    SPECIFICATION FOR FIRE FIGHTING WORKS

    i

  • 7/25/2019 Fire Fighting Specification

    2/23

    TABLE OF CONTENTS

    Fire Fighting.......................................................................................................................1

    Installation..........................................................................................................................1

    1. S!o"e o# Wor$............................................................................................................1

    %. Stat&tor' A""ro(als..................................................................................................1

    2.1 Site Conditions.....................................................................................................................1

    2.2 Standard And Codes of Practice...........................................................................................1

    2.3 Workmanship..........................................................................................................................1

    2.4 Drawing And Documents.........................................................................................................12.4.1 Genera.................................................................................................................................................1

    2.4.2 !anufacturers" Data.............................................................................................................................32.4.3 #perating and !aintenance !anua....................................................................................................3

    2.4.4 $As %uit$ Drawings.............................................................................................................................4

    2. & 'ates.....................................................................................................................................4

    2.( )ire )ighting *nstaation Drawings......................................................................................4

    2.+ Discrepancies *n ,he Drawings............................................................................................4

    2.- *nstruments )or !easurement And ,esting..........................................................................4

    2. Co/#rdination With #ther ,rades.........................................................................................4

    2.10 Protection.............................................................................................................................4

    ). Pi"e Wor$s.................................................................................................................*

    3.1 !aterias...............................................................................................................................&

    3.2 ointing.................................................................................................................................&3.2.1 Weded oints........................................................................................................................................&

    3.2.2 Screwed oints......................................................................................................................................(

    3.3 aing And )iing................................................................................................................(

    +. ,al(es An- Other A!!essories..................................................................................

    4.1 Genera.................................................................................................................................+4.1.1 )u Wa 5a 6a7e..............................................................................................................................+4.1.2 5utterf 6a7es....................................................................................................................................+4.1.3 8on/'eturn 6a7es...............................................................................................................................+

    4.1.4 )u Wa Gate 6a7e.............................................................................................................................+4.1.& Pressure 'educing 6a7e......................................................................................................................+

    4.1.( Air 'eease 6a7e.................................................................................................................................-4.1.+ Drain 6a7e...........................................................................................................................................-4.1.- *nspection 9 ,esting Assem%............................................................................................................-4.1. )ow Switch..........................................................................................................................................-

    4.2 #rifice )anges.....................................................................................................................-

    4.3 Pressure Switches.................................................................................................................-

    *. Fire Fighting A""arat&s / Fittings.........................................................................0

    &.1 :terna ;ard

  • 7/25/2019 Fire Fighting Specification

    3/23

    &.+ Sprinker Annunciation Pane...............................................................................................

    &.- Porta%e )ire :tinguishers..................................................................................................

    . P&2"ing S'ste2......................................................................................................1

    (.1 Pumps.................................................................................................................................10

    (.2 :ectrica !otors................................................................................................................10

    (.3 #perating Se?uence of )ire Pumps....................................................................................10

    (.4 Audio 6isua Aarm............................................................................................................11

    . P&2" Control Panel................................................................................................1%

    +.1 Genera................................................................................................................................12

    +.2 Standards............................................................................................................................12

    +.3 Construction Detais...........................................................................................................12

    +.4 !ouded Case Circuit 5reakers..........................................................................................13

    +.& Switch )use @nits )use Switch @nits................................................................................13

    +.( Current ,ransformers..........................................................................................................13

    +.+ *nstruments.........................................................................................................................13

    +.- 5us 5ars.............................................................................................................................13+. Contro Wiring....................................................................................................................13

    +.10 a%es.................................................................................................................................13

    +.11 ,ests...................................................................................................................................14

    +.12 !eta ,reatment And )inish...............................................................................................14

    +.13 )ire Pane Drawings...........................................................................................................14

    0. Testing An- Co22issioning...................................................................................1+

    -.1 Genera...............................................................................................................................14

    -.2 !ethod of ,esting...............................................................................................................1&

    -.3 Water for ,esting................................................................................................................1&

    -.4 ,est 'ecords.......................................................................................................................1&

    -.& @nsatisfactor Work...........................................................................................................1&-.( ,esting at Works.................................................................................................................1&

    -.+ #n Site ,esting...................................................................................................................1(

    3. I-enti#i!ation o# Pi"es Lines / E4&i"2ent..........................................................1

    1. Prea25le to the Pri!ing o# Bill o# 6&antities........................................................1

    10.1 Genera...............................................................................................................................1(

    iii

  • 7/25/2019 Fire Fighting Specification

    4/23

    FIRE FIGHTING INSTALLATION

    1. SCOPE OF WORK

    ,his contract sha incude the foowing ser7icesB

    *nstaation of eterna and interna Pu%ications.

    !. Wor$2anshi"

    A the work sha %e carried out in a workmanship ike manner and as per the %est practices of thetrade.

