    Financial Model

    Reliance Infrastructure Limited- Generation (RInfra-G)Business Plan for Plan Period of FY 2011-12 to FY 2015-16

    Dahanu Thermal Power Station (DTPS)

  • 8/10/2019 Financial Model for power plant

    2/45

    1 Aggregate Revenue Requirement - Summary Sheet Form 1

    2 Energy Charges for Thermal Generation Form 2.1

    3 Fuel Cost Details Form 2.2

    4 Interest on Working Capital - Thermal Generation Form 2.3

    5 Planned & Forced Outages Form 2.6

    6 Operations and Maintenance Expenses Form 3

    6.1 Employee Expenses Form 3.1

    6.2 Administration & General Expenses Form 3.2

    6.3 Repair & Maintenance Expenses Form 3.3

    10 Assets & Depreciation Form 4

    11 Interest Expenses Form 512 Existing Loans Form 5.1

    13 Capital Expenditure Plan (only Renovation & Modernisation Schemes) Form 5.3

    14 CWIP- Projectwise details (only for Renovation and Modernisation Schemes) Form 5.4

    15 Return on Regulatory Equity Form 6

    16 Sales Forecast Form 7

    17 Expected Revenue at Existing Tariff Form 8

    18 Expected Revenue at Proposed Tariff Form 9

    19 Other Income Form 11

    20 Income Tax Computation

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    S.No. Title Reference

    Dahanu Thermal Power Station (DTPS)

  • 8/10/2019 Financial Model for power plant

    3/45

    (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Estimated Estimated Estimated Estimated Estimated

    (d) = (b) + (c) (e) (f) (g) (h) (i) (j)

    1 Fuel Related Expenses Form 2.1 780.51 804.62 1033.66 1001.98 1018.99 1036.78 1058.28

    2 Operation & Maintenance Expenses Form 3 93.45 82.99 92.84 112.03 121.21 131.15 141.92

    2.1 Employee Expenses Form 3.1 45.28 50.97 48.87 53.40 58.36 63.78

    2.2 Administration & General Expenses Form 3.2 17.30 16.64 22.71 24.51 26.45 28.55

    2.3 Repair & Maintenance Expenses Form 3.3 30.87 25.23 40.46 43.30 46.34 49.59

    3 Depreciation, including advance against depreciation Form 4 15.98 17.13 15.96 26.95 26.20 34.55 37.32

    4 Interest on Long-term Loan Capital Form 5 16.32 18.04 22.86 27.09 36.13 42.34 44.84

    5 Interest on Working Capital Form 2.3, 2.5 14.68 9.29 13.75 13.86 12.60 13.03 13.44

    6 Other Expenses Form 10 - - - - - - -

    7 Income Tax 36.85 17.02 40.14 47.34 48.10 54.39 55.81

    8 Adjustment for profit/loss on account controllable/uncontrollable factors 73.36

    9 Total Revenue Expenditure 1031.15 949.09 1219.22 1229.26 1263.23 1312.23 1351.61

    10 Add: Return on Equity Capital Form 6 74.81 74.92 75.41 84.71 89.82 97.20 100.80

    11 Add:Entitlement for Incentive for Higher PLF Form 2.1 21.97 0 0.00 0.00 0.00 0.00 0.00

    12 Less:Other Income Form 11 10.29 5 8.35 7.97 7.97 7.97 7.97

    13 Aggregate Revenue Requirement 1117.65 1019.01 1286.28 1306.00 1345.07 1401.45 1444.44

    S.No. Particulars Reference

    FY 2010-11

    Dahanu Thermal Power Station (DTPS)

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 1: Aggregate Revenue Requirement - Summary

  • 8/10/2019 Financial Model for power plant

    4/45

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)

    April-March

    (Normative

    Performance)

    Order

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    (d) = (b) + (c) (dn) (e) (f) (g) (h) (i) (j)

    1 O erational Parameters

    1.1 Total Capacity MW 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00

    94.75 (Unit1)

    98.21 (Unit2)

    94.75 (Unit1)

    98.21 (Unit2)

    95.89 NA NA NA NA

    96.48 96.48 95.89 97.48% 95.89% 95.89% 95.89% 95.90%

    99.51 (Unit1)

    102.49 (Unit2)NA NA

    102.23% NA NA 101.34% 95.90% 95.90% 95.90% 95.90%

    1.4 Gross Generation MU 4423.66 NA 4200 4450.63 4200.42 4200.42 4200.42 4211.93

    7.22 (Unit 1)

    7.53 (Unit 2)8.50 8.50 8.50 8.50 8.50 8.50

    7.38% 8.50 8.50 8.50 8.50 8.50 8.50 8.50

    1.6 aAuxiliary Energy

    Consumption Normal

    MU 326.44 380.62 357.00 378.30 357.04 357.04 357.04 358.01

    1.6 bAuxiliary Energy

    Consumption FGDMU 55.78 55.78 57.00 57.37 57.37 57.37 57.37 57.37

    16 c MU 382.22 436.40 414 435.67 414.41 414.41 414.41 415.38

    % 8.64% 9.75% 9.86% 9.79% 9.87% 9.87% 9.87% 9.86%

    1.7Net Generation MU 4041.44 4041.44 3786 4014.96 3786.01 3786.01 3786.01 3796.54

    2306 (Unit1)

    2259 (Unit2)2500 2500 NA NA NA NA NA

    2282 2500 2500 2500 2450 2450 2450 2450

    2Fuel Parameters (for each

    primary and secondary fuel)

    2.1 Calorific Value

    2.1.1 Washed Coal kcal/kg 3467 3467 3356 3461 3461 3461 3461 3461

    F Grade Coal kcal/kg 2860 2860 NA 2847 2847 2847 2847 2847

    2.1.2 Imported Coal kcal/kg 4544 4544 4852 4653 4653 4653 4653 4653

    2.1.3 HFO - Heavy Furnace Oil kcal/kg 0 0 0 0 0 0 0 0

    2.1.4 LDO - Light Diesel Oil kcal/kg 10742 10742 10833 10768 10768 10768 10768 10768

    1.5

    Auxiliary Energy

    Consumption (Excluding

    FGD)

    Particulars

    1.8 Heat Rate

    1.3

    kcal/kWh

    Total Auxiliary Consumption

    %

    Availability %

    PLF

    FY 2010-11

    %

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 2.1: Energy Charges for Thermal Generation

    Dahanu Thermal Power Station (DTPS)

    Units

    1.2

    S.No.

  • 8/10/2019 Financial Model for power plant

    5/45

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)

    April-March(Normative

    Performance)

    OrderEstimated

    (Normative

    Performance)

    Estimated(Normative

    Performance)

    Estimated(Normative

    Performance)

    Estimated(Normative

    Performance)

    Estimated(Normative

    Performance)Particulars

    FY 2010-11

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 2.1: Energy Charges for Thermal Generation

    Dahanu Thermal Power Station (DTPS)

    UnitsS.No.

    2.2 Landed Fuel Price per unit

    2.2.1 Washed Coal Rs/MT 2664.29 2632.06 2579.00 2824.04 3113.36 3189.22 3268.40 3351.03

    F Grade Coal Rs/MT 2339.77 2329.87 NA 2496.35 2793.23 2871.08 2952.32 3037.12

    2.2.2 Imported Coal Rs/MT 3430.24 3448.47 3295.00 4809.16 4809.16 4809.16 4809.16 4809.16

    2.2.3 HFO - Heavy Furnace Oil Rs/Kl 0 0 0 0.00 0.00 0.00 0.00 0.00

    2.2.4 LDO - Light Diesel Oil** Rs/Kl 42525.35 42525.35 37435.00 45113.39 48324.93 51765.09 55450.15 59397.54

    2.2.3.1Percent Washed coal in

    primary fuel blend% 54.0% 54.0% 73.1% 54.0% 54.0% 54.0% 54.0% 54.0%

    Percent Raw (F Grade) coal in

    primary fuel blend% 18.9% 18.9% 6.9% 18.9% 18.9% 18.9% 18.9% 18.9%

    2.2.3.2Percent Imported coal in

    primary fuel blend% 27.1% 27.1% 20.0% 27.1% 27.1% 27.1% 27.1% 27.1%

    2.2.3.3Percent HFO in secondary fuel

    basket% 0.0% 0.0% 0.0% 0.00% 0.00% 0.00% 0.00% 0.00%

    2.2.3.4Percent LDO in secondary fuel

    basket

    % 100.0% 100.0% 100.0% 100.00% 100.00% 100.00% 100.00% 100.00%

    3

    Fuel Consumption and Heat

    Contribution (for each fuel

    separately)

    3.1 Specific Fuel Consumption

    3.1.1 Washed Coal kg/kWh 0.338 0.367 NA 0.365 0.359 0.359 0.359 0.359

    F Grade Coal kg/kWh 0.119 0.129 NA 0.128 0.126 0.126 0.126 0.126

    3.1.2 Imported Coal kg/kWh 0.170 0.185 NA 0.183 0.180 0.180 0.180 0.180

    3.1.3 Secondary Oil Consumption ml/kWh 0.135 2.000 2.000 2.000 1.000 1.000 1.000 1.0003.1.3.1 HFO - Heavy Furnace Oil ml/kWh 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

    3.1.3.2 LDO - Light Diesel Oil ml/kWh 0.135 2.000 2.000 2.000 1.000 1.000 1.000 1.000

    3.2 Total Fuel Consumption

    3.2.1 Washed Coal MT 1493436 1644817 NA 1624239 1507887 1507887 1507887 1512018

    F Grade Coal MT 524465 577627 NA 570400 529540 529540 529540 530990

    3.2.2 Imported Coal MT 750279 826331 NA 815993 757539 757539 757539 759615

    3.2.3 HFO - Heavy Furnace Oil kL 254 0 0 0 0 0 0 0

    3.2.4 LDO - Light Diesel Oil kL 597 8956 8400 8901.27 4200.42 4200.42 4200.42 4211.93

  • 8/10/2019 Financial Model for power plant

    6/45

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)

    April-March

    (Normative

    Performance)

    Order

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)

    Estimated

    (Normative

    Performance)Particulars

    FY 2010-11

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16Form 2.1: Energy Charges for Thermal Generation

    Dahanu Thermal Power Station (DTPS)

    UnitsS.No.

