FINISHING SERVICESfinestco.com › wp-content › uploads › 2019 › 09 › COMPANY-PROFILE... ·...

24
FINISHING SERVICES WWW. FINEST CO.COM

Transcript of FINISHING SERVICESfinestco.com › wp-content › uploads › 2019 › 09 › COMPANY-PROFILE... ·...

FINISHING SERVICES

WWW.FINESTCO.COM

TABLE OF CONTENTS

PROFILE 1. Overview2. Services3. Objectives4. Organizational Chart

PROJECTS 1. Current2. Completed3. Selective

RESOURCES 1. FINEST Staff2. Key Personnel Profiles3. List of Plants, Machinery & Equipment4. List of Suppliers

OVERVIEW

“Finishing Services Contracting Co. Ltd. - FINEST”, a regional company established 1984 in the Kingdom of Saudi Arabia, has more than two decades of experience in the fields of General Contracting, General Construction, Interior and Renovation, Building Maintenance, Projects Execution and Development and Finishing works.

FINEST, a group of highly qualified and experienced professionals prides itself in striving to achieve clients’ satisfaction by offering high standards and quality, dedication in all phases of the project, time and cost efficient work and commitment to deliver as per schedule. We adopt each of our client’s goals as our own, and place our clients’ interests above all.

When adopting a project, FINEST provides assurances to the designer/Consultant to deliver a project executed in conformity with the latter’s vision, design and standards, and even better, to deliver a project executed in the most time and cost efficient manner. We believe that with positive co-operation, professional interaction and extensive experience in all fields of construction, FINEST can undertake any project, from simple to complex, without sacrificing our high standards and our focus on quality and customer service. You can be assured of our commitment, care and attention throughout all phases of the project.

PROFILE | 1. OVERVIEW

Building projects is what we do; Building strong relationships with our clients is what we excel at.

Firas Ibrahim | General Manager

“”

SERVICES

FINEST‘s contracting and construction activities include without limitation, residential and Commercial buildings, Airports, Hotels, Hospitals, Schools, Technical buildings and so forth. Our main activities compromise but are not limited to the following:

A. FINISHING WORKS

1. Flooring: Supply and install all types of flooring, such as: Ceramic, Marble, Granite,Polished Concrete, Carpet, Linoleum, Vinyl, Rubber, wood, and so forth.

2. Treating concrete flooring, such as: Epoxy coating, Waterproofing, Sealed concrete, and so forth.

3. Walls: Supply and install all types of walls and wall coverings, such as: Block work,Plaster, Dry Wall partitions, Wood Cladding, Stone Cladding, Wall Paper, Acoustical WallPanels, all type of paints, and so forth.

4. Ceiling: Supply and install all types of false ceilings, such as: Gypsum Board, Metal Ceiling,Acoustical Ceiling, Wood, Fabric, and so forth.

5. Other special finishing items, such as but not limited to the following: Glass/stainless,SteelHandrails, Stainless Steel and special metal works, Mirrors, Art Works, Acrylic ResinPanelling, Wooden Cabinets, Counter Tops, Vanity Tops, Decorative Wooden Works, and so forth.

6. FINEST also undertakes soft and landscaping works, including: Backfilling, Planting,Interlocking Tiles, Road Jersey and Curb Stone Barriers, Road Marking and Signage, and so forth.

7. In addition to the above, FINEST undertakes concrete works, from the excavation stage up tothe last element of the structure, as well as it has the capability to execute metal structures.

PROFILE | 2. SERVICES

you can be confident that FINEST can cater for all your demands, and is open to undertake new

challenges and experience new fields. Firas Ibrahim | General Manager

OBJECTIVES

FINEST’s main objectives are to achieve:

• Qualitycontrol.• Satisfactionofallourclient’sneeds.• Deliveryontimeandcostefficientmanner.• Aone-stop-shoptofulfillalltheprojectsneeds

