FINISHING SERVICESfinestco.com › wp-content › uploads › 2019 › 09 › COMPANY-PROFILE... ·...
Transcript of FINISHING SERVICESfinestco.com › wp-content › uploads › 2019 › 09 › COMPANY-PROFILE... ·...
TABLE OF CONTENTS
PROFILE 1. Overview2. Services3. Objectives4. Organizational Chart
PROJECTS 1. Current2. Completed3. Selective
RESOURCES 1. FINEST Staff2. Key Personnel Profiles3. List of Plants, Machinery & Equipment4. List of Suppliers
OVERVIEW
“Finishing Services Contracting Co. Ltd. - FINEST”, a regional company established 1984 in the Kingdom of Saudi Arabia, has more than two decades of experience in the fields of General Contracting, General Construction, Interior and Renovation, Building Maintenance, Projects Execution and Development and Finishing works.
FINEST, a group of highly qualified and experienced professionals prides itself in striving to achieve clients’ satisfaction by offering high standards and quality, dedication in all phases of the project, time and cost efficient work and commitment to deliver as per schedule. We adopt each of our client’s goals as our own, and place our clients’ interests above all.
When adopting a project, FINEST provides assurances to the designer/Consultant to deliver a project executed in conformity with the latter’s vision, design and standards, and even better, to deliver a project executed in the most time and cost efficient manner. We believe that with positive co-operation, professional interaction and extensive experience in all fields of construction, FINEST can undertake any project, from simple to complex, without sacrificing our high standards and our focus on quality and customer service. You can be assured of our commitment, care and attention throughout all phases of the project.
PROFILE | 1. OVERVIEW
Building projects is what we do; Building strong relationships with our clients is what we excel at.
Firas Ibrahim | General Manager
“”
SERVICES
FINEST‘s contracting and construction activities include without limitation, residential and Commercial buildings, Airports, Hotels, Hospitals, Schools, Technical buildings and so forth. Our main activities compromise but are not limited to the following:
A. FINISHING WORKS
1. Flooring: Supply and install all types of flooring, such as: Ceramic, Marble, Granite,Polished Concrete, Carpet, Linoleum, Vinyl, Rubber, wood, and so forth.
2. Treating concrete flooring, such as: Epoxy coating, Waterproofing, Sealed concrete, and so forth.
3. Walls: Supply and install all types of walls and wall coverings, such as: Block work,Plaster, Dry Wall partitions, Wood Cladding, Stone Cladding, Wall Paper, Acoustical WallPanels, all type of paints, and so forth.
4. Ceiling: Supply and install all types of false ceilings, such as: Gypsum Board, Metal Ceiling,Acoustical Ceiling, Wood, Fabric, and so forth.
5. Other special finishing items, such as but not limited to the following: Glass/stainless,SteelHandrails, Stainless Steel and special metal works, Mirrors, Art Works, Acrylic ResinPanelling, Wooden Cabinets, Counter Tops, Vanity Tops, Decorative Wooden Works, and so forth.
6. FINEST also undertakes soft and landscaping works, including: Backfilling, Planting,Interlocking Tiles, Road Jersey and Curb Stone Barriers, Road Marking and Signage, and so forth.
7. In addition to the above, FINEST undertakes concrete works, from the excavation stage up tothe last element of the structure, as well as it has the capability to execute metal structures.