    3.3Heat Rate Contribution

    (each fuel separately)

    3.3.1 Washed Coal kcal/ kWh 1170.52 1273.57 NA 1263.08 1242.45 1242.45 1242.45 1242.45

    F Grade Coal kcal/ kWh 339.04 368.89 NA 364.88 358.92 358.92 358.92 358.92

    3.3.2 Imported Coal kcal/ kWh 770.70 838.56 NA 853.10 839.16 839.16 839.16 839.16

    3.3.3 HFO - Heavy Furnace Oil kcal/ kWh 0.00 0.00 NA 0.00 0.00 0.00 0.00 0.00

    3.3.4 LDO - Light Diesel Oil kcal/ kWh 1.28 18.98 NA 18.95 9.48 9.48 9.48 9.48

    Total Heat Content kcal/ kWh 2282 2500 2500 2500 2450 2450 2450 2450

    4 Total Fuel Cost

    4.1 Washed Coal Rs Crore 397.89 432.93 NA 458.69 469.46 480.90 492.84 506.68

    F Grade Coal Rs Crore 122.71 134.58 NA 142.39 147.91 152.03 156.34 161.274.2 Imported Coal Rs Crore 257.36 284.96 NA 392.42 364.31 364.31 364.31 365.31

    4.3 HFO - Heavy Furnace Oil Rs Crore 0.00 0.00 NA 0.00 0.00 0.00 0.00 0.00

    4.4 LDO - Light Diesel Oil Rs Crore 2.54 38.08 NA 40.16 20.30 21.74 23.29 25.02

    Total Fuel Cost Rs Crore 780.51 890.55 804.62 1033.66 1001.98 1018.99 1036.78 1058.28

    6 Total Cost (4+5) Rs Crore 780.51 890.55 804.62 1033.66 1001.98 1018.99 1036.78 1058.28

    7 Cost of Generation per unit

    (at Generation Terminal) Rs/kWh 1.764 2.201 1.916 2.323 2.385 2.426 2.468 2.513

    8Energy Charge per unit

    (ex-bus)Rs/kWh 1.931 2.204 2.120 2.575 2.647 2.691 2.738 2.787

  • 8/10/2019 Financial Model for power plant

    7/45

    Washed Coal 4.37%

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    Un-auditedEstimated Estimated Estimated Estimated

    (a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)

    Basic Cost Rs/MT 967.91 1029.29 1029.29 1029.29 1029.29 1029.29

    Freight

    Rs/MT

    1334.46 1435.04 1722.05 1797.31 1875.85 1957.82

    6 year CAGR of freight rate has b

    freight of FY 12-13 and FY 11-12

    due to recent MoR notification offreight rate

    Freight Surcharge, if applicableRs/MT

    26.13 28.13 28.13 28.13 28.13 28.13

    Fuel Handling Charges Rs/MT

    Taxes and Duties (pl. specify

    details) Rs/MT

    Any other charges Rs/MT 282.49 308.98 308.98 308.98 308.98 308.98

    Total Price excluding Transit

    LossRs/MT 2611.00 2801.45 3088.45 3163.71 3242.25 3324.23

    Transit Loss (Actual) % 2.00 1.91Transit Loss (Truing Up) 0.80 0.80 0.80 0.80 0.80 0.80 0.80

    Total Price including Transit

    Loss (Actual)Rs/MT 2664.29 2856.00 3088.45 3163.71 3242.25 3324.23

    Total Price including Transit

    Loss (True up / Normative) Rs/MT 2632.06 2579.00 53.06 2824.04 3113.36 3189.22 3268.40 3351.03

    Remarks

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 2.2: Landed Cost of Fuel

    Dahanu Thermal Power Station (DTPS)

    S.No. Particulars Unit

    FY 2010-11

  • 8/10/2019 Financial Model for power plant

    8/45

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16Form 2.2: Landed Cost of Fuel

    Dahanu Thermal Power Station (DTPS)

    F Grade Coal

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    Un-auditedEstimated Estimated Estimated Estimated

    (a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)

    Basic Cost Rs/MT 780.25 839.86 839.86 839.86 839.86 839.86

    Freight Rs/MT 1392.99 1472.54 1767.05 1844.27 1924.87 2008.98

    6 year CAGR of freight rate has b

    freight of FY 12-13 and FY 11-12

    due to recent MoR notification offreight rate

    Freight Surcharge, if applicable Rs/MT 27.51 28.52 28.52 28.52 28.52 28.52

    Fuel Handling Charges Rs/MT 110.48 135.46 135.46 135.46 135.46 135.46

    Taxes and Duties (pl. specify

    details)Rs/MT

    Any other charges Rs/MT

    Total Price excluding Transit

    LossRs/MT 2311.23 2476.38 2770.89 2848.11 2928.70 3012.82

    Transit Loss (Actual) % 1.22 N.A.

    Transit Loss (Norm) % 0.80 0.80 0.80 0.80 0.80 0.80

    Total Price including Transit

    Loss (Actual)Rs/MT 2339.77 2476.38 2770.89 2848.11 2928.70 3012.82

    Total Price including Transit

    Loss (Normative)Rs/MT 2329.87 N.A. 2496.35 2793.23 2871.08 2952.32 3037.12

    Remarks

    FY 2010-11

    S.No. Particulars Unit

  • 8/10/2019 Financial Model for power plant

    9/45

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16Form 2.2: Landed Cost of Fuel

    Dahanu Thermal Power Station (DTPS)

    Imported Coal

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    Un-auditedEstimated Estimated Estimated Estimated

    (a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)

    Basic Cost Rs/MT 3006.20 4137.62 4137.62 4137.62 4137.62 4137.62

    Freight Rs/MT 204.61 216.28 216.28 216.28 216.28 216.28

    Freight Surcharge, if applicable Rs/MT

    Fuel Handling Charges Rs/MT

    Taxes and Duties (pl. specify

    details) Rs/MT210.07 416.78 416.78 416.78 416.78 416.78

    Any other charges Rs/MT

    Total Price excluding Transit

    Loss

    Rs/MT

    3420.88 4770.68 4770.68 4770.68 4770.68 4770.68

    No Change in landed cost is being

    turbulent market, any projection m

    be relevant may be after 6 months

    Transit Loss (Actual) % 0.27 0.30Transit Loss (Normative) % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

    Total Price including Transit

    Loss (Actual)Rs/MT 3430.24 4785.04 4770.68 4770.68 4770.68 4770.68

    Total Price including Transit

    Loss (Normative)Rs/MT 3448.47 3295.00 153.47 4809.16 4809.16 4809.16 4809.16 4809.16

    RemarksS.No. Particulars Unit

    FY 2010-11

  • 8/10/2019 Financial Model for power plant

    10/45

    (Rs. Crore

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual

    April - March

    (with Normative

    performance)

    Order Estimated Estimated Estimated Estimated Estimated

    1 Cost of Coal/Lignite1

    2 Months 110.92 117.81 135.89 136.50 138.66 140.92 143.6

    2 Cost of Secondary Fuel Oil1

    2 Months 1.45 5.26 5.49 2.82 3.02 3.24 3.4

    3 Fuel Cost2

    NA

    4 Liquid Fuel Stock2

    NA

    5 O & M expenses 1 Month 7.79 7.79 7.74 9.34 10.10 10.93 11.86 Maintenance Spares 1% 25.25 14.69 14.81 14.99 15.96 17.19 18.0

    7Receivables (2 month revenue from sale of

    electricity at targeted Availability) 2 Months

    8Less: Payables for one month fuel at

    targeted Availability 1 Month61.54 70.69 69.66 70.84 72.08 73.5

    9 Total Working Capital Requirement 145.40 84.02 79.06 93.24 93.98 96.90 100.20 103.4

    Computation of working capital interest

    9 Interest Rate (%) 11.75% 11.75% 11.75% 14.75% 14.75% 13.00% 13.00% 13.00%

    10 Working Capital Interest 17.08 9.87 9.29 13.75 13.86 12.60 13.03 13.4

    11 Efficiency Loss 7.21

    12 Loss passed through 4.81

    13 Net entitlement of IOWC 14.68

    S.No. NormParticulars

    FY 2010-11

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 2.3: Interest on Working Capital - Thermal Generation

    Dahanu Thermal Power Station (DTPS)

  • 8/10/2019 Financial Model for power plant

    11/45

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15

    Apr-Sep(Actual)

    Oct-Mar(Actual)

    April - March(Actual)

    Order Difference Actual Un-audited

    Estimated Estimated Estimated

    (b) (c) (d) = (b) + (c) (e) (f) = (d) - (e) (g) (h) (i) (j)

    1 DTPS

    A. Planned Outages

    No of days of outage 2.18 7.60 9.78 1.02 13 13

    Period of Outage

    Reasons for Outage 16 days for majoroverhaul of Unit 1

    16 days for majoroverhaul of Unit 1

    23 days for major

    overhaul of Unit 2 and

    3 days for license

    renewal of Unit 1

    boiler

    23 days for major

    overhaul of Unit 1 and

    3 days for license

    renewal of Unit 2

    boiler

    23 days for major

    overhaul of Unit 2 and days for license renewa

    of Unit 1 boiler

    B. Forced Outages

    No of days of outage 0.00 3.07 3.07 8.21 2 2

    Period of Outage Jun-10 & Jul-10 Nov-10 & Dec-10

    Reasons for Outage

    Condensor Tube &

    Boiler Tube

    Leakage( Unit- II )

    Boiler tube Leakage &

    Planned shutdown for

    overhauling (Unit - I)

    Boiler Tube Leakage(

    Unit - I & II ) &

    System Problem

    2 days against forced

    outages for each unit

    2 days against forced

    outages for each unit

    2 days against forced

    outages for each unit

    Total Outage 2.18 10.67 12.85 9.23 15 15

    Availability 98.81% 94.14% 96.48% 97.48% 95.89% 95.89% 95.89

    Nov-10 & Dec-10

    FY 2010-11

    ParticularsS.No.

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 2.6: Planned & Forced Outages

    Dahanu Thermal Power Station (DTPS)

  • 8/10/2019 Financial Model for power plant

    12/45

    (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    un-auditedEstimated Estimated Estimated Estimated

    (c) = (b) + (a) (d) (e) = (d) - (c) (f) (g) (h) (i) (j)

    1

    Employee Expenses

    (net of capitalisation)Form 3.1 45.28 50.97 48.87 53.40 58.36 63.78

    Inflationary impact of CPI

    considered and explanation for

    projection is detailed in the petit

    write up

    2Administration & General Expenses (net

    of capitalisation)Form 3.2 17.30 16.64 22.71 24.51 26.45 28.55

    Inflationary impact of CPI and Win ratio 40:60 considered and

    explanation for the projection

    detailed in the petition write u

    3

    Repair and Maintenance

    (net of capitalisation)Form 3.3 30.87 25.23 40.46 43.30 46.34 49.59

    Inflationary impact of WPI

    considered and explanation for

    projection is detailed in the petit

    write up

    Total Operation & Maintenance

    Expenses (net of capitalisation)93.45 82.99 10.46 92.84 112.03 121.21 131.15 141.92

    Remarks

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 3: Operations and Maintenance Expenses

    Dahanu Thermal Power Station (DTPS)

    Notavailable

    FY 2010-11

    S.No. Particulars Reference

    Notavailable

  • 8/10/2019 Financial Model for power plant

    13/45

    A. Expenditure details (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    un-auditedEstimated Estimated Estimated Estimated

    (a) (b) ('c) = (b)-(a) (d) (e) (f) (g) (h)1 Basic Salary 9.57 9.98 10.33 11.29 12.33 13.48

    2 Dearness Allowance (DA) 5.98 6.59 6.45 7.05 7.71 8.42

    3 House Rent Allowance 0.21 0.27 0.23 0.25 0.27 0.30

    4 Conveyance Allowance 3.03 2.95 3.27 3.57 3.91 4.27

    5 Leave Travel Allowance 0.78 0.78 0.84 0.92 1.01 1.10

    6 Earned Leave Encashment 2.58 3.65 2.78 3.04 3.33 3.63

    7 Other Allowances 13.38 17.19 14.44 15.78 17.25 18.85

    8 Medical Reimbursement 0.72 0.70 0.78 0.85 0.93 1.01

    9 Overtime Payment 1.03 0.84 1.11 1.21 1.33 1.45

    10 Bonus/Ex-Gratia Payments 0.69 0.76 0.74 0.81 0.89 0.9711 Interim Relief / Wage Revision Arrears - - - - -

    12 Staff welfare expenses 3.18 2.06 3.43 3.75 4.10 4.48

    13 VRS Expenses/Retrenchment Compensation - - - - -

    14 Commission to Directors - - - - -

    15 Training Expenses 0.05 0.06 0.05 0.06 0.06 0.07

    16 Payment under Workmen's Compensation Act - - - - -

    17 Net Employee Costs 41.20 45.83 44.46 48.59 53.10 58.03

    18 Terminal Benefits - - - - -

    18.1 Provident Fund Contribution 2.03 2.19 2.19 2.39 2.62 2.86

    18.2 Provision for PF Fund - - - - -18.3 Pension Payments (superannuation) 0.54 0.58 0.58 0.64 0.70 0.76

    18.4 Gratuity Payment 1.51 2.37 1.63 1.78 1.95 2.13

    19 Gross Employee Expenses 45.28 50.97 48.87 53.40 58.36 63.78

    20 Less: Expenses Capitalised - 0

    21 Net Employee Expenses 45.28 50.97 48.87 53.40 58.36 63.78

    Projection for the individual

    heads has been made on

    proportionate basis for FY 12-13 considering the actual

    expenses of FY 10-11 as base

    and for FY 11-12, it is actual

    though un-audited details which

    may change subject to final

    audit of expenses

    Explanation for the projection i

    made therein the petition write

    up

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 3.1: Employee Expenses

    Dahanu Thermal Power Station (DTPS)