    -. 9ra:ing An- 9o!&2ents

    %.+.1 General,he Drawings pro7ided with the Specification sha %e treated as confidentia documents and must not%e copied or oaned to an other part without the epress permission of the #wner.

    ,he Drawings are intended as a guide to the firms tendering and gi7e approimate positions of pipesconduits ca%e runs andEor e?uipment on and in measuring from these drawings the Contractorsmust make due and proper aowance for a necessar di7ersions from the straight ine rises or fas as

    ma %e re?uired for the proper eecution of the works.

    Detai drawings in a cases sha %e worked to in preference to those of a more genera nature andfigured dimensions where indicated sha %e foowed in preference to scae.

    1

  • 7/25/2019 Fire Fighting Specification

    5/23

    Where necessar the eact positions of pant andEor e?uipment wi %e decided % the issue of furtherdrawings %ut no caim for etra pament due to insufficient information on this scope wi %eentertained.

    *n an case of dou%t as to the interpretation of either Drawings andEor Specification the Contractormust refer the matter to the #wner prior to the su%mission of his ,ender.

    *t is to %e cear understood that this ,ender is to %e a%soute incusi7e for the proper competion ofthe whoe of the works specified to the true intent and meaning of the specification andEor Drawings

    and the description therein contained sha %e read conoint and together and no error inconsistencdiscrepanc in the Drawings andEor Specification wi reie7e the Contractor of his o%igations toincude for an hand/o7er the work in the true meaning and intent of the Specification andEor Drawingscompete in e7er respect.

    ,he Contract Drawings and such other drawings as ma %e furnished to the Contractor during the

    progress of the Works sha %e considered as iustration %etween the Drawings and the Specificationthe Contractor sha eecute the work in accordance with the decision of the #wner. *f modificationsare necessar the Contractor sha su%mit modifications to the #wner for appro7a %efore suchmodifications are eecuted.

    A Drawings and Specification are the propert of the #wner.

    ,he Contractor wi %e re?uired to gi7e and o%tain a necessar site and other particuars and to agreesuch detais with the #wner. ,he Contractor must aso o%tain detais of an other Contractor"s workaffected % his work and sha work in cose co/operation with a such firms or persons concerned.

    ,he Contractor sha %e responsi%e for an damage caused to %uidings and contents and works %

    reason of arising out of or incidenta to or in connection with the eecution of an work in theContract Documents.

    ,he Contractor sha permit nothing to %e done which ma inure the sta%iit of the Works or eisting%uidings and no cutting through foors or was wi %e aowed other than where re?uired % the

    Drawings without the sanction of the #wner.

    ,he Contractor sha su%mit to #wner for appro7a %efore the work is commenced a cop of aworking detais and instaation drawings and sha aso supp sufficient copies for the use of the5uider and other interested parties.

    ,he Contractor must su%mit these drawings as soon as possi%e after the order is paced to gi7e ampe

    time for a parties concerned to stud and comment thereon.

    ,he contractor for a cearance fied conditions maintenance of architectura conditions and properco/ordination sha carefu check the work descri%ed on an working drawings su%mitted with atrades on the o%. ,o this end the contractor during the construction drawing stage sha ensure that heco/ordinates drawings of a other trades that might interfere with the proper instaation of his work.

    8o pament sha %e made for an 7ariations or aterations on site due to ack of knowedge of othertrades. An unreso7ed confict %etween trades sha %e referred to the #wner.

    ,he e?uipment aout is to %e detaied on the drawings showing the eact method of instaing andcear iustrating components to %e used in making a connections.

    Pipe work drawings must %e fu detaied showing a pipe work in dou%e ine and indicating theprecise sie of fittings 7a7es and e?uipment position of hanger supports with reference num%ers must%e indicated and a arge scae detai must %e gi7en showing the tpe and method of instaation of eachtpe of hanger. A schedue is to %e incuded on each drawing showing detais of the tpe of hangerfiings and references num%er for each tpe.

    2

  • 7/25/2019 Fire Fighting Specification

    6/23

    A genera aout drawings sha %e drawn 1E&0 scae uness agreed otherwise with the #wner. ,oietpiping aouts detais and hangers ceanouts methods of fiing of a fittings and fitures incudingpipes detaied cross sections of ser7ice duct s etc. are to %e drawn to 1E10 scae.

    ,he contractor sha pro7ide a detaied programme incorporating working drawing production whichcan %e read in conunction with he %uiding construction programme.

    ,he contractor sha prepare schedues and drawings showing precise detais of hoes in concrete %ockworks etc. %ase frames or support re?uired and the ike. ,he schedues sha show in detai the %uider"swork re?uired to %e performed % a other trades for the mechanica and eectrica instaations. ,hese

    drawings and schedues in an appro7ed form must %e su%mitted to an proper appro7ed % theArchitect %efore an structura work re?uiring hoes or other modifications is constructed.