PROFILE | 2. SERVICES
you can be confident that FINEST can cater for all your demands, and is open to undertake new
challenges and experience new fields. Firas Ibrahim | General Manager
OBJECTIVES
FINEST’s main objectives are to achieve:
• Qualitycontrol.• Satisfactionofallourclient’sneeds.• Deliveryontimeandcostefficientmanner.• Aone-stop-shoptofulfillalltheprojectsneeds
“
”
PROFILE | 3. OBJECTIVES
GENERAL MANAGER
PROCUREMENTOFFICER
STORY KEEPERESTIMATION
ENGINEER
COST CONTROLOFFICER
PLANNINGENGINEER
PMV OFFICER
CASH MANAGEMENTACCOUNTANT
ADMIN ASSISTANT/PRO
PROJECTMANAGER
AP/AR & PAYROLLACCOUNTANT
EMPLOYMENT RELATIONS
OFFICER
HUMAN RESOURCES &
ADMINSTRATIONMANAGER
FINANCIAL &RISK MANAGER
QHSSEMANAGER
OPERATIONSMANAGER
PROJECTCONTROLMANAGER
COMMERCIALMANAGER
PROFILE | 4. ORGANIZATIONAL CHART
ORGANIZATIONAL CHART
SR. NO. PROJECT NAME
SCOPE OF WORKS
CLIENT CONSULTANT CONTRACT AMOUNT (SR)
PERCENTAGE COMPLETED
1
2
3
4
5
6
7
HHR2 Work Base 1
HHR2Work Base 2
HHR2 Work Base 3
HHR2 Work Base 4
Finishing Works
Finishing Works
Finishing Works
Finishing Works
Ohl/COPASA Arabia - Imathia
OHL / COPASA Arabia - Imathia
Ohl Arabia
Copasa Arabia
Dar Al Handassah
Dar Al Handassah
Dar Al Handassah
Dar Al Handassah
3,700,000
3,330,000
3,108,700
5,956,400
95%
95%
95%
95%
CURRENT PROJECTS
FINISHING PROJECTS | 1. CURRENT PROJECTS
Riyadh Metro Package 1 Line 2
BACS Consortium RMTC 20,000,000 10%
Riyadh Metro Package 3 Line 5
Finishing Works
Finishing Works
ANM Consortium RMTC 15,000,000 50% Riyadh Metro
Package 2 Line 3
FAST Consortium RAMPED 10,000,000 70%
Finishing Works
SR.NO.
PROJECT NAME SCOPE OF WORKS CLIENTCONTRACT
AMOUNT (SR)
7
8
9
10
KAUST - Villas
Prince Bandar Private Villa
KAUST - LFOs
HHR2 - Work Base 3
KAUST - Town Center
UAE - Ambassador Residential Villa
King Saud University - AL HASSA Academic Bldg.
King Saud University - Riyadh Medicine Bldg.
Out Patient Clinic - Al Hassa
Correctional Facilities - Dhaban
All Finishing Items
Construction & Finishing Works
All Finishing Items
Finishing Works
Finishing Works
Turn Key Project (Structural, MEP
& Finishing)
All Finishing Works
All Finishing Works
Concrete & All Finishing Works
All Finishing Works
KAUST E & PM Team
Saudi Diyar
Nesma Tradings
UAE - MOF
Saudi Bin Laden Group
Saudi Bin Laden Group
Saudi Bin Laden Group
Saudi Bin Laden Group
Hapco
Cap - France
554,000
23,345,000
6,500,000
9,500,000
5,200,000
9,500,000
110,000,000
50,000,000
15,000,000
13,200,000
FINISHING PROJECTS | 2. COMPLETED PROJECTS
COMPLETED PROJECTS
American New Consular Compound Items
AICI All Finishing 24,400,000
KAICC Conference Centre
Finishing Works Saudi Oger 7,000,000
KAUST Bldg. 4302
Aldara Hospital
KAUST D &T School
Kaust Garden
BAYTOUR
Carillion
HAPCO
CAP France BAT
Finishing Works
Terracotta Marble works
Finishing Works
Finishing Works
2,500,000
7,614,150
1,250,000
600,000
1
2
3
4
5
6
11
12
13
15
14
16
SR.NO. PROJECT NAME SCOPE OF WORKS CLIENT
CONTRACT AMOUNT (SR)
18
19
20
21
22
23
27
24
25
26
Khozam Palace, Riyadh
Prince Sultan Palace, Medina
Mina Prince Sultan
Mina Prince Abdullah
Al Safa Palace, Mecca
Royal Guard Housing
4 Palace in Azizia, Prince Sultan
Armed Forces Command Staff College, Riyadh
44 Villas housing, Jeddah
Prince Salman Bin Sultan Palace
False Ceiling & Tiling Works
Marble Works Internal & External
Marble Works Internal & External
Marble works Internal & External
Finishing Works
Marble, False Ceiling & Decorations
Finishing Works
Special Ceiling & Gypsum Decorations
Complete Concrete &Finishing Works
Finishing Works
Saudi Oger
SPD, Jeddah
Saudi Oger
Saudi Oger
Saudi Bin Laden Group
Saudi Oger
Aldiar / United
United Co.