    Remarks

    Employeeexpesesdatanotavaia

    lbleseparately

    FY 2010-11

    Employeeexpesesdatanotavaia

    lbleseparately

    S.No. Particulars

  • 8/10/2019 Financial Model for power plant

    14/45

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 3.1: Employee Expenses

    B. Details of number of employees

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Estimated Estimated Estimated Estimated Estimated

    (a) (b) (c) (d) (e) (f)

    As on

    31.03.2011As on 31.03.2012

    As on

    31.03.2013

    As on

    31.03.2014

    As on

    31.03.2015

    As on

    31.03.2016

    A Officer/Managerial Cadre

    1 Technical 168 168 168 168 168 168

    2 Administrative 37 37 37 37 37 37

    3 Accounts and finance 7 7 7 7 7 7

    4 Other (Please specify)0 0 0 0 0 0

    B Staff Cadre

    5 Technical

    5.1 Grade I 71 71 71 71 71 71

    5.2 Grade II 115 115 115 115 115 115

    5.3 Grade III 7 7 7 7 7 75.4 Grade IV 0 0 0 0 0 0

    6 Administrative

    6.1 Grade I 36 36 36 36 36 36

    6.2 Grade II 58 58 58 58 58 58

    6.3 Grade III 0 0 0 0 0 0

    6.4 Grade IV 0 0 0 0 0 0

    7 Accounts and finance

    7.1 Grade I 0 0 0 0 0 0

    7.2 Grade II 5 5 5 5 5 5

    7.3 Grade III 0 0 0 0 0 07.4 Grade IV 0 0 0 0 0 0

    8 Others (please specify)

    8.1 Grade I - - - - - -

    8.2 Grade II - - - - - -

    8.3 Grade III - - - - - -

    8.4 Grade IV - - - - - -

    Total Employees 504 504 504 504 504 504

    ParticularsS.No.

  • 8/10/2019 Financial Model for power plant

    15/45

    (Rs. Crore)FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    un-auditedEstimated Estimated Estimated Estimated

    (a) (b) ('c) = (b)-(a) (d) (e) (f) (g) (h)

    1 Rent Rates & Taxes 2.38 1.94 3.12 3.37 3.64 3.93

    2 Insurance 6.49 6.00 8.52 9.19 9.92 10.71

    3 Telephone & Postage, etc. 0.26 0.28 0.34 0.37 0.40 0.43

    4 Legal charges & Audit fee 0.04 0.17 0.05 0.06 0.06 0.07

    5 Professional, Consultancy, Tech 0.25 0.17 0.33 0.35 0.38 0.416 Conveyance & Travel 0.44 0.14 0.58 0.62 0.67 0.73

    7 Electricity charges 0.35 0.29 0.46 0.50 0.54 0.58

    8 Water charges 3.84 3.94 5.04 5.44 5.87 6.34

    9 Security arrangements 0.97 0.97 1.27 1.37 1.48 1.60

    10 Fees & subscription - - - - - -

    11 Books & periodicals 0.02 0.01 0.03 0.03 0.03 0.03

    12 Computer Stationery - - - - - -

    13 Printing & Stationery 0.04 0.03 0.05 0.06 0.06 0.07

    14 Advertisements 0.05 0.64 0.07 0.07 0.08 0.08

    15 Purchase Related Advertisement - - - - -16 Contribution/Donations - - - - -

    17License Fee and other related

    fee- - - - -

    18Vehicle Running Expenses

    Truck / Delivery Van- - - - -

    19 Vehicle Hiring Expenses Truck 0.58 0.61 0.76 0.82 0.89 0.96

    20 Cost of services procured - - - - -

    21 Outsourcing of metering and bil - - - - -

    22 Freight On Capital Equipments - - - - -

    23 V-sat, Internet and related charg - - - - -24 Training - - - - -

    25 Bank Charges 0.03 0.03 0.04 0.04 0.05 0.05

    26 Miscellaneous Expenses - - - - -

    27 Office Expenses - - - - -

    28 Loss on sale of assets/ obsolate 0.20 0.26 0.28 0.31 0.33

    29 Provision for Doubtful debts - - - - -

    30 Others 1.36 1.40 1.79 1.93 2.08 2.24

    31 Gross A &G Expenses 17.30 16.64 22.71 24.51 26.45 28.55

    32 Less: Expenses Capitalised - - - - - -

    33 Net A &G Expenses 17.30 16.64 22.71 24.51 26.45 28.55

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 3.2: Administration & General Expenses

    Dahanu Thermal Power Station (DTPS)

    S.No. Particulars

    FY 2010-11

    Projection for the individual

    heads has been made on

    proportionate basis for FY 12-

    13 considering the actualexpenses of FY 10-11 as

    base and for FY 11-12, it is

    actual though un-audited

    details which may change

    subject to final audit of

    expenses

    Explanation for the

    projection is made therein the

    petition write up

    Remarks

    A&Gexpensesnotavailableseparately

    A&Gexpensesnotavailableseparately

  • 8/10/2019 Financial Model for power plant

    16/45

    (Rs. Crore)FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    Actual though

    un-auditedEstimated Estimated Estimated Estimated

    (a) (b) ('c) = (b)-(a) (d) (e) (f) (g) (h)

    1 Plant & Machinery 20.76 20.66 27.21 29.12 31.16 33.35

    Plant & Machinery (FGD) 7.50 3.23 7.50 0.00 3.23 7.50

    2 Buildings 1.27 0.51 1.66 1.78 1.91 2.04

    3 Civil Works 1.11 0.65 1.45 1.56 1.67 1.78

    4 Hydraulic Works 0.00 0.00 0.00 0.00 0.00 0.005 Lines & Cable Networks 0.00 0.07 0.00 0.00 0.00 0.00

    6 Vehicles 0.00 0.00 0.00 0.00 0.00 0.00

    7 Furniture & Fixtures 0.08 0.00 0.10 0.11 0.12 0.13

    8 Office Equipment 0.15 0.10 0.20 0.21 0.23 0.24

    9 Gross R&M Expenses 30.87 25.23 38.13 32.78 38.31 45.04

    10 Less: Expenses Capitalised 0.00 0.00 0.00 0.00 0.00 0.00

    11 Net R&M Expenses 30.87 25.23 40.46 43.30 46.34 49.59

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 3.3: Repair & Maintenance Expenses

    Dahanu Thermal Power Station (DTPS)

    Particulars

    FY 2010-11

    Projection for the individual heads

    has been made on proportionate basis

    for FY 12-13 considering the actual

    expenses of FY 10-11 as base and forFY 11-12, it is actual though un-

    audited details which may change

    subject to final audit of expenses

    Explanation for the projection is

    made therein the petition write up

    Remarks

    R&Mexpensesaren

    otavailable

    separately

    R&Mexpensesaren

    otavailable

    separately

    S.No.

  • 8/10/2019 Financial Model for power plant

    17/45

    (A) Gross Fixed Assets (Rs. Crore)

    Balance at the

    beginning of the

    year

    Additions during

    the year

    Retirement of

    assets during the

    year

    Balance at the end

    of the year

    31.03.11

    Balance at the

    beginning of the

    year

    Additions

    during the

    year

    Retirement of

    assets during

    the year

    Balance at the end of

    the year 31.03.12

    (a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)

    1 LAND (FREE HOLD) 19.51 0.14 - 19.65 19.65 0.04 - 19.69

    2 BUILDINGS 111.40 0.94 - 112.34 112.34 7.36 - 119.70

    3 PLANT & MACHINARY 1,469.32 12.62 (1.39) 1,480.55 1,480.55 18.59 (0.56) 1,498.57

    4 OFFICE EQUIPMENTS 4.17 0.16 (0.41) 3.92 3.92 0.04 (0.00) 3.96

    5 VEHICLES 8.35 - (0.03) 8.32 8.32 - (0.00) 8.32

    6FURNITURE & FIXTURE 2.53 0.06 (0.03) 2.55 2.55 0.15 (0.00) 2.70

    7 ELECTRICAL FITTINGS 0.58 0.20 - 0.78 0.78 0.11 - 0.89

    8 REF. & DOMESTIC

    APPLIANCES0.94 0.03 - 0.97 0.97 0.05 (0.08) 0.94

    Total 1,616.80 14.15 (1.86) 1,629.09 1,629.09 26.34 (0.64) 1,654.78

    Balance at the

    beginning of the

    year

    Additions during

    the year

    Retirement of

    assets during the

    year

    Balance at the end

    of the year

    31.03.13

    Balance at the

    beginning of the

    year

    Additions

    during the

    year

    Retirement of

    assets during

    the year

    Balance at the end of

    the year 31.03.14

    (a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)

    1 LAND (FREE HOLD) 19.69 1.12 - 20.81 20.81 1.43 - 22.23

    2 BUILDINGS 119.70 7.47 - 127.17 127.17 9.28 - 136.45

    3 PLANT & MACHINARY 1,498.57 98.55 (1.39) 1,595.73 1,595.73 124.68 (1.39) 1,719.02

    4 OFFICE EQUIPMENTS 3.96 1.27 (0.41) 4.82 4.82 1.59 (0.41) 6.00

    5 VEHICLES 8.32 0.00 (0.03) 8.30 8.30 - (0.03) 8.27

    6FURNITURE & FIXTURE 2.70 0.44 (0.03) 3.12 3.12 0.55 (0.03) 3.65

    7 ELECTRICAL FITTINGS 0.89 1.53 - 2.42 2.42 1.93 - 4.35

    8 REF. & DOMESTIC

    APPLIANCES0.94 0.23 - 1.17 1.17 0.29 - 1.47

    Total 1,654.78 110.62 (1.86) 1,763.54 1,763.54 139.75 (1.86) 1,901.44

    Estimated

    Audited Actual though un-audited

    S.No. Particulars

    FY 2010-11 FY 2011-12

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 4: Gross Fixed Assets, Depreciation

    Dahanu Thermal Power Station (DTPS)

    FY 2013-14

    Estimated

    S.No. Particulars

    FY 2012-13

  • 8/10/2019 Financial Model for power plant

    18/45

    Balance at the

    beginning of theyear

    Additions during

    the year

    Retirement of

    assets during theyear

    Balance at the end

    of the year31.03.15

    Balance at the

    beginning of theyear

    Additions

    during theyear

    Retirement of

    assets duringthe year

    Balance at the end of

    the year 31.03.16

    (a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)

    1 LAND (FREE HOLD) 22.23 0.95 - 23.19 23.19 1.21 - 24.40

    2 BUILDINGS 136.45 6.21 - 142.66 142.66 7.88 - 150.54

    3 PLANT & MACHINARY 1,719.02 83.38 (1.39) 1,801.00 1,801.00 105.93 (1.39) 1,905.54

    4 OFFICE EQUIPMENTS 6.00 1.06 (0.41) 6.65 6.65 1.35 (0.41) 7.59

    5 VEHICLES 8.27 - (0.03) 8.24 8.24 - (0.03) 8.22

    6FURNITURE & FIXTURE 3.65 0.37 (0.03) 3.99 3.99 0.47 (0.03) 4.43

    7 ELECTRICAL FITTINGS 4.35 1.29 - 5.64 5.64 1.64 - 7.28

    8 REF. & DOMESTIC

    APPLIANCES1.47 0.20 - 1.66 1.66 0.25 - 1.91

    Total 1,901.44 93.46 (1.86) 1,993.04 1,993.04 118.74 (1.86) 2,109.91

    (B) DepreciationAudited for FY 2010-11 (Rs. Crore)

    Additions during the yearRate of

    depreciation (%)

