Financial Model
Reliance Infrastructure Limited- Generation (RInfra-G)Business Plan for Plan Period of FY 2011-12 to FY 2015-16
Dahanu Thermal Power Station (DTPS)
-
8/10/2019 Financial Model for power plant
2/45
1 Aggregate Revenue Requirement - Summary Sheet Form 1
2 Energy Charges for Thermal Generation Form 2.1
3 Fuel Cost Details Form 2.2
4 Interest on Working Capital - Thermal Generation Form 2.3
5 Planned & Forced Outages Form 2.6
6 Operations and Maintenance Expenses Form 3
6.1 Employee Expenses Form 3.1
6.2 Administration & General Expenses Form 3.2
6.3 Repair & Maintenance Expenses Form 3.3
10 Assets & Depreciation Form 4
11 Interest Expenses Form 512 Existing Loans Form 5.1
13 Capital Expenditure Plan (only Renovation & Modernisation Schemes) Form 5.3
14 CWIP- Projectwise details (only for Renovation and Modernisation Schemes) Form 5.4
15 Return on Regulatory Equity Form 6
16 Sales Forecast Form 7
17 Expected Revenue at Existing Tariff Form 8
18 Expected Revenue at Proposed Tariff Form 9
19 Other Income Form 11
20 Income Tax Computation
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
S.No. Title Reference
Dahanu Thermal Power Station (DTPS)
-
8/10/2019 Financial Model for power plant
3/45
(Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Estimated Estimated Estimated Estimated Estimated
(d) = (b) + (c) (e) (f) (g) (h) (i) (j)
1 Fuel Related Expenses Form 2.1 780.51 804.62 1033.66 1001.98 1018.99 1036.78 1058.28
2 Operation & Maintenance Expenses Form 3 93.45 82.99 92.84 112.03 121.21 131.15 141.92
2.1 Employee Expenses Form 3.1 45.28 50.97 48.87 53.40 58.36 63.78
2.2 Administration & General Expenses Form 3.2 17.30 16.64 22.71 24.51 26.45 28.55
2.3 Repair & Maintenance Expenses Form 3.3 30.87 25.23 40.46 43.30 46.34 49.59
3 Depreciation, including advance against depreciation Form 4 15.98 17.13 15.96 26.95 26.20 34.55 37.32
4 Interest on Long-term Loan Capital Form 5 16.32 18.04 22.86 27.09 36.13 42.34 44.84
5 Interest on Working Capital Form 2.3, 2.5 14.68 9.29 13.75 13.86 12.60 13.03 13.44
6 Other Expenses Form 10 - - - - - - -
7 Income Tax 36.85 17.02 40.14 47.34 48.10 54.39 55.81
8 Adjustment for profit/loss on account controllable/uncontrollable factors 73.36
9 Total Revenue Expenditure 1031.15 949.09 1219.22 1229.26 1263.23 1312.23 1351.61
10 Add: Return on Equity Capital Form 6 74.81 74.92 75.41 84.71 89.82 97.20 100.80
11 Add:Entitlement for Incentive for Higher PLF Form 2.1 21.97 0 0.00 0.00 0.00 0.00 0.00
12 Less:Other Income Form 11 10.29 5 8.35 7.97 7.97 7.97 7.97
13 Aggregate Revenue Requirement 1117.65 1019.01 1286.28 1306.00 1345.07 1401.45 1444.44
S.No. Particulars Reference
FY 2010-11
Dahanu Thermal Power Station (DTPS)
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 1: Aggregate Revenue Requirement - Summary
-
8/10/2019 Financial Model for power plant
4/45
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)
April-March
(Normative
Performance)
Order
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
(d) = (b) + (c) (dn) (e) (f) (g) (h) (i) (j)
1 O erational Parameters
1.1 Total Capacity MW 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00
94.75 (Unit1)
98.21 (Unit2)
94.75 (Unit1)
98.21 (Unit2)
95.89 NA NA NA NA
96.48 96.48 95.89 97.48% 95.89% 95.89% 95.89% 95.90%
99.51 (Unit1)
102.49 (Unit2)NA NA
102.23% NA NA 101.34% 95.90% 95.90% 95.90% 95.90%
1.4 Gross Generation MU 4423.66 NA 4200 4450.63 4200.42 4200.42 4200.42 4211.93
7.22 (Unit 1)
7.53 (Unit 2)8.50 8.50 8.50 8.50 8.50 8.50
7.38% 8.50 8.50 8.50 8.50 8.50 8.50 8.50
1.6 aAuxiliary Energy
Consumption Normal
MU 326.44 380.62 357.00 378.30 357.04 357.04 357.04 358.01
1.6 bAuxiliary Energy
Consumption FGDMU 55.78 55.78 57.00 57.37 57.37 57.37 57.37 57.37
16 c MU 382.22 436.40 414 435.67 414.41 414.41 414.41 415.38
% 8.64% 9.75% 9.86% 9.79% 9.87% 9.87% 9.87% 9.86%
1.7Net Generation MU 4041.44 4041.44 3786 4014.96 3786.01 3786.01 3786.01 3796.54
2306 (Unit1)
2259 (Unit2)2500 2500 NA NA NA NA NA
2282 2500 2500 2500 2450 2450 2450 2450
2Fuel Parameters (for each
primary and secondary fuel)
2.1 Calorific Value
2.1.1 Washed Coal kcal/kg 3467 3467 3356 3461 3461 3461 3461 3461
F Grade Coal kcal/kg 2860 2860 NA 2847 2847 2847 2847 2847
2.1.2 Imported Coal kcal/kg 4544 4544 4852 4653 4653 4653 4653 4653
2.1.3 HFO - Heavy Furnace Oil kcal/kg 0 0 0 0 0 0 0 0
2.1.4 LDO - Light Diesel Oil kcal/kg 10742 10742 10833 10768 10768 10768 10768 10768
1.5
Auxiliary Energy
Consumption (Excluding
FGD)
Particulars
1.8 Heat Rate
1.3
kcal/kWh
Total Auxiliary Consumption
%
Availability %
PLF
FY 2010-11
%
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 2.1: Energy Charges for Thermal Generation
Dahanu Thermal Power Station (DTPS)
Units
1.2
S.No.
-
8/10/2019 Financial Model for power plant
5/45
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)
April-March(Normative
Performance)
OrderEstimated
(Normative
Performance)
Estimated(Normative
Performance)
Estimated(Normative
Performance)
Estimated(Normative
Performance)
Estimated(Normative
Performance)Particulars
FY 2010-11
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 2.1: Energy Charges for Thermal Generation
Dahanu Thermal Power Station (DTPS)
UnitsS.No.
2.2 Landed Fuel Price per unit
2.2.1 Washed Coal Rs/MT 2664.29 2632.06 2579.00 2824.04 3113.36 3189.22 3268.40 3351.03
F Grade Coal Rs/MT 2339.77 2329.87 NA 2496.35 2793.23 2871.08 2952.32 3037.12
2.2.2 Imported Coal Rs/MT 3430.24 3448.47 3295.00 4809.16 4809.16 4809.16 4809.16 4809.16
2.2.3 HFO - Heavy Furnace Oil Rs/Kl 0 0 0 0.00 0.00 0.00 0.00 0.00
2.2.4 LDO - Light Diesel Oil** Rs/Kl 42525.35 42525.35 37435.00 45113.39 48324.93 51765.09 55450.15 59397.54
2.2.3.1Percent Washed coal in
primary fuel blend% 54.0% 54.0% 73.1% 54.0% 54.0% 54.0% 54.0% 54.0%
Percent Raw (F Grade) coal in
primary fuel blend% 18.9% 18.9% 6.9% 18.9% 18.9% 18.9% 18.9% 18.9%
2.2.3.2Percent Imported coal in
primary fuel blend% 27.1% 27.1% 20.0% 27.1% 27.1% 27.1% 27.1% 27.1%
2.2.3.3Percent HFO in secondary fuel
basket% 0.0% 0.0% 0.0% 0.00% 0.00% 0.00% 0.00% 0.00%
2.2.3.4Percent LDO in secondary fuel
basket
% 100.0% 100.0% 100.0% 100.00% 100.00% 100.00% 100.00% 100.00%
3
Fuel Consumption and Heat
Contribution (for each fuel
separately)
3.1 Specific Fuel Consumption
3.1.1 Washed Coal kg/kWh 0.338 0.367 NA 0.365 0.359 0.359 0.359 0.359
F Grade Coal kg/kWh 0.119 0.129 NA 0.128 0.126 0.126 0.126 0.126
3.1.2 Imported Coal kg/kWh 0.170 0.185 NA 0.183 0.180 0.180 0.180 0.180
3.1.3 Secondary Oil Consumption ml/kWh 0.135 2.000 2.000 2.000 1.000 1.000 1.000 1.0003.1.3.1 HFO - Heavy Furnace Oil ml/kWh 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.1.3.2 LDO - Light Diesel Oil ml/kWh 0.135 2.000 2.000 2.000 1.000 1.000 1.000 1.000
3.2 Total Fuel Consumption
3.2.1 Washed Coal MT 1493436 1644817 NA 1624239 1507887 1507887 1507887 1512018
F Grade Coal MT 524465 577627 NA 570400 529540 529540 529540 530990
3.2.2 Imported Coal MT 750279 826331 NA 815993 757539 757539 757539 759615
3.2.3 HFO - Heavy Furnace Oil kL 254 0 0 0 0 0 0 0
3.2.4 LDO - Light Diesel Oil kL 597 8956 8400 8901.27 4200.42 4200.42 4200.42 4211.93
-
8/10/2019 Financial Model for power plant
6/45
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)
April-March
(Normative
Performance)
Order
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)
Estimated
(Normative
Performance)Particulars
FY 2010-11
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16Form 2.1: Energy Charges for Thermal Generation
Dahanu Thermal Power Station (DTPS)
UnitsS.No.