Arabian Roots
Arabian Roots
2,500,000
6,500,000
3,000,000
3,000,000
2,000,000
8,500,000
7,500,000
3,000,000
6,600,000
10,000,000
FINISHING PROJECTS | 2. COMPLETED PROJECTS
COMPLETED PROJECTS
17
Prince Sultan Palace, Hofuf
King Abdullah University (KAUST)
Expansion of HAJJ Terminal in Jeddah
Private Villa
Conference Palace
Sari Villa
General Aviation airport
Marble & Cladding Works
Finishing Works
Finishing Works & Concrete Works
(Boundary Wall)
Finishing Works
Finishing Works
Concrete & Finishing Works
Finishing & landscaping works
Arabian Roots
Saudi Oger
Saudi Bin Laden Group
Saudi Diyar
Saudi Oger
Saudi Oger
Saudi Bin Laden Group
5,000,000
43,000,000
26,000,000
15,000,000
3,000,000
25,000,000
2,500,000
28
29
30
31
32
33
FINISHING PROJECTS | 3. SELECTIVE
HHR WORK BASE (Work In Progress)
CLIENT OHL/COPASA Arabia - Imathia CONTRACT AMOUNT (SR) 3,700,000
SCOPE OF WORK
WALL FINISHES
• StoneCladding• Epoxy• TexturePaint
FLOORING FINISHES
• Marble• Ceramic• RaisedFloor(Carpet,
Marble & Vinyl Finish)• HeavyDutyEpoxy
LANSCAPING
• Curbstone• Interlock
CEILINGS
• Gypsum Board• Operable Metal Ceilings• Gypsum Tiles
PARTITION WORKS
• Block Work Partitions• Gypsum Board• HPL Cubicles• Cold rooms
WOOD WORKS
• Fire Rated Doors• Wooden Doors
SCOPE OF WORK
WALL FINISHES
•WoodCladding•Stone Cladding•Paint Works•Ceramic
FLOORING FINISHES
•Linoleum Flooring•Vinyl flooring•Carpet Flooring•Marble Flooring•Ceramic•Epoxy
CEILINGS
•Metal Ceiling•Mineral Fiber Ceilings•Acoustical Wood Ceilings•Gypsum Board Ceilings
PARTITION WORKS
•Dry Wall Partitions•Block Work Partitions
KAUST 2009CLIENT Saudi Oger CONTRACT AMOUNT (SR) 43,000,000
FINISHING PROJECTS | 3. SELECTIVE
FINISHING PROJECTS | 3. SELECTIVE
KSAUHS - RIYADHCLIENT Saudi Bin Laden Group CONTRACT AMOUNT (SR) 50,000,000
SCOPE OF WORK
WALL FINISHES
•WoodCladding•Stone Cladding•Resin Panels•Acoustical Fabric• Panels •Paint Works•Ceramic
FLOORING FINISHES
•Linoleum Flooring•Vinyl Flooring•Carpet Flooring•Marble Flooring•Ceramic•Epoxy
CEILINGS
•Operable Metal Ceiling•Mineral Fiber Ceilings•Acoustical Wood Ceilings•Gypsum Board Ceilings
SPECIAL ITEMS
•OperablePartitions,•StainlessSteelHandrails•ResinFlooring•SmokeCurtains•WoodenDoors•MetalWorks•BackPaintedGlass
PARTITION WORKS
•Dry Wall Partitions•Block Work Partitions
SCOPE OF WORK
WALL FINISHES
•WoodCladding•Stone Cladding•Resin Panels•Gage Metal Cladding•Acoustical Fabric• Panels •Wall Paper•Paint Works•Ceramic
FLOORING FINISHES
•Linoleum Flooring•Vinyl Flooring•Carpet Flooring•Marble Flooring•Ceramic•Epoxy
CEILINGS
•Operable Metal Ceiling•Mineral Fiber Ceilings•Acoustical Wood Ceilings•Gypsum Board Ceilings
SPECIAL ITEMS
•OperablePartitions,•CascadeCoilDraperies•StainlessSteelHandrails•ResinFlooring•SmokeCurtains•WoodenDoors•MetalWorks•BackPaintedGlass
PARTITION WORKS