    Depreciation

    during the year

    Arrears of

    depreciation

    written off

    during the year

    Total

    1 LAND (FREE HOLD) - - - - - -

    2 BUILDINGS 37.49 62.78 2.87 2.87 - 40.35 60.76

    3 PLANT & MACHINARY 1,061.52 260.87 12.37 12.37 (1.25) 1,072.64 259.85

    4 OFFICE EQUIPMENTS 2.37 1.38 0.14 0.14 (0.36) 2.15 1.38

    5 VEHICLES 6.30 1.21 0.44 0.44 (0.03) 6.72 0.776

    FURNITURE & FIXTURE 1.46 0.81 0.07 0.07 (0.03) 1.51 0.79

    7 ELECTRICAL FITTINGS 0.10 0.42 0.04 0.04 - 0.14 0.56

    8 REF. & DOMESTIC

    APPLIANCES0.46 0.39 0.05 0.05 - 0.51 0.37

    TOTAL 1,109.71 327.86 15.98 - 15.98 (1.66) 1,124.03 324.47

    Balance

    depreciation at the

    beginning of the

    year (01.04.10)

    Balancedepreciation at

    the end of the

    year (31.03.11)

    Withdrawalsduring the year

    Accumulateddepreciation at the

    end of the year

    (31.03.11)

    FY 2015-16

    S.No. Particulars

    FY 2014-15

    S.No. Particulars

    Estimated

    Accumulated

    depreciation at

    the beginning of

    the year

    (01.04.10)

    Estimated

  • 8/10/2019 Financial Model for power plant

    19/45

    Actual though un-audited for FY 2011-12Additions during the year

    Rate of

    depreciation (%)

    Depreciation

    during the year

    Arrears of

    depreciation

    written off

    during the year

    Total

    1 LAND (FREE HOLD) - -

    2 BUILDINGS 40.35 60.76 3.21 3.21 - 43.56 57.54

    3 PLANT & MACHINARY 1,072.64 259.85 13.36 13.36 (0.51) 1,086.00 246.49

    4 OFFICE EQUIPMENTS 2.15 1.38 (0.64) (0.64) (0.00) 1.51 2.025 VEHICLES 6.72 0.77 (0.05) (0.05) (0.00) 6.67 0.82

    6 FURNITURE & FIXTURE 1.51 0.79 0.07 0.07 (0.00) 1.58 0.71

    7 ELECTRICAL FITTINGS 0.14 0.56 0.05 0.05 - 0.19 0.51

    8.

    0.51 0.37 (0.04) (0.04) (0.07) 0.47 0.40

    TOTAL 1,124.03 324.47 15.96 0 15.96 (0.58) 1,139.98 308.51

    Estimate for FY 2012-13

    Additions during the year

    Rate ofdepreciation (%)

    Depreciationduring the year

    Arrears ofdepreciation

    written off

    during the year

    Total

    1 LAND (FREE HOLD) - - - - - -

    2 BUILDINGS 43.56 57.54 4.12 4.12 - 47.69 60.05

    3 PLANT & MACHINARY 1,086.00 246.49 22.37 22.37 (1.25) 1,108.37 240.35

    4 OFFICE EQUIPMENTS 1.51 2.02 0.10 0.10 (0.37) 1.60 1.97

    5 VEHICLES 6.67 0.82 0.14 0.14 (0.02) 6.80 0.69

    6 FURNITURE & FIXTURE 1.58 0.71 0.09 0.09 (0.02) 1.67 0.767 ELECTRICAL FITTINGS 0.19 0.51 0.10 0.10 - 0.29 0.51

    8.

    0.47 0.40 0.04 0.04 - 0.51 0.34

    TOTAL 1,139.98 308.51 26.95 0 26.95 (1.67) 1,166.93 304.65

    Particulars

    Balance

    depreciation at the

    beginning of the

    year (01.04.11)

    Particulars

    Balance

    depreciation at

    the end of the

    year (31.03.12)

    Accumulated

    depreciation at the

    end of the year

    (31.03.12)

    Withdrawals

    during the year

    Accumulated

    depreciation at

    the beginning of

    the year

    (01.04.12)

    S.No.

    S.No.

    Balancedepreciation at the

    beginning of the

    year (01.04.12)

    Accumulated

    depreciation at

    the beginning of

    the year

    (01.04.11)

    Accumulated

    depreciation at theend of the year

    (31.03.13)

    Balance

    depreciation atthe end of the

    year (31.03.13)

    Withdrawals

    during the year

  • 8/10/2019 Financial Model for power plant

    20/45

    Estimate for FY 2013-14

    Additions during the year

    Rate of

    depreciation (%)

    Depreciation

    during the year

    Arrears of

    depreciation

    written off

    during the year

    Total

    1 LAND (FREE HOLD) - - - - - -

    2 BUILDINGS 47.69 60.05 4.09 4.09 - 51.78 62.68

    3 PLANT & MACHINARY 1,108.37 240.35 21.68 21.68 (1.25) 1,130.05 306.114 OFFICE EQUIPMENTS 1.60 1.97 0.09 0.09 (0.37) 1.69 2.65

    5 VEHICLES 6.80 0.69 0.14 0.14 (0.02) 6.94 0.53

    6 FURNITURE & FIXTURE 1.67 0.76 0.09 0.09 (0.02) 1.76 1.04

    7 ELECTRICAL FITTINGS 0.29 0.51 0.09 0.09 - 0.37 1.80

    8.

    0.51 0.34 0.03 0.03 - 0.55 0.51

    TOTAL 1,166.93 304.65 26.20 0 26.20 (1.67) 1,193.13 375.33

    Estimate for FY 2014-15

    Additions during the yearRate of

    depreciation (%)

    Depreciation

    during the year

    Arrears of

    depreciation

    written off

    during the year

    Total

    1 LAND (FREE HOLD) - - - - - - - -

    2 BUILDINGS 51.78 62.68 4.45 4.45 - 56.23 66.58

    3 PLANT & MACHINARY 1,130.05 306.11 29.35 29.35 (1.25) 1,159.40 387.72

    4 OFFICE EQUIPMENTS 1.69 2.65 0.20 0.20 (0.37) 1.89 3.51

    5 VEHICLES 6.94 0.53 0.13 0.13 (0.02) 7.07 0.376 FURNITURE & FIXTURE 1.76 1.04 0.13 0.13 (0.02) 1.89 1.39

    7 ELECTRICAL FITTINGS 0.37 1.80 0.23 0.23 - 0.60 3.31

    8.

    0.55 0.51 0.06 0.06 - 0.60 0.72

    TOTAL 1,193.13 375.33 34.55 0 34.55 (1.67) 1,227.68 463.60

    Estimate for FY 2015-16

    Additions during the year

    Rate of

    depreciation (%)

    Depreciation

    during the year

    Arrears of

    depreciationwritten off

    during the year

    Total

    1 LAND (FREE HOLD) - - - - - -

    2 BUILDINGS 56.23 66.58 4.63 4.63 - 60.86 67.53

    3 PLANT & MACHINARY 1,159.40 387.72 31.80 31.80 (1.25) 1,191.20 429.70

    4 OFFICE EQUIPMENTS 1.89 3.51 0.26 0.26 (0.37) 2.15 3.84

    5 VEHICLES 7.07 0.37 0.12 0.12 (0.02) 7.19 0.23

    6 FURNITURE & FIXTURE 1.89 1.39 0.15 0.15 (0.02) 2.04 1.55

    7 ELECTRICAL FITTINGS 0.60 3.31 0.30 0.30 - 0.91 4.17

    8 . 0 60 0 72 0 06 0 06 0 67 0 83

    Accumulated

    depreciation at

    the beginning of

    the year

    (01.04.14)

    Balance

    depreciation at the

    beginning of the

    year (01.04.14)

    S.No. Particulars

    Particulars

    Accumulated

    depreciation at

    the beginning of

    the year

    (01.04.13)

    Balance

    depreciation at the

    beginning of the

    year (01.04.13)

    S.No.

    Withdrawals

    during the year

    Accumulated

    depreciation at

    the beginning ofthe year

    (01.04.15)

    Balance

    depreciation at thebeginning of the

    year (01.04.15)

    Withdrawals

    during the year

    Accumulated

    depreciation at the

    end of the year(31.03.16)

    Balance

    depreciation at

    the end of the

    year (31.03.14)

    Withdrawalsduring the year

    Accumulateddepreciation at the

    end of the year

    (31.03.15)

    Balancedepreciation at

    the end of the

    year (31.03.15)

    Accumulated

    depreciation at the

    end of the year

    (31.03.14)

    Balance

    depreciation at

    the end of theyear (31.03.16)S.No. Particulars

  • 8/10/2019 Financial Model for power plant

    21/45

    (C) Advance Against Depreciation

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual Estimated Estimated Estimated Estimated Estimated

    (a) (b) (c) (d) (e) (f)

    1 Cumulative depreciation at

    the end of the year

    2 Depreciation for the year

    3 Cumulative loan repayment at

    the end of the year

    4Loan repayment for the year

    5

    6 Excess of cumulative loan

    repayment over cumulative

    depreciation

    7 Excess of loan repayment

    over depreciation during the

    year

    8 Loan amount admitted

    9

    1/10th of the loan amount

    admitted

    10

    Cumulative 'Advance Against

    Depreciation' at the beginning

    of the year

    11

    Additional 'Advance Against

    Depreciation' during the year

    12

    Reduction in 'Advance

    Against Depreciation' during

    the year

    13

    Cumulative 'Advance Against

    Depreciation' at the end of the

    year

    S.No. ReferenceParticulars

  • 8/10/2019 Financial Model for power plant

    22/45

    (Rs. Crore)

    Balance at the

    beginning of the

    year 01.04.10

    Additions during

    the year

    Retirement of

    assets during the

    year

    Balance at the end

    of the year

    31.03.11

    Balance at the

    beginning of the

    year 01.04.11

    Additions

    during the

    year

    Retirement of

    assets during

    the year

    Balance at the end of

    the year 31.03.12

    (a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)

    1 LAND (FREE HOLD) 19.51 19.65 19.65 19.69

    2 BUILDINGS 73.92 71.99 71.99 76.14

    3 PLANT & MACHINARY 407.80 407.90 407.90 412.57

    4 OFFICE EQUIPMENTS 1.80 1.77 1.77 2.46

    5 VEHICLES 2.04 1.60 1.60 1.65

    6FURNITURE & FIXTURE

    1.06 1.04 1.04 1.12

    7 ELECTRICAL FITTINGS 0.48 0.64 0.64 0.70

    8 REF. & DOMESTIC

    APPLIANCES 0.48 0.46 0.46 0.47

    Total 507.10 - - 505.06 505.06 - - 514.80

    Balance at the

    beginning of the

    year 01.04.12

    Additions during

    the year

    Retirement of

    assets during the

    year

    Balance at the end

    of the year

    31.03.13

    Balance at the

    beginning of the

    year 01.04.13

    Additions

    during the

    year

    Retirement of

    assets during

    the year

    Balance at the end of

    the year 31.03.14

    (a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)

    1 LAND (FREE HOLD) 19.69 20.81 20.81 22.23

    2 BUILDINGS 76.14 79.49 79.49 84.68

    3 PLANT & MACHINARY 412.57 487.36 487.36 588.97

    4 OFFICE EQUIPMENTS 2.46 3.22 3.22 4.315 VEHICLES 1.65 1.49 1.49 1.33

    6FURNITURE & FIXTURE 1.12 1.44 1.44 1.88

    7 ELECTRICAL FITTINGS 0.70 2.13 2.13 3.98

    8 REF. & DOMESTIC

    APPLIANCES0.47 0.66 0.66 0.92

    Total 514.80 - - 596.61 596.61 - - 708.30

    FY 2010-11

    Audited

    FY 2011-12

    (D) Net Fixed Assets

    Actual though un-audited

    S.No. Particulars

    S.No. Particulars

    FY 2012-13 FY 2013-14

    Estimated Estimated

  • 8/10/2019 Financial Model for power plant

    23/45

    Balance at thebeginning of the

    year 01.04.14

    Additions duringthe year

    Retirement ofassets during the

    year

    Balance at the endof the year

    31.03.15

    Balance at thebeginning of the

    year 01.04.15

    Additionsduring the

    year

    Retirement ofassets during

    the year

    Balance at the end ofthe year 31.03.16

    (a) (b) (c) (d) = (a) + (b) - (c) (e) (f) (g) (h) = (e) + (f) - (g)

