Finals Construction Planning (1)

23
length 7.00 m width 6.00 m height, inside 5.00 m thickness of concrete wall 0.25 m thickness of bottom slab 0.25 m thickness of top slab 0.25 m reservoir bottom slab is 0.85 m from NGL wall 16mm dia grade 40 vertical bars spaced @ 0.15 m 12mm dia grade 40 horizontal bars spaced @ 0.20 m 12mm dia grade 40 top and bottom bars spaced @ 0.20 m Gravel bedding 0.1 m G1 Volume of Concrete: wall: 31.25 5000 php/cu.m top slab: 10.5 bot. slab: 10.5 total: 52.25 261250 Volume of excavation: 39.9 Volume of G1 for gravel beddi 4.62 Rebs: wall 1 & 2 16mm vertical bars 192 pcs @ 6.0 m 12mm hor. bars 104 pcs @ 6.0 m Additional 208 m 35 pcs @ 6.0 m total 12mm hor. bars 139 pcs @ 6.0 m wall 3 & 4 16mm vertical bars 164 pcs @ 6.0 m 12mm hor. bars 104 pcs @ 6.0 m Additional 52 m 9 pcs @ 6.0 m m 3 m 3 m 3 m 3 m 3 m 3

description

Final Construction Planning

Transcript of Finals Construction Planning (1)

Estimateslength7.00mwidth6.00mheight, inside5.00mthickness of concrete wall0.25mthickness of bottom slab0.25mthickness of top slab0.25mreservoir bottom slab is 0.85mfrom NGLwall16mm dia grade 40 vertical bars spaced @0.15mOC12mm dia grade 40 horizontal bars spaced @0.20mOC12mm dia grade 40 top and bottom bars spaced @ 0.20m OC both waysGravel bedding 0.1mG1Volume of Concrete:wall:31.25m35000php/cu.mtop slab:10.5m3bot. slab:10.5m3total:52.25m3261250Volume of excavation:39.9m3Volume of G1 for gravel bedding4.62m3Rebs:wall 1 & 216mm vertical bars192pcs @ 6.0 m12mm hor. bars104pcs @ 6.0 mAdditional length208m 35pcs @ 6.0 mtotal 12mm hor. bars139pcs @ 6.0 mwall 3 & 416mm vertical bars164pcs @ 6.0 m12mm hor. bars104pcs @ 6.0 mAdditional length52m9pcs @ 6.0 mtotal 12mm hor. bars113pcs @ 6.0 mtop and bottom slab12mm x-direction144pcs @ 6.0 mAdditional length72m12pcs @ 6.0 mtotal bars x-direction156pcs @ 6.0 m12mm y-direction124pcs @ 6.0 mAdditional length24841pcs @ 6.0 mtotal bars y-direction165pcs @ 6.0 mLength of distribution1600m200households4.5m 100mm dia main line75mm dia distribution lineStandard length of PPR pipe4mreq. pcs of 100 mm PPR (BELDIN BRAND)400pcsreq. pcs of 75 mm PPR (BELDIN BRAND)225pcs100 - 75 mm tee reducer (BELDIN BRAND)200pcs75mm elbow (BELDIN BRAND)800pcsGate Valves (KITZ BRAND)200pcsStandard water meter (ARAD BRAND)200pcs

Manpower & Equipment ScheduleWEEK 1WEEK 2WEEK 3WEEK 4WEEK 5WEEK 6WEEK 7WEEK 8WEEK 9WEEK 10WEEK 11ActivityManpowerEquipment123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475General requirementsApplying for PermitsProviding storage area and Power ConnectionLaborer33Site ConstructionEstablishing benchmarks/Layouting, Site Boundaries, and Site ClearingSurveyor, Laborer444ExcavationExcavation WorksLaborerJack Hammer33Backfilling & CompactingLaborerPlate Compactor22Gravel Bedding at 0.1 mLaborer22Ground levelingLaborer22MetalFabrication of Rebars (Slab and Wall)LaborerRebar Cutter and Bender22Concreting Installation of Reinforcing Bars for Bottom Slab and WallLaborer43Concreting of Bottom SlabLaborerConcrete Vibrator4CuringInstallation of Formworks for WallLaborer23Installation of Scaffoldings for WallsLaborer32Installation of Main Pipes 0.5 m from NGL for tank outletLaborerFusion Welding Machine4Concreting of WallsLaborerConcrete Vibrator5Curingstripping of formworks and ScaffoldingsLaborer4CleaningLaborer2Installation of PipessLaborerJack Hammer3333333333Excavation for Distribution Pipes 0.3 m from NGLLaborerJack Hammer2222222222Laying out of PipesLaborer2222222222Installation of Main Pipes LaborerFusion Welding Machine/ Generator4343433333Installation of Distribution Pipes LaborerFusion Welding Machine/ Generator3333332222Installation of Gate Valves and Water MeterLaborerFusion Welding Machine/ Generator1111111111Backfilling & CompactingLaborer334443Concreting Installation of Formworks for Top Slab Laborer3Installation of Reinforcing Bars for Top SlabLaborer3Concreting of Top SlabLaborer3CuringLaborerStripping of formworks for Top SlabLaborer4Testing of Pipe Connections for leakagesProject Manager22TroubleshootingProject Manager22Punch listingProject Manager222222