3.3Heat Rate Contribution
(each fuel separately)
3.3.1 Washed Coal kcal/ kWh 1170.52 1273.57 NA 1263.08 1242.45 1242.45 1242.45 1242.45
F Grade Coal kcal/ kWh 339.04 368.89 NA 364.88 358.92 358.92 358.92 358.92
3.3.2 Imported Coal kcal/ kWh 770.70 838.56 NA 853.10 839.16 839.16 839.16 839.16
3.3.3 HFO - Heavy Furnace Oil kcal/ kWh 0.00 0.00 NA 0.00 0.00 0.00 0.00 0.00
3.3.4 LDO - Light Diesel Oil kcal/ kWh 1.28 18.98 NA 18.95 9.48 9.48 9.48 9.48
Total Heat Content kcal/ kWh 2282 2500 2500 2500 2450 2450 2450 2450
4 Total Fuel Cost
4.1 Washed Coal Rs Crore 397.89 432.93 NA 458.69 469.46 480.90 492.84 506.68
F Grade Coal Rs Crore 122.71 134.58 NA 142.39 147.91 152.03 156.34 161.274.2 Imported Coal Rs Crore 257.36 284.96 NA 392.42 364.31 364.31 364.31 365.31
4.3 HFO - Heavy Furnace Oil Rs Crore 0.00 0.00 NA 0.00 0.00 0.00 0.00 0.00
4.4 LDO - Light Diesel Oil Rs Crore 2.54 38.08 NA 40.16 20.30 21.74 23.29 25.02
Total Fuel Cost Rs Crore 780.51 890.55 804.62 1033.66 1001.98 1018.99 1036.78 1058.28
6 Total Cost (4+5) Rs Crore 780.51 890.55 804.62 1033.66 1001.98 1018.99 1036.78 1058.28
7 Cost of Generation per unit
(at Generation Terminal) Rs/kWh 1.764 2.201 1.916 2.323 2.385 2.426 2.468 2.513
8Energy Charge per unit
(ex-bus)Rs/kWh 1.931 2.204 2.120 2.575 2.647 2.691 2.738 2.787
-
8/10/2019 Financial Model for power plant
7/45
Washed Coal 4.37%
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
Un-auditedEstimated Estimated Estimated Estimated
(a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)
Basic Cost Rs/MT 967.91 1029.29 1029.29 1029.29 1029.29 1029.29
Freight
Rs/MT
1334.46 1435.04 1722.05 1797.31 1875.85 1957.82
6 year CAGR of freight rate has b
freight of FY 12-13 and FY 11-12
due to recent MoR notification offreight rate
Freight Surcharge, if applicableRs/MT
26.13 28.13 28.13 28.13 28.13 28.13
Fuel Handling Charges Rs/MT
Taxes and Duties (pl. specify
details) Rs/MT
Any other charges Rs/MT 282.49 308.98 308.98 308.98 308.98 308.98
Total Price excluding Transit
LossRs/MT 2611.00 2801.45 3088.45 3163.71 3242.25 3324.23
Transit Loss (Actual) % 2.00 1.91Transit Loss (Truing Up) 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Total Price including Transit
Loss (Actual)Rs/MT 2664.29 2856.00 3088.45 3163.71 3242.25 3324.23
Total Price including Transit
Loss (True up / Normative) Rs/MT 2632.06 2579.00 53.06 2824.04 3113.36 3189.22 3268.40 3351.03
Remarks
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 2.2: Landed Cost of Fuel
Dahanu Thermal Power Station (DTPS)
S.No. Particulars Unit
FY 2010-11
-
8/10/2019 Financial Model for power plant
8/45
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16Form 2.2: Landed Cost of Fuel
Dahanu Thermal Power Station (DTPS)
F Grade Coal
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
Un-auditedEstimated Estimated Estimated Estimated
(a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)
Basic Cost Rs/MT 780.25 839.86 839.86 839.86 839.86 839.86
Freight Rs/MT 1392.99 1472.54 1767.05 1844.27 1924.87 2008.98
6 year CAGR of freight rate has b
freight of FY 12-13 and FY 11-12
due to recent MoR notification offreight rate
Freight Surcharge, if applicable Rs/MT 27.51 28.52 28.52 28.52 28.52 28.52
Fuel Handling Charges Rs/MT 110.48 135.46 135.46 135.46 135.46 135.46
Taxes and Duties (pl. specify
details)Rs/MT
Any other charges Rs/MT
Total Price excluding Transit
LossRs/MT 2311.23 2476.38 2770.89 2848.11 2928.70 3012.82
Transit Loss (Actual) % 1.22 N.A.
Transit Loss (Norm) % 0.80 0.80 0.80 0.80 0.80 0.80
Total Price including Transit
Loss (Actual)Rs/MT 2339.77 2476.38 2770.89 2848.11 2928.70 3012.82
Total Price including Transit
Loss (Normative)Rs/MT 2329.87 N.A. 2496.35 2793.23 2871.08 2952.32 3037.12
Remarks
FY 2010-11
S.No. Particulars Unit
-
8/10/2019 Financial Model for power plant
9/45
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16Form 2.2: Landed Cost of Fuel
Dahanu Thermal Power Station (DTPS)
Imported Coal
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
Un-auditedEstimated Estimated Estimated Estimated
(a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)
Basic Cost Rs/MT 3006.20 4137.62 4137.62 4137.62 4137.62 4137.62
Freight Rs/MT 204.61 216.28 216.28 216.28 216.28 216.28
Freight Surcharge, if applicable Rs/MT
Fuel Handling Charges Rs/MT
Taxes and Duties (pl. specify
details) Rs/MT210.07 416.78 416.78 416.78 416.78 416.78
Any other charges Rs/MT
Total Price excluding Transit
Loss
Rs/MT
3420.88 4770.68 4770.68 4770.68 4770.68 4770.68
No Change in landed cost is being
turbulent market, any projection m
be relevant may be after 6 months
Transit Loss (Actual) % 0.27 0.30Transit Loss (Normative) % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Total Price including Transit
Loss (Actual)Rs/MT 3430.24 4785.04 4770.68 4770.68 4770.68 4770.68
Total Price including Transit
Loss (Normative)Rs/MT 3448.47 3295.00 153.47 4809.16 4809.16 4809.16 4809.16 4809.16
RemarksS.No. Particulars Unit
FY 2010-11
-
8/10/2019 Financial Model for power plant
10/45
(Rs. Crore
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual
April - March
(with Normative
performance)
Order Estimated Estimated Estimated Estimated Estimated
1 Cost of Coal/Lignite1
2 Months 110.92 117.81 135.89 136.50 138.66 140.92 143.6
2 Cost of Secondary Fuel Oil1
2 Months 1.45 5.26 5.49 2.82 3.02 3.24 3.4
3 Fuel Cost2
NA
4 Liquid Fuel Stock2
NA
5 O & M expenses 1 Month 7.79 7.79 7.74 9.34 10.10 10.93 11.86 Maintenance Spares 1% 25.25 14.69 14.81 14.99 15.96 17.19 18.0
7Receivables (2 month revenue from sale of
electricity at targeted Availability) 2 Months
8Less: Payables for one month fuel at
targeted Availability 1 Month61.54 70.69 69.66 70.84 72.08 73.5
9 Total Working Capital Requirement 145.40 84.02 79.06 93.24 93.98 96.90 100.20 103.4
Computation of working capital interest
9 Interest Rate (%) 11.75% 11.75% 11.75% 14.75% 14.75% 13.00% 13.00% 13.00%
10 Working Capital Interest 17.08 9.87 9.29 13.75 13.86 12.60 13.03 13.4
11 Efficiency Loss 7.21
12 Loss passed through 4.81
13 Net entitlement of IOWC 14.68
S.No. NormParticulars
FY 2010-11
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 2.3: Interest on Working Capital - Thermal Generation
Dahanu Thermal Power Station (DTPS)
-
8/10/2019 Financial Model for power plant
11/45
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15
Apr-Sep(Actual)
Oct-Mar(Actual)
April - March(Actual)
Order Difference Actual Un-audited
Estimated Estimated Estimated
(b) (c) (d) = (b) + (c) (e) (f) = (d) - (e) (g) (h) (i) (j)
1 DTPS
A. Planned Outages
No of days of outage 2.18 7.60 9.78 1.02 13 13
Period of Outage
Reasons for Outage 16 days for majoroverhaul of Unit 1
16 days for majoroverhaul of Unit 1
23 days for major
overhaul of Unit 2 and
3 days for license
renewal of Unit 1
boiler
23 days for major
overhaul of Unit 1 and
3 days for license
renewal of Unit 2
boiler
23 days for major
overhaul of Unit 2 and days for license renewa
of Unit 1 boiler
B. Forced Outages
No of days of outage 0.00 3.07 3.07 8.21 2 2
Period of Outage Jun-10 & Jul-10 Nov-10 & Dec-10
Reasons for Outage
Condensor Tube &
Boiler Tube
Leakage( Unit- II )
Boiler tube Leakage &
Planned shutdown for
overhauling (Unit - I)
Boiler Tube Leakage(
Unit - I & II ) &
System Problem
2 days against forced
outages for each unit
2 days against forced
outages for each unit
2 days against forced
outages for each unit
Total Outage 2.18 10.67 12.85 9.23 15 15
Availability 98.81% 94.14% 96.48% 97.48% 95.89% 95.89% 95.89
Nov-10 & Dec-10
FY 2010-11
ParticularsS.No.
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 2.6: Planned & Forced Outages
Dahanu Thermal Power Station (DTPS)
-
8/10/2019 Financial Model for power plant
12/45
(Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
un-auditedEstimated Estimated Estimated Estimated
(c) = (b) + (a) (d) (e) = (d) - (c) (f) (g) (h) (i) (j)
1
Employee Expenses
(net of capitalisation)Form 3.1 45.28 50.97 48.87 53.40 58.36 63.78
Inflationary impact of CPI
considered and explanation for
projection is detailed in the petit
write up
2Administration & General Expenses (net
of capitalisation)Form 3.2 17.30 16.64 22.71 24.51 26.45 28.55
Inflationary impact of CPI and Win ratio 40:60 considered and
explanation for the projection
detailed in the petition write u
3
Repair and Maintenance
(net of capitalisation)Form 3.3 30.87 25.23 40.46 43.30 46.34 49.59
Inflationary impact of WPI
considered and explanation for
projection is detailed in the petit
write up
Total Operation & Maintenance
Expenses (net of capitalisation)93.45 82.99 10.46 92.84 112.03 121.21 131.15 141.92
Remarks
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 3: Operations and Maintenance Expenses
Dahanu Thermal Power Station (DTPS)
Notavailable
FY 2010-11
S.No. Particulars Reference
Notavailable
-
8/10/2019 Financial Model for power plant
13/45
A. Expenditure details (Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
un-auditedEstimated Estimated Estimated Estimated
(a) (b) ('c) = (b)-(a) (d) (e) (f) (g) (h)1 Basic Salary 9.57 9.98 10.33 11.29 12.33 13.48
2 Dearness Allowance (DA) 5.98 6.59 6.45 7.05 7.71 8.42
3 House Rent Allowance 0.21 0.27 0.23 0.25 0.27 0.30
4 Conveyance Allowance 3.03 2.95 3.27 3.57 3.91 4.27
5 Leave Travel Allowance 0.78 0.78 0.84 0.92 1.01 1.10
6 Earned Leave Encashment 2.58 3.65 2.78 3.04 3.33 3.63
7 Other Allowances 13.38 17.19 14.44 15.78 17.25 18.85
8 Medical Reimbursement 0.72 0.70 0.78 0.85 0.93 1.01
9 Overtime Payment 1.03 0.84 1.11 1.21 1.33 1.45
10 Bonus/Ex-Gratia Payments 0.69 0.76 0.74 0.81 0.89 0.9711 Interim Relief / Wage Revision Arrears - - - - -
12 Staff welfare expenses 3.18 2.06 3.43 3.75 4.10 4.48
13 VRS Expenses/Retrenchment Compensation - - - - -
14 Commission to Directors - - - - -
15 Training Expenses 0.05 0.06 0.05 0.06 0.06 0.07
16 Payment under Workmen's Compensation Act - - - - -
17 Net Employee Costs 41.20 45.83 44.46 48.59 53.10 58.03
18 Terminal Benefits - - - - -
18.1 Provident Fund Contribution 2.03 2.19 2.19 2.39 2.62 2.86
18.2 Provision for PF Fund - - - - -18.3 Pension Payments (superannuation) 0.54 0.58 0.58 0.64 0.70 0.76
18.4 Gratuity Payment 1.51 2.37 1.63 1.78 1.95 2.13
19 Gross Employee Expenses 45.28 50.97 48.87 53.40 58.36 63.78
20 Less: Expenses Capitalised - 0
21 Net Employee Expenses 45.28 50.97 48.87 53.40 58.36 63.78
Projection for the individual
heads has been made on
proportionate basis for FY 12-13 considering the actual
expenses of FY 10-11 as base
and for FY 11-12, it is actual
though un-audited details which
may change subject to final
audit of expenses
Explanation for the projection i
made therein the petition write
up
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 3.1: Employee Expenses
Dahanu Thermal Power Station (DTPS)
Remarks
Employeeexpesesdatanotavaia
lbleseparately
FY 2010-11
Employeeexpesesdatanotavaia
lbleseparately
S.No. Particulars
-
8/10/2019 Financial Model for power plant
14/45
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 3.1: Employee Expenses
B. Details of number of employees
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Estimated Estimated Estimated Estimated Estimated
(a) (b) (c) (d) (e) (f)
As on
31.03.2011As on 31.03.2012
As on
31.03.2013
As on
31.03.2014
As on
31.03.2015
As on
31.03.2016
A Officer/Managerial Cadre
1 Technical 168 168 168 168 168 168
2 Administrative 37 37 37 37 37 37
3 Accounts and finance 7 7 7 7 7 7
4 Other (Please specify)0 0 0 0 0 0
B Staff Cadre
5 Technical
5.1 Grade I 71 71 71 71 71 71
5.2 Grade II 115 115 115 115 115 115
5.3 Grade III 7 7 7 7 7 75.4 Grade IV 0 0 0 0 0 0
6 Administrative
6.1 Grade I 36 36 36 36 36 36
6.2 Grade II 58 58 58 58 58 58
6.3 Grade III 0 0 0 0 0 0
6.4 Grade IV 0 0 0 0 0 0
7 Accounts and finance
7.1 Grade I 0 0 0 0 0 0
7.2 Grade II 5 5 5 5 5 5
7.3 Grade III 0 0 0 0 0 07.4 Grade IV 0 0 0 0 0 0
8 Others (please specify)
8.1 Grade I - - - - - -
8.2 Grade II - - - - - -
8.3 Grade III - - - - - -
8.4 Grade IV - - - - - -
Total Employees 504 504 504 504 504 504
ParticularsS.No.