PROFILE | 3. OBJECTIVES

GENERAL MANAGER

PROCUREMENTOFFICER

STORY KEEPERESTIMATION

ENGINEER

COST CONTROLOFFICER

PLANNINGENGINEER

PMV OFFICER

CASH MANAGEMENTACCOUNTANT

ADMIN ASSISTANT/PRO

PROJECTMANAGER

AP/AR & PAYROLLACCOUNTANT

EMPLOYMENT RELATIONS

OFFICER

HUMAN RESOURCES &

ADMINSTRATIONMANAGER

FINANCIAL &RISK MANAGER

QHSSEMANAGER

OPERATIONSMANAGER

PROJECTCONTROLMANAGER

COMMERCIALMANAGER

PROFILE | 4. ORGANIZATIONAL CHART

ORGANIZATIONAL CHART

SR. NO. PROJECT NAME

SCOPE OF WORKS

CLIENT CONSULTANT CONTRACT AMOUNT (SR)

PERCENTAGE COMPLETED

1

2

3

4

5

6

7

HHR2 Work Base 1

HHR2Work Base 2

HHR2 Work Base 3

HHR2 Work Base 4

Finishing Works

Finishing Works

Finishing Works

Finishing Works

Ohl/COPASA Arabia - Imathia

OHL / COPASA Arabia - Imathia

Ohl Arabia

Copasa Arabia

Dar Al Handassah

Dar Al Handassah

Dar Al Handassah

Dar Al Handassah

3,700,000

3,330,000

3,108,700

5,956,400

95%

95%

95%

95%

CURRENT PROJECTS

FINISHING PROJECTS | 1. CURRENT PROJECTS

Riyadh Metro Package 1 Line 2

BACS Consortium RMTC 20,000,000 10%

Riyadh Metro Package 3 Line 5

Finishing Works

Finishing Works

ANM Consortium RMTC 15,000,000 50% Riyadh Metro

Package 2 Line 3

FAST Consortium RAMPED 10,000,000 70%

Finishing Works

SR.NO.

PROJECT NAME SCOPE OF WORKS CLIENTCONTRACT

AMOUNT (SR)

7

8

9

10

KAUST - Villas

Prince Bandar Private Villa

KAUST - LFOs

HHR2 - Work Base 3

KAUST - Town Center

UAE - Ambassador Residential Villa

King Saud University - AL HASSA Academic Bldg.

King Saud University - Riyadh Medicine Bldg.

Out Patient Clinic - Al Hassa

Correctional Facilities - Dhaban

All Finishing Items

Construction & Finishing Works

All Finishing Items

Finishing Works

Finishing Works

Turn Key Project (Structural, MEP

& Finishing)

All Finishing Works

All Finishing Works

Concrete & All Finishing Works

All Finishing Works

KAUST E & PM Team

Saudi Diyar

Nesma Tradings

UAE - MOF

Saudi Bin Laden Group

Saudi Bin Laden Group

Saudi Bin Laden Group

Saudi Bin Laden Group

Hapco

Cap - France

554,000

23,345,000

6,500,000

9,500,000

5,200,000

9,500,000

110,000,000

50,000,000

15,000,000

13,200,000

FINISHING PROJECTS | 2. COMPLETED PROJECTS

COMPLETED PROJECTS

American New Consular Compound Items

AICI All Finishing 24,400,000

KAICC Conference Centre

Finishing Works Saudi Oger 7,000,000

KAUST Bldg. 4302

Aldara Hospital

KAUST D &T School

Kaust Garden

BAYTOUR

Carillion

HAPCO

CAP France BAT

Finishing Works

Terracotta Marble works

Finishing Works

Finishing Works

2,500,000

7,614,150

1,250,000

600,000

1

2

3

4

5

6

11

12

13

15

14

16

SR.NO. PROJECT NAME SCOPE OF WORKS CLIENT

CONTRACT AMOUNT (SR)

18

19

20

21

22

23

27

24

25

26

Khozam Palace, Riyadh

Prince Sultan Palace, Medina

Mina Prince Sultan

Mina Prince Abdullah

Al Safa Palace, Mecca

Royal Guard Housing

4 Palace in Azizia, Prince Sultan

Armed Forces Command Staff College, Riyadh

44 Villas housing, Jeddah

Prince Salman Bin Sultan Palace

False Ceiling & Tiling Works

Marble Works Internal & External

Marble Works Internal & External

Marble works Internal & External

Finishing Works

Marble, False Ceiling & Decorations

Finishing Works

Special Ceiling & Gypsum Decorations

Complete Concrete &Finishing Works

Finishing Works

Saudi Oger

SPD, Jeddah

Saudi Oger

Saudi Oger

Saudi Bin Laden Group

Saudi Oger

Aldiar / United

United Co.

