FIRST FLOOR AND MEZZANINE RESTROOM ... MEZZANINE RESTROOM RENOVATIONS - SEALED BID - DO NOT...

Click here to load reader

  • date post

    21-Aug-2020
  • Category

    Documents

  • view

    3
  • download

    0

Embed Size (px)

Transcript of FIRST FLOOR AND MEZZANINE RESTROOM ... MEZZANINE RESTROOM RENOVATIONS - SEALED BID - DO NOT...

  • MC1002000432 First Floor and Mezzanine Restroom Renovations November 27, 2019 Carvel State Office Building

    StudioJAED Architects & Engineers PROJECT TITLE PAGE Project No. 18046 00 01 01 - 1

    STATE OF DELAWARE

    DEPARTMENT OF OMB/DIVISION OF

    FACILITIES MANAGEMENT

    CONTRACT # MC1002000432

    SPECIFICATIONS

    FOR

    FIRST FLOOR AND MEZZANINE RESTROOM

    RENOVATIONS

    AT

    CARVEL STATE OFFICE BUILDING

    820 NORTH FRENCH STREET

    WILMINGTON, DE 19801

    PREPARED

    BY

    STUDIO JAED ARCHITECTS & ENGINEERS

    2500 WRANGLE HILL ROAD

    BEAR, DE 19701

    STUDIO JAED PROJECT # 18046

    ISSUED FOR

    BIDDING

    NOVEMBER 27, 2019

    NO T F

    OR BI

    DD IN

    G

    This document is for information only; you must purchase a set of documents in order to submit a bid.

  • NO T F

    OR BI

    DD IN

    G

  • MC1002000432 First Floor and Mezzanine Restroom Renovations November 27, 2019 Carvel State Office Building

    StudioJAED Architects & Engineers SEALS PAGE Project No. 18046 00 01 03 - 1

    SEALS PAGE

    Architecture:

    Philip Conte, AIA, NCARB Mechanical Engineering:

    Brian Zigmond, P.E., CEM Electrical Engineering: Parag H. Patel, P.E.

    END OF SECTION

    NO T F

    OR BI

    DD IN

    G

  • NO T F

    OR BI

    DD IN

    G

  • MC1002000432 First Floor and Mezzanine Restroom Renovations November 27, 2019 Carvel State Office Building

    StudioJAED Architects & Engineers TABLE OF CONTENTS Project No. 18046 00 01 10 - 1

    SECTION 00 01 10

    TABLE OF CONTENTS

    A. Specifications for this project are arranged in accordance with the Construction Specification Institute numbering

    system and format. Section numbering is discontinuous and all numbers not appearing in the Table of Contents are not used for this Project.

    B. DOCUMENTS BOUND HEREWITH DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

    INTRODUCTORY INFORMATION

    00 01 01 – PROJECT TITLE PAGE

    00 01 03 – SEALS PAGE

    00 01 10 – TABLE OF CONTENTS

    00 01 15 – LIST OF DRAWING SHEETS

    PROCUREMENT REQUIREMENTS

    00 11 13 – INVITATION TO BID

    00 21 13 – INSTRUCTIONS TO BIDDERS

    00 41 13 – BID FORM

    00 43 13 – BID BOND

    CONTRACTING REQUIREMENTS

    00 52 13 – STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR

    SAMPLE DOCUMENT AIA A101-2017

    00 54 13 – SUPPLEMENT TO AGREEMENT BETWEEN OWNER AND CONTRACTOR

    00 54 14 – SUPPLEMENT TO A101-2017 – EXHIBIT A – INSURANCE & BONDS

    SAMPLE DOCUMENT AIA A101-2017 – EXHIBIT A – INSURANCE & BONDS

    00 61 13.13 – PERFORMANCE BOND

    00 61 13.16 – PAYMENT BOND

    00 62 76 – APPLICATION AND CERTIFICATE FOR PAYMENT

    SAMPLE DOCUMENTS AIA G702 & G703

    00 63 73 – ALLOWANCE AUTHORIZATION FORM

    00 72 13 – GENERAL CONDITIONS TO THE CONTRACT

    SAMPLE DOCUMENT AIA A201

    00 73 13 – SUPPLEMENTARY GENERAL CONDITIONS TO THE CONTRACT 00 73 13.10 – SUPPLEMENTARY GENERAL CONDITIONS – SCHEDULE GUIDELINES

    00 73 46 – WAGE RATE DETERMINATION SCHEDULE

    NO T F

    OR BI

    DD IN

    G

  • First Floor and Mezzanine Restroom Renovations MC1002000432 Carvel State Office Building November 27, 2019

    TABLE OF CONTENTS StudioJAED Architects & Engineers 00 01 10 - 2 Project No. 18046