•Dry Wall Partitions•Block Work Partitions
KSU EL HASSACLIENT Saudi Bin Laden Group CONTRACT AMOUNT (SR) 110,000,000
FINISHING PROJECTS | 3. SELECTIVE
FINEST STAFF
DIVISION / DEPARTMENT STAFF DESIGNATION PERMANENT STAFF
RESOURCES | 1. FINEST STAFF
MANAGEMENT TEAM 07
ADMINISTRATION / ACCOUNTS 10
PROJECT & SITE MANAGEMENT
PROJECT MANAGER 02
SITE ENGINEER 03
QUANTITYSURVEYOR(SENIOR) 03
QUANTITYSURVEYOR(JUNIOR) 03
GENERAL FOREMAN / FOREMAN 12
STORE KEEPERS 05
DRIVERS 06 MANPOWER
SKILLS 80
SEMI SKILLS / HELPERS 75
LABOURS 29
KEY PERSONNEL BRIEF PROFILES
A. FIRAS A. IBRAHIM General Manager
NAME
NATIONALITY
DATE OF BIRTH
GENDER
COMPANY
CURRENT BUSINESS ADDRESS
FIRAS A. IBRAHIM
LEBANESE
1976
MALE
FINEST- SINCE 2000
FINEST CO. LTD. JEDDAH, KSA
Firas A. Ibrahim is Finest’s General Manager. Firas joined the company since 2000.
SUMMARY
Firas’s main scope of work is to plan, direct, and coordinate activities of designated project to ensure that goals or objectives of projects are accomplished within prescribed time frame and funding parameters by performing the following duties personally or through subordinate supervisors.
QUALIFICATIONS
Firas obtained his bachelor in Business Management from the Lebanese American University of Beirut. He then obtained a Master in Business Management from Webster University - LONDON, UK.
LANGUAGES
Firas is fluent in English and Arabic.
RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES
B. FAYSSAL A. IBRAHIM Deputy General Manager
FAYSAL A. IBRAHIM
LEBANESE
1984
MALE
FINEST- SINCE 2006
FINEST CO. LTD. JEDDAH, KSA
SUMMARY
Fayssal helps in planning, developing, and implementing company projects, in addition to overseeing company operations. He is also involved in hiring and evaluating company personnel.
QUALIFICATIONS
Fayssal obtained his bachelor in Business Management from the Lebanese American University of Beirut.
LANGUAGES
Fayssal is fluent in English, French and Arabic.
NAME
NATIONALITY
DATE OF BIRTH
GENDER
COMPANY
CURRENT BUSINESS ADDRESS
RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES
C. SHADI M. KOJOK Operation Manager
Shadi joined Finest in 2006 as a Projects Manager. Prior to joining Finest, Shadi grew an extensive experience since 1999 as a Site Engineer and projects manager with leading construction and contracting companies.
SUMMARY
Shadi’s responsibilities include implementing the project execution strategy, ensuring the implementation of the project’s quality control standards and controlling its cost, and monitoring the project progress. Shadi also works closely with the sales team and the client.
QUALIFICATIONS
Shadi has a B.S.C. in Architecture from the Kharkov State Technical University for Civil Engineering & Architecture.
LANGUAGES
Shadi is fluent in English, Arabic & Russian.