Arabian Roots

Arabian Roots

2,500,000

6,500,000

3,000,000

3,000,000

2,000,000

8,500,000

7,500,000

3,000,000

6,600,000

10,000,000

FINISHING PROJECTS | 2. COMPLETED PROJECTS

COMPLETED PROJECTS

17

Prince Sultan Palace, Hofuf

King Abdullah University (KAUST)

Expansion of HAJJ Terminal in Jeddah

Private Villa

Conference Palace

Sari Villa

General Aviation airport

Marble & Cladding Works

Finishing Works

Finishing Works & Concrete Works

(Boundary Wall)

Finishing Works

Finishing Works

Concrete & Finishing Works

Finishing & landscaping works

Arabian Roots

Saudi Oger

Saudi Bin Laden Group

Saudi Diyar

Saudi Oger

Saudi Oger

Saudi Bin Laden Group

5,000,000

43,000,000

26,000,000

15,000,000

3,000,000

25,000,000

2,500,000

28

29

30

31

32

33

FINISHING PROJECTS | 3. SELECTIVE

HHR WORK BASE (Work In Progress)

CLIENT OHL/COPASA Arabia - Imathia CONTRACT AMOUNT (SR) 3,700,000

SCOPE OF WORK

WALL FINISHES

• StoneCladding• Epoxy• TexturePaint

FLOORING FINISHES

• Marble• Ceramic• RaisedFloor(Carpet,

Marble & Vinyl Finish)• HeavyDutyEpoxy

LANSCAPING

• Curbstone• Interlock

CEILINGS

• Gypsum Board• Operable Metal Ceilings• Gypsum Tiles

PARTITION WORKS

• Block Work Partitions• Gypsum Board• HPL Cubicles• Cold rooms

WOOD WORKS

• Fire Rated Doors• Wooden Doors

SCOPE OF WORK

WALL FINISHES

•WoodCladding•Stone Cladding•Paint Works•Ceramic

FLOORING FINISHES

•Linoleum Flooring•Vinyl flooring•Carpet Flooring•Marble Flooring•Ceramic•Epoxy

CEILINGS

•Metal Ceiling•Mineral Fiber Ceilings•Acoustical Wood Ceilings•Gypsum Board Ceilings

PARTITION WORKS

•Dry Wall Partitions•Block Work Partitions

KAUST 2009CLIENT Saudi Oger CONTRACT AMOUNT (SR) 43,000,000

FINISHING PROJECTS | 3. SELECTIVE

FINISHING PROJECTS | 3. SELECTIVE

KSAUHS - RIYADHCLIENT Saudi Bin Laden Group CONTRACT AMOUNT (SR) 50,000,000

SCOPE OF WORK

WALL FINISHES

•WoodCladding•Stone Cladding•Resin Panels•Acoustical Fabric• Panels •Paint Works•Ceramic

FLOORING FINISHES

•Linoleum Flooring•Vinyl Flooring•Carpet Flooring•Marble Flooring•Ceramic•Epoxy

CEILINGS

•Operable Metal Ceiling•Mineral Fiber Ceilings•Acoustical Wood Ceilings•Gypsum Board Ceilings

SPECIAL ITEMS

•OperablePartitions,•StainlessSteelHandrails•ResinFlooring•SmokeCurtains•WoodenDoors•MetalWorks•BackPaintedGlass

PARTITION WORKS

•Dry Wall Partitions•Block Work Partitions

SCOPE OF WORK

WALL FINISHES

•WoodCladding•Stone Cladding•Resin Panels•Gage Metal Cladding•Acoustical Fabric• Panels •Wall Paper•Paint Works•Ceramic

