - Peru

Page 18: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Taca Taca - Argentina

Located in Salta Province, Argentina

2.2 Bt at 0.44% Cu (indicated) plus 0.9 Bt at 0.37% Cu (inferred)

Preliminary drilling to identify proximal fresh water sources was carried out,initial results suggest that further drilling is warranted in targeted areas

The EIA & Options study for site construction and operation in progress

Page 19: FIRST QUANTUM MINERALS€¦ · FIRST QUANTUM MINERALS TSX:FM May2017 A Great Time To Be Building New Mines LATIN AMERICADOWN UNDER – MAY 2017 Mike Christie : Director Exploration.

Finding and developingthe next generation ofcopper mines

Thank you – any questions ?