    ,he Contractor sha su%mit a drawings as prescri%ed hereunder. A drawings sha %e suppied in theform of a second negati7e and signed % a principa of the Contract. After appro7a the negati7e wi%e signed % the #wner and returned to the Contractor. ,he #wner wi take as man prints from this

    negati7e as he re?uires for his won use.

    Signed and appro7ed drawings wi not %e departed from uness the #wner issues a singed 7ariation oromission certificate in writing. Drawings returned to the Contractor for ateration or amendment sha

    %e re/su%mitted to the #wner for appro7a.

    Amended or atered drawings sha show the nature of the amendment or ateration in a re7ision %ockon the drawing together with the re7ision num%er or etter and the date of the re7ision.

    Shoud the Contractor pro7e una%e to produce satisfactor $Working Drawings$ or %e una%e toproduce drawings to conform to the progress of the work the #wner reser7es the right to take whate7ersteps are necessar to ha7e drawings undertaken % others and de%it the Contractor"s account.

    An decision taken % the #wner to ha7e working drawings produced esewhere wi not reie7e theContractor of his contractua o%igations and the Contractor must pro7ide to the #wner a necessardetais phsica dimensions descripti7e iterature etc. of a e?uipment to %e incorporated ondrawings within 10 das of a re?uest from the #wner.

    %.+.% ;ana!t&rers< 9ata

    i> !anufacturers" performance data certified factor drawings of apparatus gi7ing fuinformation as to capacit dimensions materias and a information pertinent to the ade?uacof the su%mitted e?uipment sha %e su%mitted for appro7a.

    !anufacturer names sies cataogue num%ers andEor sampes of a materias sha %e su%mitted

    for appro7a.

    Su%mittas and working drawings shoud as far as possi%e %e compementar so that drawingsand su%mittas can %e crosschecked.

    ii> #rder of e?uipment su%mitted for appro7a must %e accompanied % ree7ant drawings

    technica data cataogues and sampes Where data certified drawings or other re?uiredinformation is not a7aia%e unti after orders ha7e %een paced the #wner wi gi7e pro7isionaappro7a unti a re?uested drawings and information ha7e %een suppied to the #wner andappro7ed % him. *t is the Contractor"s responsi%iit to ensure that a necessar information issuppied to the #wner in accordance with the progress of the work.

    %.+.) O"erating an- ;aintenan!e ;an&al

    i> ,he Contractor sha furnish si copies in %ound form of an instruction manua containing ainformation appica%e to this section of the Works. ,his manua is to %e simiar in design andcontent to those to %e pro7ided under other ser7ices.

    ,he manua sha contain a comprehensi7e written description of the Works outining theoperation of the sstems and maintenance procedures.

    3

  • 7/25/2019 Fire Fighting Specification

    7/23

    %.+.+ =As 5&ilt= 9ra:ings

    ,he Contractor sha arrange to keep on site a fu set of drawings showing the progress of the workswhich must %e kept up to date.

    ,he Contractor sha keep a record as the work proceeds of an work instaed not in accordance withthe drawings. #n competion of the works the Contractor sha supp three cear cooured prints of

    each appica%e drawing showing the eact position of a apparatus pipe ines ser7ices contro7a7es switchgear etc. together with diagrams schedues etc. to the #wner"s re?uirements and inaddition on compete set of pastic negati7es.

    ,he word $AS 5@*, D'AW*8GS$ sha %e cear indicated on a drawings adacent tot he tite%ock.

    e. Rates

    ,he rates ?uoted for an particuar item % the Contractors sha %e incusi7e of the cost of materias

    erection connection testing a%our super7ision toos pant transportation ecise duties and taescontingencies %reakage wastage and a other sundries for a e7es.

    ,he rate sha aso %e incusi7e of cutting hoes making chases in 'CCE%rick work inserting see7esand making good the same. 8o caim for etra woud %e entertained on this account.

    #. Fire Fighting Installation 9ra:ings

    ,he )ire )ighting *nstaation drawings issued from time to time to the Contractor are diagrammatic %utsha %e foowing as cose as actua construction and work wi permit. An de7iation from thedrawings re?uired to conform to the %uiding construction sha %e made % the Contractor at his own

    epenses. ,he architectura drawings sha take precedence o7er the ser7ices drawings as far as theCi7i and other trades works are concerned.

    g. 9is!re"an!ies In The 9ra:ingsShoud there %e an discrepanc due to in/compete description am%iguit or omission in the drawingsand other documents reating tot his Contract found % the Contractor either %efore starting the work orduring eecution or after competion the same sha %e immediate %rought to the attention of theArchitectEConsutant and his decision woud %e fina and %inding on the Contractor.

    h. Instr&2ents For ;eas&re2ent An- Testing

    ,he Contractor sha pro7ide free of cost a e?uipments instruments a%our and a other aiedassistance re?uired % the #wnerEArchitect or their representati7es for measurement and testing of theworks.

    i. Co>Or-ination With Other Tra-es

    ,he Contractor sha %e responsi%e for coordinating this work with works of other trades sufficientahead of time to a7oid unnecessar hod ups.