    1 LAND (FREE HOLD) 22.23 23.19 23.19 24.40

    2 BUILDINGS 84.68 86.43 86.43 89.68

    3 PLANT & MACHINARY 588.97 641.60 641.60 714.34

    4 OFFICE EQUIPMENTS 4.31 4.76 4.76 5.44

    5 VEHICLES 1.33 1.17 1.17 1.03

    6 FURNITURE & FIXTURE 1.88 2.10 2.10 2.39

    7 ELECTRICAL FITTINGS 3.98 5.04 5.04 6.38

    8 REF. & DOMESTIC

    APPLIANCES0.92 1.06 1.06 1.25

    Total 708.30 - - 765.35 765.35 - - 844.91

    S.No. Particulars

    FY 2014-15 FY 2015-16

    Estimated Estimated

  • 8/10/2019 Financial Model for power plant

    24/45

    Existing Long-term Loans (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actuals)Order Difference Estimated Estimated Estimated Estimated Estimated

    (a) (b)` ('c) = (b) - (a) (d) (e) (f) (g) (h)

    Loans on normative norms at 70 :

    30 Debt : E uit ratio

    1Projects completed & capitalised

    during 2003-040.02 0.02 0.01 0.01 0.00 0.00

    2 Projects started in 2004-05 0.04 0.04 0.03 0.02 0.01 0.003 Projects started in 2005-06 0.38 0.35 0.27 0.18 0.09 0.01

    4 New Projects of 2006-07 0.30 0.40 0.37 0.34 0.30 0.27

    5 New Projects of 2007-08 11.37 15.36 14.37 13.38 12.39 11.40

    6 New Projects of 2008-09 1.09 1.30 1.22 1.14 1.05 0.97

    7 New Projects of 2009-10 2.81 3.40 3.21 3.01 2.82 2.62

    8 New Projects of 2010-11 0.40 1.01 0.95 0.90 0.84 0.79

    9New Projects of Business Plan

    Period0.98 6.66 17.16 24.82 28.79

    9 Gross Interest Expenses 16.43

    10 Less: Expenses Capitalised 0.10

    11 Net Interest Expenses 16.32 18.04 22.86 27.09 36.13 42.34 44.84

    New Loans (only for Renovation and Modernisation Schemes)(Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March (Actual) Order Difference Estimated Estimated Estimated Estimated Estimated

    (a) (b)` ('c) = (b) - (a) (d) (e) (f) (g) (h)

    Loans on normative norms at 70 :

    30 Debt : Equity ratio

    1New Loans taken for Capex during

    FY 11-12 to FY 15-160.00 0.00 0.00 0.00 0.00

    2

    3

    4

    5

    6

    7

    8

    9 Gross Interest Expenses 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    10 Less: Expenses Capitalised

    11 Net Interest Expenses 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Other Finance Charges (only for Renovation and Modernisation Schemes)(Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March (Actual) Estimated Estimated Estimated Estimated Estimated

    FY 2010-11

    Source of Loan

    S.No. Source of Loan

    S.No. Reference

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 5: Interest Expenses

    Dahanu Thermal Power Station (DTPS)

    S.No. Source of Loan Reference

    Reference

    FY 2010-11

  • 8/10/2019 Financial Model for power plant

    25/45

    Existing Long-term Loans (Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual Estimated Estimated Estimated Estimated Estimated

    1 Projects completed & capitalised during 2003-04Loan Amount Admitted by Commission 0.47 0.47 0.47 0.47 0.47

    Opening Balance of Loan 0.24 0.19 0.14 0.10 0.05

    Loan Drawal during the year - - - - -

    Loan Repayment during the year 0.05 0.05 0.05 0.05 0.05

    Closing Balance of Loan 0.19 0.14 0.10 0.05 0.00

    Applicable Interest Rate (%) 10.00% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 0.02 0.02 0.01 0.01 0.00

    2 Projects started in 2004-05

    Loan Amount Admitted by Commission 0.78 0.78 0.78 0.78 0.78Opening Balance of Loan 0.47 0.39 0.31 0.24 0.16

    Loan Drawal during the year - - - - -

    Loan Repayment during the year 0.08 0.08 0.08 0.08 0.08

    Closing Balance of Loan 0.39 0.31 0.24 0.16 0.08

    Applicable Interest Rate (%) 10.00% 12% 12% 12% 12%

    Interest Expenses 0.04 0.04 0.03 0.02 0.01

    Source of Loan Reference

    Reliance Infrastructure Limited (Generation Business)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 5.1: Interest Expenses (Breakup of Existing and New Loans)

    Dahanu Thermal Power Station (DTPS)

    S.No.

  • 8/10/2019 Financial Model for power plant

    26/45

    Existing Long-term Loans (Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual Estimated Estimated Estimated Estimated Estimated

    Source of Loan Reference

    Reliance Infrastructure Limited (Generation Business)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 5.1: Interest Expenses (Breakup of Existing and New Loans)

    Dahanu Thermal Power Station (DTPS)

    S.No.

    3 Projects started in 2005-06

    Loan Amount Admitted by Commission 7.50 7.50 7.50 7.50 7.50 7.50

    Opening Balance of Loan 4.20 3.45 2.70 1.95 1.20 0.45

    Loan Drawal during the year - - - - - -

    Loan Repayment during the year 0.75 0.75 0.75 0.75 0.75 0.75

    Closing Balance of Loan 3.45 2.70 1.95 1.20 0.45 (0.30)

    Applicable Interest Rate (%) 10.00% 11.50% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 0.38 0.35 0.27 0.18 0.09 0.01

    4 New Projects of 2006-07Loan Amount Admitted by Commission 5.91 5.91 5.91 5.91 5.91 5.91

    Opening Balance of Loan 3.95 3.65 3.36 3.06 2.77 2.47

    Loan Drawal during the year - - - - - -

    Loan Repayment during the year 0.30 0.30 0.30 0.30 0.30 0.30

    Closing Balance of Loan 3.65 3.36 3.06 2.77 2.47 2.18

    Applicable Interest Rate (%) 8.00% 11.50% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 0.30 0.40 0.37 0.34 0.30 0.27

    5 New Projects of 2007-08

    Loan Amount Admitted by Commission 172.34 172.34 172.34 172.34 172.34 172.34

    Opening Balance of Loan 146.49 137.87 129.26 120.64 112.02 103.41

    Loan Drawal during the year - - - - - -

    Loan Repayment during the year 8.62 8.62 8.62 8.62 8.62 8.62

    Closing Balance of Loan 137.87 129.26 120.64 112.02 103.41 94.79

    Applicable Interest Rate (%) 8.00% 11.50% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 11.37 15.36 14.37 13.38 12.39 11.40

    6 New Projects of 2008-09

    Loan Amount Admitted by Commission 14.64 14.64 14.64 14.64 14.64 14.64

    Opening Balance of Loan 12.44 11.71 10.98 10.24 9.51 8.78

    Loan Drawal during the year - - - - - -

    Loan Repayment during the year 0.73 0.73 0.73 0.73 0.73 0.73

    Closing Balance of Loan 11.71 10.98 10.24 9.51 8.78 8.05

    Applicable Interest Rate (%) 9.00% 11.50% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 1.09 1.30 1.22 1.14 1.05 0.97

  • 8/10/2019 Financial Model for power plant

    27/45

    Existing Long-term Loans (Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual Estimated Estimated Estimated Estimated EstimatedSource of Loan Reference

    Reliance Infrastructure Limited (Generation Business)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 5.1: Interest Expenses (Breakup of Existing and New Loans)

    Dahanu Thermal Power Station (DTPS)

    S.No.

    7 New Projects of 2009-10

    Loan Amount Admitted by Commission 33.76 33.76 33.76 33.76 33.76 33.76

    Opening Balance of Loan 32.09 30.40 28.71 27.03 25.34 23.65

    Loan Drawal during the year - - - - - -Loan Repayment during the year 1.69 1.69 1.69 1.69 1.69 1.69

    Closing Balance of Loan 30.40 28.71 27.03 25.34 23.65 21.96

    Applicable Interest Rate (%) 9.00% 11.50% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 2.81 3.40 3.21 3.01 2.82 2.62

    New Projects of 2010-11

    Loan Amount Admitted by Commission 9.46 9.46 9.46 9.46 9.46 9.46

    Opening Balance of Loan - 8.99 8.51 8.04 7.57 7.10

    Loan Drawal during the year 9.46 - - - - -

    Loan Repayment during the year 0.47 0.47 0.47 0.47 0.47 0.47Closing Balance of Loan 8.99 8.51 8.04 7.57 7.10 6.62

    Applicable Interest Rate (%) 8.95% 11.50% 11.50% 11.50% 11.50% 11.50%

    Interest Expenses 0.40 1.01 0.95 0.90 0.84 0.79

    9 Gross Interest Expenses 16.43 21.89 20.43 18.97 17.51 16.05

    10 Less: Expenses Capitalised 0.10 0 0 0 0 0

    11 Net Interest Expenses 16.32 21.89 20.43 18.97 17.51 16.05

  • 8/10/2019 Financial Model for power plant

    28/45

    Existing Long-term Loans (Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual Estimated Estimated Estimated Estimated EstimatedSource of Loan Reference

    Reliance Infrastructure Limited (Generation Business)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 5.1: Interest Expenses (Breakup of Existing and New Loans)

    Dahanu Thermal Power Station (DTPS)

    S.No.

    (Rs. Crore)

    S.No. Particulars FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Opening Loan 199.88 196.66 183.98 171.29 158.61 145.93

    Loan Drawal during the year 9.46 0.00 0.00 0.00 0.00 0.00

    Loan Repayment during the year 12.68 12.68 12.68 12.68 12.68 12.56

    Closing Loan Balance 196.66 183.98 171.29 158.61 145.93 133.38

    New Loans (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Estimated Estimated Estimated Estimated Estimated

    1 New Projects of Business Plan Period**

    Opening Balance of Loan 0.00 17.00 98.88 199.56 232.17

    Loan Drawal during the year 18.41 90.24 118.13 54.22 62.82

    Loan Repayment during the year 1.42 8.36 17.44 21.62 26.45

    Closing Balance of Loan 17.00 98.88 199.56 232.17 268.54

    Interest Expenses 0.98 6.66 17.16 24.82 28.79

    7Reduction in Loan Capital on account of

    retirement/re lacement of assets

    8Reduction in Interest expenses due to reduction of Loan

    Capital under Sl.7 above

    9 Gross Interest Expenses 0.98 6.66 17.16 24.82 28.79

    10 Less: Expenses Capitalised 0 0 0 0 0

    11 Net Interest Expenses 0.98 6.66 17.16 24.82 28.79

    Note: * * : The detail computation of the IDC and I nterest cost chargeable to revenue is being submi tted as Exhibit D

    (Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    Actual Estimated Estimated Estimated Estimated Estimated

    1 Gross Interest Expenses 16.43 22.86 27.09 36.13 42.34 44.84

    2 Less: Expenses Capitalised 0.10 0.00 0.00 0.00 0.00 0.00

    3 Net Interest Expenses 16.32 22.86 27.09 36.13 42.34 44.84

    Loan Schedule for Previous Capex Schemes

    S.No. Particulars

    S.No. Source of Loan Reference

  • 8/10/2019 Financial Model for power plant

    29/45

    Project Details

    Original Revised Actual Original Revised Actual Original

    FY 2009-10

    a) DPR Schemes

    (i) In-principle approved by

    MERCREL-G/FY07/03 Spare HP Turbine Module Heat Rate improvement Sep-08 Sep-08 Nov-09 Nov-09 22.7

    REL-G/FY05/01 III. Construction of Ash Dyke (Pond no.4)Ash storage and subsequent

    utilization.Jul-07 Jul-07 Mar-09 Mar-11 2.1

    REL-G/FY08/01 II.Coarse Ash Grinding Unit To increase Ash Utilization Apr-10 Apr-10 Mar-11 Mar-13 29.7

    RINFRA-G/DPR/FY10/1.1

    Upgradation of Unit # 2 UPS, 48V Switchyard

    Battery System and +/-24V Battery to improve

    reliability of power supply back-up systems

    To improve reliability of

    power supply back-up systemsFeb-09 Feb-09 Mar-10 Mar-13 0.8

    RINFRA-G/DPR/FY10/1.2

    Up gradation of existing relay logic of Ash

    Pump House to PLC based system in andUpgradation of PLC systems of Condensate

    Policin Unit (CPU) and H dro en Drier

    To improve reliability and

    availbability of the systems.Technology up gradation

    Sep-09 Sep-09 Mar-11 Mar-13 0.3

    RINFRA-G/DPR/FY10/1.3

    Modernization and Upgradation of Electronic

    Cards of PR05 Module, BK03C Module, EB02

    & EA02 Cards for improving reliability of the

    system and plant

    To improve reliability of the

    system and plantNov-09 Mar-11 Mar-13 4.0

    RINFRA-G/DPR/FY10/1.4

    Upgradation of Fire Alarm system and CCTV

    system for enhancing safety and security of

    ersonnel and lant.