SHADI M. KOJOK
LEBANESE
1975
MALE
FINEST- SINCE 2006
FINEST CO. LTD. JEDDAH, KSA
NAME
NATIONALITY
DATE OF BIRTH
GENDER
COMPANY
CURRENT BUSINESS ADDRESS
RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES
D. GHAZI ABOU KAMEL Commercial Manager
Ghazi joined Finest in 2002 as an administration manager. Prior to joining Finest, Ghazi grew since 1970 an extensive experience in different fields of construction and contracting with leading construction and contracting companies.
SUMMARY
Ghazi’s main role is to manage the financial aspects of the projects and negotiate contracts. In addition, Ghazi seeks new growth opportunities for the company.
QUALIFICATION
Ghazi has a bachelor in Commerce (Accounting)
LANGUAGES
Ghazi is fluent in English and Arabic.
GHAZY ABOU KAMEL
LEBANESE
1950
MALE
FINEST- SINCE 2002
FINEST CO. LTD. JEDDAH, KSA
NAME
NATIONALITY
DATE OF BIRTH
GENDER
COMPANY
CURRENT BUSINESS ADDRESS
RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES
E. BAHAA OTHMAN Project Control Manager
Bahaa joined Finest in 2010 as a Project Manager. Prior to joining Finest, Bahaa worked with a leading construction company in Dubai for nine years.
SUMMARY
Bahaa is responsible for planning, scheduling and reporting of the project. He also ensures the availability and allocation of resources, and coordinates with various parties involved in the project.
QUALIFICATION
Bahaa has a diploma in civil Engineering from Damascus University.
LANGUAGES
Bahaa is fluent in English, and Arabic.
BAHAA OTHMAN
SYRIAN
1975
MALE
FINEST- SINCE 2010
FINEST CO. LTD. JEDDAH, KSA
NAME
NATIONALITY
DATE OF BIRTH
GENDER
COMPANY
CURRENT BUSINESS ADDRESS
RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES
LIST OF PLANTS, MACHINERY & EQUIPMENT
DESCRIPTION QTY.
EQUIPMENT
Mobile Crane 120 Tons 1
Bob Cat 1
Level Instruments 2
Pick - up 10
Small Cars 8
4x4 Cars 9
Air Compressor 375 CFM 2
Steel Cutting Machine 1
Steel Bending Machine 1
Diesel Concrete Vibrator 4
Combi Hammer 1
Core Boring Machine 4
Diamond Cutter - DC 125 2
Diamond Cutter - DC 230 2
Breaker - TE 805 3
Breaker - TE 705 6
SCAFFOLDING
Decking System 3,000 m2
Light Weight Scaffolding 4,000 m2
Sky Jacks 2
RESOURCES|3.LISTOFPLANTS,MACHINERY&EQUIPMENT
LIST OF SUPPLIERS
SUPPLIER TRADE
Arabian Roots
Armstrong
USG
Studio - E
Maya Romanoff
SMC
Dorma
Fabritrak
Cascade Coil Drapery , Inc.
Tamareed
The Gallery
BPC TechnoShade
Building Products Company (BPC)
HUK
Hunter Douglas Contract
Sika
SAUDI STEEL
CMCI
CIC
Jotun Paints
Hempel Paints
Azel Insulation
Namala Factory
Saveto Co.
SPIT
Al Fozan
HILTI
BINEX
3M
Ram Metal
Building Materials
Ceiling Materials
Building Materials
Wall Papers
Wall Papers
Ceiling Materials
Operable Partitions
Acoustical Wall Panels & Fabrics
Coil Drapery
Gage Metal Cladding & Decorative Materials
3 Form Resin Panels
Smoke Curtains & Baffles
Building Materials
Wooden Doors
Ceiling Materials
Resin Flooring
Reinforced steel
Chemicals
Chemicals
Paints
Paints
Insulation
Cement Products
Chemicals
Tools
Steel Bars & Form Works
Tools
Building Materials
Chemicals & Vinyl Products
Operable Metal Ceilings
RESOURCES | 4. LIST OF SUPPLIERS
JEDDAH OFFICE
Mohamadia District, Safia Bin Abed Moutaleb Str. Business & Finance Building 2, 2nd floor
P. O. Box 12810 Jeddah 21483
TEL (012) 2068393
FAX (012) 2068394