FIRESTOP INSPECTION
Dr. Selina LIN
Technical Manager
August 01, 2017
FS Inspection 1
2
Operations in more than 120 countries
23,385 employees (at the end of 2015)
120 nationalities in the global team
60 new products released (2016)
10,000 products in the entire product
portfolio
HILTI IN FIGURES
FS Inspection
Drilling and
demolition
Cutting and
grindingEngineering
Measuring
and aligning
Fastening and
installation
Firestop and
insulationServices
• Training and advice
• Quality and testing
• Logistics
• Finance and
administration
• Engineering services
• Tool services
• Direct
fastening
• Screw fastening
technology
• Anchor
technology
• Installation
• Construction
chemicals
• Firestop
• Distance
measuring
• Leveling and
aligning
• Detection
• Design
• Specifications
• Consulting
• Cutting and
grinding
• Diamond
systems
• Drilling and
chiseling
• Diamond
systems
Software
SYSTEM SOLUTIONS FOR THE CONSTRUCTION INDUSTRY
3FS Inspection
FS Inspection 4
FIRESTOP INSPECTION
5
AGENDA
• Part 1: Code Requirement
Why: Importance of Firestopping
What: Test Standard V.S. Application Approval
How: Oversea Case Sharing: UAE, Singapore, U.S.A
• Part 2: Inspection Standard
How: ASTM inspection standard
Who: Inspector training
??? Firestopping Inspection in HK
FS Inspection
FIRE COMPARTMENTATION
to minimize property/life loss and buy time for escape and rescue
FS Inspection 6
CORRECT FIRESTOP APPLICATIONS
FS Inspection 7
• To Prevent
fire/smoke spread
• To buy time for
escape and rescue
• To minimize
property/life loss
LONDON GRENFELL TOWER (JUNE 2017)
• the use of the flammable cladding being blamed for
spreading the fire that killed at least 70+ people.
• Barry Turner, director of technical policy at Local Authority
Building Control, which represents council building control
teams in England and Wales, said: “What we need to
know is what was inspected. You can go on site 16
times but not necessarily see everything you need to see.
They may have inspected the fixings, the fire barrier and
the cavity, which are equally important but are useless if
you put a flammable material on the front.”
FS Inspection 8
https://www.theguardian.com/uk-news/2017/jun/21/grenfell-tower-16-council-
inspections-failed-to-stop-use-of-flammable-cladding
CURTAIN WALL / EXTERNAL FACADE
9
• Curtain wall materials shall be non-combustible, in
accordance to BS-EN 13501-1: 2007 (Class A1);
BS 476 Part 4.
• Perimeter joint shall be sealed up to form smoke
and fire barrier in accordance to BS EN 1364 Part 3
or Part 4 and BS EN 12101-1, respectively.
Non-combustible
FRR and smoke
barrier
FS Inspection
COMBUSTIBILITY V.S. FIRE RESISTANCE
• Non-combustibility:
– Material characteristic
– Test standard: BS 476 Part 4 Non-combustibility test
for materials
– Limited combustibility : BS 476 Part 7 Method of test
to determine the classification of the surface spread of
flame of products
• Fire resistance:
– System Characteristic : openings + penetrant +
firestop sealing
– Test standard: Linear joint: BS EN 1366-3 or
Penetration seal: BS EN 1366-4; BS 476 Part 20.
FS Inspection 10
Materials of non-combustible DO NOT mean
they are fire resistance within a given
period.
For example, a piece of aluminum foil !
NON-COMBUSTIBILITY BS 476 – PART 4
• No sudden temperature rise
• Weight loss
• Total flaming time
FS Inspection 11
BS EN 1364-3 CURTAIN WALLING – FULL CONFIGURATION
FS Inspection 12
Horizontal Joint
Vertical Joint
BS EN 1364-4 CURTAIN WALLING – PART CONFIGURATION
FS Inspection 13
Horizontal Joint
BS 476 PART 20
• Linear joint: firestop sealant on top of mineral wool
FS Inspection 14
FS Inspection 15
FRR SYSTEM
16FS Inspection
Wrong system and poor installation
NO FRR protection
Wrong Design
Wrong system
EN V.S. BS TEST STANDARD
FS Inspection 17
Testing standard & Field of application
/ Quality Assurance
Pure Testing standard +
assessment route
Test StandardBS EN 1366-3 Penetration
BS EN 1366-4 Linear Joint BS 476 Part 20 General Principle
Application
Approval/
Classification
Classification Report
European Technical Assessment Test report/Assessment
Quality control Mandatory N/A
EN BS
BS TEST REPORT
FS Inspection 18
2000 mm * 1200 mm (2.4 m2)
1800 mm * 1300 mm (2.34 m2)
5000 mm * 400 mm (2.0 m2)
FS Inspection 19
EUROPEAN TECHNICAL APPROVAL/ASSESSMENT
EUROPEAN TECHNICAL ASSESSMENT
FS Inspection 20
QUALITY ASSURANCE ON MANUFACTURER
ETAG 026 Guideline for European technical approvals for firestopping and fire sealing products Part 1
3. Evaluation and attestation of conformity and CE marking
FS Inspection 21
FS Inspection 22
INSPECTION PRACTICE
• Code requirement
• How to conduct
• Who to conduct
• How to be qualified as inspectors
• Who sign off / liable
• Who pay for inspectors
FS Inspection 23
UNITED ARAB EMIRATES
FS Inspection 24
Certify and Sign
off Inspection
report, submitted
to civil defense
CIVIL DEFENSE CONSULTANT
FIRESTOP SPECIALIST /
HOUSE OF EXPERTS
Firestop
inspection report
at successive
stage
New UAE Code
3.3.6. Work shall not be certified as
completed unless approved by the
consultant’s, Firestopping specialist or
civil defense approved house of
expertise.