-
8/10/2019 Financial Model for power plant
15/45
(Rs. Crore)FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
un-auditedEstimated Estimated Estimated Estimated
(a) (b) ('c) = (b)-(a) (d) (e) (f) (g) (h)
1 Rent Rates & Taxes 2.38 1.94 3.12 3.37 3.64 3.93
2 Insurance 6.49 6.00 8.52 9.19 9.92 10.71
3 Telephone & Postage, etc. 0.26 0.28 0.34 0.37 0.40 0.43
4 Legal charges & Audit fee 0.04 0.17 0.05 0.06 0.06 0.07
5 Professional, Consultancy, Tech 0.25 0.17 0.33 0.35 0.38 0.416 Conveyance & Travel 0.44 0.14 0.58 0.62 0.67 0.73
7 Electricity charges 0.35 0.29 0.46 0.50 0.54 0.58
8 Water charges 3.84 3.94 5.04 5.44 5.87 6.34
9 Security arrangements 0.97 0.97 1.27 1.37 1.48 1.60
10 Fees & subscription - - - - - -
11 Books & periodicals 0.02 0.01 0.03 0.03 0.03 0.03
12 Computer Stationery - - - - - -
13 Printing & Stationery 0.04 0.03 0.05 0.06 0.06 0.07
14 Advertisements 0.05 0.64 0.07 0.07 0.08 0.08
15 Purchase Related Advertisement - - - - -16 Contribution/Donations - - - - -
17License Fee and other related
fee- - - - -
18Vehicle Running Expenses
Truck / Delivery Van- - - - -
19 Vehicle Hiring Expenses Truck 0.58 0.61 0.76 0.82 0.89 0.96
20 Cost of services procured - - - - -
21 Outsourcing of metering and bil - - - - -
22 Freight On Capital Equipments - - - - -
23 V-sat, Internet and related charg - - - - -24 Training - - - - -
25 Bank Charges 0.03 0.03 0.04 0.04 0.05 0.05
26 Miscellaneous Expenses - - - - -
27 Office Expenses - - - - -
28 Loss on sale of assets/ obsolate 0.20 0.26 0.28 0.31 0.33
29 Provision for Doubtful debts - - - - -
30 Others 1.36 1.40 1.79 1.93 2.08 2.24
31 Gross A &G Expenses 17.30 16.64 22.71 24.51 26.45 28.55
32 Less: Expenses Capitalised - - - - - -
33 Net A &G Expenses 17.30 16.64 22.71 24.51 26.45 28.55
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 3.2: Administration & General Expenses
Dahanu Thermal Power Station (DTPS)
S.No. Particulars
FY 2010-11
Projection for the individual
heads has been made on
proportionate basis for FY 12-
13 considering the actualexpenses of FY 10-11 as
base and for FY 11-12, it is
actual though un-audited
details which may change
subject to final audit of
expenses
Explanation for the
projection is made therein the
petition write up
Remarks
A&Gexpensesnotavailableseparately
A&Gexpensesnotavailableseparately
-
8/10/2019 Financial Model for power plant
16/45
(Rs. Crore)FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
Actual though
un-auditedEstimated Estimated Estimated Estimated
(a) (b) ('c) = (b)-(a) (d) (e) (f) (g) (h)
1 Plant & Machinery 20.76 20.66 27.21 29.12 31.16 33.35
Plant & Machinery (FGD) 7.50 3.23 7.50 0.00 3.23 7.50
2 Buildings 1.27 0.51 1.66 1.78 1.91 2.04
3 Civil Works 1.11 0.65 1.45 1.56 1.67 1.78
4 Hydraulic Works 0.00 0.00 0.00 0.00 0.00 0.005 Lines & Cable Networks 0.00 0.07 0.00 0.00 0.00 0.00
6 Vehicles 0.00 0.00 0.00 0.00 0.00 0.00
7 Furniture & Fixtures 0.08 0.00 0.10 0.11 0.12 0.13
8 Office Equipment 0.15 0.10 0.20 0.21 0.23 0.24
9 Gross R&M Expenses 30.87 25.23 38.13 32.78 38.31 45.04
10 Less: Expenses Capitalised 0.00 0.00 0.00 0.00 0.00 0.00
11 Net R&M Expenses 30.87 25.23 40.46 43.30 46.34 49.59
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 3.3: Repair & Maintenance Expenses
Dahanu Thermal Power Station (DTPS)
Particulars
FY 2010-11
Projection for the individual heads
has been made on proportionate basis
for FY 12-13 considering the actual
expenses of FY 10-11 as base and forFY 11-12, it is actual though un-
audited details which may change
subject to final audit of expenses
Explanation for the projection is
made therein the petition write up
Remarks
R&Mexpensesaren
otavailable
separately
R&Mexpensesaren
otavailable
separately
S.No.
-
8/10/2019 Financial Model for power plant
17/45
(A) Gross Fixed Assets (Rs. Crore)
Balance at the
beginning of the
year
Additions during
the year
Retirement of
assets during the
year
Balance at the end
of the year
31.03.11
Balance at the
beginning of the
year
Additions
during the
year
Retirement of
assets during
the year
Balance at the end of
the year 31.03.12
(a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)
1 LAND (FREE HOLD) 19.51 0.14 - 19.65 19.65 0.04 - 19.69
2 BUILDINGS 111.40 0.94 - 112.34 112.34 7.36 - 119.70
3 PLANT & MACHINARY 1,469.32 12.62 (1.39) 1,480.55 1,480.55 18.59 (0.56) 1,498.57
4 OFFICE EQUIPMENTS 4.17 0.16 (0.41) 3.92 3.92 0.04 (0.00) 3.96
5 VEHICLES 8.35 - (0.03) 8.32 8.32 - (0.00) 8.32
6FURNITURE & FIXTURE 2.53 0.06 (0.03) 2.55 2.55 0.15 (0.00) 2.70
7 ELECTRICAL FITTINGS 0.58 0.20 - 0.78 0.78 0.11 - 0.89
8 REF. & DOMESTIC
APPLIANCES0.94 0.03 - 0.97 0.97 0.05 (0.08) 0.94
Total 1,616.80 14.15 (1.86) 1,629.09 1,629.09 26.34 (0.64) 1,654.78
Balance at the
beginning of the
year
Additions during
the year
Retirement of
assets during the
year
Balance at the end
of the year
31.03.13
Balance at the
beginning of the
year
Additions
during the
year
Retirement of
assets during
the year
Balance at the end of
the year 31.03.14
(a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)
1 LAND (FREE HOLD) 19.69 1.12 - 20.81 20.81 1.43 - 22.23
2 BUILDINGS 119.70 7.47 - 127.17 127.17 9.28 - 136.45
3 PLANT & MACHINARY 1,498.57 98.55 (1.39) 1,595.73 1,595.73 124.68 (1.39) 1,719.02
4 OFFICE EQUIPMENTS 3.96 1.27 (0.41) 4.82 4.82 1.59 (0.41) 6.00
5 VEHICLES 8.32 0.00 (0.03) 8.30 8.30 - (0.03) 8.27
6FURNITURE & FIXTURE 2.70 0.44 (0.03) 3.12 3.12 0.55 (0.03) 3.65
7 ELECTRICAL FITTINGS 0.89 1.53 - 2.42 2.42 1.93 - 4.35
8 REF. & DOMESTIC
APPLIANCES0.94 0.23 - 1.17 1.17 0.29 - 1.47
Total 1,654.78 110.62 (1.86) 1,763.54 1,763.54 139.75 (1.86) 1,901.44
Estimated
Audited Actual though un-audited
S.No. Particulars
FY 2010-11 FY 2011-12
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 4: Gross Fixed Assets, Depreciation
Dahanu Thermal Power Station (DTPS)
FY 2013-14
Estimated
S.No. Particulars
FY 2012-13
-
8/10/2019 Financial Model for power plant
18/45
Balance at the
beginning of theyear
Additions during
the year
Retirement of
assets during theyear
Balance at the end
of the year31.03.15
Balance at the
beginning of theyear
Additions
during theyear
Retirement of
assets duringthe year
Balance at the end of
the year 31.03.16
(a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)
1 LAND (FREE HOLD) 22.23 0.95 - 23.19 23.19 1.21 - 24.40
2 BUILDINGS 136.45 6.21 - 142.66 142.66 7.88 - 150.54
3 PLANT & MACHINARY 1,719.02 83.38 (1.39) 1,801.00 1,801.00 105.93 (1.39) 1,905.54
4 OFFICE EQUIPMENTS 6.00 1.06 (0.41) 6.65 6.65 1.35 (0.41) 7.59
5 VEHICLES 8.27 - (0.03) 8.24 8.24 - (0.03) 8.22
6FURNITURE & FIXTURE 3.65 0.37 (0.03) 3.99 3.99 0.47 (0.03) 4.43
7 ELECTRICAL FITTINGS 4.35 1.29 - 5.64 5.64 1.64 - 7.28
8 REF. & DOMESTIC
APPLIANCES1.47 0.20 - 1.66 1.66 0.25 - 1.91
Total 1,901.44 93.46 (1.86) 1,993.04 1,993.04 118.74 (1.86) 2,109.91
(B) DepreciationAudited for FY 2010-11 (Rs. Crore)
Additions during the yearRate of
depreciation (%)
Depreciation
during the year
Arrears of
depreciation
written off
during the year
Total
1 LAND (FREE HOLD) - - - - - -
2 BUILDINGS 37.49 62.78 2.87 2.87 - 40.35 60.76
3 PLANT & MACHINARY 1,061.52 260.87 12.37 12.37 (1.25) 1,072.64 259.85
4 OFFICE EQUIPMENTS 2.37 1.38 0.14 0.14 (0.36) 2.15 1.38
5 VEHICLES 6.30 1.21 0.44 0.44 (0.03) 6.72 0.776
FURNITURE & FIXTURE 1.46 0.81 0.07 0.07 (0.03) 1.51 0.79
7 ELECTRICAL FITTINGS 0.10 0.42 0.04 0.04 - 0.14 0.56
8 REF. & DOMESTIC
APPLIANCES0.46 0.39 0.05 0.05 - 0.51 0.37
TOTAL 1,109.71 327.86 15.98 - 15.98 (1.66) 1,124.03 324.47
Balance
depreciation at the
beginning of the
year (01.04.10)
Balancedepreciation at
the end of the
year (31.03.11)
Withdrawalsduring the year
Accumulateddepreciation at the
end of the year
(31.03.11)
FY 2015-16
S.No. Particulars
FY 2014-15
S.No. Particulars
Estimated
Accumulated
depreciation at
the beginning of
the year
(01.04.10)
Estimated
-
8/10/2019 Financial Model for power plant
19/45
Actual though un-audited for FY 2011-12Additions during the year
Rate of
depreciation (%)
Depreciation
during the year
Arrears of
depreciation
written off
during the year
Total
1 LAND (FREE HOLD) - -
2 BUILDINGS 40.35 60.76 3.21 3.21 - 43.56 57.54
3 PLANT & MACHINARY 1,072.64 259.85 13.36 13.36 (0.51) 1,086.00 246.49
4 OFFICE EQUIPMENTS 2.15 1.38 (0.64) (0.64) (0.00) 1.51 2.025 VEHICLES 6.72 0.77 (0.05) (0.05) (0.00) 6.67 0.82
6 FURNITURE & FIXTURE 1.51 0.79 0.07 0.07 (0.00) 1.58 0.71
7 ELECTRICAL FITTINGS 0.14 0.56 0.05 0.05 - 0.19 0.51
8.