  • 7/25/2019 Fire Fighting Specification

    8/23

    ). PIPE WORKS

    $. ;aterials

    ,he pipe work sha %e done in %ack mid stee pipes of "

  • 7/25/2019 Fire Fighting Specification

    9/23

    Where site weding is carried out in proimit to infamma%e materias the Contractor must takespecia precautions to protect the materias from risks of fire.

    Testing o# Wel-e- @oints

    ,he weded oints sha %e tested in accordance with procedure aid down in *SB 3(00 =Part *>. #ne test

    specimen taken from at east one fied oint out of an 10 sha %e su%ected to tet.

    *f the resuts of the tensie test do not conform to the re?uirements specified retests of two additiona

    specimen from the same section sha %e made each of which sha conform to the re?uiredspecifications. *n case of faiure of one or two etensi7e gouging =scooping out> and repairing sha %ecarried out as directed % the authorit.

    *f interna pressures eceed 1.& !pa =1&kgfEcm2> specia attention shoud %e gi7en to the assem% ofthe pipe and the first run of wed. 8on/destructi7e testing of the competed wed ma %e carried out on

    pipeines % radiographic =see *SB 4-&3> or utrasonic method =see *SB 42(0> as agreed upon %etweenthe #wner and the Contractor.

    ).%.% S!re:e- @ointsoint for %ack stee pipes and fittings sha %e meta/to/meta threaded oints using ,efon tape on thethreads.

    Flange- @oint

    )anges sha %e as per the ree7ant *ndian Standard and sha %e faced. 'u%%er or as%estos gasket sha%e inserted %etween the oints.

    )ange sha %e pro7ided on B

    a. Straight runs not eceeding 12/1& m on pipeines -0 mm dia and a%o7e.%. 5oth ends of an fa%ricated fittings e.g. %ends tees etc. of (& mm or arger diameter.c. )or ointing a tpe of 7a7e appurtenances pumps connection with other tpe of pipes to

    water tanks and other paces necessar and re?uired as per good for engineering practice.

    7nions

    Pro7ide appro7ed tpe of dismounta%e unions on pipes ines &0 mm and %eow in simiar paces asspecified for fanges.

    2. La'ing An- Fiing

    a. A5o(e Gro&n-

    :posed pipes on was and ceiings sha %e fied with standard pattern G.*. %at camps on angeiron frames em%edded in was or suspended from ceiing. ,he camps sha %e spaced at reguarinter7as in straight engths as per the foowing ta%eB

    9ia o# Pi"e

    in 22

    HoriDontal Length

    in 2etre

    ,erti!al Length

    in 2etre

    2& 2.4 3.032 2.+ 3.040 3.0 3.(

    &0 3.0 3.((& 3.( 4.&-0 3.( 4.&100 4.0 4.&1&0 4.0 &.4

    5. 7n-er Gro&n-

    ,he trenches for the underground mains sha %e +&0 mm wide at top and eca7ated to a depthso that a minimum 1/meter of co7er a%o7e the crown of the pipe is a7aia%e after %ackfiing.

    (

  • 7/25/2019 Fire Fighting Specification

    10/23

    ,he pipes sha %e e7en aid in the trenches after coating and wrapping as descri%ed hereinafterand co7ered with fine sand 1&0 mm a around. An damage to coating and wrapping sha %emade good %efore %ackfiing.

    !. Prote!tion o# 7n-ergro&n- Pi"es

    ,he underground stee pipes sha %e protected % coating and wrapping. ,he coating and

    wrapping sha %e done in genera as per *SB10221/1-2.

    )irst of a the pipes surface sha %e rough ceaned and dried %efore the appication of primer

    and sha %e free of dirt grease oi rust scae or other foreign matter. After ceaning oneuniform coat of coa tar primer sha %e appied on the surface and one aer of gass fi%er tissuesha %e wrapped and simutaneous hot coat tar sha %e appied. #n this another aer of gassfi%er tissue saturated with coa tar sha %e wrapped with the simutaneous appication of coa tar.

    -. An!hor Blo!$s

    Suita% designed anchor %ocks in cement concrete to encounter ecess thrust due to waterhammer an high pressure shoud %e pro7ided at a %ends tees and such other ocations asdirected % the #wner :act ocation design sie and mi of the concrete %ock sha %eappro7ed % the Architect E Consutant prior tot he eecution of the work.

    +. ,AL,ES AN9 OTHER ACCESSORIES

    n. General

    :ach 7a7e %od sha %e marked with cast or stamped ettering gi7ing the foowing informationB

    a. ,he manufacturer"s name or trademark%. ,he sie of the 7a7e

    c. ,he guaranteed working pressure

    *soating 7a7es on the water supp ines sha %e fu %ore %a 7a7e tpe for pipe diameters upto &0

    mm. )or (& mm dia and a%o7e these sha %e %utterf 7a7es.