Coding SystemCODEActivity100General requirements100.01Applying for Permits100.02Providing storage area and Power Connection200Site Construction200.01Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing300Excavation300.01Excavation Works300.02Backfilling & Compacting300.03Gravel Bedding at 0.1 m300.04Ground leveling400Metal400.01Fabrication of Rebars (Slab and Wall)500Concreting 500.01Installation of Reinforcing Bars for Bottom Slab and Wall500.02Concreting of Bottom Slab500.03Curing500.04Installation of Formworks for Wall500.05Installation of Scaffoldings for Walls500.06Concreting of Walls500.07Cleaning500.08Installation of Formworks for Top Slab 500.09Installation of Reinforcing Bars for Top Slab500.1Concreting of Top Slab500.11Stripping of formworks600Installation of Pipes600.01Installation of Main Pipes 0.5 m from NGL for tank outlet600.02Excavation for Main Pipes 0.5 m from NGL600.03Excavation for Distribution Pipes 0.3 m from NGL600.04Laying out of Pipes600.05Installation of Main Pipes 600.06Installation of Distribution Pipes 600.07Installation of Gate Valves and Water Meter600.08Backfilling & Compacting700Testing of Pipe Connections for leakages800Troubleshooting900Punch listing

Schedule

WEEK 1WEEK 2WEEK 3WEEK 4WEEK 5WEEK 6WEEK 7WEEK 8WEEK 9WEEK 10WEEK 11CODEActivity123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475100General requirements0100.01Applying for Permits60.03351955310.03351955310.0335195531100.02Providing storage area and Power Connection510.28491620110.03351955310.03351955310.03351955310.03351955310.03351955310.03351955310.03351955310.03351955310.01675977650.2849162011200Site Construction0200.01Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing30.01675977650.01675977650.0167597765300Excavation0300.01Excavation Works20.01117318440.01117318440.0111731844300.02Backfilling & Compacting20.01117318440.01117318440.0111731844300.03Gravel Bedding at 0.1 m20.01117318440.01117318440.0111731844300.04Ground leveling20.01117318440.01117318440.0111731844400Metal0400.01Fabrication of Rebars (Slab and Wall)20.01117318440.01117318440.0111731844500Concreting 0500.01Installation of Reinforcing Bars for Bottom Slab and Wall20.01117318440.01117318440.0111731844500.02Concreting of Bottom Slab10.00558659220.00558659220.0055865922500.03Curing60.03351955310.01675977650.01675977650.0335195531500.04Installation of Formworks for Wall20.01117318440.01117318440.0111731844500.05Installation of Scaffoldings for Walls20.01117318440.01117318440.0111731844600.01Installation of Main Pipes 0.5 m from NGL for tank outlet10.00558659220.00558659220.0055865922500.06Concreting of Walls10.00558659220.00558659220.0055865922500.03Curing60.03351955310.02793296090.00558659220.0335195531500.11stripping of formworks and Scaffoldings10.00558659220.00558659220.0055865922500.07Cleaning10.00558659220.00558659220.0055865922600Installation of Pipes0600.02Excavation for Main Pipes 0.5 m from NGL100.05586592180.02234636870.03351955310.0558659218600.03Excavation for Distribution Pipes 0.3 m from NGL100.05586592180.02234636870.03351955310.0558659218600.04Laying out of Pipes100.05586592180.02234636870.03351955310.0558659218600.05Installation of Main Pipes 100.05586592180.03351955310.02234636870.0558659218600.06Installation of Distribution Pipes 100.05586592180.03351955310.02234636870.0558659218600.07Installation of Gate Valves and Water Meter100.05586592180.03351955310.02234636870.0558659218600.08Backfilling & Compacting60.03351955310.02234636870.01117318440.0335195531500Concreting 0500.08Installation of Formworks for Top Slab 10.00558659220.00558659220.0055865922500.09Installation of Reinforcing Bars for Top Slab10.00558659220.00558659220.0055865922500.1Concreting of Top Slab10.00558659220.00558659220.0055865922500.03Curing60.03351955310.02793296090.00558659220.0335195531500.11Stripping of formworks for Top Slab10.00558659220.00558659220.0055865922700Testing of Pipe Connections for leakages20.01117318440.01117318440.0111731844800Troubleshooting20.01117318440.01117318440.0111731844900Punch listing60.03351955310.03351955310.0335195531

Non Working Days1Planned Work

1793.35195530739.49720670397.82122905037.82122905036.703910614511.731843575413.407821229110.055865921814.525139664812.84916201122.23463687153.351955307312.849162011220.670391061528.491620111735.195530726346.927374301760.335195530770.391061452584.916201117397.76536312851001234567891011

13.3519553073212.8491620112320.6703910615428.4916201117535.1955307263646.9273743017760.3351955307870.3910614525984.91620111731097.765363128511100