0.51 0.37 (0.04) (0.04) (0.07) 0.47 0.40
TOTAL 1,124.03 324.47 15.96 0 15.96 (0.58) 1,139.98 308.51
Estimate for FY 2012-13
Additions during the year
Rate ofdepreciation (%)
Depreciationduring the year
Arrears ofdepreciation
written off
during the year
Total
1 LAND (FREE HOLD) - - - - - -
2 BUILDINGS 43.56 57.54 4.12 4.12 - 47.69 60.05
3 PLANT & MACHINARY 1,086.00 246.49 22.37 22.37 (1.25) 1,108.37 240.35
4 OFFICE EQUIPMENTS 1.51 2.02 0.10 0.10 (0.37) 1.60 1.97
5 VEHICLES 6.67 0.82 0.14 0.14 (0.02) 6.80 0.69
6 FURNITURE & FIXTURE 1.58 0.71 0.09 0.09 (0.02) 1.67 0.767 ELECTRICAL FITTINGS 0.19 0.51 0.10 0.10 - 0.29 0.51
8.
0.47 0.40 0.04 0.04 - 0.51 0.34
TOTAL 1,139.98 308.51 26.95 0 26.95 (1.67) 1,166.93 304.65
Particulars
Balance
depreciation at the
beginning of the
year (01.04.11)
Particulars
Balance
depreciation at
the end of the
year (31.03.12)
Accumulated
depreciation at the
end of the year
(31.03.12)
Withdrawals
during the year
Accumulated
depreciation at
the beginning of
the year
(01.04.12)
S.No.
S.No.
Balancedepreciation at the
beginning of the
year (01.04.12)
Accumulated
depreciation at
the beginning of
the year
(01.04.11)
Accumulated
depreciation at theend of the year
(31.03.13)
Balance
depreciation atthe end of the
year (31.03.13)
Withdrawals
during the year
-
8/10/2019 Financial Model for power plant
20/45
Estimate for FY 2013-14
Additions during the year
Rate of
depreciation (%)
Depreciation
during the year
Arrears of
depreciation
written off
during the year
Total
1 LAND (FREE HOLD) - - - - - -
2 BUILDINGS 47.69 60.05 4.09 4.09 - 51.78 62.68
3 PLANT & MACHINARY 1,108.37 240.35 21.68 21.68 (1.25) 1,130.05 306.114 OFFICE EQUIPMENTS 1.60 1.97 0.09 0.09 (0.37) 1.69 2.65
5 VEHICLES 6.80 0.69 0.14 0.14 (0.02) 6.94 0.53
6 FURNITURE & FIXTURE 1.67 0.76 0.09 0.09 (0.02) 1.76 1.04
7 ELECTRICAL FITTINGS 0.29 0.51 0.09 0.09 - 0.37 1.80
8.
0.51 0.34 0.03 0.03 - 0.55 0.51
TOTAL 1,166.93 304.65 26.20 0 26.20 (1.67) 1,193.13 375.33
Estimate for FY 2014-15
Additions during the yearRate of
depreciation (%)
Depreciation
during the year
Arrears of
depreciation
written off
during the year
Total
1 LAND (FREE HOLD) - - - - - - - -
2 BUILDINGS 51.78 62.68 4.45 4.45 - 56.23 66.58
3 PLANT & MACHINARY 1,130.05 306.11 29.35 29.35 (1.25) 1,159.40 387.72
4 OFFICE EQUIPMENTS 1.69 2.65 0.20 0.20 (0.37) 1.89 3.51
5 VEHICLES 6.94 0.53 0.13 0.13 (0.02) 7.07 0.376 FURNITURE & FIXTURE 1.76 1.04 0.13 0.13 (0.02) 1.89 1.39
7 ELECTRICAL FITTINGS 0.37 1.80 0.23 0.23 - 0.60 3.31
8.
0.55 0.51 0.06 0.06 - 0.60 0.72
TOTAL 1,193.13 375.33 34.55 0 34.55 (1.67) 1,227.68 463.60
Estimate for FY 2015-16
Additions during the year
Rate of
depreciation (%)
Depreciation
during the year
Arrears of
depreciationwritten off
during the year
Total
1 LAND (FREE HOLD) - - - - - -
2 BUILDINGS 56.23 66.58 4.63 4.63 - 60.86 67.53
3 PLANT & MACHINARY 1,159.40 387.72 31.80 31.80 (1.25) 1,191.20 429.70
4 OFFICE EQUIPMENTS 1.89 3.51 0.26 0.26 (0.37) 2.15 3.84
5 VEHICLES 7.07 0.37 0.12 0.12 (0.02) 7.19 0.23
6 FURNITURE & FIXTURE 1.89 1.39 0.15 0.15 (0.02) 2.04 1.55
7 ELECTRICAL FITTINGS 0.60 3.31 0.30 0.30 - 0.91 4.17
8 . 0 60 0 72 0 06 0 06 0 67 0 83
Accumulated
depreciation at
the beginning of
the year
(01.04.14)
Balance
depreciation at the
beginning of the
year (01.04.14)
S.No. Particulars
Particulars
Accumulated
depreciation at
the beginning of
the year
(01.04.13)
Balance
depreciation at the
beginning of the
year (01.04.13)
S.No.
Withdrawals
during the year
Accumulated
depreciation at
the beginning ofthe year
(01.04.15)
Balance
depreciation at thebeginning of the
year (01.04.15)
Withdrawals
during the year
Accumulated
depreciation at the
end of the year(31.03.16)
Balance
depreciation at
the end of the
year (31.03.14)
Withdrawalsduring the year
Accumulateddepreciation at the
end of the year
(31.03.15)
Balancedepreciation at
the end of the
year (31.03.15)
Accumulated
depreciation at the
end of the year
(31.03.14)
Balance
depreciation at
the end of theyear (31.03.16)S.No. Particulars
-
8/10/2019 Financial Model for power plant
21/45
(C) Advance Against Depreciation
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual Estimated Estimated Estimated Estimated Estimated
(a) (b) (c) (d) (e) (f)
1 Cumulative depreciation at
the end of the year
2 Depreciation for the year
3 Cumulative loan repayment at
the end of the year
4Loan repayment for the year
5
6 Excess of cumulative loan
repayment over cumulative
depreciation
7 Excess of loan repayment
over depreciation during the
year
8 Loan amount admitted
9
1/10th of the loan amount
admitted
10
Cumulative 'Advance Against
Depreciation' at the beginning
of the year
11
Additional 'Advance Against
Depreciation' during the year
12
Reduction in 'Advance
Against Depreciation' during
the year
13
Cumulative 'Advance Against
Depreciation' at the end of the
year
S.No. ReferenceParticulars
-
8/10/2019 Financial Model for power plant
22/45
(Rs. Crore)
Balance at the
beginning of the
year 01.04.10
Additions during
the year
Retirement of
assets during the
year
Balance at the end
of the year
31.03.11
Balance at the
beginning of the
year 01.04.11
Additions
during the
year
Retirement of
assets during
the year
Balance at the end of
the year 31.03.12
(a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)
1 LAND (FREE HOLD) 19.51 19.65 19.65 19.69
2 BUILDINGS 73.92 71.99 71.99 76.14
3 PLANT & MACHINARY 407.80 407.90 407.90 412.57
4 OFFICE EQUIPMENTS 1.80 1.77 1.77 2.46
5 VEHICLES 2.04 1.60 1.60 1.65
6FURNITURE & FIXTURE
1.06 1.04 1.04 1.12
7 ELECTRICAL FITTINGS 0.48 0.64 0.64 0.70
8 REF. & DOMESTIC
APPLIANCES 0.48 0.46 0.46 0.47
Total 507.10 - - 505.06 505.06 - - 514.80
Balance at the
beginning of the
year 01.04.12
Additions during
the year
Retirement of
assets during the
year
Balance at the end
of the year
31.03.13
Balance at the
beginning of the
year 01.04.13
Additions
during the
year
Retirement of
assets during
the year
Balance at the end of
the year 31.03.14
(a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)
1 LAND (FREE HOLD) 19.69 20.81 20.81 22.23
2 BUILDINGS 76.14 79.49 79.49 84.68
3 PLANT & MACHINARY 412.57 487.36 487.36 588.97
4 OFFICE EQUIPMENTS 2.46 3.22 3.22 4.315 VEHICLES 1.65 1.49 1.49 1.33
6FURNITURE & FIXTURE 1.12 1.44 1.44 1.88
7 ELECTRICAL FITTINGS 0.70 2.13 2.13 3.98
8 REF. & DOMESTIC
APPLIANCES0.47 0.66 0.66 0.92
Total 514.80 - - 596.61 596.61 - - 708.30
FY 2010-11
Audited
FY 2011-12
(D) Net Fixed Assets
Actual though un-audited
S.No. Particulars
S.No. Particulars
FY 2012-13 FY 2013-14
Estimated Estimated
-
8/10/2019 Financial Model for power plant
23/45
Balance at thebeginning of the
year 01.04.14
Additions duringthe year
Retirement ofassets during the
year
Balance at the endof the year
31.03.15
Balance at thebeginning of the
year 01.04.15
Additionsduring the
year
Retirement ofassets during
the year
Balance at the end ofthe year 31.03.16
(a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)
1 LAND (FREE HOLD) 22.23 23.19 23.19 24.40
2 BUILDINGS 84.68 86.43 86.43 89.68
3 PLANT & MACHINARY 588.97 641.60 641.60 714.34
4 OFFICE EQUIPMENTS 4.31 4.76 4.76 5.44
5 VEHICLES 1.33 1.17 1.17 1.03
6 FURNITURE & FIXTURE 1.88 2.10 2.10 2.39
7 ELECTRICAL FITTINGS 3.98 5.04 5.04 6.38
8 REF. & DOMESTIC
APPLIANCES0.92 1.06 1.06 1.25
Total 708.30 - - 765.35 765.35 - - 844.91
S.No. Particulars
FY 2014-15 FY 2015-16
Estimated Estimated
-
8/10/2019 Financial Model for power plant
24/45
Existing Long-term Loans (Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actuals)Order Difference Estimated Estimated Estimated Estimated Estimated
(a) (b)` ('c) = (b) - (a) (d) (e) (f) (g) (h)
Loans on normative norms at 70 :
30 Debt : E uit ratio
1Projects completed & capitalised
during 2003-040.02 0.02 0.01 0.01 0.00 0.00
2 Projects started in 2004-05 0.04 0.04 0.03 0.02 0.01 0.003 Projects started in 2005-06 0.38 0.35 0.27 0.18 0.09 0.01
4 New Projects of 2006-07 0.30 0.40 0.37 0.34 0.30 0.27
5 New Projects of 2007-08 11.37 15.36 14.37 13.38 12.39 11.40
6 New Projects of 2008-09 1.09 1.30 1.22 1.14 1.05 0.97
7 New Projects of 2009-10 2.81 3.40 3.21 3.01 2.82 2.62
8 New Projects of 2010-11 0.40 1.01 0.95 0.90 0.84 0.79
9New Projects of Business Plan
Period0.98 6.66 17.16 24.82 28.79
9 Gross Interest Expenses 16.43
10 Less: Expenses Capitalised 0.10
11 Net Interest Expenses 16.32 18.04 22.86 27.09 36.13 42.34 44.84
New Loans (only for Renovation and Modernisation Schemes)(Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March (Actual) Order Difference Estimated Estimated Estimated Estimated Estimated
(a) (b)` ('c) = (b) - (a) (d) (e) (f) (g) (h)
Loans on normative norms at 70 :
30 Debt : Equity ratio
1New Loans taken for Capex during
FY 11-12 to FY 15-160.00 0.00 0.00 0.00 0.00
2
3
4
5
6
7
8