    +.1.1 F&ll Wa' Ball ,al(e

    ,he 7a7es sha %e of fu %ore tpe and of ?uait appro7ed % the ConsutantE#wner. ,he %od and%a sha %e of copper ao and stem seat sha %e of ,efon.

    +.1.% B&tter#l' ,al(es

    ,he 7a7e sha of cast iron conforming to ree7ant *SB130&. ,he 7a7e sha %e of ?uait appro7ed %the consutant E #wner.

    +.1.) Non>Ret&rn ,al(es8on/return 7a7es are to %e *SB ++- manufactured from gunmeta of deincification resistant %rass.

    +.1.+ F&ll Wa' Gate ,al(e

    ,he 7a7es sha %e of ?uait appro7ed % the ConsutantE#wner and sha genera conform to *SB++-.

    +.1.* Press&re Re-&!ing ,al(e

    ,he 7a7e sha %e suita%e for water appication and sha conform to ree7ant 5*S standard. ,he 7a7eshoud %e instaed in a 7ertica portion on horionta ine. *n a cases a stop 7a7e shoud %e instaedin an easi accessi%e position on the inet side of the pressure/reducing 7a7e. A safet 7a7e and a

    pressure gauge must awas %e instaed on the reduced pressure or outet side of the pressure/reducing7a7e. ,o a7oid an dirt from entering the 7a7e it is ad7isa%e to fit a strainer on the inet or high

    +

  • 7/25/2019 Fire Fighting Specification

    11/23

    pressure ine. ,he pressure reducing 7a7e and accessories shoud conform to ree7ant 5*S standard andof appro7ed make.

    +.1. Air Release ,al(e

    Air 6a7es are to %e pro7ided on a high pints in the sstem. ,hese sha %e 2& mm dia screwed inet

    forged %rassEcast iron singe acting air 7a7es connected with %a 7a7e on inet side.

    +.1. 9rain ,al(e

    Drain 6a7es are to %e pro7ed at a ow points in the sstem for draining the water. ,hese sha %e 40 mdia fu wa %a 7a7e fied on 40 mm dia %ack stee pipe.

    +.1.0 Ins"e!tion / Testing Asse25l'

    *nspection and testing of the sprinker sstem sha %e done % pro7iding an assem% consisting of

    gunmeta 7a7es gunmeta sight gass %/pass 7a7e.

    +.1.3 Flo: S:it!h

    )ow switch sha %e pro7ided on sectiona mains and %ranch ines of sprinker sstems as indicated on

    drawings or necessar and re?uired and directed % the Proect !anager.

    )ow switch shoud %e suita%e to actuate at a minimum of fow of singe sprinker and sha %e suita%efor connection to a centra annunciation pane.

    o. Ori#i!e Flanges

    Where7er re?uired ( mm thick stainess stee suita% designed orifice fanges sha %e pro7ided %eforeindi7idua anding 7a7es to restrict the operating to 3.&FgES?.cm. and aow a discharge of &(0 pm.,he orifice fanges sha aso %e pro7ided in the automatic sprinker sstem at suita%e ocation to

    maintain a pressure of 2.0 kgEcm2 in the sprinker instaations.

    ". Press&re S:it!hes

    Pressure Switches sha %e differentia tpe for operation of a pumps and for the 7arious duties and

    settings re?uired. Pressure switches sha %e for hea7 dut operation and of appro7ed make. Apressure switches sha %e factor cai%rated.

    *. FIRE FIGHTING APPARAT7S / FITTINGS

    4. Eternal 8ar- H'-rant

    i. ,he eterna hdrants sha %e controed % a cast iron %utterf 7a7e. gunmeta %ranch pipe with noe to *SB 03.

    r. Internal H'-rants Lan-ing ,al(es

    i. ,he interna hdrant sha %e singe headed gunmeta anding 7a7e with (3 mm dia outet and100 mm inner =*.SB &20/1(> with indi7idua shut off 7a7es and cast iron whees. anding

    7a7e sha ha7e fanged inet and instantaneous tpe outets as shown on the drawings.

    -

  • 7/25/2019 Fire Fighting Specification

    12/23

    ii. *nstantaneous outets for fire hdrants sha %e of standard pattern appro7ed and suita%e for fire%rigade hoses.

    iii. Contractor sha pro7ide for each interna fire hdrant station two num%ers of (3 mm dia. 1& mmong ru%%eried fa%ric inen hose pipes with gunmeta mae and femae instantaneous tpecouping machine wound with G.*. wire =hose to *SB (3( tpe 2 and coupings to *SB 03 with *S

    certification> fire hose ree gunmeta %ranch pipe with noe *SB 03.

    s. First Ai- Fire Hose Reel

    ,he )irst Aid )ire

  • 7/25/2019 Fire Fighting Specification

    13/23

    . P7;PING S8STE;

    ,he Pumping Sstem sha consist of eectric motor dri7en as we as diese engine dri7en fire pumpsof dut as specified in the %i of ?uantities. ,he maor items under this head sha %e as foowsB

    '. P&2"s

    A fire pumps sha meet the foowing dut re?uirementsB

    Pumps shoud dei7er at east 1&0I of the rated discharge at a head of (&I of the rated head. ,he shutoff head sha not eceed 120I of the rated e7e.