    00 81 13 – GENERAL REQUIREMENTS

    00 81 14 – DRUG TESTING FORMS

    DIVISION 01 – GENERAL REQUIREMENTS

    01 10 00 – SUMMARY

    01 20 00 – PRICE AND PAYMENT PROCEDURES

    01 21 00 – ALLOWANCES

    01 30 00 – ADMINISTRATIVE REQUIREMENTS

    01 40 00 – QUALITY REQUIREMENTS

    01 42 16 – DEFINITIONS

    01 50 00 – TEMPORARY FACILITIES AND CONTROLS

    01 60 00 – PRODUCT REQUIREMENTS

    01 70 00 – EXECUTION AND CLOSEOUT REQUIREMENTS

    01 73 29 – CUTTING AND PATCHING

    01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

    01 76 10 – TEMPORARY PROTECTIVE COVERINGS

    01 78 00 – CLOSEOUT SUBMITTALS

    01 79 00 – DEMONSTRATION AND TRAINING

    DIVISION 02 – EXISTING CONDITIONS

    02 41 00 – DEMOLITION

    DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

    06 10 00 – ROUGH CARPENTRY

    06 20 00 – FINISH CARPENTRY

    06 65 10 – SOLID SURFACE FABRICATIONS

    DIVISION 07 – THERMAL MOISTURE PROTECTION

    07 84 00 - FIRESTOPPING

    07 90 05 – JOINT SEALERS

    DIVISION 08 – OPENINGS

    08 11 13 – HOLLOW METAL DOORS AND FRAMES

    08 14 16 – FLUSH WOOD DOORS

    NO T F

    OR BI

    DD IN

    G

  • MC1002000432 First Floor and Mezzanine Restroom Renovations November 27, 2019 Carvel State Office Building

    StudioJAED Architects & Engineers TABLE OF CONTENTS Project No. 18046 00 01 10 - 3

    08 31 00 – ACCESS DOORS AND PANELS

    08 71 00 – DOOR HARDWARE

    DIVISION 09 – FINISHES

    09 01 30.91 – TILE RESTORATION

    09 21 16 – GYPSUM BOARD ASSEMBLIES

    09 30 00 – TILING

    09 51 00 – ACOUSTICAL CEILING

    09 65 00 – RESILIENT FLOORING

    09 66 13 – PORTLAND CEMENT TERRAZZO FLOORING

    09 90 00 – PAINTING AND COATING

    DIVISION 10 – SPECIALITIES

    10 14 00 – SIGNAGE

    10 21 13.19 – PLASTIC TOILET COMPARTMENTS

    10 28 00 – TOILET, BATH AND LAUNDRY ACCESSORIES

    10 51 00 – LOCKERS

    DIVISION 21 – FIRE SUPPRESSION

    21 05 00 – COMMON WORK RESULTS FOR FIRE SUPPRESSION

    21 05 48 – VIBRATION AND SEISMIC CONTROLS FOR EQUIPMENT

    21 05 53 – IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

    21 07 19 – FIRE SUPPRESSION PIPING INSULATION

    21 13 00 – FIRE SUPPRESSION SPRINKLERS

    DIVISION 22 – PLUMBING

    22 07 19 – PLUMBING PIPING INSULATION

    22 10 05 – PLUMBING PIPING

    22 10 06 – PLUMBING SPECIALTIES

    22 30 00 – PLUMBING EQUIPMENT

    22 40 00 – PLUMBING FIXTURES

    DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING

    23 05 93 – TESTING, ADJUSTING, AND BALANCING FOR HVAC

    NO T F

    OR BI

    DD IN

    G

  • First Floor and Mezzanine Restroom Renovations MC1002000432 Carvel State Office Building November 27, 2019

    TABLE OF CONTENTS StudioJAED Architects & Engineers 00 01 10 - 4 Project No. 18046

    23 07 13 – DUCT INSULATION

    23 31 00 – HVAC DUCTS AND CASINGS

    23 33 00 – AIR DUCT ASSEMBLIES

    23 37 00 – AIR OUTLETS AND INLETS

    DIVISION 26 – ELECTRICAL

    26 05 01 – MINOR ELECTRICAL DEMOLITION

    26 05 19 – LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

    26 05 26 – GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

    26 05 29 – HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

    26 05 34 – CONDUIT

    26 05 37 – BOXES

    26 05 53 – IDENTIFICATION FOR ELECTRICAL SYSTEMS

    26 27 26 – WIRING DEVICES

    26 51 00 – INTERIOR LIGHTING

    END OF SECTION

    NO T F

    OR BI

    DD IN

    G

  • MC1002000432 First Floor and Mezzanine Restroom Renovations November 27, 2019 Carvel State Office Building

    StudioJAED Architects & Engineers LIST OF DRAWING SHEETS Project No. 18046 00 01 15 - 1

    LIST OF DRAWING SHEETS

    GENERAL INFORMATION G-000 COVER SHEET GC000 CODE COMPLIANCE, ABBREVIATIONS, AND SYMBOLS

    ARCHITECTURAL A-001 OVERALL AND PHASING FIRST AND MEZZANINE FLOOR PLANS A-101 FIRST FLOOR RESTROOM PLANS A-102 MEZZANINE RESTROOM PLANS A-103 MEZZANINE RESTROOM PLANS A-104 MEZZANINE RESTROOM PLANS A-701 TYPICAL MOUNTING HEIGHTS A-702 WALL PARTITION AND DOOR DETAILS

    MECHANICAL M-000 MECHANICAL COVER SHEET M-101 FIRST FLOOR MECHANICAL PLANS M102A MEZZANINE FLOOR MECHANICAL PLANS – AREA A M102B MEZZANINE FLOOR MECHANICAL PLANS – AREA B ELECTRICAL E-000 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES E-001 ELECTRICAL OVERALL FIRST AND MEZZANINE FLOOR PLANS E-101 ELECTRICAL FIRST FLOOR PLANS E102A ELECTRICAL MEZZANINE FLOOR PLANS – AREA A E102B ELECTRICAL MEZZANINE FLOOR PLANS – AREA B E-600 ELECTRICAL PANEL SCHEDULES PLUMBING P-000 PLUMBING COVER SHEET P-101 FIRST FLOOR PLUMBING PLANS P102A MEZZANINE FLOOR PLUMBING PLANS – AREA A P102B MEZZANINE FLOOR PLUMBING PLANS – AREA B FIRE PROTECTION F-000 FIRE PROT