9 Gross Interest Expenses 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Less: Expenses Capitalised
11 Net Interest Expenses 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Finance Charges (only for Renovation and Modernisation Schemes)(Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March (Actual) Estimated Estimated Estimated Estimated Estimated
FY 2010-11
Source of Loan
S.No. Source of Loan
S.No. Reference
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 5: Interest Expenses
Dahanu Thermal Power Station (DTPS)
S.No. Source of Loan Reference
Reference
FY 2010-11
-
8/10/2019 Financial Model for power plant
25/45
Existing Long-term Loans (Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual Estimated Estimated Estimated Estimated Estimated
1 Projects completed & capitalised during 2003-04Loan Amount Admitted by Commission 0.47 0.47 0.47 0.47 0.47
Opening Balance of Loan 0.24 0.19 0.14 0.10 0.05
Loan Drawal during the year - - - - -
Loan Repayment during the year 0.05 0.05 0.05 0.05 0.05
Closing Balance of Loan 0.19 0.14 0.10 0.05 0.00
Applicable Interest Rate (%) 10.00% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 0.02 0.02 0.01 0.01 0.00
2 Projects started in 2004-05
Loan Amount Admitted by Commission 0.78 0.78 0.78 0.78 0.78Opening Balance of Loan 0.47 0.39 0.31 0.24 0.16
Loan Drawal during the year - - - - -
Loan Repayment during the year 0.08 0.08 0.08 0.08 0.08
Closing Balance of Loan 0.39 0.31 0.24 0.16 0.08
Applicable Interest Rate (%) 10.00% 12% 12% 12% 12%
Interest Expenses 0.04 0.04 0.03 0.02 0.01
Source of Loan Reference
Reliance Infrastructure Limited (Generation Business)
Business Plan for FY 2011-12 to FY 2015-16
Form 5.1: Interest Expenses (Breakup of Existing and New Loans)
Dahanu Thermal Power Station (DTPS)
S.No.
-
8/10/2019 Financial Model for power plant
26/45
Existing Long-term Loans (Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual Estimated Estimated Estimated Estimated Estimated
Source of Loan Reference
Reliance Infrastructure Limited (Generation Business)
Business Plan for FY 2011-12 to FY 2015-16
Form 5.1: Interest Expenses (Breakup of Existing and New Loans)
Dahanu Thermal Power Station (DTPS)
S.No.
3 Projects started in 2005-06
Loan Amount Admitted by Commission 7.50 7.50 7.50 7.50 7.50 7.50
Opening Balance of Loan 4.20 3.45 2.70 1.95 1.20 0.45
Loan Drawal during the year - - - - - -
Loan Repayment during the year 0.75 0.75 0.75 0.75 0.75 0.75
Closing Balance of Loan 3.45 2.70 1.95 1.20 0.45 (0.30)
Applicable Interest Rate (%) 10.00% 11.50% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 0.38 0.35 0.27 0.18 0.09 0.01
4 New Projects of 2006-07Loan Amount Admitted by Commission 5.91 5.91 5.91 5.91 5.91 5.91
Opening Balance of Loan 3.95 3.65 3.36 3.06 2.77 2.47
Loan Drawal during the year - - - - - -
Loan Repayment during the year 0.30 0.30 0.30 0.30 0.30 0.30
Closing Balance of Loan 3.65 3.36 3.06 2.77 2.47 2.18
Applicable Interest Rate (%) 8.00% 11.50% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 0.30 0.40 0.37 0.34 0.30 0.27
5 New Projects of 2007-08
Loan Amount Admitted by Commission 172.34 172.34 172.34 172.34 172.34 172.34
Opening Balance of Loan 146.49 137.87 129.26 120.64 112.02 103.41
Loan Drawal during the year - - - - - -
Loan Repayment during the year 8.62 8.62 8.62 8.62 8.62 8.62
Closing Balance of Loan 137.87 129.26 120.64 112.02 103.41 94.79
Applicable Interest Rate (%) 8.00% 11.50% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 11.37 15.36 14.37 13.38 12.39 11.40
6 New Projects of 2008-09
Loan Amount Admitted by Commission 14.64 14.64 14.64 14.64 14.64 14.64
Opening Balance of Loan 12.44 11.71 10.98 10.24 9.51 8.78
Loan Drawal during the year - - - - - -
Loan Repayment during the year 0.73 0.73 0.73 0.73 0.73 0.73
Closing Balance of Loan 11.71 10.98 10.24 9.51 8.78 8.05
Applicable Interest Rate (%) 9.00% 11.50% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 1.09 1.30 1.22 1.14 1.05 0.97
-
8/10/2019 Financial Model for power plant
27/45
Existing Long-term Loans (Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual Estimated Estimated Estimated Estimated EstimatedSource of Loan Reference
Reliance Infrastructure Limited (Generation Business)
Business Plan for FY 2011-12 to FY 2015-16
Form 5.1: Interest Expenses (Breakup of Existing and New Loans)
Dahanu Thermal Power Station (DTPS)
S.No.
7 New Projects of 2009-10
Loan Amount Admitted by Commission 33.76 33.76 33.76 33.76 33.76 33.76
Opening Balance of Loan 32.09 30.40 28.71 27.03 25.34 23.65
Loan Drawal during the year - - - - - -Loan Repayment during the year 1.69 1.69 1.69 1.69 1.69 1.69
Closing Balance of Loan 30.40 28.71 27.03 25.34 23.65 21.96
Applicable Interest Rate (%) 9.00% 11.50% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 2.81 3.40 3.21 3.01 2.82 2.62
New Projects of 2010-11
Loan Amount Admitted by Commission 9.46 9.46 9.46 9.46 9.46 9.46
Opening Balance of Loan - 8.99 8.51 8.04 7.57 7.10
Loan Drawal during the year 9.46 - - - - -
Loan Repayment during the year 0.47 0.47 0.47 0.47 0.47 0.47Closing Balance of Loan 8.99 8.51 8.04 7.57 7.10 6.62
Applicable Interest Rate (%) 8.95% 11.50% 11.50% 11.50% 11.50% 11.50%
Interest Expenses 0.40 1.01 0.95 0.90 0.84 0.79
9 Gross Interest Expenses 16.43 21.89 20.43 18.97 17.51 16.05
10 Less: Expenses Capitalised 0.10 0 0 0 0 0
11 Net Interest Expenses 16.32 21.89 20.43 18.97 17.51 16.05
-
8/10/2019 Financial Model for power plant
28/45
Existing Long-term Loans (Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual Estimated Estimated Estimated Estimated EstimatedSource of Loan Reference
Reliance Infrastructure Limited (Generation Business)
Business Plan for FY 2011-12 to FY 2015-16
Form 5.1: Interest Expenses (Breakup of Existing and New Loans)
Dahanu Thermal Power Station (DTPS)
S.No.
(Rs. Crore)
S.No. Particulars FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Opening Loan 199.88 196.66 183.98 171.29 158.61 145.93
Loan Drawal during the year 9.46 0.00 0.00 0.00 0.00 0.00
Loan Repayment during the year 12.68 12.68 12.68 12.68 12.68 12.56
Closing Loan Balance 196.66 183.98 171.29 158.61 145.93 133.38
New Loans (Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Estimated Estimated Estimated Estimated Estimated
1 New Projects of Business Plan Period**
Opening Balance of Loan 0.00 17.00 98.88 199.56 232.17
Loan Drawal during the year 18.41 90.24 118.13 54.22 62.82
Loan Repayment during the year 1.42 8.36 17.44 21.62 26.45
Closing Balance of Loan 17.00 98.88 199.56 232.17 268.54
Interest Expenses 0.98 6.66 17.16 24.82 28.79
7Reduction in Loan Capital on account of
retirement/re lacement of assets
8Reduction in Interest expenses due to reduction of Loan
Capital under Sl.7 above
9 Gross Interest Expenses 0.98 6.66 17.16 24.82 28.79
10 Less: Expenses Capitalised 0 0 0 0 0
11 Net Interest Expenses 0.98 6.66 17.16 24.82 28.79
Note: * * : The detail computation of the IDC and I nterest cost chargeable to revenue is being submi tted as Exhibit D
(Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
Actual Estimated Estimated Estimated Estimated Estimated
1 Gross Interest Expenses 16.43 22.86 27.09 36.13 42.34 44.84
2 Less: Expenses Capitalised 0.10 0.00 0.00 0.00 0.00 0.00
3 Net Interest Expenses 16.32 22.86 27.09 36.13 42.34 44.84
Loan Schedule for Previous Capex Schemes
S.No. Particulars
S.No. Source of Loan Reference
-
8/10/2019 Financial Model for power plant
29/45
Project Details
Original Revised Actual Original Revised Actual Original
FY 2009-10
a) DPR Schemes
(i) In-principle approved by
MERCREL-G/FY07/03 Spare HP Turbine Module Heat Rate improvement Sep-08 Sep-08 Nov-09 Nov-09 22.7
REL-G/FY05/01 III. Construction of Ash Dyke (Pond no.4)Ash storage and subsequent
utilization.Jul-07 Jul-07 Mar-09 Mar-11 2.1
REL-G/FY08/01 II.Coarse Ash Grinding Unit To increase Ash Utilization Apr-10 Apr-10 Mar-11 Mar-13 29.7
RINFRA-G/DPR/FY10/1.1
Upgradation of Unit # 2 UPS, 48V Switchyard
Battery System and +/-24V Battery to improve
reliability of power supply back-up systems
To improve reliability of
power supply back-up systemsFeb-09 Feb-09 Mar-10 Mar-13 0.8
RINFRA-G/DPR/FY10/1.2
Up gradation of existing relay logic of Ash
Pump House to PLC based system in andUpgradation of PLC systems of Condensate
Policin Unit (CPU) and H dro en Drier
To improve reliability and
availbability of the systems.Technology up gradation
Sep-09 Sep-09 Mar-11 Mar-13 0.3
RINFRA-G/DPR/FY10/1.3
Modernization and Upgradation of Electronic
Cards of PR05 Module, BK03C Module, EB02
& EA02 Cards for improving reliability of the
system and plant
To improve reliability of the
system and plantNov-09 Mar-11 Mar-13 4.0
RINFRA-G/DPR/FY10/1.4
Upgradation of Fire Alarm system and CCTV
system for enhancing safety and security of
ersonnel and lant.