    Pumps sha %e centrifuga tpe dri7en % either an eectric motor or a diese engine.

    ,he casing wi %e of the 7oute tpe designed to ensure correct 7eocit distri%ution manufactured incose/grained cast iron and compete with air reease cock drain pug and dei7er pressure gaugeconnection.

    ,he impeer wi %e of the shrouded tpe manufactured in cose grain gun metaE%rone and keed to

    the shaft. *t wi ha7e %aancing hoes to achie7e hdrauic %aance and reduce pressure in the stuffing%o and proong the packing ife. ,he impeers sha %e dnamica %aanced. Connecting shaft sha%e stainess stee with %rone see7e and grease u%ricated %earings. Cose grain gun meta impeerwear rings wi %e fitted on %oth sides of the impeer to preser7e running cearances.

    Pumps sha %e connected to the dri7e % means of spacer tpe o7e o coupings which sha %eindi7idua %aanced dnamica and statica. ,he couping ointing the prime mo7ers with thepump sha %e pro7ided with a sheet meta guard.

    Pumps sha %e pro7ided with appro7ed tpe of mechanica seas.

    ,he pumps sha ha7e ratings as mentioned in 5i of Huantities. ,he pump sha meet the re?uirementsof the ,ariff Ad7isor Committee.

    D. Ele!tri!al ;otors

    'ating of the seected motor sha %e e?ui7aent to the motor re?uired for a pump capa%e of 1&0I ofthe rated discharge.

    :ectrica dri7en pumps sha %e pro7ided with tota encosed fan cooed induction motors or asspecified in 5i of !aterias. )or fire pumps the motors shoud %e rated not to draw stating currentmore than 3 times norma running current. !otors sha %e wound for cass 5 insuation Dan winding

    sha %e 7acuum impregnated with heat and moisture resistant 7arnish gass fi%er insuated. !otorssha %e suita%e for 41& 7ots 3 phase &0 cces AEC supp and sha %e designed for J3- deg Cam%ient temperature. !otors sha confirm to *.SB32&. !otors sha %e capa%e of handing the re?uiredstarting tor?ue of the pumps.

    !otors for fire pumps sha meet a re?uirements and specifications of the ,ariff Ad7isor Committee.

    aa. O"erating Se4&en!e o# Fire P&2"s

    )ire pumps sha operate on drop of operating pressure in the fire mains in the foowing se?uenceB

    ,he operating pressure in the mains is to %e maintained at &.( kgEcm2.

    ,he ocke pump sha start automatica the moment pressure drops to &.1 kgEcm 2and stop when thepressure reaches &.( kgEcm2again.

    *n case after the start of ocke pump the pressure sti keeps on faing and the main fire pump shastart at 4.( kgEcm2. ocke pump sha stop when main pump starts.

    10

  • 7/25/2019 Fire Fighting Specification

    14/23

    !ain )ire and Sprinker pumps sha start independent and automatica on fa of pressure %utstopping of the pump sha %e sha %e % manua push %utton from the !CC pane.

    55. A&-io ,is&al Alar2

    An eectrica operated fire aarm sstem sha %e pro7ided which is connected to the fire 9 sprinker

    pumps to indicate their operation 7isua % a %inker amp and % an appro7ed tpe of audi%e aarm.

    11

  • 7/25/2019 Fire Fighting Specification

    15/23

    . P7;P CONTROL PANEL

    !!. General

    ,he Contro Pane for fire fighting sstem sha %e housed in waEfoor mounted dust and damp proof

    sheet stee ca%inet with hinged front access door and sha ha7e the suita%e rating star/deta starterstimers reas necessar seector switch for automatic and manua operation indicating amps toshow the status of each pump singe phase pre7entors dr suction cut of etc. and a other switch gearnecessar for the satisfactor functioning of the hdrant sstem 9 sprinker sstem.

    Contro Panes are to %e suita%e for 3 phase 4 wire 41& 6ots &0

  • 7/25/2019 Fire Fighting Specification

    16/23

    ##. ;o&l-e- Case Cir!&it Brea$ers

    !CC5 sha conform to *SB 134+ and %e rated for the currents as shown on the singe ine diagram.,he sha ha7e a short circuit rating as specified esewhere.

    A !CC5 sha %e pro7ided with an adusta%e therma o7eroad trip de7ice together with an

    adusta%e magnetic short circuit reease. ,he !CC5 sha ha7e a trip free togge mechanism and dosha come to midwa position and the trip operates.