FLOORING FINISHES

•Linoleum Flooring•Vinyl Flooring•Carpet Flooring•Marble Flooring•Ceramic•Epoxy

CEILINGS

•Operable Metal Ceiling•Mineral Fiber Ceilings•Acoustical Wood Ceilings•Gypsum Board Ceilings

SPECIAL ITEMS

•OperablePartitions,•CascadeCoilDraperies•StainlessSteelHandrails•ResinFlooring•SmokeCurtains•WoodenDoors•MetalWorks•BackPaintedGlass

PARTITION WORKS

•Dry Wall Partitions•Block Work Partitions

KSU EL HASSACLIENT Saudi Bin Laden Group CONTRACT AMOUNT (SR) 110,000,000

FINISHING PROJECTS | 3. SELECTIVE

FINEST STAFF

DIVISION / DEPARTMENT STAFF DESIGNATION PERMANENT STAFF

RESOURCES | 1. FINEST STAFF

MANAGEMENT TEAM 07

ADMINISTRATION / ACCOUNTS 10

PROJECT & SITE MANAGEMENT

PROJECT MANAGER 02

SITE ENGINEER 03

QUANTITYSURVEYOR(SENIOR) 03

QUANTITYSURVEYOR(JUNIOR) 03

GENERAL FOREMAN / FOREMAN 12

STORE KEEPERS 05

DRIVERS 06 MANPOWER

SKILLS 80

SEMI SKILLS / HELPERS 75

LABOURS 29

KEY PERSONNEL BRIEF PROFILES

A. FIRAS A. IBRAHIM General Manager

NAME

NATIONALITY

DATE OF BIRTH

GENDER

COMPANY

CURRENT BUSINESS ADDRESS

FIRAS A. IBRAHIM

LEBANESE

1976

MALE

FINEST- SINCE 2000

FINEST CO. LTD. JEDDAH, KSA

Firas A. Ibrahim is Finest’s General Manager. Firas joined the company since 2000.

SUMMARY

Firas’s main scope of work is to plan, direct, and coordinate activities of designated project to ensure that goals or objectives of projects are accomplished within prescribed time frame and funding parameters by performing the following duties personally or through subordinate supervisors.

QUALIFICATIONS

Firas obtained his bachelor in Business Management from the Lebanese American University of Beirut. He then obtained a Master in Business Management from Webster University - LONDON, UK.

LANGUAGES

Firas is fluent in English and Arabic.

RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES

B. FAYSSAL A. IBRAHIM Deputy General Manager

FAYSAL A. IBRAHIM

LEBANESE

1984

MALE

FINEST- SINCE 2006

FINEST CO. LTD. JEDDAH, KSA

SUMMARY

Fayssal helps in planning, developing, and implementing company projects, in addition to overseeing company operations. He is also involved in hiring and evaluating company personnel.

QUALIFICATIONS

Fayssal obtained his bachelor in Business Management from the Lebanese American University of Beirut.

LANGUAGES

Fayssal is fluent in English, French and Arabic.

NAME

NATIONALITY

DATE OF BIRTH

GENDER

COMPANY

CURRENT BUSINESS ADDRESS

RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES

C. SHADI M. KOJOK Operation Manager

Shadi joined Finest in 2006 as a Projects Manager. Prior to joining Finest, Shadi grew an extensive experience since 1999 as a Site Engineer and projects manager with leading construction and contracting companies.

SUMMARY

Shadi’s responsibilities include implementing the project execution strategy, ensuring the implementation of the project’s quality control standards and controlling its cost, and monitoring the project progress. Shadi also works closely with the sales team and the client.

QUALIFICATIONS

Shadi has a B.S.C. in Architecture from the Kharkov State Technical University for Civil Engineering & Architecture.

LANGUAGES

Shadi is fluent in English, Arabic & Russian.

SHADI M. KOJOK

LEBANESE

1975

MALE

FINEST- SINCE 2006

FINEST CO. LTD. JEDDAH, KSA

NAME

NATIONALITY

DATE OF BIRTH

GENDER

COMPANY

CURRENT BUSINESS ADDRESS

RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES

D. GHAZI ABOU KAMEL Commercial Manager

Ghazi joined Finest in 2002 as an administration manager. Prior to joining Finest, Ghazi grew since 1970 an extensive experience in different fields of construction and contracting with leading construction and contracting companies.