To enhance safety and security
of personnel and plant.Jan-09 Jan-09 Mar-11 Mar-13 1.6
RINFRA-G/DPR/FY10/1.5
Upgradation of Secondary Air Damper Control
(SADC) to optimize excess air and efficiency ofthe lant
To optimize excess air and
efficiency of the plant. Mar-09 Mar-09 Jan-10 Jan-10 0.0
RINFRA-G/DPR/FY10/1.6
Installation of Flow transmitters at Condenser
Cooling Water Inlet to optimize operations of
condenser and CW system
To optimize operations of
condenser and CW system.Nov-09 Nov-09 Aug-10 Aug-10 0.1
RINFRA-G/DPR/FY10/1.7
Upgradation of ESP Field Controller & Opacity
Monitor for better monitoring of ESP
performance and environmental monitoring
For better monitoring of ESP
performance and
environmental parameters.
Apr-09 Apr-09 Mar-13 1.6
RINFRA-G/DPR/FY10/1.8
Upgradation of metering system in 220KV
system to meet accuracy requirements of CEA
Regulations.
To meet accuracy requirements
of CEA Regulations.Apr-09 Apr-09 Mar-13 1.1
RINFRA-G/DPR/FY10/1.9
Upgradation of 6.6KV Line PTs & Bus PTs to
improve electricity safety and reliability of the
s stem.
To improve electrical safety
and reliability of the system.Apr-09 Apr-09 Mar-11 Mar-13 0.2
RINFRA-G/DPR/FY10/1.10
Purchase of Electrical Testing & Measuring
Instruments for better diagnosis of electrical
installations to improve safety, availability and
reliabilit .
For better diagnosis of
electrical installations to
improve safety, availability
and reliabilit .
Apr-09 Apr-09 Mar-12 Mar-13 1.0
RINFRA-G/DPR/FY10/1.11Upgradation of LT Circuit Breakers to improve
reliability of LT.
To improve reliability of LT
auxiliaries.Apr-09 Apr-09 Mar-11 Mar-13 0.3
RINFRA G/DPR/FY10/1 12
Replacement of existing transformer of stacker
reclaimer to improve availability of Stacker
To improve availability of
Stacker Reclaimer and A 09 A 09 M 11 M 13 0 0
Project Start Date
Project PurposeProject Title
Form 5.3: Capital Expenditure Schemes
Reliance Infrastructure Limited (Generation Business)
Business Plan for FY 2011-12 to FY 2015-16
Dahanu Thermal Power Station (DTPS)
Project Code
Project Completion date
-
8/10/2019 Financial Model for power plant
30/45
Original Revised Actual Original Revised Actual Origin
Project Start Date
Project PurposeProject TitleProject Code
Project Completion date
RINFRA-G/DPR/FY10/1.16
Up-gradation of UPS of Ambient Air Quality
Monitoring stations for reliable and continuous
monitoring of environmental parameters
For reliable and continuous
monitoring of environmental
parameters
Apr-09 Apr-09 Mar-10 Mar-11 Mar-11 0
RINFRA-G/DPR/FY10/1.17
Purchase of Spare CW Pump Motor (6.6 KV
1260 kW) for improving availability and
reliability of Cooling Water system
For improving availability and
reliability of Cooling Water
system
Apr-09 Apr-09 Dec-09 Dec-09 1
RINFRA-G/DPR/FY10/1.18
Purchase of Spare Alternator for Diesel
Locomotive for improving reliability of Coal
Handling System
For improving reliability of
Coal Handling SystemApr-09 Jul-09 Jul-09 Jul-09 0
RINFRA-G/DPR/FY10/1.19 Up-gradation of control system of GeneratorTransformer (GT) Cooler to improve reliability
of GT.
To improve reliability ofGenerator Transformer.
Apr-09 Apr-09 Mar-11 Mar-11 0
RINFRA-G/DPR/FY10/1.20
Procurement of common spare for Neutral
Grounding Transformer (NGT) for Generators
to improve reliability of Units
To improve reliability of Units. Apr-10 Apr-10 Mar-11 Mar-13 0
RINFRA-G/DPR/FY10/1.21
Renovation and Modernization of Air Pre-
heater Heater (APH) of Unit # 2 to improve the
efficiency of the Unit
To improve the efficiency of
the Unit.May-09 May-09 Nov-09 Nov-09 2
RINFRA-G/DPR/FY10/1.22
Reliability Improvement through replacement of
Silencer assemblies of Primary Air Fan &
Forced Draft fan in Unit # 2
Reliability Improvement. May-09 May-09 Nov-09 Nov-09 0
RINFRA-G/DPR/FY10/1.23
Procurement of Low Vacuum Dehydration
(LVDH) Machine for recovery and recycling of
spent lubrication oil from Turbine and Boiler
Feed Pum (BFP)
For recovery and recycling of
spent lubrication oil.Apr-09 Apr-09 Dec-10 Mar-13 0
RINFRA-G/DPR/FY10/1.24
Replacement of Auxiliary Steam pressure
control valve in Unit#2 (AS-22) for efficient
utilization of steam.
For efficient utilization of
steam.Apr-09 Apr-09 Nov-09 Nov-09 0
RINFRA-G/DPR/FY10/1.25 Up-gradation of IT Infrastructure at DTPS
Upgradation of officer
computers and peripherals.
Improving reliability ofnetwork link.
Aug-09 Aug-09 Mar-15 2
RINFRA-G/DPR/FY10/1.26Procurement of Software (for auto back-up of
data and power plant performance analysis)Better work efficiency. Aug-09 Aug-09 Mar-10 Mar-13 0
RINFRA-G/DPR/FY10/1.27
Office Modernization (Mechanical Maintenance
Building in Service Building and CHP
Maintenance Building)
To provide safe, hygenic work
environment with modern
office equipments to increase
the office productivity.
Dec-09 Dec-09 Mar-10 Mar-12 0
79
(ii) Yet to receive in-principle
MERC a roval
RINFRA-G/DPR/FY10/2.1 Township Residential area renovationTownship Residential area
renovationSep-09 Sep-09 Mar-15 14
RINFRA-G/DPR/FY10/2.2 Construction of Boundry wall Construction of Boundry wall Apr-10 Apr-10 Mar-14 7
21
b) Non-DPR Schemes
RINFRA-G/NDPR/FY08/03 LAND (For Ash Pond No.4 at Asangaon)Ash storage and subsequent
utilization.Jul-08 Jul-08 Jun-10 Mar-12 Mar-12 0
Safe hygienic work
-
8/10/2019 Financial Model for power plant
31/45
Original Revised Actual Original Revised Actual Origin
Project Start Date
Project PurposeProject TitleProject Code
Project Completion date
RINFRA-G/NDPR/FY09/10UPGRADATION OF TURBINE GOVERING
SYSTEMReliability improvement Apr-10 Mar-11 Dec-10 3
RINFRA-G/NDPR/FY09/11 SIMULATOR To train engineers & other
staff in power plant operation.Jul-08 Jul-08 Mar-10 Mar-11 Mar-11 1
RINFRA-G/NDPR/FY09/13 VAPOR ABSORPTION SYSTEM
Energy Conservation and
improvement in environmental
performance
Apr-08 Apr-08 Dec-09 Mar-11 Mar-11 2
RINFRA-G/NDPR/FY09/14
CONSTRUCTION OF ROADS (On east side
of DTPS for material handling and along the
fencing for Security patrolling)
For smooth vehicular
movement and improved
security patrolling.
Dec-08 Dec-08 Jun-10 Jun-10 1
RINFRA-G/NDPR/FY09/15.1Computer Peripherals for Offices (OFFICE
EQUIPMENTS)
Routine
replacement/upgradation of
Computer Systems for
sustained erformance.
Apr-08 Apr-08 May-09 May-09 0
RINFRA-G/NDPR/FY10/01 Jeep and Motor Cycle for Security PatrollingImprovement in security
efficiencJul-09 Jul-09 Dec-09 Dec-09 0
RINFRA-G/NDPR/FY10/02Construction of allseason bituminous road at
Kom ada to ease the trafficSmooth Vehicular movement Nov-09 Nov-09 May-10 Mar-13 1
RINFRA-G/NDPR/FY10/03Asphalting to Widened Portion of Motapada
Road for smooth vehicular movement
For smooth vehicular
movement.Apr-10 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/04Construction of Peripheral WBM Roads for
Security MovementFor Security Movement Apr-10 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/05
Construction Of Peripheral Retaining Wall to
prevent entry the High tide water in to colony
premises
to prevent entry the High tide
water in to colony premisesFeb-09 Feb-09 Apr-10 Apr-10 0
RINFRA-G/NDPR/FY10/06
Construction Of RCC Approach Road Near
Railway Crossing for smooth vehicular
movement
For smooth vehicular
movementApr-10 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/07Installation Of Turbo Wind Ventilators At TG
Roof for Ener ConservationEnergy Conservation Dec-08 Dec-08 Aug-10 Mar-13 0
RINFRA-G/NDPR/FY10/08 Solar Charging System For Ups Of AAQM AtKosbad for Ener Conservation.
Energy Conservation Apr-10 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/09Hybrid Wind Solar Lighting System At Tech.
Training Center for Energy ConservationEnergy Conservation Apr-10 Apr-12 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/10 Energy Conservation in Service air system. Energy Conservation Apr-09 Apr-09 Nov-09 Nov-09 0
RINFRA-G/NDPR/FY10/11
Electro-Chlorination for Drinking Water to
reduce risk associated with bulk storage and
handling of hazardous Chlorine gas
to reduce risk associated with
bulk storage and handling of
hazardous Chlorine gas
Jul-09 Jul-09 Nov-09 Nov-09 0
RINFRA-G/NDPR/FY10/12
Belt Vulcanizing Machine to speed up the belt
joining process & Industrial Vacuum Cleaner
for dust free environment inside the Conveyor
tunnels in CHP
To speed up the coal conveyorbelt joining process.
To create a safe and dust free
environment inside the
Conveyor tunnels in CHP.
