Renewable Energy Method:
Solar Photovoltaic
Mentors:
Adrienne Gould-Choquette Imanol Gabellanes GoicoecheaUSURBIL
Presenters:
Burton Bellamy Andrew Sink
Iberian Partnership for Technician Excellence, Summer 2012
![Page 2: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/2.jpg)
Andrew Sink
• Studying Energy Technology at SCF
• Taken various courses related to Alternative Energy
• Electronics Hobbyist
• Very excited to be in Spain.
Iberian Partnership for Technician Excellence, Summer 2012
![Page 3: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/3.jpg)
Burton Bellamy
• Has an A.S. in Engineering Technology from HCC
• Interested in DIY projects, alternative energy included
• Pursuing a degree in Mechanical Engineering
Iberian Partnership for Technician Excellence, Summer 2012
![Page 4: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/4.jpg)
Project Scope
• We will be using what is known as a “Grid-tie” system, which allows the PV panels to interface with the electrical grid.
• We are going to show some of the technology and calculations that go into building a system such as this.
Iberian Partnership for Technician Excellence, Summer 2012
![Page 5: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/5.jpg)
Off Grid Systems
Iberian Partnership for Technician Excellence, Summer 2012
• Battery Banks, a good idea for everybody?
24 kWh System$3,500Would support our house For only 1 day.
![Page 6: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/6.jpg)
Iberian Partnership for Technician Excellence, Summer 2012
An example of a Grid Tie PV system
![Page 7: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/7.jpg)
Project Scope
• Site Plan• Monthly House Electrical Loads• Utility Costs• System Sizing• Panel Selection & Connection• Panel Calculations• Net Metering• Costs & ROI
Iberian Partnership for Technician Excellence, Summer 2012
![Page 8: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/8.jpg)
House Specifications
• 3-bed, 2-bath, 2,000 sq. ft., located in Tampa, FL.
• Single story, 5,000 gal. pool, 2 adults, 2 children.
• The pitch of the roof is 25.5 degrees, the front door is facing NE.
• Calculations made assuming the month of January.
Iberian Partnership for Technician Excellence, Summer 2012
![Page 9: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/9.jpg)
Household Electrical Loads
• The basic needs in an average Florida home.• The kWh they consume monthly.• Energy efficient products.• Total monthly electrical load is 432.6 kWh.
Iberian Partnership for Technician Excellence, Summer 2012
![Page 10: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/10.jpg)
Household Electrical Loads
Iberian Partnership for Technician Excellence, Summer 2012
![Page 11: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/11.jpg)
Efficiency Calculations
• Tilt= tilt-(41-Lat)
• Lat: 28, Tilt:83
• Tilt=83-(41-28)=70
• 75% Efficiency
Iberian Partnership for Technician Excellence, Summer 2012
![Page 12: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/12.jpg)
Efficiency Calculations
• Leaves us with 4140W (4.1kW)• 4.1kW x 5.6(MPH) x 31= 712kWh/m
Iberian Partnership for Technician Excellence, Summer 2012
![Page 13: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/13.jpg)
Panel Selection
• Schott Poly 230
• 230 Watt output
• 30 Volts, 7.66 Amps
• Superb Warranty
Iberian Partnership for Technician Excellence, Summer 2012
![Page 14: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/14.jpg)
System Sizing
• Total of 237.6 sq. ft. of usable space on each side of the roof.
• We used 2, creating a usable area of 475.2 sq. ft.
• 12 panels on each side of the roof
• Orientation/Inclination
• Panels are 5.57 x 3.3 ft. in size.
Iberian Partnership for Technician Excellence, Summer 2012
![Page 15: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/15.jpg)
Panel Connection
• Series/Parallel Combination
• 3 groups of 8 in parallel.
• Each group provides 30 Volts, 61.28 Amps.
• Total when placed in series is 90 Volts, 61.28 Amps
Iberian Partnership for Technician Excellence, Summer 2012
![Page 16: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/16.jpg)
Inverter Technology
• Outback Inverter 6000W
• Provides an all-in-one solution for power conditioning. Regulator/Conditioner/AC Inverter
• 120V grid tie-in output, regulated voltage/current
• Provides a small battery back-up
Iberian Partnership for Technician Excellence, Summer 2012
![Page 17: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/17.jpg)
Component CostsSchott Poly 230 @ $400 ea. (24) $9,600
Outback Inverter 6000W @ $9,400 (1) $9,400
6 AWG Wire, 500 Ft. @$326 (1) $326
Mounting Hardware @ $190 (12) $2,280
Iberian Partnership for Technician Excellence, Summer 2012
Total System Cost: $21,606
![Page 18: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/18.jpg)
Net Metering
• A brief introduction to Net Metering
• Replace 2 counters with 1 single Bi-Directional grid tie-in Meter.
• Now available through all Florida Utilities
Iberian Partnership for Technician Excellence, Summer 2012
![Page 19: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/19.jpg)
Total Costs
• Cost of installed system : $21,606
• Cost of energy consumed/year: $467.20
• Projected price of energy generated/year: $758.79
• Price per kWh: $0.09
Iberian Partnership for Technician Excellence, Summer 2012
![Page 20: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/20.jpg)
Rebate and Incentive Programs
• Florida Renewable Energy Technologies and Energy Efficiency Act
• Provides $4 a watt, maximum of $20,000
• Federal Program
• Allows for 30% to be refunded as a tax credit.
Iberian Partnership for Technician Excellence, Summer 2012
![Page 21: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/21.jpg)
Return of Investment (ROI)
• Formula = Investment / Yearly Income
• Investment Before Rebate = $21,606
• Investment After Rebate = $1,606
• ROI = ~2 Years
Iberian Partnership for Technician Excellence, Summer 2012
![Page 22: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/22.jpg)
Conclusion
• Sensible amount of electrical loads• Above 100% power generation• Simple grid tie-in system• Very low amount of maintenance • Very low Return of Investment time
A very good decision!
Iberian Partnership for Technician Excellence, Summer 2012
![Page 23: Final Project](https://reader035.fdocuments.net/reader035/viewer/2022062721/568137ef550346895d9fa9c7/html5/thumbnails/23.jpg)
Iberian Partnership for Technician Excellence, Summer 2012