    ,he operating mechanism sha %e ?uick make and ?uick %reak and trip free and contacts sha %esinge %reak tpe with arcing contacts ocated within are chutes.

    ,he !CC5 sha %e suita%e for %oth 7ertica and horionta mounting.

    gg. S:it!h F&se 7nits F&se S:it!h 7nits

    )use switch units sha %e of the oad %reak hea7 dut tpe suita%e for cu%ice mounting with frontoperation. ,he switches sha conform to the re?uirements of *SB 134+ and sha %e suita%e for %eingfitted with

  • 7/25/2019 Fire Fighting Specification

    17/23

    22. Tests

    ,he design of the contro pane sha ha7e %een tpe/tested in accordance with foowing sections of C*.- B 1 B 1 of *SB -(23B

    6erification of temperature rise imits.

    6erification of dieectric properties.6erification of short circuit strength.'outine tests sha %e conducted on contro pane in accordance with C *.- B 1 B 2 of *S B -(23 and shacomprise.

    *nspection of the pane incuding inspection of wiring and eectrica operationa tests where necessar.

    Dieectric tests.Checking of Protecti7e !easures and eectrica continuit of the protecti7e circuits.

    nn. ;etal Treat2ent An- Finish

    A steework used in the construction of the switch%oards shoud ha7e undergone a rigorous meta

    treatment process as foowsB

    :ffecti7e ceaning % hot akaine degreasing soution foowed % cod water rinsing to remo7e tracesof akaine soution.

    Picking in diute suphuric acid to remo7e oide scaes and rust formation if an foowed % codwater rinsing to remo7e trances of acidic soution.

    A recognied phosphating process to faciitate dura%e coating of the paint on the meta surfaces andaso to pre7ent the spread of rusting in the e7ent of the paint fim %eing mechanica damaged. ,hisagain sha %e foowed % hot water rinsing to remo7e traces of phosphate soution.

    Passi7ating in de/oaite soution to retain and augment the effects of phosphating. Dring with

    compressed air in a dust/free atmosphere. ,wo coats of sto7ing snthetic ename epo paint to thespecified shade of *SB&. ,he tota thickness of paint shoud not %e ess than 2& microns.

    oo. Fire Panel 9ra:ings

    ,he Contractor sha furnish the G.A. and contro circuit wiring diagram drawings for appro7a.

    Detaied cataogues for a %ought out e?uipment sha %e made a7aia%e for scrutin and appro7a.

    After competion of a works 3 sets of a fina appro7ed drawings co7ering G.A. Circuit diagramsSinge ine diagrams for tota sstem are to %e made a7aia%e.

    0. TESTING AN9 CO;;ISSIONING

    "".General

    ,he Contractor sha %e responsi%e for testing and commissioning the entire ser7ices instaationdescri%ed in these specifications and wi demonstrate the operation of the sstem of the entiresatisfaction of the #wner E Architect.

    Work under this section sha %e eecuted without an additiona cost. ,he rates ?uoted in this tendersha %e incusi7e of the works gi7en in this section.

    Contractor sha pro7ide a toos e?uipment metering and testing de7ices re?uired for the purposes.

    ,he entire fire fighting piping sstem sha %e tested at minimum 14 kgEcm 2pressure. ,he test pressure

    sha the maintained for at east 2 hrs.

    14

  • 7/25/2019 Fire Fighting Specification

    18/23

    44.0.% ;etho- o# Testing

    ,he test on fire fighting instaation sha %e carried out as per the pro7isions of 7arious Codes ofPractice fire protection manua of ,ariff Ad7isor Committee and 8ationa 5uiding Code.

    ,he carring out and recording of tests sha %e agreed with the #wner E Architect.

    ,he foowing method of testing of hdrant and sprinker instaation sha %e foowed in generaBFire H'-rant S'ste2

    Pressurie the fire hdrant instaation % running the main fire pump and once the re?uired pressure isachie7ed switch off the pump.

    #pen %pass 7a7e and aow the pressure to drop in the sstem. Check that the ocke pump cuts/inand cuts out at the pre/set pressures. *f necessar adust the pressure switch for the ocke pump.

    #pen hdrant 7a7e and aow the water to fow into the fire water tank in order to a7oid wastage ofwater. ,he main fire pump shoud cut/in at the pre/set pressure and shoud not cutout automatica on

    reaching the norma ine pressure. ,he main fire pump shoud stop on % manua push %utton.

  • 7/25/2019 Fire Fighting Specification

    19/23

    ((. 0. On Site Testing

    ,he Contractor sha pro7ide on site a the necessar instruments pant e?uipment materias watereectricit an a%our necessar for carring out the specified tests. A tests sha %e carried out asre?uired to meet the construction programme and the contractor sha incude for a necessar isoation

    and other works as ma %e re?uired for testing the whoe or parts of the instaation. ,he Contractorsha aso %e responsi%e for re/testing if necessar unti satisfactor tests are achie7ed.