Apr-10 Apr-12 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/13Replacement Of Stacker/ Reclaimer Bucket
Wheel Bod for reliabilit im rovement
To enhance life of the Stacker-
Reclaimer.Apr-10 Apr-12 Mar-11 Mar-13 0
RINFRA-G/NDPR/FY10/14
Drip Irrigation System for water conservation
and to demonstrate the growth and success of
horticulture plantation at Dahanu coastal and
Water conservation and to
demonstrate the growth and
success of horticulture
plantation at Dahanu coastal
Apr-09 Apr-09 Aug-10 Mar-13 0
-
8/10/2019 Financial Model for power plant
32/45
Original Revised Actual Original Revised Actual Origina
Project Start Date
Project PurposeProject TitleProject Code
Project Completion date
RINFRA-G/NDPR/FY10/20Procurement of Fire protection equipments to
im rove safet .To improve safety. Jun-09 Jun-09 Jan-10 Jan-10 0
RINFRA-G/NDPR/FY10/21Procurement of spare Hydrogen Coolers for
GeneratorReliability improvement Apr-09 Apr-09 Apr-09 Apr-09 0
RINFRA-G/NDPR/FY10/22Procurement of spare Brushless Excitation
S stem for GeneratorReliability improvement Apr-09 Apr-09 Apr-09 Apr-09 8
RINFRA-G/NDPR/FY10/23 Procurement of spare Generator Circuit Breaker Reliability improvement Apr-09 Apr-09 Apr-09 Apr-09 0
RINFRA-G/NDPR/FY10/24Procurement of spare OLTC for Station
TransformerReliability improvement Apr-09 Apr-09 Apr-09 Apr-09 0
24
FY 2010-11
a) DPR Schemes
(i) In-principle approved by
MERC
(ii) Yet to receive in-principle
MERC approval
RINFRA-G/DPR/FY11/1.1
Reliability improvement through upgradation of
HP Bypass & LP Bypass system andTurbovisor
Improved reliability of plant
operation. Technology upradation
Apr-10 Apr-11 Mar-11 Mar-13 3
RINFRA-G/DPR/FY11/1.2Installation of Fire alarm System at Coal
Handling Plant
To enhance safety and security
of personnel and plantApr-10 Apr-12 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.3Upgradation of Vibration Meaurement System
for HT Auxilaries
Improved reliability of plant
operation. Technology up
radation
Apr-10 Apr-12 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.4Upgradation of PLCC and Master Clock for
reliability improvement
Improved reliability of plant
operation. Technology up
gradation
Apr-10 Apr-12 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.5
Upgaradation of MS Chloride Analyzer, pH
Analyzer and Conductivity Analyzer for
reliabilit im rovement.
Improved reliability of plant
operation. Technology up
radation
Apr-10 Apr-11 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.6
Upgradation of Water Flow meters in Kawdas
Pump House and Plant Area for reliability
improvement.
Reliability improvement.
Technology up gradationApr-10 Apr-11 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.7Upgradation of Weigh Bridge at Main Store
for reliabilit im rovement.Reliability improvement. Apr-10 Apr-11 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.8
Installation of PLC for Vapour Absorption
Machine (Air Conditioning) for reliability
im rovement..
To improve reliability and
availability of the systems.Apr-10 Apr-11 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.9
Upgradation of +24 V battery set U#1 and
UPS batteries at Switchyard for reliability
im rovement.
To improve reliability and
availability of the systems.Apr-10 Apr-11 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.10
Remote indication of Flame Scanners and Mill
Lube oil system pressure for reliability
im rovement.
Improved reliability of plant
operation. Technology up
radation
Apr-10 Apr-11 Mar-11 Mar-13 0
RINFRA-G/DPR/FY11/1.11Upgradation of Boiler Feed Pump (BFP) Scoop
controllerTechnology up gradation Apr-10 Apr-14 Mar-11 Mar-15 0
RINFRA-G/DPR/FY11/1.12Energy Conservation through installatn of
Variable Fre uenc Drive for TG lift Unit 1.Energy Conservation Apr-10 Apr-11 Mar-11 Mar-13 0
Replacement of street lights with energy
-
8/10/2019 Financial Model for power plant
33/45
-
8/10/2019 Financial Model for power plant
34/45
Original Revised Actual Original Revised Actual Original
Project Start Date
Project PurposeProject TitleProject Code
Project Completion date
RINFRA-G/NDPR/FY11/05Installation of Intermediate Controller forinstrument Compressed Air System for Energy
Conservation
Energy Conservation Apr-10 Apr-12 Apr-10 Mar-11 Mar-13 0.08
RINFRA-G/NDPR/FY11/06
Energy Conservation through replacement of
street lights with LED/CFL street lighting/Other
ener savin initiatives
Energy Conservation Apr-10 Apr-10 Mar-11 Mar-13 0.60
RINFRA-G/NDPR/FY11/07Procurement of Screw compressor (Air
Compressor) for Energy ConservationEnergy Conservation Apr-10 Apr-13 Mar-11 Mar-14 5.50
RINFRA-G/NDPR/FY11/08 Construction of Record Storage Shed. For storing records. Apr-10 Apr-10 Mar-11 Mar-13 0.45
RINFRA-G/NDPR/FY11/09 Debris filter for both units to improve Vacuum. Vacuum improvement Apr-10 Mar-11 Mar-13 4.00
RINFRA-G/NDPR/FY11/10 RENOVATION OF SECURITY OFFICE Better work environment. Apr-10 Apr-10 Mar-11 Mar-13 0.10
RINFRA-G/NDPR/FY11/11 Disaster Management System Disaster Management System Apr-10 Apr-10 Mar-11 Mar-11 0.03
RINFRA-G/NDPR/FY11/12Purchase of new AAQM equipments as per
MoEF notificationStatotory requirement Apr-10 Apr-10 Mar-11 Mar-11 0.47
RINFRA-G/NDPR/FY11/13Procurement of Fire protection equipments to
improve safetySafety improvement Apr-10 Apr-10 Mar-11 Mar-11 0.03
15.91
FY 2011-12
a) DPR Schemes
(i) In-principle approved by
MERC
(ii) Yet to receive in-principle
MERC a roval
RInfra-G/DPR/BP11-16/01
Renovation & Modernization Of Ash Handling
SystemLegal Compliance and
Renovation & ModernizationApr-2011 Apr-2011 Mar-16 21.20
RInfra-G/DPR/BP11-16/02Renovation & Modernization Of Turbine and
its auxiliariesReliability Improvement Apr-2011 Apr-2011 Mar-16 43.60
RInfra-G/DPR/BP11-16/03
Renovation & Modernization Of Boiler and its
auxiliaries Reliability Improvement Apr-2011 Apr-12 Mar-16 22.90
RInfra-G/DPR/BP11-16/04
Renovation & Modernization Of Offsite Plant
auxiliariesAvailability and Reliability
ImprovementApr-2011 Apr-2011 Mar-2016 18.09
RInfra-G/DPR/BP11-16/05
Renovation & Modernization Of Flue Gas
Desulphurization Reliability Improvement Apr-2011 Apr-12 Mar-16 9.80
RInfra-G/DPR/BP11-16/06 Procurement of Generator Rotor Improvement in Boiler
combustion efficienc .Apr-2011 Apr-12 Mar-2015 29.00
RInfra-G/DPR/BP11-16/07 Procurement of Generator Transformer Availability Improvement Apr-2011 Apr-12 Mar-2016 16.00
RInfra-G/DPR/BP11-16/08Energy Conservation in Main Plant Auxiliaries
and Balance of Plant
For Reliabie Measurement of
H2 purityApr-2011 Apr-12 Mar-16 12.60
RInfra-G/DPR/BP11-16/09 Strengthening of Electrical System at DTPS For Safety Enhancement. Apr-2011 Apr-12 Mar-16 24.40
RInfra-G/DPR/BP11-16/10Renovation & Modernization of Air Preheaters
(APH) SealsEnergy Conservation. Apr-2011 Apr-12 Mar-14 0.38
RInfra-G/DPR/BP11-16/11Renovation and modernization of lighting in
lant control roomsEnergy Conservation. Apr-2011 Apr-12 Mar-13 0.16
RInfra-G/DPR/BP11-16/12 Procurement of FFT and Ultrasonic Analyzers improved electrical protection. Apr-2011 Apr-12 Mar-14 0.40
RI f G/DPR/BP11 16/13 Moderni ation of En ironment Monitoring R li bili I A 2011 A 2011 M 15 1 45
-
8/10/2019 Financial Model for power plant
35/45
Original Revised Actual Original Revised Actual Original
Project Start Date
Project PurposeProject TitleProject Code
Project Completion date
RInfra-G/DPR/BP11-16/19Renovation & Development of DTPS Storesand Procurement of Material Handling
E ui ments
Reliability and Availability
Improvement.Apr-2011 Apr-2011 Mar-15 5.66
RInfra-G/DPR/BP11-16/20 Electro Clorination System Reliability Improvement. Apr-2011 Apr-12 Mar-12 11.00
RInfra-G/DPR/BP11-16/21 Tube Conveyor from Jetty to Coal Yard Reliability Improvement. Apr-2011 Apr-12 Mar-13 50.00
NDPRS
NDPR/BP11-16/01Renovation and Modernization of Offices, TTC
Canteen etcReliability Improvement. Apr-2011 Apr-2011 Mar-16 2.00
NDPR/BP11-16/02 Procurement of Chemical Analysers Safety Improvement. Apr-2011 Apr-2011 Mar-16 1.01
NDPR/BP11-16/03
Procurement & Renovation of
Vehicles, ACs, Refrigerators and Deep Freezers Safety Improvement. Apr-2011 Apr-2011 Mar-16 1.51
NDPR/BP11-16/04 Construction of Capex Store Vacuum Improvement. Apr-08 May-08 Mar-12 Mar-12 4.81
NDPR/BP11-16/05 Civil Works at DTPSVacuum & Heat Rate
improvement.Apr-2011 Mar-16 17.50
NDPR/BP11-16/06Modernization & Automation of Greenbelt at
DTPSReliability Improvement. Apr-2011 Apr-12 Mar-13 0.60
NDPR/BP11-16/07 Procurement of thermovision camera Apr-2011 Mar-12 Mar-12 0.02
397.57
567.76
-
8/10/2019 Financial Model for power plant
36/45
Original Revised Actual Original Revised Actual Original Actual OrderDiffere
Original
Project Start Date Cost of the Project
Project PurposeProject TitleProject Code
Project Completion date
Financing PlanEquity 30.0%
Debt 70.0%
(Rs. Crore)
Loan
Amount
Interest
Rate (%
p.a.)