INSPECTOR QUALIFICATION
FS Inspection 25
FIRESTOP SPECIALIST /
HOUSE OF EXPERTS
Consultant/expertise for
Inspections (3.6.7)
Accreditation to ISO/IEC 17020
or IAS AC 291 criteria or
equivalent
2 Engineers, qualified in
accordance with Section 3.6.8.
Training and certification by
system manufactures
3 years experience in
Firestopping inspections.
Specialist for Design,
consultancy or Inspections (3.6.8)
Bachelor’s degree in engineering
Certification from any of FM,
UL/ULC, or IFC exams
certification.
Training and certification by
system manufactures
5 years experience in
Firestopping system’s design and
inspections.
Shall be certified and licensed by
Civil Defense, based on their
qualification and written
examination.
INSPECTION STANDARD
FS Inspection 26
FIRESTOP SPECIALIST /
HOUSE OF EXPERTS
SINGAPORE
FS Inspection 27
Installation by Hilti FSC
+DoC
submission
to PSB
Installation by contractor/
sub-contractor
Inspection by FSC
Option 1: By Firestop Specialist Contractor Option 2: By Trade Subcontractor
Currently there is a difficulty in execution of inspection as the FSC are empowered
to inspect their own work
PE
endorsement+
+DoC
submission
to PSB
PE
endorsement+
FIRESTOP INSTALLATION OPTIONS
FS Inspection 28
CoC DoC Form 2Form 2DoCCoC
PSB TUV SUD LISTING SCHEME
Step 2:
Declaration of Compliance
Step 3:
FSSD Form 2Step 1:
Certificate of Conformity
By Manufacturer or
Manufacturer’s FSCBy professional engineer
(PE)
By Manufacturer and
TUV Sud PSB
FS Inspection 29
This declaration is issued by the PLS listed company
named below, who is responsible for the installation
process as shown in the table below.
FS Inspection 30
U.S.A.
INTERNATIONAL BUILDING CODE
IBC CHAPTER 17 SPECIAL INSPECTIONS ON FS
FS Inspection 31
BUILDING OWNER
REGISTERED DESIGN
PROFESSIONAL
APPROVED AGENCY
1705.16 : . In high-rise buildings or in buildings assigned to Risk Category III or IV in
accordance with Section 1604.5, special inspections for through-penetrations, membrane
penetration firestops, fire- resistant joint systems, and perimeter fire barrier systems.
1704.2 Special inspections. Owner…. shall employ one or
more approved agencies to perform inspections……..
INSPECTION QUALIFICATION
FS Inspection 32
Chapter 17: Special inspections and tests
1703.1.1 Independence.
An approved agency shall be objective, competent and independent from the contractor
responsible for the work being inspected. The agency shall also disclose possible conflicts of interest so that
objectivity can be confirmed.
1704.2.1 Special inspector qualifications.
The special inspector shall provide written documentation to the building official demonstrating his
or her competence and relevant experience or training. …….
The registered design professional in responsible charge and engineers of record involved in the
design of the project are permitted to act as the approved agency and their personnel are permitted to act as the
special inspector for the work designed by them, provided they qualify as special inspectors.