SUMMARY

Ghazi’s main role is to manage the financial aspects of the projects and negotiate contracts. In addition, Ghazi seeks new growth opportunities for the company.

QUALIFICATION

Ghazi has a bachelor in Commerce (Accounting)

LANGUAGES

Ghazi is fluent in English and Arabic.

GHAZY ABOU KAMEL

LEBANESE

1950

MALE

FINEST- SINCE 2002

FINEST CO. LTD. JEDDAH, KSA

NAME

NATIONALITY

DATE OF BIRTH

GENDER

COMPANY

CURRENT BUSINESS ADDRESS

RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES

E. BAHAA OTHMAN Project Control Manager

Bahaa joined Finest in 2010 as a Project Manager. Prior to joining Finest, Bahaa worked with a leading construction company in Dubai for nine years.

SUMMARY

Bahaa is responsible for planning, scheduling and reporting of the project. He also ensures the availability and allocation of resources, and coordinates with various parties involved in the project.

QUALIFICATION

Bahaa has a diploma in civil Engineering from Damascus University.

LANGUAGES

Bahaa is fluent in English, and Arabic.

BAHAA OTHMAN

SYRIAN

1975

MALE

FINEST- SINCE 2010

FINEST CO. LTD. JEDDAH, KSA

NAME

NATIONALITY

DATE OF BIRTH

GENDER

COMPANY

CURRENT BUSINESS ADDRESS

RESOURCES | 2. KEY PERSONNEL BRIEF PROFILES

LIST OF PLANTS, MACHINERY & EQUIPMENT

DESCRIPTION QTY.

EQUIPMENT

Mobile Crane 120 Tons 1

Bob Cat 1

Level Instruments 2

Pick - up 10

Small Cars 8

4x4 Cars 9

Air Compressor 375 CFM 2

Steel Cutting Machine 1

Steel Bending Machine 1

Diesel Concrete Vibrator 4

Combi Hammer 1

Core Boring Machine 4

Diamond Cutter - DC 125 2

Diamond Cutter - DC 230 2

Breaker - TE 805 3

Breaker - TE 705 6

SCAFFOLDING

Decking System 3,000 m2

Light Weight Scaffolding 4,000 m2

Sky Jacks 2

RESOURCES|3.LISTOFPLANTS,MACHINERY&EQUIPMENT

LIST OF SUPPLIERS

SUPPLIER TRADE

Arabian Roots

Armstrong

USG

Studio - E

Maya Romanoff

SMC

Dorma

Fabritrak

Cascade Coil Drapery , Inc.

Tamareed

The Gallery

BPC TechnoShade

Building Products Company (BPC)

HUK

Hunter Douglas Contract

Sika

SAUDI STEEL

CMCI

CIC

Jotun Paints

Hempel Paints

Azel Insulation

Namala Factory

Saveto Co.

SPIT

Al Fozan

HILTI

BINEX

3M

Ram Metal

Building Materials

Ceiling Materials

Building Materials

Wall Papers

Wall Papers

Ceiling Materials

Operable Partitions

Acoustical Wall Panels & Fabrics

Coil Drapery

Gage Metal Cladding & Decorative Materials

3 Form Resin Panels

Smoke Curtains & Baffles

Building Materials

Wooden Doors

Ceiling Materials

Resin Flooring

Reinforced steel

Chemicals

Chemicals

Paints

Paints

Insulation

Cement Products

Chemicals

Tools

Steel Bars & Form Works

Tools

Building Materials

Chemicals & Vinyl Products

Operable Metal Ceilings

RESOURCES | 4. LIST OF SUPPLIERS

JEDDAH OFFICE

Mohamadia District, Safia Bin Abed Moutaleb Str. Business & Finance Building 2, 2nd floor

P. O. Box 12810 Jeddah 21483

TEL (012) 2068393

FAX (012) 2068394

[email protected]