    To enhance safety and security

    of personnel and plant.Jan-09 Jan-09 Mar-11 Mar-13 1.6

    RINFRA-G/DPR/FY10/1.5

    Upgradation of Secondary Air Damper Control

    (SADC) to optimize excess air and efficiency ofthe lant

    To optimize excess air and

    efficiency of the plant. Mar-09 Mar-09 Jan-10 Jan-10 0.0

    RINFRA-G/DPR/FY10/1.6

    Installation of Flow transmitters at Condenser

    Cooling Water Inlet to optimize operations of

    condenser and CW system

    To optimize operations of

    condenser and CW system.Nov-09 Nov-09 Aug-10 Aug-10 0.1

    RINFRA-G/DPR/FY10/1.7

    Upgradation of ESP Field Controller & Opacity

    Monitor for better monitoring of ESP

    performance and environmental monitoring

    For better monitoring of ESP

    performance and

    environmental parameters.

    Apr-09 Apr-09 Mar-13 1.6

    RINFRA-G/DPR/FY10/1.8

    Upgradation of metering system in 220KV

    system to meet accuracy requirements of CEA

    Regulations.

    To meet accuracy requirements

    of CEA Regulations.Apr-09 Apr-09 Mar-13 1.1

    RINFRA-G/DPR/FY10/1.9

    Upgradation of 6.6KV Line PTs & Bus PTs to

    improve electricity safety and reliability of the

    s stem.

    To improve electrical safety

    and reliability of the system.Apr-09 Apr-09 Mar-11 Mar-13 0.2

    RINFRA-G/DPR/FY10/1.10

    Purchase of Electrical Testing & Measuring

    Instruments for better diagnosis of electrical

    installations to improve safety, availability and

    reliabilit .

    For better diagnosis of

    electrical installations to

    improve safety, availability

    and reliabilit .

    Apr-09 Apr-09 Mar-12 Mar-13 1.0

    RINFRA-G/DPR/FY10/1.11Upgradation of LT Circuit Breakers to improve

    reliability of LT.

    To improve reliability of LT

    auxiliaries.Apr-09 Apr-09 Mar-11 Mar-13 0.3

    RINFRA G/DPR/FY10/1 12

    Replacement of existing transformer of stacker

    reclaimer to improve availability of Stacker

    To improve availability of

    Stacker Reclaimer and A 09 A 09 M 11 M 13 0 0

    Project Start Date

    Project PurposeProject Title

    Form 5.3: Capital Expenditure Schemes

    Reliance Infrastructure Limited (Generation Business)

    Business Plan for FY 2011-12 to FY 2015-16

    Dahanu Thermal Power Station (DTPS)

    Project Code

    Project Completion date

  • 8/10/2019 Financial Model for power plant

    30/45

    Original Revised Actual Original Revised Actual Origin

    Project Start Date

    Project PurposeProject TitleProject Code

    Project Completion date

    RINFRA-G/DPR/FY10/1.16

    Up-gradation of UPS of Ambient Air Quality

    Monitoring stations for reliable and continuous

    monitoring of environmental parameters

    For reliable and continuous

    monitoring of environmental

    parameters

    Apr-09 Apr-09 Mar-10 Mar-11 Mar-11 0

    RINFRA-G/DPR/FY10/1.17

    Purchase of Spare CW Pump Motor (6.6 KV

    1260 kW) for improving availability and

    reliability of Cooling Water system

    For improving availability and

    reliability of Cooling Water

    system

    Apr-09 Apr-09 Dec-09 Dec-09 1

    RINFRA-G/DPR/FY10/1.18

    Purchase of Spare Alternator for Diesel

    Locomotive for improving reliability of Coal

    Handling System

    For improving reliability of

    Coal Handling SystemApr-09 Jul-09 Jul-09 Jul-09 0

    RINFRA-G/DPR/FY10/1.19 Up-gradation of control system of GeneratorTransformer (GT) Cooler to improve reliability

    of GT.

    To improve reliability ofGenerator Transformer.

    Apr-09 Apr-09 Mar-11 Mar-11 0

    RINFRA-G/DPR/FY10/1.20

    Procurement of common spare for Neutral

    Grounding Transformer (NGT) for Generators

    to improve reliability of Units

    To improve reliability of Units. Apr-10 Apr-10 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY10/1.21

    Renovation and Modernization of Air Pre-

    heater Heater (APH) of Unit # 2 to improve the

    efficiency of the Unit

    To improve the efficiency of

    the Unit.May-09 May-09 Nov-09 Nov-09 2

    RINFRA-G/DPR/FY10/1.22

    Reliability Improvement through replacement of

    Silencer assemblies of Primary Air Fan &

    Forced Draft fan in Unit # 2

    Reliability Improvement. May-09 May-09 Nov-09 Nov-09 0

    RINFRA-G/DPR/FY10/1.23

    Procurement of Low Vacuum Dehydration

    (LVDH) Machine for recovery and recycling of

    spent lubrication oil from Turbine and Boiler

    Feed Pum (BFP)

    For recovery and recycling of

    spent lubrication oil.Apr-09 Apr-09 Dec-10 Mar-13 0

    RINFRA-G/DPR/FY10/1.24

    Replacement of Auxiliary Steam pressure

    control valve in Unit#2 (AS-22) for efficient

    utilization of steam.

    For efficient utilization of

    steam.Apr-09 Apr-09 Nov-09 Nov-09 0

    RINFRA-G/DPR/FY10/1.25 Up-gradation of IT Infrastructure at DTPS

    Upgradation of officer

    computers and peripherals.

    Improving reliability ofnetwork link.

    Aug-09 Aug-09 Mar-15 2

    RINFRA-G/DPR/FY10/1.26Procurement of Software (for auto back-up of

    data and power plant performance analysis)Better work efficiency. Aug-09 Aug-09 Mar-10 Mar-13 0

    RINFRA-G/DPR/FY10/1.27

    Office Modernization (Mechanical Maintenance

    Building in Service Building and CHP

    Maintenance Building)

    To provide safe, hygenic work

    environment with modern

    office equipments to increase

    the office productivity.

    Dec-09 Dec-09 Mar-10 Mar-12 0

    79

    (ii) Yet to receive in-principle

    MERC a roval

    RINFRA-G/DPR/FY10/2.1 Township Residential area renovationTownship Residential area

    renovationSep-09 Sep-09 Mar-15 14

    RINFRA-G/DPR/FY10/2.2 Construction of Boundry wall Construction of Boundry wall Apr-10 Apr-10 Mar-14 7

    21

    b) Non-DPR Schemes

    RINFRA-G/NDPR/FY08/03 LAND (For Ash Pond No.4 at Asangaon)Ash storage and subsequent

    utilization.Jul-08 Jul-08 Jun-10 Mar-12 Mar-12 0

    Safe hygienic work

  • 8/10/2019 Financial Model for power plant

    31/45

    Original Revised Actual Original Revised Actual Origin

    Project Start Date

    Project PurposeProject TitleProject Code

    Project Completion date

    RINFRA-G/NDPR/FY09/10UPGRADATION OF TURBINE GOVERING

    SYSTEMReliability improvement Apr-10 Mar-11 Dec-10 3

    RINFRA-G/NDPR/FY09/11 SIMULATOR To train engineers & other

    staff in power plant operation.Jul-08 Jul-08 Mar-10 Mar-11 Mar-11 1

    RINFRA-G/NDPR/FY09/13 VAPOR ABSORPTION SYSTEM

    Energy Conservation and

    improvement in environmental

    performance

    Apr-08 Apr-08 Dec-09 Mar-11 Mar-11 2

    RINFRA-G/NDPR/FY09/14

    CONSTRUCTION OF ROADS (On east side

    of DTPS for material handling and along the

    fencing for Security patrolling)

    For smooth vehicular

    movement and improved

    security patrolling.

    Dec-08 Dec-08 Jun-10 Jun-10 1

    RINFRA-G/NDPR/FY09/15.1Computer Peripherals for Offices (OFFICE

    EQUIPMENTS)

    Routine

    replacement/upgradation of

    Computer Systems for

    sustained erformance.

    Apr-08 Apr-08 May-09 May-09 0

    RINFRA-G/NDPR/FY10/01 Jeep and Motor Cycle for Security PatrollingImprovement in security

    efficiencJul-09 Jul-09 Dec-09 Dec-09 0

    RINFRA-G/NDPR/FY10/02Construction of allseason bituminous road at

    Kom ada to ease the trafficSmooth Vehicular movement Nov-09 Nov-09 May-10 Mar-13 1

    RINFRA-G/NDPR/FY10/03Asphalting to Widened Portion of Motapada

    Road for smooth vehicular movement

    For smooth vehicular

    movement.Apr-10 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/04Construction of Peripheral WBM Roads for

    Security MovementFor Security Movement Apr-10 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/05

    Construction Of Peripheral Retaining Wall to

    prevent entry the High tide water in to colony

    premises

    to prevent entry the High tide

    water in to colony premisesFeb-09 Feb-09 Apr-10 Apr-10 0

    RINFRA-G/NDPR/FY10/06

    Construction Of RCC Approach Road Near

    Railway Crossing for smooth vehicular

    movement

    For smooth vehicular

    movementApr-10 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/07Installation Of Turbo Wind Ventilators At TG

    Roof for Ener ConservationEnergy Conservation Dec-08 Dec-08 Aug-10 Mar-13 0

    RINFRA-G/NDPR/FY10/08 Solar Charging System For Ups Of AAQM AtKosbad for Ener Conservation.

    Energy Conservation Apr-10 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/09Hybrid Wind Solar Lighting System At Tech.

    Training Center for Energy ConservationEnergy Conservation Apr-10 Apr-12 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/10 Energy Conservation in Service air system. Energy Conservation Apr-09 Apr-09 Nov-09 Nov-09 0

    RINFRA-G/NDPR/FY10/11

    Electro-Chlorination for Drinking Water to

    reduce risk associated with bulk storage and

    handling of hazardous Chlorine gas

    to reduce risk associated with

    bulk storage and handling of

    hazardous Chlorine gas

    Jul-09 Jul-09 Nov-09 Nov-09 0

    RINFRA-G/NDPR/FY10/12

    Belt Vulcanizing Machine to speed up the belt

    joining process & Industrial Vacuum Cleaner

    for dust free environment inside the Conveyor

    tunnels in CHP

    To speed up the coal conveyorbelt joining process.

    To create a safe and dust free

    environment inside the

    Conveyor tunnels in CHP.