APPROVED AGENCY
33
BREAK (15 MINS)
FS Inspection
34
AGENDA
• Part 1: Code Requirement
Why: Importance of Firestopping
What: Test Standard V.S. Application Approval
How: Oversea Case Sharing: UAE, Singapore, U.S.A
• Part 2: Inspection Standard
How: ASTM inspection standard
Who: Inspector training
??? Firestopping Inspection in HK
FS Inspection
FS Inspection 35
ASTM INSPECTION STANDARD
2012 IBC (1705.16.1) Penetration firestops. Inspections of
penetration firestop system. Conducted by approved agency
in accordance with ASTM E 2741
2012 IBC (1705.16.2) Fire-resistant joint system. Conducted
by approved agency in accordance with ASTM E 2393.
FIRESTOP INSPECTION STANDARD
FS Inspection 36
THE INSPECTION PROCESS
Review design documents : Method Statement
Verify materials prior to installation: Delivery Note
Verify against listed systems and/or EJ : ETA or EN test reports
Verify that ALL firestops installed : on-site FRR system installation
ASTM E2741: Standard Practice for On-Site Inspection of Installed Fire Stops
For each “type” of firestop being installed:
Witness 10% of Installations, or Destructive Testing on 2% of Installations
ASTM E2393, Standard Practice for On-Site Inspection of Installed Fire Resistive Joint Systems and Perimeter
Fire Barriers
For each “type” of fire resistive joint system being installed:
Witness 5% of linear feet being installed, or Destructive (or disassembly) testing on 1 ft. per every
500 ft.
FS Inspection 37
IF NON-COMPLIANCE IDENTIFIED
One non-compliant:
one full additional inspection of that type
10% non-compliance of one type:
inspection halted, installer re-inspects own work
Non-compliant firestop must be repaired/replaced
E2174/E2393: no guidance on what is an acceptable non-compliance percentage
FS Inspection 38
EXAMPLE OF INSPECTION FORM FROM ASTM2393
FS Inspection 39
At the end of the project the Inspector shall
submit a final inspection report (cover page
summary of deficiency + all inspection form)
CHECK LIST BY MANUFACTURE
FS Inspection 40
TRAINING FOR INSPECTOR
FS Inspection 41
FIRESTOP INSPECTION TRAINING CAN BE FOUND AT
WWW.FIRESTOP.ORG/INSPECTION
FS Inspection 42
About the IFC:
The International Firestop Council (IFC) is a nonprofit association of manufacturers, distributors, installers, inspectors and other
key stakeholders interested in passive fire protection materials and systems in North America and abroad.
What IFC do:
The IFC provides impartial and broad-based education, information, resources, affiliation, and procedures regarding firestop
system selection, performance, installation and inspection to the construction and code-enforcement communities.
ONLINE TRAINING COURSE
• Basic self-learning modules
• (via PowerPoint presentations)
To scroll through each of the PowerPoint slide files, click on the down arrow to advance the slide show and
the up arrow to backtrack.
Firestop Overview – Just the Basics
Construction Joints
Flexible Fire Resistive Duct Enclosures
Perimeter Curtain Walls
Firestop System Selection
Comprehensive Firestop Tutorial (96 slides)
FS Inspection 43
IFC CERTIFICATE
FS Inspection 44
Exam certificate can be used to present qualifications to AHJ
A Premier Certificate (as required by OSHPD) requires the exam plus hands-
on product training from at least four firestop product manufacturers
Optional 1-day hands-on how-to-inspect training seminars are offered 4-6
times per year around the US.
VERIFYING WHETHER SOMEONE HAS PASSED THE IFC INSPECTOR EXAM
• www.firestop.org/certificate-holders
– Premier certificate holders:
additional hands-on product training
FS Inspection 45
FS Inspection 46
INSPECTION IN HK
HK PROJECT FLOW
47
Architect/Consultant’s Spec
Material submission by
contractor
Site inspection by COW/BSI if any
Test report submission via
BA-13/14
Materials submission folder FRR sealant/grouting/materials
FS Inspection
APP-13 & CDB
FS Inspection 48
FRR material test report
submitted upon OP applications
Materials selected from Center
Data Bank
APP-158 : INSTALLATION OF CHECKING ON FRR MATERIALS
49FS Inspection
The format of inspection
report/record?
Checklist, photo records, or
w/ designed drawings?
FIRESTOP DOCUMENTATION
FS Inspection 50
CFS-DM CLOUD BASED SYSTEM
FS Inspection 51
FS Inspection 54
FROM GOOD TO GREAT
• WHY: Fire Safety of Building is important to human life and
Property AND It is Challenging
• WHAT:
– FRR system and approval
• HOW:
– Oversea code and practice on inspection
– Firestopping Inspection in HK
• WHO:
– Architect / MEP consultant
– Contractor / installer
– Inspector (COW/BSI) or third party agency
55
KICK START
Questions?
Selina LIN
Hilti (Hong Kong) Ltd
(852) 9723 2153
www.hilti.com.hk