    3. I9ENTIFICATION OF PIPES LINES / E67IP;ENT

    A pipeine instaation sha %e pro7ided with a coour identification sstem. ,he sstem in generasha %e as per *SB 23+/1-3/Specification of Coour Code for the identification of Pipe ines. ,he

    coour identification sstem sha comprise ofB

    5asic *dentification Coour o7er the whoe ength of pipe. Code indication %ands for precise

    determination of the contents %eing carried % the pipe

    ,he code indication %ands sha %e minimum 1&0mm wide sha %e paced at a unctions at %oth sidesof 7a7es ser7ice appiances %uk heads wa penetrations and at an other pace where identificationis necessar.

    ,he coour of code indication %ands sha %e as directed % the #wnerEArchitect.

    ,he direction of fow sha %e cear marked on the pipe ines.

    ,he e?uipment sha %e identified with identification pates as directed % the #wnerEArchitect.

    1. PREA;BLE TO THE PRICING OF BILL OF 67ANTITIES

    ::. General

    ,his section sha %e appica%e for item rate work and for 7ariations. ,his pream%e co7ers instaationof fire protection works. ,his pream%e sha %e read in conunction with the Specifications Conditionsof Contract and a other documents accompaning the tender papers.)or a items of work the rates sha %e comprehensi7e and a incusi7e. ,he rates sha incude for amaterias and things necessar for satisfactor competion and maintenance of the work in properworking order and to the satisfaction of the ArchitectEProect !anager incuding testing making

    sampes etc. and a that ha7e %een indicated in the Specifications or other ,ender Documents eitherdirect or indirect and co7er for a o%igations of the Contractor under the Contract. 8o caim foradditiona pament sha %e aowed for an error or misunderstanding % the Contractor of the workin7o7ed.

    @ness otherwise mentioned in the description of the item this schedue sha %e appica%e for work atan height position or condition.

    @ness otherwise stated method of "measurement" as descri%ed in the atest "Specifications" of CPWDsha %e foowed. *n case of an dispute in this regard the Proect !anager"s decision sha %e fina%inding and concusi7e.

    ,he foowing notations ha7e %een used throughout the Schedue of Huantities and 'ateB

    ! E m 'unning !eter s? m S?uare !eter

    cu m Cu%ic !eter !! E mm !iimeter 8o 8um%erE8um%ersDia Diameter kg FiogramEs, ,one

    S ump Sum

    Pt Point's. 8epaese 'upees

    1(

  • 7/25/2019 Fire Fighting Specification

    20/23

    85 8omina 5ore =*nside Diameter> of pipe#D #utside Diameter I Percent.

    1+

  • 7/25/2019 Fire Fighting Specification

    21/23

    Tra!e Prea25le Fire Prote!tion Wor$s

    1. !asonr cham%er for6a7es .

    Pipe work is to %e measured in running meters nearest to a cm for thefinished work which sha incude !.S. pipe and !.S. fittings such as%ends tees e%ows reducers crosses pugs sockets nippes and nuts %utsha ecude %rass or taps 7a7es etc.

    ,he rate sha %e incusi7e of cost of materias and a%our cutting hoesand chasing in was and foors and making good the same pro7idingsee7es apping two coats of anti/corrosi7e paint on %uried andconceaed pipe work and painting of eposed pipe with two coats ofename paint o7er a coat of primer.

    ,he rate sha %e incusi7e of pro7iding "*dentification and a%eing" ofpipes with the coour coded %ands.

    3. 6a7es

  • 7/25/2019 Fire Fighting Specification

    22/23

    LISTING OF APPRO,E9 ;AKES / ;AN7FACT7RES

    LIST OF APPRO,E9 ;AKES;AN7FACT7RES OF ;ATERIALS

    FIRE FIGHTING INSTALLATALATION

    NOTE A 5rand 8amesE!anufactures are *ndian uness specified otherwise.

    S.No. ;aterial Bran- Na2e;ana!t&rer

    A. Pi"e / Fittings1. !id Stee E G* Pipes conforming to *SB 123 ,ata

    8ewage

    E. S"rin$ler Hea-s / Installations ,al(es1. Huartooid 5u% tpe Sprinker

  • 7/25/2019 Fire Fighting Specification

    23/23

    G. Fire Eting&isher1. Porta%e )ire :tinguishers !inima

    6ia

    )ire

    Safe

    Cease )ireH. Ele!tri! S:it!h Gear an- Starters1. :ectric Switch Gear Siemens

    9,

    G:

    A55

    !erin Gerin

    2. P6C *nsuated Armoured Power and Contro Ca%es Goster

    CC*

    @mca%

    I. ;is!ellaneo&s1. )ow *ndicating Switches

    '.C. Automat

    Potter

    2. Pressure Switches Danfoss

    Apha

    3. Anti/7i%ration PadsE)ootings Dunop

    4. 5eows 9 :pansion oints 'esistofe

    )econs

    Fishor

    / N /