    Apr-10 Apr-12 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/13Replacement Of Stacker/ Reclaimer Bucket

    Wheel Bod for reliabilit im rovement

    To enhance life of the Stacker-

    Reclaimer.Apr-10 Apr-12 Mar-11 Mar-13 0

    RINFRA-G/NDPR/FY10/14

    Drip Irrigation System for water conservation

    and to demonstrate the growth and success of

    horticulture plantation at Dahanu coastal and

    Water conservation and to

    demonstrate the growth and

    success of horticulture

    plantation at Dahanu coastal

    Apr-09 Apr-09 Aug-10 Mar-13 0

  • 8/10/2019 Financial Model for power plant

    32/45

    Original Revised Actual Original Revised Actual Origina

    Project Start Date

    Project PurposeProject TitleProject Code

    Project Completion date

    RINFRA-G/NDPR/FY10/20Procurement of Fire protection equipments to

    im rove safet .To improve safety. Jun-09 Jun-09 Jan-10 Jan-10 0

    RINFRA-G/NDPR/FY10/21Procurement of spare Hydrogen Coolers for

    GeneratorReliability improvement Apr-09 Apr-09 Apr-09 Apr-09 0

    RINFRA-G/NDPR/FY10/22Procurement of spare Brushless Excitation

    S stem for GeneratorReliability improvement Apr-09 Apr-09 Apr-09 Apr-09 8

    RINFRA-G/NDPR/FY10/23 Procurement of spare Generator Circuit Breaker Reliability improvement Apr-09 Apr-09 Apr-09 Apr-09 0

    RINFRA-G/NDPR/FY10/24Procurement of spare OLTC for Station

    TransformerReliability improvement Apr-09 Apr-09 Apr-09 Apr-09 0

    24

    FY 2010-11

    a) DPR Schemes

    (i) In-principle approved by

    MERC

    (ii) Yet to receive in-principle

    MERC approval

    RINFRA-G/DPR/FY11/1.1

    Reliability improvement through upgradation of

    HP Bypass & LP Bypass system andTurbovisor

    Improved reliability of plant

    operation. Technology upradation

    Apr-10 Apr-11 Mar-11 Mar-13 3

    RINFRA-G/DPR/FY11/1.2Installation of Fire alarm System at Coal

    Handling Plant

    To enhance safety and security

    of personnel and plantApr-10 Apr-12 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.3Upgradation of Vibration Meaurement System

    for HT Auxilaries

    Improved reliability of plant

    operation. Technology up

    radation

    Apr-10 Apr-12 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.4Upgradation of PLCC and Master Clock for

    reliability improvement

    Improved reliability of plant

    operation. Technology up

    gradation

    Apr-10 Apr-12 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.5

    Upgaradation of MS Chloride Analyzer, pH

    Analyzer and Conductivity Analyzer for

    reliabilit im rovement.

    Improved reliability of plant

    operation. Technology up

    radation

    Apr-10 Apr-11 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.6

    Upgradation of Water Flow meters in Kawdas

    Pump House and Plant Area for reliability

    improvement.

    Reliability improvement.

    Technology up gradationApr-10 Apr-11 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.7Upgradation of Weigh Bridge at Main Store

    for reliabilit im rovement.Reliability improvement. Apr-10 Apr-11 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.8

    Installation of PLC for Vapour Absorption

    Machine (Air Conditioning) for reliability

    im rovement..

    To improve reliability and

    availability of the systems.Apr-10 Apr-11 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.9

    Upgradation of +24 V battery set U#1 and

    UPS batteries at Switchyard for reliability

    im rovement.

    To improve reliability and

    availability of the systems.Apr-10 Apr-11 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.10

    Remote indication of Flame Scanners and Mill

    Lube oil system pressure for reliability

    im rovement.

    Improved reliability of plant

    operation. Technology up

    radation

    Apr-10 Apr-11 Mar-11 Mar-13 0

    RINFRA-G/DPR/FY11/1.11Upgradation of Boiler Feed Pump (BFP) Scoop

    controllerTechnology up gradation Apr-10 Apr-14 Mar-11 Mar-15 0

    RINFRA-G/DPR/FY11/1.12Energy Conservation through installatn of

    Variable Fre uenc Drive for TG lift Unit 1.Energy Conservation Apr-10 Apr-11 Mar-11 Mar-13 0

    Replacement of street lights with energy

  • 8/10/2019 Financial Model for power plant

    33/45

  • 8/10/2019 Financial Model for power plant

    34/45

    Original Revised Actual Original Revised Actual Original

    Project Start Date

    Project PurposeProject TitleProject Code

    Project Completion date

    RINFRA-G/NDPR/FY11/05Installation of Intermediate Controller forinstrument Compressed Air System for Energy

    Conservation

    Energy Conservation Apr-10 Apr-12 Apr-10 Mar-11 Mar-13 0.08

    RINFRA-G/NDPR/FY11/06

    Energy Conservation through replacement of

    street lights with LED/CFL street lighting/Other

    ener savin initiatives

    Energy Conservation Apr-10 Apr-10 Mar-11 Mar-13 0.60

    RINFRA-G/NDPR/FY11/07Procurement of Screw compressor (Air

    Compressor) for Energy ConservationEnergy Conservation Apr-10 Apr-13 Mar-11 Mar-14 5.50

    RINFRA-G/NDPR/FY11/08 Construction of Record Storage Shed. For storing records. Apr-10 Apr-10 Mar-11 Mar-13 0.45

    RINFRA-G/NDPR/FY11/09 Debris filter for both units to improve Vacuum. Vacuum improvement Apr-10 Mar-11 Mar-13 4.00

    RINFRA-G/NDPR/FY11/10 RENOVATION OF SECURITY OFFICE Better work environment. Apr-10 Apr-10 Mar-11 Mar-13 0.10

    RINFRA-G/NDPR/FY11/11 Disaster Management System Disaster Management System Apr-10 Apr-10 Mar-11 Mar-11 0.03

    RINFRA-G/NDPR/FY11/12Purchase of new AAQM equipments as per

    MoEF notificationStatotory requirement Apr-10 Apr-10 Mar-11 Mar-11 0.47

    RINFRA-G/NDPR/FY11/13Procurement of Fire protection equipments to

    improve safetySafety improvement Apr-10 Apr-10 Mar-11 Mar-11 0.03

    15.91

    FY 2011-12

    a) DPR Schemes

    (i) In-principle approved by

    MERC

    (ii) Yet to receive in-principle

    MERC a roval

    RInfra-G/DPR/BP11-16/01

    Renovation & Modernization Of Ash Handling

    SystemLegal Compliance and

    Renovation & ModernizationApr-2011 Apr-2011 Mar-16 21.20

    RInfra-G/DPR/BP11-16/02Renovation & Modernization Of Turbine and

    its auxiliariesReliability Improvement Apr-2011 Apr-2011 Mar-16 43.60

    RInfra-G/DPR/BP11-16/03

    Renovation & Modernization Of Boiler and its

    auxiliaries Reliability Improvement Apr-2011 Apr-12 Mar-16 22.90

    RInfra-G/DPR/BP11-16/04

    Renovation & Modernization Of Offsite Plant

    auxiliariesAvailability and Reliability

    ImprovementApr-2011 Apr-2011 Mar-2016 18.09

    RInfra-G/DPR/BP11-16/05

    Renovation & Modernization Of Flue Gas

    Desulphurization Reliability Improvement Apr-2011 Apr-12 Mar-16 9.80

    RInfra-G/DPR/BP11-16/06 Procurement of Generator Rotor Improvement in Boiler

    combustion efficienc .Apr-2011 Apr-12 Mar-2015 29.00

    RInfra-G/DPR/BP11-16/07 Procurement of Generator Transformer Availability Improvement Apr-2011 Apr-12 Mar-2016 16.00

    RInfra-G/DPR/BP11-16/08Energy Conservation in Main Plant Auxiliaries

    and Balance of Plant

    For Reliabie Measurement of

    H2 purityApr-2011 Apr-12 Mar-16 12.60

    RInfra-G/DPR/BP11-16/09 Strengthening of Electrical System at DTPS For Safety Enhancement. Apr-2011 Apr-12 Mar-16 24.40

    RInfra-G/DPR/BP11-16/10Renovation & Modernization of Air Preheaters

    (APH) SealsEnergy Conservation. Apr-2011 Apr-12 Mar-14 0.38

    RInfra-G/DPR/BP11-16/11Renovation and modernization of lighting in

    lant control roomsEnergy Conservation. Apr-2011 Apr-12 Mar-13 0.16

    RInfra-G/DPR/BP11-16/12 Procurement of FFT and Ultrasonic Analyzers improved electrical protection. Apr-2011 Apr-12 Mar-14 0.40

    RI f G/DPR/BP11 16/13 Moderni ation of En ironment Monitoring R li bili I A 2011 A 2011 M 15 1 45

  • 8/10/2019 Financial Model for power plant

    35/45

    Original Revised Actual Original Revised Actual Original

    Project Start Date

    Project PurposeProject TitleProject Code

    Project Completion date

    RInfra-G/DPR/BP11-16/19Renovation & Development of DTPS Storesand Procurement of Material Handling

    E ui ments

    Reliability and Availability

    Improvement.Apr-2011 Apr-2011 Mar-15 5.66

    RInfra-G/DPR/BP11-16/20 Electro Clorination System Reliability Improvement. Apr-2011 Apr-12 Mar-12 11.00

    RInfra-G/DPR/BP11-16/21 Tube Conveyor from Jetty to Coal Yard Reliability Improvement. Apr-2011 Apr-12 Mar-13 50.00

    NDPRS

    NDPR/BP11-16/01Renovation and Modernization of Offices, TTC

    Canteen etcReliability Improvement. Apr-2011 Apr-2011 Mar-16 2.00

    NDPR/BP11-16/02 Procurement of Chemical Analysers Safety Improvement. Apr-2011 Apr-2011 Mar-16 1.01

    NDPR/BP11-16/03

    Procurement & Renovation of

    Vehicles, ACs, Refrigerators and Deep Freezers Safety Improvement. Apr-2011 Apr-2011 Mar-16 1.51

    NDPR/BP11-16/04 Construction of Capex Store Vacuum Improvement. Apr-08 May-08 Mar-12 Mar-12 4.81

    NDPR/BP11-16/05 Civil Works at DTPSVacuum & Heat Rate

    improvement.Apr-2011 Mar-16 17.50

    NDPR/BP11-16/06Modernization & Automation of Greenbelt at

    DTPSReliability Improvement. Apr-2011 Apr-12 Mar-13 0.60

    NDPR/BP11-16/07 Procurement of thermovision camera Apr-2011 Mar-12 Mar-12 0.02

    397.57

    567.76

  • 8/10/2019 Financial Model for power plant

    36/45

    Original Revised Actual Original Revised Actual Original Actual OrderDiffere

    Original

    Project Start Date Cost of the Project

    Project PurposeProject TitleProject Code

    Project Completion date

    Financing PlanEquity 30.0%

    Debt 70.0%

    (Rs. Crore)

    Loan

    Amount

    Interest

    Rate (%

    p.a.)