Tenure of
Loan
(years)
Moratorium
Period
(years)
Loan Source
Capital Expenditure proposed for
FY 2010-11 as per Form 5.44.24 9.90 9% 20 0
Internal
Funding
Capital Expenditure proposed for
FY 2011-12 as per Form 5.47.86 18.33 11.5 13 0
Internal
Funding
Capital Expenditure proposed for
FY 2012-13 as per Form 5.432.97 76.94 11.5 13 0
Internal
Funding
Capital Expenditure proposed for
FY 2013-14 as per Form 5.447.63 111.13 11.5 13 0
Internal
Funding
Capital Expenditure proposed for
FY 2014-15 as per Form 5.423.24 54.22 11.5 13 0
Internal
Funding
Capital Expenditure proposed for
FY 2015-16 as per Form 5.426.92 62.82 11.5 13 0
Internal
Funding
TOTAL 142.86 333.34
Equity
DebtProject Number Projects
SOURCE OF FINANCING FOR CAPITAL EXPENDITURE
-
8/10/2019 Financial Model for power plant
37/45
Year: Previous Year (FY2010-11)
Audited (a) (
Works
Capitalised
Interest
Capitalised
Expense
Capitalised
Total
Capitalisation
185.09 28.46 - 0.98 13.66 8.94 0.10 - 9.05
- - -
11.68 6.05 4.50 5.10 - - 5.10
34.51 0.00 0.98 18.16 14.04 0.10 0.00 14.15
Year: Current Year (FY2011-12)
Actual though Un-audited (b) (
Investment during
the FY 11-12Capitalisation during the year
( Apr - Mar)
( Estimated)
DPR Schemes -
- 16.67 5.69 14.92 19.91 0.18 19.95
Non DPR Schemes - - - -
5.71 - 0.09 6.10 6.19 0.06 - 6.24
22.38 5.78 21.03 26.10 0.23 - 26.19
Total
Expenditure
Capitalised
Opening
CWIP
01.04.11
Project
Approved Cost
Cumulative
Expenditure
Incurred Total
Capitalisation
Project
Approved Cost
Project Number Project Title
Project Title
DPR Approved by MERC
Total DPR
b) Non-DPR Schemes
Total Non DPR
Reliance Infrastructure Limited - Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 5.4: CWIP- Projectwise details (only for Renovation and Modernisation Schemes)
3
Project Number
Cumulative
Expenditure
Incurred
Expenditure
Capitalised
Opening
CWIP
01.04.2010
Investment during
the FY 10-11
Dahanu Thermal Power Station (DTPS)
Capitalisation during the year
3Works
Capitalised
Interest
Capitalised
Expense
Capitalised
TotalTotal Non DPR
Total DPR
-
8/10/2019 Financial Model for power plant
38/45
-
8/10/2019 Financial Model for power plant
39/45
(Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)Order Difference
April-March
(Actual though
un-audited)
Estimated Estimated Estimated Estimated
(a) (b) ('c) = (b)-(a) (d)(e)
(f) (g) (h)1 Regulatory Equity at the beginning of the year (a) 534.39 535.14 -0.75 538.63 546.49 579.46 627.09 650.32
2 Capitalised Expenditure (b) 14.15 70.66 -56.51 26.19 109.92 158.75 77.46 89.74
3 Equity portion of capitalised expenditure ('c) = (30%*(b) 4.24 21.20 -16.95 7.86 32.97 47.63 23.24 26.92
4 Regulatory Equity at the end of the year (d) = (a) + ('c) 538.63 556.34 -17.71 546.49 579.46 627.09 650.32 677.25
Return Computation
5 Return on Regulatory Equity at the beginning of the
year(e) 74.81 74.92 -0.11 75.41 84.71 89.82 97.20 100.80
7 Total Return on Regulatory Equity (e) 74.81 74.92 -0.11 75.41 84.71 89.82 97.20 100.80
Note: RoE for the FY 2012-13 onwards has been calculated considering the RoE of 15.5%
S.No. Particulars Reference
FY 2010-11
Reliance Infrastructure Limited - Generation (RInfra-G)Business Plan for FY 2011-12 to FY 2015-16
Form 6: Return on Regulatory Equity
Dahanu Thermal Power Station (DTPS)
-
8/10/2019 Financial Model for power plant
40/45
Year: FY 2010-11
Audited Actual (MU)
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Reliance Energy- Mumbai
Distribution343.64 352.99 327.64 344.44 356.53 343.59 340.40 289.89 308.15 359.00 315.74 359.43
4041.44
Year: FY 2011-12:Actual adjusted with normative Aux Consumption (MU)
Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Reliance Energy- Mumbai
Distribution 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 4014.96
Year: FY 2012-13: Estimated (MU)
Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Reliance Energy- Mumbai
Distribution 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 3786.01
Year: FY 2013-14: Estimated (MU)Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Reliance Energy- Mumbai
Distribution 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 3786.01
Year: FY 2014-15: Estimated (MU)
Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Reliance Energy- Mumbai
Distribution 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 3786.01
Year: FY 2015-16: Estimated (MU)
Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Reliance Energy- Mumbai
Distribution 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 3796.54
CustomerActuals Actuals
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 7: Sales ForecastDahanu Thermal Power Station (DTPS)
Total
-
8/10/2019 Financial Model for power plant
41/45
Year: FY 2010-11 (Rs. Crore)
Fixed charges
(Rs. Crore/year)
Energy
Charges
(Rs./kWh)
PLF
Incentive
Fuel
surcharge
per unit
(Rs/kWh)
Capacity
allocated
(MW)
Enery sale
(MU)
Item 3
(specify)
Revenue
from Fixed
charges
Revenue from
Energy
charges
Revenue
from Part 3
of tariff
Revenue
from fuel
surcharge
Total
RInfra-D
Total 216.61 2.12 21.97 0.08 500.00 4041.44 216.61 856.79 21.97 33.95 1129.32
Year: FY 2011-12 (Estimated)
Fixed charges
(Rs. Crore/year)
Energy
Charges(Rs./kWh)
PLF
Incentive
Fuel
surcharge
per unit
(Rs/kWh)
Capacity
allocated(MW)
Enery sale
(MU)
Item 3
(specify)
Revenue
from Fixedcharges
Revenue from
Energycharges
PLF
Incentive
Revenue
from fuelsurcharge
Total
Total 216.61 2.12 0.00 -0.45 500.00 4014.96 216.61 851.17 0.00 0.00 1067.78
Form 8: Expected Revenue at Existing Tariff
Business Plan for FY 2011-12 to FY 2015-16
Dahanu Thermal Power Station (DTPS)
Reliance Infrastructure Limited- Generation (RInfra-G)
Customer
Customer
Components of tariff Relevant sales & load/demand Full year revenue
Components of tariffRelevant sales & load/demand
data for revenue calculation
Full year revenue
-
8/10/2019 Financial Model for power plant
42/45
Year: Ensuing Years (2011-12) (Rs. Crore)
Fixed charges (Rs.
Crore/year)
Energy
Charges
(Rs./kWh)
PLF Incentive
Fuel surcharge
per unit
(Rs/kWh)
Capacity
allocated
(MW)
Enery sale
(MU)
Item 3
(specify)
Revenue
from Fixed
charges
Revenue from
Energy
charges
PLF IncentiveRevenue from
fuel surchargeTotal
RInfra-D- Mumbai
Distribution252.61 2.575 0.00 0.000 500 4014.96 252.61 1033.66 0.00 0.00 1286.28
Total 252.61 2.575 0.00 0.00 500.00 4014.96 0.00 252.61 1033.66 0.00 0.00 1286.28
Note: Th is is exclusive of the carr ying cost and revenue true up for the FY 09-10 and FY 10-11
Year: Ensuing Years (2012-13)
Fixed charges (Rs.
Crore/year)
Energy
Charges
(Rs./kWh)
PLF Incentive
Fuel surcharge
per unit
(Rs/kWh)
Capacity
allocated
(MW)
Enery sale
(MU)
Item 3
(specify)
Revenue
from Fixed
charges
Revenue from
Energy
charges
PLF IncentiveRevenue from
fuel surchargeTotal
RInfra-D- Mumbai
Distribution304.01 2.647 0.00 2.647 500 3786.01 304.01 1001.98 0.00 0.00 1306.00
Total 304.01 2.647 0.00 2.65 500.00 3786.01 0.00 304.01 1001.98 0.00 0.00 1306.00
Year: Ensuing Years (2013-14)
Fixed charges (Rs.
Crore/year)
Energy
Charges
(Rs./kWh)
PLF Incentive
Fuel surcharge
per unit
(Rs/kWh)
Capacity
allocated
(MW)
Enery sale
(MU)
Item 3
(specify)
Revenue
from Fixed
charges
Revenue from
Energy
charges
PLF IncentiveRevenue from
fuel surchargeTotal
RInfra-D- Mumbai
Distribution326.08 2.691 0.00 2.691 500 3786.01 326.08 1018.99 0.00 0.00 1345.07
Total 326.08 2.691 0.00 2.69 500.00 3786.01 0.00 326.08 1018.99 0.00 0.00 1345.07
Customer
Components of tariffRelevant sales & load/demand data for
revenue calculation
Full year revenue
Customer
Components of tariffRelevant sales & load/demand data for
revenue calculation
Full year revenue
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 9: Expected Revenue at Proposed Tariff
Customer
Components of tariffRelevant sales & load/demand data for
revenue calculation
Full year revenue
Dahanu Thermal Power Station (DTPS)
-
8/10/2019 Financial Model for power plant
43/45
Reliance Infrastructure Limited- Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 9: Expected Revenue at Proposed Tariff
Dahanu Thermal Power Station (DTPS)
Year: Ensuing Years (2014-15)
Fixed charges (Rs.
Crore/year)
Energy
Charges
(Rs./kWh)
PLF Incentive
Fuel surcharge
per unit
(Rs/kWh)
Capacity
allocated
(MW)
Enery sale
(MU)
Item 3
(specify)
Revenue
from Fixed
charges
Revenue from
Energy
charges
PLF IncentiveRevenue from
fuel surchargeTotal
RInfra-D- Mumbai
Distribution364.68 2.738 0.00 2.738 500 3786.01 364.68 1036.78 0.00 0.00 1401.45
Total 364.68 2.738 0.00 2.74 500.00 3786.01 0.00 364.68 1036.78 0.00 0.00 1401.45
Year: Ensuing Years (2015-16)
Fixed charges (Rs.
Crore/year)
EnergyCharges
(Rs./kWh)
PLF IncentiveFuel surcharge
per unit
(Rs/kWh)
Capacityallocated
(MW)
Enery sale
(MU)
Item 3
(specify)
Revenuefrom Fixed
charges
Revenue fromEnergy
charges
PLF IncentiveRevenue from
fuel surchargeTotal
RInfra-D- Mumbai
Distribution386.17 2.787 0.00 2.787 500 3796.54 386.17 1058.28 0.00 0.00 1444.44
Total 386.17 2.787 0.00 2.79 500.00 3796.54 0.00 386.17 1058.28 0.00 0.00 1444.44
Customer
Components of tariffRelevant sales & load/demand data for
revenue calculation
Full year revenue
Customer
Components of tariffRelevant sales & load/demand data for
revenue calculation
Full year revenue
-
8/10/2019 Financial Model for power plant
44/45
(Rs. Crore)
FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March
(Actual)
Order Difference
Actual
though un-
audited
Estimated Estimated Estimated Estimated
(a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)
1 Liabilities no longer required written back- - - - - -
2 Rent - - - - - -
3 Insurance Claim Received - - - - - -
4 Connection/ Reconnection fees - - - - - -
5 Sale Of Scrap 8.22 6.10 2.58 2.58 2.58 2.58
6 Liquidated damages - - - - - -
7 Interest Received - Employee Loans 0.42 0.39 0.39 0.39 0.39 0.39
8 Interest on Contingency Reserve Inv - - - - - -
9 Interest on Deferred Tax Liability Inv - - - - - -
10 Fly Ash disposal administration & aother
misc.1.65 1.86 5.00 5.00 5.00 5.00
11 Others - - - - - -
Total 10.29 5.00 5.29 8.35 7.97 7.97 7.97 7.97
Reliance Infrastructure Limited - Generation (RInfra-G)
Business Plan for FY 2011-12 to FY 2015-16
Form 11: Other Income
Dahanu Thermal Power Station (DTPS)
ParticularsS.No. Reference
FY 2010-11
-
8/10/2019 Financial Model for power plant
45/45
(Rs. Crore)
FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16
April - March Estimated Estimated Estimated Estimated Estimated
Fuel ExpensesO&M expenses
DepreciationInterest on long-te