    Tenure of

    Loan

    (years)

    Moratorium

    Period

    (years)

    Loan Source

    Capital Expenditure proposed for

    FY 2010-11 as per Form 5.44.24 9.90 9% 20 0

    Internal

    Funding

    Capital Expenditure proposed for

    FY 2011-12 as per Form 5.47.86 18.33 11.5 13 0

    Internal

    Funding

    Capital Expenditure proposed for

    FY 2012-13 as per Form 5.432.97 76.94 11.5 13 0

    Internal

    Funding

    Capital Expenditure proposed for

    FY 2013-14 as per Form 5.447.63 111.13 11.5 13 0

    Internal

    Funding

    Capital Expenditure proposed for

    FY 2014-15 as per Form 5.423.24 54.22 11.5 13 0

    Internal

    Funding

    Capital Expenditure proposed for

    FY 2015-16 as per Form 5.426.92 62.82 11.5 13 0

    Internal

    Funding

    TOTAL 142.86 333.34

    Equity

    DebtProject Number Projects

    SOURCE OF FINANCING FOR CAPITAL EXPENDITURE

  • 8/10/2019 Financial Model for power plant

    37/45

    Year: Previous Year (FY2010-11)

    Audited (a) (

    Works

    Capitalised

    Interest

    Capitalised

    Expense

    Capitalised

    Total

    Capitalisation

    185.09 28.46 - 0.98 13.66 8.94 0.10 - 9.05

    - - -

    11.68 6.05 4.50 5.10 - - 5.10

    34.51 0.00 0.98 18.16 14.04 0.10 0.00 14.15

    Year: Current Year (FY2011-12)

    Actual though Un-audited (b) (

    Investment during

    the FY 11-12Capitalisation during the year

    ( Apr - Mar)

    ( Estimated)

    DPR Schemes -

    - 16.67 5.69 14.92 19.91 0.18 19.95

    Non DPR Schemes - - - -

    5.71 - 0.09 6.10 6.19 0.06 - 6.24

    22.38 5.78 21.03 26.10 0.23 - 26.19

    Total

    Expenditure

    Capitalised

    Opening

    CWIP

    01.04.11

    Project

    Approved Cost

    Cumulative

    Expenditure

    Incurred Total

    Capitalisation

    Project

    Approved Cost

    Project Number Project Title

    Project Title

    DPR Approved by MERC

    Total DPR

    b) Non-DPR Schemes

    Total Non DPR

    Reliance Infrastructure Limited - Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 5.4: CWIP- Projectwise details (only for Renovation and Modernisation Schemes)

    3

    Project Number

    Cumulative

    Expenditure

    Incurred

    Expenditure

    Capitalised

    Opening

    CWIP

    01.04.2010

    Investment during

    the FY 10-11

    Dahanu Thermal Power Station (DTPS)

    Capitalisation during the year

    3Works

    Capitalised

    Interest

    Capitalised

    Expense

    Capitalised

    TotalTotal Non DPR

    Total DPR

  • 8/10/2019 Financial Model for power plant

    38/45

  • 8/10/2019 Financial Model for power plant

    39/45

    (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)Order Difference

    April-March

    (Actual though

    un-audited)

    Estimated Estimated Estimated Estimated

    (a) (b) ('c) = (b)-(a) (d)(e)

    (f) (g) (h)1 Regulatory Equity at the beginning of the year (a) 534.39 535.14 -0.75 538.63 546.49 579.46 627.09 650.32

    2 Capitalised Expenditure (b) 14.15 70.66 -56.51 26.19 109.92 158.75 77.46 89.74

    3 Equity portion of capitalised expenditure ('c) = (30%*(b) 4.24 21.20 -16.95 7.86 32.97 47.63 23.24 26.92

    4 Regulatory Equity at the end of the year (d) = (a) + ('c) 538.63 556.34 -17.71 546.49 579.46 627.09 650.32 677.25

    Return Computation

    5 Return on Regulatory Equity at the beginning of the

    year(e) 74.81 74.92 -0.11 75.41 84.71 89.82 97.20 100.80

    7 Total Return on Regulatory Equity (e) 74.81 74.92 -0.11 75.41 84.71 89.82 97.20 100.80

    Note: RoE for the FY 2012-13 onwards has been calculated considering the RoE of 15.5%

    S.No. Particulars Reference

    FY 2010-11

    Reliance Infrastructure Limited - Generation (RInfra-G)Business Plan for FY 2011-12 to FY 2015-16

    Form 6: Return on Regulatory Equity

    Dahanu Thermal Power Station (DTPS)

  • 8/10/2019 Financial Model for power plant

    40/45

    Year: FY 2010-11

    Audited Actual (MU)

    Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

    Reliance Energy- Mumbai

    Distribution343.64 352.99 327.64 344.44 356.53 343.59 340.40 289.89 308.15 359.00 315.74 359.43

    4041.44

    Year: FY 2011-12:Actual adjusted with normative Aux Consumption (MU)

    Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

    Reliance Energy- Mumbai

    Distribution 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 334.58 4014.96

    Year: FY 2012-13: Estimated (MU)

    Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

    Reliance Energy- Mumbai

    Distribution 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 3786.01

    Year: FY 2013-14: Estimated (MU)Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

    Reliance Energy- Mumbai

    Distribution 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 3786.01

    Year: FY 2014-15: Estimated (MU)

    Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

    Reliance Energy- Mumbai

    Distribution 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 315.50 3786.01

    Year: FY 2015-16: Estimated (MU)

    Customer Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

    Reliance Energy- Mumbai

    Distribution 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 316.38 3796.54

    CustomerActuals Actuals

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 7: Sales ForecastDahanu Thermal Power Station (DTPS)

    Total

  • 8/10/2019 Financial Model for power plant

    41/45

    Year: FY 2010-11 (Rs. Crore)

    Fixed charges

    (Rs. Crore/year)

    Energy

    Charges

    (Rs./kWh)

    PLF

    Incentive

    Fuel

    surcharge

    per unit

    (Rs/kWh)

    Capacity

    allocated

    (MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenue

    from Fixed

    charges

    Revenue from

    Energy

    charges

    Revenue

    from Part 3

    of tariff

    Revenue

    from fuel

    surcharge

    Total

    RInfra-D

    Total 216.61 2.12 21.97 0.08 500.00 4041.44 216.61 856.79 21.97 33.95 1129.32

    Year: FY 2011-12 (Estimated)

    Fixed charges

    (Rs. Crore/year)

    Energy

    Charges(Rs./kWh)

    PLF

    Incentive

    Fuel

    surcharge

    per unit

    (Rs/kWh)

    Capacity

    allocated(MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenue

    from Fixedcharges

    Revenue from

    Energycharges

    PLF

    Incentive

    Revenue

    from fuelsurcharge

    Total

    Total 216.61 2.12 0.00 -0.45 500.00 4014.96 216.61 851.17 0.00 0.00 1067.78

    Form 8: Expected Revenue at Existing Tariff

    Business Plan for FY 2011-12 to FY 2015-16

    Dahanu Thermal Power Station (DTPS)

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Customer

    Customer

    Components of tariff Relevant sales & load/demand Full year revenue

    Components of tariffRelevant sales & load/demand

    data for revenue calculation

    Full year revenue

  • 8/10/2019 Financial Model for power plant

    42/45

    Year: Ensuing Years (2011-12) (Rs. Crore)

    Fixed charges (Rs.

    Crore/year)

    Energy

    Charges

    (Rs./kWh)

    PLF Incentive

    Fuel surcharge

    per unit

    (Rs/kWh)

    Capacity

    allocated

    (MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenue

    from Fixed

    charges

    Revenue from

    Energy

    charges

    PLF IncentiveRevenue from

    fuel surchargeTotal

    RInfra-D- Mumbai

    Distribution252.61 2.575 0.00 0.000 500 4014.96 252.61 1033.66 0.00 0.00 1286.28

    Total 252.61 2.575 0.00 0.00 500.00 4014.96 0.00 252.61 1033.66 0.00 0.00 1286.28

    Note: Th is is exclusive of the carr ying cost and revenue true up for the FY 09-10 and FY 10-11

    Year: Ensuing Years (2012-13)

    Fixed charges (Rs.

    Crore/year)

    Energy

    Charges

    (Rs./kWh)

    PLF Incentive

    Fuel surcharge

    per unit

    (Rs/kWh)

    Capacity

    allocated

    (MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenue

    from Fixed

    charges

    Revenue from

    Energy

    charges

    PLF IncentiveRevenue from

    fuel surchargeTotal

    RInfra-D- Mumbai

    Distribution304.01 2.647 0.00 2.647 500 3786.01 304.01 1001.98 0.00 0.00 1306.00

    Total 304.01 2.647 0.00 2.65 500.00 3786.01 0.00 304.01 1001.98 0.00 0.00 1306.00

    Year: Ensuing Years (2013-14)

    Fixed charges (Rs.

    Crore/year)

    Energy

    Charges

    (Rs./kWh)

    PLF Incentive

    Fuel surcharge

    per unit

    (Rs/kWh)

    Capacity

    allocated

    (MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenue

    from Fixed

    charges

    Revenue from

    Energy

    charges

    PLF IncentiveRevenue from

    fuel surchargeTotal

    RInfra-D- Mumbai

    Distribution326.08 2.691 0.00 2.691 500 3786.01 326.08 1018.99 0.00 0.00 1345.07

    Total 326.08 2.691 0.00 2.69 500.00 3786.01 0.00 326.08 1018.99 0.00 0.00 1345.07

    Customer

    Components of tariffRelevant sales & load/demand data for

    revenue calculation

    Full year revenue

    Customer

    Components of tariffRelevant sales & load/demand data for

    revenue calculation

    Full year revenue

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 9: Expected Revenue at Proposed Tariff

    Customer

    Components of tariffRelevant sales & load/demand data for

    revenue calculation

    Full year revenue

    Dahanu Thermal Power Station (DTPS)

  • 8/10/2019 Financial Model for power plant

    43/45

    Reliance Infrastructure Limited- Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 9: Expected Revenue at Proposed Tariff

    Dahanu Thermal Power Station (DTPS)

    Year: Ensuing Years (2014-15)

    Fixed charges (Rs.

    Crore/year)

    Energy

    Charges

    (Rs./kWh)

    PLF Incentive

    Fuel surcharge

    per unit

    (Rs/kWh)

    Capacity

    allocated

    (MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenue

    from Fixed

    charges

    Revenue from

    Energy

    charges

    PLF IncentiveRevenue from

    fuel surchargeTotal

    RInfra-D- Mumbai

    Distribution364.68 2.738 0.00 2.738 500 3786.01 364.68 1036.78 0.00 0.00 1401.45

    Total 364.68 2.738 0.00 2.74 500.00 3786.01 0.00 364.68 1036.78 0.00 0.00 1401.45

    Year: Ensuing Years (2015-16)

    Fixed charges (Rs.

    Crore/year)

    EnergyCharges

    (Rs./kWh)

    PLF IncentiveFuel surcharge

    per unit

    (Rs/kWh)

    Capacityallocated

    (MW)

    Enery sale

    (MU)

    Item 3

    (specify)

    Revenuefrom Fixed

    charges

    Revenue fromEnergy

    charges

    PLF IncentiveRevenue from

    fuel surchargeTotal

    RInfra-D- Mumbai

    Distribution386.17 2.787 0.00 2.787 500 3796.54 386.17 1058.28 0.00 0.00 1444.44

    Total 386.17 2.787 0.00 2.79 500.00 3796.54 0.00 386.17 1058.28 0.00 0.00 1444.44

    Customer

    Components of tariffRelevant sales & load/demand data for

    revenue calculation

    Full year revenue

    Customer

    Components of tariffRelevant sales & load/demand data for

    revenue calculation

    Full year revenue

  • 8/10/2019 Financial Model for power plant

    44/45

    (Rs. Crore)

    FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March

    (Actual)

    Order Difference

    Actual

    though un-

    audited

    Estimated Estimated Estimated Estimated

    (a) (b) (c) = (a) - (b) (d) (e) (f) (g) (h)

    1 Liabilities no longer required written back- - - - - -

    2 Rent - - - - - -

    3 Insurance Claim Received - - - - - -

    4 Connection/ Reconnection fees - - - - - -

    5 Sale Of Scrap 8.22 6.10 2.58 2.58 2.58 2.58

    6 Liquidated damages - - - - - -

    7 Interest Received - Employee Loans 0.42 0.39 0.39 0.39 0.39 0.39

    8 Interest on Contingency Reserve Inv - - - - - -

    9 Interest on Deferred Tax Liability Inv - - - - - -

    10 Fly Ash disposal administration & aother

    misc.1.65 1.86 5.00 5.00 5.00 5.00

    11 Others - - - - - -

    Total 10.29 5.00 5.29 8.35 7.97 7.97 7.97 7.97

    Reliance Infrastructure Limited - Generation (RInfra-G)

    Business Plan for FY 2011-12 to FY 2015-16

    Form 11: Other Income

    Dahanu Thermal Power Station (DTPS)

    ParticularsS.No. Reference

    FY 2010-11

  • 8/10/2019 Financial Model for power plant

    45/45

    (Rs. Crore)

    FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

    April - March Estimated Estimated Estimated Estimated Estimated

    Fuel ExpensesO&M expenses

    DepreciationInterest on long-te